Loading...
38-062 JAN 26 2006 1 : 23 PM FR WESTERN BUILDERS I NC467 9559 TO 1413tU r1e fL r . VJO/ U,3 -�� ALLIED TESTING LABORATORIES, INC. 1 15 St.George Road • Springfield,Massachusetts 0 1104 Phone:(413) 736-1846 Fax: (4 l 3) 736-1838 COMPRESSIVE STRENGTH OF CYLINDRICAL CONCRETE SPECIMENS—ASTM C39 REPORT NO: CLIENT: Western Builders PROJECT: New SRO Housing -- Smith College, 180-182 Earle Street, Northampton, Ma LOCATION OF CONCRETE PLACEMENT: Full Basement ( Mechanical. Room) Walls REPORTED TO: Western Builders, At t: Mike Flanders D'A`TE. 1/24/06 CONCRETE CLASS 3000 Mixture Weights per cubic yard Cernent (lbs) Fine Aggregate (lbs) Coarse Aggregate (lbs) Water (gals) Admixture {oz} LABORATORY NO. L-323 Specimen No. A. Slump (in) s" Entrained Air Content (%) 4.8% Concrete Temp. 58°F Date Sampled 1/17/06 Date Received 1/18/06 Date Tested 1/24/06 Age at Test (days)7 Dimensions (in) 6.12 Area (sq in)28.3 Wgt. of Specimen (lbs) 29.0 RECEIVED Total Load (lbs) 86,070 .IdN 9, 6 7006 COMPRESSIVE STRENGTH (psi) 3040 WESTERN BWDERS Raemarks. Respecttully submitted, ALLIED TESTING LABORATORIES , INC. Copy. 164-614Ar By: Richard Bellucci President �c�c TOTAI PArF . Rq 3kK JAN 26 2006 1 : 22 PM FR WESTERN BUILDERS INC467 9559 TO 141;3b8e1eee r- . VJC-/VJ1J ALLIED TE TING LABORATORIES, INC. I 15 St. George Road a Springfield,Massachusetts 0 1104 Phone:(413) 736-1846 Fax (413) 736-1838 CONCRETE FIELD REPORT NO. 3 DATE! 1/20/06 Client: Western Builders Project: New SRO Housing - Smith College, 180-182 Earle Street, NOrthamptan, Ma. Contractor; Western Buildings ' Producer: Construction Service Location of Concrete Placement: Footing North End of Building Reported to: Western Builders, Attention: MIke Flanders CYLINDER FABRICATION - ASTK C31 DATE CAST; 1/20106 IDENTIFICATION TIM TRUCK CLASS SLUMP EXACT LOCATION A,B,C,D 13:30 270 3000 271 footing North End of Building SLUMP TESTS - ASTM 0143 AIR CONTENT TESTS ASTM 0173 or 0231 Tame' Truck Slump Time Truck No. Air Content (Z) 13:30 270 13:30 270 4.4% AMBIENT TEMPERATURE CONCRETE TEMPERATURE ASTM 01.064 Time Temperature Time Truck No. Temperature 13:30 �50°F 13-.30 270 670F Wather: Sunny Temp: 50's ,NO. Yds. ; 11 Respectfully submitted, E FOE) ALLIED TESTING LABORATORIES, INC. By: Richard Belluc-ci WESTERN suiLDERS President MEMBER., A.S.T.M. / A.C.1. / A.WS. / A.&N.T. M.C.I.B. / I.A.C-R.S. JAN 26 20OG 1 : 22 PM FR WESTERN BUILDERS INC46e �bn� IU 14ijnueia (c WE STERN BUT LDERS GENERAL CONTRACTORS & CONSTRUCTION MANAGERS To: SRO Housing/Smith College Froject Team- Inspections Company: Charlie Conant- Smith College, Jody Barker—(TDA)Architect, Tony Patillo—City ofNorthampton, Dave Dietz-Dietz Construction, Valley Concrete Service,Paul O'Conner-Monadnock Engineering Mike Guy—Western Builders, Inc. Phone- N/A Fax: As Shown From. Mid Flanders Phone, (413)467-9171 Fax; (413)467-9559 Date- 1/26/2006 Time: 1:04 PM Pages(including cover): 3 Regarding: SRO Housing— Smith College-Earle Sweet Project Inspection Reports The following test inspection reports were received from Allied Testing Services for the SRO Housing Project— 180 Earle Street,Northampton,MA_ Captioned Inspection Report:J;gqcrete Report#3 1/20/2006 Compressive Streog!Lx ftpgrt#2 1/24/2006 1. Charlie Conant Smith College (413) 585—2398 Fax 2. Jody Barker TDA (413) 582—9882 Fax 3. Dave Dietz Dietz Construction (413) 527—3370 Fax 4, Mike Guy Western Builders (413) 584—0492 Fax 5. Tony Patillo Building Dept. (413) 587— 1272 Fax 6. Paul O'Connor Monadnock Eng. (603)899—9714 Fax 7. Russell/Jeff Valley Concrete (413) 648—.5321 Fax Please call or e-mail me with any questions, concerns, or comments regarding testing reports, Mike Flanders Western Builders, Inc, CC, Project Inspections File: SRO Housing Project File(Allied Testing) 73 Pleasant Street,P.O.Box 587 Qmby,MA 01033 Phone (413)467-9171 (413)467-9539 E-Mail mflanders@vAmternbuilders-com JAN 26 2006 1 : 11 PM FR WESTERN BUILULHb 1NU4br bnnb 1U 1410D0 r1crc ,ALLIED TESTING LABORATORIES, INC. 115 St George.Road . Spri ield,Massachusetts 01104 Phone:(413) 736-1816 Fax(4(3) 736-1838 COMPRESSIVE STRENGTH OF CYLINDRICAL CONCRETE SPECIMENS—ASPM C39 PORT NO: 1 SENT- Western Builders EJECT: New SRO Ht3using -- Smith College, 180-182 Earle Street, Northampton, Ma. CATION 0E CONCRETE PLACEMENT: Footing for Mechanical Room ( Full Basement) PORTED TO: Western Builders, Att: Mike Flanders DATE= 1/18/06 NCR;ETE CLASS 3000 ctureVeights per cubic yard Cement (mS) RECEIVED Fine Aggregate (lbs) Coarse Ayyregate Obs) �006 Water (gals) Admixture (oz) ,BORATORY NO. L-203 nirnen No. A [rnp (in) 41 trained Air Content N) 4.7% ncrete Temp: 60°F to SaImp(ed 1/11106 to Riceived 1/12/06 to Tested 1118/06 e at Test (days) 7 pensions (in) 6%12 ea (sq in), 28.3 rt.of.,Specimen (lbs) 28.5 tal Load (lbs) 69,875 )MPRESSIVE STRENGTH (psi) 2470. :marks- Respcetfully submitted, ALLIED TESTING LAZORA,TORI£S, INC. $y: Richard ellucci spy. President * TOTAL PAGE . 03 ** JAN 26 2006 1 : 11 PM FR WESTEKN BU1LUtKU 1NU4br ZJZ3D-J iv w � ALLIED TESTING LABORATORIES, INC. 115 St,George Road . Springfield,Massachusetts 01 104 Phone:(413) 736-1846 Fax:(413) 736-1838 CONCRETE FT.ELD REPORT,NO. 2 = DATE:_ .Client. Western Builders Project: New SRO Housing - Smith College, 180-182 Earle-Steeet, Northampton, Ma. ContractOr: WZstern Builders Producer: Construction Service Location of Concrete Placement: Full Basement (Mechanical Room) Walls Reported to: Western Builders, Attention: Mike Flanders CYLINDER FABRICATION - ASTM C 31 DATE CAST: 1117/06 IDENTIFICATION TIME TRUCK CLASS SLUMP EXACT LOCATION A,B.,C,D 13:1.0 263 3000 S" Full Basement ( Mechanical. Roam) Walls SLUMP TEST -- ASTM 0143 AIR CONTENT TESTS ASTM 0173 or C231 Time. Timck 51umP Time Truck No. . Air Content (z) 13:10 263 5" 13:10 263 4.8% AM TENT TE EER XM CONCRETE TEMPERATURE - ASTM 01064 Time Temperature Time Truck No. Temperature 13:10 360F 13:10 263 58°F REINFORCING INSPECTION Rkinforcing incorporated in today's concrete placement was found to be satisfactory for, size, quanfiigy:, cleanliness, properly supported, adequately tied and spaced as required in accordance with Drawing No. R01. WeaCher: Cloudy Temp: 30's Nccb.AW. : 53 Respectfully submitted, �+ ++ ALLIED TESTING LABORATORIE5, INC. JAN 2 3 2606 WESTERN DUILDERS By: Richard Bellucci President MEMBER: A.S.T.M_ / A_0. A.W,S. / A.S.N.T. / M.CJE B. / LA.C.R.S. JAN 26 Z00b I 149 t1m t-K WLb I LK11 nu i 4_VCMZ3 I WESTERN B U ILDER. S GENERAL CONTRACTORS & CONSTRUCTION MANAGERS TO, SRO Housing/Smith College Project Team -Inspections Company: Charlie Conant-Smith College, Jody Barker-(IDA)Architect, Tony Patillo-City of Northampton,Dave Dietz-Dietz Construction, Valley Concrete Service, Paul O'Conner-Monadnock Engineering Mike Guy-Western Builders, Inc, Phone: N/A Fax- As Shown From- Mike Danders Phone: (413)467-9171 Fax: (413)467-9559 Date: 1/26/2006 Time: 1-04 PM Pages(including cover)- 3 Regarding: SRO Housing-Smith College-Earle Street Project Inspection Reports The following test inspection reports were received from Allied Testing Services for the SRO Housing Project- 180 Earle Street, Northampton,MA, Captioned Inspection Report:Concrete Report#2 1/17/2006 Compressive Streap-th Report#1 1/18/2006 Distribution: 1. Charlie Conant Smith College (413) 585-2398 Fax 2. Jody Barker TDA (413) 582-9882 Fax 3. Dave Dieu Dietz Construction (413) 527-3370 Fax 4. Mike Guy Western Builders (413) 584-0492 Fax 5. Tony Patillo Building Dept- (413) 587- 1272 Fax 6. Paul 0"Connor Monadnock Eng, (603) 899-9714 Fax 7. Russell/Jeff Valley Concrete (413)648-5321 Fax Please call or e-mail me with any questions, concerns, or corurneuts regarding testing reports, Mike Flanders Western Builders, Inc. CC- Project Inspections File: SRO Housing Project File(Allied Testing) 73 Pleasant Stxvct,P.O.Box$87 Granby,MA 01033 Phom (413)467-9171 (413)467-9559 FMail niflanders#weskm*uilders.com JAN 26 2806 12 : 48 PM FR WESTEKN BU1LULKb IM-40 ( ZJDD7 1kj Meeting Minutes Job: 2045-003 Smith Colleg"RO Housing Meeting: Owner/ArchiteoVOC#7 .The preceding is assumed to be a complete and correct account of the items discussed, directions given, and conclusions drawn, unless this office is notified to the contrary by the next regular meeting. If no notification is received, these minutes will be deemed an accurate account of the meeting. Prepared by. Mike Flanders Copy To: Paul Ugolini, Western Builders, 'Pony Patillo, Building Inspect Page 3 of 3 TOTAL PAGE . 