Loading...
38A-010 City of Northampton 212 Main Street Health Department Phone:(413)587-1215 Northampton,MA 01060 Food Establishment Inspection Report Fax:(413)587-1221 Name , of n Type of Inspection Gh r s kv Ph el 6 e C�hfi o0d Service ❑Routlne Address D Re-Ins ❑ Go V l c�c . Q p , t? ❑Residential Kitchen Telephone Risk Level []Mobile Suspect Illness 14 13_ S - 070 ❑Temporary ❑General Complaint 1111 Yes ANo ❑(,aterer ❑HACCP ❑Bed ano Breakfast 00ther In Charge(PIC) Name of Inspecto Non Compliance with ❑ Anti-Choking ❑Tobacco ❑ Allergen FOOD PROTECTION MANAGEMENT TIMEITEMPERATURE CONTROLS 1. PIC AssignedlKnowledgeabie/Duties INX OUT❑ N/A❑ N/0❑ 16.Cooking Temperatures IN❑ OUT❑ N/A❑ N/0A 17.Reheating IN❑ OUT❑ N/A❑ N/O❑ EMPLOYEE HEALTH 18.Cooling IN❑ OUT❑ N/A❑ N/0❑ 2.Reporting of Disease IN❑ OUT❑ WA❑ N/0 19.Hot end Colo Holding IN❑ OUT❑ N/A❑ N/0❑ 3.Personnel with Infections Restricted/Excluded IN❑ OUT❑ N/A❑ N/0 20.Time as a Public Health Contra IN❑ OUT❑ N/A❑ N/0❑ FOOD FROM APPROVED SOURCE REQUIREMENTS FOR HIGHLY SUSCEPTIBLE POPULATIONS(HSP 4.Food and Water from Approved Source IN 06UT❑ N/A❑ WO❑ 21.Posting and Food Preparation for HSP IN❑ OUT❑ N/A N/0❑ 5.ReoeMng/condlon IN❑ OUT❑ N/A❑ N/0❑ Non-critical Items 6.Tegs/RecordslAccuracy of Ingredient Statements IN❑ OUT❑ N/A❑ N/O❑ CONSUMER ADVISORY 7. Conformance with Approved Procedures/ IN❑ OUT❑ N/A❑ N/0❑ 22. Posting of Consumer Advisory IN❑ OUT❑ N/A N/0❑ HACCP Plans PROTECTION FROM CONTAMINATION VIOLATIONS RELATED TO GOOD RETAIL PRACTICES B. SeparatdonfSegregationlProtection I OUT❑ N/A❑ N/0❑ 23.Management and Personnel IN❑ OUT❑ N/A❑ N/0❑ 9. Food Contact Surfaces Cleaning and Sanitizing IN OUT❑ N/A❑ .N/0❑ 24.Food and Food Protection IN❑ OUT❑ N/A❑ N/0❑ 10.Handwash Facilities I OUT❑ N/A❑ N/0❑ P5.Equipment and Utensils IN❑ OUT❑ N/A❑ N/O❑ 26.Water,Plumbing and Waste IN❑ OUT❑ N/A❑ N/0❑ PERSONAL HYGIENE 27.Physical Facility IN❑ OUT❑ N/A❑ N/0 O 11.Proper Adequate Handwashing IN❑ OUT❑ N/A❑ N/O 26.Poisonous or Toxic Materials IN❑ OUT❑ N/A❑ N/0❑ 12.Good Hygiene Practices IN❑ OUT❑ N/A❑ N/0��jj 29.01her Retail Practice Items IN❑ OUT❑ N/A❑ N/0❑ 13.Prevention of Contamination from Hands IN❑ OUT❑ WA❑ N/0❑ PROTECTION FROM CHEMICALS 14.Approved Food Color or Additives INX OUT❑ N/A❑ N/0❑ 15.Toxic Chemicals IN)K OUT❑ N/A❑ N/0❑ Violations Related to Food Some Illness Risk Factors Violations marked may pose an immInent health hazard and require immediate corrective action as determined by the Board of Health Number of Violations Related to Food Borne Illness Risk Factors Based on an inspection today,the Inspection Criteria checked Indicate violated provisions of 105 CMR 590.000/Federal Food Code(FC). Each violation has an explanation in the narrative potion of the report THIS REPORT WHEN SIGNED BY A BOARD OF HEALTH MEMBER OR R'S AGENT SERVES AS OFFICIAL ER OF T BOARD HEALTH,Th FAILURE TO COMPLY MAY RESULT IN THE SUSPENSION OR REVOCATION OF YOUR FOOD ESTABLISHMENT PERMIT AND CESSATION OF FOOD ESTABLISHMENT OPERATIONS. Violated provisions must be corrected by tie scheduled date of the re-inspection. if aggrieved by this order,you have a right to a hearing. Your requestmustbein wriling and submitted to the Board of Health at the above address within 10 days of receipt of this order. Item Code C-Critical Narrative of Items Checked Above Violation Date # Reference Corrected Verified Inspector Sig.: Print Name: - - a1yG S�✓ PIC Sig: Print Name: V"� 1j Page 1 of Operation 0 Pneumatic 0 Electric Hydraulic Piping Supervised 0 Yes 0 No Detecting Media Supervised 0 Yes No Does valve operate from the manual trip,remote,or both control stations? ❑ Yes ❑ No Is there an accessible facility in each circuit for testing? If no,explain Deluge& ❑ Yes ❑ No Preaction Does each circuit operate Doe each circuit operate valve Maximum time to operate Valves Make Model supervision loss alarm? release? release N/A Yes No Yes No Min Sec Location Make and Residual Pressure Pressure and Floor Model Setting Static Pressure (flo n Flow Rate Reducing N/A Inlet(psi) Outlet si Inlet(psi) Outlet(psi) Flow m Valve Test HYDROSTATIC: Hydrostatic tests shall be made at not less than 200 psi(13.6 bar)for two hours or 50 psi(3.4 bar)above static pressure in excess of 150 psi(10.2 bar)for two hours. Differential dry-pipe valve clappers shall be left open during the test to prevent Test damage. All aboveground piping leakage shall be stopped. Description PNEUMATIC:Establish 40 psi(2.7 bar)air pressure and measure drop,which shall not exceed 1 '/2 psi(0.1 bar)in 24 hours. Test pressure tanks at normal water level and air pressure and measure air pressure drop,which shall not exceed 1 '/2 psi(0.1 bar)in 24 hours. All piping hydrostatically tested at 200 psi for 2 hours ®Yes ❑ No If no,state reason:Partial System–not required Dry piping pneumatically tested ❑ Yes ❑ No Tested at system pressure. Equipment o erates properly ® Yes No Do you certify as the sprinkler contractor that additives and corrosive chemicals,sodium silicate or derivatives of sodium silicate,brine, or other corrosive chemicals were not used for testing system or stopping leaks? ® Yes ❑ No Drain Reading of gauge located near water supply test connection Residual pressure with valve in test connection open wide Tests Test —psi bar --psi(—bar) Underground mains and lead-in connections to system risers flushed before connection made to sprinkler piping Verified by copy of the U Form No.85B ❑ No Other Explain Flushed by installer of underground sprinkler piping ❑ Yes ❑ No Existing UG Service If powder-driven fasteners are used in concrete,has ® Yes ❑ No If no,explain representative sample testing been satisfactorily completed? Blank Number Used Locations Number Removed Testing Gaskets Welded Piping YES If Yes... Do you certify as the sprinkler contractor that welding procedures comply with the Requirements of at least AWS B2.1? ® Yes ❑ No Do you certify that the welding was performed by welders qualified in compliance Welding With the requirements of at least AWS B2.1? ® Yes ❑ No Do you certify that welding was carried out in compliance with a documented quality Control procedure to insure that all discs are retrieved,that openings in piping are Smooth,that slag and other welding residue are removed,and that the internal Diameters of piping are not penetrated? ® Yes ❑ No Cutouts Do you certify that you have a control feature to ensure that all cutouts(discs)are Discs Retrieved? ® Yes ❑ No Hydraulic Nameplate provided ® Yes No If no,explain :On as-builts Data Nameplate Remarks Name of Sprinkler Contractor LEGACY FIRE PROTECTION,INC Tests se Signatures F r property owner(printed name) Signature Title Date orsprinkler contractor(printed name Signature Title Date Additional Explanation and Notes: l � � Z T�t9t?' r'C�✓ � D�' rr'��' �id + M� t S� �(Gv1 � M " 27sz�, Contractor's Material and Test Certificate for Aboveground Piping PROCEDURE Upon completion of work,inspection and tests shall be made by the contractor's representative and witnessed by an owner's representative (hereinafter defined as property owner). All defects shall be corrected and system left in service before contractor's personnel finally leave the job. A certificate shall be filled out and signed by both representatives. Copies shall be prepared for approving authorities,owners,and contractor.It is understood that the property owner's authorized representative is a legal signatory and fully representative of the property owner and that by the property owner's or property owner's authorized representative's signature,the property owner accepts full responsibility for the system as installed and agrees that it is in compliance with the applicable approving authority's_requirements and local ordinances. Property Name: Christopher Heights Date: Property Address: 50 Village Hill Road Northampton,MA Accepted by Approving Authorities(Names): Northampton Fire Department Address:Northampton,MA Plans Installation conforms to accepted Plans ® Yes ❑ No Equipment used is approved ® Yes ❑ No If no,explain deviations Has the property owner or property owner's authorized representative been instructed as to the location of control valves and care and maintenance of this new equipment? ® Yes ❑ No If no,explain Have copies of the following been given to the property owner or property Instruction owner's authorized representative? 1. System Components Instructions ® Yes ❑ No 2. Care and Maintenance Instructions ® Yes ❑ No 3. NFPA 25 ® Yes ❑ No Location Supplies Buildings—Floor— Of System Year Temperature Make Model of Manufacture Orifice Size Quantity Rating Reliable RFC49 2015 '/2"K=4.9 90 155° Sprinklers Reliable F1 RES44HSW 2015 '/_"K=4.9 250 155° Reliable FlFRS49 2015 Y2 K=4.9 104 155° Reliable F1 FR56 2015 '/z"K=4.9 72 1 155° Pipe and Type of Pipe Sch 10,Sch 40 Black Steel Fittings Type of Fittings Cl Class 125 and Grooved End&Mechanical Joint Fittings Maximum time to operate Alarm Device through test connection Alarm Valve or Flow Type Make Model Minutes Seconds Indicator p.i S..}c h fe a 'e W Pb 60'r.Al Dry Valve I Q.O.D. Make Model Serial No. Make Model Serial No. N/A Time to trip Trip Point Time Water through test Water Air Air Reached Test Alarm Operated Properly Dry Pipe connection' Pressure Pressure Pressure Outlet" Operating Min/Sec psi psi psi Min/Sec Yes No Test w/o Q.O.D. with Q.O.D. If No,explain "measured from time inspectors test opened NFPA 13 only requires the 60-second limitation inspecific sections Final Construction Control Document To be submitted at completion of construction by a tee Registered Design Professional for work per the 8`"edition of the SJO� Massachusetts State Building Code, 780 CMR, Section 107 Project Title: Residence at Christopher Heights Date:11/5/15 Permit No. Property Address: The Residence at Christopher Heights,Northampton,MA Project: Check(x)one or both as applicable: x New construction x Existing Construction Project description: Installation of automatic sprinklers 1 Scott Henderson MA Registration Number: 46553 Expiration date: 6/30/16 ,am a registered design professional, and I have prepared or directly supervised the preparation of all design plans,computations and specifications concerning: Architectural Structural Mechanical X Fire Protection Electrical Other: Describe for the above named project. I, or my designee,have performed the necessary professional services and was present at the construction site on a regular and periodic basis.To the best of my knowledge, information,and belief the work proceeded in accordance with the requirements of 780 CMR and the design documents approved as part of the building permit and that I or my designee: 1. Have reviewed, for conformance to this code and the design concept, shop drawings, samples and other submittals by the contractor in accordance with the requirements of the construction documents. 2. Have performed the duties for registered design professionals in 780 CMR Chapter 17, as applicable. 3. Have been present at intervals appropriate to the stage of construction to become generally familiar with the progress and quality of the work and to determine if the work was performed in a manner consistent with the construction documents and this code. Nothing in this document relieves the contractor of its responsibility regarding the provisions of 780 CMR 107. Scott D. Enter in the space to the right a"wet"or Henderson electronic signature and seal: '�"E " 2015.11 .05 Legacy Fire Protection,Inc. '00'05- 10:30:44 Phone number:413-221-3399 Email: scott—henderson@charter.net Building Official Use Only Building Official Name: Permit No.: Date: Version 06 11 2013 LETTER OF COMPLIANCE/WARRANTY Date: 10/9/15 Contractor: Legacy Fire Protection, Inc. 592 Center Street P.O. Box Ludlow, Ma. 01056 Proiect: The Residences at Christopher Heights 50 Village Hill Road Northampton, MA Legacy Fire Protection, Inc. does hereby assures/warrants that all fire protection work performed at the above referenced location has been installed in compliance with the approved Fire Protection Construction Documents and conforms to NFPA 13 and MBC 780 CMR 903.3, 8th Edition. Legacy Fire hereby agrees to repair or replace any or all of the work which may prove to be defective in workmanship or materials, which requires repair or replacement, within a period of one (1)year from 11/09/15 ordinary wear and tear, unusual abuse, neglect or damage from failure to perform routine maintenance excepted. In the event of defects and the necessity of making repairs,the Owner will immediately notify the above contractor in writing of its conditions and shall give the contractor reasonable time in which to make said repairs. If any person,firm or corporation other than Legacy Fire Protection, Inc. has, since the completion of the above work, performed or attempted to perform any repairs to the property,then this warranty could become null and void. Legacy Fire Protection, Inc. Authorized by: Date: 10/9/15 Title: re ident Final Construction Control Document F To be submitted at completion of construction by a Registered Design Professional for work per the 8th edition of the Massachusetts State Building Code, 780 CMR, Section 107 Project Title: Residence at Christopher Heights Date:1 1/5/15 Permit No. Property Address: The Residence at Christopher Heights,Northampton,MA Project: Check(x)one or both as applicable: x New construction x Existing Construction Project description: Installation of automatic sprinklers I Scott Henderson MA Registration Number: 46553 Expiration date: 6/30/16 ,am a registered design professional, and I have prepared or directly supervised the preparation of all design plans,computations and specifications concerning: Architectural Structural Mechanical X Fire Protection Electrical Other: Describe for the above named project. I,or my designee,have performed the necessary professional services and was present at the construction site on a regular and periodic basis.To the best of my knowledge, information,and belief the work proceeded in accordance with the requirements of 780 CMR and the design documents approved as part of the building permit and that I or my designee: 1. Have reviewed, for conformance to this code and the design concept, shop drawings, samples and other submittals by the contractor in accordance with the requirements of the construction documents. 2. Have performed the duties for registered design professionals in 780 CMR Chapter 17, as applicable. 3. Have been present at intervals appropriate to the stage of construction to become generally familiar with the progress and quality of the work and to determine if the work was performed in a manner consistent with the construction documents and this code. Nothing in this document relieves the contractor of its responsibility regarding the provisions of 780 CMR 107. Enter in the space to the right a"wet"or electronic signature and seal: '`�� � �� �SCOTTD. Legacy Fire Protection,Inc. �l A-1 NO'46553Tf olv y Phone number: 413-221-3399 Email: scott henderson@charte �FG� Building Official Use Only Building Official Name: Permit No.: Date: Version 06 11 2013 HYDRONIC PUMP TEST REPORT PROJECT Christopher Heights DATE 10/26/2015 PUMP NO. P-1 P-2 P-3 P-4 PUMP MFR'R B&G B&G B&G B&G PUMP SIZE E1510 E1510 E90 E90 IMPELLER SIZE 7.25" 7.25" 6.15" 6.15" PUMP LOCATION Basement Basement Basement Basement AREA SERVED Hot Water Hot Water Boilers Boilers GPM DESIGN 115 115 96" GPM ACTUAL 102 103 T.D.H. DESIGN 50.0' 50.0' 10. 