Loading...
12C-041 (2) ::'U N R/1C Llnirac Code-Compliant Installation Manual SolarMount ASCE 7-05 AND ASCE 7-10 Step 2: Determine the Distributed Load on the rail, Step 3:Determine Rail Span/L-Foot Spacing W(plD Using the distributed load,w,from Part II,Step 2,look up the Determine the Distributed Load,w(plf),by multiplying the allowable spans,L,for each Unirac rail type,SOLARMOUNT module length,B(ft),by the Total Design Load,P(psf)and (SM)and SOLARMOUNT Heavy Duty(HD)in table 14. dividing by two.Use the maximum absolute value of the three downforce cases and the Uplift Case. We assume each module The L-Foot SOLARMOUNT Series Rail Span Table uses a single is supported by two rails. L-foot connection to the roof,wall or stand-off. Please refer to w=PB 12 the Part III for more installation information. w=Distributed Load(pounds per linear foot,plf) B=Module Length Perpendicular to Rails(ft) P= Total Design Pressure(pounds per square foot,psf) Table 14.L-Foot SOLARMOUNT Series Rail Span SM-SOLARMOUNT HD-SOLARMOUNT Heavy Duty Span Distributed Load ounds/linear foot) (R) 20 25 30 40 50 60 80 100 120 140 160 180 200 220 240 260 2 SM SM SM SM SM SM' SM SM SM SM SM SM`. SM SM SM SM 2.5 SM SM SM" SM SM SM SM SM WOO �O�t' 3 SM SM SM ' SM SM SM SM $M $M SM SM s I )t� py } 3.5 SM SM SM SM' $M SM:r, $M SM SM SM F 4 SMSM SM `SM SM SM;" SM sM 5M 4.5 SM SM` SM w; SM SM SM 8M r) l�c� 5 SM SM SM SM SM SM . SM SM � � y 5.5 SM. sM P SM " $M SM SM SM �4 6 SM SM SM SM SM SM SMIt 6.5 SM" SM SM SM' SM SM 7 5M SM" $M SM . SM SM 7.5 SM.:' Sw $M SM SM 8SM SM .; SM SM ,:"$h� $M 8.5 SM" °SM SM SM 9 SM SM SM SM 9.5 SM SM" SM SM 10 SM SM SM - r 10.5 $M SM SM SM SM.' { 11.5 SM 12 SM Page 26 SOLARMOUNT Technical . . . - - mm UN I RAC SOLARMOUNT Beams Part No. 310132C, 310132C-B, 310168C, 310168C-B, 310'168D 310208C, 310208C-B, 310240C, 310240C-13, 3102401), 410144M, 410168M, 410204M,410240M Properties Units SOLARMOUNT SOLARMOUNT HD Beam Height in 2.5 3.0 Approximate Weight(per linear ft) plf 0.811 1.271 Total Cross Sectional Area in' 0.676 1.059 Section Modulus(X-Axis) in 0.353 0.898 Section Modulus (Y-Axis) in' 0.113 0.221 Moment of Inertia (X-Axis) in 0.464 1.450 Moment of Inertia (Y-Axis) in 0.044 0.267 Radius of Gyration(X-Axis) in 0.289 1.170 Radius of Gyration (Y-Axis) in 0.254 0.502 "Rails are extruded using these aluminum alloys: 6005-T5, 6105-T5, 6061-T6 SLOT FOR T-BOLT OR 1,728 Y4" HEX HEAD SCREW SLOT FOR T-BOLT OR Y4"HEX HEAD SCREW -T 2X SLOT FOR SLOT FOR BOTTOM CLIP 2.500 BOTTOM CLIP T 3.000 1.316 SLOT FOR 0 Y8" HEX BOLT SLOT FOR 1.385 Y8" HEX BOLT .387 750 � 1.207 Y Y 1.875 ♦ A ►X ►X SOLARMOUNT Beam SOLARMOUNT HD Beam Dimensions specified in inches unless noted a SOLARMOUNT Technical D, , - - :: U N IRAC 1�IE SOLARMOUNT Beam Connection Hardware SOLARMOUNT L-Foot Part No.3040000, 304000D • L-Foot material: One of the following extruded aluminum alloys: 6005- T5, 6105-T5, 6061-T6 Ultimate tensile: 38ksi,Yield: 35 ksi • Finish: Clear or Dark Anodized • L-Foot weight:0.215 Ibs(98g) r' Allowable and design loads are valid when components are Bea assembled with SOLARMOUNT series beams according to authorized Bolt UNIRAC documents L-Foot For the beam to L-Foot connection: •Assemble with one ASTM F593 W-16 hex head screw and one errate ASTM F594 Wserrated flange nut Flange N • Use anti-seize and tighten to 30 ft-Ibs of torque • Resistance factors and safety factors are determined according to part 1 section 9 of the 2005 Aluminum Design Manual and third-party test Y results from an IAS accredited laboratory NOTE: Loads are given for the L-Foot to beam connection only; be ►X sure to check load limits for standoff, lag screw,or other x attachment method : 3.01 Applied Load Average Safety Design Resistance 3x HARDWARE RE �rnarn Direction Ultimate Allowable Load Factor Load Factor, ' Ibs(N) Ibs(N) FS Ibs(N) 201 _ Sliding,Z± 1766(7856) 755(3356) 2.34 1141 (5077) 0.646 Tension,Y+ 1 1859(8269) 707(3144) 2.63 1069(4755) 0.575 Dimensions specified in inches unless noted Compression,Y- 13258(14492) 1325(5893) 2.461 2004(8913) 1 0.615 Traverse,X± 1 486(2162) 213(949) 1 2.28 323(1436) 1 0.664 Enphase®M215 Microinverter//DATA INPUT DATA(DC) M215-60-2LL-S22-IG /S23-IG /S24-IG Recommended input power(STC) 190-270 W Maximum input DC voltage 48 V Peak power tracking voltage 27 V-39 V Operating range 16 V-48 V Min/Max start voltage 22 V/48 V Max DC short circuit current 15 A Max input current 10A OUTPUT DATA (AC) @208 VAC @240 VAC Peak output power 225 W 225 W Rated(continuous)output power 215 W 215 W Nominal output current 1.1 A(A rms at nominal duration) 0.9 A(A rms at nominal duration) Nominal voltage/range 208 V/183-229 V 240 V/211-264 V Nominal frequency/range 60.0/57-61 Hz 60.0/57-61 Hz Extended frequency range` 57-62.5 Hz 57-62.5 Hz Power factor >0.95 >0.95 Maximum units per 20 A branch circuit 25(three phase) 17(single phase) Maximum output fault current 850 mA rms for 6 cycles 850 mA rms for 6 cycles EFFICIENCY CEC weighted efficiency,240 VAC 96.59 CEC weighted efficiency, 208 VAC 96.5% Peak inverter efficiency 96.5% Static MPPT efficiency(weighted, reference EN50530) 99.4 % Night time power consumption 65 mW max MECHANICAL DATA Ambient temperature range -401C to+65°C Dimensions(WxHxD) 171 mm x 173 mm x 30 mm(without mounting bracket) Weight 1.6 kg(3.4 Ibs) Cooling Natural convection- No fans Enclosure environmental rating