04 JAN 26 2086 12 : 48 PM FR WESTERN MU1LVEKS 1NL:4b ( �DZ)7 IU f Meeting Minutes Job, 2005-003 Smith College-SRO Housing Meeting: Owner/Architect/GC#7 *rn Description Responsible Due Date Closed 7-2 Reviewed bulkhead issue regarding height of Jody Barker,Thomas Doglas Arc 1/26106 r specified unit. need modification 7-3 Confirmed receipt of Concrete Report 01 as Mike Flanders 1124106 listed 7.4 WB distributed updated contact list to include Mike Flanders 1124106 E Karen's, Paul's,&Lindgren information 7-5 WS reviewed with Charlie S Jody a substitute Mike Flanders 1124/06 E waterproofing drainage system for project 7-6 Mike Guy requested info on electrical feed Mike Guy,Western Bulders 1124/06 r location,as well as Telicable. MG submit FRF! 7-7 have nietz to follow-up on parking tot catch David Dietz 1126/06 r basin Cost 7-8 Dave Dietz to follow-up on formal submittal on David Dietz 1/26106 r basin and duplex pump system 7-9 Nicole Weiss to submit sketch on floor framing Nicole Weiss(Lindgren&Sharp 1/31106 r at joist piping area at the front entry 7-10 WB to research if Shawnee can provide Mike Flanders 1126106 13 bulkhead door extensions for depth modification 7-11 CO Log reviewed, all approved with exception Mike Flanders 1!31!06 C" of CE#5&GE#6, MF to provide samples of flashing 7-12 Mike Guy reported that the build dept. has had Mike Guy,Western Buidem 1/31/06 r- two inspections, 1 more redq'd before backfill 7-13 Mike Guy has suggested to remove one trunk Jody Barker,Thomas Doglas Arc 1131106 r line or more from tree overhanging foundation, TDA review 7-14 WB requests next weeks meeting to be moved Mike Flanders 1127!06 r to 11 AM -CC, ICL, JB, MG Confirm Meeting adjourned at 11:07. Next meeting at 11:00 on Tuesday,January 31,2006. Page 2 of 3 JAN 26 2006 12 : 47 PM FK WF5IEKN !3u1LVLKS 114140 7JJ7 +. Western guilders, irle_ t Pwnent street Gnvft,MA 01033.0587 Ph;(.413).467-9171 Meeting Minutes Job: 2006-003 Smith College-SRO !-sousing Meeting: Owner/Architect/GC#7 Location: 180 Earle Street Date: 1124/06 Northampton, MA 01063 Start Time: 10:00 Attendees Attended W; Charlie Conant, Smith College W Jody Barker,Thomas Doglas Arc F Karen Leveiile, HAP, Inc l- Mike Gagnon, Fuss &O'neiil r Paul O'Connor, Monadnock Eng 7 Mike Guy,Western Sulders(Westem Builders) Fi Alike Flanders(Western Builders) r David Dietz(Dietz Construction Corp) r !Nicole Weiss(Lindgren&Sharp C Dan Dickson(Statewide Mechanical Contract-) Iteral Description Responsible Due pate Closed Old Business 3-11 Charlie would tike to see the water table Jody Barker,Thomas Doolas Arc 113106 r elevations from F&O Geotechnical report 5-10 Reviewed the additional flashing requirement Mike Guy,Western Buiders 1/10106 r with Charlie&Jody with new details 541 RFI regarding exterior basin, needs completion Mike Flanders 1111106 17. to Jody Barker,the to Mike Gagnon 6-1 WS-Complete additional pricing on Flashing, Mike Flanders 1/24106 ,r door, pumps,& basin 6-5 Mike Guy will modify framing at front entry areaMike Guy.Western Buiders 1117106 r to keep piping high for pitch max 6-7 Mike Guy will construct a gas piping chase due Mike Guy,Western Buiders 1117106 E to new location in the basement FRC 8-12 WB to update CO log and RFI-FRFI log for nextMike Flanders 1124106 !r meeting 6-13 WB will be looking for approved Truss and Paul O'Connor,Monadnock Eng 1124106 r Beam drawings from Paul O'Connor as soon as possible. Now Business 7-1 Reviewed Submittal Log, RFI&FRFI Logs.& Paul O'Connor, Monadnock Eng 1/25106 r' schedule as updated. Items needed(Joist& truss shops) Page 1 or 3 JAN 26 200b 1;:f : 4 e FM rK wts i tK14 nU1LUCM� _- - WESTERN BUILD E R S GENERAL CONTRACTORS & CONSTRUCTION MANAGERS To: SRU Housing/Smith College Project Team Company: Smith College, Jody Barker—(TDA) Architect,Dietz Construction, Statewide Mechanical Contractors, T&M Electric,Warehouse Mechanical City of Northampton, Hap mousing Inc., Western Builders, Fuss&O'Neill Monadnock Engineering, Lindgren & Sharples Phone: N/A Fax: As Shown From: Mike Flanders Phone: (413)467-9171 Fac: (413)467-9559 Date: 1/26/2006 Time: 9:21 AM Pages (including cover): 4 Regarding: SRO Housing— Smith College- Earle Street Project Meeting Notes#7 Attached are the meeting notes from the SRO/Smith College Earle Street Project meeting of 1/24/2006, Please call with any questions or comments, Distribution as follows: , Charlie Conant Smith College E -Mailed 2. Jody Barker TDA E -Mailed 3_ Dave Dietz Dietz Construction E -Mailed 4. .teff McAdoo T&M Electric (413) 684— 8987 Fax 5, Dan/John Dickson Statewide Meeh, (41.3) 734—9472 Fax 6. Paul Krause Warehouse Mech. (413) 535 --2486 Fax 7. Mike Guy Western Builders (413) 584—0492 Fax 8. Tony Patillo Building Dept. (413) 587— 1272 Fax 9, Karen Leveille Hap Housing E-Mailed 10, Mike Gagnon Fuss& O'Neill E-Mailed l 1. Paul O'Connor Monadnock En,,. E-Mailed 12, Randy Johnson Hap/Her Inc. .l -Mailed 13. Nicole Weiss Lindgren& Sharples E-Mailed CC: project Meeting Minutes File: SRO Housing Project File 73 Pleasant Street, P.O. Box 587 61=by, MA 01033 Phone (413)467-9171 (4I3)467-9559 E-Mail n-tflanders(irwcsternlibuilders.com llt1. Ib Luuo � .143 HVI rK WCO I r-Mll OU1L-V=0 1111-140f 0,1.)0 1 U 114 1..1.10 f tC fG Mr.Ardhany Po011o.Building Cornrttissioner 5tnrcluml Tats and lnspcotioas for the SRO Housing.lMIS2 Earle Street *rtE Project No.03M4 0ecrtnbcr 14.2005 Page 3 It is our opinion that the above program for testing and inspection satisfies Section 1705.3.1. The designated agencies will provide written reports of their inspections and tests to your office. I trust that this will satisfy your requirements. If there are any questions regarding this matter, please call or write_ Very truly yours, Monadnock Engineering (.,�/z/*a x-�� Paul M. O'Connor, P.E. Principal cc: OWNER: Smith College, Mr. Charles Conant CONTRACTOR: Western Builders ARCHITECT: Thomas Douglas Architects ** TOTAL PAGE .04 ** Mr.Anthony PaWb,Btrifding Commissioner Str=Ural rests and raspcctions for the SRO Housing,186182 Earle street ME Project No.03021 Deacmbcr 11,2005 Pagc 2 ITEM TO BE AGENCY# SCQPE INSPECTEDITESTED Inspect and test footing Agent#1&2 Check that footing subgrade conforms to subgradde Material Class 8, Medium Dense- Test compacted structural Agent#2 One test per 1,500 s.f, minimum. fill each lift Proposed structural fill Agent#2 Perform gradation ana4mis. nd determine suitability for Project. Proposed off-site and/or Agent#2 Perform laboratory Procter density test on-site structural fill Cast concrete cylinders,4 Agent#2 Test one cylinder at 7 days and 2 at 28 cylinders for each day's days after placement of concrete. Site pour or 50 CY. Cure the cylinders for 3 days under blankets near the pour. Hold the 4th cylinder. Perform slump test,air Agent#2 Perform ASTM tests of fresh concrete. content and temperature of the concrete. Inspect hold down anchors Agent#1 Contractor shall give SER 48-flour notice that hold downs are visible for P' inspection. Donotenclose until f ins ection is completed. Inspect Prefabricated truss Agent#1 Verify that all bracing specified by the erection prefabricated lumber truss mfg. is installed. Check for full end bearings and proper placement of hold downs. Inspect diaphragm nailing, Agent#1 Inspect that plywood and nailing both duck and wall conforms.to Contract Documents. sheathi . DEC 16 2005 9;43 RM FR WESTERN BUILDERS INC4o ( 'jn5y IU 14 1Jnd (1e (e a 137 oCiin6a.