1' 10.0' T.D.H.ACTUAL .0' 0' 19.7' 19.9' DISCHARGE PRESSURE 89.5' 95.0' SUCTION PRESSURE 69.8' 75.1' NO FLOW T.D.H. 29.9' 30.2' SYSTEM PRESSURE -` 35 PSI 35 PSI VOLTAGE/PHASE 20813 208/3 208/3 208/3 AMPS RATED 8.4 8.4 1.6 1.6 AMPS ACTUAL 2.7/2.5/2.5 2.5/2.7/2.5 MOTOR MFR'R, '" Baldor Baldor Baldor Baldor MOTOR HP 3 3 1/2 1/2 MOTOR RAM 1765 1765 1740 1740 MOTOR S.F. 1.15 1.15 1.25 1.25 i MOTOR FRAME 182T 182T 56J 56J T.D.V. SETTING 100% Open 100% Open T/A Set 4.5 T/A Set 4.5 LABCO Air and Water Balancing, LLC. 11/05/2015 30 HYDRONIC ELEMENT REPORT LOCATION: NO. BALANCE VALVE DESIGN DESIGN FINAL FINAL FINAL %OF Christopher Heights SIZE MFGR GPM °P SETTING °P GPM DES. FTR 11' Room 316 97 3/4" Taco 0.71 1.38 FTR 18' Room 314 98 3/4" Taco 1.17 3.74 FTR 11' Room 312 99 3/4" Taco 0.71 1.38 FTR 17' Room 310 100 3/4" Taco 1.1 3.31 Pump Total 118.1 0°.0 fi ._ LABCO Air and Water Balancing, LLC. 11/05/2015 29 HYDRONIC ELEMENT REPORT LOCATION: NO. BALANCE VALVE DESIGN DESIGN FINAL FINAL FINAL %OF Christopher Heights SIZE MFGR GPM °P SETTING °P GPM DES. FTR 11' Room 264 45 3/4" Taco 0.71 1.38 FTR 10' Room 262 46 3/4" Taco 0.65 1,16 FTR 16' Room 256 47 3/4" Taco 1 2.74 FTR 10' Room 254 48 3/4" Taco 0.65 1.16 FTR 28' Room 252 49 3/4" Taco 1.8 8.86 FTR 15' Room 250 50 3/4" Taco 0.97 2.57 FTR 18' Room 248 51 3/4" Taco 1.2 3.94 FTR 4' Nurse 242 52 3/4" Taco 0.26 0.18 FTR 22' Room 240 53 3/4" Taco 1.4 5.36 FTR 10' Room 238 55 3/4" Taco 0.65 1.16 FTR 14' Room 236 56 3/4" Taco 0.91 2.27 FTR 16' Room 234 57 3/4" Taco 1 2.74 FTR 11' Room 232 58 3/4" Taco 0.71 1.38 FTR 11' Room 230 59 3/4" Taco 0.71 1.38 FTR 10' Room 228 60 3/4" Taco 0.65 116 FTR 24' Room 226 61 3/4" Taco 1.56 6.66 FTR 27' Room 224 62 3/4° Taco 1.75 8.38 FTR 16' Room 222 63 3/4" Taco 1 2.74. FTR 10' Room 220 64 3/4° Taco 0.65 ,z r.rr 1 16 FTR 10' Room 218 65 3/4° Taco 0.65 1.1`6 FTR 9' Room 216 66 3/4° Taco 0.58 0.92 FTR 13' Room 214 67 3/4" Taco.` 0,84 1.93 FTR 10' Room 212 68 3/4" Taco 0.65 1.16 FTR 16' Room 210 69 3/4" Taco "I . :2.74 Third Floor Print M-9 FTR 11' Room 378 70 3/4° Taco ,0.71 1.38 FTR 10' Room 376 71 3/4" Taco 0.65 116 FTR 10' Room 374 72 3/4' Taco 0.65 1.16 FTR 13' Room 372 73 3/4" 'taco 0.845 1.95 FTR 17' Room 370 A 3/4° Taco 1.1 3.31 FTR 27' Room 368 -.75 3/4" Taco 1.75 8.38 FTR 12' Room 366 76 3[4" Taco 0.78 1.66 FTR 12' Room 364 77 3/4" Taco 0.78 1.66 FTR 11' Room 362 :78 3/4° Taco 0.71 1.38 FTR 17' Room 356 79 3i " Taco 1.1 3.31 FTR 11' Room 354 X80 F-3/4° Taco 0.71 1,38 FTR 31' Room 352.�,- 3/4" Taco 2 10.94 FTR 17' Room 350,-,; 82 3/4° Taco 1.1 131 FTR 20' Room.349-1,-; `83 3/4" Taco 1.3 4.62 FTR 4' Stofia 343 84 3/4" Taco 0.26 0.18 FTR 2$f Room 340 85 3/4" Taco 1.7 7.91 FTR 11'Room_338 86 3/4^ Taco 0.71 1.38 FTR 15' Room"336 87 3/4" Taco 0.97 2.57 ................ FTR 16' Room 334 88 3/4" Taco 1 2.74 FTR 12' Room, 89 3/4" Taco 0.78 1.66 FTR 12' Room 330 90 3/4" Taco 0.78 1.66 FTR 11' Room 328 91 3/4" Taco 0.71 1.38 FTR 30' Room 326 92 3/4" Taco 1.95 10.40 FTR 17' Room 324 93 3/4" Taco 1.1 3.31 FTR 17' Room 322 94 3/4" Taco 1.1 3,31 FTR 10' Room 320 95 3/4" Taco 0.65 1.16 FTR 10' Room 318 96 3/4" Taco 0.65 1,16 LABCO Air and Water Balancing, LLC. 11/05/2015 28 HYDRONIC ELEMENT REPORT LOCATION: NO. BALANCE VALVE DESIGN DESIGN FINAL FINAL FINAL %OF Christopher Heights SIZE MFGR GPM °P SETTING °P GPM DES. P-3 Total 1 3" T/A 96 4.5 10.7' 102 106% P-4 Total 1 3" T/A 96 4.5 10.9' 103 107% P-1 & P-2 Basement Print M-6 FCU-1 Mech Rm. 030 1 Taco 5.8 UH-1 Mech Rm. 030 2 Taco 5.3 FTR Corridor 020 3 Taco 0.7 CUH-6 Receiving 028 4 Taco 12 FTR Kitchen 014 5 Taco 0.4 UH-2 Sprinkler Rm. 026 6 Taco 0.3 CUH-2 Stair 2 7 Taco 0.5 CUH-1 Stair 2 8 Taco 0.5 FCU-2 Storage 008 9 Taco 5.8 FTR Staff Lounge 012 10 Taco 0.5 UH-3 Storage 008 11 Taco 0.3 First Floor Print M-7 CUH-3 Stair 1 12 3/4" Taco 1 2,74 FTR 11' Room 150 13 3/4^ Taco 0.71 1:38 FTR 31' Room 149 14 3/4" Taco 2 10.94 FTR 22' Room 148 15 3/4" Taco 1.43 5.59 FTR 14' Room 146 16 3/4° Taco 0.91 ? x 2.27 FTR 11' Room 144 17 3/4" Taco s 0.7,1 1.38 FTR 12' Room 143 18 3/4° ;r Taco 0.78��. 1.66 CUH-3Vestubule 102 19 3/4" TacS -� 3 24.62 FTR 11' Room 168 20 3/4" ' Taco 0,71 1.38 FTR 10' Room 166 21 3/4° -Ths Taco 0.65 116 FTR 10' Room 164 22 3/4" Taco 0.65 1.16 FTR 11' Room 162 23 3/4° tko 0.71 1.38 FTR 24' Room 160 24 3/4" Taco 1.56 6.66 FTR 27' Room 158 25 - 3/4,, Taco 1.75 8.38 FTR 12' Room 156 : 26fi? 3/4±� Taco 0.78 1.66 FTR 15' Room 136 27` 3/4" Taco 0.97 2.57 FTR 1 T Room 134 'S °28 '3/4" Taco 1.1 3.31 FTR 12' Room 132 29 3/4" Taco 0.78 1.66 FTR 12' Room 130 30 3/4" Taco 0.78 1.66 FTR 11' Room 128 , i . r 31 3/4° Taco 0.71 1.38 FTR 30' Roorn 126 ,3, 32 3/4" Taco 1.95 10,40 FTR 24' R666:124 33 3/4" Taco 1.56 6.66 FTR 14' Room 122 34 3/4" Taco 0.91 2.27 CUH-5-Stair 3 35 3/4" Taco 1 2,74 FTR 11' RooM 120 36 3/4" Taco 0.71 1.38 FTR 11' R&6 -118 37 3/4" Taco 0.71 1.38 Second Floor Print M-8 FTR 10' Room 278 38 3/4" Taco 0.65 116 FTR 10' Room 276 39 3/4" Taco 0.65 1.16 FTR 10' Room 274 40 3/4" Taco 0.65 1.16 FTR 10' Room 272 41 3/4" Taco 0.65 1.16 FTR 12' Room 270 42 3/4° Taco 0.78 1.66 FTR 19' Room 268 43 3/4" Taco 1.2 194 FTR 11' Room 266 44 3/4" Taco 0.71 138 LABCO Air and Water Balancing, LLC. 11/05/2015 27 VELOCITY PRESSURE TRAVERSE REPORT LOCATION: DUCT AREA DESIGN ACTUAL STATIC %OF Christopher Heights WIDTH HEIGHT (ft) CFM FPM FPM CFM PRESS. DESIGN REF-7 Riser#1 8 Rd 0.349 150 430 453 158 Riser#2 14 6 0.583 300 514 548 320 Riser#3 14 6 0.583 300 514 541 316 Riser#4 14 6 0.583 250 429 448 261 Riser#5 10 6 0.417 150 360 379 158 Riser#6 8 Rd 0.349 100 286 309 10$ Fan Total By Risers 1,250 1,320 1066/6 REF-8 Riser#1 10 8 0.556 300 540 533 296 _ Riser#2 8 Rd 0.349 150 430 415 145 Riser#3 10 6 0.417 150 360 373 155 Riser#4 13 7 0.632 300 475 470 297 Riser#5 10 8 0.556 300 540 , 548 304 Riser#6 10 6 0.417 200 480 484 202 Riser#7 10 6 0.417 150 360 364 152 Riser#8 14 6 0.583 250 429 431 251 Riser#9 10 6 0.417 200 480 ;, 458 191 Riser#10 8 6 0.333 100 300 '- 317 106 Fan Total By Risers 2,100 2,099 100% REF-9 Riser#1 8 Rd 0.349 150 430 410 143 Riser#2 8 Rd 0.349 150 430 415 145 Riser#3 8 Rd 0.349 150 430 438 153 Riser#4 8 Rd 0.349 150 430 411 143 Riser#5 8 Rd 0.349 100 286 289 101 Riser#6 8 Rd 0.349 100 286 282 98 Fan Total By Risers 800 784 98% LABCO Air and Water Balancing, LLC. 11/05/2015 26 • AIR OUTLET TEST REPORT LOCATION: GR. OUTLET AREA K AK DESIGN ACTUAL %OF Christopher Heights NO. SIZE (ft ) CFM FPM FPM CFM DESIGN One Bedroom Type A 149 21 6X6 0.25 0.75 0.188 20 107 107 20 Toilet Room 149 22 6X6 0.25 0.75 0.188 30 160 172 32 1st Floor Riser 2 One Bedroom Type C 148 23 6X6 0.25 0.75 0.188 20 107 96, 18 Toilet Room 148 24 6X6 0.25 0.75 0.188 30 160 136 ° 26 1st Floor Riser 3 Alcove Studio Type C 146 25 6X6 0.25 0.75 0.188 20 107 100 19 Toilet Room 146 26 6X6 0.25 0.75 0.188 30 160 158 30 1st Floor Riser 4 Studio Type A 150 27 6X6 0.25 0.75 0.188 20 107 42 8 Toilet Room 150 28 6X6 0.25 0.75 0.188 30 1160 187 35 1st Floor Riser 6 Studio Type A 144 29 6X6 0.25 0.75 0.188 20 107 _ 94 18 Toilet Room 144 30 6X6 0.25 0.75 0.188 30 160 132 25 Alcove Studio Type B 143 31 6X6 0.25 0.75 0.188 20 107 84 16 Toilet Room 143 32 6X6 0.25 0.75 0,1.8ol 30 X 160 153 29 Fan Total 800 775 97% CEF-1 Elevator Room 018 1 11x9 Single Speed �. 110 173 157% CEF-2 Toilet 002 1 11x9 Single Speed 75 109 145% CEF-3 Staff Lounge 012 1 12x10 Single S eed 220 235 107% CEF-4 Toilet 004 1 11x9, Single Speed 75 104 139% CEF-5 Laundry 286 1 12x12 Set Speed Control 200 206 103% CEF-6 Laundry 386,,,-' 1 1.2x12 Set Speed Control 200 207 104% CEF-7 Tub Room 280 1 12x12 Set Speed Control 200 204 102% CEF-8 Janitor 006 1 11x9 Sin le Speed 75 96 128% CEF-9 L60,d.`A M 1 11x9 Set Speed Control 100 97 97% CEF'-?Electric Room 024 1 11x9 Single Speed 200 212 106% LABCO Air and Water Balancing, LLC. 11/05/2015 25 AIR OUTLET TEST REPORT LOCATION: GR. OUTLET AREA K AK DESIGN ACTUAL %OF Christopher Heights NO. SIZE (ft') CFM FPM FPM CFM DESIGN Toilet Room 130 74 6x6 0.25 0.7 0.175 30 171 143 25 Alcove Studio Type B 132 75 6x6 0.25 0.7 0.175 20 114 119 21 Toilet Room 132 76 6x6 0.25 0.7 0.175 30 171 159 .28 1st Floor Riser 5 Studio Type A 118 77 6x6 0.25 0.7 0.175 20 114 89 16 Toilet Room 118 78 6x6 0.25 0.7 0.175 30 171 115 20 Studio Type A 120 79 6x6 0.25 0.7 0.175 20 114 83 15 Toilet Room 120 80 6x6 0.25 0.7 0.175 30 171 153 27 1st Floor Riser 7 Studio Type G 134 81 6x6 0.25 0.7 0.175 20 114 73 13 Toilet Room 134 82 6x6 0.25 0.7 0.175 30 171 187 33 1st Floor Riser 8 Alcove Studio Type D 136 83 6x6 0.25 0.7 0.175 X20 114 56 10 Toilet Room 136 84 6x6 0.25 0.7 0.175 30 171 164 29 Fan Total 2,1,00 2,119 101% REF-9 3rd Floor Riser 1 One Bedroom Type A 352 1 6X6 0.25 0,75 0.188 20' 107 120 23 Toilet Room 352 2 6X6 0.25 0:76 0.186 - 30 160 172 32 3rd Floor Riser 2 Studio Type B 350 3 6)(8':-1--, 0.25 0.75 0.188 20 107 85 16 Toilet Room 350 4 6X6 0.25 0; 8. 0.188 30 160 151 28 3rd Floor Riser 3 Alcove Studio Type C 348 5 6X6 0.25 , 0.75 0.188 20 107 114 21 Toilet Room 348 6 6X6 `0.25 0.75 0.188 30 160 181 34 3rd Floor Riser 4 Studio Type A 354 7'`_ 6X6 0.25 0.75 0.188 20 107 134 25 Toilet Room 354 8 6X6 0.25 0.75 0.188 30 160 192 36 3rd Floor Riser 5 Studio Type E 356 9,;, 6X6 0.25 0.75 0.188 20 107 105 20 Toilet Room 356 10 6X6 0.25 0.75 0.188 30 160 165 31 2nd Floor Riser 1 One Bedroom Type A 252 11 6X6 0.25 0.75 0.188 20 107 48 9 Toilet Room 252 12 6X6 0.25 0.75 0.188 30 160 167 31 2nd Floor Riser 2 Studio Type B 250 13 6X6 0.25 0.75 0.188 20 107 63 12 Toilet Room 250 14 6X6 0.25 0.75 0.188 30 160 135 25 2nd Floor Riser 3 Alcove Studio Type C 248 15 6X6 0.25 0.75 0.188 20 107 105 20 Toilet Room 248 16 6X6 0.25 0.75 0.188 30 160 145 27 2nd Floor Riser 4 Studio Type A 254 17 6X6 0.25 0.75 0.188 20 107 117 22 Toilet Room 254 18 6X6 0.25 0.75 0.188 30 160 180 34 2nd Floor Riser 5 Studio Type E 256 19 6X6 0.25 0.75 0.188 20 107 124 23 Toilet Room 256 20 6X6 0.25 0.75 10.188 30 160 168 32 1st Floor Riser 1 LABCO Air and Water Balancing, LLC. 11/05/2015 24 AIR OUTLET TEST REPORT LOCATION: GR. OUTLET AREA K AK DESIGN ACTUAL %OF Christopher Heights NO. SIZE (ft) CFM FPM FPM CFM DESIGN One Bedroom Type A 226 37 6x6 0.25 0.7 0.175 20 114 96 17 Toilet Room 226 38 6x6 0.25 0.7 0.175 30 171 144 25 2nd Floor Riser 3 Studio Type A 228 39 6x6 0.25 0.7 0.175 20 114 129 23 Toilet Room 228 40 6x6 0.25 0.7 0.175 30 171 161 28 2nd Floor Riser 4 Alcove Studio Type B 230 41 6x6 0.25 0.7 0.175 20 114 160 28 Toilet Room 230 42 6x6 0.25 0.7 0.175 30 171 199 35 Alcove Studio Type B 232 43 6x6 0.25 0.7 0.175 20 114 131 23 Toilet Room 232 44 6x6 0.25 0.7 0.175 30 171 201 35 2nd Floor Riser 5 Alcove Studio Type A 218 45 6x6 0.25 0.7 0.175 20 114 95 17 Toilet Room 218 46 6x6 0.25 0.7 0.175 30 171 131 23 Alcove Studio Type A 2220 47 6x6 0.25 0.7 0.175 20, 114 93 16 Toilet Room 220 48 6x6 0.25 0.7 0.175 30 171 143 25 2nd Floor Riser 6 Alcove Studio Type G 214 49 6x6 0.25 0.7 0.175 "20 114 186 33 Toilet Room 214 50 6x6 0.25 0:L 0.175 30 171 198 35 Studio Type A 216 51 6x6 0.25 0.7 0.175 20 114 155 27 Toilet Room 216 52 6x6 0.25 07 0.175 30 171 204 36 2nd Floor Riser 7 Alcove Studio Type F 234 53 6x6 . 0.25 0.7 0.175 20 114 114 20 Toilet Room 234 54 6x6= 015 0.7 0.175 30 171 157 27 2nd Floor Riser 8 Alcove Studio Type D 236 55 6X6 0,25 0.7 0.175 20 114 89 16 Toilet Room 236 56 6x6 0.25 1 0.7 0.175 30 171 137 24 Studio Type A 238 57 6x6 ,70.25 1 0.7 0.175 20 114 105 18 Toilet Room 238 58 6x6 0.25 0.7 0.175 30 171 149 26 2nd Floor Riser 9 Studio Type C 212 59 6X6 0.25 0.7 0.175 20 114 49 9 Toilet Room 212 60 6x6 0.25 0.7 0.175 30 171 167 29 Studio Type D 210 61 6x6 0.25 0.7 0.175 20 114 128 22 Toilet Room 210 , 62 6x6 0.25 1 0.7 0.175 30 171 182 32 2nd Floor Riser 10 One Bedroom T �;B 240, � 63 6x6 0.25 0.7 0.175 20 114 124 22 Toilet Room 24.0 64 6x6 0.25 0.7 0.175 30 171 179 31 1st Floor Riser 1 Studio Type F 122::!!i 65 6x6 0.25 0.7 0.175 20 114 109 19 Toilet Room 122" 66 6x6 0.25 0.7 0.175 30 171 161 28 One Bedroom-T" e C 124 67 6x6 0.25 0.7 0.175 20 114 106 1 19 Toilet Room 124 68 6x6 0.25 0.7 0.175 30 171 173 30 1st Floor Riser 2 One Bedroom T "e A 126 69 6x6 0.25 0.7 0.175 20 114 96 17 Toilet Room 126 70 6x6 0.25 0.7 0.175 30 171 1 133 23 1st Floor Riser 3 0.7 Studio Type A 128 71 6x6 0.25 0.7 0.175 20 114 107 19 Toilet Room 128 72 6x6 0.25 0.7 0.175 30 171 131 23 1st Floor Riser 4 Alcove Studio Type B 130 73 6x6 0.25 0.7 0.1751 20 114 106 19 LABCO Air and Water Balancing, LLC. 11/05/2015 23 AIR OUTLET TEST REPORT LOCATION: GR. OUTLET AREA K AK DESIGN ACTUAL %OF Christopher Heights NO. SIZE (ft') CFM FPM FPM CFM DESIGN REF-8 3rd Floor Riser 1 Alcove Studio Type E 322 1 6x6 0.25 0.7 0.175 20 114 161 28 Toilet Room 322 2 6x6 0.25 0.7 0.175 30 171 144 25 Studio Type B 324 3 6x6 0.25 0.7 0.175 20 114 117 20 Toilet Room 324 4 6x6 0.25 0.7 0.175 30 171 160 28 3rd Floor Riser 2 One Bedroom Type A 326 5 6x6 0.25 0.7 0.175 20 114 101 18 Toilet Room 326 6 6x6 0.25 0.7 0.175 30 171 143 25 3rd Floor Riser 3 Studio Type A 328 7 6x6 0.25 0.7 0.175 20 114 97 17 Toilet Room 328 8 6x6 0.25 0.7 0.175 30 171 159 28 3rd Floor Riser 4 Alcove Studio Type B 330 9 6x6 0.25 0.7 0.175 20 114 144 25 Toilet Room 330 10 6x6 0.25 0.7 0.175 30 171 193 34 Alcove Studio Type B 332 11 6x6 0.25 0.7 0.175 20 114- 163 29 Toilet Room 332 12 6x6 0.25 0,17 0.175 30 :,171 231 40 3rd Floor Riser 5 Alcove Studio Type A 318 13 6x6 0.21 0.7 0.175 20 114 113 20 Toilet Room 318 14 6x6 0.25. b.7 0.175 30° 171 158 28 Alcove Studio Type A.320 15 6x6 0.25 0.7° .0.175' 20 114 146 26 Toilet Room 320 16 6x&-,.,,, 0.25 0.7 0.175 30 171 170 30 3rd Floor Riser 6 Alcove Studio Type G 314 17 6x6 ,0.25 0.7 0.175 20 114 176 31 Toilet Room 314 18 5X6 -0.25 0.7 0.175 30 171 235 41 Studio Type A 316 19 6x5 .,� 0.25 0.7 0.175 20 114 144 25 Toilet Room 316 20 6x6 0.25 0.7 0.175 30 171 197 34 3rd Floor Riser 7 Alcove Studio Type F 334 21 6x6'" 0.25 0.7 0.175 20 114 153 27 Toilet Room 334 22 6x5 0.25 0.7 0.175 30 171 215 38 3rd Floor Riser 8 Alcove Studio Type D 336 23 "° 6x6 0.25 0.7 0.175 20 114 139 24 Toilet Room 336 , .. 