38-050 (24) DIETZ&COMPANY ARCHITECTS,INC. /S
TRANSMITTAL
TO: Anthony Patillo February 1,2006
Building Commissioner
Northampton Building Department
CC: File RE: Village at Hospital Hill—
Phase
- Project No.20144
FROM: Marc Sternick AIA
® ATTACHED,via hand delivery
❑ FAXED,number of pages not including this page:2
COPIES DATE CSI No. DESCRIPTION 17 Hampden Street
I 1/31/06 Signed Certificates of Controlled Springfield,MA 01103
Construction/,Substantial Completion from
Architect,Civil Engineer,Structural Engineer, telephone
Mechanical Engineer&Electrical Engineer for (413)733-6798
Nurse's Home Renovation.
facsimile
(413)732-4385
e-mail
office@dietarch.com
REMARKS
Tony—
Attached please find the signed Certificates of Controlled Construction/Substantial
Completion from Architect, Civil Engineer,Structural Engineer, Mechanical Engineer&
Electrical Engineer for Nurse's Home Renovation. To my knowledge,all life safety issues
have been addressed and the building is safe for occupancy. However,we do not expect
there to be any occupants in this building until late February,at the earliest. We expect the
remainder of the work to be complete by then.
Thank you,
Marc Sternick
Senior Project Architect/Vice President
shop drawings logged by:
v:U0144-village at hospital hi11108-ca\r-2006-02-01-sustantial compl certs_n home_trn.doc
D I E T Z
t
FINAL CONSTRUCTION CONTROL
PROJECT NUMBER 20144
PROJECT TITLE Village at Hospital Hill
PROJECT LOCATION Northampton, Massachusetts
NAME OF BUILDING Nurses' Home
SCOPE OF PROJECT Complete renovation into 22 new dwelling units
In accordance with Section 116.0 of the 6th Edition', Massachusetts State Building Code, I,
Marc Sternick Registration No. 8516 being a Registered Professional Architect, hereby certify
that I have prepared or directly supervised the preparation of all design plans, computations and
specifications concerning:
ENTIRE ❑ ARCHITECTURAL ❑ STRUCTURAL ❑
PROJECT
MECHANICAL ❑ FIRE PROTECTION ❑ ELECTRICAL ❑
OTHER (Specify) ❑
For the above named project and that, to my knowledge, such plans, computations and
specifications meet the applicable provisions of the Massachusetts State Building Code and all
acceptable engineering practices for the proposedproject.
I further certify that I, or my designated representative, have performed the necessary
professional services and was present on the construction site on a regular and periodic basis to
determine that the work was proceeding in accordance with the documents approved for the
building permit and was responsible for the following as specified in section 116.2.2:
1. Review, for conformance to the design concept, shop drawings, samples and other
submittals, which are submitted by the contractor in accordance with the
requirements of the construction documents.
2. Review and approval of the quality control procedures for all code-required controlled
materials.
3. Be present at intervals appropriate to the stage of construction to become, generally
familiar with the progress and quality of the work and to determine, in general, if the
work is being performed in a manner consistent with the constructio documents.
Upon completion of the work, I herewith submit a final report, with the proje u ch list attached
hereto, as to the satisfactory completion and readiness of th ct f oc
Signature
Subscribed and sworn to before me this _ Day of 1 — ACA
NOTA14Y PUBLIC
( COMMONWEALTH OF MASSACHUSETTS
tary Public My commission expires My COMMISSION EXPIRES JUNE 25,2010
State of In the County of
OF
SECONDARY FINAL CONSTRUCTION CONTROLew
,9A
p ��
PROJECT NUMBER 20144
PROJECT TITLE Village at Hospital Hill
PROJECT LOCATION Northampton, Massachusetts
NAME OF BUILDING Nurses' Home
SCOPE OF PROJECT Complete renovation into 22 new dwelling units
In accordance with Section 116.0 of the 6th Edition, Massachusetts State Building Code, I, (`nt�tt�c� pPKtc��D
____________I Registration No.3Z4s1__ being, a Registered Professional Engineer, hereby
certify that I have prepared or directly supervised the preparation of all design plans,
computations and specifications concerning:
ENTIRE ❑ ARCHITECTURAL ❑ STRUCTURAL ❑
PROJECT
MECHANICAL ❑ FIRE PROTECTION ❑ ELECTRICAL ❑
OTHER (Specify) 10CSV%C. 5 %7ec.. � _% V6,0
For the above named project and that, to my knowledge, such plans, computations and
specifications meet the applicable provisions of the Massachusetts State Building Code and all
acceptable engineering practices for the proposed project.
further certify that I, or my designated representative, have performed the necessary
professional services and was present on the construction site on a regular and periodic basis to
determine that the work was proceeding in accordance with the documents approved for the
building permit and was responsible for the following as specified in section 116.2.2:
1. Review, for conformance to the design concept, shop drawings, samples and other
submittals, which are submitted by the contractor in accordance with the requirements
of the construction documents.
2. Review and approval of the quality control procedures for all code-required controlled
materials.
3. Be present at intervals appropriate to the stage of construction to become, generally
familiar with the progress and quality of the work and to determine, in general, if the
work is being performed in a manner consistent with the construction documents.
Upon completion of the work, I herewith submit a final report, with the project punch list attached
hereto, as to the satisfactory completion and readiness of th r ject f oc anc .