(l%md,• `p"dgs,`7,CX0346! CVa!t&-603-899-9714 'Woode December 14, 2005 Mr.Anthony Patillo, Building Commissioner Puchalski Municipal Building 212 Main Street Northampton, IMA 01060 Re: Structural Tests and inspections for the SRO dousing, 180-182 Earle Street Northampton, Massachusetts ME Project NO. 03024 Dear Mr.Patillo: In accordance with 780 OMR-Sixth Edition 1705.3.1 the following is a list of materials and work requiring structural tests and inspections with the corresponding agency to be retained by the owner to conduct the inspections: Agent 4l: ($t1M0ural EnQlneer of Record): Monadnock EnglneerIng 137 Kimball Road Rindge,NH 03461 503-899-9714 Contact: Paul O'Connor, P.E. Agent#2: (Material Testing and.inspection): Allied Testing Laboratories, Inc. 115 St. George Road Springfield, MA 01104 Tel.: 413-738-1848 CO,J"T`A-CT' f:;-,R A<G N— 'L DEC. 1b euun ti:4J HI'I rK WGJ I r-MIA Ou1LLCIC.7 IIY�YU I �� � • /(J\(//^ �j� • R WESTERN BUILDER GENERAL CONTRACTORS do CONSTRUCTION MANAGERS To: Tony Patillo Company: Building Inspector,City of Northampton Phone: (413) 587- 1240 Fax: (413) 587- 1272 From: Mike Flanders Phone: (413)467-9171 Fax: (413)467-9559 Date: 12/16/2005 Time: 9:09 AM Pages(including cover): 4 Regarding: SRO Housing—Smith College— 180 Earle Street,Northampton Tony: Attached is the Structural Tests and Inspection Program from the Structural Engineer for the SRO Housing—Smith College project located @ 180 Earle Street,Northampton. The distribution of this test requirement program as illustrated by Paul O'Conner of Monadnock Engineering(Structural Engineer of Record)has been distributed to the following groups: 1. Charlie Conant— Smith College 2, Jody Barker—Thomas Douglas Architects 3. Delores Chaban—Allied Testing Laboratories, Inc. 4. Mike Guy—Western Builders, inc_ (Field Superintendent) 5. Dave Dietz—Dietz Construction Co. 6. Chis Giard—Valley Concrete&Construction Please call with any questions that you may have, Mike Flanders Western Builders,Inc. Cc: Mike Guy—Western Builders, Valley Conc File,Dietz Construction File, Allied Testing File 73 Pleasant Street,P.O. Box 278 Granby, MA 01033 Phone (413)467-9171 (413)467-9559 E-Mail mflanders@westembuilders.com Meeting Minutes Job:2005-003 Smith College-SRO Housing Meeting: Owner/Architect/GC#3 Item Description Responsible Due Date Closed moisture may get in this area per elevation dwg review 3-11 Chadie would like to see the water table Jody Barker,Thomas Doglas Arc 113106 r elevations from F&O Geotechnical report 3-12 Dave Dietz reported that Tony Patillo will need David Dietz 1/3/06 r, to inspect soils,stone will repplaoe clay areas 3-13 Group discussed trees that will need to be Jody Barker,Thomas Doglas Are 12/20/05 r removed due to site conditions,all agreed to remove. Next meeting at 10:00 on Tuesday.January 3,2006. The preceding is assumed to be a complete and correct account of the items discussed, directions given, and conclusions drawn, unless this office is notified to the contrary by the next regular meeting. If no notification is received, these minutes will be deemed an accurate account of the meeting. Prepared by: Mike Flanders Copy To: Paul Ugolini,Western Builders,Tony Patillo, Building Inspect Page 3 of 3 ** TOTAL PAGE .04 ** Meeting Minutes r• Job:2005-003 Smith College-SRO Housing Meeting: Owner/Architect/GC#3 Fn-em- Description Responsible Due Date Closed 2-12 Mike Guy pointed out to jolly that the metal Jody Barker.Thomas Doglas Arc 12/28/05 r flashings were missing on sheet A49,jody to advise_ 244 Old Item-1.8, Mike Guy is awaiting his Fax d at Mike Guy.Western Buiders 12/28105 the trailer 2-15 Old Item-1.23,Tom Douglas review of RFP 01, Mike Flanders 12/28/05 r 1"rated insulation board. 246 Old item,schedule updated,reviewed and Mike Flanders 1/3106 distributed,Concrete will be moved out by 2 weeks 2-1T Next meeting-12/20/2005 @10:00 AM On-site Mike Flanders 12/21/05 17 New Business 34 Alike Guys Fax#on-site in trailer after 12/22 Mike Guy,Western Buiders 12/221005 r will be 413-984-0482 3-2 Discussed RFI 03-Enka Drains and Tar Jody Barker,Thomas Dogias Arc 12128MS r waterprvo>ng,Jody to submit drainage final 3-3 Enka Drains will be used at Full basement only,Jody Barker.Thomas Doglas Arc 12126/05 r no tar waterproofing to be used @ frost wall 3.4 Discussed RFl 04,perimeter foundation drains Jody Barker.Thomas Doglas Are 113!06 r and sump pump, revise design 3-6 RFI#4 prompted review of sump pump and Jody Barker,Thomas Doglas Arc 113108 r drainage at basement,Jody review with L&S 3-6 Discussed RFI 03,non treated plywood over Jody Barker,Thomas Doglas Arc 113/06 r concrete.WB advised to use PT wood along perimeter 3-7 Dave Dietz from Dietz Construction will price upDavid Dietz 1/3/06 r a pre-engineered pump system in basement 34 Dave Dietz also reported clay has been David Dietz 113/06 1- discovered on site,will provide cost to remove and add stone 3-9 TDA to review possible requirement of metal Jody Barker,Thomas Doglas Arc 119/06 r flashing at trim boards not shown 3-10 WB recommends flashing for item 3.9,as some Mike Guy,Western Buiders 12/20/05 r Page 2 of 3 •Western Builders. Inc. ,A 73 Pk*sent street Granby,MA 0103.3.0'',,137 Ph:(413)487-9171 Meeting Minutes Job:2005-003 Smith College-SRO Housing Meeting: Owner/ArchiteCVGC#3 Location: 180 Earle Street Date: 12120/05 Northampton, MA 01063 Start Time: 10:00 Attendees, Attended F Charlie Conant, Smith College +► Jody Barker, Thomas Doglas Are P Karen Leveille. HAP, Inc r Mike Gagnon, Fuss&O'neill r Paul O'Connor, Monadnock Eng R Mike Guy,Western Buiders(Western Builders) 1✓, Mike Flanders(Western Builders) W David Dietz(Dietz Construction Corp) item, Description Responsible Due Date Closed Old Business 23 Plywood sub-floor at 3/4"thick, must review if Jody Barker,Thomas Doglas Arc 12/21/05 r this will work for VCT, Mike Guy suggests 1" 2-4 Concrete Mixture Submittal did not include Valley Concrete 12/21/05 r Super Plasticiser 2.6 Mike Gagnon of F&O confirmed 20'Offsets Huntley Associates 12/21/05 for building layout 2.6 The top of wall elevation will need review Paul O'Connor,Monadnock Eng 12/21/05 R relative to the sub-floor given at Full basement 2-7 Per agreement this meeting for detail 6/A16,4 Jody Barker,Thomas Doglas Arc 1/3/06 I•" stringers will be used ILO 3.Jody to Issue sketch 2.8 Mike Gagnon will review the MH Invert Mike Gagnon, Fuss&O'neill 12/22/05 r elevation and supply as required 2.8 Truss designs will be reviewed by Paul Paul O'Connor,Monadnock Eng 12128/05 r O'conner at ME, Ftg width may need to gro wider at S.O.G. 2-10 Mike Gagnon@ F&O to review tree roots at theMike Gagnon,Fuss&O'neill 12/28105 R Mud Trac Mat at the entry,may need to adjust radius 2-11 Paul O'Conner had a concern with pouring Mike Guy,Western Buiders 12/28/05 f_ slabs in the cold weather,will review method at pour time Page 1 of 3 WE STERN B U I L ffE R.S. GENERAL. CONTRACTORS & CONSTRUCTION MANAGERS To: SRO Housing/Smith College Project Team Company: Smith College, Jody Barker—(TDA)Architect,Dietz Construction, Statewide Mechanical Contractors,T&M Electric,Warehouse Mechanical City of Northampton, Hap Housing Inc., Western Builders,Fuss& O'Neill Monadnock Engineering Phone: N/A Fax. As Shown From: Mike Flanders Phone: (413)467-9171 Fax: (413)467-9559 Date: 12/20/2005 J Time: 3:49 PM Pages(including cover): 4 Regarding: SRO Housing—Smith College-Earle Street Project Meeting Notes 43 Attached are the meeting notes from the SRO/Smith College Earle Street Project meeting of 12/20/2005. Please call with any questions or comments: I. Charlie Conant Smith College E-Mailed 2. Jody Barker TDA E-Mailed 3. Dave Dietz Dietz Construction (413) 527—3370 Fax 4. Jeff" McAdoo T&M Electric (413)684—8987 Fax 5. Jahn Dickson Statewide Mech. (413) 734—9472 Fax 6. Paul Krause Warehouse Mech. (413) 535—2486 Fax 7. Mike Guy Western Builders Hand Deliver 8. Tony PatilIo Building Dept. (413) 587— 1272 Fax 9. Karen Leveille Hap Housing E-Mailed 10. Mike Gagnon Fuss& O'Neill E-Mailed 11. Paul O'Connor Monadnock Eng. E-Mailed 12. Randy Johnson Hap/Her Inc. E-Mailed CC: Project Meeting Minutes File: SRO Housing Project File 73 Pleasant Street, P.O. Box 587 Granby, MA 01033 Phone (413)467-9171 (413)467-9559 E-Mail mflanders@westernbuilders.com w� CRIV Ou1Lvr_m I 111t_"o ( JJJO 1 u 1111JJO ( 1G (G r V1.3/ul} SRO Rousing Smith College -Page 2 JOB MEETING# 1 - 12/6/2005 1:15 For the future meetings, Western will bring in the foreman/PM contacts for the site, mechanical, and electrical contractors for informational and planning purposes. 1.1u All utilities and mechanical issues will be reviewed by Lindgren& Sharples. 1.17 fluke Guy to review& secume dumpster permit as requested by Fire.Chief 1.19 The balance of Project Meetings for December 2005 will be-held on 12/13 & 12/20. The first meeting of 20006 will be Tuesday 1/3, no meetinggduring the week between Holidays. 1.19 Thomas Douglas Architects& Smith College to review the existing trees and advise on what the limits will be for trimming back overgrowth as discussed. Western will need this limit to advise site contractor as soon as possible. 