24" 6x6 0.25 0.7 0.175 30 171 178 31 Studio Type A 338 ,, 25 6x6 0.25 0.7 0.175 20 114 122 21 Toilet Room 338`` e 26 6x6 0.25 0.7 0.175 30 171 164 29 3rd Floor Rimer 9 Studio T e C'112, 27 6x6 0.25 0.7 0.175 20 114 123 22 Toilet RpOM 312 �a 28 6x6 0.25 0.7 0.175 30 171 175 31 Studio , e D 3't0 29 6x6 0.25 0.7 0.1751 20 114 143 25 Toilet Rom X10` 30 6x6 0.25 0.7 0.175 30 171 200 35 3L4 Floor Riser 10 One Bedroom l= B 340 31 6x6 0.25 0.7 0.175 20 114 112 20 Toilet Room 340` 32 6x6 0.25 0.7 0.175 30 171 188 33 2nd Floor Riser 1 Alcove Studio Type E 222 33 6x6 0.25 0.7 0.1751 20 114 104 18 Toilet Room 222 34 6x6 0.25 0.7 0.175 30 171 177 31 Studio Type B 224 35 6x6 0.25 0.7 0.175 20 114 119 21 Toilet Room 224 36 6x6 0.25 0.7 0.175 30 171 175 31 2nd Floor Riser 2 LABCO Air and Water Balancing, LLC. 11/05/2015 22 AIR OUTLET TEST REPORT LOCATION: GR. OUTLET AREA K AK DESIGN ACTUAL %OF Christopher Heights NO. SIZE (ft') CFM FPM FPM CFM DESIGN 2nd Floor Riser 1 One Bedroom Type A 268 19 6x6 0.25 0.7 0.175 20 114 121 21 Toilet Room 268 20 6x6 0.25 0.7 0.175 30 171 145 25 2nd Floor Riser 2 Studio Type A 272 21 6x6 0.25 0.7 0.175 20 114 122 21 Toilet Room 272 22 6x6 0.25 0.7 0.175 30 171 173 30 Studio Type B 270 23 6x6 0.25 0.7 0.175 20 114 128 22 Toilet Room 270 24 6x6 0.25 0.7 0.175 30 171 204 36 2nd Floor Riser 3 Alcove Studio Type A 274 25 6x6 0.25 0.7 0.175 20 114 121 21 Toilet Room 274 26 6x6 0.25 0.7 0.175 30 171,_ 172 30 Alcove Studio Type A 276 27 6x6 0.25 0.7 0.175 20 114 120 21 Toilet Room 276 28 6x6 0.25 0.7 0.175 30 171 194 34 2nd Floor Riser 4 Alcove Studio Type B 266 29 6x6 0.25 0.7 0.175 20; 114,;,, 53 9 Toilet Room 266 30 6x6 0.25 0.7 0.1175 30 171 149 26 Alcove Studio Type B 264 31 6x6 0.25 0,7 0.1' 5 20 114 117 20 Toilet Room 264 32 6x6 0.25 0.7, 0.175 30 171 180 32 2nd Floor Riser 5 Studio Type A 278 33 6x6 0.25 0.7 am 20" 114 109 19 Toilet Room 278 34 6x6 0.25 04�i 0.175 30 171 191 33 2nd Floor Riser 6 Studio Type A 262 35 6x6 6,25 0;7 0.175 20 114 133 23 Toilet Room 262 36 6x6 0,.25 0.7 0.175 30 171 162 28 1st Floor Riser 1 One Bedroom Type A 158 37 6x6 : 0.25. 0.7 0.175 20 114 107 19 Toilet Room 158 38 6x6 0.25 0.7 0.175 30 171 184 32 1st Floor Riser 2 Studio Type A 162 30 6x6 0.25 0.7 0.175 20 114 109 19 Toilet Room 162 40 6X6 0.25 0.7 0.175 30 171 170 30 One Bedroom Type C 160 41 6x6 0.25 0.7 0.175 20 114 135 24 Toilet Room 160 42 6x6 0.25 0.7 0.175 30 171 161 28 1st Floor Rjsei 3 Alcove Studio TypqA 164 �t 43 1 6x6 0.25 0.7 0.175 20 114 115 20 Toilet Room 164 44 6x6 0.25 0.7 0.175 30 171 196 34 Alcove Studio T e`A 166 45 6x6 0.25 0.7 0.175 20 114 124 22 Toilet Room 166 . 46 6x6 0.25 0.7 0.175 30 171 155 27 1st FI66r Ris0t"!4 Alcove Studio Tyob B 156 47 6x6 025 0.7 0.175 20 114 108 19 Toilet Roorft 166` 48 6x6 0.25 0.7 0.175 30 171 157 27 *Tloor Riser 5 Studio Type A 106,, 49 6x6 0.25 0.7 0.175 20 114 106 19 Toilet Room 168 50 6x6 0.25 0.7 0.175 30 171 179 31 Fan Total 1,250 1,343 107% LABCO Air and Water Balancing, LLC. 11/05/2015 21 AIR OUTLET TEST REPORT LOCATION: GR. OUTLET AREA K AK DESIGN ACTUAL %OF Christopher Heights NO. SIZE (ft) CFM FPM FPM CFM DESIGN REF-1 Janitor Closet 3rd Floor 1 6x6 75 72 Janitor Closet 2nd Floor 2 6x6 0.25 0.56 0.14 75 536 536 i:75 Janitor Closet 1st Floor 3 6x6 0.25 0.56 0.14 75 536 528 74 225 221 98% REF-2 Hair Salon 106 1 12x12 300 311 104% REF-3 Toilet 382 1 6x6 75 77 Toilet 282 2 6x6 75 79 Toilet 171 3 6x6 75 78 Toilet 172 4 6x6 75 74 300 - 308 1 103% REF-4 Kitchen Hood 1 168x18 21 1.25 26.25 3,900 149 152 3,990 102% REF-6 Trash 303 1 6x6 100 No V.D 10/2912015 114 Trash 203 2 6x6 100 No V.D 10/29/2015 62 200 176 88% REF-7 3rd Floor Riser 1 One Bedroom Type A 368 1 6x6 0.25 0.7 0.175 20 114 123 22 Toilet Room 368 2 6x6 0.25 0.7 0.175 30 171 221 39 3rd Floor Riser 2 Studio Type A 372 3 6x6 0.25 0.7 0.175 20 114 152 27 Toilet Room 372 4 6x6 0.25 0.7 0.175 30 171 227 40 Studio Type B 370 5 6x6 0.25 0.7 0.175 20 114 151 26 Toilet Room 370 t't,, s'` 6x6 0.25 0.7 0.175 30 171 182 32 3rd Flout Riser 3 Alcove Studio T i A 374 7 6x6 0.25 0.7 0.175 20 114 188 33 Toilet Room 374 8 6x6 0.25 0.7 0.175 30 171 254 44 Alcove Studio,T e A"376 9 6x6 0.25 0.7 0.175 20 114 132 23 Toilet Rohm - 10 6x6 0.25 0.7 0.175 30 171 196 34 3rd Floor Riser 4 Alcove Stugio,,Type B 366 11 6x6 0.25 0.7 0.175 20 114 133 23 Toilet Room 366 12 6x6 0.25 0.7 0.175 30 171 202 35 Alcove Studio T' e B 364 13 6x6 0.25 0.7 0.175 20 114 126 22 Toilet Room 364 14 6x6 0.25 0.7 0.175 30 171 167 29 3rd Floor Riser 5 Studio Type A 378 15 6x6 0.25 0.7 0.175 20 114 149 26 Toilet Room 378 16 6x6 0.25 0.7 0.175 30 171 170 30 3rd Floor Riser 6 Studio Type A 362 17 6x6 0.25 0.7 0.175 20 114 11 102 18 Toilet Room 362 18 6x6 0.25 0.7 0.1751 30 1 171 1 201 35 LABCO Air and Water Balancing, LLC. 11/05/2015 20 EXHAUST FAN REPORT PROJECT NAME Christopher Heights DATE 10/26/2015 SYSTEM NO. REF-6 REF-7 REF-8 REF-9 AREA SERVED Trash Rooms Apartments Apartments Apartments FAN LOCATION Roof Roof Roof Roof CFM DESIGN 200 1,250 2,100 800 CFM DELIVERED 176 1,320 2,099 7$4 T.S.P. DESIGN .5" 1" 1"' ° 1" T.S.P. DELIVERED .36" .82" 1.2" .44" FAN DES. RPM 1522 1546 1533 1495 FAN DEL. RPM 100% SPEED 1658 SETS SET BY P.O.T VOLTAGE/PHASE 115/ 1 115/ 1 115/ 1 115/1 AMPS RATED 2.45 $' 12 3.5 AMPS DEL. 1.1 6.4 8.3 1.2 FAN MFR'R GreenHeck Creertk GreenHeck GreenHeck FAN MODEL# G-080-VG-6-X SWB-212-LMDX G-143-VG-10-X G-103-VG-4-X MOTOR MFR'R Vari.Green Marathon Vari-Green Vari-Green MOTOR HP 17 1/2 1 1/4 MOTOR RPM 300-1750 1725 200-1800 300-1725 MOTOR S.F. Not Listed 1.25 Not Listed Not Listed MOTOR FRAME, Listed 56 33 Not Listed MOTOR SHEAVE Direct Drive 1VL40 X 5/8" Direct Drive Direct Drive FAN PULLEY Direct Drive 1MA33 X 1" Direct Drive Direct Drive BELTS Direct Drive 1 /A26 Direct Drive Direct Drive SHEAVE POS. Direct Drive 50% Direct Drive Direct Drive CENTER TO CENTER Direct Drive 8" Direct Drive Direct Drive LABCO Air and Water Balancing, LLC. 11/05/2015 19 EXHAUST FAN REPORT PROJECT NAME Christopher Heights DATE 10/26/2015 SYSTEM NO. REF-1 REF-2 REF-3 REF-4 AREA SERVED Janitor Closets Hair Salon 106 Toilets Kitchen Hood- FAN LOCATION Roof Roof Roof Roof CFM DESIGN 225 300 300 3,900 CFM DELIVERED 221 311 308 3,990 •! T.S.P. DESIGN .5" .5" .5" 2.5" T.S.P. DELIVERED .29" .63" .52" 1.6" FAN DES. RPM 1477 1550 1725 ', 1226 1739 P.O.1. 1737 pl-otl FAN DEL. RPM 100% SPEED 1550 SPEED 1072 VOLTAGE/PHASE 115/ 1 11115/ 1 115/1 208/3 AMPS RATED 2.45 2.6 2.45 14 AMPS DEL. 0.9 2.3 1.8 8/7.8/8.1 FAN MFR'R GreenHeck GreenHeck GreenHeck GreenHeck FAN MODEL# G-070-VG-6-X G-095-D-X G-085-VG-6-X CUBE-240HP-50-G MOTOR MFR'R Vari-Green McMillan Vari-Green Baldor MOTOR HP .17 1/8 .17 5 MOTOR RPM 300-1750 3 Speed 300-1750 1750 MOTOR S.F. .Not Listed Not Listed Not Listed 1.15 a MOTOR FRAME,„ Not Listed Not Listed Not Listed 184T MOTOR SHEAVE ti Direct Drive Direct Drive Direct Drive 2VP50 X 1 1/8" 0i A FAN PULLEY Direct Drive Direct Drive Direct Drive 7" O.D X 1" L BELTS Direct Drive Direct Drive Direct Drive 2/AP30 SHEAVE POS. Direct Drive Direct Drive Direct Drive 90% Closed CENTER TO CENTER Direct Drive Direct Drive Direct Drive 71 VFD N/A N/A N/A 52 Hz LABCO Air and Water Balancing, LLC. 11/05/2015 18 ^ AIR OUTLET TEST REPORT LOCATION: GR. OUTLET AREA K AK DESIGN ACTUAL Y6OF Christopher Heights NO. SIZE *t'` CFK8 FPM FPM CFM DESIGN MAU-1 Supply y4 Kitchen 014 Hood 1 204x2O 3,000 �,,984 Kitchen 014 2 9X9 200 �4 QA Kitchen 014 3 9X9 200 185 Kitchen 014 4 9X9 200 —189 LABCO Air and Water Balancing, LLC. 11/05/2015 17 SUPPLY FAN REPORT PROJECT NAME Christopher Heights DATE 10/26/2015 UNIT DATA TEST DATA SYSTEM # MUA-1 CFM DESIGN 3,965 TCL 3,600 AREA SERVED Kitchen 014 CFM DELIVERED 3,552 UNIT LOCATION Roof E.S.P. DESIGN 1.3" VOLTAGE 208/3 E.S.P. DELIVERED .16" FAN MFR'R GreenHeck FAN DESIGN RPM 1,222 FAN MODEL# DGX-112-1-122-1-1Z FAN DELIVERED RPM,4067 MOTOR MFR'R Baldor AMPS RATED 14 MOTOR HP 5 AMPS DELIVERED 7.8/8/7.9 MOTOR RPM 1750 S.P.C.P. N/A MOTOR S.F. 1.15 V.F.D./VORTEX POS. 60 Hz MOTOR FRAME 184T SUCTION S.P. -.06" DISCHARGE S.P. 1" DRIVE DATA MOTOR SHEAVE 1VP56 X 1 1/8" . a FAN PULLEY 1BK77X 1" BELTS 1 /BX61 w , SHEAVE POSITION Open CENTER TO CENTER"" 22 1/2" NOTES : Ductwork on roof is insulated we cant take the discharge static pressure at the fan,the only spot that is accessable is in the kitchen. 11/4/2015 LABCO Air and Water Balancing, LLC. 11/05/2015 16 AIR OUTLET TEST REPORT LOCATION: GR. OUTLET AREA K AK DESIGN ACTUAL %OF Christopher Heights NO. SIZE (ft) CFM FPM FPM CFM DESIGN FCU-1 Supply Reeving 028 1 12X8 160 178 Corridor 020 2 10X10 175 1192 Chef Office 016 3 9X9 200 218 535 588 110% FCU-1 Outside Air 1 22X10 150 146 97% FCU-2 Supply Storage 028 1 16X8 215 226 Toilet 002 2 6X6 50 51 Toilet 004 3 6X6 50 49 Staff/Lounge 012 4 9X9 200 192 Corridor 020 5 10X10 175 173 690 691 100% ,. FCU-2 Outside Air 10X10 150 127 85% NOTE NO V.d:,,.ON RETURN INLET LABCO Air and Water Balancing, LLC. 11/05/2015 15 SUPPLY FAN REPORT PROJECT NAME Christopher Heights DATE 10126/2015 UNIT DATA TEST DATA SYSTEM# FC-2 CFM DESIGN 690 AREA SERVED Basement CFM DELIVERED 691 UNIT LOCATION Storage 008 E.S.P. DESIGN N/L VOLTAGE 120 E.S.P. DELIVERED .26" FAN MFR'R First. Co. FAN DESIGN RPM /L FAN MODEL# 18HBXB-HW FAN DELIVERED RPM HIGH SPEED MOTOR MFR'R TAG NOT ACCESSIBLE AMPS RATED 2.8 MOTOR HP TAG NOT ACCESSIBLE AMPS C LIVERED 2.7 4 MOTOR RPM TAG NOT ACCESSIBLE S.P.C.P. N/A MOTOR S.F. TAG NOT ACCESSIBLE V F.D.1VORTEX POS. N/A MOTOR FRAME TAG NOT ACCESSIBLE 3UCTi"ON S.P. -.05" DISCHARGE S.P. .21" DRIVE DATA MOTOR SHEAVE DIRECT DRIVE O.A. DESIGN 150 CFM FAN PULLEY DIRECT DRIVE O.A. ACTUAL 127 MOTORIZED DAMPER BELTS O.A. CONTROL POS. 100%OPEN SHEAVE POSIT.ICI " ©IR1rCT DRIVE CENTER TO CENTER DIRECT DRIVE , M1 NOTES : LABCO Air and Water Balancing, LLC. 11/05/2015 14 SUPPLY FAN REPORT PROJECT NAME Christopher Heights DATE 10126/2015 UNIT DATA TEST DATA SYSTEM # FC-1 CFM DESIGN 535 AREA SERVED Basement CFM DELIVERED 588 UNIT LOCATION Boiler Room E.S.P. DESIGN N/L-- VOLTAGE 120 E.S.P. DELIVERED :27 FAN MFR'R First. Co. FAN DESIGN RPM , N/L FAN MODEL# 18HBXB-HW FAN DELIVERED RPM MID-HIGH SPEED MOTOR MFR'R TAG NOT ACCESSIBLE AMPS RATED` . 2.8 MOTOR HP TAG NOT ACCESSIBLE AMPS DELIVERED 1.7 MOTOR RPM TAG NOT ACCESSIBLE S.P.C.P. N/A MOTOR S.F. TAG NOT ACCESSIBLE V.F.D./VORTEX'POS. N/A MOTOR FRAME TAG NOT ACCESSIBLE SUCTION S.P. -.07" DISCHARGE S.P. .2" DRIVE DATA MOTOR SHEAVE DIRECT DRIVE O.A. DESIGN 150 CFM FAN PULLEY t DIRECTDRIVE` O.A. ACTUAL 146 CFM SET BY STOP ON BELTS tDIRECT,DRI VE O.A. CONTROL POS. MOTORIZED DAMPER SHEAVE POSITION Y DIRECT DRIVE CENTER TO CENTER' = DIRECT DRIVE NOTES : LABCO Air and Water Balancing, LLC. 11/05/2015 13 AIR OUTLET TEST REPORT LOCATION: GR. OUTLET AREA K AK DESIGN ACTUAL %OF Christopher Heights NO. SIZE (ft') CFM FPM FPM CFM DESIGN RTU-7 Supply Lobby 104 1 12X12 250 265 Reception 110 2 9X9 100 104 Laundry 174 3 12X12 230 253 Corridor 180 4 12X12 240 246 Corridor 180 5 12X12 130 131 Reading 140 6 9X9 170 190 " Living Room 138 7 12X12 240 245 Living Room 138 8 12X12 240 249 1,600 1,684 105% RTU-7 Outside Air 22X18 2.751 1 2.75 670 2144 234 644 96% RTU-8 Supply Conference 116 1 12X12 250 263 Conference 116 2 12X12 250 257 Admin 115 3 9X9 170 168 Vestibule 113 4 9X9 120 128 Marketing Office 114 5 12X12 270" 283 Executive Office 108 6 12X12 270 267 1,330 1,367 103% RTU-8 Outside Air 22X18 s"2.75 ' :1 . 2.75 470 171 165 454 97% 1 4 5: RTU-9 Supply Office/Conference 258 1 12X12 200 202 Storage 260 2 12X12 50 53 Toilet 282 3 A,6X6 50 55 Laundry 286 4 9X9 100 103 Tub Room 280 5 9X9 200 204 Corridor 208 6 9X9 100 99 Corridor 208 7 9X9 100 96 Corridor 208 8 9X9 100 102 Toilet 171 9 6X6 50 51 Toilet 172. . 10 6X6 50 52 Laund Room 174a 11 6X6 50 47 Corridor X782 _i " 12 9X9 100 102 Corridor 1 X32 13 9X9 100 102 Corridor 18 14 9X9 100 97 a, 1,350 1,365 1 om RTU-9 Outside Air 22X18 2.75 1 2.75 450 164 157 432 96% LABCO Air and Water Balancing, LLC. 11/05/2015 12 AIR OUTLET TEST REPORT LOCATION: GR. OUTLET AREA K AK DESIGN ACTUAL %OF Christopher Heights NO. SIZE (ft') CFM FPM FPM CFM DESIGN RTU-4 Supply Multi-Purpose Room 344 1 9X9 185 226 Multi-Purpose Room 344 2 9X9 185 223 Multi-Purpose Room 344 3 9X9 185 216 Multi-Purpose Room 344 4 9X9 185 223 Multi-Purpose Room 344 5 6X6 185 227 Multi-Purpose Room 344 6 9X9 185 240 Kitchen 346 7 9X9 185 220 Corridor 304 8 12X12 200 221 1,495 1,795 120% RTU-4 Outside Air 22X18 2.75 1 2.75 470 171 182 501 106 06 RTU-5 Supply Corridor 178 1 9X9 100 Corridor 178 2 9X9 100 102 Corridor 178 3 9X9 99 Pub 142 4 9X9 ,185 204 Pub 142 5 9X9 185 216 Pub 142 6 9X9 185°' 212 Pub 142 7 9X9 185 191 Pub 142 8 9x9'':- 185 185 Pub 142 9 9X9 185 200 Pub 142 10 9X9 185 197 1,595 1,714 107% RTU-5 Outside Air 22X18 '2.75 1 2.75 470 171 164 451 96% RTU-6 Supply Multi-Purpose Room 244 1 9X9 185 193 Multi-Purpose Room 244 _ 2 9X9 185 189 Multi-Purpose Room 244 3 9X9 185 204 Multi-Purpose Room 24 4 9X9 185 212 Multi-Purpose Room X44 5 6X6 185 210 Multi-Purpose RoiSm 244 r r 6 9X9 185 187 Kitchen 246 7 9X9 185 196 Corridor 204 ` = 8 12X12 200 201 1,495 1,593 107% 12TU�6 Outside Air 22X18 2.75 1 2.75 470 171 177 487 104% LABCO Air and Water Balancing, LLC. 11/05/2015 11 AIR OUTLET TEST REPORT LOCATION: GR. OUTLET AREA K AK DESIGN ACTUAL %OF Christopher Heights NO. SIZE (ft) CFM FPM FPM CFM DESIGN RTU-1 Supply Corridor 308 1 9X9 165 1168 Corridor 308 2 9X9 165 175 Corridor 308 3 9X9 165 178 Office 381 4 9X9 100 103 Toilet 382 5 6X6 50 Laundry 386 6 9X9 100 102 Office 360 7 9X9 150 154 Office 358 8 12X12 200 '1216 1,095 1 1,150 105% RTU-1 Outside Air 28X14 2.722 1 2.722 220 81 84 229 104% RTU-2 Supply Corridor 306 1 9X9 120 Corridor 306 2 9X9 120 123 Corridor 306 3 9X9 120 121 Corridor 306 4 9X9 120 131 Nurse 342 5 9X9 130 134 Storage 343 6 10X8 100 99 Corridor 206 7 9X9 120 132 Corridor 206 8 9X9 120 126 Corridor 206 9 9XJ.t . 120 133 Corridor 206 10 =�-9X9 ' 120 122 Nurse 242 11 9x9_ 180 188 Corridor 180 12 9X9,": 100 101 Corridor 180 13 9X9 100 99 Corridor 180 14 9X9 100 98 1,670 1,729 104% i r RTU-2 Outside Air 22X18 2.75 1 2.75 470 171 183 503 107% RTU-3 Suppll �.. Multipurpose Room 1 2 1 12X12 300 295 Multipurpose Room 152 , ° 2 12X12 300 275 Multipurpose Room 152 3 12X12 300 305 Multi ur os `Room 152,:", 4 12X12 300 287 Multi ur"oee Room 152","411- 5 12X12 300 294 1,500 1,456 97% RM,3 Outside Air 22X18 2.75 1 2.75 470 171 176 484 103% LABCO Air and Water Balancing, LLC. 11/05/2015 10 SUPPLY FAN REPORT PROJECT NAME Christopher Heights DATE 10/2612015 UNIT DATA TEST DATA SYSTEM # RTU-9 CFM DESIGN 1,350 AREA SERVED Corridor CFM DELIVERED 1,365 UNIT LOCATION Roof E.S.P. DESIGN 1.01" VOLTAGE 208/3 E.S.P. DELIVERED .9" FAN MFR'R Carrier FAN DESIGN RPM 1,126 FAN MODEL# 48HCEA05A FAN DELIVERED RPM 1092 MOTOR MFR'R Marathon AMPS RATED 5.2 MOTOR HP Not Listed AMPS'DELIVERED 2.6/2.5/2.7 MOTOR RPM 1725 S.P.C.P. N/A MOTOR S.F. 1.15 V P.D./VORTEX POS. N/A MOTOR FRAME 56HZ SUCTIQN S.P. -.33" DISCHARGE S.P. .57" DRIVE DATA MOTOR SHEAVE 1VL40 X 5/8" O.A. DESIGN 450 CFM FAN PULLEY 1AF.D49 XL5/4"_` O.A. ACTUAL 432 CFM BELTS 1 /AX39 O.A. CONTROL POS. SET BY POT SHEAVE POSITION 75%Open CENTER TO CENTER 14 1/4" N NOTES : LABCO Air and Water Balancing, LLC. 11/05/2015 9 SUPPLY FAN REPORT PROJECT NAME Christopher Heights DATE 10/26/2015 UNIT DATA TEST DATA SYSTEM # RTU-8 CFM DESIGN 1,330 AREA SERVED Offices CFM DELIVERED 1,367 UNIT LOCATION Roof E.S.P. DESIGN 1.0 VOLTAGE 208/3 E.S.P. DELIVERED 1.06" FAN MFR'R Carrier FAN DESIGN RPM 1,126 FAN MODEL# 48HCEA05A FAN DELIVERED RPM: 1;092 MOTOR MFR'R Marathon AMPS RATED 5.2 MOTOR HP Not Listed AMPS DELIVERED 2.4/2.6/2.6 MOTOR RPM 1725 S.P.C.P. N/A MOTOR S.F. 1.15 V.F.D./VORTEX POS. N/A MOTOR FRAME 56HZ SUCTION S.P. -.28" DISCHARGE S.P. 78" DRIVE DATA . MOTOR SHEAVE 1VL40 X 5/8" O.A. DESIGN 470 CFM FAN PULLEY 1AFD49 X 5/8 O.A. ACTUAL 454 CFM BELTS 1 /AX39 O.A. CONTROL POS. SET BY POT. SHEAVE POSITION 1001/o Open CENTER TO CE ITERR 14 1/2" Ag NOTES LABCO Air and Water Balancing, LLC. 11/05/2015 8 SUPPLY FAN REPORT PROJECT NAME Christopher Heights DATE 10/26/2015 UNIT DATA TEST DATA SYSTEM # RTU-7 CFM DESIGN 1,600 AREA SERVED Lobby/Corridor CFM DELIVERED 1,,684 UNIT LOCATION Roof E.S.P. DESIGN VOLTAGE 208/3 E.S.P. DELIVERED FAN MFR'R Carrier FAN DESIGN RPM 1,163 FAN MODEL# 48HCEA06A FAN DELIVERED RPM A,215 MOTOR MFR'R Marathon AMPS RATED 6.9 MOTOR HP Not Listed AMPS DELIVERED 3.7/4.0/3.9 MOTOR RPM 1725 S.P.C.P. N/A MOTOR S.F. 1.15 V.F.D.NO'RTEX'POS. N/A MOTOR FRAME 56HZ SUCTibNl S.P. -.36" DISCHARGE S.P. .77" DRIVE DATA MOTOR SHEAVE v 1�L-40 X 5/8" O.A. DESIGN 670 CFM y,. FAN PULLEY 1AF.D44 x;5/8': r O.A. ACTUAL 644 CFM c* BELTS 1 /AX38 O.A. CONTROL POS. SET BY POT. SHEAVE POSITION 100% Open CENTER TO CENTER",` ! 