Outdoor- NEMA 6 FEATURES Compatibility Compatible with 60-cell PV modules. Communication Power line Integrated ground The DC circuit meets the requirements for ungrounded PV arrays in NEC 890.35. Equipment ground is provided in the Engage Cable. No additional GEC or ground is required.Ground fault protection(GFP)is integrated into the microinverter. Monitoring Enlighten Manager and MyEnlighten monitoring options Compliance UL1741/IEEE1547, FCC Part 15 Class B,CAN/CSA-C22.2 NO.0-M91, 0.4-04,and 107.1-01 Frequency ranges can be extended beyond nominal if required by the utility To learn more about Enphase Microinverter technology, [e] enphase° visit enphase.com E N E R G Y 0 2014 Enphase Energy.All rights reserved.All trademarks or brands in this document are registered by their respective owner. Enphase®Microinverters Enphase@M215 R Y F The Enphase" M215 Microinverter with integrated ground delivers increased energy harvest and reduces design and installation complexity with its all-AC approach. With the advanced M215, the DC circuit is isolated and insulated from ground, so no Ground Electrode Conductor (GEC) is required for the microinverter. This further simplifies installation, enhances safety, and saves on labor and materials costs. The Enphase M215 integrates seamlessly with the Engage® Cable, the Envoy® Communications Gateway`"', and Enlighten®, Enphase's monitoring and analysis software. PRODUCTIVE SIMPLE RELIABLE - Maximizes energy production - No GEC needed for microinverter - More than 1 million hours of testing - Minimizes impact of shading, - No DC design or string calculation and millions of units shipped dust, and debris required - Industry-leading warranty, up to 25 - No single point of system failure - Easy installation with Engage years Cable enphase- IeJ SA® E N E R G Y C Us MECHANICAL SPECIFICATION Format 65.7in x 39.4in x 1.38in(including frame) (1670 mm x 1000 mm x 35 mm) Weight 41.89 lb(19.0 kg) Front Cover 0.13 in(3.2 mm)thermally pre-stressed glass with anti-reflection technology $ ,El mm Back Cover Composite film Frame Black anodized aluminum Cell 6 x 10 polycrystalline solar cells [ Junction box Protection class IP67,with bypass diodes m Cable 4 mm2 Solar cable;(+)z45.67 in(1160 mm),(-)245.67 in(1160 mm) �� 3g 35 mm �•L s,P bmm, P Connector SOLARLOK PV4,IP68 0 .� o.3, I.-ol.m 1 ELECTRICAL CHARACTERISTICS 29�,:0.�mm�I fl I ,a mm� PERFORMANCE AT STANDARD TEST CONDITIONS(STC:1000 W/m2,25°C,AM 1.513 SPECTRUM)' NOMINAL POWER(+5W/-OW) [W] 255 260 265 Average Power PrAPP [WI 257.5 262.5 267.5 Short Circuit Current I50 [A] 8,90 9.09 9.28 Open Circuit Voltage V0C [V] 37.83 38.18 38.52 Current at Pmpp IMPP [A] 8.37 8.53 8.69 Voltage at Pm1P VMPP [V1 30.77 30.78 30.79 Efficiency(Nominal Power) 11 [%] 215.3 215.6 215.9 PERFORMANCE AT NORMAL OPERATING CELL TEMPERATURE(NOCT:800 W/m2,45 m3°C.AM 1.5G SPECTRUM)2 NOMINAL POWER(+5W/-OW) [W] 255 260 265 Average Power Pmpp [W] 189.7 193.4 197.1 Short Circuit Current I50 [A] 7.18 7.33 7.48 Open Circuit Voltage V0C [V] 35.22 35.54 35.86 Current at PmPP IMPP [A] 6.56 6.68 6.80 Voltage at PmPP VMPP [V] 28.92 28.94 28.97 'Measurement tolerances STC:±3%(P_);t 10%(1 ,Vim,I_,V°,,,) 2 Measurement tolerances NOCT:t5%(P,P);t 10%(Ise,Va,I-P,V-P) O CELLS PERFORMANCE WARRANTY PERFORMANCE AT LOW IRRADIANCE -7 10p hi At least 97%of nominal power during a first year. erea ter max.0.6%degra-dation per year.At least 92%of nominal power after E o _--- 10 years.At least 83%of nominal power after > w---r--�--�------- --�--�--j 25 ears.All data within measurement tolerances.ull warranties in accordance with the warranty terms of the Q CELLS sales IRRADIANCE IWIWI organisation of your respective country. voARS The typical change in module efficiency at an irradiance of 200 W/m2 in relation z to 1000 W/m2(both at 25°C and AM 1.5G spectrum)is-2%(relative). 0 TEMPERATURE COEFFICIENTS(AT 1000W/M2,25°C,AM 1.513 SPECTRUM) Temperature Coefficient of Ise a [%/K] +0.04 Temperature Coefficient of V00 R [%/Kl -0.30 Temperature Coefficient of Pm, Y [%/K] -0.42 NOCT ['Fl 113 t 5.4(45 t 3°C) PROPERTIES 1' SYSTEM DESIGN 0 Maximum System Voltage Vsys [V] 1000(IEC)/600(UL) Safety Class I o Maximum Series Fuse Rating [A DC] 20 Fire Rating C E Max Load(UL)2 [Ibs/ft2] 75(3600 Pa) Permitted module temperature -40PF up to+185'F on continuous duty (-40°C up to+85°C) Load Rating(UL)2 [Ibs/ft2] 75(3600 Pa) 2 see installation manual QUALIFICATIONS 1 CERTIFICATES PACKAGING INFORMATION UL 1703;VDE Quality Tested;CE-compliant; Number of Modules per Pallet 29 IEC 61215(Ed.2);IEC 61730(Ed.l)application class A - Number of Pallets per 53'Container 32 _ V ®R."S Number of Pallets per 40'Container 26 D E C E C aa Pallet Dimensions(L x W x H) 68.5 in x 44.5 in x 46.0 in (1740 x 1130 x 1170 mm) Pallet Weight 1323 lb(600 kg) NOTE:Installation instructions must be followed.See the installation and operating manual or contact our technical service department for further information on approved installation and use - of this product. Hanwha 0 CELLS USA Corp. N 8001 Irvine Center DniJe,suite 1250,Irvine CA 92618,USA I TEL+1 949 748 59 96 1 EMAIL ri-ce Is-usa®q-cells.com I WEB www.q-cells.us Engineered in Germany OCELLS s �i �s 1 i The new a,Pao is t a black framed he reliable lion from Q CELLS for improved evergreen for all applications, with higher operatin Op across the third module genera- more