Loading...
25A-153 (18) solar=@@ Single Phase Inveirters for North America •S o a r - • , SE3000A-US/SE3800A-US/SE500€0A-US/SE6000A-US/ SE-7600A-US%SE10000A-US/SE11400A-US SE3000A US SE3800A US SESOOOA-US SE6000A-US SE760OA-US SE10000A-US SE1140OA-US OUTPUT SolarEdge Single Phase Inverters _ Nominal AC Power Output 3000 3800 SCCO 6000 7600 9980 @ 208V 11400 VA 10000 @240V Max.AC Power Output 3300 4i50 5400 @ 208V 6000 8350 10800 @ 208V 72000 VA For North America 5450 @240V 10950 @240V " AC Output Voltage Min:Nom.-Max i,1 J J SE300OA-US O SE380OA-US i SE500OA-US/'SE600OA-US;/ 183 208-229 Vac AC Output Voltage Min.-Nom-Max iti ✓ J ✓ i J J J J SE760OA- ! SE10000A-US; SE1140OA-US 211-240-254 Vat: AC Frequency Min.-Nom.-Max."' 59.3-60-60.5(with HI ceunL y setting 57-60-50.5) Hz 24 @ 208V 48 @ 208V "�i ' Max.Continuous Output Current 12 5 16 _ 2'@?40V 25 32 42 @ 240V 47.5 A a-'av- ,�t€.', .ray., f r - `�' � e GFDr Threshold 1 A I _ Pt7 Utility Monitoring,Islanding Protection Country Configurable'hresholds Yes Yes INPUT onit _ - - - - - — - - €� tarp a Maximum DC Po 4050 5100 5750 8100 10250 13500 15350 W Tr ansformer less,Ungrounded Yes t Yeats Max.input Voltage 500 Vdc Nom.DC Input Voltage 325 @ 208V/350 @ 240V Vdc 16.5 @ 208V 33 @ 208V Max.Input Current i'i 9.5 _3 18 23 34.5 Adc 15.5 @ 240V _ 30.S @ 240V € Max.Input Short C7ralit Current 45 Adc Reverse-Polarity Protection Yes - "01 =r,r Ground-Fault Isolation Detection 600ka Sensitivity o Maximum Inverter Efficiency 97.7 98.2 98.3 983 98 98 98 % �IK E 9z5 @ zasv - 97 @ 208v l° - CEC Weighted Efficiency 97 S 98 97 5 97 5 97 5 ° I 98 @ 240V 97,5 @ 240V Nighttime Power Consumption <23 <4 W # ADDITIONAL FEATURES _ _ .. ..... _... __. . .._..__ ... _.._ .... . ..... Supported Communication:Interfaces RS485,R5232,Ether et,7igBee(ophonal) A r;` Revenue Grade Data,ANSI 012.1 Optional'' ,'" Rapid Shutdown-NEC 2014 690.12 Funcfionalit enabled when SolarEd e rapid shutdown kit is msa0ed'a' _ Y g STANDARD COMPLIANCE Safety U_ 741,UL1699B,UL1998,CSA 222 -_ s = c Grid Connection Standards IEEE1547 Emissions FCC partly class B INSTALLATION SPECIFICATIONS ` AC output conduit size/AWG range 3/4"minimum/16-6 AWG 3/4"minimum/8-3 AWG DC input conduit size/#of strings/ 3/4"minimum/1-2 strings/ _ AWG range 3/4"minimum/1-2 strings/16-6 AWG 14-6 AWG Dimensions with Safety Switch 30.5 x 12.5 x 10,5% in/ ,(HxWxD) 30.5 x 1.2.S x 7.2/775 x 315 x 184 ', 775x315x260 ' mm Weight with Safety Switch 51.2/23.2 54.7/24.7 88.4/40.1 lb/kg Natural convection Cooling Natural Convection and internal Fans(user replaceable) g, p, I� �I,, fan(user '.. The�3e5$choi a ft3t - olarEdg eCt' blet S �� m replaceable) Noise <2S <50 dBA o integrated arc fault protection(Type 1)for NEC 2011 6911.11 compliance Min.-Max.Operating Temperature Ran e -13 to+140/ 2;i to+60(-40 to+60 version available"'} °F/°C - Superior efficiency(98%) g Protection Raping NFMA 3R Small,lightweight and easy to install on provided bracket For otherregona settings please—tet SoiarEdge support y 'A h-gher current source may b used-the nverter mil rm t, -,put current W the values stated. — Built-in module-level monitoring "Revenue grad rter P/N.SE..A USOOONNR2Ifor 760OW nverter-SE7600A US002NNR2j- C♦ Rapdshutdow krP/N.SE 1000-RSD-51. ® Internet connection through Ethernet or Wire less s�40 verson P/N.SE....A-USOOONNU4(her 7600W,nvertef'SE7600A-US002NNU4). Outdoor and indoor installation Fixed voltage inverter,DC/AC conversion only — Pre-assembled Safety Switch for faster installation Optional-revenue grade data,ANSI C12.1 _. -,N, .11 . L, ACt f A sav .t TA- L;S_l RA HF NE EAt", ;.r t�w vv.sOla,t ecge.us THE amount MODULE TSM-PDO5.18 Mono Multi Solutions DIMENSIONS OF PV MODULE El,ECTRICAL DATA e STC un,t.mm Peak Power Watts-PMA.(Wp) 250 255 260 265 941 Power Output Toterdnce-P.Ax M) 0-+3 o Maximum Power Voltage Vi(V) 30.3 30.5 30.6 30.8 N t0N THE rinal I I unt O �'^ Maximum Power CUrrentlrwP(AJ 9,27 5,37 5.50'. $.61 NAA1E°L^'� c Open.Circuit Voltage-Voc(V) 38D 38.1 38.2 38.3 .e».1: Short Circuit Current-1.(A) 8,79 5.89 9A0'' 4,10 TILL NG HOLE INS c Module Efficiency 9m(%) 15.3 15.6 15.9 16.2 MODULE STC Irradiance 1000 W/m',Cell Temperature 25°C,Air Mass AMI.5 according to EN 60904-3. Typical efficiency reduction of 4.5%at 200 W/m'according to EN 60904-I, o i Ei.ECTRICF:L DASA i�''NOCT Maximum Power 186 190 193 197 60 CELL ' Maximum Po�rerYaott ttage ge-YNr(v) 28-0 28.1 2$.3 28.4 MULTICRYSTALLINE MODULE �� � PDO5.1 Maximum Power age(V)-V6 JV 6,65 6.74.3 6.84 6.93 "$ o^.nG oDNL,NG N«E A- A Open Circuit Voltage(V)-V6,fv) 35.2 35.3 35.4, 35.5 WITH �f Ten i3 DPAN MOLE TRINAMOUNTFRAME i Short Circuit Current(A)-Isc(A) 7.10 7.17 7.27 7.35 - NOCT:Irradiance at 800 W/m',Ambient Temperature 20°C,wind Speed I m/s. 812 180 rt t* Back View uE{;}i,rsy€'C-,f;�I}k[,g POWER OUTPUT RANGE Solarcells Multicrystalline 156 x 156 mm(6 inches) 1 I Celt orientation 60 cells(6 x 10) Fast and simple to install through drop in mounting solution Module dimensions 1650 x 992 x 40 mm(64.95 x 39.05 x 1.57 inches) �.'�� Weight 19,6 kg(43,124bs) € 16.2% v ' - Glass 3.2 mm(0.13 lnches),High Transmission,AR Coated Tempered Glass MAXIMUM EFFICIENCY �� tr � AA Backsheet white t, - -- -- Goad aesthetics for residential applications Frame Black Anodized Aluminium Alloy J-Brix IP65 orfP 67 rated Cables Photovoltaic Technology cable 4.0 mm'(0.006 inches'), �i , 1200 mm(47.2 inches) ......._. ............. ._.-_. .._._. .__....__..... ............... ......... _._._. 1-VC'URVES CAP PV M0 0i)26C7ih') POSITIVE POWER TOLERANCE Connector H4Amphenol 9 W L000w/m' _�. __ Fire Type UL 1703 Type 2 for Solar City sa Highly reliable due to stringent quality control Nw C 600 TC<'tiPERts7r.;xa R,�.TEP�GS MAXIMU>*-�t.�RA°iR1G5 rs t l..'. s o0 U€ t, 6 h e I Operational T 40-+ Operating Cell 44°C(+2°C) Temperature 85 0C Nominal aw _ Tem pe rature(NOCT) `Maximum System 1000V'DC(IECi ..... __..._. ....._.........................._..... ......... L €P,��[' ,. .,.,_. 2ao 2DOW/1_ _ ... Temperature Coefficient of P-x -0.41%/°G Voltage 1000V.DC(IJL) ircJna ti "' c 00 ---" - ,t' Temperature Coefficient of Voc -0.32%/°C Max Series Fuse Rating 15A Certified to withstand challenging environmental DOO N � � to zo 3o <o so Temperature Coefficient of Isc'. 0.05%(°C - vonapeM conditions _• RVARRANTy CEPTIf1CATIOtI 10 year Product Workmanship Warranty p 25 year Linear Power Warranty::. ",f`v C& (Please referto product warranty for details) usim LINEAR PERFORMANCE WARRANTY sw PACKAGING CONFIGURATION Fwl-N 10 Year Product Warranty•2 Year Linear Power Warranty Modules per box:26 pieces w _._- T€€no Sc�€ar L€mt€eJ ______.