17D-032 (7) GERALD P. BERSON, P.E. 35 Lee's Lane ' NOV 1� Longmeadow, MA 01106 7 413-567-0793 November 11 , 1994 City of Northampton Building Department 212 Main Street Northampton, MA 01061 RE : Bin Enclosure for CSI - Hatfield Street Construction Report No. 1 Gentlemen: On November 11 , 1994 , I inspected the above referenced project . The following construction has been completed and except as noted found to be in compliance with applicable codes and construction documents for this project : 1 . The majority of the Butler structural steel components for the new bin enclosure have now been delivered to the job site . Pre-assembly of these components has begun on the ground and the entire assembly will be lifted in place when completed . 2 . This assembly will be supported on existing reinforced concrete foundations and retaining wall structures . Please let me know if you have any questions or comments . Very truly yours , Gerald P. Berson, P. E. P. E. No . 32387 cc : The O'Leary Company, Inc. City of Northampton November 25 , 1994 Page 2 4 . Erection of steel components for this new bin enclosure is basically being completed as designed, however, minor modifications have been required as necessary due to existing conditions which have been uncovered during the course of construction. All work is being properly completed and no plan changes are necessary at this time. Please let me know if you have any questions or comments. Very truly yours, Gerald P. Berson, P.E. P. E. No. 32387 cc: The O'Leary Company, Inc . GERALD P. BERSON, P.E. _ 35 Lee's Lane ; Longmeadow, NA 01106 413-567-0793 November 25 , 1994 �r °r City o f Northampton , � ..,..n-,,..-...,�...,.......,.,t.� Building Department 212 Main Street Northampton, MA 01061 RE: Bin Enclosure for CSI - Hatfield Street Construction Report No. 2 Gentlemen: Since my last report dated November 11 , 1994 construction has been completed, inspected as owing found to be in compliance with applicable codes and construction documents for this project : 1 • All remaining Butler pre-engineered metal building components for the bin enclosure have now been delivered to the job site. 2 • Structural reinforcement of several existing structural steel support components was required to the new bin enclosure. This reinforcementrhas beention of completed as necessary and is adequate . 3 . Erection of the Butler pre-engineered metal building system has begun. All structural steel columns, beams, roof purlins and wall girts have now been erected and bolted in Place. Anchor bolts for columns supported by existing reinforced concrete retaining walls have been and epoxy grouted in place , pre-drilled bottom support beams have been uweldedfando bolted oasmdesigned to the existing structural system below. Galvanized steel framing for the overhead door opening has also been erected. Approximately 90% of the Butler exterior metal wall panels and fiberglass insulation has now been erected. Butler ribbed metal roof panels have been placed at the roof top level , however, installation has not yet been completed. GERALD P. BERSON, P.E. 35 Lee's Lane Longmeadow, MA 01106 j 413-567-0793 � �= ° 4 3 December 9, 1994 City of Northampton Building Department 212 Main Street Northampton, MA 01061 RE: Bin Enclosure for CSI - Hatfield Street Construction Report No . 3 Gentlemen: Since my last report dated November 25 , 1994 , the following construction has been completed, inspected and except as noted found to be in compliance with applicable codes and construction documents for this project : 1 . As previously reported, all structural reinforcement of existing steel support components for the new bin enclosure has been completed as necessary. 2 . Erection of the Butler pre-engineered metal building system for this bin enclosure is now basically complete. This includes all structural steel columns , beams , wall girts , roof purlins, exterior metal wall panels and Butler ribbed metal roofing . Galvanized steel framing has been installed at the overhead door opening supports . Installation of exterior metal trim is now approximately 50% complete . 3 . At the bottom of the new exterior metal wall panels, there is an approximate 6" opening in the exterior wall between the new bin enclosure and the existing structure . The original design for this bin enclosure does not call for closure of this area. 4 . The new overhead door unit has not yet been installed. Please let me know if you have any questions or comments . Very truly o s, Gerald P. Berson, P.E. P.E. No . 32387 cc : The O' Leary Company, Inc . THE O'LEARY COMPANY, INC. 376 College Highway P.O. Box 377 SOUTHAMPTON, MA 01073-0377 (413)538-8532 or(413)527-1360 jo 9 TO City of Northampton Building Dept . No. P. 0. Box 169 Northampton, MA 01060-0169 DATE 1/3/95 JOB B.-2256 JOB NAME Bin Enclosure for CSI Attention: Building Inspector Jos cAn at 'ield Street RE: Gentlemen: WE ARE SENDING YOU [K Herewith ❑ Under separate cover the following items ❑ Plans ❑ Shop Drawings ❑ Purchase Order ❑ Specifications ❑ Samples ❑ Copy of Letter ❑ Tracings ❑ Catalogue Cuts ® Engineer ' s Affidavit (final) ❑ Prints ❑ Change Order ❑ COPIES DATED N0. DESCRIPTION 1 12/28/94 Final En ineer' s Affidavit THESE ARE TRANSMITTED as checked below: ❑ For approval ❑ Approved as submitted ❑ Submit copies for distribution ® For your use ❑ Approved as noted ❑ Resubmit copies for approval ❑ As requested ❑ Returned for corrections ❑ Return corrected prints ❑ For review and comment ❑ ❑ ❑ FORBIDS DUE 19 ❑ PRINTS RETURNED AFTER LOAN TO US REMARKS COPY TO SIGNED: Jeff Bodeur