intelligent high g reliability and board: im design, durability, quicker installation out nstallation and tNNQVATIYE ALL-WEATHER 7ECHNQLDGY ' Maximum yields and Maximum with excellent PRQFlT-lNCRE perature behaviour, low-light ASIN 'Certified full Reduction G GLASS TECHNOLOGY Y resistant °f light reflection b to level 5 salt fog Plus long-term Y 50 ENDURING NIGH PE to high-quality corrosion resistance due fog •Sol-Gel roller • Long-term Yield Security coating PI p Technology, Y due to Anti g processing. gY, Hot-Spot Protect, ClGtITWElGN7 and Traceable Qualit QuAClTY FRp • Long-teY Y Tra,Q,, •Stability at wind ME m stability due loads of u Tested—the s to ODE Quality with P to 5400 pa strictest test to Sli a module weight of just 19 k Program. m frame d g due SAFE ELECT esign with high-tech alloy, ELECTRONICS MAXIhryuM •Protection against COST REDU thermally short circuits and • Up to 3 o CTlONS orally induced power to hi 1 lower logistics breathable junction box losses due to higher module capacit costs due to cables. and welded Y per box. • Increase EXTENDED jTOP$ Wopy Qcftts Increased flexibility WARRANTIES ' """" mateable con Y due to MC4_inter- •Investment a"� Hectors, security due to 2piq Performance warranty and 25-year 1 near mance warranty2, THE IDEAL SOLUTION FO " pr,�,r-� flRooftnP arrays on R' ouantr rested �.� al buildingsl��ndustri_ Ground-mounted +°�° eestp4� solar , solarmoaul�pi3 Power Plants RooftoP arrays Ys on ID,40032.587 aPeaozzas buildings APT test conditions: 25°C, 168h Cellsat-1pppVagainst See data sheet on r grounded,with conductive ear for further information. metal foil oration. covered module surface, QCELLS Engineered in Germany String and Conduit Layout 5 r, September 22,2015 w ° .6 Leahan,Michael Residence Electrical Review W w Z E 234 Spring Grove Ave.Florence,MA 01062 w a of n Hopkinton,MA Office:WalterJette a Reviewed By:Anuj Shrigiriwar(442-256-5353) Financing:Purchase(Enerbank) (61)O,Cells 265w Panels with(61)M215 Inverters PV meter type:Enphase RGM Emu location:Interior near the main panel j Internet Connection:Bridge Main Electrical Panel:200 Amp GE(22 k AIC) Utility:National Grid X rc a Circuit Calculations:61 M215 inverters x 0.9/Inverter=54.9 Amps x 1.25=68.625 FLA. I ie PV combiner with(1)20 Amp,2 pole circuit breaker,(4)15 Amp,2 pole circuit breaker,(1)15 Amp,1 pole circuit breaker(for EMU) Interconnection calculation:N/A,Line-Side-Tap i Interconnection will be a line-side-tap in the main panel located in the basement.From the LST install wiring to a 125 Amp main breaker enclosure with a 70 Amp main breaker mounted adjacent to the main panel(May need to mount o backer board).Wiring from this main breaker enclosure will install outside to a 100 Amp,non-fused PV disconnect mounted next to the utility meter.From the non-fused disconnect wire through the PV meter and then into the PV combiner panel located outside near the utility meter.From the PV combiner panel,run exterior conduit up the wall following the service drop and onto the lower roof.Once on the roof run exterior conduit to the gable wall.We will run the conduit up the wall it penetrates into the attic.From the penetration run conduit to the three soladecks located under the arrays as shown in the drawing.There will be five circuits of inverters to the roof. i 6 oe ry m Circuit 1 (12) a Circuit 2(12) Roof B `w Ridge:1'3.75" a C o Down:6" L El C 3(15) 91"43 Circuit 4(10) , - [bid ■ Circuit 5(12) 46 6 Q N o Soladeck , m > o m � 0 ■ B o on ox Y < Junction z 3� < Z. 0 End Cap k w N o A Trunk Cable :° Roof A Exterior Conduit Ridge:1'3.75" Meter Down:6" Interior Conduit STRING& CONDUIT LAYOUT PV-4 Electrical Diagram for Leaham-16.165 kW DC Photovoltaic Solar Array national grid Account Number-78223-13009 krterconnectintc LST in Service Panel m n Calculation for PV Breaker PV Circuit Cdfductors Mininnan f4 AYYG ¢ n PV CwWaiaer Panel to PV Wire Calc#1 #4 A1MG taar6ID - Calwlati.n for Main PV Breaker&Circuits Array degree.r ag i0 first disconnect ,°pt System Current M-mioium i10 AWG yHff S CALCATIOY _-___ z z 6 WIRE SUM CALCULATION 211!24 NEC Article 310 Wire Calc#2 ¢ Design Amperage= 54.9 125% = 6a.6Z5 Amp: 2 0 1 112 0 14 NEC Article 310 Full toad 54.9 w > Z m x Amperage."-"--': � g Main Bum Rating= 200 x 120x = 240 Amp. Full Load Amperage.............:13.5 Source Voltage tage_..._._.._._..:240 „< z m Existing Main Breaker = 200 Amp, Source Voltage -------------- 240 Length of Run(Feet).-..__..:30 Length ct I-(Feet)...........:60 Load ' Max Solar Breaker zoo Aml 1-) zoo = 200 Amps Day -.--.-_-:Cpn[inUOlIB � - - � Load ............. Ctxtduatio,Application.._._._:Conductors in Raceway,Cable orEwth Circuit 12 x 0.9x1z5%= 13.5 Amps Conductor Application-------.--:Conductors in Raceway,Cable or Earth circuit 4 2= 12 0.9 x us%= 13.5 Amps Conductor Ampacity Table__--._:NEC Table 310-15(8x16) Conductor PsmPa�Y Made.-_.:NEC Tale 310-15(s)(16) Circuit#3= 15 x 0.9 x 125x= 16.975 Am Conductor Type.....--'--'-.--:XHHW-2Alumin Conductor Type......------::OryManiper - Conductor Location.._.�__ra t re:90 I Conductor Location__-..._perat re:90 Dry/Wet Conductor Insulation 7e Circuit#a= 10 x 0.9.125%= u.zs Amp: Conductor Insulation Temperature:90°C ���'�IC ci-a#s= 12 x 0.9 x 1z5%= 13.5 Amps Arnbient Temperature------------:26-30 aC=78-86'F Ambient TemperoLrre---------[2&30'C=78-M IF Terminal Temperature Rating-.._:60'C Ternirhal Temperature Rating.