___._____ Modules per a0'container:728pieces 6100% -. _ _...... a4ue fforyl Tri 0 907, no Z`+CRT'${t�3L+a!Y#at7QP}S CAUTION-READ SAFETY AND INSTALLATION INSTRUCTIONS BEFORE USING THE PRODUCT. �Qt4 P4?,B o Y A20 1 5 Trino Solar L m'Ifed.All rights reserved.Specifications included in this datosheef are subject to Ne �m {° lar (j 80% Trin-asolar change without notice. j SniarrEneIa ��o,c.getno- ,-... » .. '- °c t^m Years 5 10 IS 20 25 em"I 0 T HE Trinamount hI', DI m Mono Multi Solutions DIMENSiONS OF PV MODULE E LEC:i,*",':C A i U1AiA un;tnnm Peak Power Watts-P­(Wp) 245 250 255 260 941 --- Power Output Tolerance-P,,A,(%) 0­3 Maximum Power Voltage VN.P(V) 29.9 30.3 30.5 30.6 Napry THE Trinalw%it-%lount O ° ox 1 Maximum PowerCUrrent-Imrr(A) 8.20 8.27 8.37 8.50.. u 1._ NAA1EPLA1F �o Open Circuit Voltage Voc(V) 37.8 38.0 38.1 38.2 c NO�r Short Circuit Current-fsc(A) 8.75 8.79 8.88. 9-00 s Module Efficiency IT.(%) 15,0 15.3 15.6 15.9 MODULE ITC Irradiance 1000 W/m'Cell Temperas e 25"C,Air Moss AMI.5 according to EN 60904-3. Typical efficiency reducf on of 4.5%at 200 W/m'according to FN 60904-1. O _ a p O HEt_T9tC z DATA,i }��� Maximum POWer PM"x(Wp) 182 186 190 193 (�rLL' Maximum Power Voltage-VmP(V). 27.6 28.0 28.1 28.3 MULTI CRYSTALLINE MODULE r,--ii.Np-LIE Maximum Power Current-1",PP(A) 6.59 6.65 6.74 6.84 WITH TRINAMOUNT FRAME A A Open Circuit Voltage(V)-Voc(V) 35.1 35.2 35.3 $5.4 Short Circuit Current(A)-I.(A) 7.07 7.10 7.17 7.27 NOCI irradiance at 800 w/m',Ambient Temperature 20'C,Wind Speed I m/s. PD05.18 stz tso Back View POWER OUTPUT RANGEF1 .. 1 I Solar cells Multicrysialline 156 x 156 mm(6 inches) Fast and simple to install through drop In mounting solution cell orientation 60 cells 16 x 10) Mil Module dimensions 1650 x 992*40 mm(64,95 x 39.05 x 1.57 inches) ._....._......__.__..__ ____ ____ _____ . _._ ............_.__ ', Weight 213 kg147.0Ilds) MAXIMUM EFFICIENCY a Glass 3.2 mm(0.13 inches),High Transmission,AR Coated Tempered Glass A-A -- Backsheet White Goad aesthetics for residential applications Frame Black Anodized Aluminivm Alloy with Trinamount Groove f-V.............. .......__ ......_........_ ____. ..... ._....... CUR O Fi MODULE t4W) 9-Box IP o 67 rThA Cables Photovoltaic Technology cable 4.0 mm'(0.006 inches'), ......... -- - __ 1200 mm(47.2 inches) POWER OUTPUT GUARANTEE 9CO -1000W1m' N j 8° - Fire Rat g Type 6 Highly reliable due t stringent duality control a 600W/m' iA AX Sf i T h 4 m q u 20ow/m r zw Nominal O gratin Cell 44°C(+2°C) Operational Temperature erature 40 85°C Te mperatu re(NO C T) Maximum System 1000V DC(I EC)......._ ew 30.E 40. O.w IO.W 20°' °' Temperature Coefficient of P­ 0.41%/'C Voltage.. 1000V DC(UL) Temperature Coefficient of V 0 32%/°C Max Series Fuse R 15A Voltage(V) P oc ° Rating CerffLd to withstand challenging Temperature Coefficient of lac 005%/°C. _... z E r e T't L_/r1 conditions "r 10 year Product Workmanship Warranty C_"1:,_ �r 25 year Linear Power Warranty,.. )Pleasa refer to product warranty for details) ar r cc r _ CER INCA'NON LINEAR PERFORMANCE WARRANTY _ __ ___ - - 10 Year Product Warranty 25 Year Linear Power Warranty ° " � p' Dora Solo!L rn Ted ___ cs Modules per box'26 feces z a pan ue n ® DZi Modules per 40'container:728 pieces. .._. _._ .___. .. ........... ................._ a tddtf' rt9 vateFe N m90% from Solcxr,�tf ® o QF alsph} CAUTION:READ SAFETY AND INSTALLATION INSTRUCTIONS BEFORE USING THE PRODUCT. goMPA' • &2014 Tr is Sold,L m'ted All nghts reserved.Specifications included in this datasheet are subject to ti BST Trinasolar U 80% ;.;Tr r, solar change with utnotce. ' Years 5 10 15 20 25 ' I I I li II I I I I I I� i II solar - • Solar - ® • & SolarEdge Power Optimizer Module Add-On for North America P300 / P350 / P400 SolarEdge Power Optimizer - - --P300 P350 P400__ Module Add-On For North America „or odideIPY (forodules PV (for modules PV modules) modules) modules) INPUT P300 ! P350 ; P400 • Rated Input DC Power�'� 300 350 400 W I ® Absolute Maximum Voltage( c input at lowest temperature) 48 60 80 Vdc u to a Vo MPPT Operating Range 8-48 8-60 _' 8-80 Vdc i Maximum Short Circuit Current fist) 10 Adc Maximum DC Input Current 12.5 Adc Maximum Efficiency 99.5 Weighted Efficiency 98.8 % Overvoltage Category II OUTPUT DURING OPERATION(POWER OPTIMIZER CONNECTED TO OPERATING INVERTER) Max court pu Out t Current 15 Adc I Maximum Output Voltage _ _ 60 Vdc T< �' x w %° • OUTPUT DURING STANDBY(POWER OPTIMIZER DISCONNECTED FROM INVERTER OR INVERTER OFF) `'a ... s .. Safety Output Voltage per Power Optimizer 1_ ..... Vdc.._.. STANDARD COMPLIANCE s t ? i✓ EMC FCC Part15 Class 8,IEC61000 6 2,IEC61000 6 3 Safety RoHS _. ICC62109 (cla Yes safety), 41 f. 1 et uu� INSTALLATION SPECIFICATIONS €� Maximum Allowed System Voltage 1000 Vdc I In Dimensions(W x 1.x H) 141 x 212 x 40.5/5.55 x 8.34 is 1.59 mm/In Weight(including cables) 950/2.1 - gr/It, Input Connector MC4/Amphenol/Tyco �* ✓'"' Output Wire Type/Connector Double Insulated;Amphenol Output Wire Length 0.95/3.0 1.2/3.9 m/ft '. Operating Temperature Range --40-+85/-40-.185 'C/'F - Protection Rating IP65/NEMA4 Relai Ve Humidity 0-100 % , = 1 R—ds ­.mm<m—<. PV SYSTEM DESIGN USING A SOLAREDGE THREE PHASE THREE PHASE j 9 '° SINGLE PHASE INVERTER 208V _ 480V..... ____._.... PV p CIF aptlrrs#<� Uon at th in, ut,,00vel Minimum String Length(Power Optimizers) _- 8 10 18 3 _ Maximum String Length(Power Optimizers) 25 25 50 Up to 254 energy - , , Maximum Power oer String 5250 6000 12750 W Superior efficiency(99.5%} Parallel Strings of Different Lengths or Orientations Yes Mitigates afitypes of module mismatch losses,from manufacturing tolerance to Partial shading Flexible system design for maximum space utilization r Fast installation with a single trait Next generation maintenance with module-level monitoring Module-level voltage shutdown for installer and firefighter safety I I i ! I I I li j i i j I I I I 11"SOlarCity ®pSolar Next-Level PV Mounting Technology ',^SOiarCity ®pSolar Next-Level PV Mounting Technology Zep System Components for composition shingle roofs Uin-roof t •.`. InteAxk 1�T94DI1Q ZfQ , t l.eretinq fuw _ ; ,ti��iy+ygy J I r i i5lil ay�"�tip lui� II Zep CarnpaiitAit PV Module , i f t 1 Raof Apaclment I I e`OMppT i Description PV mounting solution for composition shingle roofs CpMppS� Works with all Zep Compatible Modules • Auto bonding UL-listed hardware creates structual and electrical bond • Zep System has a UL 1703 Class"A"Fire Rating when installed using V� LISTED modules from any manufacturer certified as"Type 1"or"Type 2" Comp Mount Interlock Leveling Foot Part No.850-1382 Part No.850-1388 Part No.850-1397 Listed to UL 2582& Listed to UL 2703 Listed to UL 2703 _ Specifications Mounting Block to UL 2703 Designed for pitched roofs Installs in portrait and landscape orientations J • Zep System supports module wind uplift and snow load pressures to 50 psf per UL 1703 • Wind tunnel report to ASCE 7-05 and 7-10 standards • Zep System grounding products are UL listed to UL 2703 and ETL listed to UL 467 • Zep System bonding products are UL listed to UL 2703 • Engineered for spans up to 72"and cantilevers up to 24" Zep wire management products listed to UL 1565 for wire