Loading...
29-036 Single Phase Inverters for North A/ merica so I( r SE3000A-US/SE380OA-US/SE5000A-US/SE6000A-USs o I a r SE760OA-US/SE10000A-US/SE1140OA-US __ _____ _ SE3000A-U.S_�SE3800A-US MOOOA-US_.SE6000A-US SEZ600A-US SE10000A-,US j,_SE11400A OUTPUT SolarEdge Single Phase Inverters Nominal AC Power Output 3000 3800 j 5000 6000 7600 9980 @ 208V i 11400 VA .. ... .. , .. „ 10000�a 240V 5400 @ 208V i ! 10800 @ 208V � Max.AC Power Output 3300 4150 6000 8350 12000 VA p -- . . ..... ..i.. @ @ _ ._....... For North America _ I 5450 240V ; 10950 240V AC Output Voltage Min Nom.-Max 1 SE3000A-US/SE380OA-US/SE5000A-US/SE6000A-US SE76®OA-US/SE10000A-US/SE1140OA-US AC Output Voltage Mm.Nom.-Max.j11 211 240 264 Vac AC Frequency Min.-Nom.-Max.(') 59.3-60-60.5(with HI country setting 57-60-60.5) Hz Max.Continuous Output Current 24 @ 208V 1 48 @ 208V p 12 5 j 16 25 ?1.@ 32 i 47.5 A ........... ... ... ..._. ... .. _....!....... .... .., . .2aov.... .. . GFDI Threshold ._�.,.,. ._ .... ._............. ...A..... Utility Monitoring,Islanding Protection,Country Configurable Thresholds Yes 1 Yes INPWT - - _ _ Maximum DC Power(STC) 1 4050 5100 6750 8100 10250 13500 15350 W 25 Transformer-less,Ungrounded i Yes Input Voltage _ .. ..... 500. .. ... .. ... ..... _.. Vdc.... Nom DC Input Voltage I 325 @ 208V/350 @ 240V Vdc ... . j.... 16.5 @ 208V 33 @ 208V Max.Input Current") ...._I_.. 9.5 ,':......13 ;.155.(x1.240V.I.... 18 .... 23... ..305 @.240V ,,._..34.9._.. Adc... . ... .. .. Input Short Circuit Current 45 Adc Reverse-Polarity Protection ( ...... .._... ._. ..,.._. _Yes .. _..... .. .......... ..._... Ground Fault isolation Detection 600kst Sensitivity .... . ._.. . .... .. ..-. ,. I' Maximum Inverter Efficiency ., 97 7 ! 98.2 , 98 3 1 98 3 98 98 ... ._ ,.. L.,. ._. -. ....-. ...,.. € CEC Weighted Efficiency 97.5 98 1 97.5 @ 208V 97 5 97 5 97 @ 208V 97 5 ..,. ... ..... ... .9$.@.24 5.@ 24 OV 97 OV Nighttime Power Consumption <2 5 <4 -. ._.. _.. Supported Communication Interfaces RS485 RS232,Ethernet ZigBee(optional) Revenue Grade Data,ANSI C12.1 optional"' ! Rapid Shutdown-NEC 2014 690.12 Functionality enabled when SolarEdge rapid shutdown kit is installed(" STANDARD COMPLIANCE - Safety UL1741 UL16998 UL1998 CSA 22.2 4 ,.. .Grid Connection Standards i.... 1. .. _ .... . I. IEEE1547 1.1 Emissions t . _ _ __ x _ FCC part15 class B INSTALLATION SPECIFICATIONS f - "< AC output ?conduit..s.iz.e./.A.W..G rang /e...I I�.., 3/4 min.im. .u.m../.16. .6..AWG . ...... .. . A_W-�.6.. .......... 34".minimum/.8-3 DC in put conduit size #of strings 3/4'm minimum 1-2 strings/166AWG 3/4"minimum/1-2 strings/ - x 12 SWG (.. ' Dimensions with Safety Switch . I 30.5 x 10 5/ in/ 30.5 x 125 x 7.2/775 x 315 x 184 ..... ,.. ... i.. _ ...... ....... _... .. ... ._.3775 x 315 x 260 ._ .. .mm ,. r < «: ,, --� - -k '' Weight with Safety Switch 1.2/212 ..... .88.4/40 1 Ib/kg Natural i . convection t t� r ow, ' s e Cooling Natural Convection j and internal Fans(user replaceable) ' fan(user .., .» .:.. .. . ' ,. ., k .;�,' _.. . ..............___ ... ___....._..... . .... replaceable)........_. '1 z :e. a .-- t 3€ 3 r" ,y 33�.rr .., :a Y _ Noise <25 <50. ...dBA... :f In ted pr r#5 ._ x q.3,` 9d` c '" p,,r + -a. ;��`t T$ ri..r: ..:� '=jx' Mln.-Max Operating Temperature. i.. �p I " 3 3 ,z € �' .; -13 to+140 25 to+60 40 to+60 version availablelsi ..F C r . .., .3r, U ......z.:reft!i, ... "� qq '.;" '„- ., :f = a`.. �,- ;. `,; Range.. ..... ...... .. .. .�..... _...._................ ........ /. ._._. _ ........._._........,........_.................. .,. ..... 7' "' Protection Rating rlall>; Ittweiglrt easy t I' 1 rower .: ., r 5<.. :.. ,: .,. Y s} `�`�`"-� +�'e For other regional settings please contact SolarEdge support. ... ......... .... .................................................. ... ... A NEMA 3R • �.'#..ty�t„in m ule-Iiavef - '' _ - f A Higher current source may be used,the inverter will I'm't its'nput current to the values statetl. n _ i3i ReV_ue grade'nverter P/N'SExxxxA US000NNR2(for 760OW'nverter SE7600A-US002NNR2). .t, } Rapid'd s h td n kit P/N SE10x00 RSD -Sl- . Isl 40 version P/N.SExxxxA U5l70NNU4(for 760W inverterSE70A U5002NNU41yhe t orWlrele5s S� et CD6 th i` 1u in 66H fixed voltage inverter;K/AC imriversion only Pre assembled Safety Switch for faster installation '* Optional-revenue grade data,ANSI 012.1 RoHS USA-GERMANY-IT"ALY-FRANCE-IAPAN-CHINA-AUSTRAL.IA-THE NETHERLANDS-ISRAEL www.solaredge.us .US we SoIwEig� 'v , THE Vinamount MODULE T .1I Mono Multi Solutions DIMENSIONS OF PV MODULE ELECTRICAL DATA`Q,STC 'uniLmm Peak Power Watts-Pi(WP) 250 255 260 265 941 Pat5re7t Utptit Tolerani Maximum Power Voltage-VMe(V) 30.3 30.5 30.6 30.8 THE /�► ( Maximum pr Current-Imw(A) 8.27 8.37 8.53 8,61 jj�'1�r,/j ruMrrure I m Open Circuit Voltage-Voc,(V) 38A 38.1 38.2 38.3 0 o "u KKe Short Circuit Currei5t Isc(A) 8.74 8.88 9.at3 4.10 Module Efficiency rim(%) 15.3 15.6 15.9 16.2 MODULE STC:Irradiance 1000 W/m',Cell To m id-n re 25°C,Air Mass AM1.5 according to EN 60904-3. Typical efficiency reduction of 4.5%a1 W/m according to EN 60904-I. o - � ELECTRICAL DATA:-NOCT ', - • '' Maximum Power-Pmax(Wp) 186 190 193 197 01 C Moxir urn-Pi Voltoge•vmi,{Y) 28.0 28.1 28.3 28.4 Maximum Power rr nt-Iw,re lAl 6.65 6.74 6.84 6.93 Cu e seas�xournlpc nor. UI=RY PD05.18 A A Open Circuit Voltage(VI-Vac,(V) 35.2 35,3 35.4 35.5 �. W .; ,2-oxaw win 3� Short Circuit Current(A)-Isc(A) 7.10 7.17 7.27 7.35 _ NOCT:Irradiance a1800 W/m°,Ambient Temperature 20°C,Wind Speed 1 m/s. 812 180 . �01-1111 � Back View MECHANICAL DATA i •,_ Solar cells Mulhcrystaliine 156 x 156 mm(b inches) r 71 Cell orientation 60cells(6 x 10) _ Fast and simple to Install through drop I mounting solution Module dimensions 1650 x 992 x 40 mm(64.95 x 39.05 x 1.57 inches) 66 � - Weight 12 a .13 in al Glass 3 2 mm(0 131nches)Hlgh Transmission,AR Coated Tempered Glass M �, 8ocksteet White Ir - A A Frame Black Anodized Aluminium Alloy Good aesthetics for residential applications )max IP65arIP67rated ' __....._._. . ............ __ ....._._ __...__.._. ..__.. ..__.....___. ......_...____ _........ ............._... ___.._._ Cables Photovoltaic 200 mm(47.2 Y able 4 0 m ( 0 Inch Technology c ri 0 06' es'), inches) I-V CURVES Of PV MG13C9iE(26(3w) Connector H4Amphenpl �c g�A � , eoo imowm Fire Type UL 1703 Type 2 for Solar City Highly reliable due to stringent quality contra, v. J T. >'.">G 1e0;'7•rig global 1?'I inuf,c ure€ � I:;-I l ,s ,,e< -;l.x �r .,G. t_.a ' r CC;._It-:i E r<_ _$ s win __ _ TEMPERATURE RAT,PIGS MAXIMUM RA'INGS a ci-nexI gene Ia I-,,hOfc o11Qic H� _,.;; u 404 _ Nominal Operating Gell Operational Temperature 40°+85°C prCsd3JCiS,we l;e 1 'dc':'.,-IO5c- Temperature(NOCT) d4°C(±2°C) x#murr[Systg[rt 100S3V DC(IEC) Cooperation r viiiin Oar paltners nh al°o Si With le3cul TemperahxeCoefiFficien#C)iP u -0,41%/'C Voltage Yt1t#fS CI L) i,c r.ri c�o S rind Thy^ith le _rir`t`3 i. Temperature Coefficient of Voc -0.32%/°C Max Series Fuse Rating 15A obtu t „.y am ex-,ep Onaf Ssi o.00 o io 20 io ao w JemperatureCoefficlentanse 0.95%1°C Certified to withstand challenging environmental 12T Oc h cF,r: met Ir,!s�. t ngi'k�• x�m and conditions rel'Cbk prociucts with the backing 2z4, ,I rl 1ood e Tri n O trot 3, able WARRANTY 54�,, u�i i.t ,C partner. We t re committed CERTIFICATION 10 year Product Workmanship Warranty tr,building sirotcg=C,rni. icIl'y; 25 VWr Linear Power warrant ;f'n ricsOl c oliCi ar stir 1 with (Please refer to Product warranty for details)W cap- inslollers,develcipen,di tnbijtors O and other parine s ,Is the 'l 9 _ I -,:ri„n+ PTO E,lt,::".` TO eir1,T. MANCE WARRANTY �•Ii PACKAGING CONFIGURATION ' LINEAR PERFORM �.0 eu 2ewece _ _ coMnuNr Modules per pieces 16 Year Product Warranty 25 Year Linear Power Warranty Z 'I wl Tiring Solar Limited �� � Maduies per 40'container. pieces P P i �-.4vn Irma}C;ir�[..�U:n 4100% ... ... _ a ;ddttFotTa# 0 90% value fYag'n Trfi7a$a/ar,5 lin�at War ra€Tt CAUTION'READ SAFETY AND INSTALLATION INSTRUCTIONS BEFORE USING THE PRODUCT. QoonP4t, [[ o }` w 82015 Trina Solar Limited,All rights reserved.Specifications included in this datasheet are subject to ti CI`1! e7 80% C> change without notice. w smart E-iergr°TogethEr Years 5 0 15 20 25 ,nrsa>a darn FA :r:-/P.R .ad Mono Multi Solutions THE TrInamount MODULE TSM-PD05.18 DIMENSIONS OF PV MODULE ELECTRICAL DATA 4 SIC UniHmm Peak Power Watii(Wp) 245 250 255 260 941 PoiaoiOutput Toletance-P~(%) Maximum Power Valli(v) 29.9 30.3 30.5 30.6 THE Tnna1&-%1#-%1ount Maximum n-mm 8-20 a. 8.37 -7- Open Circuit Voltoge-Voc(V) 37.8 38.0 38.1 38.2 \LKs.AV­raEE Shod,CirCuT[Cuftont-fsc_(A) 8,75 8.79 8'88 9,00 Module Efficiency rj,,(%) 15.0 15.3 15.6 15.9 MUUULE STC:Irradiance 1000 W/ml,Cell Temperature 25°C.Air Mass AM1.5 according to EN 60904-3, Typical efficiency reduction of 4.5%at 200 W/Y'according to EN 60904-1. Ei Maximum Power-PMAX(Wp) 182 186 190 193 Maximum Powervologei(V) Uji 28,0 28.1 28.3 MODULO MU CRY ALLINE" I-LE Maximum Power Currieri(A) 6.59 6.65 6.74 6.84 A _A ill Open Circuit Voltage IVI-Voc(VI 33.7 35 2 35,3 35.4 Short Circuit Current(A)-isc(A) 7.07 7.10 7.17 7,27 NOCT:Irradiance at 800 W/pi Ambient Temperature 20°C.Wind Speed I m/s. PD05.18 812 `24-5 pp:wi Bock View liipt, M L ATA ECHANICAL Fast and simple to install through drop in m olutio au sn Solar cells Multicrystalline 156 x 156 mm(6 inches) Colt orientating; 60 cells(6-10) * 0 Module dimensions 1650 x 992 x 40 mm(64.95 x 39.05 x 1.57 inches) u(*fl( - -----_-_ Weight 21,3 kg(47.0 lbs) 14 -_---- Glass 3.2 nom(0.13 inches),High Transmission,AR Coated Tempered Glass t, A Backsheet White Good aesthetics for residential applications Frame Black Anodized Aluminium Alloy with Trinamount Groove I-V CURVES OF PV MODULE(245W) J-Box 1?65 or IP 67 jarred ............... Cables Photovoltaic Technology cable 4.0 mm'[0.006 incheS2), 10 1200 mm(47.2 inches) 9.. Fire Rating Type 2 Highly reliable due to stringent quality control 7.- U -c-'s 6-- As,n lecidino globcd rianufocturer g, g 0,es 4.- TEMPERATURE RATINGS F.T. 0 01'rill'Xi L) MAXIMUM RATINGS on'.)du ,we be1Y_,v.e dose 1. 20OW/m2 co,opercitlon with olur�po?tner� 2-- ........ ----_- Nominal Operating Cell 44-C(±2'C) Operational Temperature 40-+85°C Temperature(NOCT) maixitinum .'s crilicaL io 'vVTh local System 1000VIDC(LEC) Temperature Coefficient of P_ -0.41%/'C Voltage IM Pr,`T'sei!',,'C,'a")t:T!,d the p0be, 10. 20�- 30.- 40+- W OC(ULJ *=-TI to r)­vi�do voltai Temperature Coefficient of Voc -0.32%/'C Max Series Fuse Rating ISA C%S 01- 41 ch n-i-ni Certified to withstand challenging environmental Temperature Coefficient of Iso 0.05 /°C conditions T)­odi'iCfS'with ff"e.t, ,-.king o'-iina sli boni pai Wf-Ont,--offi milts', WARRANTY bu'lcflng sltoio 10 year Product Workmanship Warranty b Ili y1-mil( 0 bo If 3e w; 25 Y00fir 1:111i Power Warranty inistoflers.devel0q,)ers.('Jisitib-,,k)?s .s to(',Ihet parth-ii ci�the (Please refer to product warranty for details) < bockbon,',of iarea s� CERTIFICATION dmvng sm,irt Fnej,.1y Together, LINEAR PERFORMANCE WARRANTY S ................................... PACKAGING CONFIGURATION Trino Solar Limited -iC-�Ye-a�-Pro-duc-'t-Wa-'r'-r'an-ty'---_25 Year_L6n_j­Gr-No'-wer-Worr------ g < only Ulm Modules per box:26 pieces ............ Modules per 401 container:728 pleces 90% Iii-Fil- line"warrant CAUTION:READ SAFETY AND INSTALLATION INSTRUCTIONS BEFORE USING THE PRODUCT. Trinasolar (03 80% 82014 Trina Solar Limited.All rights reserved.Specifications included in this datashect are subject to Smart He- Togethcr Trin-asolar ch-gawthoutnotIce, Years 5 IO 15 20 21 "" aOMPatye • so I a r SolarEdge Power Optimizer so I a Module Add-On for North America• • P300 / P350 / P400 SolarEdge Power Optimizer __ P35 noo 0 P400 Module Add-On For North America ,for 60 cell PY (for 72..11 PV (for 96 cell PV modules) modules)_? modules) �_ • INPUT � ._ '_ __ '... — -_ P300 / P350 / P400 _. _ _ _ Rated Input DC Power 300 1 350 400 W Absolute Maximum Input Voltage(Voc at lowest temperature) 48 60 80 Vdc MPPT Operating Range.. .. 