1.20 Mr. Randy Johnson will be part of the Architectural review team from the future owner's perspective, in conjunction with TDA. 1.21 Western Builders received a signed CO#1 this meeting, covering the additional asbestos. 1.171) The proje�will be reviewed and inspected by Ms. Peggy Mood, director of CET 1.LL (Center for Ecological Technology)for the Energy Star Criteria 1.23 -Torn Douglas requested an alternate pricing for a 1"Density Insulation Rated Board in lieu of the Batt Insulation under the joists as shown. WB will follow-up with RFP pricing 1.24 Jody suggested that the Truss manufacturer have close and direct contact with Paul ('Conner(Structural Engineer)during the Truss and Beam approval process. Nest Meeting scheduled for Tuesday 12/13/2005 at 10:06 AM. Critical Items: 1. Approval&Fabrication of Concrete Re-Bar,Foundation Excavation stafting week of 12/12. 2. Winter Conditions,Heat,and Protection will be completed on a Time&Materials Basis. CC- All Attendees by E-Mail or fax Tony Patillo-Northampton Building Department (Fax) Karen Leveille-HAP, (E-Mail) Paul Ugolini-Western Builders, Inc.,(E-Mail) Mike Guy-Western Builders, Inc, -Faxed or Hand Delivered. By- Mike Mike Flanders, Project Manager TOTAL PAGE .03 ** ✓-- -- ---- �r 11 oulLVEMZ) 1wk.4of �JJn IV 141 JZ10 ( IL (C I'' Ulf/bpi Axl F S T F R N R II 1 I . D E R E GENERAL CONTRAtC-TORS & �%J140AAN%J A �u u.[ANAGER c V M J [ A�V 11 ♦ N SRO Housing/Smith College— 180 Earle Street PROJECT#2005—003 JOB MEETING# 1 12/6/2005 FRFSENTna__.MEETING Charlie Cenmant Smith College Tom Douglas Thomas Douglas Architects Jody Barker Thomas Douglas Architects Mike Flanders Western Builders, Inc. Mike Guy Western Builders,Inc. Item It Description Responsibility Time Frame 1.1 Welcome to the )st SRO project construction meeting to all. 1:2 ']team met on-site prior to meeting to view the demolition of existing structures. 1.3 Tom inquired about the existing trees to remain and the protection of those trees during excavation. WB will confirm with Dave Dietz(Site Contractor)regarding the protection. 1.4 Reviewed and confirmed onsite the trees that are to remain, -tress that were removed. 1.5 Western Builders received three(3)sets of construction prints from TDA this meeting, which incorporate the addendums and Q/A notes from bidding process. 1.6 'rhe procedures for testing were reviewed and discussed, which will follow the ecification for soils, Concrete, Re-Bar.Western will arrange fbr testing schedules. 1.7 Allied Testing will be the Testing agency on-site for this project_ 1.Q Weste::l Builders wi11 be setting up a fax machine in Job Trailer for Mike Guy, fax#will be listed once itis installed. 1.9 The dumpster location will be on project property to the rear,Mike Guy to coordinate location with Charlie after the site clearing phase. 1.10 Contractor Parking will be along Earle Street in front of#180& 182 Only.No parking past#184 to#186, all extra parking if required can be at the horse stable bleachers or as directed by Mike Guy on site. 1.11 Paul O'Connor from Momidrock englneertng will be at newt-meeting for suctural issues. 1.12 'Western will update project schedule and submit for review by 12/ 13/2005- 1.13 For confirmation on Alternates selected by owner, referencing the specification book in Section 01030—"Alternates", 1.3 execution, 1.3A- Alternates, for the record, Owner has chosen alternates 42&#4 only per contract documents. * Alt. #2 is to substitute Vinyl Windows for Wood-Clad Windows. Alt 44 is to substitute Vinyl Tile for all resilient flooring as scheduled throughout the building. 1.14 Project Meeting Minutes will be distributed to IVIS. Karen Leveille at HAP, and Mr. Tony Patillo at the Building department, City of Northampton, ucw . VZ] CUtJ" 1 --- I --` — I v a . au.L . iL . ` . - 11 1 WESTERN � U1 LDER S (II GENERAL CONTRACTORS & CONSTRUCTION MANAGERS 11 To: SRO Housing/Smith College Project Team Company. Smith College, Jody Barker-(TDA)Architect,Dietz Construction, Statewide Mechanical Contractors, T&M Electric,Warehouse Mechanical City of Northampton,Hap Housing Inc., Western Builders Dhone. N/A Fax. As Shown From: Mike Flanders Phone: (413)467-9171 Fax: (413)467-9559 nate; 12/9/2005 Time: 1:19 PM Pages(including cover): 3 Regarding: SRO Housing-Smith College Earle Street Project Meeting Notes#1 Attached are the meeting notes from the SRO/Smith College Earle Street Protect meeting of 12/6/2005. Please call with any questions or comments: 1. Charlie Conant Smith College E-Mailed 2. Jody Barker TDA E -Mailed 3. Lave Dietz Dietz Construction (413) 527-3370 Fax 4. Jeff McAdoo T&M Electric (413)684-8987 Fax 5. John Dickson Statewide Mech. (413) 734-9472 Fax 6. Paul Krause Warehouse Mech (413) 535-2486 Fax 7. Mike Guy Western Builders Hand Deliver 8. Tony Patillo Building Dept. (413) 587- 1272 Fax 9. Daren Leveille Hap Housing E-Mailed CC: Project meeting Minutes File: J. M. Bassinger Funeral Home 73 Pleasant Street,P_O.Box 278 Granby,MA 01033 Phone (413)467-9171 (413)467-9559 F-Mail mflanders a@westernbuilders.com JUN 10 2006 10: 00 AM FR WESTERN BUILDERS INC4be �nna i ms 141000 r ia (c "T- Meeting Minutes Job;2005-003 smith College-SRO Housing Meeting: OwnertArchitecVGC#18 lterYi Description Due Date Closed 1&3 Dumpster fencing will have new layout for Mike Flanders 8127AM C fencing and tenant entry,form with gtsn slate 18.4 sock devices at trash(1)and attic(2)will be Mike Flanders 6/27106 t- krM to a subnmoter and dwrnselvw by doorcraft 18.6 There will be a Gas inspection on Thursday Mike Guy,Western Buiders 6M5J0B C BMs,Mike(iuy to report on outcome. 18-8 The building final electrical power will be ready Jeff McAdoo 6/27A6 t- for Install and servit:e in 2 weeks,T$M to coward 18-7 Jody will be out of office next week on Jody B"er,Thomas Douglas Ar W2M C vacation,return on 8126 •184 Charlie has requested to have June requlsrtion Mike Flanders 8121106 f delivered early for approval prooess,VVB week of 6119 184 Bathme"Boors,cabinet install,and wood Mike Cory,Western Buiders 6119108 C doors week of 6119 :78-10 Next nwa ing will be GWI20M at 10:00 AM Mike Flanders 6127MG f' Meeting adjourned at 10:55. :lieAnxw iing at 10:00 on Tuesday,June 27,2006. The preceding is assumed to be a complete and correct account of the items discussed, directions given, and conclusions drawn, unless this office is notified to the contrary by the rA*d regular meeting. if no notification is received,these minutes will be deemed An accurate account of the meeting. Prepared by: Mike Flanders Copy To: Paul llgolini,Western Builders,Tony Patillo, Building Inspect Page 3 o f 3 TOTAL PAGE . 04 * JUN 18 2886 9: 59 AM FR WESTERN BU1LULKb IM-40r ZID77 l '- I eeting Minutes 'Job:2005-003 Smith Go1le "RO Housing Meeting: Owner/ArchiteeWC#18 Hent Description ResponsMle Due Date closed 16-14 site work for the front area Utilities will start d"David Diez 5129/06 r- week of 5!29/2008 1646 WB will review and finalize CE#'s 18&19 Milos Flanders Sl30MB F7 17-2 All Change estiarntes to be cornplebed for Mike Flanders. 811146 � review for CO 06,WB complete by 611#15&#19 17-4 WS win plan on a 10 CU dumpoler lair concrete Mike Flanders 5130106 W planning.Waste Management will send a plan 17-5 The trash enclosure will have a renced section Karen Leveille,HAP,Inc '3►3ti1�06 and a pedestrian opening for recycle ops 17- The keying schedule will be reviewed one more Karen I.eveilie,HAP,Inc 5130108 1"` time by Karan to look at submasters and Laundry Keying 77-8 Confirmed with sp9crfhu&bn and soope,an Karen Dille,HAP,Inc Grim R interior signage by owner. 