Loading...
10D-019 (2) City of Northampton 212 Main Street, Northampton, MA 01 060 Solid Waste Disposal Affidavit In accordance of the provisions of MGL c 40, S54, I acknowledge that as a condition of the building permit all debris resulting from the construction activity governed by this Building Permit shall be disposed of in a properly licensed solid waste disposal facility, as defined by MGL c 111, S 150A. Address of the work: A;1 The debris will be transported by: W N E­6� The debris will be received by: V ALLC ' 'R1:(-Y C L I �,L- Building permit number: Name of Permit Applicant - SZ3 ZG 2C) i 5 Date Signature of Permit Applicant d. Energy information including mechanical equipment posted on the electric panel. e. Remodeling and Additions can be completed in accordance with IECC 2009 with Energy Star Windows and the Thermal Bypass Checklist. Duct blast testing when practicable. f. All band joist insulation must be enclosed within an air tight cavity, which you must create. 40. Vapor retarders. Although these are still in the code have exceptions, one must understand that there is a difference between a vapor retarder or barrier and an air barrier.An air barrier is intended to stop air flow(convection) a vapor retarder or barrier is intended to stop molecular moisture transfer(diffusion). A vapor retarder or barrier is effective even if there are some holes or gaps, however an air barrier has to be absolute and complete. If air can leak through an electrical device or through a crack it follows the path of least resistance and carries 99%of the moisture in a structure.This is evident every time one exposes fiberglass insulation and finds black insulation, which has filtered dirt out of the air moving through the insulation. 780 CMR R601.2 for vapor retarders and Table N1102.4.2 for air sealing requirements. 41. Unvented attic assemblies. Hot roofs are allowed, but have specific requirements 780 CMR R806.4. 42. Deck ledgers and post must be appropriately attached, bolts or lags. 780 CMR R502.2.2.1 Note:ThruLoks are engineered for post attachment supporting a railing. Lateral attachment is required for each deck per section 502.2.2.3. 43. Smoke and CO detectors as required. 780 CMR R314 and R315. a. Smokes in each bedroom, within 10'of a bedroom door, and at the bottom of a stair leading to a finished floor above. b. CO within 10' of bedroom doors, at each level, for every 1500 sqft, (plumbing code in the mechanical room) Except if there are no fossil burning fuels or attached garage. c. Heat detector in attached garage, and other large unfinished unconditioned spaces. 44. Closets beneath stair which have doors must be drywalled with%". 780 CMR R302.7 45. If there is mechanical equipment or a combustible roof, 30 sqft of space, and 30" measured from top of ceiling joist to bottom of rafters an attic access of minimum RO of 22"x 30" is required to be located in an accessible place. It must be insulated equal to surrounding, gasketed, and secured in place. 46. Clearances above gas stoves and cook tops burners is 24" to non-combustible or 30" to combustibles. Relevant items must be submitted to the building department for approvals before inspections and or Certificates of Occupancy can be issued. Feel free to call if you have any questions. My telephone number is 587-1240 and office hours are Monday through Friday, 8:30 am to 4:30 pm, excepting we close for walk-ins at 12:00 noon on Wednesdays. My email address is: cmiller(@,northamptonma.gov Thank you for your peration on thes tters. uck Miller City of Northampton Assistant Commissioner and Zoning Enforcement c. Two doors remote as possible at the normal level of travel, opening measured from the face of the slab to the stop with door at 90 degrees, one 32" and one 28" minimum 78" high. 780 CMR R311.2 d. Landing at each door 36" out and the width of the door minimum 36", maximum step 7%" from the top of the threshold and only in-swinging doors. 780 CMR R311.3 23. Stairs have critical standards, make sure you know the floor finishes when planning. Minimum tread 9", maximum riser 8%", maximum overall variance for the run is 3/8",4" sphere rule on risers except where the total rise is 30" or less 780 CMR R311.7.4.3 Exception,4 3/8"on balustrade, 6" in the triangle. Graspable rail 1%" minimum and 2" maximum rail, height minimum 34" maximum 38", required for 4 or more risers. Landing to landing constitutes a new run. Minimum 6'8" ceiling height from nosing. Rails must be continuous and returned to the wall if not to newel post. 780 CMR R311.7. 24. Guards 36" minimum height above walking surface, a bench is a walking surface, required for more than 30" above floor or grade within 36",4"sphere rule. 780 CMR R312.1. 25. Floor joist systems that are not equal to 1%" nominal dimension must be covered with%" drywall or 5/8"wood structural panel or equivalent with some exceptions. 780 CMR R501.3 26. Educate the plumber and electrician about maximum notch and hole sizes, and placement. 780 CMR R502.8 and R602.6. In bearing studs holes not larger than 40%of a stud no closer than 5/8 to the edge, In interior non-bearing studs holes not larger than 60%of a stud no closer than 5/8 to the edge, or holes in joist are a maximum 1/3 the depth not closer than 2" from the top or bottom or to any other hole. Notches are different. 27. Drilling or notching of more than 50%of the wall plate width of an exterior wall or load bearing partition requires a 16 GA 1%" strap across the area and 6" beyond each side with 8- 10nd nails. 780 CMR R602.6.1 28. Where dryer ducts penetrate the wall they must be sealed with fire caulk. 780 CMR M504.2 29. Dryer ducts must terminate outside of the building, have a backdraft damper, cannot include a screen, and require 3'clearance from windows. 780 CMR M504.4 30. Dryer duct transition is limited to 8' of aluminum flex, must be exposed, and the proper UL listing. 780 CMR M504.6.3 31. Dryer duct maximum equivalent length is 35' less 5' per 901 elbow or per manufacturer's specs. 