8-48 8 60 8-8.0 Vdc Maximum Short Circuit Current(Isc) I 10 • Maximum DC Input Current. ___ ..... _..., 125 Maximum Efficiency ! 99.5 % Weighted Efficiency 988 Overvoltage Category ._..... .._._. _. .._.... II OUTPUT DURING OPERATION(POWER OPTIMIZER CONNECTED TO OPERATING INVERTER) __- ,� Maximum Output Current 15 Adc � Maximum Output Voltage 60 - Vel c P;>; • -OUTPUT DURING STANDBY(POWER OPTIMIZER DISCONNECTED FROM INVERTER OR INVERTER OFF) _ _Safety Output Voltage per Power Optimizer -- 1 1 Vdc ___.._. per __._. __ ___ __..._. .a _S_TANDARD COMPLIANCE _ -- - EMC FCC Part15 Class B,IEC61000 6-2,IEC61000-6-3 ..... ..._.. ...... ...... ....... ....., ...... _.... ....... .. ._ ... Safety IEC62109-1(class II safety),UL1741 ...... .... ... L..... .._ ...... .. ._. .... .ROHS .. � ....... __.. __........Yes INSTALLATION SPECIFICATIONS _..... _-- Maximum Allowed System Voltage .._ .......1000 Dmensions(W x L x H) 141 x 212 x 40.5/5.55 x 8.34 x159 - mm/in Weight(mcludmg cables) 950/2.1 gr/lb.— In put Connector MC4/Amphenol/Tyco d- _Output Wire.Type/Connector Double Insulated Amphenol .. ........ ....... L._. 095/3.0.. 1.2/39 ..... ...m/ft.... oy- Output Wire Length - Operating Temperature Range 40-+85/40 +185 Protection Rating IP65/NEMA4 .. ,..._.... .... Relative Humidity ( .._-0 100 p­m� gee awea. EE PHASE THREE PHASE PV SYSTEM DESIGN USING A SOLAREDGE THRZOBV 4BOV , r INVERTER SINGLE PHASE k I _ .Minimum String Length(Power Optimizers) El .. 10 _.... .. ....,18 .. .._. e r 175 €�•.. �, -'. r �; � ...� 3 . ` Maximum Siting Length(Power OPti .... ) .......... .... .. _25...._. ......_ 25.......... ..._.....50 ..... .......-.. , 3 € .. _......... .... ... 5250 6000 12750 W -� r'. r Maximum Power per String .. .. ...._._ ...._.._ _..........._ _........ _ ra - a" La€;� •,i €. ..�<•'�`— , r� Parallel Strings of Different Lengths or Orientations... .....Yes s Of ��m m �t4 �n€ sr €f'shatli € J 1 _. �» ix[EI��¢st+�fst F�yfuh rra�ct�ttsisar� * Fast Instagaion with 41"M110 slE 1 eJttgeneraridn maitriOEta liad s ule Tevef tiS Yi tr y Module}euel uoltageshuttiown for installerand firefighter safety USA - GERMANY ITALY - FRANCE - JAPAN - CHINA - ISRAEL - AUSTRALIA WWw.solaredge.u5 =' ''t'SolarQty ZepSolar Next-Level PV Mounting Technology Z-SolarGty ZepSolar Next-Level PV Mounting Technology Zep System Components " for composition shingle roofs zA f r Leveling Foot standzaa Zntertwk ;toy 4, �evrlirp Foot Part No.850-1172 pl ETL listed toUL467 ' �'' ��1� � 115-3- gg Zap compatt"PY 1/odtAe 4 a y Rod AttaoMmarrr x Array 9ldrt Comp Mount Part No.850-1382 Listed to UL 2582 Mounting Block Listed to UL 2703 Q r,OMPATAe Ah Description PV mounting solution for composition shingle roofs FgAN Works with all Zep Compatible Modules Auto bonding UL-listed hardware creates structural and electrical bond _ • Zep System has a UL 1703 Class"A"Fire Rating when installed using modules from any manufacturer certified as"Type 1"or"Type 2" �L LISTED Interlock Ground Zep V2 DC Wire Clip Specifications Part No.850-1388 Part No.850-1511 Part No.8541448 • Designed for pitched roofs Listed to UL 2703 Listed to UL 467 and UL 2703 Listed to UL 1565 • Installs in portrait and landscape orientations • Zep System supports module wind uplift and snow load pressures to 50 psf per UL 1703 • Wind tunnel report to ASCE 7-05 and 7-10 standards • Zep System grounding products are UL listed to UL 2703 and UL 467 • Zep System bonding products are UL listed to UL 2703 • Engineered for spans up to 72"and cantilevers up to 24" • Zep wire management products listed to UL 1565 for wire positioning devices • Attachment method UL listed to UL 2582 for Wind Driven Rain Array Skirt,Grip, End Caps Part Nos.850-0113,8541421, zepsolar.com zepsolar.com 850-1460,850-1467 Listed to UL 1565 This document does not create any express warranty by Zep Solar or about its products or services.Zap Solar's sole warranty is contained in the written product warranty for This document does not create any express warranty by Zap Solar or about its products or services.Zep Solar's sole warranty is contained in the written product warranty for each product.The end-user documentation shipped with Zep Solar's products constitutes the sole specifications referred to in the product warranty.The customer is solely each product.The end-user documentation shipped with Zep Solar's products constitutes the sole specifications referred to in the product warranty.The customer is solely responsible for verifying the suitability of ZepSolar's products for each use.Specifications are subject to change without notice.Patents and Apps:zspats.com. responsible for verifying the suitability of ZepSolar's products for each use.Specifications are subject to change without notice.Patents and Apps:zspats.com. Document#800-1890-001 Rev A Date last exported: November 13,2015 2:23 PM Document#800-1890-001 Rev A Date last exported: November 13,2015 2:23 PM WARNING:PHOTOVOLTAIC POWER SOURCE Label Location: Label Location: Label Location: _ _ -• WARNING (PNDeECr C)C••_(PNCeE)r(C CC:.- WARNING _ ELECTRIC SHOCK HAZARD •• ELECTRIGSHOCK HAZARD 690 •' DG?NOT TOUCH TERMINALS THE DC CONDUCTORS OF THIS BE USED WHEN Label TERMINALS ON BOTH LINE AND PHOTOVOLTAIGSYSTEM ARE • LOAD SIDES MAY BE ENERGIZED UNGROUNDED AND PHOTOVOLTAIC DC tN THE OPEN POSITION MAY BE ENERGIZED UNGROUNDED DISCONNECT P" ;;� , Labell . . . Label • • PHOTOVOLTAIC POINT OF (POI) INTERCONNECTION Code: MAXIMUM POWER- A WARNING: ELECTRIC SHOCK POINT CURRENT(Imp)- - Code: 690.17.4; ' HAZARD. DO NOT TOUCH MAXIMUM POWER- V NEC 690.53 TERMINALS.TERMINALS ON POINT VOLTAGE(Vmp)- BOTH THE LINE AND LOAD SIDE MAXIMUM SYSTEM MAY BE ENERGIZED IN THE OPEN VOLTAGE(Voc)-V POSITION. FOR SERVICE SHORT-CIRCUIT A DE-ENERGIZE BOTH SOURCE CURRENT(Isc)� AND MAIN BREAKER. PV POWER SOURCE MAXIMUM AC A OPERATING CURRENT - NIAXIMUM Label . • OPERATING VOLTAGE WARNING DCode: ELECTRIC SHOCK HAZARD 690.5(C) Label NORMALLY GROUNDED Location: CONDUCTORS MAY BE CAUTION (POI) UNGROUNDED AND ENERGIZED DUAL POWER SOURCE Per •.- SECOND SOURCE IS NEC 690.64.13.4 PHOTOVOLTAIC SYSTEM Label • • (DC)(CB) Label Location: Per Code:WARNING ELEGTR(CAL SHOCK HAZARD ' 690.17(4) CAUTION _ _ DO NOT TOUCH TERMINALS TERMINALS ON BOTH LINE AND •• LOAD SIDES MAY BE ENERGIZED PHOTOVOLTAIC SYSTEM 690.64.13.4 IN THE OPEN POSITION CIRCUIT IS BACKFED DC VOLTAGE IS ALI,NAYS PRESENT WHEN SOLAR MODULES ARE EXPOSED TO SUNLIGHT Label • • WARNING :_'Code: INVERTER OUTPUT •.� Label CONNECTION 64 AC Disconnect PHOTOVOLTAIC AC DO NOT RELOCATE DISCONNECT •'_ THIS OVERCURRENT Conduit Per (CB): Combiner B• NEC I •'0 • • Panel Disconnect Interior • • Label Location: (INV): Inverter With Integrated DC Disconnect MAXIMUM AC Meter Load OPERATING CURRENT Per MAXIMUM AG V NEC 690.54 '• Point of • • 3055 Clearview Way OPERATING VOLTAGE .' San Mateo,CA 94402 T:(6SO)638-1028 F:(650)638-1029 • . . ► . LabelSet GROUND SPECS MAIN PANEL SPECS GENERAL NOTES INVERTER SPECS MODULE SPECS LICENSE BOND (N) #8 GEC TO TWO (N) GROUND Panel Number:NoMatch Inv 1: DC Ungrounded GEN 168572 RODS AT PANEL WITH IRREVERSIBLE CRIMP Meter Number:88 796 651 Tie-In: Supply Side Connection INV 1 -(1)SOLAREDGE E GSE5000 V, 97.5 4 T/ LABEL: A -(23)TRINA SOLAR ## TSM2360P PTT, # Inverter; 50 0W, 240V, 97.57q w Unifed Disco and ZB,RGM,AFCI PV Module; 260W, 236.9W PTC, 40MM, Black Frame, H4, ZEP, 1000V ELEC 1136 MR Overhead Service Entrance INV 2 Voc: 38,2 Vpmax: 30.6 INV 3 Isc AND Imp ARE SHOWN IN THE DC STRINGS IDENTIFIER E 100A MAIN SERVICE PANEL E 10OA/2P MAIN CIRCUIT BREAKER (E) WIRING CUTLER-HAMMER Inverter 1 Disconnect CUTLER-HAMMER 10OA/2P 4 Disconnect 3 SOLAREDGE *DC. MPi,MP2,MP3: A 30A SE5000A-US000SNR2 A 1x14 B L1 zaov F---------------------- ----------- -------------- ----� L2 1 Dc+ I i N DC- I (E) LOADS GND 2 I _--- GND _ ---_--_-- -EGC/ _-- DC+ + (El 31 13) I �� cEC N Da C MP3,MP4: 1x9 ---J EGC--- --------------------- ------------- G -------------- - --tJ N 1 I 1 Conduit Kit; 3/4"EMT o EGC GEC_ z � l I I 1 I I 1 1 �- GEC TO 120/240V I I SINGLE PHASE UTILITY SERVICE 1 I I 1 i 1 1 I I 1 I PHOTO VOLTAIC SYSTEM EQUIPPED WITH RAPID SHUTDOWN Voc* = MAX VOC AT MIN TEMP POI (2)SdxR8 P� A (1)CUTLER-HAMMER I DG222NRB /k PV (23)SOLAREDGE�300-2NA4AZS D� -(2)ILSCO IPC 4 0 Per Disconnect; 60A, 240Vac, Fusible, NEMA 3R H PowerBox ptimizer, 30OW, H4, DC to DC, ZEP Insulation Piercing Connector; Main 4/0-4, Tap 6-14 (1)CUTLER-HAMMER #DG221UR6 B nd (1)AWG/6, Solid Bare Copper SC SUPPLY SIDE CONNECTION. DISCONNECTING MEANS SHALL BE SUITABLE Disconnect; 30A, 240Vac, Non-Fusible, NEMA 3R -(1)CUTLER- AMMER DGO30NB -(1)Ground Rod; 5/8" x 8', Copper AS SERVICE EQUIPMENT AND SHALL BE RATED PER NEC. Ground�lleutral K t; 30A, General Duty(DG) (N) ARRAY GROUND PER 690.47(D). NOTE: PER EXCEPTION NO. 2, ADDITIONAL !ELECTRODE MAY NOT BE REQUIRED DEPENDING ON LOCATION OF (E) ELECTRODE 1 AWC /6, THWN-2, Black -- _ _ (1 AWG/10, THWN-2, Black - 4 cn (1)AWG/6, THWN-2, Red � i (2)AWG/10, PV Wire, BOON, Black Voc* =500 VDC Isc =15 ADC (1)AWG O Isl-(1)AWG/10, THWN-2, Red 3 O (1)AWG#6, Solid Bare Copper EGC Vmp =350 VDC Imp=10.26 ADC /6, THWN-2, White NEUTRAL Vmp =240 VAC Imp=21 AAC M (1)AWG/10, THWN-2, White NEUTRAL Vmp =240 VAC Imp=21 AAC 1 Conduit Kit; 3/4" EMT (. 70 AWG/6, Solid Bore.Copper. ,GEC. . . _-(1)Conduit.Kit.3/4".EMT, _ . . -(1)AWG#8, THWN-2, Green EGC/GEC (1)Conduit.Kit;. (2 AWG/10, PV Wire, ti00V, Black Voc* =500 VDC Isc =15 ADC O (1)AWG#6, Solid Bare Copper EGC Vmp =350 VDC Imp=6.6 ADC (1)Conduit Kit; 3/4"EMT 4 I CONFIDENTIAL- THE INFORMATION HEREIN JOB NUMBER: J B-01017 2 8 0 0 PREMISE OWNER: DESCRIPTION; DESIGN. } CONTAINED SHALL NOT E USED FOR THE MARTINEAU, ANN MARIE MARTINEAU RESIDENCE Nathan Graham `z"It' 'ar�� 1. NOR SHALL OF ANYONE EXCEPT IN WHOLE INC., MOUNTING SYSTEM: �� . ` , NOR SHALL IT BE DISCLOSED IN WHOLE oR IN Com Mount Type C 60 PIONEER KNOLLS �'' Y PART TO OTHERS OUTSIDE THE RECIPIENTS P 5.9 8 K W P V A R R A Y ORGANIZATION, EXCEPT IN CONNECTION WITH MODULES. FLORENCE, MA 01062 THE SALE AND USE OF THE RESPECTIVE (23) TRINA SOLAR # TSM-260PDO5.18 24 St. Martin Drive,Building 2,Unit 11 SOLARCITY EQUIPMENT, WITHOUT THE WRI1TEt4 INVERTER: PAGE NAME: SHEET: REV DALE Marlborough,MA 01752 PERMISSION OF SOLARCITY INC. 41 3 5 8 6-0 0 9 2 T. (650)638-1028 F: (650)636-1029 SOLAREDGE SE5000A-USOOOSNR2 ) THREE LINE DIAGRAM PV 6 12/2/2015 (BB8)-SOL-cm(765-2489) www.solarcity.com UPLIFT CALCULATIONS SEE SEPARATE PACKET FOR STRUCTURAL CALCULATIONS. PREMISE OWNER: DESCRIPTION: DESIGN: CONFIDENTIAL- THE INFORMATION HEREIN JOB NUMBER: JB-0101728 00 MARTINEAU ANN MARIE MARTINEAU RESIDENCE Nathan Graham CONTAINED SHALL NOT BE USED FOR THE BENEFIT OF ANYONE EXCEPT SOLARCITY INC., MOUNTING SYSTEM: 6 0 PIONEER KNOLLS 5.9 8 K W P V ARRAY solareCity. NOR SHALL IT BE DISCLOSED IN WHOLE OR IN Carp Mount Type C PART TO OTHERS OUTSIDE THE RECIPIENT'S MooutEs n' FLORENCE, MA 01062 Unit 11 ORGANIZATION, EXCEPT IN CONNECTION NTH 24 St. Martin Drive, Building 2, THE SALE AND USE OF THE RESPECTIVE (23) TRINA SOLAR # TSM-260PDO5.18 PAGE NAME SHEET: REV. DATE: Marlborough,MA 01752 SOLARCITY EQUIPMENT, WITHOUT THE WRITTEN INVERTER: (413) 586-0092 T: (650)s38-105- F: (650)638-1029 PERMISSION OF SOLARCITY INC. SOLAREDGE SE5000A—USOOOSNR2 UPLIFT CALCULATIONS PV 5 12�2�2015 (BBB�sa-qTY(7ss 24es) www.8olaraity.can -' S1 JASON WIL IA S 1 TUNIAN `, STR11 TtJRAL C No.51554 2„ 9,-3„ +Sr I NAL (E) LBW (E) LBW 02/2015 D SIDE VIEW OF MP4 NTS C SIDE VIEW OF MP3 NTS MP4 X-SPACING X-CANTILEVER Y-SPACING Y-CANTILEVER NOTES MP3 X-SPACING X-CANTILEVER Y-SPACING Y-CANTILEVER1 NOTES LANDSCAPE 72" 24" STAGGERED LANDSCAPE 72" 24" STAGGERED PORTRAIT 48" 18" PORTRAIT 48" 20" ROOF AZI 137 PITCH 27 RAFTER 2x6 @ 24" OC ARRAY AZI 137 PITCH 27 STORIES: 1 RAFTER 2x6 @ 24" OC ROOF AZI 227 PITCH 30 STORIES: 1 c.J. 2x4 @24" OC ARRAY AZI 227 PITCH 30 Comp Shingle C.J. 2x8 @48" OC Comp Shingle PV MODULE 