14 1/2" ,X NOTES : . LABCO Air and Water Balancing, LLC. 11/05/2015 7 SUPPLY FAN REPORT PROJECT NAME Christopher Heights DATE 10/26/2015 UNIT DATA TEST DATA SYSTEM # RTU-6 CFM DESIGN 1,495 AREA SERVED Multipurpose Room CFM DELIVERED 1,593 UNIT LOCATION Roof E.S.P. DESIGN 1.0 VOLTAGE 208/3 E.S.P. DELIVERED .95" FAN MFR'R Carrier FAN DESIGN RPM 1,126 FAN MODEL# 48HCEA06A FAN DELIVERED RPM 1,173 MOTOR MFR'R Marathon AMPS RATED 6.9 MOTOR HP Not Listed AMPS DELIVERED 3.9/3.8/3.8 MOTOR RPM 1725 S.R.C.P. N/A MOTOR S.F. 1.15 �V F.D.1V6RTEXPOS. N/A MOTOR FRAME 56HZ SUCTION S.P. -.47" DISCHARGE S.P. .48" DRIVE DATA MOTOR SHEAVE 1VL40 X 5/8" O.A. DESIGN 470 CFM FAN PULLEY 1AFD44 X,5/8,", O.A. ACTUAL 487 CFM BELTS f 1 /AX38 O.A. CONTROL POS. SET BY POT. Tr SHEAVE POSITION 100% Open CENTER TO CENTER, 14 1/2" NOTES : LABCO Air and Water Balancing, LLC. 11/05/2015 6 SUPPLY FAN REPORT PROJECT NAME Christopher Heights DATE 10/26/2015 UNIT DATA TEST DATA SYSTEM # RTU-5 CFM DESIGN 1,595 AREA SERVED Corridor/Pub CFM DELIVERED 1,714 UNIT LOCATION Roof E.S.P. DESIGN 1.0 VOLTAGE 208/3 E.S.P. DELIVERED FAN MFR'R Carrier FAN DESIGN RPM 1,163 FAN MODEL# 48HCEA06A FAN DELIVERED RPM 1,216 MOTOR MFR'R Marathon AMPS RATED 6.9 MOTOR HP Not Listed AMPS DELIVERED 3.8/3.9/4.0 MOTOR RPM 1725 S.P.C.P. ' N/A MOTOR S.F. 1.15 V1F.D.fV6kTEX POS. N/A MOTOR FRAME 56HZ SUCTION S.P. -.44" DISCHARGE S.P. .67" DRIVE DATA MOTOR SHEAVE 1VL40 X 5/8" O.A. DESIGN 470 CFM FAN PULLEY 1AFD44 X 5/8" O.A. ACTUAL 451 CFM BELTS 1 /AX38 O.A. CONTROL POS. SET BY POT. SHEAVE POSITION 100% Open CENTER TO C �VTER� ! ��d�� 14 1/2" NOTES : „ LABCO Air and Water Balancing, LLC. 11/05/2015 5 ' SUPPLY FAN REPORT PROJECT NAME Christopher Heights DATE 10/2612015 UNIT DATA TEST DATA SYSTEM # RTU-4 CFM DESIGN 1,495 AREA SERVED Multipurpose Room CFM DELIVERED 1,795 UNIT LOCATION Roof E.S.P. DESIGN 1.0" VOLTAGE 208/3 E.S.P. DELIVERED 8'1" FAN MFR'R Carrier FAN DESIGN RPM 1,126 FAN MODEL# 48HCEA05A FAN DELIVERED RPM 1°,087 MOTOR MFR'R Marathon AMPS RATED 5.2 MOTOR HP Not Listed AMPS DELIVERED 2.8/2.8/2.9 MOTOR RPM 1725 S.P.C.P. N/A MOTOR S.F. 1.15 V.F.D./VORTEX`POS. N/A :" MOTOR FRAME 56HZ SUCT16N S.P. -.33" DISCHARGE S.P. .48" DRIVE DATA MOTOR SHEAVE 1VL40 X 5/8" O.A. DESIGN 470 CFM 9 X 5/3" O.A. ACTUAL 501 CFM FAN PULLEY 1AFD4 BELTS ` ` 1 /AX39 O.A. CONTROL POS. SET BY POT. SHEAVE POSITION z41006/o Open yw. . CENTER TO CNTER. %' 14 1!2" NOTES : F.a LABCO Air and Water Balancing, LLC. 11/05/2015 4 ' SUPPLY FAN REPORT PROJECT NAME Christopher Heights DATE 10/26/2015 UNIT DATA TEST DATA SYSTEM# RTU-3 CFM DESIGN 1,500 AREA SERVED Multipurpose Room CFM DELIVERED 1,456 UNIT LOCATION Roof E.S.P. DESIGN 1.0" VOLTAGE 208/3 E.S.P. DELIVERED FAN MFR'R Carrier FAN DESIGN RPM 1,126 FAN MODEL# 48HCEA05A FAN DELIVERED RPM 1,163 MOTOR MFR'R Marathon AMPS RATED 5.2 MOTOR HP Not Listed AMPS DELIVERED 2.8/2.7/2.8 MOTOR RPM 1725 S.P.C.P. N/A MOTOR S.F. 1.15 VlF.D.NO'RTEX'POS. N/A MOTOR FRAME 56HZ SUCTION S.P. -.37" DISCHARGE S.P. 72" DRIVE DATA MOTOR SHEAVE 1VL40 X 5/8" O.A. DESIGN 470 CFM FAN PULLEY 1AFD49 X 5/8'!'�'J O.A. ACTUAL 484 CFM BELTS 1 /AX39 O.A. CONTROL POS. SET BY POT. SHEAVE POSITION 75o/o„Open CENTER TO C LATER' 14 1/4” NOTES : ...... ........ LABCO Air and Water Balancing, LLC. 11/05/2015 3 ' SUPPLY FAN REPORT PROJECT NAME Christopher Heights DATE 10/2612015 UNIT DATA TEST DATA .. SYSTEM # RTU-2 CFM DESIGN 1,670 AREA SERVED Corridors CFM DELIVERED 1,729 UNIT LOCATION Roof E.S.P. DESIGN VOLTAGE 208/3 E.S.P. DELIVERED 1.02" FAN MFR'R Carrier FAN DESIGN RPM 1,163 FAN MODEL# 48HCEA06A FAN DELIVERED RPM 1,172 MOTOR MFR'R Marathon AMPS RATED 6.9 MOTOR HP Not Listed AMPS tLIVERED 3.9/3.7/4.0 MOTOR RPM 1725 S.P.-C.P. N/A MOTOR S.F. 1.15 crV.F.D.1VQRTEX POS. N/A MOTOR FRAME 56HZ SUCTION S.P. -.39" DISCHARGE S.P. .63" DRIVE DATA MOTOR SHEAVE 1VL40 X 5/8" O.A. DESIGN 470 CFM FAN PULLEY 1AFD44 X 5/8" O.A. ACTUAL 503 CFM BELTS 1 /AX38 O.A. CONTROL POS. SET BY POT. SHEAVE POSITION 1006Io Open CENTER TO CENTER !' 14 1/2" f. NOTES LABCO Air and Water Balancing, LLC. 11/05/2015 2 SUPPLY FAN REPORT PROJECT NAME Christopher Heights DATE 10/26/2015 UNIT DATA TEST DATA SYSTEM # RTU-1 CFM DESIGN 1400 T.C.L. 1095 AREA SERVED Corridors CFM DELIVERED 1,150 UNIT LOCATION Roof E.S.P. DESIGN 1.0 VOLTAGE 208/3 E.S.P. DELIVERED .88" FAN MFR'R Carrier FAN DESIGN RPM 1,126 FAN MODEL# 48HCEA05A FAN DELIVERED RPIVI' 1;062 MOTOR MFR'R Marathon AMPS RATED 5.2 MOTOR HP Not Listed AMPS DELIVI RED 2.4/2.5/2.3 MOTOR RPM 1725 S.P.C.P. N/A MOTOR S.F. 1.15 VF.D.NCIRTEX'POS. N/A MOTOR FRAME 56HZ SUCTION S.P. -.14" DISCHARGE S.P. .74" DRIVE DATA MOTOR SHEAVE 1VL40 X 5/8" O.A. DESIGN 220 CFM FAN PULLEY 1AFD49 X 5/8" O.A. ACTUAL 229 CFM BELTS 1 /AX39 O.A. CONTROL POS. SET BY POT. SHEAVE POSITION Open CENTER TO CENTER' 4 14 1/4" 4r -mow NOTES LABCO Air and Water Balancing, LLC. 11/05/2015 1 CERTIFIED TEST, ADJUST AND BALANCE REPORT DATE: 11/5/2015 PROJECT: CHRISTOPHER HEIGHTS LOCATION: NORTHAMPTON, MASSACHUSETTS CUSTOMER: J. J. BAFARO CONTRACTOR: LABCO Air Water Balancing, LLC ADDRESS: PO 136k,21 6: West Suffield, Connecticut 06093 � ; PHONE 860-668-1329 FAX 860-668-7089 k' f t #T130338407C T.A.B.B. CERTIFICATION EXP. 12/2015 Final Construction Control Document To be submitted at completion of construction by a W d Registered Design Professional for work per the 8th edition of the Massachusetts State Building Code, 780 CMR, Section 107 Project Title: Residence at Christopher Heights Date:11/5/15 Permit No. Property Address: The Residence at Christopher Heights,Northampton,MA Project: Check(x)one or both as applicable: x New construction x Existing Construction Project description: Installation of automatic sprinklers I Scott Henderson MA Registration Number: 46553 Expiration date: 6/30/16 ,am a registered design professional, and I have prepared or directly supervised the preparation of all design plans, computations and specifications concerning: Architectural Structural Mechanical X Fire Protection Electrical Other: Describe for the above named project. I, or my designee,have performed the necessary professional services and was present at the construction site on a regular and periodic basis. To the best of my knowledge, information, and belief the work proceeded in accordance with the requirements of 780 CMR and the design documents approved as part of the building permit and that I or my designee: 1. Have reviewed, for conformance to this code and the design concept, shop drawings, samples and other submittals by the contractor in accordance with the requirements of the construction documents. 2. Have performed the duties for registered design professionals in 780 CMR Chapter 17, as applicable. 3. Have been present at intervals appropriate to the stage of construction to become generally familiar with the progress and quality of the work and to determine if the work was performed in a manner consistent with the construction documents and this code. Nothing in this document relieves the contractor of its responsibility regarding the provisions of 780 CMR 107. Scott D. �ySN OF b{qq„� Enter in the space to the right a"wet"or Henderson electronic signature and seal: ift m.*55� ti 2015.11 .05 '•*,�9 Legacy Fire Protection,Inc. '00'05- 10:30:44 Phone number: 413-221-3399 Email: scott_henderson @charter.net Building Official Use Only Building Official Name: Permit No.: Date: Version 06 11 2013 16. CERTIFICATIONS AND APPROVALS (continued) 16.4 Property or Owner Representative: I accept this system as having been installed and tested to its specifications and all NFPA standards cited herein. Signed: Print name: Date: Organization: Title: Phone: 16.5 Authority Having Jurisdiction: have witnessed a satisfactory acceptance test of this system and find it to be installed and operating properly in accordance with its approved plans and specifications.with its approved sequence of operations.and with all NFPA standards cited herein. Signed: Print name: Date: Organization: Title: Phone: NF PA 72 p. 12 of 12 Life Safety, Security and Communication Systems ISO 9001:2000 A 7365 and UL UUJS S6438 MA Lic 11940 • CT Lic 106016 • SSCO 000525 15. RECORD OF SYSTEM OPERATIONAL ACCEPTANCE TEST bA New System All operational features and functions of this system were tested by, or in the presence of the signer shown below, on the date shown below, and were found to be operating properly in accordance with the requirements for the following: ❑ Modification to an existing system All newly modified operational features and junctions of this system were tested by, or in the presence of the signer shown below, on the date shown below, and were found to be operating properly in accordance with the requirements for the following: ®NFPA 72,Edition: ®NFPA 70.National Electric Code.Article 760.Edition: 'T ® Manufacturer's published instructions Other(specify): Ef Individual devi testing cu tation spection and Testing Form is attached] Signed: Print name:VINCENT SVELNIS Date: Organization:FIRE DETECTION SYSTEM, Title:TECH Phone:5947710 16. CERTIFICATIONS AND APPROVALS 16.1 System Installation Contractor: This system,as specified hereJ4 h s been installed and tested according to allall NFPA st dards cited herein. Signed: Print name: dv Date: Organization: (AJ 6L Title: Phone: 16.2 System Service Contractor: The undersigns as a sjqrvice ntraeor this system in effect as of the date shown below. Signed: �Di Print name:VINCENT SVELNIS Date: Organization: N SYSTEM. Title:TECH Phone:594-7710 16.3 Supervising Station: This system,as specified herein,will be monitored according to all NFPA standards cited herein. Signed: Print name: Date: Organization: Title: Phone: NFPA 72 p. I I of 12 Life Safety, Security and Communication Systems ISO 9001:2000 A 7365 and UL UUJS S6438 MA Lic 1194C • CT Lic 106016 • SSCO 000525 ♦ Y 13. SYSTEM POWER(continued) 13.3 Notification Appliance Power Extender Panels ❑This system does not have power extender panels. 13.2.1 Primary Power Input voltage of power extender panel(s): -b Power extender panel amps: J,b Overcurrent protection: Type: A–K 6 4 e,../.e- t- Amps: 2 ?> _ Location(of primary supply panel board): , P e S10 Disconneting means location: C kA 3 35- 13.2.2 Engine-Driven Generator f ❑This system does not have a generator. Location of generator R IOA2 .k f— L O Location of fuel storage: Gt.-1 d;.1 G G,-,e. &d /C.. Type of Fuel: Pfrs e- 13.2.3 Uninterruptable Primary Power lll.his system does not have a UPS. Equipment powered by a UPS system: Location of UPS system: Calculated capacity of UPS batteries to drive the system components connected to it: In standby mode(hours): — In alarm mode(minutes): 13.2.4 Batteries J Location: Y *V j?AA,ti/ voltage: .Z Amp/hour rating:___ Calculated capacity of batteries to drive the system: In zatteries mode(hours): `�� In alarm mode(minutes): are marked with date of manufacture ❑Battery calculations are attached 14. RECORD OF SYSTEM INSTALLATION Fill out after all installation is completed and wiring has been checked for opens, shorts,ground faults,and improper branching, but before con�d��ling operational acceptance tests. This is a: New System ❑ Modification to an existing system Permit number: The system has been installed in accordance with the following requirements:(Note any or all that apply.) NFPA 72.Edition: 0.0 10 NFPA 70,National Electric Code.Article 760.Edrtion:_�U� l�J Manufacturers published instructions Other(specify): System deviations from the referenced NFPA standards: Signed: Print name:_ 1 Date: Organization: Title: �� Cited'(C_L'�� Phone: NFPA 72 p. 10 of 12 Life Safety, Security and Communication Systems ISO 9001:2000 A 7365 and UL UUJS S6438 MA Lic 1194C • CT Lic 106016 • SSCO 000525 13. SYSTEM POWER(continued) 13.1.3 Uninterruptable Primary Power is system does not have a UPS. Equipment powered by a UPS system: Location of UPS system: Calculated capacity of UPS batteries to drive the system components connected to it: In standby mode(hours): In alarm mode(minutes): 13.1.4 Batteries I "'/ Location: %,{J .�r-G I Type: *�GY 'vi"jNominal voltage: 12—_ Amp/hour rating: /Z T Calculated capacity of batteries to drive the system: In standby mode(hours): r7"I In alarm mode(minutes): .� batteries are marked with date of manufacture ❑ Battery calculations are attached 13.2 In-Building Fire Emergency Voice Alarm Communication System or Mass Notification System a,-his system does not have an EVACS or MNS system. 13.2.1 Primary Power Input voltage of EVACS or MNS panel: EVACS or MNS panel amps: Overcurrent protection: Type: Amps: Location(of primary supply panel board): Disconneting means location: 13.2.2 Engine-Driven Generator I ❑This system does not have a generator. Location of generator: /1��r2 .N/t Location of fuel storage: �2 Type of Fuel: � 5 13.2.3 Uninterruptable Primary Power is system does not have a UPS. Equipment powered by a UPS system: Location of UPS system: Calculated capacity of UPS batteries to drive the system components connected to it: In standby mode(hours): In alarm mode(minutes): 13.2.4 Batteries Location: Type: Nominal voltage: Amp/hour rating: Calculated capacity of batteries to drive the system: In standby mode(hours): In alarm mode(minutes): ❑ Batteries are marked with date of manufacture ❑Battery calculations arc attached Nl PA 72 p.9 of 12 Life Safety, Security and Communication Systems ISO 9001:2000 A7365 and UL UUJS S6438 MA Lic 1194(' • CT Lic 106016 • SSCO 000525 11. TWO-WAY EMERGENCY COMMUNICATION SYSTEMS (continued) 11.3 area of Refuge(Area of Rescue Assistance)Emergency Communications Systems This system does not have an area of refuge(area of rescue assistance)emergency communications systems. Number of stations: _ Location of central control point: Days and hours when central control point is attended: Location of alternate control point: Days and hours when altmate control point is attended: 111.44E 2-This Emergency Communications Systems This system does not have an elevator emergency communications systems. Number of elevators with stations: Location of central control point: Days and hours when central control point is attended: Location of alternate control point: Days and hours when altmate control point is attended: 11.5 Other Two-Way Communication Systems Describe: 12. CONTROL FUNCTIONS L;� stem activates the following control functions: old-open door rel;zrecall ces ❑ Smoke management 31 VAC shutdown ❑F/S dampers D Door unlocking 0 Fuel source shutdown D Extinguishing agent release D Elevator shunt trip D Mass notification system override of the fire alarm notification appliances Other(specify): 12.1 Addressable Control Modules D This system does not have control modules. Numberofdevices: Other(specify): 13. SYSTEM POWER 13.1 Control Unit 13.1.1 Primary Power r Input voltage of control panel: Control panel amps: •.7 Overcurrent protection: Type: / A ps: 2 Location(of primary supply panel board): nl e./.e-G /2 Jt Disconneting means location: f_ 4 13.1.2 Engine-Driven Generator This system does not have a generator. Locationofgenerator:_ U ;�4� 10� Location of fuel storage:_ C�A) eti- Type of Fuel: Ple se, NFPA72p.8ofl2 Life Safety, Security and Communication Systems ISO 9001:2000 A 7365 and UL UUJS S6438 MA Lic 1194C • CT Lic 106016• SSCO 000525 10. MASS NOTIFICATION CONTROLS,APPLIANCES,AND CIRCUITS L7This system does not have a MNS. 10.1 MNS Local Operating Consoles Location l: Location 2: Location 3: 10.2 High-Power Speaker Arrays Number of I IPSA speaker initiation zones: Location l: Location 2: Location 3: 10.3 Mass Notification Devices Combination fire alarm/MNS visible appliances: MNS-only visible appliances: Textual signs: Other(describe): Supervision class: 10.3.1 pecial Hazard Notification Zhis system does not have special suppression predischarge notification. ;4 systems DO NOT override notification appliances required to provide special suppression predischarge notification. 