780 CMR M502.6.4, no screwed connections use foil tape appropriate for the use. 32. Dryer ducts when concealed must have a permanent label or tag within 6'of the duct connection 780 CMR M502.6.5 33. Makeup air is required for dryers exhausting more than 200 CFM. 780 CMR M504.5 34. Makeup air is required for any exhaust hood over 400 CFM. 780 CMR M505.2 35. Fireplaces require all combustion air be provided from the exterior and below the firebox, duct work maintaining 1" clearance for 5' from the duct outlet for all fireplaces and airtight doors. 2009 IECC 402.4.3 36. Fire and draft stopping shall be completed before rough inspection.Typical locations,top (ceiling) and bottom (floor) plates, soffits, and every 10'within enclosed cavities. 780 CMR R302. 37. Ignition barriers are required overall thermal plastics and must be in place before final. 780 CMR R316. 38. Dwelling/Garage fire separation.An attached garage (within 3'of main structure) is required to have%" drywall on the garage side of the separation wall and if there is a finished space above the garage all walls must have%Z" drywall and the ceiling 5/8" drywall. 780 CMR R302.6 39. Energy aspects shall comply with the stretch energy code. 780 CMR Appendix 115AA or 2009 IECC. a. An initial HERS evaluation is required including insulation levels anticipated. b. A final HERS evaluation confirming code requirements have been met including duct testing. c. A signed copy of the Thermal Bypass Checklist. 6. Foundation anchor bolts must be %" and be embedded a minimum of 7" into the concrete. 10" bolts! 780 CMR R403.1.6 7. CMU foundations require 3/8" parging before damp proofing. 780 CMR R406.1 see exceptions. 8. Emergency escape is required out of every basement whether habitable or not, each bedroom and walk- in attics. 780 CMR R310.1 9. Crawl spaces can be treated in three different ways,vented (poor idea), exhausted (similar to exhaust only systems), or treating the space with supply and return. See 780 CMR R408 10. Ceiling joist are intended to prevent spread, once raised above the wall plate they become rafters ties and may require up sizing of rafters and increased nailing for example with a 4" slope 8-16nd common are required at each connection. 780 CMR R802.3.1. When there is neither of these a structural ridge is required with a load path to the foundation. 11. Steel straps over the ridge or 1x4 minimum collar ties are required 4' OC in the upper 1/3rd 780 CMR R802.3.1 12. Ridge boards must be the full depth of the cut. 780 CMR R802.3. 13. A complete window and header schedule is required. 780 CMR Table R502.5 for header sizing and number of jack studs required. 14. Wood walls shall be capped with double plates to provide overlapping at corners and intersecting walls with bearing partitions,joints staggered 2' minimum.780 CMR R602.3.2 a. Exception:A single plate may be used or plates may be excluded over lintels provided the plates/lintels are adequately connected by a 3"x 6" plate .036 galvanized steel nailed to each segment with 6-8d nails 15. All framing materials which are not code prescriptive must have stamped engineering. a. LVLs b. 1-joist and or Floor Truss c. Roof truss 16. All I-Joist need to be protected from fire with% drywall or 5/8 wood structural panel. (R501.3) 17. A braced wall plan identifying appropriate braced wall areas where required (R301.1) and braced wall method being used. 780 CMR 602.10. a. Garage corners and large corner window/door layout may require special solutions. b. All corners must be appropriately attached to the foundation. c. When using PFH (R602.10.3.3) or PFG (R602.10.3.4)the nailing requirement is 4" and 3" respectively using 8d common nails or galvanized box nails. PNEUMATIC nails must be full headed with the temper and shank sizing meeting the strict code requirement. 18. When nailing sheathing make sure your pneumatic nailers' pressure is properly set. Nails set too deep perforate the sheathing weakening it and contribute to building damage in high wind events. 19. Ceiling heights minimum 7'for habitable spaces, 6'8"for bathrooms includes tub/shower area if a shower head is used, 6'8"for basements, 6'4" at beams/ducts. 780 CMR R305.1. MA amended 20. Hazardous glazing locations, within 24" of a door, or within 60" of a stair,or across from hot tubs, spas, bathtubs within 60" if not 60" above the walking surface, and other locations.780 CMR R308.4 21. Windows over 72" above grade with the opening less than 24 above the finished floor shall meet the 4" sphere rule. Order restrictors. 780 CMR R612.2 22. Egress and emergency escape requirements shall be strictly met. a. Basements, habitable attics, and all sleeping rooms require emergency escape. 780 CMR R310 b. Windows within 44" of floor, DH 3.3 sqft min window size, Casement 20"x41" exception 5 sqft at I"floor. Minimum clear opening 20"x24" or 24"x20". 780 CMR R310.1.1 City of Northampton Massachusetts DEPARTMENT OF BUILDING INSPECTIONS ? z` 212 Main Street • Municipal Building Northampton, MA 01060 INSPECTOR Ed Jazab October 13, 2015 9 Shepards Hollow Leeds, MA 01053 Subject Location: 167A1aiftAj&e(r Map Block: 10D-019 Mr.Jazab, Your building permit application with plans dated 2-13-15 has been approved as drawn and per this memo. All work must meet all applicable codes whether noted or not included within this memo. Please follow up on the following items: These items will need to be accomplished as the project moves forward and before rough inspections; 1. Must meet all conservation "Orders of Conditions" 2. Footing steel must be bonded, check with your electrician. 3. Toilets require 21" clearance in the front. 4. The windows over the master tub must be tempered. 5. Wood stove must meet the manufacturer's installation requirements. 6. Chimney must go 2' higher that any roof within 10'and meet manufacture's installation requirements. 7. Walls higher than 10' need fire stopping at 10'. Verticals separated from horizontals. 8. An emergency escape window is required within every bedroom, basement and walk-in attic. 9. Final HERS ratings, duct blast results, and a signed Thermal Bypass Checklist. 10. Smoke, Heat and CO detectors throughout the structure to current building codes. 11. An air barrier is required between the tub and the wall cavity. 