positioning devices Ground Zep Array Skirt,Grip,End Caps DC Wire Clip • Attachment method UL listed to UL 2582 for Wind Driven Rain Part No.850-1172 Part Nos.500-0113, Part No.850-1448 Listed to UL 2703 and 850-1421,850-1460, Listed UL 1565 ETL listed to UL 467 850-1467 zepsolar.com zepsolar.com Listed to UL 2703 This document does not create any express warranty by Zep Solar or about its products or services.Zep Solar's sole warranty is contained in the written product warranty for This document does not create any express warranty by Zep Solar or about its products or services.Zep Solar's sole warranty is contained in the written product warranty for each product.The end-user documentation shipped with Zep Solar's products constitutes the sole specifications referred to in the product warranty.The customer is solely each product.The end-user documentation shipped with Zep Solar's products constitutes the sole specifications referred to in the product warranty.The customer is solely responsible for verifying the suitability of Zep Solar's products for each use.Specifications are subject to change without notice.Patents and Apps:zspats.com. responsible for verifying the suitability of Zep Solar's products for each use.Specifications are subject to change without notice.Patents and Apps:zspats.com. 02 27 15 ZS for Comp Shingle Cutsheet Rev 04.pdf Page: 1 of 2 02 27 15 ZS for Comp Shingle Cutsheet Rev 04.pdf Page: 2 of 2 WARNING:a[#, OLTA[III OWER SOURCE Label Location: '• • •n: Label Location: Per Code: WARMNG ;_ '• WARNING Code: NEC 690.31.G.3 ELECTRIC SHACK HAZARD ELECTRIC SHOCK.HAZARD d0 NOT TOUCH TERMINALS '•/ THE DC CONDUCTORS OF THIS 690.35(F) Label • •n: TO BE USED WHEN � LOAD SIDES MAY BE ENERGIZED UNGROUNDED AND PHOTOVOLTAIC DC ' IN THE C}PEN POSITION MAY BE ENERGIZED UNGROUNDED INVERTERIS DISCONNECT Code: NEC .•1 Label Location: Label • PHOTOVOLTAIC POINT OF - MAXIMUM POWER- INTERCONNECTION _ Code: Per POINT CURRENT(Imp)-A WARNING: ELECTRIC SHOCK Code: HAZARD. DO NOT TOUCH 690.17.4; ' MAXIMUM POWER -V NEC 690.53 TERMINALS.TERMINALS ON POINT VOLTAGE(Vmp) MAXIMUM SYSTEh9 BOTH THE LINE AND LOAD SIDE VOLTAGE(Voc)_V MAY BE ENERGIZED IN THE OPEN SHORT-CIRCUIT POSITION.FOR SERVICE CURRENT(Isc)_A DE-ENERGIZE BOTH SOURCE AND MAIN BREAKER. PV POWER SOURCE MAXIMUM AC _ A OPERATING CURRENT MAXIMUM AC V Label • • OPERATING VOLTAGE - WARNING ' P er ..- ELECTRIC SHOCK HAZARD IF A GROUND FAULT IS INDICATED 1 NORMALLY GROUNDED Label L• • CONDUCTORS MAY BE CAUTION UNGROUNDED AND ENERGIZED l� -' DUAL POWER SOURCE Per Code: SECOND SOURCE IS 690.64.13.4 PHOTOVOLTAIC SYSTEM Label • • WARNING Label ELECTRICAL SHOCK HAZARD DO NOT TOUCH TERMINALS 1 CAUTION ' (POI)� • TERMINALS ON BOTH LINE AND Per ••- LOAD SIDES MAYBE ENERGIZED PHOTOVOLTAIC SYSTEM IN THE OPEN POSITION CIRCUIT IS BACKFED NEC 690.64.B.4 DC VOLTAGE IS ALWAYS PRESENT UVHEN SOLAR MODULES ARE EXPOSED TO SUNLIGHT Label • • WARNING -' Per ..- INVERTER OUTPUT Label Location: CONNECTION 690.64.13.7 AC '•I) sconnec Per DISCONNECT Code: DEVIC NEC .•1 • • :• Distribution Disconnect Interior • • Label • • Disconnect NIAXINIUM AC A - OPERATING CURRENT Load Center Code:Per MAXIMUM AC OPERATING VOLTAGE V NEC 690.54 1 1 /• / 7' / 1 / 71 1' 3055 Clearview Way San Mateo,CA 94402 T:(650)638 1028 F:(650)638-1029 « ' 1 •1 1 ` I • • 1 '► 1 7 / '7' \1 1 1 CAUTION POWER TO THIS BUILDING IS ALSO SUPPLIED FROM THE FOLLOWING SOURCES WITH DISCONNECTS LOCATED AS SHOWN: - Address: 39 Woodbine Ave ----------� L----------J r---------------------- ----� SOLAR PHOTOVOLTAIC ARRAYS) L--------------------------J PHOTOVOLTAIC BACK-FED CIRCUIT BREAKER IN MAIN ELECTRICAL PANEL IS AN A/C DISCONNECT PER NEC 690.17 OPERATING VOLTAGE = 240V JB-0101495-00 CONFIDENTIAL- THE INFORMATION HEREIN JOB NUMBER: PREMISE OWNER' DESCRIPTION. DESIGN: CONTAINED SHALL NOT BE USED FOR THE JB-0101495 00 \►� BENEFIT OF ANYONE EXCEPT SOLARCITY INC., MOUNTING SYSTEM: FREEMAN, MR STANLEY A FREEMAN RESIDENCE Chris Wachter SolarCity. NOR SHALL IT BE DISCLOSED IN WHOLE OR IN 39 WOODBINE AVE �"��o PART TO OTHERS OUTSIDE THE RECIPIENT'S Comp Mount Type c 2.86 KW PV ARRAY it ORGANIZATION, EXCEPT IN CONNECTION WITH MODULES NORTHAMPTON, MA 01060 THE SALE AND USE OF THE RESPECTIVE (11) TRINA SOLAR # TSM-260PD05.18 24 St.Martin Drive,Building 2,Unit 11 SOLARCITY EQUIPMENT, VATHOUT THE WRITTEN ��� PAGE NAME SHEET: REV DATE T: (650)638-1028 MA 650568-1029 PERMISSION OF SOLARCITY INC. ISOLAREDGE SE3000A—USOOOSNR2 203-451-5825 SITE PLAN PLACARD PV 6 10/6/2015 (666)—SOL—CITY(765-2469) „�.sdaraHYcom GROUND SPECS MAIN PANEL SPECS GENERAL NOTES INVERTER SPECS MODULE SPECS LICENSE BOND (N) #8 GEC TO TWO (N) GROUND Panel Number:NoMatch Inv 1: DC Ungrounded INV 1 —(1)SOLAREDGE SE3000A—USOOOSNR2 LABEL: A —(11)TRINA SOLAR ## TSM-260PDO5.18 GEN #168572 RODS AT PANEL WITH IRREVERSIBLE CRIMP Meter Number:40027212 Tie—In: Supply Side Connection Inverter; 3010W, 240V. 97-57o; w/Unifed Disco and ZB,RGM,AFCI PV Module; 150W, 236.9W PTC, 40MM, Black Frame, H4, ZEP, 1000V ELEC 1136 MR Underground Service Entrance INV 2 Voc: 38.2 Vpmax: 30.6 INV 3 Isc AND Imp ARE SHOWN IN THE DC STRINGS IDENTIFIER E 125A MAIN SERVICE PANEL E 10OA/2P MAIN CIRCUIT BREAKER BRYANT Inverter 1 Load Center CUTLER—HAMMER 10OA/2P 3 Disconnect 2 SOLAREDGE A SE3000A—USOOOSNR2 20A/2P g A /I� Ll 1=1 F7H L2 N(E) LOADS EGC DC. Da---------- --- — --------------- GEC --- DC. DG MP1: 1x11 J EGC----------------------------- N 1 —J o EGC/GEC z I I I I I I TO 120/240V SINGLE PHASE I I UTILITY SERVICE I I I I I I I I I I PHOTO VOLTAIC SYSTEM EQUIPPED WITH RAPID SHUTDOWN Voc* = MAX VOC AT MIN TEMP OTT (2)Gr qd Roo (I)BRYANT N BR24L70RP (11)SOLAREDGEJP300-2NA4AZS 1 5�8 x 8, C per A Load Center, 70A, 120/24OV, NEMA 3R AC PowerBox Optimizer, 300W, H4, DC to DC, ZEP DC -(2)IL SCO/IPC 4�0-/6 -(1)CUTLER-HAMM #BR220 (1)AWG , Solid Bare Copper Insulation Piercing Connector Main 4/0-4, Tap 6-14 Breaker 20A/2P, 2 Spaces n- /6 PP S SUPPLY SIDE CONNECTION. DISCONNECTING MEANS SHALL BE SUITABLE �}—(1)CUTLER-HAMMER #DG221URB -(1)Ground Rod; 5/8" x B', Copper AS SERVICE EQUIPMENT AND SHALL BE RATED PER NEC. Disconnect; 30A, 24OVac, Non-Fusible, NEMA 3R N ARRAY GROUND PER 690.47(D). NOTE: PER EXCEPTION NO. 2, ADDITIONAL -(1) GGrnouEndXMtraIPIt;D330A, General Duty(DG) ELECTRODE MAY NOT BE REQUIRED DEPENDING ON LOCATION OF (E) ELECTRODE l ____. _.._..._., , _.._-_-_._-- _... __.__._..._. _..__ .__....__..._.__._...... -......_._. _ _____._ _ __ _ - (1)AWG � THWN-2, Blade (1)AWG#10, THWN-2, Blade j (2)AWG X10, PV Wre, 60OV, Black Voc* 500 VDC Isc =15 ADC O L-L (11)AWG #6, THWN-2, Red O L_L(1)AWG/10, THWN-2, Red O (11)AWG#6, Solid Bare Copper EGC Vmp =350 VDC Imp=8.07 ADC I^ (1)AWG #6, THWN-2, White NEUTRAL Vmp =240 VAC Imp=12.5 AAC "' (1)AWG/10, THWN-2, White NEUTRAL Vmp =240 VAC Imp=12.5 AAC �. (1)Conduit Kit;.3/4" EMT . . . . . . . . . . . . . . .. -(1)0P #6,,Solid,Bare.Copper, GEC. . . -(1)Conduit.Kit;.3/4'.EMT. .. .. . . .