Loading...
24A-215 Engineer/License Holder: MOUNTED SOLAR MODULES MOUNTED TO ROOF ON1ARRAY UNDER SOLAR MODULE 35-270W MODULES W/1 SOLAR EDGE P300 PER MODULE NEC 690.34 18.75 ADC MAX PER STRING 1 STRING OF 17 MODULES IN SERIES-350 Vmax $,x8' \\ 1 STRING OF 18 MODULES IN SERIES-350 Vmax °- °-"- JUNCTION --- - -- *2 STRINGSTO BETERMINATED IN PARALLEL INSIDE INVERTER 1 __ __.."._. _....,___ BOX _..__. " .-_.-.-.-. -___......_ _._.._.__. _ __. _.. .._,„,�_ __.."...�.._.._.._.,._.._,._- .. ..__. ,. ._ " ,,, .., . . ....__.. is Issued/Revisions t R1 SYSTEM SIZE INCREASE 11/1612015 P1 ISSUED TO TOWNSHIP FOR PERMIT 11M12015 NO. DESCRIPTION DATE Project Title: KAWAR,NADA- i ARRAY CIRCUIT WIRING NOTES TRINITY ACCT#:2015-67482 COMPLIES WITH 2011 NEC GFCI RECEPTACLE Project Address: 1.) LOWEST EXPECTED AMBIENT TEMPERATURE BASED ON EXISTING 1p15A BREAKER 14 ASHRAE MINIMUM MEAN EXTREME DRY BULB 120/240V 240V 10 /2 NM CABLE TEMPERATURE FOR ASHRAE LOCATION MOST SIMILAR TO UTILITY 200A MAIN BREAKER 29 ADARE PLACE INSTALLATION LOCATION. LOWEST EXPECTED AMBIENT METER 200A BUSBAR NORTHAMPTON,MASSACHUSETTS TEMP = -16'C - 01060 2.) HIGHEST CONTINUOUS AMBIENT TEMPERATURE BASED ON ASHRAE HIGHEST MONTH 2% DRY BULB Drawing Title: TEMPERATURE FOR ASHRAE LOCATION MOST SIMILAR TO INSTALLATION LOCATION. HIGHEST CONTINUOUS TEMP = 33'C PROPOSED 9.45kW 60A UNFUSED PRODUCTION SOLAR SYSTEM 3.) 2005 ASHRAE FUNDAMENTALS 2% DESIGN DISCONNECT METER D TEMPERATURES DO NOT EXCEED 47'C IN THE UNITED Rn INVERTER #1 STATES (PALM SPRINGS, CA IS 44.1'C). FOR LESS THAN 2400V— TFAL10 Drawing Information 9 CURRENT-CARRYING CONDUCTORS IN A ee0ame > Iur ROOF-MOUNTED SUNLIT CONDUIT AT LEAST 0.5” ABOVE o a ___a+� DRAWING DATE: 11/9/2015 _. ROOF AND USING THE OUTDOOR DESIGN TEMPERATURE DRAWN BY: 1MG OF 47-C OR LESS (ALL OF UNITED STATES), 0 el > I !00 0I- .--- 0- _ REVISED BY MR 4.) PHOTOVOLTAIC POWER SYSTEMS SHALL BE --- -... 0 F �\ �6 R 0 D 0 _ �r _ _ ,� �I N - System Information: PERMITTED TO OPERATE WITH UNGROUNDED - - - - e 0 e m m e= - 0 0 �� PHOTOVOLTAIC SOURCE AND OUTPUT CIRCUIT AS PER 0 0 e e 0 0 TOTAL SYSTEM SIZE: 9.45kW NEC 690.35 NZY EXISTING MAIN BREAKER SQUARE D ........ TOTAL MODULE COUNT: 35 LOAD CENTER PN: D222RB _ MODULES USED: SUNEDSION z7a 5.) ALL EQUIPMENT INSTALLED OUTDOORS SHALL HAVE 2p4OA BACK FEED BREAKER MODULESUSED: FUNEDSI3y A NEMA 3 RATING. W/BREAKER LOCK NEC 690.64 UTILITY COMPANY: NATTGRID CALCULATIONS FOR CURRENT CARRYING UTILITY ACCT#: 0088840019 CONDUCTORS UTILITY METER#: 30592153 REQUIRED CONDUCTOR AMPACITY PER STRING DEAL TYPE: [NEC 690.8(6)(1)]: (15.00*1.25)1 = 18.75A AWG #10, DERATED AMPACITY PV MODULE SPECIFICATIONS AMBIENT TEMP: 55'C, TEMP DERATING FACTOR: .76 RACEWAY DERATING = 4 CCC: 0.80 SUNEDSION 270(F2701<0-3y) Rev.No. Sheet (40*.76)0.80 = 24.32A Imp 8.94 R 1 PV - 3 24.32A ' 18.75A, THEREFORE WIRE SIZE IS VALID Vmp 30.2 Voc 37.8 A #6THWN-2 GECTO EXISTING GROUND ROD TOTAL AC REQUIRED CONDUCTOR AMPACITY 32.00A*1.25 = 40.00A Isc 9.3 B 3/4"EMT W/2-#8 THWN-2,1410 THWN-2,1410 THWN-2 GROUND AWG #8, DERATED AMPACITY C 3/4"EMT W/4-#10 THWN-2,1410 THWN-2 GROUND AMBIENT TEMP: 30'C, TEMP DERATING: 1.0 INVERTER#1-SE760OA-US RACEWAY DERATNG < 3 CCC: N/A DC AC D 3/4"EMT W/4-#10 THWN-2,1410 THWN-2 GROUND 55A*1.0 = 55A Imp 23.5 Pout 7600 E 3/4"EMT W/2-118 THWN-2,1 410 THWN-2,1 410 THWN-2 GROUND 55A-_40.00A, THEREFORE AC WIRE SIZE IS VALID Vmp 350 lout 32 F #12 PV WIRE W/#6 BARE COPPER BOND TO MODULES AND RAILS CALCULATION FOR PV OVERCURRENT PROTECTION Voc 500 Imax 40 TOTAL INVERTER CURRENT: 32.00A Isc 30 Vnom 240 SOLAR 32.00A*1.25 = 40.00A --> 40A OVERCURRENT PROTECTION IS VALID 2211 Allenwood Road 877 Wall,New Jersey 07719 www.Trinity-So-Solac978 accom 3'-2" NEW PV SOLAR MODULE,TYPICAL SERRATED FLANGE HEX NUT U.0.L (REFER TO EQUIPMENT SCHEDULE PANEL CLAMP (SEE SPEC sHEET FOR DETAILS) FOR SPECS AND QUANTITIES) (SEE SPEC SHEET FOR oerAlLSI HEX N UT (SEE SPEC SHEET FOR DETAILS) NEW MOUNTING FOOT/ATTACHMENT SOLAR MODULE SOLAR MODULE POINTS,TYPICAL (REFER TO ENGINEERING LETTER FOR SPACING AND DETAILS) HEX HEAD CAP SCREW (SEE SPEC SHEET FOR DETAILS) NEW TOP SLIDER,TYPICAL CLAMP BASE TOP SLIDER o ' I / (REFER TO THE QUICK RACK (SEE SPEC SHEET FOR DETAILS) (SEE SPEC SHEET FOR DETAILS/ m \\N 4S LIZ CODE-COMPLIANT INSTALLATION Q-BLOCK SLIDER ONE LAYER ASPHALT SHINGLES N MANUAL FOR SPECS AND DETAILS) (SEE SPEC SHEETFORDETAILS) (SEE ENGINEERS LETTER FOR SPECS1 ,o FLASHING APOC SEALANT o NEW END CLIP,TYPICAL (SEE SPEC SHEET FOR DETAILS) (REFER TO THE QUICK RACK (SEE SPEC SHEET FOR DETAILS 0 CODE-COMPLIANT INSTALLATION c� MANUAL FOR SPECS AND DETAILS) SOLAR MODULES SHALL NOT NEW MID CLIP,TYPICAL EXCEED PEAK HEIGHT. (REFER TO THE QUICK RACK CODE-COMPLIANT INSTALLATION EXISTING RAFTER MANUAL FOR SPECS AND DETAILS) (REFER TO ENGINEERS LETTER FOR SPECIFICATIONI E ATTACHMENT&CLIP DETAIL nPV MODULE ATTACHMENT ON ASPHALT SHINGLE ROOF HEIGHT FROM GROUND LEVEL TO PEAK OF ROOF SCALE:NOT TO SCALE SCALE:NOT TO SCALE SCALE:NOT TO SCALE Issued/Revisions Ri SYSTEM-E INCREASE 11/16/z015 PS ISSUED TO TOWNSHIP FOR PERMIT 1119/2015 NO. DESCRIPTION DATE Project Title: KAWAR,NADA- TRINITY ACCT#:2015-67482 ■■ Project Address: 29 ADARE PLACE NORTHAMPTON,MASSACHUSETTS 01060 Drawing Title: FRONT BACK P SOLAR SD 9.45kW - -9 - Drawing Information . J c .. DRAWING DATE: 11/9/2015 DRAWN ISED BY ,MR -- - - i. --- - - - R D ? - - System Information: TOTAL SYSTEM SIZE 9 45 ... .�,i kW TOTAL MODULE COUNT: 35 R1 D EP MODULES USED: SUNEDSION 270 MODULE SPEC N: F270KzD-3y AC UD UTILITY COMPANY: NAT'LGRID DC UTILITY ACCT#: 0088840019 UTILITY METER p: 30592153 DEAL TYPE: NOTES: 1.)ALL EQUIPMENT SHALL BE INSTALLED IN ACCORDANCE WITH THE MANUFACTURER'S INSTALLATION INSTRUCTIONS. 2.)ALL OUTDOOR EQUIPMENT SHALL BE RAIN TIGHT WITH MINIMUM NEMA 3R RATING. Rev.NO. Sheet 3.)ALL LOCATIONS ARE APPROXIMATE AND REQUIRE FIELD VERIFICATION. 4.) ROOFTOP SOLAR INSTALLATION ONLY PV ARRAY"WILL NOT EXTEND BEYOND THE EXISTING BUILDING ENVELOPE R 1 PV - 2 ARRAY SCHEDULE SYMBOL LEGEND PLUMBING SCHEDULE EQUIPMENT SCHEDULE Rl NEW END CLIP,TYPICAL(REFER TO THE UNIRAC QTY SPEC# R 1 INDICATES ROOF DESIGNATION.REFER TO INDICATES NEW UTILITY DISCONNECT TO BE CODE-COMPLIANT INSTALLATION MANUAL ARRAY ORIENTATION=203° ARRAY SCHEDULE FOR MORE INFORMATION U� INSTALLED OUTSIDE MODULE PITCH 32° SECTION 3.2.5 FOR SPECS AND DETAILS) 35 SUNEDSION 270(F270KzD-3y) = INDICATES NEW PV SOLAR MODULE.RED MODULES NEW MID CLIP,TYPICAL(REFER TO THE UNIRAC 1 SE760OA-US M INDICATES EXISTING METER LOCATION INDICATE PANELS THAT USE MICRO INVERTERS. CODE-COMPLIANT INSTALLATION MANUAL REFER TO EQUIPMENT SCHEDULE FOR SPECS. SECTION 3.2.5 FOR SPECS AND DETAILS) OTHER OBSTRUCTIONS INDICATES EXISTING ELECTRICAL PANEL INDICATES NEW PRODUCTION METER TO BE NEW UNIRAC RAIL,TYPICAL EP LOCATION: IN BASEMENT INSTALLED OUTSIDE. --- (REFER TO THE UNIRAC CODE-COMPLIANT INSTALLATION MANUAL FOR SPECS AND DETAILS) SOLAR ,/ INDICATES NEW MAIN DISCONNECT TO BE INDICATES NEW INVERTER TO BE NEW MOUNTING FOOT/ATTACHMENT POINTS, 2211 Allenwood Road B77-797-2978 GROUPED WITH MAIN PANEL INSTALLED OUTSIDE. 0 TYPICAL (REFER TO ENGINEERING LETTER FOR Wall,New Jersey 07719 www.Trinity-Solar.com REFER TO EQUIPMENT SCHEDULE FOR SPECS. SPACING AND DETAILS) 6 � INSTALLATION OF NEW ROOF MOUNTED Aclare Place* 9 . 