12. If permeable insulation is used air sealing and an air sealing inspection is required at the exterior and interior skins.Typically the sheathing and drywall. Note:The 2012 IECC with MA amendments is the non-stretch energy code and the new Stretch Code expected to be completed in 2015. As of August 4th 2011 the 8th Edition MA code is the 2009 IRC with MA amendments. In the following are some generic requirements which seem to be problematic. This is not intended to be comprehensive, nor is it a substitute for purchasing and reading the MA codes. Read only international codes are available on line at http://publicecodes.cVberregs.com/icod/one must also consider the MA amendments to these codes which can be found at www.mass.gov/dps/bbrs . The current relevant building codes are: 2009 IBC, 2009 IEBC, 2009 IMC, 2009 IRC, 2009 or 2012 IECC,AA115, MA amendments. 1. Structures shall conform to 780 CUR 8th Edition 1 and 2 family building codes with MA amendments. 2. Grading plan for structures being constructed required.780 CMR R401.3 for drainage requirements. 3. A basement drainage system is required in all basements 780 CMR R405.2.3. except those in group I soils (table R405.1) 4. Foundations that retain earth and enclose interior space require damp proofing 780 CMR R406.1.or if high water table or severe soils waterproofing 780 CMR R406.2. 5. Through wall form ties must be removed from both faces and patched with hydraulic cement.780 CMR R406.2 of amendments. a native perennial grass mixture. Any stabilization materials such as jute netting shall be firmly anchored to prevent them from being washed from slopes by rain or flooding. Preference should be given to biodegradable materials. 10. All disturbed areas shall be graded, loamed and seeded,or stabilized with erosion control blankets or netting, and a covering of straw mulch prior to November 30, of each year, No disturbed areas or stockpiled materials will be left unprotected or without erosion control after this date. 11. No disposal of soils or other materials shall be allowed within: a 100-year floodplain; 40 feet of the 100-year floodplain elevation; any wetland; or any area within 100-feet of a wetland, or 200 feet of a vernal pool unless such areas are specifically approved by the Commission,in accordance with 310 CMR 10,00,and City of Northampton Ordinances - Chapter 337. 12. The Determination applies only to the porch, and reconstruction of the house within the footprint of the previously existing house. Any other work will require additional review. i "ATTACHMENT A" 1. Prior to the initiation of any work,the applicant/owner shall submit a letter of understanding to the Commission stating that he/she has received,read,understands and shall comply with these conditions. The applicant,and,his or her contractor,foreman and/or construction manager shall sign the letter of understanding. 2. Prior to the initiation of any work,the applicant shall submit to the Commission a sequencing plan for construction, and erosion and sedimentation control installation. 3. Prior to the start of any site work, excavation or construction, a pre-construction conference shall be held on the site,between the contractor conducting the work,the site/project engineer,the applicant,and a member or agent of the Conservation Commission,in order to ensure that the requirements of this Determination are understood by all parties. Prior to the pre-construction meeting, all erosion control devices must be installed. 4. All required permits must be obtained from applicable federal, state and local agencies and departments prior to the start of any project. 5. A copy of these conditions and associated plans shall remain on site during all construction and/or building activities. The project manager and all equipment operators shall be familiar with the approved plans, and shall be informed of their location on the site. This location shall be accessible to all contractors whenever work is occurring on site. 6. All revised plans shall be approved by the Conservation Commission and incorporated into the permit by reference and shall be followed during the course of construction. 7. The areas of construction shall remain in a stable condition at the close of each construction day. Erosion control measures shall be inspected at this time, and maintained or reinforced as necessary. All such devices shall be inspected, cleaned or replaced during construction and shall remain in place until such time as stabilization of all areas that may impact resource areas is permanent. These devices shall also be inspected to assure that the maximum control has been provided. Any entrapped silt shall be removed to an area outside the buffer zone and resource areas, and maintained or reinforced as necessary. Erosion controls shall be inspected after every rainfall to assure that maximum control has been provided. 8. An adequate stockpile of erosion control materials shall be on site at all times for emergency or routine replacement and shall include materials to repair or replace silt fences, straw bales, erosion control blankets,riprap,filter berms or other devices planned for use during construction. 9. Soils exposed for periods greater than two months shall be stabilized with erosion control blankets and netting, a covering of straw mulch,or a temporary cover of rye or other grass to prevent erosion and sedimentation. Drainage ditches shall be stabilized and seeded with Massachusetts Department of Environmental Protection Bureau of Resource Protection -Wetlands WPA Form 2 — Determination of Applicability Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 D. Appeals The applicant, owner, any person aggrieved by this Determination, any owner of land abutting the land upon which the proposed work is to be done, or any ten residents of the city or town in which such land is located, are hereby notified of their right to request the appropriate Department of Environmental Protection Regional Office(see http://www.mass.gov/dep/about/re_qion.findyour.htm)to issue a Superseding Determination of Applicability.The request must be made by certified mail or hand delivery to the Department,with the appropriate filing fee