5/16" BOLT WITH LOCK INSTALLATION ORDER & FENDER WASHERS LOCATE RAFTER, MARK HOLE ZEP LEVELING FOOT (1) LOCATION, AND DRILL PILOT ZEP ARRAY SKIRT (6) HOLE. (4) (2) SEAL PILOT HOLE WITH ZEP COMP MOUNT C POLYURETHANE SEALANT. ZEP FLASHING C (3) (3) INSERT FLASHING. (E) COMP. SHINGLE (1) (4) PLACE MOUNT. (E) ROOF DECKING U (2) V INSTALL LAG BOLT WITH 5/16" DIA STAINLESS (5) (5) SEALING WASHER. STEEL LAG BOLT LOWEST MODULE SUBSEQUENT MODULES WITH SEALING WASHER (6) INSTALL LEVELING FOOT WITH (2-1/2" EMBED, MIN) BOLT & WASHERS. (E) RAFTER STANDOFF SScale: 1 1/2" = 1' CONFIDENTIAL— THE INFORMATION HEREIN 109 NUMBER: J B-0101728 0 0 PREMISE OWNER: DESCRIPTION; DESIGr. CONTAINED SHALL NOT E USED FOR THE MARTINEAU, ANN MARIE MARTINEAU RESIDENCE Nathan Graham ;;,So�arCit . BENEFIT OF ANYONE EXCEPT SOLARCITY INC., MOUNTWG SYSTEM; � � NOR SHALL IT BE DISCLOSED IN WHOLE OR IN Comp Mount Type C 60 PIONEER KNOLLS 5.98 KW PV ARRAY ��'". Y PART TO OTHERS C PT IN THE CONNECTION T FLORENCE, MA 01062 ORGANIZATION, EXCEPT IN CONNECTION YATH MODULES 24 St. Martin Drive, Building 2, Unit 11 THE SALE AND USE OF THE RESPECTIVE (23) TRINA SOLAR # TSM-260PDO5.18 SHEET: REV DATE Marlborough,Dri e, MA Building Z SOLARCITY EQUIPMENT, WITHOUT THE WRITTEN . PAGE NAME PERMISSION of SoLARGTY INC. (41 3 586-0092 T: (650)638-1026 F: (650)638-1029 SOLAREDGE SE5000A—USOOOSNR2 C ) STRUCTURAL VIEWS PV 4 12/2/2015 (666)—SCI—CITY(765-2469) www.Warcity�om r jt r U1 U1 2x6 SPF#2 (N 2x6 SPF#2 (N S1 10'-9 S 1 11'-3 —2" 11'-5" '-2" 11'-6° (E) LBW (E) LBW A SIDE VIEW OF MP1 NTS SISTER UPGRADE INFORMATION: RAFTER UPGRADE INDICATED BY HATCHING SIDE VIEW OF MP2 NTS SISTER UPGRADE INFORMATION: RAFTER UPGRADE INDICATED BY HATCHING zjjzzzzM UPGRADE NOTES: B MP1 X-SPACING X-CANTILEVER Y- PACING Y-CANTILEVER NOTES 1. CUT AND ADD (N) SISTER AS SHOWN IN THIS SIDE VIEW AND REFERENCED TOP VIEW. UPGRADE NOTES: LANDSCAPE 72" 1 24" STAGGERED 2. FASTEN (N) SISTER TO (E) MEMBER W/ SIMPSON SOW 22300 (IF 2—PLY) OR 22458 MP2 I X-SPACING I X-CANTILEVER Y-SPACING Y-CANTILEVER NOTES 1. CUT AND ADD (N) SISTER AS SHOWN IN THIS SIDE VIEW AND REFERENCED TOP VIEW. IF 3—PLY SDW SCREWS AS SHOWN AT 16° O.C. ALONG SPAN AS SPECIFIED, IF LANDSCAPE 72" 24" STAGGERED 2. FASTEN (N) SISTER TO (E) MEMBER W/ SIMPSON SDW 22300 (IF 2—PLY) OR 22458 PORTRAIT 48" 18" ( ) PORTRAIT 48" 17" (IF 3—PLY) SDW SCREWS AS SHOWN AT 16" O.C. ALONG SPAN AS SPECIFIED, IF RAFTER 2x6 @ 24"OC ROOF AZI 227 PITCH 25 STORIES:1 WOOD SPLITTING IS SEEN OR HEARD, PRE—DRILL WITH A �" DRILL BIT. ARRAY AZI 227 PITCH 25 ALT. OPTION FOR FULL LENGTH MEMBERS ONLY— FASTEN N SIDE MEMBER TO RAFTER 2x6 @ 24"OC ROOF AZI a7 PITCH za STORIES:1 WOOD SPLITTING IS SEEN OR HEARD, PRE—DRILL WITH A �" DRILL BIT. C.I. 2x6 @16"OC Comp Shingle ( ) ARRAY AZI a7 PITCH 28 ALT. OPTION FOR FULL LENGTH MEMBERS ONLY— FASTEN (N) SIDE MEMBER TO (E) RAFTER W/ 10d (IF 2—PLY) OR 16d FROM EACH SIDE (IF 3—PLY) COMMON C.I. 2x6 @16"OC Comp Shingle (E) RAFTER W/10d (IF 2—PLY) OR 16d FROM EACH SIDE (IF 3—PLY) COMMON NAILS AT 6" O.C. ALONG SPAN. •SISTER ALL RAFTERS ON THIS MP SECTION INTO WHICH THE ARRAY IS LAGGED NAILS 6" O.C. ALONG SPAN. T •SISTER ALL RAFTERS ON THIS MP SECTION INTO WHICH THE ARRAY IS LAGGED JASON WIL TAM TOMAN `fir STRUCTURAL Gant T 2/2015 SIMPSON SDW 22300 WOOD SCREWS (E) RAFTER 6" END (E) WALL OR (N) SISTER MEMBER CENTERED (E) RIDGE BOARD DISTANCE SUPPORT BELOW BETWEEN SUPPORTS OR SUPPORT BELOW I —16" O.C. TYP.�r (E) 2x6 RAFTER 2%" I SEE MP SIDE VIEW FOR REQUIRED LENGT" D1 D1 SIMPSON SDW WOOD SCREWS (N) 2x6 SIDE MEMBER MIR _ TOP VIEW OF PARTIAL LENGTH SISTER U1 Scale: 3/4"=1'-0" D1 2x6 END FASTENER GROUPING Scale: 1"=1'-0" PREMISE OWNER: DESCRIPTION: DESIGN: CONFIDENTIAL— THE INFORMATION HEREIN JOB NUMBER: ,JB-0101728 00 MARTINEAU, ANN MARIE MARTINEAU RESIDENCE ,,,So�arCity CONTAINED SHALL NOT BE USED FOR THE Nathan Graham �. BENEFIT OF ANYONE EXCEPT SOLARCITY INC., MOUNTING SYSTEM: 60 PIONEER KNOLLS 5.98 KW PV ARRAY •„r NOR SHALL IT BE DISCLOSED IN WHOLE OR IN Comp Mount Type C PART TO OTHERS OUTSIDE THE RECIPIENTS FLORENCE, MA 01062 MODULES,ORGANIZATION, EXCEPT IN CONNECTION WITH 24 St. Martin Drive, Building 2, Unit it THE SALE AND USE OF THE RESPECTIVE (23) TRINA SOLAR # TSM-260PD05.18 PAGE NAME: SHEET: REV: DATE: Modborough,MA 01752 SOLARCITY EQUIPMENT, WITHOUT THE WRITTEN INVERTER: (413) 586-0092 T: (650)638-1028 F: (650) .sofa 29 PERMISSION OF SOtARCITY INC. SOLAREDGE SE5000A—US000SNR2 STRUCTURAL VIEWS PV 3 12/2/2015 (888)—soL-CITY(7ss-2489) ,rw.�.galaraitr�am PITCH: 25 ARRAY PITCH:25 MP1 AZIMUTH:227 ARRAY AZIMUTH:227 MATERIAL: Comp Shingle STORY: 1 Story PITCH: 28 ARRAY PITCH:28 MP2 AZIMUTH:47 ARRAY AZIMUTH:47 B MATERIAL: Comp Shingle STORY: 1 Story O PITCH: 30 ARRAY PITCH:30 MP3 AZIMUTH:227 ARRAY AZIMUTH:227 ' AC MATERIAL: Comp Shingle STORY: 1 Story PITCH: 27 ARRAY PITCH:27 MP4 AZIMUTH: 137 ARRAY AZIMUTH: 137 --- AC I MATERIAL: Comp Shingle STORY: 1 Story -- Inv ZdW L" ❑ --- LEGEND (E) UTILITY METER & WARNING LABEL Inv INVERTER W/ INTEGRATED DC DISCO MP1 - .MP3 & WARNING LABELS -1 © DC DISCONNECT & WARNING LABELS a JASON WIL IAt AC DISCONNECT & WARNING LABELS OAN 0 M , STRUCTURAL r 1 . r 'l• B DC JUNCTION/COMBINER No BOX & LABELS 51554 Ted -� DISTRIBUTION PANEL & LABELS `S`1C OVA .- , /02/2015 r tk ` LOAD CENTER & WARNING LABELS Digitally slgned by Jason Toman Date:2015.12.02 22:23:34 DEDICATED PV SYSTEM METER 07'00' _ A �° STANDOFF LOCATIONS CONDUIT RUN ON EXTERIOR " CONDUIT RUN ON INTERIOR GATE/FENCE HEAT PRODUCING VENTS AR E RED f (E) DRIVEWAY � � %� e' i' INTERIOR EQUIPMENT IS DASHED SITE PLAN 60 Pioneer Knolls Scale: 1/8" = 1' 01' 8' 16' CONFIDENTIAL— THE INFORMATION HEREIN M NUMBER: ,J g_0101728 00 POSE OMTd:R. DESCRIPTION: DESIGN: CONTAINED SHALL NOT E USED FOR THE MARTINEAU, ANN MARIE MARTINEAU RESIDENCE Nathan Graham BENEFIT OF ANYONE EXCEPT IN WILE INC., MOUNTING SYSTEM: ,SO larCity.PARTSTO OTHERS OUTSIDE THE RECIPIENTS IN Comp Mount Type C 60 PIONEER KNOLLS 5.98 KW PV ARRAY �-0 atcANlzanoN, EXCEPT IN CONNECTION WITH MaOUtES FLORENCE, MA 01062 THE SALE AND USE OF THE RESPECTIVE (23) TRINA SOLAR # TSM-260PDO5.18 24 St.Martin Drive,Building 2 Unit 11 PERMISSION EQUIPMENT, WITHWT THE WRITTEN INVERTER: PAGE NAME: SHEET: REV DATE Ma@ Drive, MA Building Z PERMISSION soLARarr INC. SOLAREDGE SE5000A—USOOOSNR2 (413) 586-0092 T: (650)638-1028 F: (650)636-1029 +� - SITE PLAN I PV 3 12/2/2015 1(888)-SCI-CITY(765-2489) www."orcity.com . w ABBREVIATIONS ELECTRICAL NOTES JURISDICTION NOTES A AMPERE 1. THIS SYSTEM IS GRID—INTERTIED VIA A AC ALTERNATING CURRENT UL—LISTED POWER—CONDITIONING INVERTER. BLDG BUILDING 2. THIS SYSTEM HAS NO BATTERIES, NO UPS. CONC CONCRETE 3. A NATIONALLY—RECOGNIZED TESTING DC DIRECT CURRENT LABORATORY SHALL LIST ALL EQUIPMENT IN EGC EQUIPMENT GROUNDING CONDUCTOR COMPLIANCE WITH ART. 110.3. CITY OF NORTHAMPTON (E) EXISTING 4. WHERE ALL TERMINALS OF THE DISCONNECTING BUILDING DEPARTMENT EMT ELECTRICAL METALLIC TUBING MEANS MAY BE ENERGIZED IN THE OPEN POSITION, FSB FIRE SET—BACK A SIGN WILL BE PROVIDED WARNING OF THE GALV GALVANIZED HAZARDS PER ART. 690.17. GEC GROUNDING ELECTRODE CONDUCTOR 5. EACH UNGROUNDED CONDUCTOR OF THE GND GROUND MULTIWIRE BRANCH CIRCUIT WILL BE IDENTIFIED BY These plans have been reviewed HDG CUR DIPPED GALVANIZED 6. SYSTEM GROUND SHALL And approved, Imp CURRENT AT MAX POWER COMPLY WITH ART. 250.97, 250.92(6). Isc SHORT CIRCUIT CURRENT 7. DC CONDUCTORS EITHER DO NOT ENTER kVA KILOVOLT AMPERE BUILDING OR ARE RUN IN METALLIC RACEWAYS OR Date kW KILOWATT ENCLOSURES TO THE FIRST ACCESSIBLE DC LBW LOAD BEARING WALL DISCONNECTING MEANS PER ART. 690.31(E). MIN MINIMUM 8. ALL WIRES SHALL BE PROVIDED WITH STRAIN (N) NEW RELIEF AT ALL ENTRY INTO BOXES AS REQUIRED BY Signature NEUT NEUTRAL UL LISTING. NTS NOT TO SCALE 9. MODULE FRAMES SHALL BE GROUNDED AT THE OC ON CENTER UL—LISTED LOCATION PROVIDED BY THE PL PROPERTY LINE MANUFACTURER USING UL LISTED GROUNDING POI POINT OF INTERCONNECTION HARDWARE. PV PHOTOVOLTAIC 10. MODULE FRAMES, RAIL, AND POSTS SHALL BE SCH SCHEDULE BONDED WITH EQUIPMENT GROUND CONDUCTORS. S STAINLESS STEEL STC STANDARD TESTING CONDITIONS TYP TYPICAL UPS UNINTERRUPTIBLE POWER SUPPLY V VOLT Vmp VOLTAGE AT MAX POWER VICINITY MAP INDEX Voc VOLTAGE AT OPEN CIRCUIT W WATT 3R NEMA 3R, RAINTIGHT PV COVER SHEET PV2 SITE PLAN PV3 STRUCTURAL VIEWS PV4 STRUCTURAL VIEWS LICENSE GENERAL NOTES PV5 UPLIFT CALCULATIONS PV6 THREE LINE DIAGRAM GEN #168572 1. ALL WORK TO BE DONE TO THE 8TH EDITION Cutsheets Attached ELEC 1136 MR OF THE MA STATE BUILDING CODE. 2. ALL ELECTRICAL WORK SHALL COMPLY WITH THE 2014 NATIONAL ELECTRIC CODE INCLUDING MASSACHUSETTS AMENDMENTS. MODULE GROUNDING METHOD: ZEP SOLAR AHJ: Northampton REV BY DATE COMMENTS REV A NAME DATE COMMENTS UTILITY: National Grid USA (Massachusetts Electric) * * CONFIDENTIAL- THE INFORMATION HEREIN JOB NUMBER PREMISE OWfR: DESCRIPTION: DESIGN: CONTAINED SHALL NOT BE USED FOR THE J B-01017 2 8 O 0 MARTINEAU, ANN MARIE MARTINEAU RESIDENCE Nathan Graham So�arCity. BENEFIT OF ANYONE EXCEPT SOLARCITY INC., MOUNTING SYSTEM: /��� NOR SHALL IT BE DISCLOSED IN WHOLE OR IN Comp Mount Type C 60 PIONEER KNOLLS 5.98 KW PV ARRAY ►�� PART IZ OTHERS OUTSIDE THE RECIPIENT'S MODULES: FLORENCE MA 01062 ORGANIZATION, EXCEPT IN CONNECTION VN1H r THE SALE AND USE OF THE RESPECTIVE (23) TRINA SOLAR # TSM-260PDO5.18 24 St. Martin Drive,Building 2,Unit 11 SOLARCITY EQUIPMENT, WITHOUT THE WRITTEN INVERTER: PAGE NAME: SHEET. REV: DATE T: 650 6arlborough,MA 01752 PERMISSION of soLARaTY INC. SOLAREDGE SE5000A—USOOOSNR2 (413) 586-0092 COVER SHEET PV 1 12/2/2015 �BBB>-SOL)CIT�iss624FSSjs oo citycorn CALCULATION OF DESIGN WIND LOADS - MP 777 Roofing Material Comp Roof PV System Type SolarCity SleekMount"" Spanning Vents No Standoff Attachment Hardware Comp Mount T C Roof Slope 270 Rafter Spacing 24"O.C. Framing Type Direction Y-Y Rafters Purlin Spacing X-X Purlins Only NA, Tile Reveal Tile Roofs Only NA Tile Attachment System Tile Roofs Only NA ,Standing Seam/Trap Spacing SM Seam Only NA Wind Design Code ASCE 7-05 Wind Design Method Partially/Fully Enclosed Method Basic Wind Speed V 90 mph Fig. 6-1 Exposure Category C Section 6.5.6.3 Roof Style Gable Roof Fig.6-11B/C/D-14A/B Mean Roof Height h 15 ft Section 6.2 Wind Pressure Exposure K� 0.85 Table 6.3 Topographic Factor Kzt 1.00 Section 6.5.7 Wind Directionality Factor Kd 0.85 Table 6-4 Importance Factor I 1 1.0 Table 6-1 Velocity Pressure qh qh =0.00256(Kz)(Kzt)(Kd)(V^2)(I) Equation 6-15 15.0 psf dP , re' Ext. Pressure Coefficient U GC u -0.88 Fig.6-11B/C/D-14A/B Ext.Pressure Coefficient Down ni 0.45 Fig.6.11B/C/D-14A/B Design Wind Pressure p= qh(GC ) Equation 6-22 Wind PreasuCe �1 - ind Pr+a s Mr b n ALLOWABLE STANDOFF SPACINGS r Max Allowable Standoff Spacing Landscape 72" 39" Max Allowable Cantilever Landscape 24" NA Standoff Configuration Landscape Staggered Max Standoff Tributary Area Trib 20 sf PV Assembly Dead Load W-PV 3.0 psf Net Wind Uplift at Standoff T-actual -224 lbs Uplift Capacity of Standoff T-allow 500 lbs Standoff Demand Ca ci DCR 44,9% di '4-Dirwdon Max Allowable Standoff Spacing Portrait 48" 65" Max Allowable Cantilever Portrait 18" NA Standoff Configuration Portrait Staggered Max Standoff Tributary Area Trib 22 sf PV Assembly Dead Load W-PV 3.0 psf Net Wind Uplift at Standoff T actual -249 lbs Uplift Capacity of Standoff T-allow 500 lbs Standoff Demand/Capacity DCR 49.8% STRUCTURE ANALYSIS --LOADING SUMMARY AND MEMBER.CHECK- MP4 M bre �. '' kv Overhang 3.16 ft Actual W 1.50" :: .... P . 5,50"[ Number of Spans(w Lo overhang) 1 San 2 Nominal Yes Roofl M t Trial Corno Roof Sinn 3 A &8_jn.^2 Re-Roof No Span 4 S. 7.56 in.