45kW PV SYSTEM 29 ADARE PLACE NORTHAMPTON, MASSACHUSETTS 01060 ' 'S` Issued/Revisions RS SYSTEM SIT INCREASE 11/16/201 11 ISSUED TO TOWNSHIP FOR PERMIT 11/9/2015 nVICINITY MAP SITE NO. DESCRIPTION DATE SCALE: NTS Project Title: KAWAR,NADA- TRINITY ACCT#:2015-67482 Project Address: 29 ADARE PLACE NORTHAMPTON,MASSACHUSETTS 01060 GENERAL NOTES GENERAL NOTES CONTINUED GENERAL NOTES CONTINUED ABBREVIATIONS CONTINUED SHEET INDEX 1. THE INSTALLATION CONTRACTOR IS 8. THE DC VOLTAGE FROM THE PANELS IS 14. B) CURRENT PREVAILING UTILITY JB JUNCTION BOX PV-1 COVER SHEET W1 SITE INFO & NOTES Drawing Title: RESPONSIBLE FOR INSTALLING ALL ALWAYS PRESENT AT THE DC COMPANY SPECIFICATIONS, IECMIL THOUSAND CIRCULAR MILS EQUIPMENT AND FOLLOWING ALL DISCONNECT ENCLOSURE AND THE DC STANDARDS,AND REQUIREMENTS kVA KILO-VOLT AMPERE PV-2 ROOF PLAN W1 MODULE LOCATIONS PROPOSED9.45kW DIRECTIONS AND INSTRUCTIONS TERMINALS OF THE INVERTER DURING 15 THIS SET OF PLANS HAVE BEEN kW KILO-WATT SOLAR SYSTEM CONTAINED IN THE DRAWING PACKAGE AND DAYLIGHT HOURS.ALL PERSONS PREPARED FOR THE PURPOSE OF kWH KILO-WATT HOUR - PV-3 ELECTRICAL 3 LINE DIAGRAM INFORMATION RECEIVED FROM TRINITY. WORKING ON OR INVOLVED WITH THE MUNICIPAL AND AGENCY REVIEW AND L LINE 2. THE INSTALLATION CONTRACTOR IS PHOTOVOLTAIC SYSTEM ARE WARNED APPROVAL.THIS SET OF PLANS SHALL MCB MAIN CIRCUIT BREAKER Drawing Information RESPONSIBLE FOR INSTALLING ALL THAT THE SOLAR MODULES ARE NOT BE UTILIZED AS CONSTRUCTION MDP MAIN DISTRIBUTION PANEL EQUIPMENT AND FOLLOWING ALL ENERGIZED WHENEVER THEY ARE DRAWINGS UNTIL REVISED TO INDICATE MLO MAIN LUG ONLY DRAWING DATE: 11/9/2015 DIRECTIONS AND INSTRUCTION CONTAINED EXPOSED TO LIGHT. "ISSUED FOR CONSTRUCTION". MTO MOUNTED DRAWN BY: 1MG IN THE COMPLETE MANUAL. 9. ALL PORTIONS OF THIS SOLAR 16 ALL INFORMATION SHOWN MUST BE MTG MOUNTING 3. THE INSTALLATION CONTRACTOR IS PHOTOVOLTAIC SYSTEM SHALL BE CERTIFIED PRIOR TO USE FOR N NEUTRAL REVISED BY: DMR RESPONSIBLE FOR READING AND MARKED CLEARLY IN ACCORDANCE WITH CONSTRUCTION ACTIVITIES. NEC NATIONAL ELECTRICAL CODE UNDERSTANDING ALL DRAWINGS, THE NATIONAL ELECTRIC CODE ARTICLE NIC NOT IN CONTRACT —'--' COMPONENT AND INVERTER MANUALS 690. NO# NUMBER System Information: PRIOR TO INSTALLATION.THE INSTALLATION 10. PRIOR TO THE INSTALLATION OF THIS ABBREVIATIONS NTS NOT TO SCALE TOTAL SYSTEM SIZE: 9.45ISW CONTRACTOR IS ALSO REQUIRED TO HAVE PHOTOVOLTAIC SYSTEM,THE OCP OVER CURRENT PROTECTION TOTAL MODULE COUNT: 35 ALL COMPONENT SWITCHES IN THE OFF INSTALLATION CONTRACTOR SHALL AMP AMPERE P POLE POSITION AND FUSES REMOVED PRIOR TO ATTEND APRE-INSTALLTION MEETING AC ALTERNATING CURRENT PB PULL BOX MODULES USED: SUNEDSION 270 THE INSTALLATION OF ALL FUSES BEARING FOR THE REVIEW OF THE INSTALLATION AL ALUMINUM PH O PHASE MODULE SPEC#: NAT'L AF AMP.FRAME PVC POLY-VINYL CHLORIDE CONDUIT UTILITY COMPANY: NAT'L GRID SYSTEM COMPONENTS. PROCEDURES,SCHEDULES,SAFETY AND AFF ABOVE FINISHED FLOOR PWR POWER 4. ONCE THE PHOTOVOLTAIC MODULES ARE COORDINATION. UTILITY ACCT#: 0088840019 AFG ABOVE FINISHED GRADE MOUNTED,THE INSTALLATION 11. PRIOR TO THE SYSTEM START UP THE QTY QUANTITY CONTRACTOR SHOULD HAVE A MINIMUM OF INSTALLATION CONTRACTOR SHALL AWG AMERICAN WIRE GAUGE FIGS RIGID GALVANIZED STEEL UTILITY METER#: 30592153 C CONDUIT (GENERIC TERM OF SN ONE ELECTRICIAN WHO HAS ATTENDED A ASSIST IN PERFORMING ALL INITIAL SOLID NEUTRAL DEAL TYPE: JS SOLAR PHOTOVOLTAIC INSTALLATION HARDWARE CHECKS AND DC WIRING RACEWAY,PROVIDE AS WBD SWITCHBOARD SPECIFIED) TYP TYPICAL COURSE ON SITE. CONDUCTIVITY CHECKS. CB COMBINER BOX U"O.I. UNLESS OTHERWISE INDICATED 5. FOR SAFETY,IT IS RECOMMENDED BY THE 12. FOR THE PROPER MAINTENANCE AND CKT CIRCUIT WP MANUFACTURE THAT THE INSTALLATION ISOLATION OF THE INVERTS REFER TO WEATHERPROOF CREW ALWAYS HAVE A MINIMUM OF TWO THE ISOLATION PROCEDURES IN THE CT CURRENT TRANSFORMER XFMR TRANSFORMER Rev.No. Sheet PERSONS WORKING TOGETHER AND THAT OPERATION MANUAL. CU COPPER +72 MOUNT 72 INCHES TO BOTTOM D EACH OF THE INSTALLATION CREW 13. THE LOCATION OF PROPOSED ELECTRIC DIRECT CURRENT OF ABOVE FINISHED FLOOR OR MEMBERS BE TRAINED IN FIRST AID AND AND TELEPHONE UTILITIES ARE SUBJECT DI SC DISCONNECT SWITCH GRADE R 1 PV 1 CPR. TO FINAL APPROVAL OF THE DWG DRAWING 6. THIS SOLAR PHOTOVOLTAIC SYSTEM IS TO APPROPRIATE UTILITY COMPANIES AND EC ELECTRICAL SYSTEM INSTALLER EMT ELECTRICAL METALLIC TUBING BE INSTALLED FOLLOWING THE OWNERS. FS FUSIBLE SWITCH CONVENTIONS OF THE NATIONAL ELECTRIC 14. ALL MATERIALS,WORKMANSHIP AND FU FUSE CODE.ANY LOCAL CODE WHICH MAY CONSTRUCTION FOR THE SITE GND GROUND SUPERSEDE THE NEC SHALL GOVERN. IMPROVEMENTS SHOWN HEREIN SHALL GFI GROUND FAULT INTERRUPTER 7. ALL SYSTEM COMPONENTS TO BE BE IN ACCORDANCE WITH: HZ INSTALLED WITH THIS SYSTEM ARE TO BE A) CURRENT PREVAILING MUNICIPAL HZ FREQUENCY (CYCLES PER SEC "UL"LISTED.ALL EQUIPMENT WILL BE NEMA AND/OR COUNTY SPECIFICATIONS, SECOND) 3R OUTDOOR RATED UNLESS INDOORS. STANDARDS AND REQUIREMENTS GENERAL NOTES SOLAR I' IF ISSUED DRAWING IS MARKED WITH A REVISION CHARACTER OTHER THAN"A",PLEASE BE ADVISED THAT FINAL EQUIPMENT AND/OR SYSTEM CHARACTERISTICS ARE SUBJECT TO CHANGE DUE TO AVAILABILITY OF EQUIPMENT. 2211 Allenwood Road 877-797-2978 Wall,New Jersey 07719 www.Trinity-Solar.com City of Northampton Mail - System size/layout changes -29 Adare Place Page 1 of 1 e� Linda Lapointe <Ilapointe @northamptonma.gov>Cft Of System size/layout changes - 29 Adare Place 1 message Rachel Bruso <rachel.bruso @trinitysolarsystems.com> Wed, Nov 18, 2015 at 8:31 AM To: Ilapointe @northamptonma.gov Good Morning Linda Attached are designs showing system size and layout changes from a 8.91 kw system to a 9.45kw system and adding 2 panels. This is for Nada Kawar property located at 29 Adare Place. This building permit has not been approved yet as far as I know, so if you need any additional information please let me know. Thank you Rachel Rachel Bruso I Trinity Solar ( Permit Specialist 4 Open Square Way-Suite 410, Holyoke, MA 01040 1 P:413-203-9088 ext. 1511 E: rachel.bruso(a)trinity-solar.com Web: http://www.Trinity-Solar.com Kawar Revised Designs.pdf 1539K https://mail.google.com/mail/u/0/?ui=2&ik=542a2ddO3a&view=pt&search=inbox&th=15... 11/19/2015 P_1;,l YL:.n,:r C'irnans uns �^r,v; ,.. Fryin Material back A oJi ad Ldirnin—, ( ' 1. Imm1 2 -ter iFe.n:d,1N 3(��s anuu Nominal eratin Op g Call Temperature(NOCT)(°C) Ab r 2 ICvC� Nominal Operating Cell Temperature(NOCT)(°C(All Block Model 48 2 1K,/C; Temperature Coefficient of Pmax(%/°C) •C.A5 Temperature Coefficient of Pmax(%/C)All Black Model -048 Temperature Coefficient of Voo(%/°C) -0.34 "1 d Se Pitrie,7sb,r> Temperature Coefficient of lao(WC) x0,05 Maximum System Voltage M 1000(UL)6 1000 UEC; Maximum System Voltage(VI All Black Model 6C0(UL)6 I4)O1j;iECi P f r"J Dti�"7 late Spacing Limiting Reverse Current(A) 8.40 " (' Maximum Series Fuse Rating(A) `5 v�b1d�anr�th ELECTRICAL CHARACTERISTICS" Model# M250CyC IA255CVC M26GGyC M265CyC M270CyC M2501(yC M255KyC M260KVC M265KyC Tolerance V. Al 0-5 h4 0 w 6 I/Y �)+5,;1 0 15W .L-5`rd d:-ti LN 0�5 W -0,51N Rated Maximum Power Pmax(W) 250 255 160 265 2'0 250 255 260 265 Open-Circuit Voltage Voc(V) 38 2 383 38 a 313.5 38.6 38.2 38 3 363.4 38.5 Short Circuit Current Inc(A) 8.82 8.84 837 3 D0 9.10 8.92 8.84 887 9.00 Module Efficiency(%) 15 21 15.0 110 ,5 8"b 16 1'/0 l6 4°b 15,2,,. 