{ .. . . . ..70 AWG/8,.THEN-2,,Green . EGC/GEC (1)Conduit,Kit;.3/4'.EMT. . . . . �II CONFIDENTIAL- THE INFORMATION HEREIN JOB NUMBER: J B-010149 5 00 PREMISE OWNER DESCRIPTION: DESIGN: CONTAINED SHALL NOT BE USED FOR THE FREEMAN, MR STANLEY A FREEMAN RESIDENCE Chris Wachter ';;;So�arCity BENEFIT OF ANYONE EXCEPT SOLARCITY INC., MOUNTING SYSTEM:NOR NOR SHALL IT BE DISCLOSED IN WHOLE OR IN Comp Mount Type C 39 WOODBINE AVE 2.86 KW PV ARRAY PART TO OTHERS OUTSIDE THE RECIPIENT'S MaoulFS NORTHAMPTON MA 01060 WITH THE ASALE AND EXCEPT E OF IN THE RESPECTVIE (11) TRINA SOLAR # TSM-260PDO5.18 r 24 St Martin Drive, MA 01g 2 Unit 11 SOLARCITY EQUIPMENT, WITHOUT THE WRITTEN PAGE NAME SHEET: REV DAIS Marlborough,MA 50) NyQt�; T: (650)636-1028 F: (850)638-1029 PERMISSION OF SOLARCITY INC. SOLAREDGE SE3000A—LIS000SNR2 203-451-5825 THREE LINE DIAGRAM PV 5 10/6/2015 (666)-saL-CITY(765-2489) www.sdardtYaam (N) SIMPSON A34 CLIP W/ (8) 8D NAILS 6" END DISTANCE 16" 0 C r6'�-STAGG. TYP� (E) 2x6 RAFTER U1 2" o o 2x8 SPF#2 (N) 1 2 0 0 - o / t - - - - - -- -- - - - - - - - - - - - - -- -3 — 4' MIN. SIMPSON SDW WOOD SCREWS (N) 2x8 SISTER MEMBER S1 2x8 END FASTENER GROUPING 4" 12'-5" ol Di Scale: 1"=1'-0" (E) LBW ST IrI z I ACT >° D SIDE VIEW OF MP1 NTS SISTER UPGRADE INFORMATION: RAFTER UPGRADE I BY HATCHING UPGRADE NOTES: MP1 X-SPACING X CANTILEVER Y-SPACING Y-CANTILEVER NOTES 1. CUT AND ADD (N) SISTER AS SHOWN IN THIS SIDE VIEW AND REFERENCED TOP VIEW. , . LANDSCAPE 52" 24" STAGGERED 2. FASTEN (N) SISTER TO (E) MEMBER W/ SIMPSON SDW 22300 (IF 2-PLY) OR 22458 JASON `II- IA men PORTRAIT 52" 20" (IF 3-PLY) SDW SCREWS AS SHOWN AT 16" O.C. ALONG SPAN AS SPECIFIED, IF TOMAP RAFTER 2x6 @ 26"OC ROOF AZI 160 PITCH 32 STORIES: 2 WOOD SPLITTING IS SEEN OR HEARD, PRE-DRILL WITH A " DRILL BIT. STRUCTURAL t;" ARRAY AZI I60 PITCH 32 ALT. OPTION FOR FULL LENGTH MEMBERS ONLY- FASTEN (N) SIDE MEMBER TO o.51554 C.I. 2x6 @26"OC Comp shingle (E) RAFTER W/ 10d (IF 2-PLY) OR 16d FROM EACH SIDE (IF 3-PLY) COMMON t? Gi S TVe- NAILS AT 6" O.C. ALONG SPAN. " PV MODULE •SISTER ALL RAFTERS ON THIS MP SECTION INTO WHICH THE ARRAY IS LAGGED y Jason Toman 5/16" BOLT WITH LOCK INS ALLATION ORDER Date: .10.07 09:55:59-07'00' & FENDER WASHERS (N) SISTER MEMBER TO BEAR LOCATE RAFTER, MARK HOLE ON PARALLEL CEILING JOIST - ZEP LEVELING FOOT (1) LOCATION, AND DRILL PILOT OR SUPPORT BELOW SIMPSON SDW 22458 SIMPSON SDW ZEP ARRAY SKIRT (6) HOLE. (E) RAFTER I WOOD SCREWS 22300 WOOD (4) (2) SEAL PILOT HOLE WITH (N) SISTER MEMBERS SCREWS POLYURETHANE SEALANT. ZEP COMP MOUNT C „ /E/ $+� ZEP FLASHING C (3) (3) INSERT FLASHING. (E) COMP. SHINGLE (E) WALL OR D1 (N) SIMPSO 834 CLIP ri (1) (4) PLACE MOUNT. SUPPORT BELOW W/ (8)) 8d NAILS (E) ROOF DECKING (2) (5) INSTALL LAG BOLT WITH (E) RIDGE BOARD OR SUPPORT BELOW 5/16" DIA STAINLESS (5) SEALING WASHER. STEEL LAG BOLT LOWEST MODULE SUBSEQUENT MODULES INSTALL LEVELING FOOT WITH NOTE: LAP SPLICE DOES NOT NEED TO BE CENTERED ON THE MEMBER WITH SEALING WASHER (6) (2-1/2" EMBED, MIN) BOLT & WASH ERS. (E) RAFTER STANDOFF i TOP VIEW OF FULL LENGTH LAPPED SISTER CONFIDENTIAL— THE INFORMATION HEREIN p8 NUMBER PREMISE OWNER: DESCRIPTION: DESIGN: CONTAINED SHALL NOT BE USED FOR THE J B-010149 5 O 0 \\t FREEMAN, MR STANLEY A FREEMAN RESIDENCE Chris Wachter a' SolarCity. BENEFIT OF ANYONE EXCEPT SOLARCITY INC., MOUNTING SYSTEM: �,,` NOR SHALL IT BE DISCLOSED IN WHOLE OR IN Comp ount Type C 39 WOODBINE AVE 2.86 KW PV ARRAY PART TO OTHERS OUTSIDE THE RECIPIENTS MODULES- NORTHAMPTON MA 01060 ORGANIZATION, EXCEPT IN CONNECTION WITH , THE SALE AND USE OF THE RESPECTIVE (11) TRINA SOLAR # TSM-260PD05.18 24 St.Martin Drive,Building 2,Unit 11 SOLARCITY EQUIPMENT, WITHOUT THE WRITTEN INVERTER: PAGE NAME SHEET: REV. DATE: T: (650)638�gh,MA(650)638-1029 PERMISSION OF SOLARCITY INC. SOLAREDGE SE3000A-USOOOSNR2 203-451-5825 STRUCTURAL VIEWS PV 4 10/6/2015 (868)—SOL-CITY(765-2489) www.solarcity.aam PITCH: 32 ARRAY PITCH:32 MP1 AZIMUTH: 160 ARRAY AZIMUTH: 160 MATERIAL: Comp Shingle STORY: 2 Stories a� Q STAMPED & SIGt4EU STRUCTURAL FOR 0 Y o (E) DRIVEWAY 0 rte-, AC M JASON IL IA 0 STRUCTURAL cn No,51554 ---j � dT ' Sf AL ' y Jason Toman Date:2015.10.07 09:55:55-07'00' LEGEND O (E) UTILITY METER & WARNING LABEL Inv INVERTER W/ INTEGRATED DC DISCO NEW SEPARATE PV SYSTEM & WARNING LABELS © DC DISCONNECT & WARNING LABELS AC DISCONNECT & WARNING LABELS DC JUNCTION/COMBINER BOX & LABELS MP1 ❑ DISTRIBUTION PANEL & LABELS T Lc LOAD CENTER & WARNING LABELS ~ O DEDICATED PV SYSTEM METER A STANDOFF LOCATIONS - CONDUIT RUN ON EXTERIOR CONDUIT RUN ON INTERIOR `Ix ' ��' — GATE/FENCE HEAT PRODUCING VENTS ARE RED INTERIOR EQUIPMENT IS DASHED L—'J SITE PLAN Scale: 1/8" = 1' W f O 1' 8' 16' S F CONFIDENTIAL— THE INFORMATION B-010149 5 00 PRASE OWNER: DESCRIPTION: DESIGN: TION HEREIN JOB NUMBER: "�,�SolarCity. CONTAINED SHALL NOT BE USED FOR THE FREEMAN, MR STANLEY A FREEMAN RESIDENCE Chris Wachter • BENEFIT OF ANYONE EXCEPT SOLARCITY INC., MOUNTING SYSTEM: ��� NOR SHALL IT BE DISCLOSED IN WHOLE OR IN Comp Mount Type C 39 WOODBINE AVE 2.86 KW PV ARRAY PART IZ OTHERS EXCEPT IN THE RECIPIENTS MODULES NORTHAMPTON MA 01060 ORGANIZATION, EXCEPT IN CONNECTION WITH � 24 St Martin Drive,Building 2,Unit 11 THE SALE AND USE OF THE RESPECTIVE (11) TRINA SOLAR # TSM-260PDO5.18 PAGE NAME SHEET: REV: DATE Marlborough,MA 01752 SOLARCITY EQUIPMENT, WITHOUT THE WRITTEN INVERTER: T: (650)638-1028 F: (650)638-1029 PERMISSION OF SOLARCITY INC. SOLAREDGE # SE3000A-USOOOSNR2 203-451-5825 SITE PLAN PV 3 10/6/2015 (888)-SOL-CITY(765-2489) www.sdarcitycom 4 (E)ORNEWAY Ki `q PROPERTY PLAN Scale:1" = 20'-0' W 0 20' 40' E S CONFIDENTIAL— THE INFORMATION HEREIN JOB NUMBER PREMISE OWNER: DESCRIPTION: DESIGN: CONTAINED SHALL NOT BE USED FOR THE J B-0101495 00 FREEMAN, MR STANLEY A FREEMAN RESIDENCE Chris Wachter BENEFIT OF ANYONE EXCEPT SOLARCITY INC., MOUNTING SYSTEM: solarCity. NOR SHALL IT BE DISCLOSED IN WHOLE OR IN Com Mount T e C 39 WOODBINE AVE 2.86 KW PV ARRAY PART TO OTHERS OUTSIDE THE RECIPIENTS MODULE P ' NORTHAMPTON MA 01060 ORGANIZATION, EXCEPT IN CONNECTION WITH THE SALE AND USE OF THE RESPECTIVE (11) TRINA SOLAR # TSM-260PDO5.18 24 St Martin Drive,Building 2,Unit 11 SOLARCITY EQUIPMENT, VATHOUT THE WRITTEN INVERTER: PAGE NAME SHEET: REV-. DATE: T: (650) 638-1028 Marlborough,MA(650)638-1029 PERMISSION OF SOLARCITY INC. SOLAREDGE SE3000A—USOOOSNR2 203-451-5825 PROPERTY PLAN PV 2 10/6/2015 (866)-soL-cITY(765-2489) www.adarcity.com ABBREVIATIONS ELECTRICAL NOTES JURISDICTION NOTES A AMPERE 1. THIS SYSTEM IS GRID-INTERTIED VIA A AC ALTERNATING CURRENT UL-LISTED POWER-CONDITIONING INVERTER. BLDG BUILDING 2. THIS SYSTEM HAS NO BATTERIES, NO UPS. CONC CONCRETE 3, A NATIONALLY-RECOGNIZED TESTING DC DIRECT CURRENT LABORATORY SHALL LIST ALL EQUIPMENT IN EGC EQUIPMENT GROUNDING CONDUCTOR COMPLIANCE WITH ART. 110.3. (E) EXISTING 4. WHERE ALL TERMINALS OF THE DISCONNECTING EMT ELECTRICAL METALLIC TUBING MEANS MAY BE ENERGIZED IN THE OPEN POSITION, FSB FIRE SET-BACK A SIGN WILL BE PROVIDED WARNING OF THE City of Northampton GALV GALVANIZED HAZARDS PER ART. 690.17. Building Department GEC GROUNDING ELECTRODE CONDUCTOR 5. EACH UNGROUNDED CONDUCTOR OF THE GND GROUND MULTIWIRE BRANCH CIRCUIT WILL BE IDENTIFIED BY Plan Review HDG HOT DIPPED GALVANIZED PHASE AND SYSTEM PER ART. 210.5. 