and Fee Transmittal Form (see Request for Departmental Action Fee Transmittal Form)as provided in 310 CMR 10.03(7)within ten business days from the date of issuance of this Determination. A copy of the request shall at the same time be sent by certified mail or hand delivery to the Conservation Commission and to the applicant if he/she is not the appellant. The request shall state clearly and concisely the objections to the Determination which is being appealed. To the extent that the Determination is based on a municipal ordinance or bylaw and not on the Massachusetts Wetlands Protection Act or regulations, the Department of Environmental Protection has no appellate jurisdiction. I wpafcrm2.doc•Determination of Appl cability•rev.1016104 Page 5 of 5 LlMassachusetts Department of Environmental Protection Bureau of Resource Protection -Wetlands WPA Form 2 — Determination of Applicability Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 B. Determination (cont.) 5. The area described in the Request is subject to protection under the Act. Since the work described therein meets the requirements for the following exemption, as specified in the Act and the regulations, no Notice of Intent is required: ZX#mpt lVity site applicable statuatory/r ulatory ovisi s) j 0 1.Qa i ❑ 6. The area and/or work described in the Request is not subject to review and approval by: Name of Municipality Pursuant to a municipal wetlands ordinance or bylaw. I Name Ordinance or Bylaw Citation C. Authorization This Determination is issued to the applicant and delivered as follows: ❑ by hand delivery on by certified mail, return receipt requested on Date Date This Determination is valid for three years from the date of issuance(except Determinations for Vegetation Management Plans which are valid for the duration of the Plan). This Determination does not relieve the applicant from complying with all other applicable federal, state, or local statutes, ordinances, bylaws, or regulations. This Determination must be signed by a majority of the Conservation Commission. A copy must be sent to the appropriate DEP Regional Office(see http://www.mass.gov/dep/about/region.findyour.htm) and the property owner(if different from the applicant). i Signatur : cam" C r Date wpafcrm2.doc-Determiretion of Applicability•rev.I M104 Page 4 of 5 LlMassachusetts Department of Environmental Protection Bureau of Resource Protection -Wetlands WPA Form 2 — Determination of Applicability Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 B. Determination (cont.) ® 6. The following area and/or work, if any, is subject to a municipal ordinance or bylaw but not subject to the Massachusetts Wetlands Protection Act: The project in its entirety qualifies for exemptions noted below and is not subject to the WPA so long as erosion control is maintained. Please see Attachment A for conditions under the Northampton Wetlands Protection Act. ❑ 7. If a Notice of Intent is filed for the work in the Riverfront Area described on referenced plans) and document(s),which includes all or part of the work described in the Request, the applicant must consider the following alternatives. (Refer to the wetland regulations at 10.58(4)c. for more information about the scope of alternatives requirements): ❑ Alternatives limited to the lot on which the project is located. ❑ Alternatives limited to the lot on which the project is located, the subdivided lots, and any adjacent lots formerly or presently owned by the same owner. ❑ Alternatives limited to the original parcel on which the project is located, the subdivided parcels, any adjacent parcels,and any other land which can reasonably be obtained within the municipality. ❑ Alternatives extend to any sites which can reasonably be obtained within the appropriate region of the state. Negative Determination Note: No further action under the Wetlands Protection Act is required by the applicant. However, if the Department is requested to issue a Superseding Determination of Applicability, work may not proceed on this project unless the Department fails to act on such request within 35 days of the date the request is post-marked for certified mail or hand delivered to the Department.Work may then proceed at the owner's risk only upon notice to the Department and to the Conservation Commission. Requirements for requests for Superseding Determinations are listed at the end of this document. ❑ 1. The area described in the Request is not an area subject to protection under the Act or the Buffer Zone. ❑ 2. The work described in the Request is within an area subject to protection under the Act, but will not remove, fill, dredge, or alter that area. Therefore, said work does not require the filing of a Notice of Intent. ❑ 3. The work described in the Request is within the Buffer Zone, as defined in the regulations, but will not alter an Area subject to protection under the Act. Therefore, said work does not require the filing of a Notice of Intent, subject to the following conditions(if any). ❑ 4. The work described in the Request is not within an Area subject to protection under the Act (including the Buffer Zone). Therefore, said work does not require the filing of a Notice of Intent, unless and until said work alters an Area subject to protection under the Act. wpaforrn2.doc Determination of Applicability•rev.10/6/04 Page 3 of 5 ILIMassachusetts Department of Environmental Protection Bureau of Resource Protection -Wetlands WPA Form 2 — Determination of Applicability Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 B. Determination (cont.) The following Determination(s) is/are applicable to the proposed site and/or project relative to the Wetlands Protection Act and regulations: Positive Determination Note: No work within the jurisdiction of the Wetlands Protection Act may proceed until a final Order of Conditions(issued following submittal of a Notice of Intent or Abbreviated Notice of Intent)or Order of Resource Area Delineation (issued following submittal of Simplified Review ANRAD)has been received from the issuing authority(i.e., Conservation Commission or the Department of Environmental Protection). ❑ 1. The area