17-9 W13 suggesftd that Karen start process for Gas Karen Levoille.HAP.Inc 6M3MG P Servlm Account,Gas Co.will not come out without ins 17-10 Charlie advised that*9 rail trail easement may Charlie Consent.Smith College W13MG IF not happen,WO will credit track the work in Earea 17-11 Charlie will grange wit Mike Guy for storage of Charlie Conant,Smith College W13MG F bed units at 184 Eerie 1712 Karen will hold tours for tenants after 5:30 PM Karen Leveille.HAP,[no 6rJOFO6 9 in late JundEariy July. Doors are now locked 17-13 Jody Barber will confirm A Final Keying Jody Barker.Thomas Douglas Ar 611106 F, Requirements by W112006 1744 ' Next meeting is 6/1312006 at 10:00 AM Mike Flanders W13X6 17 New Business 184 Mike Guy has reviewed detalls%r Bike rack Jody Barker,Thomas Douglas Ar W1046 l•' roof,framing to revised by TDA 18-2 Durnpster location has been nt4ved ower closer Mike Flanders 6127106 f` to buikling,WS will do a prellm I"OUt Pape 2 013 JUN 18 2006 9 : 59 AM FR WESTERN BUILDERb 1NU4b r bMD� IU L4L..]JO t 1� 4 r tlWestiiim Builders, Inc. .6ranhy,MA 01 0337 Ph:(413)4674H 71 r ho ee#ing Minutes Job:20 5-003 Smith College-SRO Housing Meeting: OwneNArchiteotfGG#18 Logon: 180 Earle Stye t 0440, sm3m Northampton, MA 01063 Start Time: 10:00 "rte A"ended P Charlie Conant,Smith Gallege W Jody Barker,Thomas Douglas Ar P Karen Leveille,HAP, Inc r- Mike Gagnon,Fuss&O'neill r Paul O'Connor, Monadnock Eng +r Mike Guy,Western Buiders(Western Builders) 12 Mike Flanders(Western Builders) r- David Dieu(Dietz Construction Corp) f' Nicole Weiss(Lindgren 8 Sharp E Dan Dickson(Statewide Mechanical Contract) E Jeff McAdoo(T$M Electric,Inc.) 17. Randy Johnson(H&Mepone r; Dave Krause(Warehouse Mechani C Mike Broad(HAP Housing) E Peter Fraser(Mass Housing Per ption R"ponsible Due Dsbe Closed Old Business 14.16 All kitchen cam am scheduled to arrive an Milne Guar,Western Buiders 6liew E Bt81200e,WB to off bard and place in aptartments 15-10 Painter to start exterior triol and siding on Milne Guy,Viestern Buiders 5mm F, 5/$/2p06 13-11 Painter to start on priming 1st flow wails on Milne Guy,YMeeternBukkrs 615M F WW2006 16-7 Karen to review the public telephone Karen Unmile,HAP,Ina $MeNG r requireneMar as shown tar electrical and pla rAc od braekertwood b 1640 Suasequent informatiefn from Trash enclosure Jody Barber,Thomas Douglas Ar 5/17106 till meeting will require ioffw*-up infrmation 16-11 Milne Oftnon will review truck entry,provide Mibe Gagnon,Fuss a aneill SM7106 lr landsaaps plain%and review curb requirements 16-12 Mike Gagnon will also review the tree Mike Gagnon,Fuss&O`neill 5/17145 +± irrterf erne and existing storm drain line in tine trash area 16-43 Karen will provide all requirements ltottl Trash Karen Laveille,HAP,Inc 5117106 F vendor for pianning,sizes,and rule mquiretrre t page 1 of 3 JUN 19 2006 9: 59 AM FR WESTERN BUILDERS INt_:46 ( 5t)n�J 1U 141J0tJ r1c rL WESTERN BUILDERS GENERAL CONTRACTORS & CONSTRUCTION MANAGERS To. SRO Housing/Smith College "ed Teams Company: Smith College, Jolly Barker—(IDA)Architect,Dietz Construction, Statewide Mechanical Contractors,T&M Electric,Warehouse Mechanical City of Northampton, Hap Housing Inc., Western Builders, Fuss& O'Neill Monadnock Engineering, Lindgren& Sharples Phone: N/A Fax: As Shown From: Mike Flanders Phone: (413)467-9171 ' Fax: (413)467-9559 JUN 1 9 2006 Jj Date: 6/16/2006 Time: 5:00 PQM Pages(including cover): 4 Regarding: SRO Housing- Smith College-Earle Street Project Meeting Notes#18 Attached are the meeting notes from the SRO/Smith College Earle Street Project,meeting of 6/1312006_Please call with any questions or comments: Distribution as follows: i. Charlie Conant Smith College E-Mailed 2. Jody Barker TDA E-Mailed 3. Dave Dieu Dietz Conduction E-Mailed 4. Jeff McAdoo T&M Electric E-Mailed 5_ Dan/John Dickson Statewide Mech. (413) 592—6411 Fax 6. Paul Kirause Warehouse Mech_ (413) 535—2486 Fax 7. Mike Guy Western Builders (413)584—0492 Fax 8, Tony Patillo Building Dept. (413)587— 12'72 Fax 9. Karen Leveille Hap Housing E-Mailed 1.0. Mike Gagnon Fuss&O'Neill E-mailed 11. Paul O'Connor Monadnock Eng. E-Mailed 12. Randy Johnson Hap/Her Inc. E-Mailed 13.Nicole Weiss Lindgren& Sharples E-Mailed CC: Pmject Meeting Minutes File: SILO Housing Project File 73 Pleasant Strocj5 P.O.Box 587 Granby,MA 01033 Phone (413)467-9171 (413)467-9559 F-b1ail mflandas@wasternbuilden.com AUG 06 E00b le : ;:f j HM FK WLb 1 CKN tiU1LUCKS 11-V-40 r ZJUZ3Z3 I U L-+1'7...10 r lc rc_ Meeting Minutes ' y Job:2005-8A3 Smith College-SRO Housing Melting: Owrw/Arahitect/GC#21 [tern Description Responsible Due Date Closed completed within 3-4 weeks from this meeting 20-5 Charlie agreed to have the new bollards which Charlie Conant,Smith College 811106 F+' come primed,painted by Smith College Grew. 20-9 The durnpater fencing gate pasts to be instailedMike Guy,Western Buiders 7128106 the week of 7/2412006 20-11 All unit appliances are to arrive by 7124/2006 Mike Flanders 7124106 F 20-12 Mike Guy to advise on the final blower door testMike Guy,Western Guiders alam r for energy star,will advise for August date 2043' Next Meeting is Tuesday 71250006 at 10:00 AM Mike Flanders 7125Joe Now Business 21-1 Mike G and EWF to arrange far final island and Mike Guy,Wester Buidem SI$!06 countertops 214 Mike G and EWF to arrange for island bade Mike Guy,Western Buiders SAM 177 panel color match per review on-site 21-3 T S M electric to review motor starters and Jeff McAdoo 8mme r boiler electrical components 21-4 T&M electric to deliver remaining light kits Jeff McAdoo 814106 t! and fan components 21-6 Painting of exterior light fixtures to match Jody Barker,Thomas Douglas Ar 818106 r exterior white band trim 21-6 Dietz construction to have all site work grading David Dietz 814MO and bider course complete by 8/4/2006 21-7 Dietz construction to have all sewer and water David Diez 814106 connections made to building by 8/412006 .21-8 Dietz construction to repair old clay strorn David Dietz 814106 r water liner to Storm water manhole by 8/41201)6 21-8 The exterior wslkWay was revised in shape, Mike Guy.Western Buiders 7125106 P- from cone to rectangle per site meating 21-10 Dumpster pad concrete to be poured and Mike Guy,Western Suiders 5006 completed w4x*of 713112006 gage 2 cf 3 * TOTAL PAGE .01 ** AUG 06 2006 12: E2 PM FH WESIENN tJU1L-UtNb iNt-qb ( n3oZi IU Meeting Minutes Jo&2005-M Smith College-SRO Housing Meeting: 0wner1ArchftwVGC#21 item, Descriptio" Responsible Due Date Closed 21-11 At door#140,and extra step in concrete will be Mike Guy,Western Buiders 8/8106 C required due to grading,and added rails installed . 2142 Amherst Iwiidscapinq to provide aft details and Mike Flanders 8f4M 171 unit pricing by NN2005 2143 All constnwtion feneciong was removed from Mike Flanders 7125106 127 the site per meeting 020 21-14. Gas connection to be installed within 2 weeks, Mike OW,Western Buiders Gas Co on-ode 7t24416 21-115 Karen to review telephone cosft for Verizon Karen Leveille,MAP,Inc 8111/06 and Comcast by 818,and advise which to lj,-- used .2146- Wftw Meter and FP line to be complailad by Dan Dickson 011IA36 SM112006 2147 Charlie inquired about basement sump pump, David Dietz 817M Dietz to have vendor Install equipment week of 21-18. Mike Guy to confirm all 184 Endo Street Mike Guy,Wevtem Buiders 814M 177 patching is complete 2149 Mike described the difference in elevation by Mike Guy,Vftsftm Rulders 7125 pr sloping Vat bike rack for drainage and water run-off .21-90 Next Mes1ling is August 8,2006 at 10:00 AM Mike Flanders afim r7 Meeting adjourned at 10:52. 311ld cth-wWnq at 10:W.on Tuesday,August 8,2006. .,The preceding is assumed to be a complete and correct acoount of the items discussed, directions given, and conclusions drawn, unless this office is notified to the contrary by the next regular meeting. It no notification is received, these minutes%Yih be deemed an accurate account of the meeting. Prepared by., Mike Flanders Copy To: Paul Ugolini,Western Builders,Tony Patillo, Building Inspect Page 3 of 3 TOTAL PAGE . 03 AUG 06 2006 12 : 21 PM FR WESTERN HUILDLRb INU4be tJnn� IU i4toDo ( jcra Western Builders, Inc. ?S Pkawnt Street P Graft MA 01033-M7 Ph:(413)*7-151171 Meefing Minutes Job:2005-003 Smith College-SRO Housing Meeting-. Owner/Architect/GC#21 Loo2bon: 180 Earle Street Dais: 7r25m Northampton,MA 01063 Stud Time: 10.00 Attendees Attended 0 Charlie Conant,Smith College 17- Jody Barker,Thomas Douglas Ar V, Karen Leveille, HAP, Inc 17, Mike Gagnon, Fuss&O'neill E Paul O'Connor, Monadnock Eng IIF Mike Guy,Western Bulders(Western Builders) R Mike Flanders(Western Builders) 177. David Dietz(Dietz Construction Corp) C Nicole Weiss(Lindgren&Sharp r Dan Dickson(Statewide Mechanical Contract-) Or Jeff McAdoo(T&M Electric, Inc.) r Randy Johnson(H&J/Stepone 0 Dave Krause(Warehouse Mechani C Mike Broad(HAP Housing) r-j Peter Fraser(Moss Housing Par lil6m. Description Responsible Due Date Ckmed Old'Business W14 Site work for the front area utilities will start theDavild Dietz 5129106 week of$129/2006 19-12 Dietz Construction to credit the wort involved David Dietz 715106 with rear easement drainage,work may completed TBD 19-15 TDA to advise Mike Guy on the two exterior Jody Barker,Thomas Douglas Ar 7111106 R light fixtures per aft discussions 19-19 The week of 713,2nd flow cabinets and doors Mike Guy,Western Buiders 713106 will start in"abon 19-20 The countertops far the 1st floor cabinets will Mike Guy,Western Buklers 713= arrive the week of 7138006 204 A poet site nmating was held an Thursday 7120 Charlie Conant,Smith College 7125M FF for site details changes,Charlie to advise on 7125106 20-2 Type"L"IW fixtums were discussed in detail,Jeff McAdoo 7121106 Fri T& M to wohm issue,TDA to solve color. 