212 Main Street I CURRENT 6. CIRCUITS OVER 250V TO GROUND SHALL Northampton, MA 01060 Imp CURRENT AT MAX POWER COMPLY WITH ART. 250.97, 250.92(B). Isc SHORT CIRCUIT CURRENT 7. DC CONDUCTORS EITHER DO NOT ENTER kVA KILOVOLT AMPERE BUILDING OR ARE RUN IN METALLIC RACEWAYS OR kW KILOWATT ENCLOSURES TO THE FIRST ACCESSIBLE DC LBW LOAD BEARING WALL DISCONNECTING MEANS PER ART. 690.31(E). MIN MINIMUM 8. ALL WIRES SHALL BE PROVIDED WITH STRAIN (N) NEW RELIEF AT ALL ENTRY INTO BOXES AS REQUIRED BY NEUT NEUTRAL UL LISTING. NTS NOT TO SCALE 9. MODULE FRAMES SHALL BE GROUNDED AT THE OC ON CENTER UL-LISTED LOCATION PROVIDED BY THE PL PROPERTY LINE MANUFACTURER USING UL LISTED GROUNDING POI POINT OF INTERCONNECTION HARDWARE. PV PHOTOVOLTAIC 10. MODULE FRAMES, RAIL, AND POSTS SHALL BE SCH SCHEDULE BONDED WITH EQUIPMENT GROUND CONDUCTORS. S STAINLESS STEEL STC STANDARD TESTING CONDITIONS TYP TYPICAL UPS UNINTERRUPTIBLE POWER SUPPLY V VOLT Vmp VOLTAGE AT MAX POWER VICINITY MAP INDEX Voc VOLTAGE AT OPEN CIRCUIT W WATT 3R NEMA 3R, RAIN11GHT PV1 COVER SHEET PV2 PROPERTY PLAN PV3 SITE PLAN PV4 STRUCTURAL VIEWS LICENSE GENERAL NOTES Cu heeds Attal h d IAGRAM t GEN #168572 1. ALL WORK TO BE DONE TO THE 8TH EDITION ELEC 1136 MR OF THE MA STATE BUILDING CODE. 2. ALL ELECTRICAL WORK SHALL COMPLY WITH THE 2014 NATIONAL ELECTRIC CODE INCLUDING MASSACHUSETTS AMENDMENTS. MODULE GROUNDING METHOD: ZEP SOLAR AHJ: Northampton REV BY DATE COMMENTS REV A NAME DATE COMMENTS UTILITY: National Grid USA (Massachusetts Electric) CONFIDENTIAL— THE INFORMATION HEREIN JOB NUMBER PREMISE OWNER DESCRIPTION: DESIGN: JB-0101495 00 CONTAINED SHALL NOT BE USED FOR THE FREEMAN, MR STANLEY A FREEMAN RESIDENCE Chris Wachter �;1`�Olar�'}11 BENEnT OF ANYONE EXCEPT SOLARCITY INC., MOUNTING SYSTEM: I,1 l•r® NOR SHALL IT BE DISCLOSED IN WHOLE OR IN Comp Mount Type C 39 WOODBINE AVE 2.86 KW PV ARRAY PART TO OTHERS OUTSIDE THE RECIPIENT'S ORGANIZATION, EXCEPT IN CONNECTION WITH MODULES: NORTHAMPTON, MA 01060 TMK OWNER: 24 St.Martin Drive,BuTd'ng 2,Unit 11 THE SALE AND USE OF THE RESPECTIVE (11) TRINA SOLAR # TSM-260PDO5.18 ANN: * PAGE NAME: SHEET: RR DATE Marlborough,MA 01752 SOLARCITY EQUIPMENT, WITHOUT THE WRITTEN INVERTER T: (650)638-1028 F. (650)638-1029 PERMISSION OF SOLARCITY INC. SOLAREDGE # SE3000A-USOOOSNR2 203-451-5825 COVER SHEET PV 1 10/6/2015 (888)-SCI-CITY(765-2489) www.sdarcitycom CALCULATION OF DESIGN WIND LOADS - MP1 Mounting Plane Information Roofing Material Comp Roof PV System Type SolarCity SleekMountTM Spanning Vents No Standoff(Attachment Hardware) Comp Mount Tyne C Roof Slope 320 Rafter Spacing 26"O.C. Framing Type/ Direction Y-Y Rafters Purlin Spacing X-X Purlins Only NA Tile Reveal Tile Roofs Only NA Tile Attachment System Tile Roofs Only NA Standing Seam/Trap Spacing SM Seam Only NA Wind Design Criteria Wind Design Code ASCE 7-05 Wind Design Method Partially/Fully Enclosed Method Basic Wind Speed V 90 mph Fig.6-1 Exposure Category C Section 6.5.6.3 Roof Style Gable Roof Fig.6-11B/C/D-14A/B Mean Roof Height h 25 ft Section 6.2 Wind Pressure Calculation Coefficients Wind Pressure Exposure KZ 0.95 Table 6-3 Topographic Factor Krt 1.00 Section 6.5.7 Wind Directionality Factor Kd 0.85 Table 6-4 Importance Factor I 1.0 Table 6-1 Velocity Pressure qh qh = 0.00256(Kz) (Kzt)(Kd)(V^2)(I) Equation 6-15 16.7 psf Wind Pressure Ext. Pressure Coefficient U GC -0.95 Fig.6-11B/C/D-14A/B Ext. Pressure Coefficient Down G (Don) 0.88 Fig.6-11B/C/D-14A/8 Design Wind Pressure p p = qh (GC) Equation 6-22 Wind Pressure U „ -15.8 psf Wind Pressure Down 14.6 psf ALLOWABLE STANDOFF SPACINGS X-Direction Y-Direction Max Allowable Standoff Spacinq Landscape 52" 39" Max Allowable Cantilever Landscape 24" NA Standoff Configuration Landscape Staggered Max Standoff Tributary Area Trib 14 sf PV Assembly Dead Load W-PV 3.0 psf Net Wind Uplift at Standoff T-actual -202 Ibs Uplift Capacity of Standoff T-allow 500 Ibs Standoff Demand/Capacity DCR 40.4% X-Direction Y-Direction Max Allowable Standoff Spacing Portrait 52" 65" Max Allowable Cantilever Portrait 20" NA Standoff Configuration Portrait Staggered Max Standoff Tributary Area Trib 23 sf PV Assembly Dead Load W-PV 3.0 psf Net Wind Uplift at Standoff T-actual -336 Ibs Uplift Capacity of Standoff T-allow 500 Ibs Standoff Demand/Capacity DCR 67.2% STRUCTURE ANALYSIS - LOADING SUMMARY AND MEMBER CHECK- MP1 Member Properties Summary MP1 Horizontal Member Spans Upgraded Rafter Properties Overhang 1.99 ft Net W 3.00" Roof System Pro roes San 1 12.41 ft E uiv D 6.43" Number of Spans w/o Overhang) 1 San 2 Nominal Yes Roofing Material Comp Roof Span 3 A 19.30 in.^2 Re-Roof No Span 4 S. 20.70 in.^3 Plywood Sheathini No San 5 1,t 66.61 in.^4 Board Sheathing Solid-Sheathing Total Rake Span 16.98 ft TL Defl'n Limit 120 Vaulted Ceiling No PV 1 Start 0.83 ft Wood Species SPF Ceiling Finish 1/2"Gypsum Board PV 1 End 16.08 ft Wood Grade #2 Rafter slope 320 PV 2 Start Fb 875 psi Rafter Spacing 26" O.C. PV 2 End F„ 135 psi Top Lat Bracing Full PV 3 Start E 1400000 psi Bot Lat Bracing At Supports PV 3 End E,„;,, 510000 psi Member Loading Summa Roof Pitch 8/12 Initial Pitch Ad"ust Non-PV Areas PV Areas Roof Dead Load DL 11.5 psf x 1.18 13.6 psf 13.6 psf PV Dead Load PV-DL 3.0 psf x 1.18 3.5 psf Roof Live Load RLL 20.0 psf x 0.83 16.5 psf Live/Snow Load LL SLl'Z 40.0 psf x 0.7 1 x 0.45 28.0 psf 18.0 psf Total Load(Governing LC TL 1 41.6 psf 35.1 psf Notes: 1. ps=Cs*pf;Cs-roof,Cs-pv per ASCE 7[Figure 7-2] 2. pf=0.7(Cj(Q(Ij pg; Ce=0.9,Ct=1.1,I5=1.0 Member Design Summary(per NDS) Governing Load Comb CD CL + CL - CF Cr D+S 1.15 1.00 1 0.96 1 1.2 1 Member Anal sis Results Summary Maximum Max Demand 0 Location Capacity DCR Load Combo Shear Stress 39 psi 2.0 ft. 155 psi 0.25 D+ S Bending +)Stress 802 psi 8.4 ft. 1208 psi 0.66 D+S Bending (-)Stress -94 psi 2.0 ft. -1164 psi 0.08 D+S Total Load Deflection 0.56 in. 311 8.3 ft. 1.46 in. I 1_1120 0.39 D+S 30.06.2U15 ca V SolarCityP V System Structural Version#49.3 Design Software PROJECT INFORMATION &TABLE OF CONTENTS Project Name: Freeman Residence AHJ: Northampton Job Number: 0101495 Building Code: MA Res.Code,8th Edition Customer Name: Freeman, Mr Stanley A Based On: IRC 2009/IBC 2009 Address: 39 Woodbine Ave ASCE Code: ASCE 7-05 City/State: Northampton, MA Risk Category: II Zip Code 01060 Upgrades Req'd? Yes Latitude/Longitude: 42.330445 -72.628487 Stamp Req'd? Yes SC Office:I Springfield I PV Designer:I Chris Wachter Certification Letter 1 Project Information,Table Of