^3 P od Sheaths " Yes San S Ix 20.80'In,A4 Board Sheathing Solid-Sheathing Total Rake Span 12.63 ft TL DefPn Limit 120 Vaulted CAlling No PV I start 1.83 ft woad cies Sl'F Ceiling Finish 1/2"Gypsum Board PV 1 End 11.83 ft Wood Grade #2 Rafter Slope 270 PV 2 Start P 875 psi Rafter Spacing 24"O.C. PV 2 End F„ 135 psi Td 10AP404 I I I Full PV 3 Start c E 1400000 psi Bot Lat Bracing At Supports PV 3 End Emig 510000 psi M' of n S�#11r mn MW ft Roof Dead Load DL 11.5 psf x 1.12 12.9 psf 12.9 psf PV Dead Load PV DL 3.0 psf x 1.12 3.4 psf Roof Live Load RLL 20.0 psf x 0.90 18.0 psf Lives/Snow Lail. #L SLx z 40.0 psf x 0.7', x 0.7 28,11 psf MODS f Tal Load' .its Lip . ` Notes: 1. ps=Cs*pf; Cs-roof, Cs-pv per ASCE 7[Figure 7-2] 2. pf=0.7(Q(Ct)(IS)p9; C,=0.9,Ct=1.1,I5=1.0 embiv,De SU D Cr '" : - � 1.1 " 1.Gp X1.75 I�3 � 115 er J OWWs ntma i�rnin Shear Stress 97 psi 3.2 ft 155 psi 0.63 Pass CALCULATION OF DESIGN WIND LOADS .. MP In Roofing Material Comp Roof Pit System Type SolarCity SleekMountTm Spanning Vents No Standoff Attachment hardware Comp Mount T` C Roof Slope 300 Rafter Spacing 24"O.C. Framing Type Direction Y-Y Rafters Purlin Spacing X-X Purlins Only NA Tile Reveal Tile Roofs Only NA Tile Attachment System Tile Roofs Only NA ,Standing Seam/Trap Spacing SM Seam Only NA Wind B O Wind Design Code ASCE 7-05 Wind Design Method Partially/Fully Enclosed Method Basic Wind Speed V 90 mph Fig. 6-1 Exposure Category C Section 6.5.63 Roof Style Gable Roof Fig.6-11B/C/D-14A/B Mean Roof Height h 15 ft Section 6.2 Wind Pt6ism Coil Wind Pressure Exposure K� 0.85 Table 6-3 Topographic Factor Ka 1.00 Section 6.5.7: Wind Directionality Factor Kd 0.85 Table 6-4 Importance Factor I 1.0 Table 6-1 Velocity Pressure qh qh = 0.00256(Kz)(Kzt)(Kd)(V^2)(I) Equation 6-15 15.0 psf Wind Prewi l Ext. Pressure Coefficient U GC u -0.95 Fig.6-11B/C/D-14A/B Ext. Pressure Coefficient Down G 0.88 Fig.64t6/C/o-14A/B Design Wind Pressure p = qh(GC) E uation 6-22 Wind Pressure Up Pst Wind P ure Down 111 pof ALLOWABLE STANDOFF SPACINGS X-11>11rection c►e.':y= Max Allowable Standoff Spacing Landscape 72" 39" Max Allowable Cantilever Landscape 24" NA Standoff Configuration Landscape Staggered Max Standoff Tributary Area Trib 20 sf PV Assembly Dead Load W-PV 3.0 psf Net Wind Uplift at Standoff T-actual f -247 Ibs Uplift Capacity of Standoff T-allow 500 Ibs Standoff Demand/Capacity DCR 4945% * din Y-p on Max Allowable Standoff Spacing Portrait 48" 65" Max Allowable Cantilever Portrait 20" NA Standoff Configuration Portrait Staggered Max Standoff Tributary Area Trib 22 s PV Assembly Dead Load W-PV 3.0 psf Net Wind Uplift at Standoff T-actual =274 Ibs Uplift Capacity of Standoff T-allow 500 Ibs Standoff Demand Ca DCR 54.9% S RUCTU ANALMS -'WADING SUMMARY AND MEMBER CHECK M ► M .� _._,. . t Overhang 2.16 ft Actual W 1.50"" ",�. ens ...I" n 2 4.28 ft Actualb 5150" Number of Spans w o Overhang) 1 San 2 Nominal Yes Roc►tln Material Como Roof Span 3 A 8.25 itt A2 Re-Roof No San 4 S. 7.56 in.A3 Pl od Sheathing Span 5 20,80 in.A4 Board Sheathing Solid-Sheathing Total Rake S an 13.21 ft TL Defl'n Limit 120 Vaulted Cei No PV 1-start 1.42 ft Wsaod S seise SF Ceilina Finish 1/2"Gypsum Board PV 1 End 12.33 ft Wood Grade #2 Ratter Slope,, 300 PV 2 Start Fb 875 psi Rafter Spacing 24"O.C. PV 2 End F„ 135 psi To'" Lat 111racing Full PV 3 Start E 1400000 psi Bot Lat Bracing At Supports PV 3 End Emi„ 510000 psi M14 V Roof Dead Load DL 11.5 psf x 1.15 13.3 psf 13.3 psf ITV Dead Lori" ITV-ILL 3.0 psf x 1.15 3.5 W Roof Live Load RLL 20.0 psf x 0.85 17.0 psf Live/Sneer Load LL SL',2 40.0 Psf x 0.7 1 x 4.47 28.0 psf 18. teal l n `` 411 35. Notes: 1. ps=Cs*pf,Cs-roof,Cs-pv per ASCE 7[Figure 7-21 2. pf=0.7(Cj(Ct)(IS)p9; Ce 0.9,Ct=1.1,I5=1.0 -56 'J511 ffia, " 1"Noye 3 r ., "t .,�: 1.1 1.00.° . O 1 1,3':.'., V n Prep send 1 =PV filet ,. i J� Gravity Loadinq Check 1282 Dsi 1073 psi 0.84 Pass CALCULATION ©FDESIGN WIND L AD P° Mounting ans r1 can Roofing Material Comp Roof PV System'Type SolarCity SleekMount Ir Spanning Vents No Standoff Attachment Hardware Comp,Mount Ty pet Roof Slope 280 Rafter Spacing 24"O.C. Framing Type Direction Y-Y Rafters Purlin Spacing X-X Puriins Only NA Tile Reveal Tile Roofs Only NA Tile Attachment System Tile Roofs Only NA ,Standing Seam/Trap Spacing SM Seam Only NA a<td Dowarl crite - Wind Design Code ASCE 7-05 Wind Design Method ` Partially/Fully Enclosed Method Basic Wind Speed V 90 mph Fig. 6-1 Exposure Category C Section 6.5.6.3 Roof Style Gable Roof Fig.6-11B/C/D-14A/B Mean Roof Hei ht h 15 ft Section 6.2 Wind Pressure Ca Ian P Wind Pressure Exposure K� _ 0.85 Table 6-3 Topographic Factor Kzt 1100 Section 6.5.7 Wind Directionality Factor Kd 0.85 Table 6-4 Importance Factor 1 1.0 Table 6-1 Velocity Pressure qh qh:= 0.00256(Kz)(Kzt)(Kd)(V^2)(I) Equation 6-15 15.0 psf Ext. Pressure Coefficient U GC U -0.95 Fig.6-11B/C/D-14A/B Ext.Pressure Coefficient Down G 0.88 , i .6-118/C{D 14A1i Desi n Wind Pressure P p= qh(GC ) E nation 6-22 P AJR, 14«2,psU- WOreoure Down T 13.1 - ALLOWABLE STANDOFF SPACINGS 1C-ICI 1r can Max Allowable Standoff Spacing Landscape 72" 39" Max Allowable Cantilever Landscape 24" NA Standoff Configuration Landscape Staggered Max Standoff Tributary Area Trib 20 sf PV Assembly Dead Load W-PV 3.0 psf Net Wind Uplift at Standoff T-actual -247 ft Uplift Capacity of Standoff T-allow 500 Ibs Standoff Demand Ca d DCR 45.E n 7 7",i Z Max Allowable Standoff Spacing Portrait 48" 65" Max Allowable Cantilever Portrait 17" NA Standoff Configuration Portrait Staggered Max Standoff Tributary Area Trib 22 If PV Assembly Dead Load W-PV 3.0 psf Net Wind Uplift at Standoff T-actual -274 lbs Uplift Capacity of Standoff T-allow 500 Ibs Standoff Demand/Capatity I Demand/Ca DM 54.7'/0 STRUMM ANA S -LOAD NG SUMMARY AND MEM6ER CHECK MP2 hem rlei ;. ' .. . . Overhang 2.16 ft � i Net W 3.00" ro- an:i M49 ft X u ► a.SO" Number of Sean (w/o Overhang) 1 San 2 Nominal Yes RooffnO Mhtterlal comp Roof soon 3 A 1,6.50 in.^2 Re-Roof No Span 4 S. 15.12 in.^3 Pl"wood SheadOn' Yes Span S Ix 41,69,In.114 Board Sheathing Solid-Sheathin Total Rake Span 15.46 ft TL Defl'n Limit 120 Vautlted No PV 1 Smart 310 ft Wood Species SPF Ceilina Finish 1/2"Gypsum Board PV 1 End 12.92 ft Wood Grade #2 Of*Slope-' 280 PV 2 Start Fb 87 si Rafter Spacing 24"O.C. PV 2 End F„ 135 psi o-`Lat Bracing Full PV 3 start E 1400000 psi Bot Lat Bracing At Supports PV 3 End Em;,, 510000 psi ember D Ov 9 - .. Roof Dead Load DL 13.0 psf x 1.13 14.7 psf 14.7 Psf PV Lead L PVAX 10 psf x'1.13 3.4 psf Roof Live Load RLL 20.0 psf x 0.88 17.5 psf !/snow Load LL S02 40.0 f x 0.7 x 0.7 28,0 sf, . . 28.0, L'L L v . Notes: 1. ps=Cs*pf;Cs-roof,Cs-pv per ASCE 7[Figure 7-2] 2. pf=0.7(Ce)(Ct)(IS)pg; Ce=0.9,Ct=1.1,I5=1.0 IUD k;' l: - Cr. +5. 1.15 1:00 0. 7 1.3 - , 'x'uz. s�# ' nW Bending + Stress 1107 psi 8.1 ft 1504 si 0.74 Pass CALCULATION OF DESIGN WIND LOADS- MP Roofing Material Comp Roof PV System Type SolarCity Sleek9ountTm Spanning Vents No Standoff Attachment Hardware)— Comp Mount T'' e C Roof Slope 250 Rafter Spacing 24"©,C. Framing T Direction Y-Y Rafters Purlin Spacing X-X Purlins'Only NA Tile Reveal Tile Roofs Only NA Tile Attachment System Tile Roofs Only NA Standing Seam/Trap Spacing SM Seam Only NA Wind D` * - Wind Design Code ASCE 7-05 Wind Design Method Partially/Fully Enclosed Method Basic Wind Speed V 90 mph Fig. 6-1 Exposure Category C Section 65.6.3 Roof Style Gable Roof Fig.6-118/C/D-14A/B Mean Roof Height h 16 ft Section 6.2 Win tl lei Wind Pressure Exposure KZ 0.85 Table 6-3 Topographic factor Ket 1.00 Section 6.5.7 Wind Directionality Factor Kd 0.85 Table 6-4 Importance factor I to, Table 6-1 Velocity Pressure qh qh 1= 0.00256(Kz)(Kzt)(Kd)(V^2)(I) Equation 6-15 15.0 Psf 'ndOWsum ; Ext. Pressure Coefficient U GC u -0.88 Fig.6-118/C/D-14A/B Ext. Pressure Coe ent Down G 0.45 Fig.6.11F1/C/Q-14A/B Design Wind Pressure p p = qh(GC) Equation 6-22 Wind Pnure S. W nd P wn "d plify ALLOWABLE STANDOFF SPACINGS 1��►i on Max Allowable Standoff Spacing Landscape 72" 39" Max Allowable Cantilever Landscape ( 24" NA Standoff Configuration Landscape Staggered Max Standoff Tributary Area Trila 20 sf PV Assembly Dead Load W-PV 3.0 psf Net Wind Uplift at Standoff T-actual ( -224 lbs Uplift Capacity of Standoff T-allow 500 Ibs Standoff Dman Ca DCR 44.8/0 .-. - YwIC►Ir4wUori Max Allowable Standoff Spacing Portrait 48" 65" Max Allowable Cantilever Portrait 181" NA Standoff Configuration Portrait Staggered Max Standoff Tributary Area Trib 22 sf PV Assembly Dead Load W-PV 3.0 psf Net Wind Uplift at Standoff T-actual ( -248 tbs Uplift Capacity of Standoff T-allow 500 Ibs Standoff Demand/Capacity I DCR 4947% STRUCTURE'ANALYSIS-LOADING SUMMARY AND MEMBER CHECK ' MPi Mary '` Cw Men1N raded Rafter � A Overhang 2.16 ft Net W 3.00" r° � e'1 11!40 ft n 5.aW Number of S ans(w Lo Overhang) 1 San 2 Nominal Yes 01loofing Material Como Roof Span 3 A 16.50 1n.^2 Re-Roof No Span 4 S. 15.12 in.^3 Plywood Sheathin` Yes Span S ix 41.59[n.A4 Board Sheathing Solid-Sheathing Total Rake Span 14.96 ft TL Defl'n Limit 120 Vaulted Celli No PV 1 Start 4.17 ft 'Wood Species ,, SPF Ceiling Finish 1/2"Gypsum Board PV 1 End 14.08 ft Wood Grade #2 RAerSlope, 25° PV 2 Start P 875 si Rafter Spacing 24"O.C. PV 2 End F„ 135 psi Top Lot Prulfig Full PV 3 Start E 1400000 psi Bot Lat Bracing At Supports PV 3 End Emi„ 510000 psi Roof _ f Dead Load DL 13.0 psf x 1.10 14.3 psf 14.3 psf PV[dead Ll PV-DL 3.0 psf x 1.10 33'' f Roof Live Load RLL 20.0 psf x 0.93 18.5 psf Live �r Loasi LL Sls.z 40.0 sf x 0.7 1 x,0.7 2810 psf 2$10? f T i*L in 42.5 psf Notes: 1. ps=Cs*pf;Cs-roof,Cs-pv per ASCE 7[Figure 7-2] 2. pf=0.7(Q(Ct)(IS)pg; Ce=0.9,Ct=1.1,I,=1.0 ry �r i r WRf 1« .00 0. 7_ - „ 1, 8 Bending + Stress 1078 psi 8.1 ft 1 1504 si 0.72 Pass r Version#53.4-TBD bo-larCity. RU HARDWARE DESIGN AND STRUC 'lJRAI NA .YS S RESU�."C SUMMARY T LES i.andsrta►pe Hardware-;Lan dsc.4pe Modules'Standoff a#�' Hardware X-X Spacing X-X Cantilever Y-Y S cing Y-Y Cantilever Configuration Uplift DCR MP3 72" 24" 39!' NA Stag ered 44.8% MP2 72" 24" 39" NA Staggered 49.4% MP3 72" 24" 39" NA Staggered 49.5% MP4 72" 24" 39" NA Staggered 44.9% Portrait Hardware-Poruran Modules'Standoff,Specifications Hardware X-X,Spacing X-X Cantilever Y-Y S' cing Y-Y'Cantilever Configuration Uplift DCR MP3 48" 18" 65" NA Staggered 49.7% MP2 48" 17" 65" NA Staggered 54.7% MP3 48" 20" 65' NA Staggered 54.9% MP4 48" 18" 65' NA Staggered 49.8% Structure Mo nting Plane Framing alflcaition Results Type Spacing P1 1114h Member Evaluation Results MP3 Stick Frame @ 24 in.O.C. 25 Member Analysis OK w/Upgrades as Specified in Plans MP2 Stick Frame @ 24 in.O.C. 280 Member Analysis OK w/Upgrades as Specified in Plans MP3 Stick Frame @ 24 in.O.C. 300 Member Impact Check OK MP4 Stick Frame @ 24 in.O.C. 270 Member Analysis OK Refer to the submitted drawings for details of information collected during a site survey. All member analysis and/or evaluation is based on framing information gathered on site.The existing gravity and lateral load carrying members were evaluated in accordance with the IBC and the IEBC. 3055 Clearview Way San Mateo,CA 94402 T(650)638-1028 (888)SOL-CITY F(650)638-1029 solarcity.corTi w Version#53.4-TBD AVft 0+ r RU a V7% December 2, 2015 RE: CERTIFICATION LETTER Project/Job# 0101728 Project Address: Martineau Residence JASON VWIL IAM tp 60 Pioneer Knolls TOMAN 4 FLORENCE, MA 01062 0 0 STRUCTURAL cry AHJ Northampton No.51554 SC Office Springfield Design Criteria: �1C�NAL 2/2015 -Applicable Codes = MA Res. Code, 8th Edition,ASCE 7-05,and 2005 NDS - Risk Category = II -Wind Speed = 90 mph, Exposure Category C -Ground Snow Load = 40 psf - MPi: Roof DL= 13 psf, Roof LL/SL= 28 psf(Non-PV Areas), Roof LL/SL = 28 psf(PV Areas) - MP2: Roof DL= 13 psf, Roof LL/SL= 28 psf(Non-PV Areas), Roof LL/SL = 28 psf(PV Areas) - MP3: Roof DL = 11.5 psf, Roof LL/SL= 28 psf(Non-PV Areas), Roof LL/SL= 18.8 psf(PV Areas) - MP4: Roof DL= 11.5 psf, Roof LL/SL= 28 psf(Non-PV Areas), Roof LL/SL= 28 psf(PV Areas) Note: Per IBC 1613.1; Seismic check is not required because Ss = 0.22424 < 0.4g and Seismic Design Category(SDC) = B < D To Whom It May Concern, A jobsite survey of the existing framing system of the address indicated above was performed by a site survey team from SolarCity. Structural evaluation was