15 51<, 5 T", 16.'n, Maximum Power Point Voltage Vmpp M 30 7 30.3 31,0 31.5 317 30.7 30 8 31 D 31.5 Maximum Power Point Current lmpp(A) 81b 8.27 BAO "42 852 815 ;,2; ?,:p g,42 Frame Color Bieck black Black Black Black Blacr. BIACk Rlaci: Black Back Shoot Color ^,Nhite vVnite 'White 'T4hite Whyte Black 31ank B,dck a:ack i � 1 4 i For more mformatioir atxoot:;unEdison Silveenti3 ModWes,please visit www',3wiEdison.so+n . w z Sun I i i s Ike. wA AMP � ,.. > a• r'b i �B �• � erI( Ya-?'i a 'o tt.3 �s°�tb Y^� ea tm Il,il ,.� Vli,cn_I,�staJire 'o•��: ",q''�`:�t ,, , . � � , �;�,�3t .�1 It.� �=-er*, pr��IGe..�nl: st0m'! • ,..ter ,,i-ra o'i a . y t: mI� co Pu CYCLC ^'a t GPAGE 51 REAVES POWER DISTRIBUTION BUG-BITES"' l SA Insulaticn Piercing Connectors usTa Eliminates +Teed roi conductor insufatlor,.st-Ipp,nG No taping roeuired after nstallotlon '=or copper to copper, copper to al uninurr,or alurrinum to ah,lrint,m app icaUpns nor use on insulates conductor only IPC SERIES NAED CATALOG WIRE RANGE TORQUE CTN EST.SHIPPING -- NUMBER NUMBER MAIN TAP VOLTS BOLTS FT-LBS QT-Y ;WEIGHT(111s) UNI7 13110 IPC 1002,, -n 2-8 300 r; 12 2.63 C7N 13107 'IPC 4006 -n A 6-14 600 .. 12 1..90 CTN 13108 '1 PC 4020 =tr 2/0-6 600 1 t2 4.06 CTNmr� � 13109 'IPC 2540 250 1 4/0 6 0 1 30 6 4 17 CTN 13113 IPC 3540 350-4/0 410 10 2„ 1 6 4 17 CTN 13114 IPC 3535 35C-410 35C-410 bi:G 25 6 7.63 CTN 13116 tIPC 5012 500•250 10-12 300 25 4 { 265 CTN 13104 '[PC$025 500-250 250-4 600 t b5 4 4.06 CTN 13105 *IPC 5050 500-300 500-250 600 1 75 j 1 264 EA CAUTION 1310E 'IPC 7550 750-500 500-350 600 1 75 1 i 262 EA Use Bug-Bites on _..._..___.... .. 1111 _ ._I. . 1111. insulated cable only! '6C10 Vons,balance 300 Volts(tor 480V grounded Y systems) y t Not„sA certified Co not install on bare cable- Dual-Rated GUTTER TAP CONNECTORS CU9AL High strength aluminum alloy 6061-T6,tin-plated USTE$ 600V 90'C Lay-in designed main conductor remains continuous Tap parallel or perpendicular to main GP SERIES A CNDtlCTOR RANGE APPROX.DIMENSIONS{Nj CTN SHIPPING NUMBER NUMBER MAIN TAP W OTY WEIGHT(b) UNIT 13117 GP 2' 2-12 4,12 SQL 7118 5:8 24 1.43 CTN I i 13118 GP 10 1(0-2 1,C '2 SOL 319 11+ i 12 1.19 CTN + 13119 GP 250 251)-Ito 250-6 1=n, 1 1, 2'1. 12 2.54 CTN 13121 GP 350 350-41`0 350-6 Ili, 1111, 6 2.75 CTN For COppef-to-COpp@r, 13122 OP 500 5011-350 5:)(1-° t'1. 3'1. 6 3.10 CTN copper-to-aluminum, 13123 GP T50 750-500 500-2 2 1 r, 3'', { 3 2.5 CTN 81U1111nUm-t0-81UriTIrlUm ...1.1_.11._.__. ..._.. ; 'G P2 has slotted screws. Oxide-inhibitor is recommended for added corrosion protection 600V 9YC Snap-on insulating covers for use with GP connectors For indour use only GPC SERIES NAED CATALOG FOR USE WITH APPROX.DIMENSIONS(IN) CTN EST.SHIPPING NUMBER NUMBER CONNECTOR COLOR H W L OTY WEIGHT(1931 UNIT 13137 OPC 2 P 1 t.. i y.�-.-- T 4ii CTN 13138 GPC 10 13140 OPC 250 13141 GPC 350 _,. � ;,:� CTN - �� i ! 13142 GPC 500 CTN 13134 GPC T50 3PT',t1 �to�.�.,t ( - ',J c CrN viww gra2vos-uSa-Corn Her Cage Park,Cli;,tun CT 06413,Phone 860-664-45(15•Fax 860-6134-4546 TOL(-�REE 1-600243.1130'(Dutside CT) a solar - • • r SolarEdge Power Optimizer Module Add-On for North America P300 / P350 / P400 / P405 P300 P350 P400 P405 (for 60-cell modules) (for 72te11 modules) (for 96-cell modules) (for thin film modules) INPUT Rated Input DC Powers" 300 350 400 405 W Absolute Maximum Input Voltage 48 60 80 125 Vdc (Vac at lowest temperature) MPPT Operating Range 8•48 8•60 9-80 12.S-105 Vdc Maximum Short Circuit Current(Isc) 10 Adc .. ..... .. . .. . .... ... ..... Maximum DC Input Current 12.5 Adc Maximum Efficiency 99.5 % Weighted Efficiency 98.8 % Overvoltag e... Category II OUTPUT DURING OPERATION(POWER OPTIMIZER CONNECTED TO OPERATING INVERTER) Maximum Output Current 15 Adc Maximum Output Voltage 60 85 Vdc OUTPUT DURING STANDBY(POWER OPTIMIZER DISCONNECTED FROM INVERTER OR INVERTER OFF) Safety Output Voltage per Power Optimizer 1 Vdc STANDARD COMPLIANCE EMC FCC Part15 Class B,IEC61000-5-2,IEC61000-6-3 Safety IEC62109-1(class II safety),UL1741 RoHS Yes INSTALLATION SPECIFICATIONS Maximum Allowed System Volta_ge 1000 Vdc Dimensions(W x L x H) 141 x 212 x 40.5/5.55 x 8.34 x 1.S9 mm/in .. .. .... .. Weight(including cables) 950/2,1 gr/lb Input Connector MC4/Amphenol/Tyco MC4 Output Wire Type/Connector Double Insulated;Amphenol Output Wire Length 0,95/3.0 1.2/3,9 m/ft Operating Temperature Range -40-+85/1-40 +185 'C/-F Protection Rating IP65/NEMA4 Relative Humidity 0-100 % �'�Rated STC Deaver of the module Mudule o(up to+5%Dower tolerance apewM PV SYSTEM DESIGN USING A SOLAREDGE INVERTERIZI SINGLE PHASE THREE PHASE 208V THREE PHASE 480V Minimum String Length (Power Optimizers) 8 10 1 18 Maximum String Length 25 25 SO (Power Optimizers) Maximum Power per String 5250 6000 12750 W Parallel Strings of Different Lengths Yes or Orientations "�it is not.11—ed to mix NO with P300/P350/P400/P600/P700 in one string rCEi Q­�."" solar=is # SolarEdge Power Optimizer Module Add-On For North America P300 / P350 J P400 / P405 • WI n i s •y: R� PV power optimization at the module-level — Up to 25%more energy Superior efficiency(99.5%) — Mitigates all types of module mismatch losses,from manufacturing tolerance to partial shading - Flexible system design for maximum space utilization — Fast installation with a single bolt — Next generation maintenance with module-level monitoring — Module-level voltage shutdown for installer and firefighter safety www.solaredge.us Single Phase Inverters for North America solar SE3000A-US -US/SE5000A-US/SE6000A-US/ SE760OA-US It SE1000OA•US/SE1140OA-US SE3000A-US SE380OA-US . SESOOOA-US SE6000A-US SE7600A-US SE10000A-US SE1140OA-US OUTPUT Nominal AC Power Output 3300 38ew 5200 C 208V 6000 7680 99$0 @ 208V 11520 VA 5520(?z40V 10080 @240V Max AC Power Output 3650 41-„) 5600 @ 20SV 6000 8.350 10800 @ 209V 12000 VA 6000 @ 240V I Ogri(7 @ 240V AC Output Voltage Min:Nom.-Max.* 133-208-229 Vac AC Output Valtagra Min.Nom.-Max 211 240-264 Vac AC Frequency Min-Nom.-Max.' 593-60-605(with HI country setting 57-60-60.5) Hz Max.Continuous Output Current 14 16 2S @ 209V 25 32 48 @ 208V 4E A 23 @ 240V 42 @ 240V GFDI I A Utility Monitunng,Warding Protection,Country Configurable yes Thresholds INPUT Recommended Max.DC Power*' (STC). 4100 4800 6500 7500 9600 12400 14400 W . .. ' , Transformer-less,Ungrounded yes Max.Input Voltage 500 Vdc Nom DC lnput.Voltage 325 @ 209V/3SO @ 240V Vdc Max.Input Current*** 11 13 17 @ 208V i$ 23.5 33 @ 208V 35 I Adc 17 @ 240V 305 @ 240V Max.Input Short Circuit Current 30 45 Adc Reverse-Polarity Protection yes Ground-Fault Isolation Detection 6001tuSensitivity Maximum Inverter Effriency 973 98.2 98.3 98.3 98 98 98 % 97.5 @ 208V 97 @ 208V CFC Weighted Efficiency 97.5 9" 975 5 97.5 97,5 % 98 @ 240V 97.5 @ 24OV Nighttime Power Consumption <2.5 <4 W ADDITIONAL FEATURES Supported Communication Interfaces RS485,R5232,Ethernet,Zig$ee(optional) STANDARD COMPLIANCE Safety UL1741,UL1699B(Part numbers ending In"-U"),UL1998,CSA 22.2 Grid Connectior Standards IEEE1547 missions FCC partly class B INSTALLATION SPECIFICATIONS AC output conduit size/AWG range 3/4"minimum/24-6 AWG 3/4"minimum/8-3 AWG DC input conduit size/0 of strings/ AWG range 3/4"minimum/ -2 strings/24-6 AWG 3/4"minimum/1-2 strings/14-6 AWG Dimensions with AC/DC Safety 30.5 x 12.5 x 7 J 30.5 x 12.5 x 7.5/ in/ 30.5x125x10.5/775x31Sx260 Switch'HxWxD 75 x 315 x 172 775 x 315 x 191 i mm Weight with AC/DC Safety Switch 7 51 2, 23.2 S4.7 J 24.7 88.4/40,1 Ib/kg Cooling Natural Convection Fans(user replaceable) Noise <25 <50 I d8A Min.