Contents, &Vicinity Map 2 Structure Analysis (Loading Summary and Member Check) 3 Hardware Design (PV System Assembly) 4 Note: Per IBC 1613.1; Seismic check is not required because Ss = 0.22462 < 0.4g and Seismic Design Category(SDQ = B < D 1/2-MILE VICINITY MAP .S J 9 5 39 Woodbine Ave, Northampton, MA 01060 Latitude:42.330445, Longitude: -72.628487, Exposure Category:C Version#49.3 r.,SolarCit . RU y October 6, 2015 Project/Job# 0101495 RE: CERTIFICATION LETTER Project: Freeman Residence 39 Woodbine Ave Northampton, MA 01060 To Whom It May Concern, A jobsite survey of the existing framing system was performed by a site survey team from SolarCity. Structural review was based on site observations and the design criteria listed below: Design Criteria: -Applicable Codes = MA Res. Code,8th Edition,ASCE 7-05, and 2005 NDS - Risk Category = II -Wind Speed = 90 mph, Exposure Category C -Ground Snow Load = 40 psf - MP1: Roof DL = 11.5 psf, Roof LL/SL= 28 psf(Non-PV Areas), Roof LL/SL= 18 psf(PV Areas) Note: Per IBC 1613.1; Seismic check is not required because Ss = 0.22462 < 0.4g and Seismic Design Category(SDC) = B < D On the above referenced project,the components of the structural roof framing impacted by the installation of the PV assembly have been reviewed. After this review it has been determined that the existing structure requires structural upgrades as detailed in the plan set to withstand the applicable roof dead load, PV assembly load,and live/snow loads indicated in the design criteria above. I certify that the structural roof framing including the specified upgrades and the new attachments that directly support the gravity loading and wind uplift loading from PV modules have been reviewed and determined to meet or exceed structural strength requirements of the MA Res.Code, 8th Edition. Please contact me with any questions or concerns regarding this project. 4 JASON WIL IAM01 N TOWN o STRUCTURAL No.51554 Jason W.Toman, P.E. 9410 1 T6��CI, Professional Engineer St , �' T: 480-553-8115 x58115 y Jason Toman email: jtoman @solarcity.com Date: .10.07 09:56:17-07'00' 3055 Clearview Way San Mateo, CA 94402 T(650)638 1028 (888)SOL-CITY F(650)638-1029 solarcity.com DocuSign Envelope ID:45FB9F98-8EAB-4A7A-94A9-D2DC632B2F2F PPA AMENDMENT Customer Name and Address Installation Location Date Mr Stanley A Freeman 39 Woodbine Ave 10/17/2015 39 Woodbine Ave Northampton,MA 01060 Northampton,MA 01060 Congratulations! Your system design is complete and you are on your way to clean, more affordable energy. Based on the information in your System design,there are some amendments we need to make to your Power Purchase Agreement(the"PPA").The amendments are as follows: We estimate that your System's first year annual production will be 3,386 kWh and we estimate that your average first year monthly payments will be$33.86.Over the next 20 years we estimate that your System will produce 64,589 kWh.We also confirm that your electricity rate will be$0.1200 per kWh, (i.e. electricity rate$0.1200 and tax rate$0.0000). Your electricity rate,exclusive of taxes,will never increase more than 2.90%per year. By signing below,you are agreeing to amend your PPA and you are agreeing to all of the new terms above. If you have any questions or concerns please contact your Sales Representative. Customer's Name:Mr Stanley A Freeman Power Purchase Agreement Amendment FD=uSigned by: Signature: �kL B7424FA81 D384BF._ S o'a r C i ty Date: i C)1/1 7 7?n-i s approved Customer's Name: �� Signature: Signature: Lyndon Rive, CEO Date: Date: 10/8/2015 3055 Clearview Way,San Mateo, CA 94402 i 888.7651489 1 slarcity.com Power Purchase Agreement Amendment,version 2.0.1,June 25,2015 Contractor License MA HIC 168572/FL 1136MR ❑■ ❑■ Document generated on 10/8/2015 1184821 ❑ - 1 A�® DATE(MMOONY ► CERTIFICATE OF LIABILITY INSURANCE 08117/2015 THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER.THIS CERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW. THIS CERTIFICATE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING INSURERS), AUTHORIZED REPRESENTATIVE OR PRODUCER,AND THE CERTIFICATE HOLDER. IMPORTANT_ If the certificate holder is an ADDITIONAL INSURED,the policy(les)must be endorsed. If SUBROGATION IS WAIVED,subject to the terms and conditions of the policy,certain policies may require an endorsement. A statement on this certificate does not confer rights to the certificate holder in lieu of such endorsement(s). PRODUCER CONTACT MARSH RISK&INSURANCE SERVICES NAMMB FAX 345 CALIFORNIA STREET,SUITE 1300 _11%-E RO _.. liArc f441• CALIFORNIA LICENSE NO.0437153 E-MAIL SAN FRANCISCO,CA 94104 –ADDRESS, _.. Attn:Shannon Scott 415-743.8334 INSUpE1s)APFORDINGCOVERAGE _..- _ NAFC.a,._ _ 998301-STND GAWUE-15 16 INSURER a Zurich American insurance Company 16535 .....-. INSURED INSURERS.NlA �N1A SOlarCityCorporation _ ._ _}_ --_—.- 3055 Claalview Way INSURER C:NIA 'NIA San Mateo,CA 94402 INSURER D:Amarican Zurich insurance Company 40142 INSURER F: COVERAGES CERTIFICATE NUMBER: SEA-002713835-08 REVISION NUMBER:4 THIS IS TO CERTIFY THAT THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED. NOTWITHSTANDING ANY REQUIREMENT,TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS CERTIFICATE MAY BE ISSUED OR MAY PERTAIN,THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS, EXCLUSIONS AND CONDITIONS OF SUCH POLICIES.LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS. INSR .. -. ..._..-.. At)OI.SUER...... . .. .. _..-_._._.-._—__—.__PIc DDY��POLICY EIfP�- --_.—. LIMITS LT TYPE OF INSURANCE POLICY NUMBER M7ODl E;N A i,X .'COMMERCIALGENERALLIABILITY IGLO0182016-00 09101/2015 !091012016 EACHOCCURRENCE S _ _ 3,D00,000 .,. CLAIMS-MADE !. �OCCUR .PREMISES-(Ea DAMAGE TO RENTED pccerrence)_,,.,, $ 3,000,,000 00 X SIR 5250,000 _. j MED EX P(Any drte person)_ S 5.000 3,000,000 PERSONAL&ADV INJURY 5 r _ [GE�l AGGREGATE LIMIT APPLIES PER- GENERAL AGGREGATE 5 PRO-POLECY I J JECT j, LOG PRODUCTS COMPIOP AGG 1 S 6 000,000 .... -. . . ._.. .......,.. OTHER ! � 13 A AUTOMOBILE LIABILITY -BAP0182017.00 091012015 '0 910 112 0 1 6 COMBINED SINGLE LIMIT 5 5,000,000 , 1171 acclderil .. _ . X .......... .... .. .. _......_.....-_.- ANY AUTO j BODILY INJURY(Per person) $ X ALL OWNED X I SCHEDULED ! BODILY INJURY(Per acadent) S AUTOS .... AUTOS .,, .. NON-OWNED I PROPE FiTY DAMRGE X HIRED AUTOS .x.. AUTOS f 5 COMP1COLL DED: S $5,000 UMBRELLA LIAB 'OCCUR 1 EACH OCCURRENCE S _ EXCESS LIAR ,CLAIMS-MADEI AGGREGATE S _ f DEO I RETENTIONS S D WORKERS COMPENSATION IWC0182014-00(AOS) 09MI2015 09101/2016 X f PER I 0TH- AND EMPLOYERVLIABILITY I >_ .i STATUTE A ANY PROPRUITORIPARTNERIEXECUTIVE YIN NIA A WC0182015-D(}(MA) 09,,10112015 09101/2016 E L.EACH ACCIDENT t S 1,000�D00 OFFICER/MEMBER MLUDED7 1 .. .' .......� .._._. IMandatory In NH} �4vC DEDUCTIBLE:$500,1100 E.L.DISEASE-EA EMPLOYE _S 1,000,D00 I( es.descnbe under ............. _.._... .--- ..- . ......