11. TWO-WAY EMERGENCY COMMUNICATION SYSTEMS 11.1 Telephone System his system does not have a two-way telephone system. Number of telephone jacks installed: Number of warden stations installed: Number of telephone handsets stored on site: Type of telephone system installed: ❑Electrically powered ❑Sound powered ;;h-'is wp-way Radio Communications Enhancement Systems system does not have a two-way radio communications enhancement system. Percentage of area covered by two-way radio service: Critical areas: % General building areas:—% Amplification component locations: Inbound signal strength: dBm Outbound signal strength dBm Donor antenna isolation is dB above the signal booster gain Radio Frequencies covered: Radio system monitor panel locations: NFPA 72 p.7 of']2 Life Safety, Security and Communication Systems ISO 9001:2000 A7365 and UL UUJS S6438 MA Lic 1194C • CT Lic 106016 • SSCO 000525 7. MONITORED SYSTEMS 7.1 Engine-Driven Generator ❑ This system does not have a generator. 7.1.1 Generator Functions Supervised ❑Engine or control panel trouble ❑Generat running ❑ Selector switch not in auto ❑Low fuel ❑Other(specify): 7.2 Special Hazard Suppression Systems D<s system does not monitor special hazard systems. Description of special hazard system(s): 7.3 Other Monitoring Systems ❑This system does not monitor other systems. Description of other system(s): 1:5y,-94- 8. ANNUNCIATORS ❑This system does not have annunciators. 8.1 Location and Description of Annunciators f Location l:1 S 1—,rt! /W,P-,tA) �V�✓t/J NC(w Ve S,Tj� cC le— Location 2: Location 3: 9. ALARM NOTIFICATION APPLIANCES 9.1 In-Building Fire Emergency Voice Alarm Communication System is system does not have an EVACS. Number of single voice alarm channels: Number of multiple voice alarm channels: Number of Speakers: Number of speaker circuits: Location of amplification and sound-processing equipment:_ Location of paging microphone stations: Location 1: Location 2: Location 3: 9.2 Nonvoiee Notification Appliances ❑This system does not have nonvoice notification appliances. Horns: hil With visible: �? _ Bells: With visible: Chimes: With visible: Visible only: Other(describe): g,�p�.D 9.3 Notification Appliance Power Extender Panels ❑This system does not have power extender panels. Quantity: 3 Location: NFPA 72 p.6 of 12 Life Safety, Security and Communication Systems ISO 9001:2000 A 7365 and UL UUJS 56438 MA Lic 1194C • CT Lic 106016 • SSCO 000525 5. ALARM INITIATING DEVICES (continued) 5.2.6 Addressable Monitoring Modules ❑This system does not have monitoring modules. Number of devices: _ 5.2.7 Waterflow Alarm Devices ❑ This system does not have waterflow alarm devices. Type and number of devices: Addressable:_ '�� _ Conventional: Coded: Transmitter: 5.2.8 Alarm Verification 6, is system does not incorporate alarm verification. Number of devices subject to alarm verification: Alarm verification set for seconds 5.2.9 Presignal .s system does not incorporate pre-signal. Number of devices subject to presignal: Describe presignal functions: 5.2.10 Positive Alarm Sequence(PAS) is his system does not incorporate PAS. Describe PAS: 5.2.11 Other Initiating Devices his system does not have other initiating devices. Describe: 6. SUPERVISORY SIGNAL-INITIATING DEVICES 6.1 Sprinkler System Supervisory Devices ❑ This system does not have sprinkler supervisory devices. Type and number of devices: Addressable:_ Conventional: Coded: Transmitter: Other(specify): 6.2 Fire Pump Description and Supervisory Devices is system does not have a fire pump. Type fire pump: ❑ Electric ❑ Engine Type and number of devices: Addressable: Conventional: Coded: Transmitter: Other(specify): 6.2.1 Fire Pump Functions Supervised ❑Power ❑ Running ❑Phase reversal ❑ Selector switch not in auto ❑Engine or control panel trouble ❑Low fuel Other(specify): 6.3 Duct Smoke Detectors(DSDs) U 4isstem does not have DSDs causing supervisory signals. Type and number of devices. Addressable: Conventional: 1 Other(specify): 'type of coverage:_ Type of smoke detector sensing technology: ❑ Ionization ❑ Photoelectric ❑Aspirating ❑Beam 6.4 Other Supervisory Devices ❑ This system does not have other supervisory devices. Describe: ,(3":rir4e_ P6�i✓G /4tarryt<b�.S NFPA72p.5of'12 Life Safety, Security and Communication Systems ISO 9001:2000 A7365 and UL UU.IS 56438 MA Lic 11940 • CT Lic 106016 • SSCO 000525 NOWWWWWW 5. ALARM INITIATING DEVICES 5.1 Manual Initiating Devices 5.1.1 Manual Fire Alarm Boxes ❑ This system does not have manual fire alarm boxes. Type and number of devices: Addressable: Conventional: Coded: Transmitter: Other(specify): 5.1.2 Other Alarm Boxes 'his system does not have other alarm boxes. Description: Type and number of devices. Addressable: Conventional: Coded: Transmitter: Other(specify): 5.2 Automaticl Initiating Devices 5.2.1 Smoke Detectors ❑This system does not have smoke detectors. Type and number of devices. Addressable:_ Conventional: Other(specify): Type of coverage: Complete area ❑ Partial area ❑Nonrequired partial area Other(specify): Type of smoke detector sensing technology: ❑ Ionization hotoelectric ❑Multicriteria ❑Aspirating ❑Beam Other(specify): 5.2.2 Duct Smoke Detectors ❑This system does not have alarm-causing duct smoke detectors. Type and number of devices. Addressable: Other(specify): Type of coverage: Type of smoke detector sensing technology: ❑ Ionization 2 hotoelectric ❑Aspirating ❑Beam 5.2.3 Radiant Energy(Flame)Detectors 121" is system does not have radiant energy detectors. Type and number of devices. Addressable: Conventional: Other(specify): Type of coverage: 5.2.4 Gas Detectors ❑ This system does not have gas detectors. Type of detector(s): t✓ d Type and number of devices. Addressable:_ Conventional: Type of coverage: 0, m plQ,L 5.2.1 Heat Detectors ❑This system does not have heat detectors. Type and number of devices. Addressable: c5— Conventional: Type of coverage: 0"Complete area ❑ Partial area ❑Nonrequired partial area ❑ Linear ❑ Spot Type of smoke detector sensing technology: MIrixed temperature ❑ Rate-of-rise ❑ Rate compensated NFPA 72 p.4 of 12 Life Safety, Security and Communication Systems ISO 9001:2000 A 7365 and UL UUJS S6438 MA Lic 1194C • CT Lic 106016 • SSCO 000525 4. CIRCUITS AND PATHWAYS 4.1 Signaling Line Pathways 4.1.1 Pathways Class Designations and Survivability Pathway Class: is Survivability level: Quantity: (See NFPA 72, Sections 12.3 and 12.4) 4.1.2 Pathways Utilizing Two or More Media Quantity: Description: 4.1.3 Device Power Pathways ld'No separate power pathways from the signaling line pathway ❑ Power pathways are separate but the same pathway classification as the signaling line pathway ❑Power pathways are separate and different classification from the signaling line pathway 4.1.4 Isolation Modules Quantity: 4.2 Alarm Initiating Device Pathways 4.2.1 Pathways Class Designations and Survivability Pathways Class: Survivability level: Quantity: (See NFPA 72,Sections 12.3 and 12.4) 4.2.2 Pathways Utilizing Two or More Media Quantity: Description: 4.2.3 Device Power Pathways U-N,separate power pathways from the signaling line pathway ❑ Power pathways are separate but the same pathway classification as the signaling line pathway ❑ Power pathways are separate and different classification from the signaling line pathway 4.3 Non-Voice Audible System Pathways 4.3.1 Pathways Class Designations and Survivability / Pathway Class: Survivability level: Quantity: (See NFPA 72. Sections 12.3 and 12.4) 4.3.2 Pathways Utilizing Two or More Media Quantity: Description: 4_.3.33 Appliance Power Pathways 2<01 separate power pathways from the signaling line pathway ❑ Power pathways are separate but the same pathway classification as the signaling line pathway ❑ Power pathways are separate and different classification from the signaling line pathway NFPA 72 p.3 of 12 Life Safety. Security and Communication Systems ISO 9001:2000 A 7365 and UL UUJS 56438 MA Lic 1194C • CT Lic 106016 • SSCO 000525 IN I I IN 3. DESCRIPTION OF SYSTEM OR SERVICE (continued) NFPA 72 edition: -2 O I6 Additional description of system(s): 3.1 Control Unit / fir. Manufacturer: w/.--?eY�' Model number 07nJ_ 3.2 Mass Notification System �system does not incorporate an MNS. 3.2.1 System Type: ❑ In-building MNS-combination ❑ In-building MNS-stand-alone ❑Wide-area MNS ❑ Distributed recipient MNS ❑ Other(specify): 3.2.2 System Features: ❑Combination fire alarm/MNS ❑MNS autonomous control unit ❑Wide-area MNS to regional national alerting interface ❑ Local operating console(LOC) ❑Distributed recipient MNS(DRMNS) ❑Wide-area MNS to DRMNS interface ❑ Wide-area MNS to high-power speaker array(HPSA)interface ❑In-building MNS to wide-area MNS interface ❑Other(specify): 3.3 System Documentation a<n oxN neCs manual,a copy of the manufacturer's instructions.a written sequence of operation,and a copy of the numbered record drawings are stored on site. Location: 4") S 1 �� 3.4 System Software &I/his system does not have alterable site-specific software. Operating system(executive)software revision level: _X•5 Site-specific software revision date: �� to �S _ Revision completed by: .D Ca+ss✓' S� �� ❑A copy of the site-specific software is stored on site. Location: 3.5 Off-Premises Signal Transmission ❑This system does not have off-premises transmission. Name of organization receiving alarm signals with phone numbers. Alarm: ttS,g 060d� # q// — 67t il _ Phone: f'�f1Z4- �Y177/d Supervisory: IL ^ Phone: Trouble: (� -- Phone: u Entity to which alarms are retransmitted: _ Phone: Method of retransmission: S-,4 — pj4G'� If Chapter 26. specify the means of transmission from the protected premised to the supervising station: If Chapter 27. specify the type of auxiliary alarm system: ❑Local energy ❑ Shunt ❑Wired ❑Wireless NFPA 72 p.2 of 12 Life Safety, Seewity ante Communication Systems ISO 9001:2000 A7365 and UL UU.IS 56438 MA Lic 1194C • CT Lic 106016 • SSCO 000525 t Division of Cebula Electronics,Corp. F IRE 1411 66 Main Street Chicopee, Ma 01020 D (414)594-7710 Fax(413)594-9866 www.cebula.com FIRE ALARM AND EMERGENCY COMMUNICATION SYSTEM RECORD OF COMPLETION To be completed by the system installation contractor at the time of system acceptance and approval. Insert N/A in all unused lines. Attach additional sheets,data, or calculations as necessary to provide a complete record. 1. PROPERTY INFORMATION ww / c c i Name of property: C UJ/t�s #,e C i/" /"' Z s U• or Address: Description of Property: G 4-i G Occupancy type: Name of property representative: Address: Phone: Fax: E-mail: Authority having jurisdiction over the property: Die a e- e Phone: 3—Tr /—/b 36 Fax: E-mail: 2. INSTALLATION, SERVICE,AND TESTING CONTRACTOR INFORMATION Installation contractor for this equipment: 7 q Address: 116 r d License or certification num er n7k Phone: /— 6-66— Li f—F6,30 Fax: 1-YO,?— YA — 7L,5 E-mail: Service organization for this equipment:Fire Detection Systems Address:66 Main Street- Chicopee, MA 01020 License or certification number:1194C Phone:413-594-7710 Fax:413-594-9866 E-mail:fds @cebula.eom A contract for test and inspection in accordance with NFPA standards is in eft'ect as of: Contracted testing company: Address: Phone: Fax: E-mail: Contract expires: Contract number: Frequency of routine inspections: 3. DESFiC�iIPTION OF SYSTEM OR SERVICE Fire alarm system(nonvoice) ❑ Fire alarm with in-building fire emergency voice alarm communication system(EVACS) ❑ Mass notification system(MNS) ❑ Combination system.with the following components: ❑ Fire Alarm ❑ EVACS ❑ MNS ❑Two-way. in-building.emergency communication system ❑Other(specify): .,..i.