-_:60'C Circuit Type:Satgle Phase 3 Wire(2 phase conductors&neutral) Cr°d Type:Single Phase 3 Ytrre(2 phase conductors dr neutrsPp Clty.of Cincuit Current-Carrying Conductors:2 Qty.of Circuit Curr at-Carrymtg Conductors:2 a Addibi ai Current-Carrying Conductors-__--8 Conductor RecptirPtrettt W Full Load Amps......._...54.9 Total Qty_Cuawd-Canymg Conductors-----:10 Lead OuLV Multiplier-_..:125 Conductor Requirement Artt)ien2 Temp.Multiplier-:1D Full Load Amps----------- 13-5 Oty.Conductors Multiplier:1.0 Load Duly Multiplier-...-:1.25 Antbient Temp.Multiplier_:1.0 Required Conductor Ampecdy:68.63 F Qty-Conductors Muult:plier:20 Terminal Requirement as Full toad Amps_.._...__:54.9 Regwred Conductor Ampacity 33-75 Load Duly Multiplier.....:125 Teminal Requ"rement: Full Load Amps-------:13.6 Required Terminal A npar3y-68.83 Laad Duty Multiplier---.:1.25 Selected Conductor. ¢ .• m ConductorAmpacity__.-:70.0 Required Terminal Ampacdy:16.68 Antient Temp.Deraile_--:1.0 Selected Conductor QtY-Conductors I3erate_.:1.ID �t Condua Ampsaty-,---.:25-0 -&j Ambient Temp_Derails__..:1-0 C Qty.Conductors Derate-..:0.5 Adktsted Arnpacty-----.:70A Qj $I 0 SELECTED CONDUCTOR SIZE.4 Avrg Adushed Ampacty-._._..:125 2 x Ohffa MiFt x Length x Amps 2 x 0-308 x 30 x 68.6:. Es LLI LA SELECTED CONDUCTOR SIZE:10 Awg W= _ =1.01 2 x OhnmAWt x Length x Amps 2 x 204 x 60 x 33.75 1000 x ay dtilres per Phase tale x 1 row VD= _ =3.3 Vats At Load Termau s-_.:238.99 1000 x Oty Wires per Phase 1000 x 1 Actual Percent Voltage trap.:0.42 Volts At Load Tenninais_..-.:236.7 Acted Percent Voltage Drop.:138 Electrical Notes l)All equipment[o be listed and labeled forks app0cti.n. 2)All..doctors shall be copper,rated for 90C and wet environment,unless 0 otherwise noted. � ry 3)Working clearances a.und al new arable xlsting electrical equipment shall G o .mplywith NEC110.26 O O 4)All wire terminaeonz shall be appropriately labeled and...dily visable. U' R Z V 5)Module grounding clips to be Installed between module frame and module Q N Q supportrail,per groundingclip manufacturersinstruction. V p ry F 6)Module Support rail to be bonded to continuous.pper GEC via W EEB lug per NEC 690.4(C). 7)k used PV powers.....breaker to be h-d at bottom of bus per NEC 690.64(B)(7). B)AC combiner panels shall be labeled as"Inverter AC Combiner Panel". 9)listing agency name and numberto be indicated.n inverters and mOd.les per ELECTRICAL NEC 110.3(8) st w� 10)PV power source breaker to be suitable for baWeed per NEC 690.64(B)(5). CALCULATIONS PV-3.1 Electrical Diagram for Leaham-16.165 kW DC Photovoltaic Solar Array national grid Account Number-78223-13009 'i � � N a n O w o KOi R.aYn IPdWYIYrMw > Q ~ z EE w 'a o m G � Z L/ bi u.uarw.aee. m,wLt wee x,.. v,atwagta r,� � � O= v OCai+srr+^arr,r�rMrl f+ ' a,aderaYnr d...e Lww, tin�C.rcmeNe. LL a/w t�rw,w ar.rr n� sr.awerre.ur�ywdwrt. ruwreax� rMtlracafa rrrrrrtrasaar a yorr�raa..3ut . roY c vnc �� OQ1]UM L1At°r� isa a renm rJwraro�Aeretc nst. IN ]DPmr ss,lrsssx= vLS ura. ' tr,nrrrt a:r ssA" r1 :''� ,'*�r�• tar:ru.Wr trtre..��u,ra,w..d �� � a�ara�reml�i isww � , i � irr.ar.vrr�rr.w i r+,r i c..rt..srrrryr.arr rM[„iir No.. ssA uay � i nn crnw,run.v-"°r++�exmrarr ti,lrlE%= tL5 CIy� l MAOIxtFa1MFLi,mi4 48 tiratW lgl,�tlmrtn --__� -Mtriiily i m CauitOratloe � iaftlra arr wc�unv rrr � ruy,;r,.ru..rr � Q Gnr Wire Calc#1 Wu,yszoaeaet e�rxwr r.w:rwr� ..—__.______..._....... An as emacu ;Wire a Calc#2 ! sa<c eu na,mmw,. Wu.rr.t-wi.a.avay.r,er a.1 W,� a i ' fsn,.rcraraw �- cr c•'A° w ., � m Leahan,Michael u,l,sssc=, uns e. A- � i 4-' t7't L. a 234 Spring grove Ave. puj 0) M Florence,MA 01062 0 to ' r ,....., 30 Arblr.ew, � .►r„ 1Z.rN,��.a0e, _ tsa.se�.rrr a�r�r.,m o n � o O d (D 2 l7 az '-' G = aw v O ELECTRICAL DIAGRAM PV-3 I] TYpiml Section 9.805 kW DC Photvuohaic Solar Array � � n Thk solar arrayucomprued Of3]Q Call 265 Paly Black Framezalar p,,h.The panels are mounted using the Unirac5olarmauntsolar O w o tv mounting rail to the building,,sp,cd at-Each solar panel 4 attached tp a a Enphase M215 21.L-S22 micro-irnertealsa mounted )- j Q to the Uninc Solarmoum rail di-ly beneath the panel. ¢ Z oZ. ¢ o v F a n Y oThe solar panels produce DC power when muck by sunlight.The DC power b converted to 240 V AC power at the inverter.Micro- 4 nwerters are connected in mills with a maximum number of 17 mi-inverters in each string. �� LL This system will be grid-tied.Ifthe solar paneh produce more power than is used by the building,the excess power flaws hack into the utility grid through a net meter to be available for other power users. All metal parts including solar panel frames,micro-inverters,and mounting rails are grounded using the manufacturefs recommended Y grounding meth,d and WEEB technology along with#6 AWG grounding wire. G w The building was comtruRed in. 2 ese' .,_FSS Q Panel lawuts 4 acs ~ N m Panel Dimensions 65.7 in 111,4 in System Weight 2478lbs Panel Weight 43.7 lbs System Distributed Load 3.7 psf _ ? System Square Footage 665 sq ft FaafSUppart 0 1.1 e Racking Weight 6981bs Actual Point Load Max Spacing 0 I D�� Micro-lnverter Weight 162.8 Ibs Total number of Roof Penetrations #DIV/01 Max Allowable Rail Overhang Din allowing Ibs per inch thread depth r1l Nate 1:Use 5/16"x 4°Hex Head Stein/ess Steel Lag Sve ws Variables Nate 2:RaafSuppprt Members arc h 32 ft 3 ft Pnet