_....... I DESCRIPTION OFOPERATIONS Oelox ! EL DISEASE-POLICY LIMIT I, 1,0011,000 f DESCRIPTION OF OPERATIONS/LOCATIONS[VEHICLES{ACORD 161,Additional Remarks Schedule,may he anached if more epace Is required) Evidence Of insurance. CERTIFICATE HOLDER CANCELLATION SolarCily Corporation SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE 3055 CieaNlew Way THE EXPIRATION DATE THEREOF, NOTICE WILL BE DELIVERED IN San Mateo,CA 99402 ACCORDANCE WITH THE POLICY PROVISIONS. AUTHORIZED REPRESENTATIVE Df Marsh Risk&Insurance Services I Charles Marmolejo 0 1988-2014 ACORD CORPORATION. All rights reserved_ ACORD 25(2014101) The ACORD name and logo are registered marks of ACORD The Commonwealth of Massachusetts Department of IndustrialAccidents Office of Investigatious I Congress Street,Suite 100 Boston,MA 02114-2017 �.-_..- wipwinas4.gon1dia Workers'Compensation Insurance Affidavit:Builders/Contractors/C lectric[an.s/Plulmbers Applicaul Information Please Print Le Lb_1 Name(BusineWOrganizationttndividual): SOLARCIN CORP Address:3455 CI.EARVIEW WAY City/State/Zi :SAN MATEO,CA 94402 Phone#:888-765-2489 Are you an employer?Check the appropriate box: Type of project(required): I.® I am a employer with 5000 4. ❑ l am a gencreI contractor and 1 6. New cohstnection employees(full and/or part-time).* have hired the sub-contractors �] 2.❑ I am a sole proprietor or partner- listed on the attached sheet_ 7. ❑Remodeling ship and have no employees These sub-contraclors have S. ❑t)emolltion working or me in an capacity. employees and have workers' & Y t 9. Building addition [No workers'comp_insurance camp.insurance. required.] 5. ❑ We are a corporation and its 10.[]Electrical repairs or additions 3.0 1 am a homeowner doing ail work officers have exercised their l LEI Plumbing repairs or additions myself: [No workers' comp. right of exemption per MGL 12_❑Roof repairs insurance required.]t c. 152,§1(4),and we have no SOLAR f PV employees.[No workers' 13.Q Other comp.insurance required.) "Any applicant that citecks box ti 1 maxi also fill out the scclion bcloly shwving their workers'compensation policy information. 1 tlomeowncts who submit this offidarit indicating they arc doing all work and then htrc outside conlWorsmust submit a now affidavit indicating such. tContractars that check this box trust attached an addilional sheet shoving the name orthe stab-contractors and stale whether at not those entities have employees. Irthe sub-contraclors have employees,they must providelheir %vorlxrs'comp.policy ntmlber, !air air employer trial+ts providlttg workers`eo»rpensatiopi itisarapicc for mp enaplvyees. Below is the policy airyfob site Information. Insurance Company N$me: Zurich American Insurance Company Policy It or Self--ins.Lie. tt: WC0182014-00 Expiration late: 09/01 12016 Job Site Address:L� 1 C ( f (1+ City/Statc/Zip: , Attach a copy of the workers'compensation policy declaration page(showing the policy number and expiration date). Failure to secure coverage as required under Section 25A of MGL e. 152 can lead to the imposition of criminal penalties of a l Jl }ll/ fine up to$1,500.00 and/or one-year imprisonment,as well as civil penalties in the form of a STOP WORK ORDER and aline of up to$250.00 a day against the violator. Be advised that a copy of this statement may be forwarded to the Office of Investigations of the DIA for insurance coverage verification. I do hereby certify andor the pains tine►penalties ofpeiYurp that'die btjorniation provided above Is true tepid correct. Phonc tt Oflicial ase aptly. Do idol write in lids area,to he completed by city or town official. City or Town: Permit/License# issuing Authority(circle one): 1.Board of Health 2.wilding Department 3.City/Towo Clerk 4.Electrical Inspector 5.Plumbing Inspector 6.Other Contact Person: Phone#: SECTION 8-CONSTRUCTION SERVICES 8.1 Licensed Construction Supervisor: Not Applicable ❑ Name of License Holder:SOLARCITY/CRAIG ELLS 107663 License Number 604 SILVER ST AGAWAM MA 01001 8/29/17 Address Expiration Date (It ` 978-875-1698 Signature Telephone 9.Registered Home Improvement Contractor: Not Applicable ❑ SOLARCITY CORP/VICTORIA JUNCK 168572 Company Name Registration Number 604 SILVER ST AGAWAM MA 01001 03/08/2017 Address Expiration Date Telephone 978-215-2367 SECTION 10-WORKERS'COMPENSATION INSURANCE AFFIDAVIT(M.G.L.c. 152,§25C(6)) Workers Compensation Insurance affidavit must be completed and submitted with this application. Failure to provide this affidavit will result in the denial of the issuance of the building permit. Signed Affidavit Attached Yes....... ❑ No...... ❑ 11. - Home:Owner Exemption The current exemption for"homeowners"was extended to include Owner-occupied Dwellings of one(1) or two(2)families and to allow such homeowner to engage an individual for hire who does not possess a license,provided that the owner acts as supervisor.CMR 780, Sixth Edition Section 108.3.5.1. Definition of Homeowner: Person(s)who own a parcel of land on which he/she resides or intends to reside,on which there is,or is intended to be,a one or two family dwelling,attached or detached structures accessory to such use and/or farm structures.A person who constructs more than one home in a two-year period shall not be considered a homeowner. Such"homeowner"shall submit to the Building Official,on a form acceptable to the Building Official,that he/she shall be responsible for all such work performed under the building permit. As acting Construction Supervisor your presence on the job site will be required from time to time,during and upon completion of the work for which this permit is issued. Also be advised that with reference to Chapter 152(Workers' Compensation) and Chapter 153(Liability of Employers to Employees for injuries not resulting in Death)of the Massachusetts General Laws Annotated,you may be liable for person(s) you hire to perform work for you under this permit. The undersigned"homeowner"certifies and assumes responsibility for compliance with the State Building Code,City of Northampton Ordinances, State and Local Zoning Laws and State of Massachusetts General Laws Annotated. Homeowner Signature SECTION 5-DESCRIPTION OF PROPOSED WORK(check all applicable) New House Addition Replacement Windows Alteration(s) Roofing Or Doors Accessory Bldg. Demolition New Signs [ ] Decks [ ] Siding[ ] Other F,—/] Brief Description of Proposed Work: Install solar electric panels to roof of existing home to be interconnected with home's electrical system. Alteration of existing bedroom Yes No Adding new bedroom Yes No Attached Narrative Renovating unfinished basement Yes No Plans Attached Roll -Sheet sa. If New house and or addition to existina housing, comolete the following: a. Use of building : One Family Two Family Other b. Number of rooms in each family unit: Number of Bathrooms c. Is there a garage attached? d. Proposed Square footage of new construction. Dimensions e. Number of stories? f. Method of heating? Fireplaces or Woodstoves Number of each g. Energy Conservation Compliance. Masscheck Energy Compliance form attached? h. Type of construction i. Is construction within 100 ft. of wetlands? Yes No. Is construction within 100 yr. floodplain Yes No j. Depth of basement or cellar floor below finished grade k. Will building conform to the Building and Zoning regulations? Yes No . I. Septic Tank City Sewer Private well City water Supply SECTION 7a-OWNER AUTHORIZATION-TO BE COMPLETED WHEN OWNERS AGENT OR CONTRACTOR APPLIES FOR BUILDING PERMIT Stanley A Freeman as Owner of the subject property hereby authorize SOLARCITY to act on my behalf, in all matters relative to work authorized by this building permit application. 