„.. NFPA 72 p. 1 of 12 Life Safety, Security and Communication Systems ISO 9001:2000 A 7365 and UL UUJS S6438 MA Lic 1194C • CT Lic 106016 • SSCO 000525 -144 Tamper Switch 1 st Main system side 29809531 -145 Pull Station 1 st Pub exit Dual Action 29809539 -147 Battery Basement Fire alarm panel room 026 Sealed Lead Acid 29809432 -147 Control Panel Basement Fire alarm panel room 026 Dual Action 29809433 -147 Pull Station 1 st Exit by stair#1 Dual Action 29809552 -148 Pull Station 1 st Stair#1 exit Dual Action 29809553 -150 Pull Station 1 st By stair#2 Dual Action 29809536 -151 Waterflow Switch 1 st Stair#2 29809534 -152 Tamper Switch 1 st Stair#2 29809533 -153 CO Detector 1 st Mutipurpose room 29809542 -154 CO Detector 1 st Pub 29809537 -155 CO Detector 1 st Living area 29809524 -156 CO Detector 1 st Living area 29809523 -157 CO Detector 1 st Living area 29809522 -158 Tamper Switch 3rd Hall by stair#1 29809$49 -159 Tamper Switch 1 st By stair#2 29809535 -160 Waterflow Switch 2nd Stair#2 29809477 -161 Tamper Switch 2nd Stair#2 29809476 -166 CO Detector 2nd Mutipurpose room 29809451 -168 Pull Station 2nd By stair#1 Dual Action 29809454 -175 CO Detector 3rd Mutipurpose room 29809448 -68 Smoke Detector 3rd By elevator Photoelectric 3923801655 -70 Smoke Detector 3rd By laundry room Photoelectric 3923787331 -81 Smoke Detector 3rd Elevator lobby Photoelectric 3923771118 -82 Smoke Detector 3rd Hall by room 302 Photoelectric 3923805257 -83 Smoke Detector 3rd Hall by room 305 Photoelectric 3997843223 -83 Smoke Detector 3rd Hall by room 322 Photoelectric 3923815003 -84 Smoke Detector 3rd Hall by room 308 Photoelectric 3918715165 -85 Smoke Detector 3rd Hall by room 312 Photoelectric 3918738850 0169 Pull Station 3rd Floor Hallway By Room 321 Dual Action 30744614 0176 Pull Station 3rd Floor Hallway By Room 311 Dual Action 30744637 Fire Detection Systems 18 11/09/2015 -045 Smoke Detector 1 st Laundry room Photoelectric 3923806049 -046 Smoke Detector 1 st By bathrooms Photoelectric 3923806421 -047 Smoke Detector 1 st Multipurpose room Photoelectric 3923804878 -048 Smoke Detector 1 st Hall by room 112 Photoelectric 3923804960 -049 Smoke Detector 1 st Hall by room 114 Photoelectric 3923674129 -050 Smoke Detector 2nd Laundry room Photoelectric 3923805004 -051 Smoke Detector 2nd Hall by room 221 Photoelectric 3923773105 -052 Smoke Detector 2nd Hall by room 220 Photoelectric 3923786747 -053 Smoke Detector 2nd By laundry room Photoelectric 3923805707 -054 Smoke Detector 2nd Hall by offices Photoelectric 3923803758 -055 Smoke Detector 2nd Hall by room 226 Photoelectric 3923806346 -056 Smoke Detector 2nd Hall by room 230 Photoelectric 3923671609 -057 Smoke Detector 2nd Country kitchen vestibule Photoelectric 3923794247 -058 Heat Detector 2nd Country kitchen Fixed Temperature 3604100169 -059 Smoke Detector 2nd Multipurpose room Photoelectric 3923769344 -060 Smoke Detector 2nd Multipurpose room Photoelectric 3923670411 -061 Smoke Detector 2nd Hall by room 214 Photoelectric 3923775284 -063 Smoke Detector 2nd Hall by room 208 Photoelectric 3923783227 -064 Smoke Detector 2nd Hall by room 205 Photoelectric 3923775802 -065 Smoke Detector 2nd Hall by room 201 Photoelectric 3923782374 -066 Smoke Detector 2nd Hall elevator lobby Photoelectric 39238051 10 -067 Smoke Detector 2nd By elevator shaft Photoelectric 3923671043 -069 Smoke Detector 3rd Laundry room Photoelectric 3923814143 -070 Smoke Detector 3rd Stair#3 Photoelectric 3923793912 -071 Smoke Detector 3rd Hall by room 319 Photoelectric 3923786563 -072 Smoke Detector 3rd Hall by room 323 Photoelectric 3923813191 -073 Smoke Detector 3rd Hall by offices Photoelectric 3923783173 -074 Smoke Detector 3rd Hall by room 326 Photoelectric 3923775611 -075 Smoke Detector 3rd Stair#1 Photoelectric 3923770944 -076 Smoke Detector 3rd Hall by room 328 Photoelectric 3923624728 -077 Smoke Detector 3rd Photoelectric 3918739239 -078 Heat Detector 3rd Country kitchen Fixed Temperature 3604100343 -079 Smoke Detector 3rd Photoelectric 3923794230 -080 Smoke Detector 3rd Photoelectric 3918739222 -086 Smoke Detector 3rd Stair#3 Photoelectric 3997843216 -126 Pull Station Basement Recieving exit 028 Dual Action 29809445 -126 Expander Panel 2nd Electric room 29809452 -126 Battery 2nd Electric room Sealed Lead Acid 29809453 -127 Pull Station Basement Fire alarm panel room 026 Dual Action 30744588 -127 Pull Station Basement Kitchen Ansul Single Action 30744674 -127 Waterflow Switch 3rd Stair#2 29809446 -128 Pull Station Basement Exit by stair#3 Dual Action 29809514 -128 Tamper Switch 3rd Stair#2 29809447 -129 CO Detector Basement Mech. room 30744677 -130 CO Detector Basement Mech. room 30744676 -135 Waterflow Switch 1 st Stair#2 29809528 -136 Tamper Switch 1 st Stair#2 29809527 -137 Pull Station 1 st Vestibule exit Dual Action 29809521 -138 Pull Station 1 st Stair#3 exit Dual Action 29809516 -140 Pull Station 1 st By stair#3 Dual Action 29809515 -141 Tamper Switch 1 st By stair#3 29809529 -142 Tamper Switch 1 st Main city side 29809530 -143 Waterflow Switch 1 st Main 29809532 Fire Detection Systems 17 11/09/2015 Zone Address Report Generated by:BuitdingReports.com The Zone Address Report lists all of the devices and items that have an individual address, or are grouped together under a common zone. The device type, location, and description are included for your reference. - Heat Detector Basement Mech room Fixed Temperature 3604099616 -001 Smoke Detector Basement Recieving Photoelectric 3923812880 -002 Smoke Detector Basement Fire alarm panel room 026 Photoelectric 3923805301 -003 Smoke Detector Basement Main electric room Photoelectric 3918739208 -004 Smoke Detector Basement Exit by stair#3 Photoelectric 3923773129 -005 Smoke Detector Basement Tele / data room Photoelectric 392381 3375 -006 Smoke Detector Basement Hall by tele / data room Photoelectric 3924413642 -008 Smoke Detector Basement Hall by elev. mach room Photoelectric 3923660474 -009 Smoke Detector Basement Elevator lobby Photoelectric 3923814983 -011 Smoke Detector Basement Elev mach rm Photoelectric 3923804687 -012 Heat Detector Basement Kitchen Fixed Temperature 3604087439 -013 Heat Detector Basement Kitchen Fixed Temperature 3604102606 -014 Smoke Detector Basement Bottom of stair#3 Photoelectric 3923804922 -015 Smoke Detector Basement Hall by bathrooms Photoelectric 3923815034 -017 Smoke Detector Basement Storage room Photoelectric 3923805288 -018 Smoke Detector Basement Storage room Photoelectric 3923773099 -019 Smoke Detector 1 st Salon Photoelectric 3923807886 -020 Smoke Detector 1 st Lobby Photoelectric 3923805097 -021 Smoke Detector 1 st Vestibule Photoelectric 3923805264 -022 Smoke Detector 1 st Hall by admin. Photoelectric 3923813306 -023 Smoke Detector 1 st Conference room 116 Photoelectric 3923815089 -024 Smoke Detector 1 st Stair#3 exit Photoelectric 3923672545 -025 Smoke Detector 1 st Hall by room 108 Photoelectric 3923800757 -026 Smoke Detector 1 st Hall by room 105 Photoelectric 3923813290 -027 Smoke Detector 1 st Hall by room 104 Photoelectric 3923804427 -028 Smoke Detector 1 st Hall by room 102 Photoelectric 3923803369 -029 Smoke Detector 1 st Hall by main lobby Photoelectric 3923805417 -030 Smoke Detector 1 st Living area Photoelectric 3923773273 -031 Smoke Detector 1st Reading room Photoelectric 3923805592 -032 Smoke Detector 1 st Elevator lobby Photoelectric 3923803352 -033 Smoke Detector 1 st Pub by bar Photoelectric 3923804809 -034 Smoke Detector 1 st Hall by multi room Photoelectric 3923797422 -035 Smoke Detector 1 st Pub by exit Photoelectric 3923803697 -036 Smoke Detector 1 st Hall by room 118 Photoelectric 3923807282 -037 Smoke Detector 1 st Hall by room 121 Photoelectric 3923804533 -038 Smoke Detector 1 st Hall by room 120 Photoelectric 3923800290 -039 Smoke Detector 1 st Bottom of stair#1 Photoelectric 3923806339 -040 Smoke Detector 1 st Stair#1 exit Photoelectric 3923805530 -041 Smoke Detector 1st Multipurpose room Photoelectric 3923806384 -042 Duct Detector Basement Kitchen MUA-1 Photoelectric 29809520 -042 Smoke Detector 1st Multipurpose room Photoelectric 3923670985 -043 Smoke Detector 1 st By elevator shaft Photoelectric 3923797545 Fire Detection Systems 16 11/09/2015 Horn/Strobe 1 ESTWG4WF-HV 11/05/2015 MC Horn/Strobe 13 GL1WF-HDVI 11/05/2015 Horn/Strobe 26 GLl WFHDVI 11/05/2015 Power Supply 1 BPS10 11/05/2015 Power Supply 1 BPS 10A 11/05/2015 Pull Station 11 ESTSIGA-278 Dual Action 11/05/2015 Pull Station 4 SIGA-278 Dual Action 11/05/2015 Releasing Device 10 EST Door Holder 11/05/2015 Smoke Detector 79 ESTSIGA2-PS Photoelectric 11/05/2015 Strobe 1 ESTGLI WF-HDV 11/05/2015 1 Strobe 9 ESTGLI WF-VM 11/05/2015 C Tamper Switch 2 ESTSIGA-CTI 11/05/2015 Tamper Switch 7 ESTSIGA-CT2 11/05/2015 Waterflow Switch 5 ESTSIGA-CT2 11/05/2015 Yuasa Battery 1 BATNP7-12 Sealed Lead Acid 11/05/2015 Battery 1 NP7-12 11/05/2015 Battery 2 NP7-12 Sealed Lead Acid 11/05/2015 Fire Detection Systems 15 11/09/2015 Inventory & Warranty Report Generated by:BuildingReports.com The Inventory& Warranty Report lists each of the devices and items that are included in your Inspection Report.A complete inventory count by device type and category is provided. Items installed within the last 90 days, within the last year, and devices installed for two years or more are grouped together for easy reference. Horn/Strobe Indicating 20.13% 60 Pull Station Initiating 5.37% 16 Power Supply Control 0.67% 2 Battery Control 1.68% 5 Horn Indicating 27.18% 81 Releasing Device Auxiliary 4.03% 12 Strobe Indicating 3.36% 10 Heat Detector Initiating 1.68% 5 Smoke Detector Initiating 26.51% 79 Waterflow Switch Initiating 1.68% 5 CO Detector Initiating 3.02% 9 Expander Panel Control 0.34% 1 Tamper Switch Supervisory 3.02% 9 Control Panel Control 0.34% 1 Communicator Control 0.34% 1 Duct Detector Initiating 0.34% 1 Annunciator Control 0.34% 1 Releasing Device 2 Door Holder 11/05/2015 ANSUL Pull Station 1 ESTSIGA-CT1 Single Action 11/05/2015 Edwards Battery 1 10-50OG Sealed Lead Acid 11/05/2015 Communicator 1 SA-DACT Digital Communicator 11/05/2015 Control Panel 1 10-50OG Dual Action 11/05/2015 Expander Panel 1 ESTBPSIOA 11/05/2015 ESL CO Detector 9 ESL26000 11/05/2015 EST Annunciator 1 EST LCDC 11/05/2015 Duct Detector 1 ESTSIGASD Photoelectric 11/05/2015 Heat Detector 5 ESTSIGA2-HFS Fixed Temperature 11/05/2015 Horn 2 EST 11/05/2015 Horn 22 ESTG4LFWF-H 11/05/2015 Horn 57 G4LFWF-H 11/05/2015 Horn/Strobe 1 ESTG4LFWF-H 11/05/2015 Horn/Strobe 19 ESTGLIWF-HDV 11/05/2015 I Fire Detection Systems 14 11/09/2015 Battery & Power Supply Testing Generated by:BuildingReports.com Ell The Control&Power Testing section details the readings and measurements of batteries and power supplies used to provide power to the fire alarm and life safety systems.Items are grouped by Passed or Failed/Other. Battery Sealed Lead Acid Basement Fire alarm panel room 026 Passed 12 12 13.4 13.4 Sealed Lead Acid 2nd Electric room Passed 7 12 1 st FLR BPS Laundry Room Passed 7 12 13.4 13.2 Sealed Lead Acid 3rd Floor Electrical Closet Room 384 Passed 7 12 13.4 13.2 Sealed Lead Acid 3rd Floor Electrical Closet Room 384 Passed 7 12 13.4 13.2 Power Supply 3rd Floor Electrical Closet Room 384 Passed 10 24 Fire Detection Systems 13 11/09/2015 Smoke Management Testing Generated by:BuildingReports.com MEER The Smoke Management Testing section details the test and inspection of device items that are involved in controlling the spread of smoke in a building.Items are grouped by Passed or Failed/Other. Releasing Device 11 Door Holder Passed 29809540 1 st By laundry 1 st By laundry Door Holder Passed 29809541 11 1 st By room 102 Door Holder Passed 29809517 ❑ 1 st By room 102 Door Holder Passed 29809518 ❑ 1 st By room 118 Door Holder Passed 29809544 11 1 st By room 118 Door Holder Passed 29809545 O 2nd By laundry Door Holder Passed 29809481 ❑ 2nd By laundry Door Holder Passed 29809480 ❑ 2nd By room 201 Door Holder Passed 29809474 ❑ 2nd By room 201 Door Holder Passed 29809475 ❑ 3rd Floor Hallway Door Holder Passed 30744619 ❑ 3rd Floor Hallway By Elevator Door Holder Passed 30744621 11 Fire Detection Systems 12 11/09/2015 Auxiliary Functions Testing Generated by:BuildingReports.com The Auxiliary Functions Testing section lists each of the ancillary items, systems, and emergency equipment that are controlled by the system control unit.Items are grouped by Passed or Failed/Other. The items are listed by device type, and a check box is provided to indicate if the test conducted was simulated. Releasing Device Door Holder 1 st By laundry Passed 29809540 0 Door Holder 1 st By laundry Passed 29809541 Door Holder 1 st By room 102 Passed 29809517 Door Holder 1 st By room 102 Passed 29809518 Door Holder 1 st By room 118 Passed 29809544 Door Holder 1 st By room 1 18 Passed 29809545 ❑ Door Holder 2nd By laundry Passed 29809481 ❑ Door Holder 2nd By laundry Passed 29809480 11 Door Holder 2nd By room 201 Passed 29809474 ❑ Door Holder 2nd By room 201 Passed 29809475 11 Door Holder 3rd Floor Hallway Passed 30744619 ❑ Door Holder 3rd Floor Hallway By Elevator Passed 30744621 11 Fire Detection Systems 11 11/09/2015 Service Summary Generated by:BuildingReports.com MEN III:! The Service Summary section provides an overview of the services performed in this report. Annunciator Tested 1 Battery Tested 5 CO Detector Tested 9 Communicator Tested 1 Control Panel Tested 1 Duct Detector Tested 1 Expander Panel Tested 1 Heat Detector Tested 5 Horn/Strobe Tested 60 Horn Tested 81 Power Supply Tested 2 Pull Station Tested 16 Releasing Device Tested 12 Smoke Detector Tested 79 Strobe Tested 10 Tamper Switch Tested 9 Waterflow Switch Tested 5 Total 298 Fire Detection Systems 10 11/09/2015 .! ,'k� �"'� xE;e� c wie3v ':.k.� �„�i, z. �'�z �'oA.,.'�fi "�,4 ✓'AF ..t'Y 3. Waterflow Switch 1 st Main Tested 4:55:17 PM 11/05/2015 Waterflow Switch 1 st Stair#2 Tested 4:50:33 PM 11/05/2015 Waterflow Switch 1 st Stair#2 Tested 5:06:06 PM 11/05/2015 Waterflow Switch 2nd Stair#2 Tested 3:29:19 PM 11/05/2015 Waterflow Switch 3rd Stair#2 Tested 2:05:31 PM 11/05/2015 Supervisory Tamper Switch 1 st By stair#2 Tested 4:49:13 PM 11/05/2015 Tamper Switch 1 st By stair#3 Tested 5:00:36 PM 11/05/2015 Tamper Switch 1 st Main city side Tested 4:54:59 PM 11/05/2015 Tamper Switch 1 st Main system side Tested 4:53:47 PM 11/05/2015 Tamper Switch 1 st Stair#2 Tested 4:51:14 PM 11/05/2015 Tamper Switch 1 st Stair#2 Tested 5:05:14 PM 11/05/2015 Tamper Switch 2nd Stair#2 Tested 3:29:01 PM 11/05/2015 Tamper Switch 3rd Hall by stair#1 Tested 4:11:38 PM 11/05/2015 Tamper Switch 3rd Stair#2 Tested 3:30:01 PM 11/05/2015 Fire Detection Systems 9 11/09/2015 gm Smoke Detector 1 st Hall by room 121 Tested 4:05:31 PM 11/05/2015 Smoke Detector 1 st Laundry room Tested 4:29:52 PM 11/05/2015 Smoke Detector 1 st Living area Tested 2:42:25 PM 11/06/2015 Smoke Detector 1 st Lobby Tested 2:51:34 PM 11/06/2015 Smoke Detector 1 st Multipurpose room Tested 4:23:26 PM 11/05/2015 Smoke Detector 1 st Multipurpose room Tested 4:24:53 PM 11/05/2015 Smoke Detector 1 st Multipurpose room Tested 4:27:06 PM 11/05/2015 Smoke Detector 1 st Pub by bar Tested 4:40:14 PM 11/05/2015 Smoke Detector 1 st Pub by exit Tested 4:37:03 PM 11/05/2015 Smoke Detector 1 st Reading room Tested 2:41:28 PM 11/06/2015 Smoke Detector 1 st Salon Tested 2:39:03 PM 11/06/2015 Smoke Detector 1 st Stair#1 exit Tested 4:15:16 PM 11/05/2015 Smoke Detector 1 st Stair#3 exit Tested 3:13:25 PM 11/06/2015 Smoke Detector 1 st Vestibule Tested 2:51:57 PM 11/06/2015 Smoke Detector 2nd By elevator shaft Tested 2:59:38 PM 11/05/2015 Smoke Detector 2nd By laundry room Tested 3:06:21 PM 11/05/2015 Smoke Detector 2nd Country kitchen vestibule Tested 2:50:00 PM 11/05/2015 Smoke Detector 2nd Hall by offices Tested 2:52:34 PM 11/05/2015 Smoke Detector 2nd Hall by room 201 Tested 3:35:52 PM 11/05/2015 Smoke Detector 2nd Hall by room 205 Tested 3:40:22 PM 11/05/2015 Smoke Detector 2nd Hall by room 208 Tested 3:43:32 PM 11/05/2015 Smoke Detector 2nd Hall by room 214 Tested 3:49:18 PM 11/05/2015 Smoke Detector 2nd Hall by room 220 Tested 3:18:42 PM 11/05/2015 Smoke Detector 2nd Hall by room 221 Tested 3:17:58 PM 11/05/2015 Smoke Detector 2nd Hall by room 226 Tested 2:50:51 PM 11/05/2015 Smoke Detector 2nd Hall by room 230 Tested 2:47:57 PM 11/05/2015 Smoke Detector 2nd Hall elevator lobby Tested 3:33:35 PM 11/05/2015 Smoke Detector 2nd Laundry room Tested 3:07:12 PM 11/05/2015 Smoke Detector 2nd Multipurpose room Tested 2:53:33 PM 11/05/2015 Smoke Detector 2nd Multipurpose room Tested 2:56:12 PM 11/05/2015 Smoke Detector 3rd Tested 1:51:52 PM 11/05/2015 Smoke Detector 3rd Tested 1:52:40 PM 11/05/2015 Smoke Detector 3rd Tested 1:55:44 PM 11/05/2015 Smoke Detector 3rd By elevator Tested 12:55:35 PM 11/05/2015 Smoke Detector 3rd By laundry room Tested 12:57:39 PM 11/05/2015 Smoke Detector 3rd Elevator lobby Tested 12:54:49 PM 11/05/2015 Smoke Detector 3rd Hall by offices Tested 1:50:30 PM 11/05/2015 