20-3 All exterior bollards and dumpstar pad Co workMike Flanders 7128M approved,Concrete pad to be completed on T& M 20-b- The building final Gas Service will be Dan Dickman 818M 17� Pap 1 of AUG 06 2006 12: 21 PM FR WESTERN BUILDEHb INU4b r aMDZJ l u L4LX111 - 1_ ­ f VV ES �' ERN B [.� I L D E R S GENERAL CONTRACTORS & CONSTRUCTION MANAGERS .10 To: SILO Housing I Smith Couege Company' Smith College, Jody Barker—(TDA)Architect,Diets Construction, Statewide Mechanical Contractors, T,&M Electric,Warehouse Mechanical City ofNorthampton,Hap Hoasing Inc_,Western Builders, Fuss&O'Neill Monadnock Engineering, Phone: N/A _ Fax: As Shown From: Mike Flanders ) Phone: (413)467-9171 �iLG _ 7 2006 Fax: (413) 467-9559 °< Date: 8/6/2008 Time: 12:20 PM Pages(including cover): 4 Regarding: SRO Housing—Smith College-Earle Street Project Meeting Notes#21 Attached are the meeting notes from the SILO/Smith College Earle Street Project meeting of 7/25/2046. Please calf with any questions 4r comments:Distribution as follows: 1. Charlie Conant Smith College E-Mailed 2. Jody Barker TDA E -Mailed 3. Dave Dietz Dietz Construction E-Mailed 4. Jeff McAdoo T&M Electric E-Mailed 5. Dan/John Dickson Statewide Mech. (413) 592—6411 Fax 6. Paul Krause Warehouse Mech. (413) 535--2486 Fax 7. Mike Guy Western Builders Hand Deliver 8_ Tony Patillo Building Dept. (413) 587— 1272 Fax 9_ Karen Leveille Hap Housing E-Mailed 1.0. Mike Gagnon Fuss&O'Neill E-Mailed I 1.Paul O'Connor Monadnock Eng. E-Mailed 12, Randy Johnson Hap/Her Inc. E-Mailed CC: Project Meeting Minutes File. SRO Housing Project File 73 Pleasant Street,P.O.Box 587 Granby,MA 01033 Phone (413)467-9171 (41.3)467-9559 F.-Mail mflawders@wcesternbuilders.com JUL 24 2006 J : JU Nfl FFA WEb 1 LKN BU1LUL-Kb 1NU4U r n00I i V 1E+1.JDO r ic rc IVMee inn Minutes job:20os-003 Smith College$RO Housing Meeting: 0wner1Architect W#20 Description Responsible Due Dabs Closed 2" All exterior bollards and dumpster pard CO wgtrMike Flanders 7128106 T approved,Concrete pad to be completed on T S M 2" Final Building Electric paver was being .Teff McAdo0 711IMS ,rr. completed by end of work day today 20.5 The building final Gas Service will be Dan Dickson amm 1- completed within 3-4 weeks from this truing 2M ChMie requested a site meeting with pave David Dietz 7rAm Fr Dietz,est S parking area,results as noted 20-1 20-7 The storage trailer will be leaving the SRO site Miles Gulf.Western Suiders 7113106 G on Thursday 7113!2006 20.8 Charlie agreed to have the new bollards which Charlie Conant,Smith College 811mi r come primed,painted by Smith College Crew. 20.8 The dumpster fencing gate Rost$to be install0dMlk0 Guy,Western SWKk rs 7128108 r the week of 7124!2006 . 20-10. Flooring will be installed on the 1st floor week Miite Guy.Western Buidem 7114= R of 7113/2006 :20-11 All unit appliances are to arrive by 7/24/2006 Mice Flanders 7►ZU* G 20-12 Mike Guy to advise on the final blower door t stMike Guy.Western Buiders 818106 G for energy star,will advise for August delta 20-13 Next Meeting is Tuesday 7fZ812ow at 10:0o AM Mike Flanders 7AMM r' `.Meeting adjourned at 10:44. next�eeting at.10-.06 on Tuesday,July 25,2M. The preceding is assumed to be a complete and correct sooaunt of the items discussed, directions given,and conclusions drawn, unless this office is notified to the contrary by the nod regular meeting. If no notification is received.these minutes will the deemed an accurate account of the meeting_ Prepared by: Mike Flanders Copy To: Paul Ugolini,Western Builders,Tony Patillo, Building Inspect P"s3of3 TOTAL PAGE .04 * JUL 24 Z-00b j: JU FM I-M Wtzb I tKN UU1LUCKS 11'4'-40 f OJJO I V LVL J-JI:J 1 L 1 r Meeting !Minutes Job:2005-003 Smith College-SRO Housing Meeting: 0WnexlArchitectlGC 0 20 >� Deeeription responsible Dire Date Closed I" TDA to select style for(2)bollard cape(King Jody Sacker,Thomas Douglas Ar 715106 F Architectural)for pricing and order. 19-11 Mike Gay Mould like to review the final location Milne Guy.WWfer n Buide rs 711 1108 Ir of Gag/W&W Meter orisae determined by Util Company .1942 Dietz Consiructiot to crUM the wO*involved David Dietz 715106 1'" with rear easement drainage,work may completed TBD 19=13 Karen will.have a tenant walk4hnr on Monday Karen Levelte,HAP.Inc 71171118 W. 7/17/2006 at 2:80 PM,Milne Guy arrange access and dose 10-14 Mike Guy will advise date of perimeter fence Mdse Gu V W0%tRm Bueders 7171106 F? removal,shework in rear will be stardng in July 2006 1945 TDA to advise Mike Guy an the two exterior Jody Banner,Thomas Douglas Ar 7►71►06 I•" light fixtures per site discussions 19-16 TDA 10 confirm the floor patternlbasloet weave, Jody Barker.Thomas Douglas Ar 7MIMS W, conditkm for Kingf Mike 0"for install of floor W17 Painting contractor will be complete with the Milne Guy,VftMem Buiders 6130816 WE second ikaor paiNi ng on Friday W30106 19-10 The Wawa-in insulation in the stlic area will beMike Geri/.YMestwn Sulders 6/3046 91 compere an Friday 6/30!2006 19-79 The week of 718,2nd floor cabhiets and doors Mdw Guy,Vft t m SWders 7/3106 17 will start installation 19-20. The countertepe for the 1st floor cabinets wit Mike Guy,Western Buiders 713106 G arrive the week of 7!312006 191 Next meeting will be held an Tuesday 7111►Z006 Milne Flanders 7111106 P' at 10:00 AM New Business 2D-7 A post site meeting was heli on Thursday 712D Charlie Conant.Smith College 7►25108 r. for site details changes,Charlie to advise on 7125106 Type"L light fixtures were di wmssed in detaii,Jeff McAdoo 7121/116 r T S M to soWe issue,TDA to solve color. Page 2 of 3 JUL ��4 eUab J: ed t111 rK WC5 1 CKI'1 --t- I - .- W"elm Builders, Inc. 73 Pleeserd 8 Offer y;:Ma 01033-MW Ph�(413)467-a77! Meefing Minutes Job:2005-003 Smith College-SRO Housing Meeting: O nedArchitect/GC 20 Loeadon: 180 Earle Street Date: 7/11106 Northampton,MA 01063 Start Time: 10:00 Attended Irl Charlie Conant, Smith College tr Jody Barker,Thomas Douglas Ar G Karen Leveille,HAP, Inc r Mike Gagnon.Fuss&O'neill C Paul=onnor.Monadnock Eng 9 Mike Guy,Western Buiders(Western Builders) lo: Mike Flanders(Western Builders) r" David pialz(Dietz Construction Corp) Nicole Weiss(Lindgren&Sharp C Dan Dickson(Statue Mechanical Contract-) C Jeff McAdoo(T&M Electric, Inc_) r=" Randy Johnson(H&.i/Stepone ri pave Krause(Warehouse Mechani r" Mike Broad(HAP Housing) C Pow Fraser(Mass Housing Par p ip Responsible Due Daft.Closets Old Business 16-14 Site work for the boort area utilities will start theDSVM Ok t SrAm 8 r week of 5r2grA]6 18-8 The building flown allectrical pm wVal ba moot Jeff McAdoo 6JgTlID6 f� for Install and service in 2 weeks,T A M to coord '19-9 Issue of replacing the ekwtiing approved right Jody Badws Thomas DoWlas Ar 6f30= fixtures by owner is being reviewed,3 installed naw 19-2 Smith College to aompllete the ApplicsUon for Charlie Conant,Smith College 7111M F. Fined Pcow.all inspecVMw complete at this time. 19.3 Smith College to complete the Application liar Charlie Co>rharht,Smith College 7M IM f Final Gas Connection and Meter,all Inspections comp Westem Builders soh"current DPW issues Mike Flanders 715JOB for trench permit for Diets Construction 19-7 V"stem will price the(2)6"X 6"bollards and Mike Flanders 71s" sonotubes as discusses!with Smith College 19-$ Western will also plaice up the now trash Mitac Flanders 715M 1 compactor pied bused on the final approval this meeting. Page 1 d3 JUL 34 3006 3 : 38 PM FH WEj I EKM MU1LUCKS 11-0-,40 ( Z)-JJ--J l ki ,• • . .. . . WESTERN B U ILDE R S GENERAL CONTRACTORS & CONSTRUCTION MANAGERS To: SRO Housb g/Smith College Project Team Company: Smith College, Jody Barber-(TDA)Architect,Dietz Construction, Statewide Mechanical Contractors,T&M Electric,Wardwuse Mechanical City ofNordumVton,Hap Housing Inc.,Western Builders,Fuss&O'Neill Monadnock Engineering,Lindgren&Sharples Phone: N/A Fax: As Shown From: 1Vlitke Flanders Phone: (413)467-9171 Fax: (413)467-9559 J U L 2 4 2006 Date: 7/24/2005 'Time: 3:20 PM Pages(Including cover): 4 Regarding: SRO Housing-Smith College-Earle Street Project Mecdog Notes#20 Attached are the meeting notes from the SRO/Smith College Earle Street Project meeting of 7/11/2006.Plew call with any questions or comments: Distribution as follows: I. Charlie Conant Smith College E -Mailed 2. Jody Barker TDA E-Mailed. 