Downforre 5.9 psf Note B:Unirac5olarmaunt Racking Note 4: H 24 ft Wind Downforre 5.9 psf Pnet Uplift -26.9 psf Roof Pitch 25 degrees Wind Uplift -26.9 psf B 5.5 Load Combinatiorts wMax 147 pif V 90 mph Kt 1 D1 02 D3 Uplift Max Span 3 ft 5now Load Sopsf Exposure Category 8 Dead Load D 1 3.7 3.7 3.7 2.2 psf Achsal Span Oft F- N Roof Zone 3 ,l 1 Snow load 5 T 50A 0.0 37.5 0.0 psf Rd 0lbs G > o E 1097 1 1 OWL' Pnet 0.0 5.9 4.4 -26.9 psf R. a Ibs p 4 i Total Load pat 53.7 9.6 45.6 24.7 pd p Required Thread Depth 0 in 'D 5i� n Distrib TL w•' 147.0 26.3 1243 67.6 plf Actual Thread Depth 2.25 in G Z V S Z U w N K Q •DWL:Design Wind Load ss ••Absolute values are ind/cated for the calculated quantities of P-Uplift and w-Uplh Glossary of Terms for Load Calculations h 8u11ding Height A Adjustmera F-r far height H Building Least HOrizomal RoafPitch Roof Pitch 1 Importance F.-f fora single family residence V Basic Wind Speed Slaw Load Snaw Load g Module length perpendicular to beams DESCRIPTION OF AoofZOne Roof Zane Rd Point Load-Maximum Downforre WORK&LOAD £ EffeRive Raaf Area Ru Point Laad-Uplift CALCULATIONS Roof Zone Setback Length Exposure B-Suburbansingle family dwelling Pnet Downforre Net Design Dawnfarce Pressure Category Part Uplift Net Design Uplift Pressure IQt Topographic Factor PV-2.2 a Typical Section 6.36 kW DC Phatavakaic Solar Artay ul � op O QJ N This solar arra prb ty pane@.The pane(sare mourned icing<he Uniracsolarmausrc solar O us O as yecom ed of 24GCe112fi5 PO Black Frame solar ruing rail to the building's 2x6,spaced at 24 oc.Eachsalarpanel is attached W an Enphase M215-6U2LL-S22 micro-inverteraho mourned to the Unirac SOlarmoum rail directly beneath the panel. z Z PsptaStP w Q OZ m e� aaa` G x un The solar panels produce DC pow—Wri struck by sunlight.The DC power's mmerted to 246 V AC power ae the invert�r.Mic—invert—W A p O 2 connected in strings with a maxYmum number of 1]micro-inverters in each string. �\\ u.. This system will be grid-tied.If the solar panels produce more power than is used by the building,the excess power flaws back into the utility grid through a net meter to be available for other power users. All metal parts induding solar panel homes,micro-inverters,and mounting rails are grounded using the manufactures recommended Y grounding method and WEER technology along wfth R6 AWG grounding wire. K The building was cortstrurxed in. 4ey�s �yt w m m m K Panel Layosrt s Panel Dimensions 65.7 in x 39.4 in System Weight 160716, ��s+" S Panel Weight 43.716, System Distributed Load 3.7 psf V i System Square Footage 431 sq ft Roof Support 2x6 a M Racking Weight 453 Its Actual Point Load Max Spadng 4 f ��� Micro-lnverter Weigh[ 105.6 lbs Total number of Roof Penetrations 52 Mox Allowable Rail Overhang 16 in r� Members are Hem,Fir(North)allowing 23516,per inch thread depth Va ahles te solo Na 1:Use 5/16"x 4"Hex Head Stainless Steel Lag Screws e Nate 2:RaofSUpport Members are 2x6 h 32 ft 3 ft Pnet Dawnfome 5.9 psf No23:Uni-5.1ormaunt Racking Note 4:plywood H 24 ft Wind Downforce 5.9 psf Pnet Uplift -26.9 psf Roof Pitch 25 degrees Wind Uplift -26.9 psf B 5.5 Load Combinations wm,x 147 plf V 90 mph Kz 1 Dl D2 D3 Uplift Max Span 3 f Roo Zone SO psf Exposure Category g Dead Load D 3.7 3.7 3.7 2.2 psf Actual5pan 4ft f 3 ,1 1 Snow Load 5 50.0 0,0 37.5 0.0 psf Rd 598 lbs G o E 1097 1 I DWL- Pnet 0,0 5.9 4.4 -26.9 psf Ru 270 Ibs O ¢ Q Total Load p.. 53.7 9.6 45.7 24.7 psf Required Thread Depth 1.15 in (D s Distrlb TL 147.1 26.4 125,0 67.5 plf Actual Thread Depth 2,25 in Q Z U U = Z Q w OWL:Design Wind Load "Absolute values ore indicated f-the calculated quantities o P-U 1 N j fo 4 f P ft and w-Uplh Glossary of Terms for Load Calculations h BuiWing Height 1 Adjustment Factor for height H Building Leart Horizontal Raaf Pitch Roof Pkch 1 Importance Factor of for a single family residence ✓ Basic Wind Speed DESCRIPTION OF Snow load Sn Wed ad B Module length perpendicular to beams Roof Zane Roof Zone Rd Point Load-Maximum 0awnfarce WORK&LOAD E Eff—iv.R fArea R. PaintLoad-Uplift CALCULATIONS Roof Zone Setback Length Exposure 8-Suburb—trill.family dweiling Pnet Downforce Net Design Downforce Pressure Category Pnet Uplift Net Design Uplift Pressure IQt Topographic Fa-r PV-2.1 City of Northampton / BuIlding Q S aCJ/Y fa Leaham Residence Plan ReV1eV11 building inspector 234 Spring Grave Rd 212 Main Street Florence,Ma 01062 Northampton, MA 01060 o 5 � r Z System Ratings •.�_ �- w w � Ei 16.165 kW DC Photovoltaic Solar Array Roof B y t TZ � r w ¢ O 13.12 kW AC Photovoltaic Solar Array Ridge:1'n,� i 0 0 x — Equipment Summary 466" 61 Q Cell 265 Poly Black Frame Modules 61 Enphase M215-60-2LL-5221nverters ' t Q #DIV/O! w A- a Sheet Index Roof A PV-1 Cover * RidW.1'3-75' PV-2.1 Description of Work and Load Calculations- a Mohr Down:6- < PV-2.2 Description of Work and Load Calculations- b 0 PV-3 Electrical Diagram PV-3.1 Electrical Calculations w PV-4 String and Conduit Layout PV-5 Equipment Ratings&Signage v aa� a sift to 42 sold Governing Codes 2014 National Electric Code Massachusetts Residential Code,8th Edition F Underwriters Labratories(UL)Standards OSHA 29 CFR 1910.269 o N 1 ASCE-7-10 'o Goo ° a a Z U G x w w $ z < a O N COVER SHEET r�pv-1 Direct Energy Solar October 1,2015 To: Town of Northampton 212 Main Street Northampton, MA 01060 Subject: Structural Certification for Installation of Solar