-Max.Operating Temperature Range 13 to+140/-25 to+60(CAN versinn*'**-40 to+60) Protec ion Rating NEMA 3R 'For other regional seffings pleas.rontacCSolarEdge support "1-im;ted to 125%for locations where the veadv average high temperature m abo a/)eF(25"r and U-135%for locatons whe it is below IM 125-C Fat detailed information,refer to 4ttp.liwwy.solgrcvlrm us//Ills/odts/bwener d[overyl 1+UIde_gtf A higher current snurre may be used;the inverter will limit its Input current to the values stated I,AN P/NS are eligible for the Ontario FIT and micro FIT ImicroFIT exc 517,1140CA-US CANT i LiL+lr-.PEC ROHS Fit- solar • • • :. a SolarEdge Single Phase Inverters For North America SL 3nJsG'U'-U13) / Sa=3500A-US / SE5030A-US / SEBOGOA—US SE760DA-US / SE1300OA-US / SE 11400A-US r art ,. q V SO4a x e, i r (. - p, <a.a=+r:•s^'n>^r,�y�mrxr°ee*;v,yexr r:•w w.yaoe The best choice for SolarEdge enabled systems — Integrated arc fault protection(Type 1)for NEC 2011690.11 compliance(part numbers ending in"-U") - Superior efficiency(98%) — Small,lightweight and easy to install on provided bracket — Built-in module-level monitoring — Internet connection through Ethernet or Wireless — Outdoor and indoor installation - Fixed voltage inverter,DC/AC conversion only — Pre-assembled AC/DC Safety Switch for faster installation . -it ,. www.solaredge.us REVr-CN SNAPNRACK SERIES 100 ON FLASHED L-FEET -OR 0 FANLASHED L-FEET ARE OPTIMIZE r D ROBUST INSTALLATION ON D STANDARD COMPOSITION SHINGLE ROOF SURFACES FOR OTHER ROOF TYPES STANDOFFS ARE RECOMMENDED SNAPNRACK M00Ur ATTACHMENT HARDWARE SNAPNRACK STANDARD RAIL ROOF RAMRTYP(ROOF ATTACHMENTS SM)LILD RD f- RS OR NG UNDERLAYMENT, ALWAYS BE EMBEDDED INTO ROOF RAFTE SHEATHING, STRUCTURAL MEMESERS SUCH AS STEEL PURLINS) ROOF AND ROOFING MATERIAL,TYP• SNAPNRACK FLASWD L-FOOT REV PART NUMBER DESCRPTON SERIES 10()OVERV�EW,ON FLASHED G MCPrft '1 ter3 SCALE: DNS 00 Dal L-FEET D Ryan DATE: 120113 sr APPROVED By - 1X SNAPNRACK —2X SNAPNRACK LEVELING REVISION USE CARE DURING LEVELING SPACER SPACER INSTALLATION TO ENSURE THAT THE SET SCREW IS —ix-j"-18 X 1"LONG -2X7&"-18 X 1"LONG ROUGHLY CENTERED BETWEEN SETSCREW SETSCREW THE TWO PIECES BEING JOINED _ + STANDARD SERIES 100 A I ATTACHMENTS FEATURE 3"OF f + VERTICAL ADJUSTABILITY ON ALL MOUNTING POINTS WITH THE USE OF 1"LEVELING 10.5 SPACERS 9.5 8.5 THE FIRST INCH OF 7.5 ADJUSTABILITY IS ACCOMPLISHED WITH SLIDING DETAIL A FEATURES BUILT INTO BOTH L FOOT AND STANDOFF CLAMP SCALE S:S COMPONENTS RAIL HEIGHT=7.5" -RAIL HEIGHT=85" RAIL HEIGHT=9.5" RAIL HEIGHT=10.5" FOR AN ADDITIONAL INCH OF :.'.ABOVE ROOF SURFACE ABOVE ROOF SURFACE ABOVE ROOF SURFACE ABOVE ROOF SURFACE HEIGHT ADJUSTMENT,ADD 7"STANDOFF 7"STANDOFF =' 7"STANDOFF 7"STANDOFF ONE LEVELING SPACER. USE PLUS ONE SPACER PLUS TWO SPACERS OF SINGLE LEVELING SPACER ON TOP OF STANDOFF ON TOP OF STANDOFF NOT TO EXCEED 30%OF ATTACHMENT POINTS ON L—FEET OR 10"STANDOFFS. e FOR A SECOND ADDITIONAL + INCH OF HEIGHT Q ADJUSTMENT,ADD ANOTHER + LEVELING SPACER. USE OF + ' s TWO LEVELING SPACERS NOT m I 5.4 — TO EXCEED 10%OF 4.4 ATTACHMENT POINT'S ON I 3.4 — L—FEET OR 10"STANDOFFS. RAIL HEIGHT=3.4" F RAIL HEIGHT=4.4" RAIL HEIGHT=5.4" RAIL HEIGHT=6.4" ABOVE ROOF SURFACE 6 ABOVE ROOF SURFACE ABOVE ROOF SURFACE ABOVE ROOF SURFACE ONE L FOOT ONE L FOOT ONE L FOOT ONE L FOOT PLUS ONE SPACER PLUS TWO SPACERS UNDER L FOOT UNDER L FOOT DESIGNER G WPMeete(S SCALE DNS PART NUMBER DESCRIPTION REV jJl DRAFTER D Ryan 5100 DOE SERIES 100 RAIL LEVELING F [�4 b@1GOtTiuj zycw-w APPROVED By DAB 120113 NOTES: REVISION -5/16"LAG BOLTS MUST EMBED 2.5"INTO ROOF STRUCTURAL MEMBERS/RAFTERS STEP 3: PLACE L FOOT -TORQUE ALL 5/16"HARDWARE TO ON TOP OF FLASHING SNAPNRACK THE FOLLOWING. AND TIGHTEN NUT COMPOSITION L FOOT -SILVER S.S. 10-16 FT-LBS CAN BE MOUNTED IN -BLACK S.S.7-9 FT-LBS STEP 2: SLIP FLASHING OVER ANY ORIENTATION 1 S.S. FLANGE NUT -RAILS CAN MOUNT TO EITHER SIDE L FOOT BASE AND UNDER ROW 11 X 1"(OR 1.25") OF L FOOT(UPSLOPE VS DOWNSLOPE) OF SHINGLES ABOVE SNAPNRACK S.S. BOLT AND ` CHANNEL NUT SPLIT WASHER « "S.S.LAG SCREW WITH FLAT WASHER SNAPNRACK 2.5"MINIMUM EMBEDMENT STANDARD RAIL IS STANDARD SNAPNRACK COMPOSITION STEP 1: BOLT L FOOT ROOF FLASHING .' BASE TO ROOF WITH LAG BOLT SNAPNRACK L FOOT WE ROOF DEMNG TYP. ROOF DECKING TYP. FLASHED L FOOT MOUNTING POINT FOR USE ON COMPOSITION ROOF SURFACES WITH LOW TO MODERATE TILT RAILS CAN BE LEVELED UP TO 3"USING UP TO TWO LEVELING SPACERS AS COMPLETED INSTALLATION SHOWN IN"SERIES 100 RAIL LEVELING" RAFTER TYP. `r'AI 9`+1� ltrvtr F' DESIGNER: GMcPheeters SCALE: DNS PART NUMBER: DESCRIPTION: REV DRAFTER D"� S100 PEN D01 PEN DETAIL 01,FLASHED L FOOT TO C !1" r DATE: 120113 RAFTER 1FV RA®6UP ang ! APPROVED BV_ Aard.iro.Rail q io_ r. St"WQ51 -1 low_, stainless H.,dwam with l,�illl t'l Split-Lock Washers SnapNrack Banding Adjustable End Clan [!tr" p",.":ki.,15-oin,d,l nq SnapNrack Bonding Ip Mid Cl amp Standard Rail Splice SnapNrack Ground Lug T. Assembly (ONE REQUIRED PER POW OF MODULES) SnapNrack 11.,,(I,n,,universal End Cla,,p(UEC.)Wave JEC Pull Strap 01-C'Nedge Siainles SlQel 14.11 with Flat 1h,3snr F r F SnapNrack Bonding r Universal End Clamp SnapNla(i, Bonding I­ Standoff I Clamp Assembly SnapNrac� !AitatodStarile-In. 0'a SnapNrack SnapNrack Bonding Rubowr steel Flange Not Bonding Channel Not Ram Collar Channel sta"le". '.N(Alrd Stalnlvsi Nut Jd Floryu 1�At Steel F:hnqe Holt SnapNi,dck grid '"less :r 9:1 Degree 5 9. -1;n.PN,Ack Flan Mill F 111stl Soft 'Aa.dofftf SnapNrack AU I'uronse Mill Fumsn L,Foof -Stanclott Base(1-1-1010 SnapNrack SnapNrack Base Shawn) ' SnapNrack I eat Metal Roof .1111,1z" 441 Finish 4 Flashing Base ASSeMbiy L Foot Base 'sh'ny SnapNrack Bonding SnapNrack Bonding SnapNrack Metal Roof Bass with Standoff Assembly L Foot Bass With Flashing Banding L Foot SnapNrack Series 100 UL Technical Data Materials • 6000 Series aluminum • Stainless steel • Galvanized Steel Flashing Material Finish •Clear and black anodized aluminum •Mill Finish on select components Installation •Quick and efficient mounting •Adjustable hardware to ensure clear and level finish •All components bonded to ground with integrated bonding features CaIcs. & Certifications UL 2703 Certification • Stamped Structural Engineering Reports for all SO States Grounding • SnapNrack Grounding Lug (One Lug per individual row of modules) Warranty • 10 Year material and worksmanship(download full details at snapnrack.com) SnapNlrack- SERIES i0 Solar� ROOF MOUNT SYSTEM The SnapNrack line of solar mounting solutions is designed to