described on the referenced plan(s)is an area subject to protection under the Act. Removing,filling,dredging, or altering of the area requires the filing of a Notice of Intent. ❑ 2a.The boundary delineations of the following resource areas described on the referenced pian(s)are confirmed as accurate.Therefore,the resource area boundaries confirmed in this Determination are binding as to all decisions rendered pursuant to the Wetlands Protection Act and its regulations regarding such boundaries for as long as this Determination is valid. ® 2b. The boundaries of resource areas listed below are not confirmed by this Determination, regardless of whether such boundaries are contained on the plans attached to this Determination or to the Request for Determination. No boundaries shown or confirmed ❑ 3. The work described on referenced plan(s)and document(s) is within an area subject to protection under the Act and will remove, fill, dredge, or alter that area. Therefore, said work requires the filing of a Notice of Intent. ❑ 4. The work described on referenced plan(s) and document(s) is within the Buffer Zone and will alter an Area subject to protection under the Act. Therefore, said work requires the filing of a Notice of Intent or ANRAD Simplified Review(if work is limited to the Buffer Zone). ❑ 5. The area and/or work described on referenced plan(s)and document(s) is subject to review and approval by: Name of Municipality Pursuant to the following municipal wetland ordinance or bylaw: Name Ordinance or Bylaw Citation wpaferrr2.doc-Determination of Applicability•rev,1 WEl44 Page 2 of 5 ILIMassachusetts Department of Environmental Protection Bureau of Resource Protection -Wetlands WPA Form 2 — Determination of Applicability Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 A. General Information Important: When filling out From: forms on the Northampton computer, use Conservation Commission only the tab key to move To: Applicant Property Owner(if different from applicant): your cursor- do not use the Moses Miller return key. Name Name 167 Main Street ± Mailing Address Mailing Address Leeds MA 01053 City/Town State Zip Coda City/Town State Zip Code rte, 1. Title and Date (or Revised Date if applicable)of Final Plans and Other Documents: Request for Determination Packet 8/27/2015 Title Date New Residence Plans, Sheets Al-A3, S1-S3 2/13/15 Title Date Tit-le- Date 2. Date Request Filed: i B. Determination Pursuant to the authority of M.G.L. c. 131, §40, the Conservation Commission considered your Request for Determination of Applicability,with its supporting documentation, and made the following Determination. Project Description (if applicable): Reconstruction of a home destroyed by fire, on the same foundation,with addition of a 40' by 6' porch including stairs approximately 100 feet from the bank of the Mill River, Project Location: 167 Main Street Leeds Street Address City/Town 10D 019 Assessors Map/Plat Number Parcel/Lot Number wpatormZdoc-Determination of ApplicatNlity-rev.10!6104 Page 1 of 5 Registry ID: Rating Number: HERS-418 • Certified Energy Rater: Matt Turcofte Rating Date: 3/269/15 167 Main St Rating Ordered For: Leeds,MAO 1053 [ Estimated Annual Energy Cost ProjectedWorstCase 5 Stars Plus Use MMBtu Cost Percent Projected Rating: Based on Plans, Field Confirmation Required Heating 60.3 $881 37% Uniform Energy Rating System Energy Efficient Cooling 3.8 $194 8%Hot Water 15.7 $221 9% r 1 Star 1 Star Plus 2 Stars 2 Stars Plus 3 Stars 3 Stars Pins 4 Stars 4 Stars Pins 5 Stars 5 Stars Plus Lights/Appliances 23.1 $1067 45% 500-401 1 400-301 300-251 250-201 200-151 150 101 1 100-91 1 90-86 85-71 70 or Less photovoltaics -0.0 $-0 -0% HERS Index: 68 Service Charges $0 0% General Information Total 102.9 $2363 100% Conditioned Area: 2170 sq.ft. HouseType: Single-family detached Conditioned Volume: 27915 cubic ft. Foundation: Unconditioned basement Bedrooms: 3 This home meets or exceeds the minimum Mechanical Systems Features criteria for all of the following: Heating: Fuel-fired air distribution,Natural gas,95.1 AFUE. Cooling: Air conditioner,Electric,13.0 SEER. Wale r Heating: Instant water heater,Natu ral gas,0.82 EF,0.0 Gal. Duct Leakage to Outside: 130.20 CFM25. Ventilation System: Exhaust Only:52 cfm,7.6 watts. Programmable Thermostat: Heating:Yes Cooling:Yes Building She#Features Ceiling Flat: R-40.8 Slab: None Sealed Attic: NA Exposed Floor: R-0.0 Vaulted Ceiling: R-40.5 Window Type: U-Value:0.300,SHGC:0.260 Above Grade WaIs: R-20.1 Infiltration Rate: Htg:3.00 Clg:3.00 ACH50 Foundation Walls: R-12.0 Method: Blower door test Lights and Appliance Features TITLE Percent Interior Lighting: 80.00 Range/Oven Fuel: Natural gas Company Percent Garage Lighting: 80.00 Clothes Dryer Fuel: Electric Address Refrigerator(kWh/yr): 0.00 Clothes Dryer EF: 3.01 City,State,Zip Dishwasher Energy Factor: 0.00 Ceiling Fan(cfm/Watt): 0.00 Phone# The Home Energy Rating Standard Disclosure for this home is available from the rating provider. Fax# REM/Rate-Residential Energy Analysis and Rating Software v14.5.1 This information does not constitute any warranty of energy cost or savings. ®1985-2014 PrchtecturaI Energy Corporation,Boulder,Colorado. 10/13/2015 City of Northampton Mail-Re:167 Main Street r , Of Louis Hasbrouck <Iasbrouck @northamptonma.gov> Re: 167 Main Street 1 message Sarah LaValley <slavalley @northamptonma.gov> Tue, Oct 13, 2015 at 1:29 PM To: Louis Hasbrouck < has brouck @northamptonma.gov> Cc: Ed Jazab <eJazab @yahoo.com>, Charles Miller<cmiller @northamptonma.gov> Hi Louis- The Conservation Commission issued a negative determination that covers a rebuild on the same footprint, and a 40'by 6'porch on the river side. We required a preconstruction meeting and some other standard conditions. Sarah I. LaValley Conservation, Preservation and Land Use Planner City of Northampton Office of Planning and Sustainability 210 Main Street, Room 11 Northampton MA, o1o6o 413-587-1263 On Tue, Oct 13, 2015 at 1:24 PM, Louis Hasbrouck <Iasbrouck @northamptonma.gov> wrote: Ed, As you know, that house is within the 200' riverbank zone. You need to contact Sarah LaValley and find out if she needs anything more