Panels Leahan Residence 234 Spring Grove Road Florence, MA.01062 To Whom It May Concern, A design check for the subject residence was done on the existing roofing and framing systems for the installation of solar panels over the roof. From a field inspection of the property,the existing roof support structures were observed by Direct Energy Solar auditors as follows: The roof structure of(Roof A)consists of composition shingle on roof plywood that is supported by fink trusses that are spaced at @ 24"o.c..The trusses have a max projected horizontal span of approximately 26'-0"between exterior load bearing walls, and a slope of 25 degrees.The top chords are 2x6 sections,the bottom chords are 2x6 sections and the web members are 2x4 sections.The truss members are connected by steel gusset plates.The max unsupported projected horizontal top chord span is approximately 7'-0". The existing roof framing system of(Roof A)is judged to be adequate to withstand the loading imposed by the installation of the solar panels. No reinforcement is necessary. The spacing of the solar standoffs should be kept at 48"o.c.with a staggered pattern to ensure proper distribution of loads. I further certify that all applicable loads required by the codes and design criteria listed below were applied to the Unirac Solarmount solar rail system and analyzed. Furthermore,the installation crews have been thoroughly trained to install the solar panels based on the specific roof installation instructions developed by Unirac Solarmount for the racking system and Ecofasten for the roof connections. Finally, I accept the certifications indicated by the solar panel manufacturer for the ability of the panels to withstand high wind and snow loads. Design Criteria: • Applicable Codes= Massachusetts Residential Code,8th Edition,ASCE 7-05,and 2005 NDS • Roof Dead Load=8 psf(Roof A) • Roof Live Load=20 psf • Wind Speed=90 mph, Exposure B • Ground Snow Load=40 psf - Roof Snow Load=28 psf Please contact me with any further questions or concerns regarding this project. Sincerely, a`rg4Jo ELAINE A. HUANG CIVIL Elaine Huang, P.E. �No.40pgo Project Engineer �G S!pNAL EN S 8955 Henkels Lane • Suite S08 Annapolis Junction, MIJ 20701 Phone: 800.903.6430 • Fax: 1443.267.0036 • Web: directenergysol7r.com The Commonwealth of Massachusetts Department of Industrial Accidents F Office of Investigations 1 Congress Street, Suite 100 Boston,MA 02114-2017 www mass.gov/dia Workers'Compensation Insurance Affidavit: Builders/Contractors/Electricians/Plumbers Applicant Information Please Print Legibly Name (Business/Organization/Individual): Directenergysolar/AstrumSolar Address; 15 Ave E City/State/Zip: Hopkinton, MA 01748 Phone#: 1-800-903-6130 Are you an employer? Check the appropriate box: Type of project(required): 1.0 I am a employer with 15 4. ❑ I am a general contractor and I employees (full and/or part-time).* have hired the sub-contractors 6. ❑New construction 2.❑ I am a sole proprietor or partner- listed on the attached sheet. 7. ❑ Remodeling ship and have no employees These sub-contractors have g. ❑ Demolition working or me in an capacity. employees and have workers' g � y comp. insurance.$ 9. E] Building addition [No workers comp. insurance p required.] 5. ❑ We are a corporation and its 10.E] Electrical repairs or additions 3.❑ I am a homeowner doing all work officers have exercised their 1 l.❑ Plumbing repairs or additions myself. [No workers' comp. right of exemption per MGL 12.❑ Roof repairs insurance required.] t c. 152,§1(4),and we have no solar employees. [No workers' 13.❑■ Other comp. insurance required.] `Any applicant that checks box#1 must also fill out the section below showing their workers'compensation policy information. t Homeowners who submit this affidavit indicating they are doing all work and then hire outside contractors must submit a new affidavit indicating such. #Contractors that check this box must attached an additional sheet showing the name of the sub-contractors and state whether or not those entities have employees. If the sub-contractors have employees,they must provide their workers'comp.policy number. I am an employer that is providing workers'compensation insurance for my employees. Below is the policy and job site information. Insurance Company Name:Zurich American Insurance Policy#or Self-ins. Lic.#:WC595396901 Expiration Date: 1/1/16 Job Site Address: J 3 �s-t�i �/dr/P_ L1v City/State/Zip:9/2 i —b-ler, aA!79,6 Attach a copy of the workers' compensation policy declaration page(showing the policy number and expiration date). Failure to secure coverage as required under Section 25A of MGL c. 152 can lead to the imposition of criminal penalties of a fine up to$1,500.00 and/or one-year imprisonment, as well as civil penalties in the form of a STOP WORK ORDER and a fine of up to$250.00 a day against the violator. Be advised that a copy of this statement may be forwarded to the Office of Investigations of the DIA for insurance coverage verification. I do hereby certify under th pains nd pen es of perj ry that the information provided above is true and correct Signature. j f/ Date: Phone#: �°/ ! .r�� `�� � 0 Official use only. Do not write in this area,to be completed by city or town official. City or Town: Permit/License # Issuing Authority(circle one): 1.Board of Health 2.Building Department 3. City/Town Clerk 4.Electrical Inspector 5.Plumbing Inspector 6.Other Contact Person: Phone#: City of Northampton 212 Main Street, Northampton, MA 01060 Solid Waste Disposal Affidavit In accordance of the provisions of MGL c 40, S54, I acknowledge that as a condition of the building permit all debris resulting from the construction activity governed by this Building Permit shall be disposed of in a properly licensed solid waste disposal facility, as defined by MGL c 111, S 150A. D Address of the work: S-11-141 61v?