Smoke Detector 3rd Hall by room 302 Tested 12:52:28 PM 11/05/2015 Smoke Detector 3rd Hall by room 305 Tested 12:51:32 PM 11/05/2015 Smoke Detector 3rd Hall by room 308 Tested 12:47:55 PM 11/05/2015 Smoke Detector 3rd Hall by room 312 Tested 12:46:27 PM 11/05/2015 Smoke Detector 3rd Hall by room 319 Tested 1:44:25 PM 11/05/2015 Smoke Detector 3rd Hall by room 322 Tested 12:44:51 PM 11/05/2015 Smoke Detector 3rd Hall by room 323 Tested 1:45:49 PM 11/05/2015 Smoke Detector 3rd Hall by room 326 Tested 1:54:23 PM 11/05/2015 Smoke Detector 3rd Hall by room 328 Tested 1:57:54 PM 11/05/2015 Smoke Detector 3rd Laundry room Tested 1:43:15 PM 11/05/2015 Smoke Detector 3rd Stair#1 Tested 1:59:58 PM 11/05/2015 Smoke Detector 3rd Stair#3 Tested 1:48:56 PM 11/05/2015 Smoke Detector 3rd Stair#3 Tested 2:13:49 PM 11/05/2015 Fire Detection Systems 8 11/09/2015 v a f ;s Won, Heat Detector Basement Kitchen Tested 12:27:23 PM 11/05/2015 Heat Detector Basement Kitchen Tested 12:28:14 PM 11/05/2015 Heat Detector Basement Mech room Tested 12:08:02 PM 11/05/2015 Heat Detector 2nd Country kitchen Tested 12:35:43 PM 11/05/2015 Heat Detector 3rd Country kitchen Tested 12:42:28 PM 11/05/2015 Pull Station Basement Exit by stair#3 Tested 3:43:42 PM 11/06/2015 Pull Station Basement Fire alarm panel room 026 Tested 1:37:47 PM 11/05/2015 Pull Station Basement Kitchen Ansul Tested 11:43:13 AM 11/05/2015 Pull Station Basement Recieving exit 028 Tested 1:33:06 PM 11/05/2015 Pull Station 1 st By stair#2 Tested 4:44:12 PM 11/05/2015 Pull Station 1 st By stair#3 Tested 3:16:46 PM 11/06/2015 Pull Station 1 st Exit by stair#1 Tested 4:04:21 PM 11/05/2015 Pull Station 1 st Pub exit Tested 4:34:58 PM 11/05/2015 Pull Station 1 st Stair#1 exit Tested 4:01:48 PM 11/05/2015 Pull Station 1 st Stair#3 exit Tested 3:1 5:20 PM 11/06/2015 Pull Station 1 st Vestibule exit Tested 2:54:46 PM 11/06/2015 Pull Station 2nd By stair#1 Tested 3:52:42 PM 11/05/2015 Pull Station 2nd Floor Hallway By Room 228 Stairwell Tested 11:12:35 AM 11/05/2015 Pull Station 3rd Floor Hallway By Room 311 Tested 11:00:43 AM 11/05/2015 Pull Station 3rd Floor Hallway By Room 321 Tested 10:38:18 AM 11/05/2015 Pull Station 3rd Floor Hallway By Room Tested 10:08:51 AM 11/05/2015 Smoke Detector Basement Bottom of stair#3 Tested 3:42:12 PM 11/06/2015 Smoke Detector Basement Elev mach rm Tested 3:56:04 PM 11/06/2015 Smoke Detector Basement Elevator lobby Tested 3:31:58 PM 11/06/2015 Smoke Detector Basement Exit by stair#3 Tested 3:43:07 PM 11/06/2015 Smoke Detector Basement Fire alarm panel room 026 Tested 3:45:22 PM 11/06/2015 Smoke Detector Basement Hall by bathrooms Tested 3:37:52 PM 11/06/2015 Smoke Detector Basement Hall by elev. mach room Tested 3:33:28 PM 11/06/2015 Smoke Detector Basement Hall by tele / data room Tested 3:34:55 PM 11/06/2015 Smoke Detector Basement Main electric room Tested 3:37:13 PM 11/06/2015 Smoke Detector Basement Recieving Tested 3:27:15 PM 11/06/2015 Smoke Detector Basement Storage room Tested 3:38:58 PM 11/06/2015 Smoke Detector Basement Storage room Tested 3:39:34 PM 11/06/2015 Smoke Detector Basement Tele / data room Tested 3:38:14 PM 11/06/2015 Smoke Detector 1 st Bottom of stair#1 Tested 4:19:01 PM 11/05/2015 Smoke Detector 1 st By bathrooms Tested 4:30:53 PM 11/05/2015 Smoke Detector 1 st By elevator shaft Tested 4:32:46 PM 11/05/2015 Smoke Detector 1 st Conference room 116 Tested 3:06:38 PM 11/06/2015 Smoke Detector 1 st Elevator lobby Tested 2:36:31 PM 11/06/2015 Smoke Detector 1 st Hall by admin. Tested 3:04:42 PM 11/06/2015 Smoke Detector 1 st Hall by main lobby Tested 3:02:09 PM 11/06/2015 Smoke Detector 1 st Hall by multi room Tested 4:22:54 PM 11/05/2015 Smoke Detector 1 st Hall by room 102 Tested 3:08:28 PM 11/06/2015 Smoke Detector 1 st Hall by room 104 Tested 3:09:47 PM 11/06/2015 Smoke Detector 1 st Hall by room 105 Tested 3:10:44 PM 11/06/2015 Smoke Detector 1 st Hall by room 108 Tested 3:11:50 PM 11/06/2015 Smoke Detector 1 st Hall by room 112 Tested 4:43:09 PM 11/05/2015 Smoke Detector 1 st Hall by room 114 Tested 4:45:13 PM 11/05/2015 Smoke Detector 1 st Hall by room 118 Tested 4:20:14 PM 11/05/2015 Smoke Detector 1 st Hall by room 120 Tested 4:08:33 PM 11/05/2015 Fire Detection Systems 7 11/09/2015 'F-P "m 1", � � 11 Horn/Strobe 1 st Fir Main common area Tested 12:20:33 PM 11/05/2015 Horn/Strobe 1 st Fir Main common area Tested 12:22:54 PM 11/05/2015 Horn/Strobe 1 st Fir Main common area room by fire place Tested 3:27:03 PM 11/06/2015 Horn/Strobe 2nd Floor Conference Room Tested 11:16:18 AM 11/05/2015 Horn/Strobe 2nd Floor Conference Room Tested 11:17:41 AM 11/05/2015 Horn/Strobe 2nd Floor Conference Room Kitchen Tested 11:16:53 AM 11/05/2015 Horn/Strobe 2nd Floor Hallway By Room 226 Tested 11:15:12 AM 11/05/2015 Horn/Strobe 2nd Floor Hallway By Room 227 Tested 11:10:04 AM 11/05/2015 Horn/Strobe 2nd Floor Hallway By Room 258 Tested 11:19:39 AM 11/05/2015 Horn/Strobe 2nd Floor Room 242 Tested 11:21:33 AM 11/05/2015 Horn/Strobe 2nd Floor Room 258 Tested 11:20:23 AM 11/05/2015 Horn/Strobe 3rd Floor Bathroom 301 Tested 10:47:17 AM 11/05/2015 Horn/Strobe 3rd Floor Hallway By Elevator Tested 10:45:08 AM 11/05/2015 Horn/Strobe 3rd Floor Hallway By Room Tested 10:07:35 AM 11/05/2015 Horn/Strobe 3rd Floor Hallway By Room 302 Tested 10:48:56 AM 11/05/2015 Horn/Strobe 3rd Floor Hallway By Room 309 Tested 10:54:44 AM 11/05/2015 Horn/Strobe 3rd Floor Hallway By Room 314 Tested 11:02:54 AM 11/05/2015 Horn/Strobe 3rd Floor Hallway By Room 318 Tested 10:32:05 AM 11/05/2015 Horn/Strobe 3rd Floor Hallway By Room 323 Tested 10:38:57 AM 11/05/2015 Horn/Strobe 3rd Floor Hallway By Room 326 Tested 10:30:13 AM 11/05/2015 Horn/Strobe 3rd Floor Hallway By Room 360 Tested 10:31:35 AM 11/05/2015 Horn/Strobe 3rd Floor Office Tested 10:31:05 AM 11/05/2015 Horn/Strobe 3rd Floor Room Tested 10:12:44 AM 11/05/2015 Horn/Strobe 3rd Floor Room Tested 10:13:14 AM 11/05/2015 Horn/Strobe 3rd Floor Room Tested 10:13:57 AM 11/05/2015 Horn/Strobe 3rd Floor Room 301 Tested 10:46:27 AM 11/05/2015 Horn/Strobe 3rd Floor Room 342 Tested 10:18:35 AM 11/05/2015 Horn/Strobe 3rd Floor Room 381 Tested 10:25:47 AM 11/05/2015 Horn/Strobe 3rd Floor Room 386 Tested 10:20:27 AM 11/05/2015 Strobe Basement DATA ROOM Tested 11:47:10 AM 11/05/2015 Strobe Basement Restroom Tested 11:13:47 AM 11/05/2015 Strobe Basement Restroom Tested 11:20:38 AM 11/05/2015 Strobe Basement Electrical Room Tested 11:47:40 AM 11/05/2015 Strobe 2nd Bathroom by laundry Tested 3:20:02 PM 11/05/2015 Strobe 2nd Laundry Tested 3:20:47 PM 11/05/2015 Strobe 2nd Room 226 bathroom Tested 3:26:50 PM 11/05/2015 Strobe 1 st FLR Conference room Tested 3:10:24 PM 11/06/2015 Strobe 1 st FLR Restroom Tested 12:18:21 PM 11/05/2015 Strobe 1 st FLR Restroom Tested 12:19:30 PM 11/05/2015 Initiating CO Detector Basement Mech. room Tested 3:30:01 PM 11/06/2015 CO Detector Basement Mech. room Tested 3:31:19 PM 11/06/2015 CO Detector 1 st Living area Tested 2:44:47 PM 11/06/2015 CO Detector 1 st Living area Tested 2:46:14 PM 11/06/2015 CO Detector 1 st Living area Tested 2:46:57 PM 11/06/2015 CO Detector 1 st Mutipurpose room Tested 4:25:44 PM 11/05/2015 CO Detector 1 st Pub Tested 4:38:33 PM 11/05/2015 CO Detector 2nd Mutipurpose room Tested 2:55:21 PM 11/05/2015 CO Detector 3rd Mutipurpose room Tested 2:28:59 PM 11/05/2015 Duct Detector Basement Kitchen MUA-1 Tested 2:56:49 PM 11/06/2015 Fire Detection Systems 6 11/09/2015 f i Horn 3rd Floor Room 308 Tested 10:53:52 AM 11/05/2015 Horn 3rd Floor Room 309 Tested 10:56:33 AM 11/05/2015 Horn 3rd Floor Room 310 Tested 10:55:33 AM 11/05/2015 Horn 3rd Floor Room 311 Tested 10:59:01 AM 11/05/2015 Horn 3rd Floor Room 312 Tested 10:57:17 AM 11/05/2015 Horn 3rd Floor Room 313 Tested 11:01:34 AM 11/05/2015 Horn 3rd Floor Room 314 Tested 11:02:19 AM 11/05/2015 Horn 3rd Floor Room 316 Tested 11:03:32 AM 11/05/2015 Horn 3rd Floor Room 318 Tested 10:32:53 AM 11/05/2015 Horn 3rd Floor Room 319 Tested 10:35:15 AM 11/05/2015 Horn 3rd Floor Room 320 Tested 10:33:56 AM 11/05/2015 Horn 3rd Floor Room 321 Tested 10:36:48 AM 11/05/2015 Horn 3rd Floor Room 322 Tested 10:35:56 AM 11/05/2015 Horn 3rd Floor Room 322 Tested 10:42:38 AM 11/05/2015 Horn 3rd Floor Room 326 Tested 10:30:38 AM 11/05/2015 Horn 3rd Floor Room 328 Tested 10:29:23 AM 11/05/2015 Horn 3rd Floor Room 329 Tested 10:28:17 AM 11/05/2015 Horn 3rd Floor Room 330 Tested 10:28:54 AM 11/05/2015 Horn 3rd Floor Room 327 Tested 10:27:49 AM 11/05/2015 Horn/Strobe Basement Break Room Tested 11:21:41 AM 11/05/2015 Horn/Strobe Basement FACP ROOM Tested 10:51:12 AM 11/05/2015 Horn/Strobe Basement Hallway by Elevator Tested 11:45:03 AM 11/05/2015 Horn/Strobe Basement Hallway by Elevator machine room Tested 11:44:58 AM 11/05/2015 Horn/Strobe Basement Hallway by Restroom Tested 11:12:03 AM 11/05/2015 Horn/Strobe Basement Hallway by stairway exit Tested 11:48:46 AM 11/05/2015 Horn/Strobe Basement Kitchen Tested 11:27:12 AM 11/05/2015 Horn/Strobe Basement Kitchen by co detector Tested 11:40:44 AM 11/05/2015 Horn/Strobe Basement Mechanical Room Tested 11:50:46 AM 11/05/2015 Horn/Strobe Basement Exit Ramp for mech rm Tested 11:08:23 AM 11/05/2015 Horn/Strobe Basement OUTSIDE FACP ROOM WALL Tested 11:05:55 AM 11/05/2015 Horn/Strobe 1 st By main lobby Tested 2:59:01 PM 11/06/2015 Horn/Strobe 1 st By pub exit Tested 4:36:06 PM 11/05/2015 Horn/Strobe 1 st Exit by stair#1 Tested 4:14:10 PM 11/05/2015 Horn/Strobe 1 st Hall by multi room Tested 4:21:46 PM 11/05/2015 Horn/Strobe 1 st Hall by stair#1 Tested 4:12:05 PM 11/05/2015 Horn/Strobe 1 st Living area Tested 2:43:43 PM 11/06/2015 Horn/Strobe 1 st Salon Tested 2:38:19 PM 11/06/2015 Horn/Strobe 2nd By room 201 Tested 3:37:49 PM 11/05/2015 Horn/Strobe 2nd By room 216 Tested 3:51:31 PM 11/05/2015 Horn/Strobe 2nd Hall by laundry Tested 3:08:45 PM 11/05/2015 Horn/Strobe 2nd Hall by room 221 Tested 3:14:39 PM 11/05/2015 Horn/Strobe Roof By REF-9 Tested 2:37:12 PM 11/05/2015 Horn/Strobe Roof By RTU-7 Tested 2:38:59 PM 11/05/2015 Horn/Strobe 1 st Fir Hallway by room 107 Tested 3:17:27 PM 11/06/2015 Horn/Strobe 1 st FLR Hallway by room 116 Tested 3:10:56 PM 11/06/2015 Horn/Strobe 1 st Fir Hallway by room 122 Tested 12:27:40 PM 11/05/2015 Horn/Strobe 1 st Fir Hallway by stair 3 exit Tested 3:19:17 PM 11/06/2015 Horn/Strobe 1 st FLR Hallway by Room 101 Tested 3:02:20 PM 11/06/2015 Horn/Strobe 1 st FLR Hallway by Room 1 1 1 Tested 12:11:21 PM 11/05/2015 Horn/Strobe 1 st FLR Hallway by Room 1 1 5 Tested 12:04:32 PM 11/05/2015 Fire Detection Systems 5 11/09/2015 "�-+��.�r+,vc .'°� +, fiM p x m 1. ? x "'.d#i s;✓y' '3' '�, pff a "iP;'• � Y r.. Horn 2nd Room 210 Tested 3:45:49 PM 11/05/2015 Horn 2nd Room 211 Tested 3:47:11 PM 11/05/2015 Horn 2nd Room 212 Tested 3:46:42 PM 11/05/2015 Horn 2nd Room 213 Tested 3:48:28 PM 11/05/2015 Horn 2nd Room 214 Tested 3:48:52 PM 11/05/2015 Horn 2nd Room 215 Tested 3:50:19 PM 11/05/2015 Horn 2nd Room 216 Tested 3:50:45 PM 11/05/2015 Horn 2nd Room 217 Tested 3:11:21 PM 11/05/2015 Horn 2nd Room 218 Tested 3:10:13 PM 11/05/2015 Horn 2nd Room 219 Tested 3:12:25 PM 11/05/2015 Horn 2nd Room 220 Tested 3:11:56 PM 11/05/2015 Horn 2nd Room 221 Tested 3:13:33 PM 11/05/2015 Horn 2nd Room 222 Tested 3:13:08 PM 11/05/2015 Horn 2nd Room 223 Tested 3:15:14 PM 11/05/2015 Horn 2nd Room 224 Tested 3:17:04 PM 11/05/2015 Horn 2nd Room 225 Tested 3:15:51 PM 11/05/2015 Horn 2nd Room 226 Tested 3:25:44 PM 11/05/2015 Horn 1 st FLR Hallway Admin Tested 3:05:40 PM 11/06/2015 Horn 1 st FLR Room 101 Bedroom Tested 3:04:13 PM 11/06/2015 Horn 1 st FLR Room 102 Bedroom Tested 3:11:59 PM 11/06/2015 Horn 1 st FLR Room 103 Bedroom Tested 3:14:47 PM 11/06/2015 Horn 1 st FLR Room 104 Bedroom Tested 3:13:57 PM 11/06/2015 Horn 1 st FLR Room 105 Bedroom Tested 3:16:30 PM 11/06/2015 Horn 1 st FLR Room 106 Bedroom Tested 3:15:44 PM 11/06/2015 Horn 1 st FLR Room 107 Bedroom Tested 3:18:36 PM 11/06/2015 Horn 1 st FLR Room 108 Bedroom Tested 3:21:51 PM 11/06/2015 Horn 1 st FLR Room 109 Bedroom Tested 3:22:42 PM 11/06/2015 Horn 1 st FLR Room 110 Bedroom Tested 3:23:43 PM 11/06/2015 Horn 1 st FLR Room 1 1 1 Bedroom Tested 12:10:21 PM 11/05/2015 Horn 1 st FLR Room 112 Bedroom Tested 12:07:40 PM 11/05/2015 Horn 1 st FLR Room 1 1 3 Bedroom Tested 12:06:33 PM 11/05/2015 Horn 1 st FLR Room 114 Bedroom Tested 12:09:07 PM 11/05/2015 Horn 1 st FLR Room 1 1 5 Bedroom Tested 12:03:23 PM 11/05/2015 Horn 1 st FLR Room 116 Bedroom Tested 12:02:02 PM 11/05/2015 Horn 1 st FLR Room 1 1 7 Bedroom Tested 11:55:23 AM 11/05/2015 Horn 1 st FLR Room 121 Bedroom Tested 12:26:54 PM 11/05/2015 Horn 1 st FLR Room 122 Bedroom Tested 12:26:01 PM 11/05/2015 Horn 1 st FLR Room 123 Bedroom Tested 12:25:08 PM 11/05/2015 Horn 2nd Floor Bedroom 230 Tested 11:08:08 AM 11/05/2015 Horn 2nd Floor Room 227 Tested 11:09:13 AM 11/05/2015 Horn 2nd Floor Room 228 Tested 11:11:1 7 AM 11/05/2015 Horn 2nd Floor Room 229 Tested 11:07:26 AM 11/05/2015 Horn 3rd Floor Bedroom 315 Tested 11:04:33 AM 11/05/2015 Horn 3rd Floor Bedroom 324 Tested 10:39:37 AM 11/05/2015 Horn 3rd Floor Room 302 Tested 10:48:10 AM 11/05/2015 Horn 3rd Floor Room 303 Tested 10:49:47 AM 11/05/2015 Horn 3rd Floor Room 304 Tested 10:50:26 AM 11/05/2015 Horn 3rd Floor Room 305 Tested 10:51:19 AM 11/05/2015 Horn 3rd Floor Room 306 Tested 10:52:06 AM 11/05/2015 Horn 3rd Floor Room 307 Tested 10:52:46 AM 11/05/2015 Fire Detection Systems 4 11/09/2015 T T Inspection & Testing Generated by:BuildingReports.com The Inspection&Testing section lists all of the items inspected in your building. Items are grouped by Passed or Failed/Other.Items are listed by Category. Each item includes the services performed, and the time&date at which testing occurred. Auxiliary Releasing Device 1 st By laundry Tested 4:32:10 PM 11/05/2015 Releasing Device 1 st By laundry Tested 4:32:25 PM 11/05/2015 Releasing Device 1 st By room 102 Tested 3:03:48 PM 11/06/2015 Releasing Device 1 st By room 102 Tested 3:03:59 PM 11/06/2015 Releasing Device 1 st By room 118 Tested 4:18:06 PM 11/05/2015 Releasing Device 1 st By room 118 Tested 4:18:22 PM 11/05/2015 Releasing Device 2nd By laundry Tested 3:23:00 PM 11/05/2015 Releasing Device 2nd By laundry Tested 3:23:32 PM 11/05/2015 Releasing Device 2nd By room 201 Tested 3:35:01 PM 11/05/2015 Releasing Device 2nd By room 201 Tested 3:35:12 PM 11/05/2015 Releasing Device 3rd Floor Hallway Tested 10:44:23 AM 11/05/2015 Releasing Device 3rd Floor Hallway By Elevator Tested 10:45:47 AM 11/05/2015 Control Annunciator 1 st Flr Main Entrance Tested 4:12:18 PM 11/06/2015 Battery Basement Fire alarm panel room 026 Tested H: 1:09 AM 11/06/2015 Battery 2nd Electric room Tested 3:05:46 PM 11/05/2015 Battery 1 st FLR BPS Laundry Room Tested 12:15:21 PM 11/05/2015 Battery 3rd Floor Electrical Closet Room 384 Tested 10:24:15 AM 11/05/2015 Battery 3rd Floor Electrical Closet Room 384 Tested 10:24:31 AM 11/05/2015 Communicator Basement Fire alarm panel room 026 Tested 11:17:30 AM 11/06/2015 Control Panel Basement Fire alarm panel room 026 Tested 11:08:42 AM 11/06/2015 Expander Panel 2nd Electric room Tested 3:06:08 PM 11/05/2015 Power Supply 1 st FLR Laundry Room Tested 12:13:33 PM 