than what you did for the demolition. She may also want a pre-construction meeting. We won't issue the permit until we hear from her. She's copied on this email. didn't find the HERS rating sheets; we'll need that before we issue the permit. We'll also need an electronic copy of the plans. Chuck Miller will be doing the plan review. Louis Hasbrouck Building Commissioner City of Northampton Town of Williamsburg (413) 587-1240 office (413) 587-1272 fax in House Reconstruction Determination.pdf 6323K https://mai l.google.com/mail/ca/u/0/?ui=2&ik=ec5fl9a57e&view=pt&search=inbox&th=150623fa9c4b89bb 1/1 I i , 1 i i t f. i a t t + Registry ID: 5'av &V 11 Rating Number: HERS-418 / Certified Energy Rater: Matt Turcotte 0 Rating Date: 3/269/15 167 Main St Rating Ordered For: Leeds,MAO 1053 s. Estimated Annual Energy Cost Projected W orstCase 5 Stars Plus Use MMBtu Cost Percent Projected Rating: Based on Plans, Field Confirmation Required Heating 60.3 $881 37% Uniform Energy Rating System Energy Efficient Cooling 3.8 $194 8% Hot Water 15.7 $221 9% 1 Star 1 Star Plus 2 Stars 2 Stars Plus 3 Stars 3 Stars Plus 4 Stars f190-86 ars Plus 5 Stars 5 Stars Plus Lights/Appliances 23.1 $1067 45% 500-401 400-301 300-251 250-201 200-151 150-101 100-91 1 85-71 1 70 or Less Photovoltaics -0.0 $-0 -0% HERS Index 68 Service Charges ° ? General Inf�rimation � �� �� �u � ,,� 9 $0 0/° Total 102.9 $2363 100% e M,. . Conditioned Area: 2170 sq.ft. HouseType: Single-family detached „,• Conditioned Volume: 27915 cubic ft. Foundation: Unconditioned basement ... ,< ., Bedrooms: 3 This home meets or exceeds the minimum :.. criteria for all of the following: Mechanicalystetll t eater Heating: Fuel-fired air distribution,Natural gas,95.1 AFUE. Cooling: Air conditioner,Electric,13.0 SEER. Water Heating: Instant water heater,Natural gas,0.82 EF,0.0 Gal. Duct Leakage to Outside: 130.20 CFM25. Ventilation System: Exhaust Only:52 cfm,7.6 watts. Programmable Thermostat: Heating:Yes Cooling:Yes tt iing he' Fe lur s w'. N Ceiling Flat: R-40.8 Slab: None Sealed Attic: NA Exposed Floor: R-0.0 Vaulted Ceiling: R-40.5 Window Type: U-Value:0.300,SHGC:0.260 Above Grade Walls: R-20.1 Infiltration Rate: Htg:3.00 CIg:3.00 ACH50 Foundation Walls R-1 2 0 Method: Blower door test '%fir g 9: TITLE Percent Interior Lighting: 80.00 Ran e/Oven Fuel: Natural as Company Percent Garage Lighting: 80.00 Clothes Dryer Fuel: Electric Address Refrigerator(kWh/yr): 0.00 Clothes Dryer EF: 3.01 City,State,Zip Dishwasher Energy Factor: 0.00 Ceiling Fan(cfm/Watt): 0.00 Phone# The Home Energy Rating Standard Disclosure for this home is available from the rating provider. Fax# REM/Rate-Residential Energy Analysis and Rating Software v14.5.1 This information does not constitute any warranty of energy cost or savings. ©1985-2014 Architectural Energy Corporation,Boulder,Colorado. _ City of Northampton _ Massachusetts k DEPARTMENT OF BUILDING INSPECTIONS n 212 Main Street • Municipal Building Northampton, MA 01060 Fee Calculator for Residential Properties Location : I C� �? �1 97 LE-CV S I/AA . ',:) ► D S 3 Square Footage Amount Basement @ .20 c3 1 ST Floor @ .50 CD 7 2nd Floor @ .50 1y '/ Floors, Finish Attic, Garage @ .20 Deck / Porches @ .20 Total s� City of Northampton � r Massachusetts mow; - rf c x. DEPARTMENT OF BUILDING INSPECTIONS l' 212 Main Street • Municipal Building Northampton, MA 01060 INSPECTOR Louis Hasbrouck Chuck Miller Building Commissioner Assistant Commissioner HOME OWNER EXEMPTION ACKNOWLEDGEMENT The State of Massachusetts allows the homeowner the right under 780CMR 108.3.4 to act as his/her construction supervisor. The state defines "Homeowner" as, " Person(s) who owns a parcel on which he/she resides or intends to be, a one or two family dwelling, attached or detached structures accessory to such use and/or farm structures. A person who constructs more than one home in a two- year period shall not be considered a home owner." The building department for the City of Northampton wants any person(s)who seek to use the home owner exemption, to act as their own construction supervisor, to be aware that by doing so you become responsible for compliance with state building codes and regulations. The inspection process requires that the building department be called to inspect work at various stages, which include foundation/footings (before backfill) sonotube holes (before pour), a rough building inspection (before work is concealed) insulation inspection (if required) and a final building inspection. The building department requires these inspections before the work is concealed, failure to secure these inspections can result in failure to obtain a certificate of occupancy-until the work can be inspected. If the homeowner hires other trades to perform work (electrical, plumbing & gas) the homeowner will be responsible to make sure that the trades hired secure their proper permits in conjunction to the building permit issued, and that they get their required inspections. Failure of the individual trades to secure the permits and inspections as required can DELAY the project until such time as the proper permits and inspections are tyade I, /l understand the above. (Home o ner/residdnt's signature reques ng exemption) will call to schedule all required building inspections necessary for the building permit issued to me. Date 10) 1 2.z 5 Address of work location 13 The Commonwealth of Massachusetts Department of Industrial Accidents Office of Investigations 600 Washington Street Boston, MA 02111 Y v www.mass.gov/dia Workers' Compensation Insurance Affidavit: Builders/Contractors/Electricians/Plumbers Applicant Information Please Print Legibly Name (Business/Organization/Individual): Address: City/State/Zip: Phone M Are you an employer? Check the appropriate box: Type of project(required): 1.❑ I am a employer with 4. ❑ I am a general contractor and I 6. g]New construction employees (full and/or part-time).* have hired the sub-contractors 2.M I am a sole proprietor or partner- listed on the attached sheet. 7. ❑ Remodeling ship and have no employees These sub-contractors have g• ❑ Demolition working for me in an capacity. employees and have workers' g Y p tY• 9. ❑ Building addition [No workers' comp. insurance comp. insurance.1 required.] 