_ A/1. f1c�/ Kewce ;7tlo e/U& The debris will be transported by: /%'- "'- !ft y/ The debris will be received by: _S Zqu,c e, t,,- ,4% ����P�/�•-r , J�iac�l7y Building permit number: Name of Permit Applicant 4L c,. !'%- J,t'//.e i � i Date Signature of Permit Applicant I F SECTION 8-CONSTRUCTION SERVICES 8.1 Licensed Construction Supervisor: } J Not Applicable(❑ Name of License Holder: t ,- ��Qr� (rl� �C'�' `�'C�C� � 5 C9 S`� License Number Address Expiration Date Signature Telephone 9:.Repistered Home Improvement Contractor: Not Applicable ❑ 0 l�ti✓4✓i Corn pany Name Registration Number j9/'�9�o%oSI / 4 / .,1 Si /zi�,�I°7 Address Expiration Date "oo Telephone oyn-3yg-V4-9 SECTION 10-WORKERS'COMPENSATION INSURANCE AFFIDAVIT(M.G.L.c.152,§25C(6)) Workers Compensation Insurance affidavit must be completed and submitted with this application.Failure to provide this affidavit will result in the denial of the issuance of the building permit. Signed Affidavit Attached Yes...,... 21'- No...... ❑ Home`Owner Exeal orlon The current exemption for"homeowners"was extended to include Owner-occupied Dwellings of one(1) or two(2)families and to allow such homeowner to engage an individual for hire who does not possess a license,provided that the owner acts as supervisor.CMR 780, Sixth Edition Section 108.3.5.1. Definition of Homeowner,Person(s)who own a parcel of land on which he/she resides or intends to reside,on which there is,or is intended to be,a one or two family dwelling,attached or detached structures accessory to such use and/or farm structures.A person who constructs more than one home in a two-year period shall not be considered a homeowner. Such"homeowner"shall submit to the Building Official,on a form acceptable to the Building Official,that he/she shall be responsible for all such work performed under the building permit. As acting Construction Supervisor your presence on the job site will be required from time to time,during and upon completion of the work for which this permit is issued. Also be advised that with reference to Chapter 152(Workers'Compensation) and Chapter 153(Liability of Employers to Employees for injuries not resulting in Death)of the Massachusetts General Laws Annotated,you may be liable for person(s) you hire to perform work for you under this permit. The undersigned"homeowner"certifies and assumes responsibility for compliance with the State Building Code,City of Northampton Ordinances,State and Local Zoning Laws and State of Massachusetts General Laws Annotated. k Homeowner Signature f+ S„OON 5-DESCRIPTION OF PROPOSED WORK(chock all apollaable) New House ❑ Addition Replaaoment Windows Alteration(s) Itoofing [] Or Doors Q Accessory Bldg. ❑ Demolitloh ❑ Now Signs (C]j Decks 10 Siding gyp) Other[� Brief Description of Proposed Instillation of solar array on roof Alteretbn of a*ting bedroom Yes NO Adding new bedroom Yes No Altached Narrative Renovating unfinished basement Yes NO Plans Alteched Rol -Sheet Ili jjj� a. Use of building:One Family Two Far* Other b. Number of rooms in each family unit Number of Bathrooms c. Is there a garage attached? d. Proposed ftwe faataJr a of new construction. Dbnenalons e. Number of storles? f. Method of heating? Fireplaces or Woodstaves Number of each g. Energy Conservation Compliance. Maescheck Energy Compliance form attached? h. Type of conatruction 1. Is corisbuctlon wiNn 100 it of wetlands? Yes No. Is construction within 100 yr. floodptatn Yes No J. Depth of basement or color floor below flnishad grade k, Will building conform to the 9ulidlog and Zoning regulations? Yes No. 1. Septic Tank City Sower Private well City water supply SECTION 7a-OWNER AUTHORIZATION-TO BE COMPLETED WHEN OWNERS•AGENT OR CONTRACTOR APPLIES FOR BUILDING PERMIT I, Micheal Leahan as Owner of the subject property hereby aulhorhe direct Energy Solar to act at rnribe alf,in matte re five to work mrthorbmd by thla building permit application. s of Omer mete I. re ( Y d as OwnedAudx zed Agent hereby declare that the statements and information on the foregoing application are true and accurate,to the beat of my knowfodge and belief. titt t Signed urr the pahra and penalties of PorJury• Q/�T/ " Li e Print Name —~- Signature of Owne048"t Date Section 4, ZONING All Information Must Be Completed.Permit Can Be Denied Due To Incomplete Information Existing Proposed Required by Zoning This column to be filled in by Building Department Lot Size Frontage Setbacks Front Side R:� 44 -i Rear F.