10/19/2015 ignature of Owner Date SOLARCITY CORPNICTORIA JUNCK as Owner/Authorized Agent hereby declare that the statements and information on the foregoing application are true and accurate, to the best of my knowledge and belief. Signed under the pains and penalties of perjury. SOLARCITY CORPNICTORIA JUNCK Print Name zngm—�— 10/19/2015 Signature of Owner/Agent Date Section 4. ZONING All Information Must Be Completed. Permit Can Be Denied Due To Incomplete Information Existing Proposed Required by Zoning This column b fi in by y Building Department a Lot Size Frontage Setbacks Front Side L: R: L: R: Rear Building Height Bldg. Square Footage % Open Space Footage % (Lot area minus bldg&paved parking) #of Parking Spaces Fill: volume&Location A. Has a Special Permit/Variance/Finding ever been issued for/on the site? NO DON'T KNOW YES IF YES, date issued: IF YES: Was the permit recorded at the Registry of Deeds? NO DON'T KNOW YES IF YES: enter Book Page and/or Document# B. Does the site contain a brook, body of water or wetlands? NO DON'T KNOW YES IF YES, has a permit been or need to be obtained from the Conservation Commission? Needs to be obtained Obtained , Date Issued: C. Do any signs exist on the property? YES NO IF YES, describe size, type and location: D. Are there any proposed changes to or additions of signs intended for the property? YES NO IF YES, describe size, type and location: E. Will the construction activity disturb(clearing,grading, excavation, or filling)over 1 acre or is it part of a common plan that will disturb over 1 acre? YES NO IF YES,then a Northampton Storm Water Management Permit from the DPW is required. 06partrnent use of l City of Northampton Stems t Permit: Building Department Curb Out(Driueway Permit 212 Main Street Sewer/Septic A tlab�llty Room 100 Waterltelt Availability rthampton, MA 01060 Two Sets of Struetral Flans 13-587-1240 Fax 413-587-1272 Platt + Prins Other~specify _.,:-- � TION TO CONSTRUCT,ALTER,REPAIR,RENOVATE OR DEMOLISH A ONE OR TWO FAMILY DWELLING SEC ION 1 -SITE INFORMATION This section to be completed;by office 1.1 Property Address: 39 Woodbine Ave Map Lot Unit Zone Overlay District Elm St.District CS District SECTION 2-PROPERTY OWNERSHIP/AUTHORIZED AGENT 2.1 Owner of Record: Stanley A Freeman 39 Woodbine Ave,Northampton MA 01060 Name(Print) Current Mailing Address: 203-451-5825 Telephone Signature 2.2 Authorized A-gent: SolarCity CorpNictoria Junck 604 Silver St Agawam MA 01001 Name( rint) Current Mailing Address: 978-215-2367 Signature Telephone SECTION 3-ESTIMATED CONSTRUCTION COSTS Item Estimated Cost(Dollars)to be Official Use Only completed by ermit applicant 1. Building 2,000 (a)Building Permit Fee 2. Electrical 6,000 (b)Estimated Total Cost of Construction from 6 3. Plumbing Building Permit Fee 4. Mechanical(HVAC) 5. Fire Protection 6. Total=0 +2+3+4+5) 8,000 Check Number This Section For Official Use Only Date Building Permit Number: Issued: Signature: Building Commissioner/Inspector of Buildings Date File#BP-2016-0535 APPLICANT/CONTACT PERSON SOLARCITY CORP ADDRESS/PHONE 604 SILVER ST AGAWAMO1001 (888)765-2489(2358) PROPERTY LOCATION 39 WOODBINE AVE MAP 25A PARCEL 153 001 ZONE URBO00)/ THIS SECTION FOR OFFICIAL USE ONLY: PERMIT APPLICATION CHECKLIST ENCLOSED REQUIRED DATE ZONING FORM FILLED OUT s Fee Paid 17 rZ!J Building Permit Filled out Fee Paid T eof Construction• INSTALL ROOF MOUNTED 2.86 KW SOLAR ARRAY New Construction Non Structural interior renovations Addition to Existing Accessory Structure Buildiniz Plans Included• Owner/Statement or License 107663 3 sets of Plans/Plot Plan THE FOLLOWING ACTION HAS BEEN TAKEN ON THIS APPLICATION BASED ON INFqRMATION PRESENTED: Approved Additional permits required(see below) PLANNING BOARD PERMIT REQUIRED UNDER:§ Intermediate Project: Site Plan AND/OR Special Permit With Site Plan Major Project: Site Plan AND/OR Special Permit With Site Plan ZONING BOARD PERMIT REQUIRED UNDER: § Finding Special Permit Variance* Received&Recorded at Registry of Deeds Proof Enclosed Other Permits Required: Curb Cut from DPW Water Availability Sewer Availability Septic Approval Board of Health Well Water Potability Board of Health Permit from Conservation Commission Permit from CB Architecture Committee Permit from Elm Street Commission Permit DPW Storm Water Management em i ' D ay Sig ure of Building ffic Date Note: Issuance of a Zoning permit does not relieve a applicant's burden to comply with all zoning requirements and obtain all required permits from Board of Health,Conservation Commission,Department of public works and other applicable permit granting authorities. *Variances are granted only to those applicants who meet the strict standards of MGL 40A. Contact Office of Planning&Development for more information. 39 WOODBINE AVE BP-2016-0535 GIs#: COMMONWEALTH OF MASSACHUSETTS Map:Block: 25A- 153 CITY OF NORTHAMPTON Lot: -001 PERSONS CONTRACTING WITH UNREGISTERED CONTRACTORS Permit: Building DO NOT HAVE ACCESS TO THE GUARANTY FUND (MGL c.142A) Category: SOLAR PANELS BUILDING PERMIT Permit# BP-2016-0535 Project# JS-2016-000891 Est. Cost: $8000.00 Fee: $75.00 PERMISSION IS HEREBY GRANTED TO: Const.Class: Contractor: License: Use Group: SOLARCITY CORP 107663 Lot Size(sa.ft.): 4878.72 Owner: FREEMAN STANLEY Zoning:URB(loo)/ Applicant: SOLARCITY CORP AT. 39 WOODBINE AVE Applicant Address: Phone: Insurance: 604 SILVER ST (888) 765-2489 (2358) Workers Compensation AGAWAMMA01001 ISSUED ON:1012012015 0:00:00 TO PERFORM THE FOLLOWING WORK.-INSTALL ROOF MOUNTED 2.86 KW SOLAR ARRAY POST THIS CARD SO IT IS VISIBLE FROM THE STREET Inspector of Plumbing Inspector of Wiring D.P.W. Building Inspector Underground: Service: Meter: Footings: Rough: Rough: House# Foundation: Driveway Final: Final: Final: Rough Frame: Gas: Fire Department Fireplace/Chimney: Rough: Oil: Insulation: Final: Smoke: Final: THIS PERMIT MAY BE REVOKED BY THE CITY OF NORTHAMPTON UPON VIOLATION OF ANY OF ITS RULES AND REGULATIONS. Certificate of Occupancy Shinature: FeeType: Date Paid: Amount: Building 10/20/2015 0:00:00 $75.00 212 Main Street,Phone(413)587-1240,Fax: (413)587-1272 Louis Hasbrouck—Building Commissioner