based on site observations and the design criteria listed above. Based on this evaluation, I certify that the existing structure,with upgrades specified in the plans, directly supporting the PV system is adequate to withstand all loading indicated in the design criteria above based on the requirements of the applicable existing building and/or new building provisions adopted/referenced above. This review relies on the roof's structural system having been originally designed and constructed in accordance with the building code requirements and having been maintained to be in good condition. Additionally, I certify that the PV module assembly including all standoffs supporting it have been reviewed to be in accordance with the manufacturer's specifications and to meet and/or exceed all requirements set forth by the ASCE 7 standards for loading. The PV assembly hardware specifications are contained in the plans submitted for approval. Additionally a summary of the structural review is provided in the results summary tables on the following page. Digitally signed by Jason Toman Date:2015.12.02 22:23:17-07'00' 3055 Clearview Way San Mateo, CA 94402 T(650)638-1028 (888)SOL-CITY F(650)638-1029 solarcity.corn DocuSign Envelope ID:EDOE24C4-A3B7-4750-948E-7354824F884E 23. NOTICE OF RIGHT TO CANCEL. I have read this Power Purchase Agreement and the Exhibits in YOU MAY CANCEL THIS CONTRACT AT ANY TIME PRIOR their entirety and I acknowledge that I have received a TO MIDNIGHT OF THE THIRD BUSINESS DAY AFTER THE complete copy of this Power Purchase Agreement. DATE YOU SIGN THIS CONTRACT. SEE EXHIBIT 1,THE ATTACHED NOTICE OF CANCELLATION FORM FOR AN EXPLANATION OF THIS RIGHT. DocuSigned 6y! 24. ADDITIONAL RIGHTS TO CANCEL. Signature: I�lMti. t ��M� IN ADDITION TO ANY RIGHTS YOU MAY HAVE TO CANCEL 6FB2405BD1664A4... THIS PPA UNDER SECTION 23,YOU MAY ALSO CANCEL THIS PPA AT NO COST AT ANY TIME PRIOR TO Date: 11/27/2015 COMMENCEMENT OF CONSTRUCTION ON YOUR HOME. — 25. Pricing The pricing in this PPA is valid for 30 days after on or prior to 30 days after 11/26/2015,SolarCity reserves the right to reject this PPA unless you agree to our then Signature: current pricing. emu, Date: Power Purchase;4ement SolarCity approved Signature: --^- Lyndon Rive, CEO Date: 11/26/2015 wer -1 h st ;ern nt,aer,c 9 DocuSign Envelope ID:EDOE24C4-A3B7-4750-948E-7354824F884E 20. Privacy/Publicity You grant SolarCity the right to publicly use,display,share, and advertise the photographic images, Project details, price and any other non-personally identifying information of your Project.SolarCity shall not knowingly release any personally identifiable information about you or any data associating you with the Project location.You may opt-out of these publicity rights by giving us written notice and mailing it to:SolarCity Corporation,Attention: Publicity Opt Out,3055 Clearview Way,San Mateo,CA 94402. 21. Notices. All notices under this PPA shall be in writing and shall be by personal delivery,facsimile transmission,electronic mail, overnight courier,or certified or registered mail,return receipt requested. 22. Entire Agreement;Changes. the sale and purchase of power generated by the System. There are no other agreements regarding this PPA,either NR written or oral. Any change to this PPA must be in writing and signed by both parties.Only an authorized officer of SolarCity may execute any change to this Agreement on ,. behalf of SolarCity. If any portion of this PPA is determined to be unenforceable,the remaining provisions shall be enforced in accordance with their terms or shall be interpreted or re-written so as to make them enforcq�► . REST OF PAGE INTENTIONALLY LI" *tANK. ewe r r , ;;�s e nt' Je: r: �_?0, 348928 �� �� DocuSign Envelope ID:EDOE24C4-A3B7-4750-948E-7354824F884E schedule a convenient time for SolarCity to remove the as a class action,class arbitration,private attorney general System from your Home at no cost to you. action or other representative action,nor may any such 18. Applicable Law;Arbitration. Dispute be pursued on your or our behalf in any litigation in any court.Claims regarding any Dispute and remedies PLEASE READ THIS SECTION CAREFULLY.ARBITRATION sought as part of a class action,class arbitration,private REPLACES THE RIGHT TO GO TO COURT, INCLUDING THE attorney general or other representative action are subject RIGHT TO A JURY AND THE RIGHT TO PARTICIPATE IN A to arbitration on an individual(non-class,non- CLASS ACTION OR SIMILAR PROCEEDING. IN ARBITRATION, representative)basis,and the arbitrator may award relief A DISPUTE IS RESOLVED BY AN ARBITRATOR INSTEAD OF A only on an individual(non-class,non-representative)basis. JUDGE OR JURY. This means that the arbitration may not address disputes The laws of the state where your Home is located shall involving other persons with disputes similar to the govern this PPA without giving effect to conflict of laws Disputes between you and SolarCity. principles.We agree that any dispute,claim or The arbitrator shall have the authority to award any legal or equitable remedy or relief that a court could order or grant exclusively by arbitration. under this agreement.The arbitrator,however,is not The arbitration,including the selecting of the arbitrator,will authorized to change or alter the terms of this agreement be administered by JAMS,under its Streamlined Arbitration or to make any award ghat would extend to any transaction other than yours.All statutes of limitations that are by the parties within thirty(30)days of the commencement applicable to any dlsptt - all apply to any arbitration of the arbitration. The arbitration will be governed by the between us I i I Thrbitr E `'will issue a decision or award in Federal Arbitration Act(Title 9 of the U.S.Code). Either writing,briefly°�CinS th essential findings of fact and party may initiate the arbitration process by filing the co9clUs"ns of law. necessary forms with JAMS.To learn more about a1ECAUSE Y'2R, ­ d,'UAN.DWEHAV#A REED TO ARBITRATE ALL arbitration,you can call any JAMS office or review the 11 ?UTES, NE�*15R OF USi1 ) L HAVE THE RIGHT TO materials at www.jamsadr.com.The arbitration shall be LI IGATJM THAfi DISPUTE IN COURT,OR TO HAVE A JURY held in the location that is most convenient to your Horrt ,'"E: TRIAL N�1AT DISPUTE,OR ENGAGE IN DISCOVERY If a JAMS office does not exist within 50(fifty)miles of,",-,,,y EXCEPT "pWVIDED FOR IN THE RULES. FURTHER,YOU Home,then we will use another accredited arbitratiotl #LL NOT FiA''VETHE RIGHT TO PARTICIPATE AS A provider with offices close to your Hww", �° 1�EPRESENTATIVE OR MEMBER OF ANY CLASS PERTAINING If you initiate the arbitration,you will be required to pay first$125 of any filing fee We day any filing fees in FINAL AND BINDING ON THE PARTIES AND MAY BE excess of$125 and we will pay a!)t1 "the arbitration f�:' ENTERED AND ENFORCED IN ANY COURT HAVING and costs. If we initiate the arbitr �olt�we will pays of JURISDICTION, EXCEPT TO THE EXTENT IT IS SUBJECT TO the filing fees and all of the arbitrate t` es an OstS. We REVIEW IN ACCORDANCE WITH APPLICABLE LAW GOVERNING ARBITRATION AWARDS.OTHER RIGHTS THAT YOU OR WE WOULD HAVE IN COURT MAY ALSO NOT BE and costs if you prevail in the arbitration and the award you AVAILABLE IN ARBITRATION. 19. Waiver. written settlement offer. When determining whether your Any delay or failure of a party to enforce any of the provisions of this PPA,including but not limited to any remedies listed in this PPA,or to require performance by Only Disputes involving you and SolarCity may be addressed the other party of any of the provisions of this PPA,shall in the arbitration. Disputes must be brought in the name of not be construed to(i) be a waiver of such provisions or a an individual person or entity and must proceed on an individual(non-class, non-representative)basis.The validity of this PPA. arbitrator will not award relief for or against anyone who is not a party. If either of us arbitrates a Dispute, neither of us, nor any other person, may pursue the Dispute in arbitration i,ower Vur;l;sse Agre.emcm,version 9.L"".lluveifiber 11,7.015 13 4897 8 Gtif DocuSign Envelope ID:EDOE24C4-A3B7-4750-948E-7354824F884E (b)take any reasonable action to correct your default or to PURCHASE AGREEMENT SHALL BE LIMITED TO DIRECT, prevent our loss;any amount we pay will be added to ACTUAL DAMAGES ONLY. YOU AGREE THAT IN NO the amount you owe us and will be immediately due; EVENT SHALL EITHER PARTY BE LIABLE TO THE OTHER FOR CONSEQUENTIAL,INCIDENTAL,PUNITIVE, (c) require you,at your expense,to return the System or make it available to us in a reasonable manner; EXEMPLARY,SPECIAL OR INDIRECT DAMAGES. (b)Actual Damages (d)proceed,by appropriate court action,to enforce performance of this PPA and to recover damages for EXCEPT FOR CLAIMS UNDER SECTION 5(H), NEITHER your breach; AMOUNT EQUAL TO THE MAXIMUM AMOUNT THAT (e)disconnect,turn off or take back the System by legal COULD BE PAYABLE BY YOU UNDER SECTION 16(H). process or self-help, but we may not disturb the peace DAMAGES TO YOUR HOME, BELONGINGS OR PROPERTY or violate the law; RESULTING FROM THE INSTALLATION OR OPERATION (f) report such non-operational status of the System to OF THE SYSTEM ARE COVERED IN SECTION 6(C)OF THE your utility, informing them that you are no longer net LIMITED WARRANTY. metering; 15. Default. (g)charge you a reasonable reconnection fee for reconnecting the System to your utility or turning your You will be in default under this Power Purchase System back on after we disconnect or turn off the Agreement if any one of the following occurs: System 0e tp your`i 6fault; (a) you fail to make any payment when it is due and such (h)recover from'' yment equal to the purchase failure continues for a period of ten(10)days; - IC Set forth in tieement plus(ii)all taxes, (b) you fail to perform any material obligation that you . ate c S r enalti es,ijo est and all or any other have undertaken in this PPA(which includes doing r'sums the rued or d> nd owing;or something you have agreed not to do,like alter they usl y r remedy available to us in this PPA or by System)and such failure continues for a period of fourteen(14)days after written notice; la We may subM t to credit reporting agencies(credit (c) you or your guarantor have provided any false or ,� bureaus)negative credit reports that would be reflected on misleading financial or other information to obtain this, your credit record if you do not pay any amounts due Power Purchase Agreement; under this PPA as required. (d) you assign,transfer,encumber;_sublet or sell this PPA or You agree to repay us for any reasonable amounts we pay consent;or to correct or cover your default.You also agree to reimburse us for any costs and expenses we incur relating F (e) you or any guarantor makes an assigner e benefit of creditors,admits in writing its insolvency, choosing any one or more of these remedies,SolarCity files or there is filed against you or it a voluntary does not give up its right to use another remedy. By petition in bankruptcy,is adjudicated bankrupt or deciding not to use any remedy should this Power insolvent or undertakes or experiences any substantially Purchase Agreement be in default,SolarCity does not give similar activity. up our right to use that remedy in case of a subsequent 16. Remedies in Case of Default. default. If this Power Purchase Agreement is in default,we may 17. System Removal:Return. take any one or more of the following actions. If the law At the end of the Term or the termination of this PPA,if requires us to do so,we will give you notice and wait any you have not renewed this PPA or exercised your purchase period of time required before taking any of these actions. option(if any)and you have not defaulted,then within We may: ninety(90)days you agree to call SolarCity at the (a)terminate this PPA; telephone number listed in Section 7 of Exhibit 2 to Power:urcl,asA .green iri _,.,._3.Y 51"� ]3489),8 �� ■ Y DocuSign Envelope ID:EDOE24C4-A3B7-4750-948E-7354824F884E (30)days prior to a renewal term that you do not wish to your approved buyer and SolarCity shall execute a renew;or(ii)we send you a notice terminating the PPA. written transfer of this PPA. 12. Selling Your Home. (a) If you sell your Home you can: options in subsection(a)above,you will be in default under this Power Purchase Agreement. Section 12(a) (i)Transfer this Power Purchase Agreement and the includes a Home sale by your estate or heirs. Monthly Payments (d) Free Assumability.This agreement is free of any restrictions that would prevent the homeowner from can sign a transfer agreement assuming all of your rights and obligations under this Agreement by will not prohibit the sale,conveyance or refinancing of qualifying in one of three ways: the Property.SolarCity may choose to file in the real 1) The Home Buyer has a FICO score of 650 or greater; 2) The Home Buyer is paying cash for your Fixture Filing is intended only to give notice of its rights Home;or relating to the System and is not a lien or 3) If the Home Buyer does not qualify under(1) encumbrance against the Property.SolarCity shall or(2),the Home Buyer qualifies for a explain the Fixttf�Filing to any subsequent purchasers mortgage to purchase your Home and either of the Property end any related lenders as requested. you or the Home Buyer pays us a$250 credit SolarCity shall alsdQIlommoclate reasonable requests exception fee. from lendes orAj lt6mpanies to facilitate a (ii)Move the System to Your New Home purohase,finer hg1or refinancing of the Property. Where permitted by the utility(s),the System can be ( EXCI AS-5 ET FORTH 04 JHIS SECTION,YOU WILL NOT moved to your new home pursuant to Section 4 of ASSIGN J L, PLEDGEi ANY OTHER WAY the Limited Warranty.You will need to provide the TRANSFER YOUR INTEREST IN THE SYSTEM OR THIS same rights to SolarCity as provided for in this PPA PP 146UT OUR PRIOR WRITTEN CONSENT,WHICH and provide any third party consents or releases ( NOT BE UNREASONABLY WITHHELD. required by SolarCity in connection with the = substitute premises. 4 (.u..)Prepay i this Power Purchase ree t and s` 1 ss or Damage. P Y Transfer only the Use of stem' ". (a) Unless you are grossly negligent,you intentionally At any time during the Term,you can prepay this damage the System,or damage or loss to the System is Power Purchase Agreem' full by paying °` caused by ball strikes,SolarCity will bear all of the risk SolarCity the expected remi r ig payments of loss,damage,theft,destruction or similar occurrence (estimated future production d rl% 'rest f the to any or all of the System. Except as expressly Term multiplied by the average km"rate during the provided in this PPA,no loss,damage,theft or rest of the Term)at a five percent(5%)discount destruction will excuse you from your obligations under rate.The person buying your Home will only need to this PPA,including Monthly Payments. sign a transfer agreement to assume your rights and non-Monthly Payment obligations under this PPA. (b)If there is loss,damage,theft,destruction or a similar The System stays at your Home,the person buying occurrence affecting the System,and you are not in your Home does not make any Monthly Payments default of this PPA,you shall continue to timely make all and has only to comply with the non-Monthly Monthly Payments and pay all other amounts due under the PPA and,cooperate with SolarCity,at Payment portions of this PPA. (iv)Purchase the System(see Section 10) repaired pursuant to the Limited Warranty. (b) You agree to give SolarCity at least fifteen (15)days 14. Limitation of Liability. but not more than three(3)months prior written notice if you want someone to assume your PPA (a)No Consequential Damages obligations. in connection with this assumption,you, Power P=Urchase lgreerncnt,version 9.1.0,November 11,2015 1348928 ti DocuSign Envelope ID:EDOE24C4-A3B7-4750-948E-7354824F884E transfer the System and this Power Purchase Agreement, monitoring issues.Your failure to cooperate with SolarCity or any part of this Power Purchase Agreement or the with respect to Internet requirements will result in your exhibits,without your consent. This assignment does not obligation to compensate SolarCity for all lost SREC or incentive revenue and related costs,subject to a monthly System as set forth in the Warranty. charge of no less than$10.00(ten dollars)per month until 9. Ownership of the System;Tax Credits and Rebates. adequate Internet monitoring is implemented or restored. 10. Purchasing the System Prior to the End of the Term. under the Uniform Commercial Code. You understand and In addition to purchasing the System at the end of the agree that this PPA is not a contract to sell or lease the Term,you have the option to purchase the System prior to System to you. SolarCity owns the System for all purposes, the end of the Term as detailed below. To exercise this including any data generated from the System. You shall at option you must be in good standing under this Power all times keep the System free and clear of all liens,claims, Purchase Agreement and you need to give us at least one levies and legal processes not created by SolarCity, and shall at your expense protect and defend SolarCity against written notice. You can purchase this System: the same. (i) on the five(5)year anniversary of the YOU UNDERSTAND AND AGREE THAT ANY AND ALL TAX beginning of the Term and every annual CREDITS, INCENTIVES, RENEWABLE ENERGY CREDITS, anniversary after the five(5)year anniversary; GREEN TAGS,CARBON OFFSET CREDITS,UTILITY REBATES and OR ANY OTHER NON-POWER ATTRIBUTES OF THE SYSTEM (ii) at ft dime afl.er the five(5)year anniversary ARE THE PROPERTY OF AND FOR THE BENEFIT OF of E" jrlllir► of the Term,when you sell SOLARCITY, USABLE AT ITS SOLE DISCRETION.SOLARCITY � fur Ho and , SHALL HAVE THE EXCLUSIVE RIGHT TO ENJOY AND USE ALL 3 SUCH BENEFITS,WHETHER SUCH BENEFITS EXIST NOW OR (Iii) .olarCity ever Cses its operations. IN THE FUTURE. YOU AGREE TO REFRAIN FROM ENTERING In each of(i), j)and(iii)above,the price you will pay for INTO ANY AGREEMENT WITH YOUR UTILITY THAT WOULD ENTITLE YOUR UTILITY TO CLAIM ANY SUCH BENEFITS. A th�rdy independent appraiser will be retained to a r YOU AGREE TO REASONABLY COOPERATE WITH SOL Y SO THAT IT MAY CLAIM ANY TAX CREDO$, ENEWA pair obligations under the Limited Warranty(Exhibit 2) ENERGY CREDITS, REBATES,CARBQ)+t3„ p REDITS� Will continue when you purchase the System until what ANY OTHER BENEFITS FROM THE SYSTEM.THIS MAY would have been the end of the original Term. INCLUDE TO THE EXTENT ALLOt,0"A LE BY LAW, ENTERING 11. Renewal. INTO NET METERING AGREEMENT`,INTERCONNECTION AGREEMENTS,AND FILING RENEI)~I„.ENERGY/GAR$ON If you are in compliance with your PPA,you have the option to renew your PPA for up to ten(10)years in two(2)five(5) OFFSET CREDIT REGISTRATIONS AN'6 APPLI T16NS FOR REBATES FROM THE FEDERAL,STA Qf��L year renewal periods. We will send you renewal forms three `� �AL GOVERNMENT OR A LOCAL UTILITY AND GIVING THESE TAX (3)months prior to the expiration of the Term,which forms CREDITS, RENEWABLE ENERGY/CARBON CREDITS, REBATES shall set forth the new Monthly Payments due under the OR OTHER BENEFITS TO SOLARCITY. renewal PPA, based on our assessment of the then current fair market value of the System. If you want to renew, You understand that solar renewable energy credits complete the renewal forms and return them to us at least (SRECs)and certain incentives and associated data cannot one(1)month prior to the end of the PPA. In the event that be generated or earned without internet.As such,you you do not agree to the new Monthly Payments this PPA agree to maintain and make available,at your cost,a shall expire by its terms on the termination date. If you functioning indoor Internet connection with the understanding that Wi-Fi hotspotting,tethering and renewal forms,then this PPA shall renew for an additional intermittent Internet connection will not satisfy this one(1)year term at ten percent(10%) less than the then- obligation.You also agree to cooperate with SolarCity as current average rate charged by your local utility and shall necessary to provide any other information required to continue to renew for one(1)year terms at the same rate as generate SRECs or earn incentives and troubleshoot your first renewal until(i)you give us notice at least tl °�­ 1 il 1owt 111 rc..-,_ 1.greer ai,aer, 3 i-G,(1 ,( :.br' % ?_-.`' �� 13489)8 �1 DocuSign Envelope ID:EDOE24C4-A3B7-4750-948E-7354824F884E ABSOLUTE AND UNCONDITIONAL UNDER ALL (v) confirmation that SolarCity will obtain all CIRCUMSTANCES AND SHALL NOT BE SUBJECT TO applicable benefits referred to in Section 9; ANY ABATEMENT, DEFENSE,COUNTERCLAIM, (vi) receipt of all necessary zoning,land use and SETOFF, RECOUPMENT OR REDUCTION FOR ANY building permits;and REASON WHATSOEVER,IT BEING THE EXPRESS (vii) completion of any renovations,improvements INTENT OF THE PARTIES THAT ALL AMOUNTS or changes reasonably required at your Home PAYABLE BY YOU HEREUNDER SHALL BE,AND or on the Property(e.g.,removal of a tree or CONTINUE TO BE, PAYABLE IN ALL EVENTS necessary roof repairs to enable us to safely INCLUDING BY YOUR HEIRS AND ESTATE AND, install the System). EXCEPT AS SET FORTH BELOW IN SECTIONS 6,23 AND 24,YOU HEREBY WAIVE ALL RIGHTS YOU MAY (viii) HAVE TO REJECT OR CANCEL THIS PPA,TO REVOKE association or similar community organization, ACCEPTANCE OF THE SYSTEM,OR TO GRANT A your receipt of all approvals and authorizations for the System required by that organization and SECURITY INTEREST IN THE SYSTEM. advising us of any requirements of that (j) Credit Check organization that will otherwise impact the You authorize SolarCity,or its designee,to obtain System,its installation or operation. your credit report now and in the future,check your SolarCity may terminate this Power Purchase credit and employment history,answer questions Agreement w", liability if,in its reasonable others may ask regarding your credit and share your judgrnt,any ft above listed conditions(i) through(vii)will riO 3e satisfied for reasons beyond partners.You certify that all information you provide ,Ats reasonab16, Btjol. Once SolarCity starts to us in connection with checking your credit will be inSto*ion,howe*0t tnay not terminate this true and understand that this information must be PoAf Purchase Agri` ,,.P'nt for your failure to updated upon request if your financial condition satisfy, itions(i)through(vii)above. changes. (ks A"#Coments. 