5. ❑ We are a corporation and its 10.❑ Electrical repairs or additions 3.❑ I am a homeowner doing all work officers have exercised their 11.❑ Plumbing repairs or additions myself. [No workers' comp. right of exemption per MGL 12.❑ Roof repairs insurance required.] t c. 152, §1(4), and we have no employees. [No workers' 13.❑ Other comp. insurance required.] *Any applicant that checks box#1 must also fill out the section below showing their workers'compensation policy information. tHo meowners who submit this affidavit indicating they are doing all work and then hire outside contractors must submit a new affidavit indicating such. $Contractors that check this box must attached an additional sheet showing the name of the sub-contractors and state whether or not those entities have employees. If the sub-contractors have employees,they must provide their workers'comp.policy number. I am an employer that is providing workers'compensation insurance for my employees. Below is the policy and job site information. Insurance Company Name: Policy#or Self-ins. Lic. #: Expiration Date: Job Site Address: City/State/Zip: Attach a copy of the workers' compensation policy declaration page(showing the policy number and expiration date). Failure to secure coverage as required under Section 25A of MGL c. 152 can lead to the imposition of criminal penalties of a fine up to$1,500.00 and/or one-year imprisonment, as well as civil penalties in the form of a STOP WORK ORDER and a fine of up to$250.00 a day against the violator. Be advised that a copy of this statement may be forwarded to the Office of Investigations of the DIA for insurance coverage verification. I do hereby certify under the pains and penalties of perjury that the information provided above is true and correct. Sign ature: n. Date: t D I 1 2 D 1 S Phone#• LM 2 22 ' LAZ) Official use only. Do not write in this area, to be completed by city or town official City or Town: Permit/License# Issuing Authority(circle one): 1. Board of Health 2.Building Department 3. City/Town Clerk 4.Electrical Inspector 5.Plumbing Inspector 6. Other Contact Person: Phone#: SECTION 8-CONSTRUCTION SERVICES 8.1 Licensed Construction Supe visor: Not Applicable £ Name of License Holder: h J- Z(-va License Number 1-���l-�"��2.��5 � l.L a w �E�1�S �� •.7 ���'j L''�y � c7 Z�Z� I j Expiration Date Av ,� X113 222 r � I Signature Telephone 9.RedisteredHome Improvement Confracton':_. . „ _ _... ,. „. Not Applicable £ Company Name Registration Number Address Expiration Date Telephone SECTION 10-WORKERS'COMPENSATION INSURANCE AFFIDAVIT(M.G,L.c.152,§25C(6)) Workers Compensation Insurance affidavit must be completed and submitted with this application. Failure to provide this affidavit will result in the denial of the issuance of the building permit. Signed Affidavit Attached Yes....... £ No...... £ 11: - Home Owrier Exemption The current exemption for"homeowners"was extended to include Owner-occupied Dwellings of one(1) or two(2)families and to allow such homeowner to engage an individual for hire who does not possess a license,provided that the owner acts as supervisor.CMR 780, Sixth Edition Section 108.3.5.1. Definition of Homeowner:Person(s)who own a parcel of land on which he/she resides or intends to reside,on which there is,or is intended to be,a one or two family dwelling,attached or detached structures accessory to such use and/or farm structures.A person who constructs more than one home in a two-year period shall not be considered a homeowner. Such"homeowner"shall submit to the Building Official,on a form acceptable to the Building Official,that he/she shall be responsible for all such work performed under the building permit. As acting Construction Supervisor your presence on the job site will be required from time to time,during and upon completion of the work for which this permit is issued. Also be advised that with reference to Chapter 152(Workers'Compensation) and Chapter 153 (Liability of Employers to Employees for injuries not resulting in Death)of the Massachusetts General Laws Annotated,you may be liable for person(s) you hire to perform work for you under this permit. The undersigned"homeowner"certifies d assumes responsibility for compliance with the State Building Code,City of Northampton Ordinances,State and L al Zoning s a to of Massachusetts General Laws Annotated. Homeowner Signature. SECTION 5-DESCRIPTION OF PROPOSED WORK(check all applicable) New House Addition ❑ Replacement Windows Alterations) ❑ Roofing ❑ Or Doors Accessory Bldg. ❑ Demolition ❑ New Signs [❑] Decks [Q Siding[❑] Other[❑] Brief Description of Proposed.R���' IRE 7ir- T�� LT �-t6fy)1E Work: Alteration of existing bedroom Yes X No Adding new bedroom Yes X No Attached Narrative Renovating unfinished basement Yes No Plans Attached Roll -Sheet - �._ Ga. if Newhouse and or'addition to exlstlng.housirig complete the following:: a. Use of building :One Family Two Family Other b. Number of rooms in each family unit: I° Number of Bathrooms 2 �Z t a c. Is there a garage attached? N V 2\00 If 0 �30 d. Proposed Square footage of new construction. Dimensions 30 e. Number of stories? I tv f. Method of heating? G5 Fireplaces or Woodstoves Number of each g. Energy Conservation Compliance. J Masscheck Energy Compliance form attached? It h. Type of construction Vv Oa 9 1 'm i. Is construction within 100 ft.of wetlands? Yes No. Is construction within 100 yr. floodplain Yes No j. Depth of basement or cellar floor below finished grade k. Will building conform to the Building and Zoning regulations? Yes No. I. Septic Tank City Sewer ✓ Private well City water Supply SECTION 7a-OWNER AUTHORIZATION-TO BE COMPLETED WHEN OWNERS AGENT OR CONTRACTOR APPLIES FOR BUILDING PERMIT I, M CX,6 �)+{� as Owner of the subject property hereby authorize to act on my b alf an utters relative to work authorized by this building permit application. iJ Z Zoi` Signature f e Date ED �"zA P, as Owner/Authorized Agent hereby declare that the statements and information on the foregoing application are true and accurate,to the best of my knowledge and belief. Signed under the pai and penalties of perjury. 