reduce total installation costs_ The system's technical innovations have been proven to drive down costs and improve installation quality on more than 350 MW of solar '' installations. , > �°" Pitched Roof Arrays Simplified The SnapNrack Series 100 UL Roof Mount System . is an efficient,visually appealing, photovoltaic(PV) module installation system. Series 100 UL is listed to the UL 2703 Standard for Bonding, meaning that all system components have been certified by UL for Roof System in 4 Simple Steps: electrical continuity, eliminating the need For additional 1) Go t:the un.ine 100 Configuration g-ounding hardware. rho system's components provide oal Cconfig. re.snapnrack.com)and select an adequate bonding path which has eliminated the yes" for rjl 27(V t_isted need for grounding lugs and washers at each module, and bonding jumpers between splices. The UL 2703 2) Ide'n1i1y bite Ccnd!t.ons(Array Tilt,Building Height, Roof Type, Mind and Snow Lnads) Certification ensures that SnapNrack partners can provide the best in class installations in quality.safety, 3) Build urray in the orilone, Configuration and efficiency. Fool and automnocolly generate a Hill of Materiels. All bonding hardware is fully integrated into the components �ti place )rd-:- wit`-. Purchase mitt,r;�)l i,>r a single prole;.' cr order in bui'.c No groundina lugs required for modules fn, ndJ!cn..l Rail splices bond rails together, no rail jumpers required Proprietary SnapNrack grounding lug snaps '.n the rail channel. no drilling of rail or reaching for other tools required (One Lug per individual row of rnodules) �L LISTED PV Mounting System 2703 Engineer I License Holder: MOUNTED SOLAR MODULES MOUNTED TO ROOF ON I ARRAY UNDER SOLAR MODULE 33-Z70W MODULES W/I SOLAR EWE P300 PER MODULE NEC 690.34 UL75 ADC MAX PER STRING 8"x8' 15TRING OF I]MODULES IN SERIES-350 Vmax C dUNCT10N - 15TRINGOFI6MODULESINSERIES-350 Vmax 1 ROX •2 STRINGS TO BE TERMINATED IN PARALLEL INSIDE INVERTER 1 Issued/Revisions NO. DESCRIPTION DAIE I Project Title: I -WAR,TRINITY ACCT W 2015-6]48 ARRAY CIRCUIT WIRING NOTES COMPLIES WITH 2011 NEC GFCI RECEPTACLE Project Address: 1. 14/2 LOWEST EXPECTED AMBIENT TEMPERATURE BASED ON EXISTING 14 BREAKER /SA ASHRAE MINIMUM MEAN EXTREME DRY BULB I20/240y 240V 10 NM CABLE TEMPERATURE FOR ASHRAE LOCATION MOST SIMILAR TO UTILITY 200A MAIN BREAKER 29 ADARE PLACE NORTHAMPTON, INSTALLATION LOCATION. LOWEST EXPECTED AMBIENT METER 00A AR MPTON,MASSACHUSETTS 01060 TEMP=-167C -- 2.)HIGHEST CONTINUOUS AMBIENT TEMPERATURE BASED ON ASHRAE HIGHEST MONTH 2%DRY BULB Drawing Tittle: TEMPERATURE FOR ASHRAE LOCATION MOST SIMILAR TO INSTALLATION LOCATION. HIGHEST CONTINUOUS TEMP PROPOSED 8.91kW 33-C I 60A UNFUSED PRODUCTION SOLAR SYSTEM 3.)2005 ASHRAE FUNDAMENTALS 2%DESIGN DISCONNECT METER D TEMPERATURES DO NOT EXCEED 47'C IN THE UNITED 240V 10 INVERTER ri STATES(PALM SPRINGS,CA IS 44.1-C). FOR LESS THAN Ora wino InfOfR131i0n n 9 CURRENT-CARRYING CONDUCTORS IN A —a+ DMWING DATE: 11/9/z015 ROOF-MOUNTED SUNLIT CONDUIT AT LEAST 0.5°ABOVE e 3 -_-, --- DMWNBY: IMG ROOF AND USING THE OUTDOOR DESIGN TEMPERATURE `/� REVISED 11 OF 47C OR LESS(ALL OF UNITED STATES), o el a 4.)PHOTOVOLTAIC POWER SYSTEMS SHALL BE - e B m.._. E i PERMITTED TO OPERATE WITH UNGROUNDED L I -— -- --- -- - B -- a AL PHOTOVOLTAIC SOURCE AND OUTPUT CIRCUIT AS PER r0i LSYSTEM SZE 8.91kW NEC 690.35 ® EXISTING MAIN BREAKER SQUARE D - rOT MODULE CO 33 LOAD CENTER PN: D222RB __ _ MoILLi OSEO�atIOn 111EOSIII III 5.)ALL EQUIPMENT INSTALLED OUTDOORS SHALL HAVE __L 2p4OA BACK FEED BREAKER No—SPECK: iii FPOxzo-3y A NEMA3 RATING. - W/BREAKER LOCK UTILITY COMPANY: i NATLGRiD NEC 690.64 UTLIttACCT p: 0088840019 GLCULATIONS FOR CURRENT GRRYING UTILITYMETER x: 30Sw2 CONDMCTORS REQUIRED CONDUCTOR AMPACITY PER STRING DEAL TYPE [NEC690.6(6)(1)) (15.00'1.25)1=18.75A AWG/10,DERATED AMPACITY PV MODULE SPECIFICATIONS AMBIENT TEMP: SSC,TEMP OERATNG FACTOR: .76 SUNEDSION 2701F2]OKZD-3y1 ReV.NO. SheSt RACEWAY DERATING=4 CCC: 0.80 (404.76)0.80-24.32A imp 8.94 24.32A'-18.75A,THEREFORE WIRE SIZE IS VAUD Vmp 30.2 p 1 PV - 3 V. 137.8 A 46 TNWN-2GECTO EXISTING GROUND ADD TOTAL AC REQUIRED CONDUCTOR AMPACITY Is[ 9.3 B 3/4"EMT W/2-K8 THWN-2,S-410 THWN-2,1-M10 THWN-2 GROUND 32.00A41.25-40.00A C 3/4"EMTW/4 K10THWN 2,1410THWN-2 GROUND AWG/8,DERATED AMPACITY AMBIENT TEMP: 30C,TEMP DERATING 1.0 INVERTERKI-SE7600A-US RACEWAY DERATING<3 CCC: N/A DC AC D 3/4"EMT W/4-K10 THWl12,1JI10THWN-2 GROUND - • 55A41.0=55A Imp 23.5 Pout ]600 E 3/4"EMT W/2-YBTHWN-2,I-KSO TNW- 1-tt10 TNWH-2 GROUND 55A'-40.00A THEREFORE AC WIRE SIZE IS VALID Vmp 350 I"t 32 F 412 PV WIRE W/P6 BARE COPPER BOND TO MODULES AND MILS R CA IATiONPORPVOV lRCURRlNTPROTlCTION 90D A0 SOLAR TOTAL INVERTER CURRENT: 32.00A IscT 30 Vnom 240 32COA41.25-40.00A 2211 Allenwood Road 87]'97-2978 -->40A OVERCURRENT PROTECTION IS VALID Will,New kr:<y 07719 w.vw?rinirySol:r rom �p j-2' NEWPVSMNR MOOULE,TWICAL PANEL CLAMP SERRATED FLANGE HEXNUT Ifpl (REFER TO FOUIPFAEUT C[:HEDULE �uc,occ viccrrm oe�.ra NOT ETE�o al`m FOR SPECS MI 00AN ITIES3 sEf srsc NEW MOUNTING FOOT/ATTACHMENT SOLAR MODULE SOLAR MODULE POINTS.TYPICAL (REFER TO IF ENGINEERING LETTER FOR SPACING AND DETAILS) HE HEAD C P�SCREWW 1 NEW TOP SLIDER,TVPIGAL CLAMP BASE TOP SLIDER Tn Q `\ �5 (REFER TO THE WICK RACK xg fc sHSST VOn of*ana Isrnsxcs.eKr voaoF ca - `` CODELDOMPUANTINTALIATION - +su sZo-ILOCKSLIDER pNE LAYER ASPHALTSHINGLES MANUAL FOR SPECS AND DETAIL51 ts�srcc ronarnas ISEeeNCIwEFws.nre vovcm sassrFmte�ANO APOC SEALANT B NEW END CLIP,TYPICAL s �cFr PEinnm (REFER TO THE WICK RACK CODELOMPLIANT INSTALLATION 'o MANUAL FOR SPECS AND DETAILS) SOLAR MODULES SHALL NOT Z i NEW MID CUP,TYPCAL EKCEED PEAL(HEIGHT. (REFER TO THE QUICK RACK CODECOMPIL TINSTALLATION EXISTING RAFTER MANUAL FOR SPECS AND DETAILS) ATTACHMENT 8 CLIP DETAIL V MODULERATTACHMENTvON ASPHALT SHINGLE ROOF HEIGHT FROM GROUND LEVEL TO PEAK OF ROOF SCALE'NOT TO SCALE SCALE.NOT TO SCALE SCALE'NOT TO SCALE Issued I Revisions NO. DESCRIPTION DATE Project Title: A,NADA [7T RIttAW ■ Project Address: 29 ADARE PLACE NORTHAMPTON,MASSACHUSETTS 01060 Drawing Title: FRONT BACK PROPOSED 8.91kW SOLAR SYSTEM -- - -- - - ---- --- Drawing Information DBAWING DATE: 11/9/2015 DRAWN By )MG REVISED BY - - System Information: R� TOTAL SYSTEMSI)E: S.91kW TOTAL MODULE COUNT: 33 D EP MODULES USED: SUNEDSION 270 K,t MODULE SPEC R: F270KrD-3y AC P UD 1 I UTILITY COMPANY: AT-RID D� UTLITY ACCT R: OOSB 19 UTILITY METEB R: 30592153 DEALTYPE NOTES: 1)ALL EQUIPMENT SHALL BE INSTALLED IN ACCORDANCE WITH THE MANUFACTURER'S INSTALLATION INSTRUCTIONS. RBV.NO. Sheet 2.)ALL OUTDOOR EQUIPMENT SHALL BE RAIN TIGHT WITH MINIMUM NEMA 3R RATING. 3.)ALL LOCATIONS ARE APPROXIMATE AND REQUIRE FIELD VERIFICATION. 