11/05/2015 Power Supply 3rd Floor Electrical Closet Room 384 Tested 10:23:18 AM 11/05/2015 Indicating Horn 1 st Room 118 Tested 4:17:08 PM 11/05/2015 Horn 1 st Room 119 Tested 4:07:15 PM 11/05/2015 Horn 1 st Room 120 Tested 4:07:50 PM 11/05/2015 Horn 2nd Room 201 Tested 3:36:34 PM 11/05/2015 Horn 2nd Room 202 Tested 3:38:18 PM 11/05/2015 Horn 2nd Room 203 Tested 3:38:51 PM 11/05/2015 Horn 2nd Room 204 Tested 3:39:24 PM 11/05/2015 Horn 2nd Room 205 Tested 3:39:53 PM 11/05/2015 Horn 2nd Room 206 Tested 3:41:39 PM 11/05/2015 Horn 2nd Room 207 Tested 3:42:05 PM 11/05/2015 Horn 2nd Room 208 Tested 3:42:33 PM 11/05/2015 Horn 2nd Room 209 Tested 3:44:45 PM 11/05/2015 Fire Detection Systems 3 11/09/2015 Inspection u � Category Total Items Serviced Passed Failed tOther Q % Q % MY % % Supervisory 9 3.02% 9 100.00% 9 100.00% 0 0% Auxiliary 12 4.03% 12 100.00% 12 100.00% 0 0% Initiating 115 38.59% 115 100.00% 115 100.00% 0 0% Indicating 151 50.67% 151 100.00% 151 100.00% 0 0% Control 11 3.69% 11 100.00% 11 100.00% 0 0% Totals 298 100% 298 100.00% 298 100.00% 0 0% Verification Company: Fire Detection Systems Building: Christopher Heights Inspector:Vincent Svelnis Contact: brandon griffin TAW Signed: Signed: Fire Detection Systems 2 11/09/2015 Executive Summary Generated by:BuildingReports.com d� � s `y:»a Building: Christopher Heights Contact: brandon griffin Address: 50 Village Hill Road Phone: 413-626-5240 Address: Fax: City/State/Zip: Northampton, MA 01060 Mobile: Country: United States of America Email: Company: Fire Detection Systems Inspector:Jeffrey Larochelle Address: 66 Main Street Phone: 413-530-1888 Address: Division of Cebula Electronics Corp Fax: City/State/Zip: Chicopee, Massachusetts Mobile: Country: United States of America Email:jlarochelle @cebula.com 'WO y ni Manufacturer: Edwards Inspection Date: 11/06/2015 IDC Style: Model Number: 10-500G Install Date: 11/05/201 5 SLC Style: 4 Software Version: 3.5 Version Date: 11/05/2015 NAC Style: Y Location: Basement Fire alarm panel room 026 Current Protection: Breaker Company: Phone: Account#: Type: Digital Communicator Mfg: Edwards Model#: SA-DACT Test Time/Date: 1 1/6/1 5 1 1:1 7:30 AM Restore Time Fire Detection Systems 1 11/09/2015 � Y Fire Alarm and Life Safety System Inspection Certificate For Christopher Heights 50 Village Hill Road Northampton, MA 01060 Tested to NFPA 72 Standards This Inspection was performed in accordance with applicable NFPA Standards. The subsequent pages of this report provide performance measurements, listed ranges of acceptable results, and complete documentation of the inspection. Whenever discrepancies exist between acceptable performance standards and actual test results, notes and/or recommended solutions have been proposed or provided for immediate review and approval. Inspection Date Nov 6, 2015 Building: Christopher Heights Company:Fire Detection Systems Contact:brandon griffin Contact: Vincent Svelnis Title:electrician Title:Technician Final Construction Control Document To be submitted at completion of construction by a a Registered Design Professional for work per the 8"'edition of the Massachusetts State Building Code, 780 CMR, Section 107 The Residents at Project Title: Christopher Heights Date: 11/9/15 Permit No. Property Address: Northampton, Massachusetts Project: Check one or both as applicable: X,. New construction I Existing Construction Project description: New 83 unit assisted living facility. I John A. Harper MA Registration Number: 45041 Expiration date: 10/28/2016 am a registered design professional, and I have prepared or directly supervised the preparation of all design plans, computations and specifications concerning: [ ] Architectural [ ] Structural [ ] Mechanical [ ] Fire Protection [X] Electrical (X] Other: Fire Alarm for the above named project. 1, or my designee,have performed the necessary professional services and was present at the construction site on a regular and periodic basis. To the best of my knowledge, information, and belief the work proceeded in accordance with the requirements of 780 CMR and the design documents approved as part of the building permit and that 1 or my designee: 1. Have reviewed,for conformance to this code and the design concept,shop drawings,samples and other submittals by the contractor in accordance with the requirements of the construction documents. 2 Have performed the duties for registered design professionals in 780 CMR Chapter 17,as applicable. 3 Have been present at intervals appropriate to the stage of construction to become generally familiar with the progress and quality of the work and to determine if the work was performed in a manner consistent with the construction documents and this code. Nothing in this document relieves the contractor of its responsibility regarding the provisions of 780 CMR 107. s Enter in the space to the right a"wet"or o�� JOHN A. ��yG electronic signature and seal: g HARPER o ELECTRIC No. Phone number: (603)870-9009 Email: John @ebsnh.net Building Official Use Only Building Official Name: PermitNo.: Date: Version 06 11 2013 Final Construction Control Document W To be submitted at completion of construction by a s d Registered Design Professional eW� for work per the 81h edition of the Massachusetts State Building Code, 780 CMR, Section 107 Project Title: Christopher Heights Date:OCT. 30,2015 Permit No. BP-2015-0262 Property Address: Northampton, Ma. Project: Check(x) one or both as applicable: X New construction Existing Construction Project description: HVAC I Richard R. Faella, MA Registration Number: 27449M Expiration date: June 30,2016 , am a registered design professional, and I have prepared or directly supervised the preparation of all design plans, computations and specifications concerning: Architectural Structural X Mechanical Fire Protection Electrical Other: Describe for the above named project. I, or my designee, have performed the necessary professional services and was present at the construction site on a regular and periodic basis. To the best of my knowledge, information, and belief the work proceeded in accordance with the requirements of 780 CMR and the design documents approved as part of the building permit and that I or my designee: 1. Have reviewed, for conformance to this code and the design concept, shop drawings, samples and other submittals by the contractor in accordance with the requirements of the construction documents. 2. Have performed the duties for registered design professionals in 780 CMR Chapter 17, as applicable. 3. Have been present at intervals appropriate to the stage of construction to become generally familiar with the progress and quality of the work and to determine if the work was performed in a manner consistent with the construction documents and this code. Nothing in this document relieves the contractor of its responsibility regarding the provisions of 780 CMR 107. Enter in the space to the right a"wet"or 42ICH � 1 electronic signature and seal: R'• rALLLA t No.27449 A , CIS Phone number: 1-508-757-7429 Email: RFAELLA @JJBAFARO.COM � Building Official Use Only Building Official Name: Permit No.: Date: Version 06 11 2013 Final Construction Control Document u W To be submitted at completion of construction by a Registered Design Professional ,w for work per the 8th edition of the 5�0 v Massachusetts State Building Code, 780 CMR, Section 107 Project Title: The Residences at Christopher Heights Date: 11/10/15 Permit No.BP-2015-0262 Property Address: Village Hill Drive,Northampton,MA 01060 Project: Check(x) one or both as applicable: X New construction Existing Construction Project description: Non-separated mixed use assisted living facility. I,Thomas E.Lamb,MA Registration Number: 49045 Expiration date: 06/30/16,am a registered design professional, and I have prepared or directly supervised the preparation of all design plans,computations and specifications concerning: Architectural X Structural Mechanical Fire Protection Electrical Other: for the above named project. I, or my designee,have performed the necessary professional services and was present at the construction site on a regular and periodic basis.To the best of my knowledge, information, and belief the work proceeded in accordance with the requirements of 780 CMR and the design documents approved as part of the building permit and that I or my designee: 1. Have reviewed,for conformance to this code and the design concept, shop drawings, samples and other submittals by the contractor in accordance with the requirements of the construction documents. 2. Have performed the duties for registered design professionals in 780 CMR Chapter 17, as applicable. 3. Have been present at intervals appropriate to the stage of construction to become generally familiar with the progress and quality of the work and to determine if the work was performed in a manner consistent with the construction documents and this code. Nothing in this document relieves the contractor of its responsibility regarding the provision f 780 CMR 107. MgSS9C' THOMAS S Enter in the space to the right a"wet"or o E. m electronic signature and seal: s LAMB o STRUCTURAL co NO.490d5 � Phone number: 603 472-4488 Email: tlamb tfmoran. orfi Building Official Use Only Building Official Name: Permit No.: Date: Version 06 11 2013 Final Construction Control Document H a To be submitted at completion of construction by a Registered Design Professional 4 for work per the 8t"edition of the V Massachusetts State Building Code, 780 CMR, Section 107 Project Title: The Residences at Christopher Heights Date: 11/2/15 Permit No.bF_Z,0 Property Address: 50 Village Hill Rd,Northampton, Massachusetts Project: Check(x)one or both as applicable: X New construction _Existing Construction Project description: 83 unit,Assisted Living Facility I Clay B. Smook MA Registration Number: 7976 Expiration date: 8/31/16 , am a registered design professional, and I have prepared or directly supervised the preparation of all design plans,computations and specifications concerning: X Architectural Structural Mechanical Fire Protection Electrical Other: Describe for the above named project. I, or my designee, have performed the necessary professional services and was present at the construction site on a regular and periodic basis. To the best of my knowledge, information, and belief the work proceeded in accordance with the requirements of 780 CMR and the design documents approved as part of the building permit and that I or my designee: 1. Have reviewed, for conformance to this code and the design concept, shop drawings, samples and other submittals by the contractor in accordance with the requirements of the construction documents. 2. Have performed the duties for registered design professionals in 780 CMR Chapter 17, as applicable. 3. Have been present at intervals appropriate to the stage of construction to become generally familiar with the progress and quality of the work and to determine if the work was performed in a manner consistent with the construction documents and this code. Nothing in this document relieves the contractor of its responsibility regarding the provisions of 780 CMR 107. Enter in the space to the right a"wet"or electronic signature and seal: 0. r 76 l� A Phone number: 617-423-3040 Email: clay @smookarchitecture.com OF 'ys (Tu ljr�%�i Building Official Use Only Building Official Name: Permit No.: Date: Version 06 11 2013 Final Construction Control Document To be submitted at completion of construction by a off Registered Design Professional for work per the 8t'edition of the v Massachusetts State Building Code, 780 CMR, Section 107.6.2 Project Title: The Residence at Christopher Heights Date: 11/2/15 Property Address: Marlborough,Massachusetts Project: Check(x)one or both as applicable: X New construction Existing Construction Project description: New assisted living facility I,Bruce MacRitchie,MA Registration Number: 28788 Expiration date: 06/30/16, am a registered design professional, and I have prepared or directly supervised the preparation of all design plans,computations and specifications concerning: Entire Project Architectural Structural Mechanical Fire Protection Electrical. X Other: Plumbing for the above named project. 1,or my designee,have performed the necessary professional services and was present at the construction site on a regular and periodic basis.To the best of my knowledge, information,and belief the work proceeded in accordance with the requirements of 780 CMR and the design documents approved as part of the building permit and that I or my designee: 1. Have reviewed,for conformance to this code and the design concept, shop drawings, samples and other submittals by the contractor in accordance with the requirements of the construction documents. 2. Have performed the duties for registered design professionals in 780 CMR Chapter 17, as applicable. 3. Have been present at intervals appropriate to the stage of construction to become generally familiar with the progress and quality of the work and to determine if the work was performed in a manner consistent with the construction documents and this code. Nothing in this document relieves the contractor of its responsibility regarding the provisions of 780 CMR 107. OF 4 Enter in the space to the right a"wet"or y��c.��� M4.0 electronic signature and seal: �o`� BRUCE tiN g B. rr v MacRITCHIE No.28788 �� FG/STEREO Phone number: 781-344-6743 Email: eshifrnan @verizon.net Building Official Use Only Building Official Name: Permit No.: Date: Commonwealth of Massachusetts Yr The Co City of Northampton Certificate of Temporary In accordance with 780 CMR, (The 8th Edition of the Massachusetts State Building Code) this Certificate of Occupancy is issued to the premise or structure or part thereof as herein identified. Identify Naine of Building of Space Within Certificate No. Issued to The Residence at Christopher Heights Permit# p g BP-2015-0262 Identify property address including street number, name, city or town and county Located at 50 Village Hill Northampton,MA 01060 Use Group Classification(s) Assisted Living Facility 1-2 This Certificate of Occupancy is hereby issued by the undersigned to certify that the premise, structure or portion thereof as herein specified has been inspected for general fire and life safety features. This certificate shall allow for the use as herein described and in conformance with any and all conditions as identified below. It shall be posted in a conspicuous place within the space as directed by the undersigned. Failure to post the certificate,failure to comply with conditions or, tampering with the contents of the certificate is strictly prohibited. Conditions of Use Assisted living 83 - units total when finished. Fully sprinklered. Temporary ocuupancy for first and second floors valid for 90-days from issue date of this certificate. Name of Municipal Date of Final Map/Plot: Building Official Kyle J. Scott Inspection Date 38A/10 11/13/2015 Signature of Municipal Date of Issuance Date Map Building Official I All 11/13/2015 Lot