6. Conditions Prior to Installation of the System;Chang >t: Orders. in thi J�IPA.After System design,the estimated (a) production is likely to change and we will share you the power it produces Is Conditioned on the! �. those changes with you prior to installation. If the following items having b0e,,.completed to its estimated production increases or decreases by reasonable satisfaction. ,: more than twenty percent(20%),we will document that change in an amendment.. (i) completion of(A)the eering site audit(a , - thorough physical insper t10r( the P,r 0p ty, You authorize SolarCity to make corrections to the r including,if applicable,gea njaI!work),(B) utility paperwork to conform to this PPA or any the final System design,and(C)real estate due amendments to this PPA we both sign. diligence to confirm the suitability of the 7• Warranty. Property for the construction,installation and operation of the System; YOU UNDERSTAND THAT THE SYSTEM IS WARRANTED (ii) approval of this Power Purchase Agreement by SOLELY UNDER THE LIMITED WARRANTY ATTACHED AS EXHIBIT 2,AND THAT THERE ARE NO OTHER REPRESENTATIONS OR WARRANTIES, EXPRESS OR IMPLIED, (iii) your meeting the applicable credit score; AS TO THE MERCHANTABILITY, FITNESS FOR ANY PURPOSE, (iv) confirmation of rebate,tax credit and CONDITION,DESIGN,CAPACITY,SUITABILITY OR renewable energy credit payment availability in PERFORMANCE OF THE SYSTEM OR ITS INSTALLATION. the amount used to calculate the Monthly Payments set forth in this Power Purchase 8 Transfer. Agreement; SolarCity will assign this PPA to one of its financing partners. You agree that SolarCity may assign,sell or Power Purchase preernFnt version 9.1.0,November 11,1015 {1 134£39)8 K7 DocuSign Envelope ID:EDOE24C4-A3B7-4750-948E-7354824F884E In addition to the other amounts you agree to pay in System or making any additions to the System this Power Purchase Agreement,you agree to pay the or installing complementary technologies on or following: about the location of the System;(B)enforcing (i) Automatic Payment Discount: If you make your Monthly Payments by allowing us to Agreement and the System; (C)installing,using automatically debit your checking or savings and maintaining electric lines and inverters and account,then you will receive a discount of$7.50 meters,necessary to interconnect the System to on your Monthly Payments.The Monthly your electric system at the Property and/or to Payments listed in Section 4 of this Agreement reflect this discount.If you do not allow the taking any other action reasonably necessary in automatic debit,this discount will not be applied connection with installing,constructing, to your Monthly Payments and each Monthly operating,owning, repairing, removing and Payment will be$7.50 greater; replacing the System.This access right shall Returned Check Fee:$25(or such lower amount continue for up to ninety(90)days after this (ii) Power Purchase Agreement expires to provide as required bylaw)for any check or withdrawal SolarCity with time to remove the System at the right that is returned or refused by your bank;and end of the Power Purchase Agreement. (iii) Late Payments:accrue interest at the lesser of SolarCity shill provide you with reasonable twelve percent(12%)annually or the maximum notice of Its#eed to access the Property allowable by applicable law. wherever rcially reasonable. (e) Taxes (ii) Duringt,40timp that SolarCity has access rights Your SolarCity electricity rate of$0.1200 per kWh is you shah iWire.that its access rights are composed of an electricity rate of$0.1200 plus prrved and shall not interfere with or permit current taxes of$0.0000.You agree to a an a bird party t interfere with such rights or g pay Y P, changes in the applicable taxes related to this PPA. amass. You agree that the System is not a Thus, if tax rates change,your SolarCity electricity ure,but SolarCity has the right to file any rate will change to reflect this rate change. If this UCC 1 financing statement or fixture filing that PPA contains a purchase option at the end of the"' confirms its interest in the System. Term,you agree to pay any appp} tax on the ) Indemnity purchase price for the Systern� s�agree to pay. "'� r To the fullest extent permitted by law,you shall as invoiced any applicable personal property taxes indemnify,defend, protect,save and hold harmless on the System that your)00' 1 jurisdiction may; ry. SolarCity,its employees,officers,directors,agents, (f) No Alterations successors and assigns from any and all third party claims,actions,costs,expenses(including You agree that you will not make any 41 ications, improvements, revisions or additici tse System liabilities, penalties,losses,obligations,injuries, or take any other action that could void the Limited demands and liens of any kind or nature arising out written consent. If you make any modifications, of,connected with,relating to or resulting from your improvements,revisions or additions to the System, negligence or willful misconduct; provided,that they will become part of the System and shall be nothing herein shall require you to indemnify SolarCity for its own negligence or willful misconduct.The provisions of this paragraph shall (g) Access to the System survive termination or expiration of this Power (i) You grant to SolarCity and its employees,agents Purchase Agreement. and contractors the right to reasonably access (i) Payments all of the Property as necessary for the purposes SUBJECT TO SECTION 4(b)ABOVE,YOU AGREE THAT of(A)installing,constructing,operating, THE OBLIGATION TO PAY ALL PAYMENTS AND ALL owning, repairing,removing and replacing the OTHER AMOUNTS DUE UNDER THIS PPA SHALL RC t,ovv t ir_-se „reerr nr ver,,. 9?_D. J ,-�, e !.*5 DocuSign Envelope ID:EDOE24C4-A3B7-4750-948E-7354824F884E (i) only have the System repaired pursuant to the obtain all approvals and authorizations for the Limited Warranty and reasonably cooperate System required by that organization and advise when repairs are being made; us of any requirements of that organization that (ii) keep trees,bushes and hedges trimmed so that will otherwise impact the System,its installation the System receives as much sunlight as it did or operation. when SolarCity installed it; (b) System Construction,Repair,Insurance and (iii) not modify your Home in a way that shades the System; SolarCity agrees to: (iv) be responsible for any conditions at your Home (i) schedule the installation of the System at a that affect the installation(e.g.,blocking access mutually convenient date and time; to the roof,or removing a tree that is in the way, prior work you have done on your home that was 00 construct the System according to written plans not permitted); you review; (v) not remove any markings or identification tags (iii) provide you with a web-enabled meter to on the System; accurately measure the amount of power the System delivers to you; (vi) permit SolarCity,after we give you reasonable notice,to inspect the System for proper (iv) provide you with a home energy evaluation; operation as we reasonably determine (v) notify you if the System design has to be necessary; materially changed so that you can review any (vii) use the System primarily for personal,family or such changes; household purposes,but not to heat a swimming (vi) clean up after ourselves during the construction pool; of the System; (viii) not do anything,permit or allow to exist any NO insure the System against all damage or loss condition or circumstance that would cause the unless(A)that damage or loss is caused by your System not to operate as intended at the gross negligence;or(B)that damage or loss is Property; caused by ball strikes;or(C)you intentionally (ix) notify SolarCity if you think the System is damage the System; damaged or appears unsafe;if the System is (viii) repair the System pursuant to the Limited stolen;and prior to changing your power Warranty and reasonably cooperate with you supplier; when scheduling repairs; (x) have anyone who has''an ownership interest in (ix) create a priority stream of operation and your Home sign this Power Purchase Agreement; maintenance payments to provide enough cash (xi) return any documents we send you for signature flow in our financing transactions to pay for the (like incentive claim forms)within seven(7)days Limited Warranty obligations and the repair and of receiving them;and maintenance of the System in accordance with this PPA even if SolarCity ceases to operate;and (A) maintain and make available,at your cost,a functioning indoor internet connection with a (x) not put a lien on your Home or Property. router,one DHCP enabled Ethernet port with internet access and standard AC power outlet (c) Home Renovations or Repairs close enough and free of interference to enable an If you want to make any repairs or improvements to internet-connected gateway provided by SolarCity the Property that could interfere with the System to communicate wirelessly with the system's (such as repairing the roof where the System is inverter(typically this is 80 feet,but may depend located),you may only remove and replace the on site conditions). See section 2(c)(ii)of the System pursuant to the Limited Warranty. (xiii) Limited Warranty for details;and (d) Automatic Payment,Late Charges,Fees association or similar community organization, ov:�er f'U(c;.rase ngreemc nl,:ersi.;n 9.:.Q CVs e�7�Ler 7 >D: [3489)8 DocuSign Envelope ID:E DOE 24C4-A3B7-4750-948E-7354824F884E 1. Introduction. :c will debit your n � yo bank account on or about the 1 day of the next month following invoice(e.g.January invoices are sent in early February and debited on or about between you and SolarCity Corporation (together with its March 1).Monthly Payments will change as your price per kWh changes over the Term of this PPA and as sale to you of the power produced by the solar panel System production varies(e.g.,summer has higher production).You will have regular access to the SolarCity agrees to sell to you,and you agree to buy from SolarCity,all of the power produced by the System. The Payments due upon installation,if any,are due System will be installed by SolarCity at the address you immediately prior to commencement of installation. You will make no Monthly Payments if you are fully Purchase Agreement is eight(8)pages long and has up to prepaying this PPA. In this case,you will pay only the three(3) Exhibits depending on the state where you live. amounts listed in the key terms summary on page one SolarCity provides you with a Limited Warranty(the of this PPA. (c) Estimated Production. If(i)the System is shut down for Exhibit 2. If you have any questions regarding this Power more than seven(7)full twenty-four(24) hour days Purchase Agreement, please ask your SolarCity sales cumulatively during the Term because of your actions; consultant. or(ii)you take some action that significantly reduces THIS AGREEMENT SUPERSEDES ALL PRIOR EXISTING CONTRACTS BETWEEN YOU AND SOLARCITY THAT PERTAIN bushes or trees to their appearance when you signed this PPA to avoid foliage growth from shading the System;or(iv)your System is not reporting production 2. Term. to SolarCity(e.g.you have disconnected the SolarCity agrees to sell you the power generated by the PowerGuide system or the internet connection at your System for 20 years(240 months), plus,if the Home goes down on the reporting day),then SolarCity Interconnection Date is not on the first day of a calendar will reasonably estimate the amount of power that month,the number of days left in that partial calendar would have been delivered to you during such System or reporting outages or reduced production periods Term begins on the Interconnection Date. The Production as actual production for purposes of this turned on and generating power. SolarCity will notify you ( paragraph. In the first year of the Term, Estimated when your System is ready to be turned on. Production will be based on our production projections. After the first year of the Term, Estimated Production 3. Intentionally Left Blank. will be based on historical production for that month in 4. Power Purchase Agreement Payments:Amounts the prior year. If we bill you for Estimated Production (a) Power Price. During the first year of the term,you are because your System is not reporting production to SolarCity,and we subsequently determine that we have purchasing all of the power the System produces for either overestimated or underestimated the actual $0.1200 per kWh. After the first year,the price per production,then we will adjust the next bill downward kWh will increase by 2.90%per year.There are no (to refund overbilling)or upward(to make up for lost installation costs. billing). You will not be charged for Estimated (b)Payments. Production when the System is not producing electricity Your monthly payments will be the product of(A)the price per kWh multiplied by(B)the actual kWh output power outages caused by someone other than you. 5. Power Purchase Agreement Obligations. for Monthly Payments will be mailed or emailed no (a) System,Home and Property Maintenance later than ten(10)days after the end of a calendar month. If you are paying your invoice by automatic You agree to: debit from your checking or savings account(ACH)we Powc '�r.itas-r greernrnt, rera 3 � r ,_r;oe I?15 W*1■ 1_'•48� R DocuSign Envelope ID:EDOE24C4-A3B7-4750-948E-7354824F884E SolarCity I PPA Customer Name and Address Installation Location Date Ann Marie Martineau 60 Pioneer Knls 11/27/2015 FLORENCE,MA 01062 60 Pioneer Knolls FLORENCE,MA 01062 Here are the key terms of your Power Purchase Agreement O .A. 01% .9111111111111k Mff $0 128 %f 2UY13 System installation cost Electric y ray°'os Agr+eeme�..:'ros,., Initial herd Initial here Ds The SolarCity Promise a0Ut1I� •We guarantee that if you sell your Home,the buyer will qualify to assume your Agreement. Initial here •We warrant all of our roofing work. us •We restore your roof at the end of the Agreement. Q�1A dl�l •We warrant, insure, maintain and repair the System. Initial here •We fix or pay for any damage we may cause to your property. •We provide 24/7 web-enabled monitoring at no additional cost. •The rate you pay us will never increase by more than 2.90%per year, •The pricing in this Agreement is valid for 30 days after 11/26/2015. Your SolarCity Power Purchase Agreement Details Your Choices at the End of the Initial Options for System Purchase: Amount due at contract signing Term: •At certain times,as specified in $0 .SolarCity will remove the System at no the Agreement,you may Est.,amount due at installation {. cost to you. purchase the System. $0 •You can upgrade to a new System with •These options apply during the 20 the latest solar technology under a new year term of our Agreement and Est.amount due at building Inspection contract. not beyond that term. $0 •You may purchase the System from Est.first year production SolarCity for its fair market value as 7,680 kWh specified in the Agreement. •You may renew this Agreement for up to ten(10)years in two(2)five(5)year increments. 3055 Clearview Way, San Mateo, CA 94402 1 888.765.2489 a solarcity.com 1348928 Power Purchase Agreement,version 9.1.0,November 11,2015 SAPC/SEFA Compliant Contractors License MA HIC 168572/EL-1136MR Document generated on 11/26/2015 ■ Copyright 2008-2015 SolarCity Corporation,All Rights Reserved SECTION 5-DESCRIPTION OF PROPOSED WORK check all gimli cable) New House Addition Replacement Windows Alteration(s) Roofing Or Doors Accessory Bldg. Demolition New Signs [, ] Decks [ ] Siding( ] Other❑✓ Brief Description of Proposed I � g Work: Install solar electric 12anels to roof of existing home to be inter•onnected with home's electricals stem. Alteration of existing bedroom Yes No Adding new bedroom Yes No Attached Narrative Renovating unfinished basement Yes No Plans Attached Roll -Sheet 644-If WAIMEA Wh Addition to eidifibabouSI n a. owihatomlio6a a. Use of building : One Family Two Family Other b. Number of rooms in each family unit: Number of Bathrooms c. Is there a garage attached? d. Proposed Square footage of new construction. Dimensions e. Number of stories? f. Method of heating? Fireplaces or Woodstoves Number of each g. Energy Conservation Compliance. Masscheck Energy Compliance form attached? h. Type of construction i. Is construction within 100 ft. of wetlands? Yes No. Is construction within 100 yr. floodplain Yes No j. Depth of basement or cellar floor below finished grade k. Will building conform to the Building and Zoning regulations? Yes No . I. Septic Tank City Sewer Private well City water Supply SECTION 7a-OWNER AUTHORIZATION-TO BE COMPLETED WEN OWNERS AGENT OR CONTRACTOR APPLIES FOR BUILDING PE MIT ANN MARIE MARTINEAU as Owner of the subject property hereby authorize SOLARCITY to act on my behalf, in all matters relative to work authorized by this building permit application. 12/15/2015 Signature of Owner Date Nov- SOLARCITY CORP/CRAIG ELLS as Owner/Authorized Agent hereby declare that the statements and information on the foregoing application are true and accurate, to the best of my knowledge and belief. Signed under the pains and penalties of perjury. SOLARCITY CORP/CRAIG ELLS Print Nam 12/15/2015 Signature of Owner/Ag nt Date SECTION 8-CONSTRUCTION SERVICES 8.1 Licensed Construction Supervisor: Not Applicable ❑ Name of License Holder:SOLARCITY/CRAIG ELLS 107663 License Number 604 SILVER ST AGAWAM MA 01001 8/29/17 Address Expiration Date l 978-875-1698 Signature Telephone 9.Rtcr titer d. me ImbrovogenfConWtto w: Not Applicable ❑ SOLARCITY CORP/CRAIG ELLS 168572 Company Name Registration Number 604 SILVER ST AGAWAM MA 01001 03/08/2017 Address Expiration Date Telephone 978-215-2367 SECTION 10-WORKERS'COMPENSATION INSURANCE AFFIDAVIT(M.G.L.c.152,§25C(6)) Workers Compensation Insurance affidavit must be completed and submitted with this application. Failure to provide this affidavit will result in the denial of the issuance of the building permit. Signed Affidavit Attached Yes....... ❑ No...... ❑ The current exemption for"homeowners"was extended to include Owner-occupied Dwellings of one(1) or two(2)families and to allow such homeowner to engage an individual for hire who does not possess a license,provided that the owner acts as supervisor.CMR 780 Sixth Edition Section 108.3.5.1. Definition of Homeowner:Person(s)who own a parcel of land on which he/she resides or intends to reside,on which there is,or is intended to be,a one or two family dwelling,attached or detached structures accessory to such use and/or farm structures.A person who constructs more than one home in a two-year period shall not be considered a homeowner. Such"homeowner"shall submit to the Building Official,on a form acceptable to the Building Official,that he/she shall be responsible for all such work performed under the building permit. As acting Construction Supervisor your presence on the job site will be required from time to time,during and upon completion of the work for which this permit is issued. Also be advised that with reference to Chapter 152(Workers' Compensation) and Chapter 153 (Liability of Employers to Employees for injuries not resulting in Death)of the Massachusetts General Laws Annotated,you may be liable for person(s) you hire to perform work for you under this permit. The undersigned"homeowner"certifies and assumes responsibility for compliance with the State Building Code,City of Northampton Ordinances, State and Local Zoning Laws and State of Massachusetts General Laws Annotated. Homeowner Signature _ __ I Section 4. ZONING All Information Must Be Completed Permit Can Be Denied Due To Incomplete Information Existing Proposed Required by Zoning This column to be filled in by Building Department Lot Size Frontage Setbacks Front Side L: R: L: R: Rear Building Height Bldg. Square Footage % Open Space Footage % (Lot area minus bldg&paved parking) #of Parking Spaces Fill: volume&Location A. Has a Special Permit/Variance/Finding ever been issued for/on the site? NO DON'T KNOW YES IF YES, date issued: IF YES: Was the permit recorded at the Registry of Deeds? NO DON'T KNOW YES IF YES: enter Book Page and/or Document# B. Does the site contain a brook, body of water or wetlands? NO DON'T KNOW YES IF YES, has a permit been or need to be obtained from the Conservation Commission? Needs to be obtained Obtained , Date Issued: C. Do any signs exist on the property? YES NO IF YES, describe size, type and location: D. Are there any proposed changes to or additions of signs intended for the property? YES NO IF YES, describe size, type and location: E. Will the construction activity disturb(clearing,grading, excavation, or filling)over 1 acre or is it part of a common plan that will disturb over 1 acre? YES NO IF YES,then a Northampton Storm Water Management Permit from the DPW is required. J a ity of Northampton t B ilding Department 2 Main Street f C_ Y L1 f oom 100 mpton, MA 01060 r � -587-1240 Fax 413-587-1272 I � A PL TO CONSTRUCT,ALTER,REPAIR, RENOVATE OR DEMOLISH A ONE OR TWO FAMILY DWELLING SECTION 1 -SITE INFORMATION 1.1 Property Address: This section to be completed by office 60 PIONEER KNLS Map Lot I I Unit Zane Overlay District Elm St.District ce District SECTION 2 PROPERTY OWNERSHIPIAUTHORIZED AGENT 2.1 Owner of Record: ANN MARIE MARTINEAU 60 PIONEER KNLS FLORENCE MA 01062 Name(Print) Current Mailing Address: 413-586-0092 Telephone Signature 2.2 Authorized Anent: SolarCity Corp/CRAIG ELLS 604 Silver St Agawam MA 01001 Name(Print) Current Mailing Address: 978-215-2367 Signature Telephone SECTION 3-ESTIMATED CONSTRUCTION COSTS Item Estimated Cost(Dollars)to be Official Use Only completed by ermit applicant 1. Building 4,500 (a)Building Permit Fee 2. Electrical 10,500 (b)Estimated Total Cost of Construction from 6 3. Plumbing Building Permit Fee 4. Mechanical (HVAC) 5. Fire Protection 6. Total=0 +2+3+4+5) 15,000 Check Number This Section For Official Use Only Date Building Permit Number: Issued: Signature: Building Commissioner/Inspector of Buildings Date File# BP-2016-0801 APPLICANT/CONTACT PERSON SOLARCITY CORP ADDRESS/PHONE 604 SILVER ST AGAWAM01001 (888)765-2489(2358) PROPERTY LOCATION 60 PIONEER KNLS MAP 29 PARCEL 036 001 ZONE THIS SECTION FOR OFFICIAL USE ONLY: PERMIT APPLICATION CHECKLIST ENCLOSED REQUIRED DATE ZONING FORM FILLED OUT Fee Paid Building Permit Filled out Fee Paid tvif 4 Typeof Construction: INSTALL ROOF MOUNTED 5.98KW SOLAR ARRAY `f C New Construction � �/ 6� Non Structural interior renovations Addition to Existing Accessory Structure Building Plans Included: Owner/Statement or License 107663 3 sets of Plans/Plot Plan THE FOLLOWING ACTION HAS BEEN TAKEN ON THIS APPLICATION BASED ON INF RMATION PRESENTED: Approved Additional permits required(see below) PLANNING BOARD PERMIT REQUIRED UNDER:§ Intermediate Project: Site Plan AND/OR Special Permit With Site Plan Major Project: Site Plan AND/OR Special Permit With Site Plan ZONING BOARD PERMIT REQUIRED UNDER: § Finding Special Permit Variance* Received&Recorded at Registry of Deeds Proof Enclosed Other Permits Required: Curb Cut from DPW Water Availability Sewer Availability Septic Approval Board of Health Well Water Potability Board of Health Permit from Conservation Commission Permit from CB Architecture Committee Permit from Elm Street Commission Permit DPW Storm Water Management o ' Sig na of Bui di g Offici Date Note: Issuance of a Zoning permit does not relieve a applicant's burden to comply with all zoning requirements and obtain all required permits from Board of Health,Conservation Commission,Department of public works and other applicable permit granting authorities. * Variances are granted only to those applicants who meet the strict standards of MGL 40A. Contact Office of Planning&Development for more information. 60 PIONEER KNLS BP-2016-0801 GIs#: COMMONWEALTH OF MASSACHUSETTS Map:Block: 29-036 CITY OF NORTHAMPTON Lot: -001 PERSONS CONTRACTING WITH UNREGISTERED CONTRACTORS Permit: Building DO NOT HAVE ACCESS TO THE GUARANTY FUND (MGL e.142A) Category: SOLAR PANELS BUILDING PERMIT Permit# BP-2016-0801 Project# JS-2016-001346 Est. Cost: $15000.00 Fee: $75.00 PERMISSION IS HEREBY GRANTED TO: Const. Class: Contractor: License: Use Group: SOLARCITY CORP 107663 Lot Size(sq. ft.): 11979.00 Owner: MARTINEAU ANNE MARIE Zoning: Applicant: SOLARCITY CORP AT. 60 PIONEER KNLS Applicant Address: Phone: Insurance: 604 SILVER ST (888) 765-2489 (2358) Workers Compensation AGAWAMMA01001 ISSUED ON:1211712015 0:00:00 TO PERFORM THE FOLLOWING WORK.INSTALL ROOF MOUNTED 5.98KW SOLAR ARRAY W/SPECIFIED STRUCTURAL REINFORCEMENT POST THIS CARD SO IT IS VISIBLE FROM THE STREET Inspector of Plumbing Inspector of Wiring D.P.W. Building Inspector Underground: Service: Meter: Footings: Rough: Rough: House# Foundation: Driveway Final: Final: Final: Rough Frame: Gas: Fire Department Fireplace/Chimney: Rough: Oil: Insulation: Final: Smoke: Final: THIS PERMIT MAY BE REVOKED BY THE CITY OF NORTHAMPTON UPON VIOLATION OF ANY OF ITS RULES AND REGULATIONS. Certificate of Occupancy Signature: FeeType: Date Paid: Amount: Building 12/17/2015 0:00:00 $75.00 212 Main Street,Phone(413)587-1240,Fax: (413)587-1272 Louis Hasbrouck—Building Commissioner