3. Dave Dieu Dietz Construction E -Mailed 4. Jeff McAdoo T&M Electric E-Mailed 5, Dan/John Dickson Statewide Mech. (413) 592 6411 Fax 6. Paul Krause Warehouse Mech. (413)535-2486 Fax 7. Mike Guy Western Builders (413)584-0492 Fax 8. Tony Patillo Building Dept. (413) 587- 1272 Fax 9. Karen Leveille Hap Housing E-Mailed 10. Mike Gagnon Fuss&O'Neill E-Mailed 11. Paul O'Connor Monadnock Eng. E-Mailed 12. Randy Johnson Hap/Her Inc, &Mailed CC:Projekt Meeting Minutes File: SRO Housing Project Fite 73 Pleasant Street,P.Q.Box 587 Granby,MA 01433 Phase (413)467-9171 (413)467-9559 E-Mail azflander we abuitdm.com HUU UU CL70b 1 I : U1 HI"1 F'K Wt5 I tKN tIU1LDFHS 1NC4b r y555 TO 14135871272 P .05/05 Meeting minutes-W Jab: 2005-003 Smith College-SF?Q Housing Meeting: Owner/Architect/GC#22 Prepared by: Mike Flanders Copy To: Paul llgolini,Westem Builders, Tony Patillo, Building inspect Page 4 of 4 ** TOTAL PAGE . 05 ** HUU UtJ ifWUb 11 : 01 HM r WL51EHN BUILDERS INC467 9559 TO 14135871272 P .04/05 Meeting Minutes Job: 2005-003 Smith College-SRO Housing Meeting. Owner/ArchitectM#22 :Item, Description Responsible Due k ate�Cled inquire 8/812006 22-7 The Door#140 extervior bollards will be Gerry Henderson 819106 F` installed on 819, hand rails for stapfstair on 8123/2006 224 Final Landscaping scope completed this Mike Flanders 8111006 r., meeting,WB to summarize with Amherst Landscaping ,22-9 Staewide Mechanical to install teh water meter Dan Dickson 8111106 17 and back ftow preventer installed by end of week$111 22-10 Hap Inc.has chosen Verizon as the telephone Jeff McAdoo 811111106 17 provider,T&M to install the 3"conduit system 22-11 TDA advised WS to modify unit#107 counter Jody Barker,Thomas Douglas Ar 8/8106 9r, per this meeting 22-12 All 134 Earle Street patching to be complete by Gerry Henderson W23M r 812312006 22-13 TDA advised WS to install unit 3107 light switchJeff McAdoo 8111M r within the tall cabinet adjacent to counter 22-14 All curbing to be installed 819,all final paving David Dietz 8114106 8114=6 2245 The project punchlist walk-thru will be held Jody Barker.Thomas Douglas Ar 8122M6 Tuesday 812212W6 on site,TDA to lead puncllfst 22-16 HAP Inc./TDA selected final lanscape,WB to Mike Flanders 8111106 price a stonebed at building perimeter 22-17 Next Project meeting is scheduled for$12212006 Mike Flanders 8/22fO6 at 10 AM 14W.'iniefing at 10:00 on Tuesday.August 22,2006. The preceding is assumed to be a complete and correct account of the items discussed, directions given, and conclusions drawn, unless this office is notified to the contrary by the next regular meeting. If no natftation is received,these minutes will be deemed an accurate account of the meeting. Page 3 of 4 HUU UPJ il-00b 11 : 00 HM t-K WEbIERN HUILDERS INC467 9'559 TO 14135871272 P .03/05 Meeting Minutes Job: 2005-003 Smith College-SRO Housing Meeting: Owner/ArchiteclJOC#22 Itern Description Responsible Due Date Closed 21-8 Dietz construction to repair old clay strom David Dietz 814M6 water liner to Stom water manhole by 81412006 21-11 At door#140.and extra step in concrete will be Mike Guy,Western Buiders $18/06 required due to grading,and added rails installed 21-12 Amherst landscaping to provide aft details and Mike Flanders W4M6 unit pricing by$14/2006 21-14 Gas connect-ion to be installed within 2 weeks, Mike Guy,Western Buiders 8006 Gas Co on-site 7124106 2145 Karen to review telephone costs for Verizon Karen Leveille,HAP,Inc 81$106 and Comcast by W,and advise which to be used 21-16 Water Meter and FP line to be completed by Dan Dickson 8111106 911 U1112006 21-17 Charlie inquired about basement sump pump, David Dietz 817/06 r Dietz to have vendor install equipment week of $/R2006 21-18 Mike GLpj to confirm all 184 Earle Street Mike Guy,Western Buiders 818106 �- patching Is complete 21-20 Next Meeting is August 8,2006 at 10:00 AM Mike Flanders 8111/06 . New Business 224 Mike Guy will beheading on vacation week of Gerry Henderson 817106 817,Gerry Henderson will cover this project 22-2 For oommunicsition with Gerry on-site,please Gerry Henderson 8/7f06Ire, call(A13)348-0378. 22-3 Bay State Gas Co.out an internal work order on Mike Flanders 818/06 it 7131 for meter installation, 224 Based upon schedule for SSG,Dietz will be Mike Flanders informed for planning and excavation 22-d For all energy Star tests,all mechanical Dan Dickson 8122W* equipment needs to be in place and operational,812=006 .22-6 EWF has a panel that needs to be replaced,WB Mike Flanders 818106 G Page 2 of 4 HU" Uzi cuuo 11 ; 00 HN r-K Wt:bILKN bU1LVtKb INU46e SbnU 10 141JbUYI2YZ P .02/05 'Westem Builders, Inc_ 173plawlent Street I:Granby;VA 010334rV ,Ph:(413)467-W 71 Meeting Minutes Job: 2005-003 Smith Cottage-SRO Housing Meeting* Owner/ArchitecVGC#22 Location: ISO Earle Street Date: 818/06 Northampton, MA 01063 Start Time., 10:00 �dee s Attended rj Charlie Conant, Smith College 17 Jody Barker, Thomas Douglas Ar E Karen Leveille, HAP, Inc r� Mike Gagnon, Fuss&O'neilt 177 ' Paul O'Connor, Monadnock Eng ` Mike Guy, Western Buiders(Western Builders) 9 Mike Flanders(Western Builders) 177 David Dietz(Dietz Construction Corp) r7i Nicole Weiss(Lindgren &Sharp 17- Dan Dickson (Statewide Mechanical Contract-) C Jeff McAdoo(T&M Electric, Inc,) 177 Randy Johnson(H&JMepone 17, Dave Krause(Warehouse Mechani r- Mike Broad(HAP Housing) Peter Fraser(Mass Housing Par f 7 Gerry/Field(Western Builders) Item Oescripti on Responsible Due Date Closed Old Business 20.5 The building final Gas Service will be Dan Dickson Completed within 3-4 weeks from this meeting 20-12 Mike Guy to advise on the final blower door testMike Guy,Western Buiders ataim 17 for energy star,will advise for August date 21-1 Mike 0 and EWF to arrange for final Island and Mike Guy,Western Buiders 8181116 countertops 21-2 Mike 0 and EWF to arrange for Island back Mike Guy,Western Buiders BIB/06 17, panel color match per review on-site 21-3 T&M electric to review motor starters and Jeff McAdoo a/BIOS boiler electrical components '21-4 T&M electric to deliver remaining light kits Jeff McAdoo 814/06 and Un components 21-5 Painting of exterior light fixtures to match JodY Barker,Thomas Douglas Ar $18/06 exterior white band trim 21-6 Dietz construction to have all site work grading David Dietz 814/06 P1. and bider course complete by amaooe 21-7 Dietz construction to have all sewer and water David Dietz 814M6 1.7 connections made to building by 81412006 Page 1 of 4 HUU b5 eUUb HM FR WESIERN BUILDERS INC467 9559 TO 14135871272 P . 01i05 0 WESTERN BUILDERS GENERAL CONTRACTORS & CONSTRUCTION MANAGERS To: SRO Housing I Smith College Company: Smith College, Jody Barker—(TDA) Architect,Dietz Constnmction, Statewide Mechanical Contractors, T&M Electric, Warehouse Mechanical City of Northampton, Hap Housing Inc., Western Builders, Fuss& O'Neill Monadnock Engineering, Phone: N/A Fax: As Shown From: Mike Flanders , Phone: ��;;:7 ,ODb �..