17i > P-?�A p Print Name L_n Signature of Owner/Agent Date D RYE _ � v ` ©eparfr�ent use only �J City of Northampton Status pfPermrt � " aaF y Building Department Curb Cut/Drlue�ra Perrrsl# °� ' r y F3 4 OCT 2015 212 Main Street SewerlSspticgvalra"bllrty F Room 100 Water/WelEfivatlalhty f ,Plumbing g Cas I Northampton, MA 01060 Twin Sets d_fStructi FaI PIaE}s ortham ton,MA 0 �t 0 e 413-587-1240 Fax 413-587-1272 P[ot/Slte Pfana „ KL J{yJ�* Y. l? Over S ec� APPLICATION TO CONSTRUCT,ALTER,REPAIR,RENOVATE OR DEMOLISH A ONE OR TWO FAMILY DWELLING SECTION 1 -SITE INFORMATION This section to be completetl by office 1.1 Property Address: b', t S T LE L'P 5 Map Lot Unit o i o ,53 Zone. _._. .. Overlay D sfrrct Elm t District - - CB Distncf SECTION 2 PROPERTY OWNERSHIP/AUTHORIZED AGENT: 2.1 Owner of Record: nn MvSC3 " 1 LLIuV, Name(Print) Current Mailing Address: 1A IiZ -(_ s Telephone Sign re 2.2 Authorized Agent: t \ L L D'vJ Namegrint) Current Mailing Address: y►3 - 222 - ` 910 Signature Telephone SECTION 3-ESTIMATED CONSTRUCTION COSTS. Item Estimated Cost(Dollars)to be Official Use Only completed by ermit applicant 1. Building (a) Building Permit Fee Ilo, 2. Electrical (b)Estimated Total Cost of D ' `�p Construction from 6 3. Plumbing 000 Building Permit Fee 4. Mechanical(HVAC) 0..O p 5. Fire Protection v 6. Total=(I +2+3+4+5) 20-2 , O D Check Number FT This Section For Official Use Only Building Permit Number: Date Issued: Signature: Building Commissioner/Inspector of Buildings Date '/ •1 Section 4. ZONING All Information Must Be Completed. Permit Can Be Denied Due To Incomplete Information 1;1V Existing Proposed Required by Zoning This column to be filled in by 1 Building Department- , i I N Lot Size 1 - ----�---~—t - -1 Frontage Setbacks Front s Side L:(1®o 1 R:0114 L:fe�` R:'k1=1 1_� Rear !._M_�'_�_1 ' ' Building Height 117-1 ff2 I Bldg.Square Footage ? _ % i Open Space Footage % (Lot area minus bldg&paved parking) #of Parking Spaces (- — L7 Fill; IV ,�y (volume&Location) A. Has a Special Permit/Variance/Finding ever been issued for/on the site? NO DONT KNOW X-1111 YES Q IF YES, date issued:' IF YES: Was the permit recorded at the Registry of Deeds? NO Q DONT KNOW 0 YES IF YES: enter Book + _ w Page l and/or Document#' B. Does the site contain a brook, body of water or wetlands? NO Q DONT KNOW 0 YES IF YES, has a permit been or need to be obtained from the Conservation Commission? Needs to be obtained Q Obtained & , Date Issued: j f 2'= 1 5 C. Do any signs exist on the property? YES Q NO IF YES, describe size, type and location: D. Are there any proposed changes to or additions of signs intended for the property? YES 0 NO Q IF YES, describe size, type and location: t E. Will the construction activity disturb(clearing,grading,excavation, or filling)over 1 acre or is it part of a common plan that will disturb over 1 acre? YES Q NO IF YES,then a Northampton Storm Water Management Permit from the DPW is required. pnJtN� 01,Cj fLA N 94Wirk File#BP-2016-0451 APPLICANT/CONTACT PERSON ED JAZAB K��" 1 ADDRESS/PHONE 9 SHEPHERDS HOLLOW LEEDS01053 (413)222-4910() K��" 1 PROPERTY LOCATION 167 MAIN ST �wff RoN1C� N MAP IOD PARCEL 019 001 ZONE URB(100)/ THIS SECTION FOR OFFICIAL USE ONLY: C� ��� a&A PERMIT APPLICATION CHECKLIST �� ENCLOSED REQUIRED DATE but ZONING FORM FILLED OUT Fee Paid Building Permit Filled out Fee Paid Typeof Construction:_REBUILD 2 STORY SFH W/DECK/PORCH New Construction VC.IJV�/✓V P Non Structural interior renovations Addition to Existing Accessory Structure Building Plans Included: Owner/Statement or License 050099 / 3 sets of Plans/Plot Plan THE FOLLOWING ACTION HAS BEEN TAKEN ON THIS APPLICATION BASED ON INFqRMATION PRESENTED: Approved Additional permits required(see below) PLANNING BOARD PERMIT REQUIRED UNDER:§ Intermediate Project: Site Plan AND/OR Special Permit With Site Plan Major Project: Site Plan AND/OR Special Permit With Site Plan ZONING BOARD PERMIT REQUIRED UNDER: § Finding Special Permit Variance* Received&Recorded at Registry of Deeds Proof Enclosed Other Permits Required: Curb Cut from DPW Water Availability Sewer Availability Septic Approval Board of Health Well Water Potability Board of Health Permit from Conservation Commission Permit from CB Architecture Committee Permit from Elm Street Commission Permit DPW Storm Water Management e 1' ' n Delay Si re of Building OKicial Date Note: Issuance of a Zoning permit does not relieve a applicant's burden to comply with all zoning requirements and obtain all required permits from Board of Health,Conservation Commission,Department of public works and other applicable permit granting authorities. * Variances are granted only to those applicants who meet the strict standards of MGL 40A. Contact Office of Planning&Development for more information. 167 MAIN ST BP-2016-0451 GIs#: COMMONWEALTH OF MASSACHUSETTS ME:Block: IOD-019 CITY OF NORTHAMPTON Lot:-001 PERSONS CONTRACTING WITH UNREGISTERED CONTRACTORS Permit: Building DO NOT HAVE ACCESS TO THE GUARANTY FUND (MGL c.142A) Category: FIRE RESTORATION BUILDING PERMIT Permit# BP-2016-0451 Project# JS-2016-000746 Est. Cost: $202000.00 Fee: $1344.00 PERMISSION IS HEREBY GRANTED TO: Const. Class: Contractor: License: Use Group: ED JAZAB 050099 Lot Size(sq. ft.): 9757.44 Owner: MILLER MOSES D Zoning: URB(100)/ Applicant: ED JAZAB AT: 167 MAIN ST Applicant Address: Phone: Insurance: 9 SHEPHERDS HOLLOW (413) 222-4910 (� LEEDSMA01053 ISSUED ON.1012612015 0:00:00 TO PERFORM THE FOLLOWING WORK.-REBUILD 2 STORY SFH W/DECK/PORCH POST THIS CARD SO IT IS VISIBLE FROM THE STREET Inspector of Plumbing Inspector of Wiring D.P.W. Building Inspector Underground: Service: Meter: Footings: Rough: Rough: House# Foundation: Driveway Final: Final: Final: Rough Frame: Gas: Fire Department Fireplace/Chimney: Rough: Oil: Insulation: Final: Smoke: Final: THIS PERMIT MAY BE REVOKED BY THE CITY OF NORTHAMPTON UPON VIOLATION OF ANY OF ITS RULES AND REGULATIONS. Certificate of Occupancy Signature: FeeType: Date Paid: Amount: Building 10/26/2015 0:00:00 $1344.00 212 Main Street,Phone(413)587-1240,Fax: (413)587-1272 Louis Hasbrouck—Building Commissioner