4.) ROOFTOP SOLAR INSTALLATION ONLY PV ARRAY WILL NOT EXTEND BEYOND THE EXISTING BUILDING ENVELOPE ARRAY SCHEDULE SYMBOL LEGEND PLUMBING SCHEDULE EQUIPMENT SCHEDULE P1 INDICATESROOFDESIGNATION.REFERTO �''.INDICATES NEW UTILITY DISCONNECT TO BE NEWENO PLIANT INSTALLATION TO THE UNIPAC Ott SPEC CODE-COMPLIANT INSTALATION MANUAL ARRAY ORIENTATION M* ®'ARRAY SCHEDULE FOR MORE INFpRMATION U� INSTALLED OUTSIDE © iSECTION 3.2.5 FOR SPECS AND DETAILS 33 SUNEDSION 270 IF2]OK2D-3y) MODULE PITON=32- INDICATESNEWPVSOLARMODUIE.RED MODULES 'I NEW MID LIP TYPICAL(REFER TO THE UNIRAC 1 5E]600A-U5 • ® ' INDICATES EXISTING METER LOCATION INDICATE PANELS THAT USE MICRO INVERTERS. a CODELOMMANT INSTALLATION MANUAL REFER TO EQUIPMENT SCHEDULE FOR SPECS. SECTION 32.5 FOR SPECS AND DETAILS) OTHER OBSTRUCTIONS r' EP INDICATES EXISTING ELECTRICAL PANEL I p I INSTULESNEW DRODUCTIONMETERTOBE __ )NEW UNIRAC RAIL,ttPICAL LODATION:IN&SfMENT L'J Iry TFALLATOIONMANUKFORSPECSPM DETAILS) SOLAR THE UN INDICATES NEW MAIN DISCONNECT TO BE INDICATES NEW INVERTER TO BE I NEW MOUNTING FOOT/ATTACHMENT POINTS. 2211 Allenwood Road 8]]-79]29]8 �' GRWPED WITH MAINPANEL INSTALLED OUTSIDE • TYPICAL (REFER TO ENGINEERING LETTER FOR Wall,New jersey 0]]t9 wu+v.Trinily-SOIar.. REFER TO EQUIPMENT SCHEDULE FOR SPECS. SPACINCAN D DETAILS) INSTALLATION OF NEW ROOF MOUNTED Adare Place. 8.91 kW PV SYSTEM h " 29 ADARE PLACE .4 /2 C "\ NORTHAMPTON, MASSACHUSETTS 01060 _ Issued/Revisions E-3 No VICINITY MAP SITE UE CRIPTI°" J-T SCALE:NTS I Project Title: KAWAR,NADA- TRINITY ACCT R:2015-6]482 Project Address: 29 ADARE PLACE NORTHAMPTON,MASSACHUSETTS 01060 SHEET INDEX GENERAL NOTES GENERAL NOTES CONTINUED GENERAL NOTES CONTINUED ABBREVIATIONS CONTINUED JB JUNCTION BOX PV-1 COVER SHEET W/SITE INFO&NOTES Drawing Title: 1.THE INSTALLATION CONTRACTOR L 8, THE M VOLTAGE FROM THE PANELS IS td. B)CURRENT PREVAILING UTILITY kCMIL THOUSAND CIRCULAR MILS EOUIPMENTLAND FOLLOWING ALL DI CONNECT ENCLOSURE AND THE DC STANDARDSPANp REQUIREMENTS kVA KILO-VOLT AMPERE PV-2 ROOF PLAN W/MODULE LOCATIONS PROPORSYS,91kW DIRECTIONS AND INSTRUCTIONS TERMINALS OF THE INVERTER DURING 15 THIS SET OF PLANS HAVE BEEN kW KILO-WATT SOLAR SYSTEM CONTAINED IN THE GRANT No PACKAGE AND DAYLIGHT HOURS.ALL PERSONS PREPARED FOR THE PURPOSE OF kWH KILO-WATT HOUR PV-3 ELECTRICAL 3 LINE DIAGRAM INFORMATION RECEIVED FROM TRINITY. WORKING ON OR INVOLVED WITH THE MUNICIPAL AND AGENCY RENEW AND L LINE 2,THE INSTALLATIONCONTRACTORIS PHOTOVOLTAIC SYSTEM ARE WARNED APPROVAL.THIS SET OF PLANS SHALL MCB MAIN CIRCUIT BREAKER DTBWI Informaton RESPONSI8LEFORINSTALLINGALL THAT THE SOLAR MODULES ARE NOT BE UTILIZED AS CONSTRUCTION MDP MAIN DISTRIBUTION PANEL EQUIPMENTANDFOLLOWINGALL ENERGIZED WHENEVER THEY ARE DRAWINGS UNTIL REVISED TO INDICATE MLO MAIN LUG ONLY DRAWING GATE: 11/9/2015 DIRECTIONS AND INSTRUCTION CONTAINED EXPOSED TO LIGHT. 'ISSUED FOR CONSTRUCTION'. MTD MOUNTED DRAWN.Y. G INTHECOMPLETEMANUAL 9. ALL PORTIONS OF THIS SOLAR 16 ALL INFORMATION SHOWN MUST BE MTG MOUNTING REVISED BY 3.THEINSTALLATIONCOWRACTORIS PHOTOVOLTAIC SYSTEM SHALL BE CERTIFIED PRIOR TO USE FOR N NEUTRAL RESPONSIBLE FOR READINGAND MPIL(ED CLEARLY IN ACCORDANCE WRH CONSTRUCTION ACirvmES. NEC NATIONAL ELECTRICAL CODE UN DERSTANDINGALLDRAWINGS. THE NATIONAL ELECTRIC CODE ARTICLE MC NOT IN CONTRACT System Information: COMPONENT AND INVERTER MANUALS 690. IS NUMBER PRIORTO INSTALLATION.THE INSTALLATION 10. PRIORTO THE INSTALLATION OF THIS ABBREVIATIONS OC OVER CURRENT TOTAL MODULECO 8.91kW CONTRACTOR IS ALSO REQUIRED TO HAVE PHOTOVOLTAIC SYSTEM.THE OCP OVER CURRENT PROTECTION TOTAL MODULE COUNT: 33 AMP AMPERE P POLE MODULE5USE0: 270KIDON 220 ALL COMPONENT ASWITCHES REMOINTHEOR INSTALEA PREHNNT'LTI N SHALL AC ALTERNATING LURREM PB PULL BOX THE INSTALLATION AND IONO REMOLISESBORTO ATTEND REVIEW TALLTI INSTALLATION AL ALUMINUM PHO PHASE MOLITYCO PA NT LGRIY SYSTEM COMPONENTS ALL FUSES BEARING FOR THP ES,SCOFDULES,TALEATION AF -1. BOVE FINISHED PVC POLV-VINYL CHLORIDE CONDUIT SYSTEM COMPONENTS. PROCEDURES.SCHEDULES,SAFETY AND qFF ABOVE FINISHED FLOOR POUR POWER UTILITY COMPANY: NAY'L GRID 4.ONCE THE PHOTOVOLTAIC MODULES ARE COORDINATION. AFG ABOVE FINISHED GRADE QTY QUANTITY UTILITY METER. 0088840019 MOUNTED,THE INSTALLATION 11. PRIOR TO THE SYSTEM START UP THE AWG AMERICAN WIRE GAUGE RGS RIGID GP.LVANEED STEEL UTILITY METER .30592153 CONTRACTOR SHOULD HAVE A MINIMUM OF INSTALLATION CONTRACTOR SHALL C COMMIT(GENERIC TERM OF SN SOLID NEUTRAL DEAL TYPE: ONE ELECTRICW4 WHO HAS ATTENDED ASSIST IN PERFORMING ALL INITIAL RACEWAY,PROVIDE AS JSWBD SWITCHBOARD SOUR PHOTOVOLTAIC INSTALLATION HARDWARE CHECKS AND MWIRING SPECIFIED) TYP TYPICAL COURSE ON SITE CONDUCTIVITY CHECKS. CS COMBINER BOX L.D,1. UNLESS OTHERWISE INDICATED 5.FOR SAFETY,R IS RECOMMENDED BY THE 12. FOR THE PROPER MAINTENANCE AND CXT CIRCUIT WP WEATHERPROOF MANUFACTURETHATTHE INSTALLATION ISOLATION OF THE INVERTS REFER TO CT CURRENT TRANSFORMER XFMR TRANSFORMER CREW ALWAYSHANEAMINIMUMOFTWO THE ISOLATION PROCEDURES IN THE CU COPPER a72 RSV.NO. Bat RE SONG WORKING TOGETHER AND THAT OPERATION MANUAL. MOUNT INCHES EACH OF THE INSTALLATION CREW 13. THE LOCATION OF PROPOSED ELECTRIC DC DIRECT CURRENT OF ABOVE FINISHED FLOOR OR MEMBER SBETRAINEDINFIRSTAIDAND AND TELEPHONE UTILITIES ARE SUBJECT DISC DISCONNECT SWITCH GRADE CPR TOFINALAPPROVAL OFTHE EC ELECTRICAL SYSTEM INSTALLER DRAWING 6.THISSOLARPHOTOVOLTAICSYSTEMISTO APPROPRIATE UTILITY COMPANIES AND EC EMT W ELECTRICAL METACTUBING BE INSTALLED FOLLOWING THE OWNERS. FS FUSIBLE SWITCH CODE.A LOCAF CODEW WHICH MAY ELECTRIC 14. CONSTRUCTION WORKMANSHIP AND FU FUSE CODE.ANYLOCA NEC SHA COVEY CONSTRUCTION SOOTHE SITE G GROUND SUPERSEDE COMPONENTS OBEERN. IMPROVEMENTS SHOWN HEREIN SFWLL GFI GROUND ].ALL UILED NTH THIS SYSTEM BE BE IN ACCORDANCE WITH: HZ FREOUENCY(CYCLES PER • INSTALLED.ALL THIS SYSTEM ARE E E N CURRENT PREVAILING MUNICIPAL SECOND) DR USTEO.ARATED UNLESS WILL BE. STANDARDS DSAND SPECIFICATIONS, 3R OUTDOOR RATED UNLESS INDOORS. STANDARD3 AND REQUIREMENTS GENERAL NOTES SO LA R IF ISSUED DRAWING IS MARKED WITH A REVISION CHARACTER OTHER THAN'A,PLEASE BE ADVISED THAT FINAL EQUIPMENT ANDIOR SYSTEM CHARACTERISTICS ARE SUBJECT TO CHANGE DUE TO AVAILABLITY OF EQUIPMENT. 2211 Allenwood Road 877-922978 Will,New leruy 0)]19 www.Tnniry-9olar.rom Trinity Solar 20 Patterson Brook Road Wareham, MA 02571 508-291-0007 Date: 10/8/15 I, N ada Kawar ,do hereby grant Trinity Solar the right to sign on (Homeowners Nome) my behalf in all matters regarding the permit applications through the township of Northampton, MA for the installation of solar panels and all other (Municipality) related work on my property at 29 Adare Place . Please accept this (Street Address) document,with full signature, in place of all application signatures. Furthermore,should there be any issues or discrepancies with the paperwork,please contact Danielle DeVito at Trinity Solar, 732-780-3779 ext. 9044 or danielle.devito @trinitysolarsystems.com. Sincerely, 6W41-� 1 29 Adare Place Homeowner's Signature Street Address Nada Kawar Northampton MA 01060 Print name City,State,Zip Code 413-412-9526 Phone Number Optimize Engineering Co., LLC P.O. Box 264•Farmville•VA 23901 Ph: 434.574.6138.E-mail: grichardpe @aol.com Richard B. Gordon, P.E. President October 12,2015 Northampton Building Department Northampton,MA Re: Solar Panels Roof Structural Framing Support To Whom It May Concern: I hereby certify that I am a Licensed Professional Engineer in the State of Massachusetts. Please note the following conclusions regarding framing structure, roof loading,and proposed site location of installation: 1. Existing roof framing: Truss framing is 2x4 at 24" o.c.This existing structure is definitely capable to support all of the loads that are indicated below for this photovoltaic project. 