Signature
Subscri d sworn 09
be ore me this 31`'T Day of Uy A0�
Notary Pu is - My commission expirest='E BZ U A rC14 18 Zo I�
State of In the County of 1AA�(P�u '
SECONDARY FINAL CONSTRUCTION CONTROL
PROJECT NUMBER 20144
PROJECT TITLE Village at Hospital Hill
PROJECT LOCATION Northampton, Massachusetts
NAME OF BUILDING Nurses' Home
SCOPE OF PROJECT Complete renovation into 22 new dwelling
units
In accordance with Section 116.0 of the 6th Edition, Massachusetts State Building Code, I,
Charles P. Sharples, Registration No. 28940 being a Registered Professional Engineer, hereby
certify that I have prepared or directly supervised the preparation of all design plans,
computations and specifications concerning:
ENTIRE ❑ ARCHITECTURAL ❑ STRUCTURAL ❑
PROJECT
MECHANICAL ® FIRE PROTECTION ❑ ELECTRICAL ❑
OTHER (Specify) ❑
For the above named project and that, to my knowledge, such plans, computations and
specifications meet the applicable provisions of the Massachusetts State Building Code and all
acceptable engineering practices for the proposed project.
I further certify that I, or my designated representative, have performed the necessary
professional services and was present on the construction site on a regular and periodic basis
to determine that the work was proceeding in accordance with the documents approved for the
building permit and was responsible for the following as specified in section 116.2.2:
1. Review, for conformance to the design concept, shop drawings, samples and other
submittals, which are submitted by the contractor in accordance with the
requirements of the construction documents.
2. Review and approval of the quality control procedures for all code-required
controlled materials.
3. Be present at intervals appropriate to the stage of construction to become, generally
familiar with the progress and quality of the work and to determine, in general, if the
work is being performed in a manner consistent with the construction documents.
Upon completion of the work, I herewith submit a final report, with the project punch list
attached hereto, as to the satisfactory completion and readirAss of the project for occupancy.
Signature
S bscribed and sworn to before me this �/ Day of
Z", L X'/_1
Notary POwc My commission expires May 19, 2011
State of Massachusetts In the County of Hampden
SECONDARY FINAL CONSTRUCTION CONTROL
PROJECT NUMBER 20144
PROJECT TITLE Village at Hospital Hill
PROJECT LOCATION Northampton, Massachusetts
NAME OF BUILDING Nurses' Home
SCOPE OF PROJECT Complete renovation into 22 new dwelling
units
In accordance with Section 116.0 of the 6th Edition, Massachusetts State Building Code, I,
Paul T. Babin, Jr.. Registration No. 33979 being a Registered Professional Engineer, hereby
certify that I have prepared or directly supervised the preparation of all design plans,
computations and specifications concerning:
ENTIRE ❑ ARCHITECTURAL ❑ STRUCTURAL ❑
PROJECT
MECHANICAL ❑ FIRE PROTECTION ❑ ELECTRICAL
OTHER (Specify) ❑
For the above named project and that, to my knowledge, such plans, computations and
specifications meet the applicable provisions of the Massachusetts State Building Code and all
acceptable engineering practices for the proposed project.
I further certify that I, or my designated representative, have performed the necessary
professional services and was present on the construction site on a regular and periodic basis
to determine that the work was proceeding in accordance with the documents approved for the
building permit and was responsible for the followiing as specified in section 116.2.2:
1. Review, for conformance to the design concept, shop drawings, samples and other
submittals, which are submitted by the contractor in accordance with the
requirements of the construction documents.
2. Review and approval of the quality control procedures for all code-required
controlled materials.
3. Be present at intervals appropriate to the stage of construction to become, generally
familiar with the progress and quality of the work and to determine, in general, if the
work is being performed in a manner consistent with the construction documents.
Upon completion of the work, I herewith submit a final report, with the project punch list
attached hereto, as to the satisfactory completion and readine pr ject for occupancy.
Signature
Subscribed and sworn to before a this Day of r v
cil
Notary P My commission expires May 19, 2011
State of Massachusetts In the County of Hampden
SECONDARY FINAL CONSTRUCTION CONTROL
PROJECT NUMBER 20144
PROJECT TITLE Village at Hospital Hill
PROJECT LOCATION Northampton, Massachusetts
NAME OF BUILDING Nurses' Home
SCOPE OF PROJECT Complete renovation into 22 new dwelling units
In accordance with Section 116.0 of the 6th Edition, Massachusetts State Building Code, I,
, Registration No. being a Registered Professional Engineer, hereby
certify that I have prepared or directly supervised the preparation of all design plans,
computations and specifications concerning:
ENTIRE ❑ ARCHITECTURAL ❑ STRUCTURAL
PROJECT
MECHANICAL ❑ FIRE PROTECTION ❑ ELECTRICAL
OTHER (Specify) ❑
For the above named project and that, to my knowledge, such plans, computations and
specifications meet the applicable provisions of the Massachusetts State Building Code and all
acceptable engineering practices for the proposed project.
I further certify that I, or my designated representative, have performed the necessary
professional services and was present on the construction site on a regular and periodic basis to
determine that the work was proceeding in accordance with the documents approved for the
building permit and was responsible for the following as specified in section 116.2.2:
1. Review, for conformance to the design concept, shop drawings, samples and other
submittals, which are submitted by the contractor in accordance with the requirements
of the construction documents.
2. Review and approval of the quality control procedures for all code-required controlled
materials.
3. Be present at intervals appropriate to the stage of construction to become, generally
familiar with the progress and quality of the work and to determine, in general, if the
work is being performed in a manner consistent with the construction documents.
Upon completion of the work, I herewith submit a final report, with the project punch list attached
hereto, as to the satisfactory completion and readiness of the project for occupancy.
Aiga/naature2 L A��
Subscribed and sworn to before me thist Day of ► `Z G' d(�
C' �
Notary P blit _ _ My commission expires � Zi�U
State of /�'
In the County of �L( L1,(�1`-