� (413)467-9171 Fax: (413)467-9559 �s Date: 8/9/2006 Time: 10:51 AM Pages(including cover): 5 Regarding: SRO Housing— Smith College-Earle Street Project Meeting Notes 922 Attached are the meeting notes from the SR01Smitb College Earle Street Project meeting of 8/8/2006. Please call with any questions or comments: Distribution as follows: 1. Charlie Conant Smith College E-Mailed 2. Jody Barker TDA E -Mailed 3. Dave Dieu Dietz Construction E -Mailed 4. Jeff McAdoo T&M;Electric E -Mailed 5. Dan/John Dickson Statewide Meeh_ (413) 592—6411 Fax 6. -Paul Krause Warehouse Mech. (413) 535 —2486 Fax T Mike Guy Western Builders Hand Deliver 8. Tony Patillo Building Dept. (413) 587— 1272 Fax 9. Karen Leveille Hap.Housing E-Mailed 10- Mike Gagnon Fuss& O'Neill E--Mailed 11. Paul O'Connor Monadnock Eng. E-Mailed 12. Randy Johnson Hap/Her Ier Inc. E-Mailed 13. Gerry Henderson Western Builders Hand Deliver CC: Project Meeting Minutes File: SRO Housing Project File 73 Pleasant Street,P.O. Box 587 Granby,MA 01433 Phone (41.3)467-9171 (413)467-9559 E-Mail mflanders@,,westernbuilders.com AUG -24 2006 3: 20 PM FR WESTERN BUILDERS INC467 9559 TO 14135871272 w . kl5r4�� Meeting Minutes Job: 5-t)r}3 Smith Coll" -SRO Housing Meeting: Owner/Arri1*cVW 23 dent', Clae�criptia�n Responsible Due Date Closed x-14 T&M to rewiewv why intercoms in 13,15,&17 Jeff McAdoo 13=X16 C are oltmw to corneP#w tethers in building 23-15 cost Project Meeting to be held Tuesday Mike Flanders WAS= 177 8t2lft2006 at 110 AM Meeting adjourned at 10,42. rict'"rim ing at 110:00 on Tuesday,September S.2006, The prsoading is assumed to be a complete and correct account of the items discussed,directions given,and conclusions drawn, unless this office is notified to the contrary by the neat regular meeting. If no notification is received,these minutes will bre deemed 'an apPixift account of the meeting, Priii"Jimed by, Mike islanders Coppy Ta: Paul Ugolini,Western Builders, Tony Patillo, Building Inspect Page 4 ar 4 TOTAL PAGE .05 * AUG 24 2006 3 : 20 PM FR WESTERN BUILDERS INC467 9559 10 141J5k3r1er� R Meeting Minutes Jo lx.2005-003 Srnitts Coft RO Eiouung Meeting: 0Wner1Archil C#23 *=am Delaeription Responsible Due Date Cioeed I+ow,8aalness 231.1 Verizon Telephimm Co can instaii their Chadle Conant,smith GbHegs 8124= Cal telephone service lime any time atter Bt23J20013 23-2 WB will piece all lenover c ons matoriafsGerry Henderson 11/28106 17.I and attic shock items in the nwmbnk*l room. .233 All Bay Stater Gas service lines and molars arse Milne Flanders 8198106 p complete as of 4111812008 23*4 WORNetz distributed the H7fdro pressure and Milo Flanders 812.M W water CoiMorm Tests to TDA/and Owners this meeting 23-5 WS to fax the final plantllandscape mean to Mike Flanders 8122/t16 r Jody a Karen as approved by Snaith Cchliege 234 Karen has requested Dietz Construction to David Dietz 847M l evaharbe rip no and otq*ly additional prising for added 2 7 Karn has also requested pricing an a splash David Dietz W22f06 C black unit 1br the valley water ran-off at entry door 23.8 A tttainta ea-9-p-11 s wld be held with Mike Fiamders 8"Ith College S WapMer personnel on 616 Time TSD .23-0 For the operations meeting noted in 23-9,T&M Mike Random Staff-and WB will be on hand for walk Thru 28-" Statewide Mechanical to verityr bolter vert Dan Dickson 131?5I06 C dWanoe SWAW t'r m bldg is required&weather sealed 33-11 WS to have painting cx ntmdor point the Carry Henderson � G bulkhead unit same ardor as entry doors at Earle St 2342 TDA1L S 8 to provide Karen with a narrative for Jody Barker,Thomas Douglas Ar 8J39FD6 C the electrical panels as m quired tar new owner 23413 Karen to review her bulletin board requirement Karen Lavelle,WAP,Ina &PAW C at old pay phone Io=#on Rade 3 of 4 AUG 24 2006 3 : 19 PM FR WESTERN BUILDERS INC467 9559 TO 14135871272 Meeting Minutes Job:2005-003 Smith College•SRO Housing Meering: Owner/ArM teal W#23 _ sib Due Date Cloned 21-16 Mike Guy to confirm all 184 Earle street Mike Guy,Western Guiders 8/8N6 1? patching is complete 224 Bay State Gas Co.out on Internal work order on Mike Flanders 816J06 r 7/31 ibr meter Installation. 22.4 Based upon schedule for 89%DNelz will be Mike Flanders informed torr planning and exca vNtiors 22-5 For all energy Star testa,ail mednanical Dan Dickson 8122/06 17 equipment neem to be in plaice and operational,X12006 224 EVW has a panel that needs to be replaced,VYB Mike F enders x8106 V Inquire 8/8/2006 22.7 The Door#140 exteruior bollards will be Gerry Henderson 8Mlry6 installed on 8N,hand rails for steplstair on ws 200e 22.6 Final Landscaping scope completed this Mike Flanders $/11/06 1s meeting,WB to summarize with Amherst Landscaping 22-6 Staewide Mechanical to Install teh water meter Dan Dickson 8M1lD6 and back flow preventer installed by end of week 8111 .2240 Hap Inc.has chosen Verizon as the tek*hom Jeff McAdoo SHIM Ir. pmrAder,T 8:M to install the r COfm aft system 22-12 All 184 Earle Street patching to be complete by Gerry Henderson 8123106 F 8/2312006 22-13 TDA advised WB to install unit 3107 light swfthJ*ff McAdoo 8/1101 F7 within the tall cabinet adjacad to ccaunter 2244 All curbing to be installed SM,all final paving David Dietz 8114106 Pr 8114/2006 22-43 The prrojeck punchlist walk-thra will be hold •oft Barker,Thomas Douglas Ar 8/2P106 Fr Tuesday 8d=ne on sits,TDA to lead puncliast ..22-16 HAP hrcJTDA selected final lanscape.WB to Mike Flanders 8171A6 price a stonebed at building perimeter 22-17 Next Project meeting is scheduled for 8/221"1006 Mike Flanders w2M6 L at 10 AM Page 2 of 4 AUG 24 2006 3 : 19 PM FR WESTERN BUILDERS INC467 9559 To 14135871;:'- re Western Builders, Inc. /7+�Y3 PPl�sa�satt t OW/5S7 P .(413)'467-0171 ~ng Minutes Job:2445-003 Smith College RO Housing Meeting: town WArchikeWGC#23 Location: 180 Earte Street Date: $P2. " Northampton, MA 010N Stark Time: 10.O0 i`3 Charlie Conant Smith CoNMe le Jody Sarker,Thomas Douglas Ar 0 Karen Leveilte,MAP. Inc C Mitre Gagnon,Fuss&CYneill i•? Paul CrOonnor,Monadnock Eng Mike Guy,Western guiders(Western Builders) 0 Mike Flanders(Westam Builders) i' David Dietz(Dietz Construction Corp) C; Nicole Weiss(Lindgren&Sharp r Dan Dickson(Statw*le Mechanical Contract--) G .tuff McAdoo(T&M Electric, Inc.) R Rw*Johnson(f•LYStepone 177 Dave Krause(Warehouse Muni 17 Mike Broad(HAP using) t« Peter Fraser(Mess Housing Par f_'` Go"I Field(Wegern Builders) Description Due Dale Closed Old''Ouslows 2A-12 Mike Guy to advise on the final blower door twMike Guy,Western Butlers 81 106 G for energy StIC will adze for August date 214 Mike Ct and EWF to arrange for final Island and Mike Guy,Western Buiders 8111011 Fr countertops A1-2 Miioe G and Elis F to arrange for Island track Mine Guy,Westem Butters 818108 0 panel cow nratcir per review once 21-3 T&M electric to review motor stadgm and Jeff McAdoo 818NB bailer electrical components 21-4. T&M ekvb1c to deliver remaining light kits Jeff McAdoo af4m l^ and fan components Painting of exterior Tight fixtures to match Jody Sarver,Thomas Douglas Ar slag ri exterior white til trim *142 12 Amherst ka scapirig to provide alt details gad Mike Flan Wm 814MG F unit pricing by aM12W 2144 Gas ooarneotlon to be installed within 2 weeka, Miles Quy,Western Suldsrs 8006 F Gas Co on-site 7124106 21-17 Chadle inquired about basement sump pump, David Dietz 817108 0 Dietz t*have vendor install equipmw*week of S1712006 Page i 4f 4 AUG 24 2006 3 : 19 PM FR WESTERN BUILDERS INC467 9559 TO 14135871272 N . 01/ub WEST E R N B U I L D E R S GENERAL CONTRACTORS & CONSTRUCTION MANAGERS To: SRO Housing/Smith College Company: Smith College,Jody Barker-(TDA)Architect,Dietz Construction. Statewide Mechanical Contractors,,T&M Electric,Warehouse Mechanical City of Northampton,Hap Housing Inc.,Western Builders,Fuss& O'Neill Monadnocic Engineering, Phone: NIA ----------------- Fax: __Fax: As Shown I r- ia, From: Mike Flanders Phone: (413)467-9171 Fax: (413)40-7-9559 i _ S Date: 8/24/2006 _a Time: 3:05 PM Pages(including cover): 5 Regarding: SRO Housing.7-Smith College-Eade Street Project Meeting Notes#23 Attached are the meeting notes from the SRO/Smith College Earle Street Project meeting of 8/2212006. Please call with any questions or omnments:Distribution as follows: 1. Charlie Conant Smith College E -Mailed 2. Jody Barker TDA E-Mailed 3. Dave Dietz Dietz Construction E-Mailed 4. Jeff McAdoo T&M Electric E-Mailed 5. Dan/John Dickson Statewide Mech. (413) 592--641.1 Fax 6. Paul Krause Wamhoum Meeh. (413) 535--2486 Fax 7, Mike Guy Western Builders Hand Deliver S. Tony Patillo Building Dept. (413) 587- 1272 Fax 9. Karen Uveille Hap Housing E-Mailed 10.Mike Gagnon Monadnock &O'Neill E-Mailed 11.Paul O'Cowwr MonadnockEms. E Mailed 12. Randy Johnson Haolw Inc. E-Mailed 13. Gerry Henderson Western Builders Hand Deliver CC: Project Meeting Minutes File: SRO Housing Project File 73 Pleasant Street,P.O.Box 587 Granby,MA 41033 Fb m (413)467-9171 (413)467-9559 E-Mail mflanders@vesternbuilders.com