2. Roof Loading • 4.33 psf dead load (modules plus all mounting hardware) • 24 psf snow live load(40 psf ground snow live load reference) • 4.5 psf dead load roof materials • Exposure Category B, 115 mph wind uplift live load of 19.6 psf(wind resistance) 3. Address of proposed installation: Residence of Nada Kawar, 29 Adare Place, Northampton, Massachusetts This installation design will be in general conformance to the manufacturer's specifications,and is in compliance with all applicable laws,codes,and ordinances,and specifically, International Residential Code/ IRC 2009,2011 NEC,and 2012 ICC Energy Code. The spacing and fastening of the Unirac mounting brackets is to have a maximum of 64"o.c.span along the rail between mounting brackets and secured using 5/16"x 3%" length corrosive resistant steel lag bolts. In order to evenly distribute the load across the roof rafters,there shall be a minimum of 2 mounting brackets per rafter&min. 2" penetration of lag bolt per bracket,which is adequate to resist all 115 mph wind live loads including wind shear. The mounting brackets shall alternate between adjacent rafters between rail rows for better distribution of roof load. Penetration of anchors for modules mounted within 18" of ridge and edges of roof is to be a minimum of 3". Rails may be attached to either of two mounting holes in the L-feet. Mounting in the lower hole for a low profile, more aesthetically pleasing installation or mount in the upper hole for a higher profile to maximize airflow under the modules to cool them more. Slide the"-inch mounting bolts into the footing bolt slots. The rails will be attached to the footings with the flange nuts. Very truly yours, Optimize Engineering Co., LLC Richard JLQWdonA1P.E.f Massachusetts P.E. License No.49993 MECHANICAL, ELECTRICAL, &CIVIL ENGINEERING N OF MASS,q�y � RICNPRO6' ;\jp'' GORDON CPS OJ b� NO 49993 kO�SSIOf1A��� Optimize Engineering Co., LLC P.O. Box 264•1Farmvi1le•VA 23901 Ph: 434.574.6138.E-mail: grichardpe @aol.com Richard B. Gordon, P.E. President October 12,2015 Northampton Building Department Northampton, MA Re: Solar Panels Roof Structural Framing Support To Whom It May Concern: I hereby certify that I am a Licensed Professional Engineer in the State of Massachusetts. Please note the following conclusions regarding framing structure, roof loading,and proposed site location of installation: 1. Existing roof framing: Truss framing is 2x4 at 24"o.c.This existing structure is definitely capable to support all of the loads that are indicated below for this photovoltaic project. 2. Roof Loading • 4.33 psf dead load (modules plus all mounting hardware) • 24 psf snow live load(40 psf ground snow live load reference) • 4.5 psf dead load roof materials • Exposure Category B, 115 mph wind uplift live load of 19.6 psf(wind resistance) 3. Address of proposed installation: Residence of Nada Kawar, 29 Adare Place, Northampton, Massachusetts This installation design will be in general conformance to the manufacturer's specifications,and is in compliance with all applicable laws, codes,and ordinances,and specifically, International Residential Code/ IRC 2009,2011 NEC,and 2012 ICC Energy Code. The spacing and fastening of the Unirac mounting brackets is to have a maximum of 64"o.c.span along the rail between mounting brackets and secured using 5116"x 3%" length corrosive resistant steel lag bolts. In order to evenly distribute the load across the roof rafters,there shall be a minimum of 2 mounting brackets per rafter&min.2" penetration of lag bolt per bracket,which is adequate to resist all 115 mph wind live loads including wind shear. The mounting brackets shall alternate between adjacent rafters between rail rows for better distribution of roof load. Penetration of anchors for modules mounted within 18"of ridge and edges of roof is to be a minimum of 3". Rails may be attached to either of two mounting holes in the L-feet. Mounting in the lower hole for a low profile, more aesthetically pleasing installation or mount in the upper hole for a higher profile to maximize airflow under the modules to cool them more. Slide the 3B-inch mounting bolts into the footing bolt slots. The rails will be attached to the footings with the flange nuts. Very truly yours, Optimize Engineering Co., LLC Richard Bjr gWon, k.E. Massachusetts P.E. License No.49993 MECHANICAL, ELECTRICAL, &CIVIL ENGINEERING 1N OF MAS` P� A ' Z �1, ° R�cNAIRD CORDON n �e O �tECH,9� NO Q_ * �FGIsT G� ' ��SSIONP& SECTION 8-CONSTRUCTION SERVICES 8.1 Licensed Construction Supervisor: Not Applicable ❑ Name of License Holder: — License Number Addr Expiration Date Signature Telephone 9 Renistered Horne Improvement Contractor: Not Applicable ❑ l�ys l _c f) V, 1 "1 G Company Name Registration Number iAk Address ( j`';t_D Expiration Date Telephone�� SECTION 10-WORKERS'COMPENSATION INSURANCE AFFIDAVIT(M.G.L.c.152,§25C(6)) Workers Compensation Insurance affidavit must be completed and submitted with this application. Failure to provide this affidavit will result in the denial of the issuance of the building permit. Signed Affidavit Attached Yes.......A No...... ❑ 11. - Home Owner Exemption The current exemption for"homeowners"was extended to include Owner-occupied Dwellings of one(1) or two(2)families and to allow such homeowner to engage an individual for hire who does not possess a license,provided that the owner acts as supervisor.CMR 780 Sixth Edition Section 108.3.5.1. Definition of Homeowner:Person(s)who own a parcel of land on which he/she resides or intends to reside,on which there is,or is intended to be,a one or two family dwelling,attached or detached structures accessory to such use and/or farm structures.A person who constructs more than one home in a two-year period shall not be considered a homeowner. Such"homeowner"shall submit to the Building Official,on a form acceptable to the Building Official,that he/she shall be responsible for all such work performed under the building permit. As acting Construction Supervisor your presence on the job site will be required from time to time,during and upon completion of the work for which this permit is issued. Also be advised that with reference to Chapter 152(Workers' Compensation) and Chapter 153 (Liability of Employers to Employees for injuries not resulting in Death)of the Massachusetts General Laws Annotated,you may be liable for person(s) you hire to perform work for you under this permit. The undersigned"homeowner"certifies and assumes responsibility for compliance with the State Building Code,City of Northampton Ordinances,State and Local Zoning Laws and State of Massachusetts General Laws Annotated. Homeowner Signature SECTION 5-DESCRIPTION OF PROPOSED WORK(check all applicable) New House ❑ Addition ❑ Replacement Windows Alteration(s) ❑ Roofing ❑ Or Doors I] Accessory Bldg. ❑ Demolition ❑ New Signs [0] Decks [Q Siding[L7] Other�] Brief De cription of Proposed Work: U t�,t_L ' 'I k k�-W `ice L