-. _A t (- Building Height Bldg. Square Footage % Open Space Footage ! i % 11 (Lot area minus bldg&paved I -___ 1 f_._ I_ E-77, -] E A parking) #of Parking Spaces �- ._....._ Fill; f _ (volume&Location) 4 V A. Has a Special Permit/Variance/Finding ever been issued for/on the site? NO DON'T KNOW (2f YES �J IF YES, date issued IF YES: Was the permit recorded at the Registry of Deeds? NO 0 DON'T KNOW O YES 0 P IF YES: enter Book Page _. - and/or Document#1 „ B. Does the site contain a brook, body of water or wetlands? NO 0 DON`T KNOW () YES IF YES, has a permit been or need to be obtained from the Conservation Commission? Needs to be obtained 0 Obtained , Date Issued C. Do any signs exist on the property? YES 0 NO (a IF YES, describe Size, type and location: t D. Are there any proposed changes to or additions of signs intended for the property? YES ® NO IF YES, describe size, type and location; E. Will the construction activity disturb(clearing,grading,excavation,or filling)over 1 acre or is it part of a common plan that will disturb over 1 acre? YES 0 NO a IF YES,then a Northampton Storm Water Management Permit from the DPW is required. I .. pepartment use on{y" City o No thamptontatus'of Permit^ ,� 4 ��lildi g D partment taurJa GutlJ�nyeway PermJt 1 2 Mai i Street oon i 100 Wateft .... AYai►ab►I{ty Der of sui`o'' I 4,11! pto , MA 01060 Tyro Sets of St<uetural Flans NORTHAMPTON, „?,,, phone - - Fax 413-587-1272 PJotls�fe Phis APPLICATION TO CONSTRUCT,ALTER, REPAIR, RENOVATE OR DEMOLISH A ONE OR TWO FAMILY DWELLING SECTION-1 -SITE INFORMATION 1.1 Property Address: This section to be completed by office 234 Spring Grove Ave. Map Lot Unit Florence , Ma. 01062 Zone Overlay District Elm St.District CB District SECTION 2-PROPERTY OWNERSHIPIAUTHORIZED AGENT 2.1 Owner of Record: Michael Leahan 234 Spring Grove Ave. Florence , Ma. 01062 i Name(Print) C,�rnnt 11AaiEinn Ar1drP.SS: i _ �3- $ � 2 Telephone S gnature 2,2 Authorized Agent: Robert Acevedo, 64 Maple St. Franklin , Ma. 02038 Name P' Current Mailing Address: q4 Signature Telephone I t SECTION 3-ESTIMATED CONSTRUCTION COSTS Item Estimated Cost(Dollars)to be Official Use Only completed by ermit applicant 1. Building [� {� ,. (a)Building Permit Fee 2. Electrical ,, 11 (b)Estimated Total Cost of J V Construction from 6 3. Plumbing Building Permit Fee 4. Mechanical (HVAC) 5.Fire Protection 6. Total= (1 +2+3+4+5) C? Check.Number This Section For Official Use Only ' Building Permit Number; Date issued; Signature: Building Commissionerlinspector of Buildings Date File#BP-2016-0627 APPLICANT/CONTACT PERSON ASTRUM SOLAR ADDRESS/PHONE 15 AVENUE E HOPKINTON01748(508)259-2387 PROPERTY LOCATION 234 SPRING GROVE AVE MAP 12C PARCEL 041 001 ZONE RI(100)/URA(100)/WSP(100)/ THIS SECTION FOR OFFICIAL USE ONLY: PERMIT APPLICATION CHECKLIST ENCLOSED REQUIRED DATE ZONING FORM FILLED OUT Fee Paid Building Permit Filled out Fee Paid Typeof Construction: INSTALL REOOF MOUNTED 16.175 KW SOLAR ARRAY New Construction Non Structural interior renovations Addition to Existing Accessory Structure Building Plans Included: Owner/Statement or License 057898 3 sets of Plans/Plot Plan THE FOJL'OWING ACTION HAS BEEN TAKEN ON THIS APPLICATION BASED ON INF,QRMATION PRESENTED: Approved Additional permits required(see below) PLANNING BOARD PERMIT REQUIRED UNDER:§ Intermediate Project: Site Plan AND/OR Special Permit With Site Plan Major Project: Site Plan AND/OR Special Permit With Site Plan ZONING BOARD PERMIT REQUIRED UNDER: § Finding Special Permit Variance* Received&Recorded at Registry of Deeds Proof Enclosed Other Permits Required: Curb Cut from DPW Water Availability Sewer Availability Septic Approval Board of Health Well Water Potability Board of Health Permit from Conservation Commission Permit from CB Architecture Committee Permit from Elm Street Commission Permit DPW Storm Water Management Demolition Delay �r t t ro 1 f .t„ ECG o tic C 1r 6 Signature of Building Official Date Note: Issuance of a Zoning permit does not relieve a applicant's burden to comply with all zoning requirements and obtain all required permits from Board of Health,Conservation Commission,Department of public works and other applicable permit granting authorities. *Variances are granted only to those applicants who meet the strict standards of MGL 40A.Contact Office of Planning&Development for more information. 234 SPRING GROVE AVE BP-2016-0627 GIS#: COMMONWEALTH OF MASSACHUSETTS Map:Block: 12C-041 CITY OF NORTHAMPTON Lot: -001 PERSONS CONTRACTING WITH UNREGISTERED CONTRACTORS Permit: Buildinq DO NOT HAVE ACCESS TO THE GUARANTY FUND (MGL c.142A) Category: SOLAR PANELS BUILDING PERMIT Permit# BP-2016-0627 Project# JS-2016-001046 Est. Cost: $56000.00 Fee: $75.00 PERMISSION IS HEREBY GRANTED TO: Const.Class: Contractor: License: Use Group: ASTRUM SOLAR 057898 Lot Size(sq. ft.): 13503.60 Owner: KRUEGER MARJORIE R&MICHAEL P LEAHAN Zoning: RI(100)/URA(100)/WSP(100)/ Applicant: ASTRUM SOLAR AT. 234 SPRING GROVE AVE Applicant Address: Phone: Insurance: 15 AVENUE E (508) 259-2387 WC HOPKINTONMA01748 ISSUED ON.111912015 0:00:00 TO PERFORM THE FOLLOWING WORK.-INSTALL ROOF MOUNTED 16.175 KW SOLAR ARRAY POST THIS CARD SO IT IS VISIBLE FROM THE STREET Inspector of Plumbing Inspector of Wiring D.P.W. Building Inspector Underground: Service: Meter: Footings: Rough: Rough: House# Foundation: Driveway Final: Final: Final: Rough Frame: Gas: Fire Department Fireplace/Chimney: Rough: Oil: Insulation: Final: Smoke: Final: THIS PERMIT MAY BE REVOKED BY THE CITY OF NORTHAMPTON UPON VIOLATION OF ANY OF ITS RULES AND REGULATIONS. Certificate of Occupancy Signature: FeeType: Date Paid: Amount: Building 11/9/2015 0:00:00 $75.00 212 Main Street,Phone(413)587-1240,Fax: (413)587-1272 Louis Hasbrouck—Building Commissioner