C, IV Alteration of existing bedroom Yes X No Adding new bedroom Yes No Attached Narrative Renovating unfinished basement Yes No Plans Attached Roll -Sheet 6a.If New house and or addition to existing housing, complete the following: a. Use of building :One Family Two Family Other b. Number of rooms in each family unit: Number of Bathrooms c. Is there a garage attached? d. Proposed Square footage of new construction. Dimensions e. Number of stories? f. Method of heating? Fireplaces or Woodstoves Number of each g. Energy Conservation Compliance. Masscheck Energy Compliance form attached? h. Type of construction i. Is construction within 100 ft.of wetlands? Yes No. Is construction within 100 yr. floodplain Yes No j. Depth of basement or cellar floor below finished grade k. Will building conform to the Building and Zoning regulations? Yes No. I. Septic Tank City Sewer Private well City water Supply SECTION 7a-OWNER AUTHORIZATION-TO BE COMPLETED WHEN OWNERS AGENT OR CONTRACTOR APPLIES FOR BUILDING PERMIT 1A as Owner of the subject property hereby authorize to act on my behalf, in all matters relative to work authorized by this building permit application. Signature of Owner Date tr I ��i �� � asOwner/Authorized Agent hereby declare that the statements and information on the foregoing application are true and accurate,to the best of my knowledge and belief. Signed under the pains and penalties of perjury. .a� Print Name Signature of Owner/Agent Date Section 4. ZONING All Information Must Be Completed. Permit Can Be Denied Due To Incomplete Information Existing Proposed Required by Zoning This column to be filled in by Building Department Lot Size Frontage Setbacks Front Side L: R: L: R: Rear Building Height Bldg. Square Footage % Open Space Footage % (Lot area minus bldg&paved parking) #of Parking Spaces Fill: volume&Location A. Has a Special Permit/Variance/Finding ever been issued for/on the site? NO O DON'T KNOW • YES IF YES, date issued: IF YES: Was the permit recorded at the Registry of Deeds? NO 0 DON'T KNOW YES IF YES: enter Book Page and/or Document# B. Does the site contain a brook, body of water or wetlands? NO • DONT KNOW O YES O IF YES, has a permit been or need to be obtained from the Conservation Commission? Needs to be obtained © Obtained © , Date Issued: C. Do any signs exist on the property? YES © NO IF YES, describe size, type and location: D. Are there any proposed changes to or additions of signs intended for the property? YES 0 NO IF YES, describe size, type and location: E. Will the construction activity disturb(clearing,grading,excavation,or filling)over 1 acre or is it part of a common plan that will disturb over 1 acre? YES ® NO IF YES,then a Northampton Storm Water Management Permit from the DPW is required. Department use only LN61' City of Northampton Status of Permit: Building Department Curb Cut/Driveway Permit 212 Main Street Sewer/Septic Availability 15 Room 100 Water/Well Availability orthampton, MA 01060 Two Sets of Structural Plans 4 -587-1240 Fax 413-587-1272 Plot/Site Plans 01060 Other Specify APPLICATION TO CONSTRUCT,ALTER, REPAIR, RENOVATE OR DEMOLISH A ONE OR TWO FAMILY DWELLING SECTION 1 -SITE INFORMATION This section to be completed by office 1.1 Property Address: Map Lot Unit Zone Overlay District Elm St.District CB District SECTION 2-PROPERTY OWNERSHIP/AUTHORIZED AGENT 2.1 Owner of Record: Name(Print) Current Mailing Address: Telephone Signature 2.2 Authorized Agent: c —14 9 Address: Current Mailing Name(Print Signature Telephone SECTION 3-ESTIMATED CONSTRUCTION COSTS Item Estimated Cost(Dollars)to be Official Use Only completed by ermit applicant 1. Building 00 0 (a)Building Permit Fee 2. Electrical (b)Estimated Total Cost of Construction from 6 3. Plumbing Building Permit Fee 4. Mechanical (HVAC) 5. Fire Protection 6. Total=(1 +2+3+4+5) S coo Check Number This Section For Official Use Only Date Building Permit Number: Issued: Signature: Building Commissioner/Inspector of Buildings Date 3.? 3/w�-r File#BP-2016-0665 APPLICANT/CONTACT PERSON TRINITY SOLAR ADDRESS/PHONE 20 PATTERSON BROOK RD UNIT 10 WEST WAREHAM02576(508)291-0007 PROPERTY LOCATION 29 ADARE PL MAP 24A PARCEL 215 001 ZONE URB(100) THIS SECTION FOR OFFICIAL USE ONLY: PERMIT APPLICATION CHECKLIST ENCLOSED REQUIRED DATE ZONING FORM FILLED OUT Fee Paid to Building Permit Filled out Fee Paid Typeof Construction:_INSTALL ROOF MOUNTED&.<I KW SOLAR ARRAY New Construction Non Structural interior renovations Addition to Existing Accessory Structure Building Plans Included: Owner/Statement or License 108025 3 sets of Plans/Plot Plan THE FOLLOWING ACTION HAS BEEN TAKEN ON THIS APPLICATION BASED ON INFORMATION PRESENTED: _J,��Approved Additional permits required(see below) PLANNING BOARD PERMIT REQUIRED UNDER:§ Intermediate Project: Site Plan AND/OR Special Permit With Site Plan Major Project: Site Plan AND/OR Special Permit With Site Plan ZONING BOARD PERMIT REQUIRED UNDER: § Finding Special Permit Variance* Received&Recorded at Registry of Deeds Proof Enclosed Other Permits Required: Curb Cut from DPW Water Availability Sewer Availability Septic Approval Board of Health Well Water Potability Board of Health Permit from Conservation Commission Permit from CB Architecture Committee Permit from Elm Street Commission Permit DPW Storm Water Management oli ' D ay Sigh ure of Building Cffficihl Date Note: Issuance of a Zoning permit does not relieve a applicant's burden to comply with all zoning requirements and obtain all required permits from Board of Health,Conservation Commission,Department of public works and other applicable permit granting authorities. * Variances are granted only to those applicants who meet the strict standards of MGL 40A.Contact Office of Planning&Development for more information. 29 ADARE PL BP-2016-0665 GIs#: COMMONWEALTH OF MASSACHUSETTS Map:Block: 24A-215 CITY OF NORTHAMPTON Lot: -001 PERSONS CONTRACTING WITH UNREGISTERED CONTRACTORS Permit: Building DO NOT HAVE ACCESS TO THE GUARANTY FUND (MGL c.142A) Category: SOLAR PANELS BUILDING PERMIT Permit# BP-2016-0665 Project# JS-2016-001115 Est. Cost: $35000.00 Fee: $75.00 PERMISSION IS HEREBY GRANTED TO: Const.Class: Contractor: License: Use Group: TRINITY SOLAR 108025 Lot Size(sq. ft.): 12980.88 Owner: KAWAR NADA Zoning.URB(100)/ Applicant. TRINITY SOLAR AT. 29 ADARE PL Applicant Address: Phone: Insurance: 20 PATTERSON BROOK RD UNIT 10 (508)291-0007 WC WEST WAREHAMMA02576 ISSUED ON.]]/]712015 0:00:00 TO PERFORM THE FOLLOWING WORK.INSTALL ROOF MOUNTED 9.45 KW SOLAR ARRAY rev 11-19-15 to 9.45 kw cnm POST THIS CARD SO IT IS VISIBLE FROM THE STREET Inspector of Plumbing Inspector of Wiring D.P.W. Building Inspector Underground: Service: Meter: Footings: Rough: Rough: House# Foundation: Driveway Final: Final: Final: Rough Frame: Gas: Fire Department Fireplace/Chimney: Rough: Oil: Insulation: Final: Smoke: Final: THIS PERMIT MAY BE REVOKED BY THE CITY OF NORTHAMPTON UPON VIOLATION OF ANY OF ITS RULES AND REGULATIONS. Certificate of Occupancy Signature: FeeType: Date Paid: Amount: Building 11/17/2015 0:00:00 $75.00 212 Main Street,Phone(413)587-1240,Fax: (413)587-1272 Louis Hasbrouck—Building Commissioner