17C-278 (5) 5. Install missing diffusers at 2nd floor janitor's closet. ELECTRICAL 1. Firestop risers from Mach Room to Data Room. 2. Confirm all lights are in working order. - 3. Install ceiling light in 2nd floor janitors closet. 4. Install raceway end cap above counter in Work Room 5. Provide labeling at elec.Panels and keying signage at bank of light switches in the Work Room. 6. Check power to pumps in the Machine Room. 7. Down light is missing in the bay area of the addition at the 2nd floor. 8. Install the wall hung phone jack in the staff Break Room. 9. Install substitute fixture in ceiling of porch at 2nd Floor exit.. GENERAL 1. As built drawings. 2. O and M Manuals and Balancing report. 3. Systems training sessions. 4. Final cleaning. 5. Construction Photographs. Lilly Library Punch Last C A O L O & B I E N t. E K ASSOCIATES , I N D 3 July 28,2006 A R 0 H I T E C T B A N 0 E N G 1 N E E R 5 r DOORS 1. Correct day light at top and bottom of astragal at 2nd floor exit double doors. 2. Provide trim plate at automatic door button inside entry to circulation area. HARDWARE 1. Change cores for new keying' 2. Add battery alarm to Door#110. 3. Activate battery alarms at door Nos. 102 and 109. CEILING 1. Replace tiles in Reference area with paint stains. FLOORING 1. Replace VCT file in Program Room(one piece)that was installed with some debris underneath. PAINTING 1. Correct wall surfaces with chips in the paint coating 2. Do final coat on stairwell walls. 1 Conect paint splatters in,various locations: At boarders of exterior field and trim color,door hinges, radiation covers,walls,woodwork,etc. 4. Touch up nail fill holes in wood work. 5. Touch up the wood filler on the, floor exit doors. 6. - Paint the trash room. ;. Paint the wood column bases at the entry. SIC'=NAGE L Install exterior building signage. FIRE PROTECTION 1. Final testing and programming: PLUMBING 1. Setup all faucets in the toilet room sinks to operate like the Men's Toilet and Children's Room Toilet. The faucet at the Second Floor toiletrreoif5s too long and the First Floor Women's Room doesn't shut off completely. HVAC 1. Install,fin-tube radiation covers and repair damaged fins. 2. Install sound'insulation at open deck beo,w x.xof.top unit. 3. Adjust belts ? to stop vibration of condensing unit at roof top in exchange for the specified sound insulation package not proyided., 4. Install covers on toilet room heaters. Lilly Library Iuach List 2 J uly 28,200 C A O L O & B I E N I E K A S S O C I AT E S , I N C A R C H I T E C T S A N D E N G I N E E R S CURTIS A.EDGIN,A.I.A.,N.C.A.R.B. ® JAMES M.HANIFAN,A.I.A.,N.C.A.R.B. KENNETH R.JODRIE vrrO CAOLC,A.I.A.,N.C.AR.B. CARL ® & BIENIEK ASSOCIATES , INC. A R C H I T E C T U R E • P L A N N I N G I N T E F Z I O R D E S I G N LILLY LIBRARY PUNCH LIST JULY 28,2006 SITE WORK 1. Fine grading and seeding of lawn areas. 2. Fine grading and seeding of detention pond. 3. Removal of erosion control barriers. MASONRY 1. Cleaning of split face block on addition. 2. Touch up of mortar to unify color at split face block. 3. Rebuild granite steps and kneewall at front landing. 4. Grouting caulking of front stairs. METAL FABRICATIONS 1. Railings at exterior landing and stairs WOODWORK 1. End caps at baseboard under sink at Program Room. 2. Fill nail holes at wood trim work. 3. Repair welding marks in oak treads. 4. Install raised panel trim at infill panel on 2nd fl. exit doors. ROOFING 1. Remove roofing supplies left on roof. 2. Trim Tyvek hanging below siding on new gable end. SEALANTS 1. Caulk exterior doors. 2. Caulk sidewalk expansion joints. 3. Caulk slab at 2nd floor exit WINDOWS L.Installation of replacement windows. Lilly Library Punch List 1 July 28,2006 521 East Street•Cliicopee, Massachusetts 01020-4161 (413) 594-2800 Fax(413) 594-2900 info@cbaarchitects.net ses VwAIA Document G704 2000 Certificate of Substantial Completion PROJECT: PROJECT NUMBER:200449/ OWNER:❑ (Name and address): CONTRACT FOR:General Construction Lilly Library CONTRACT DATE:July 07,2005 ARCHITECT:❑ 18 Meadow Street CONTRACTOR:❑ Florence,MA TO OWNER: TO CONTRACTOR: FIELD:F-1 (Name and address): (Name and address): OTHER:❑ Lilly Library Association Western Builders,Inc. 18 Meadow Street 73 Pleasant Street Florence,MA Granby,MA 01033 PROJECT OR PORTION OF THE PROJECT DESIGNATED FOR PARTIAL OCCUPANCY OR USE SHALL INCLUDE: All work of the Lilly Library Renovation and Addition contract. The Work performed under this Contract has been reviewed and found,to the Architect's best knowledge,information and belief, to be substantially complete.Substantial Completion is the stage in the progress of the Work when the Work or designated portion is sufficiently complete in accordance with the Contract Documents so that the Owner can occupy or utilize the Work for its intended use.The date of Substantial Completion of the Project or portion designated above is the date of issuance established by this Certificate,which is also the date of commencement of applicable warranties required by the Contract Documents,except as stated below: Warranty Date of Commencement Caolo&Bieniek Associates,Inc. O.O( •2oo([> ARCHITECT B DATE OF ISSUANCE A list of items to be completed or corrected is attached heret .The failure to inc de any items on such list does not alter the responsibility of the Contractor to complete all Work in accor cc wit ontract Documents.Unless otherwise agreed to in writing,the date of commencement of warranties for items on the attached list will be the date of issuance of the final Certificate of Payment or the date of final payment. Cost estimate of Work that is incomplete or defective:$81,500.00 The Contractor will complete or correct the Work on the list of items attached hereto within Ninety(90)days from the above date of Substantial Completion. Western Builders,Inc. CONTRACTOR BY DATE The Owner accepts the Work or designated portion as substantially complete and will assume.full possession at 12:00 a.m.(time) on August 01,2006(date). Lilly Library Association OWNER DATE The responsibilities of the Owner and Contractor for security,maintenance,heat,utilities,damage to the Work and insurance shall be as follows: (Note:Owner's and Contractor's legal and insurance counsel should determine and review insurance requirements and coverage.) The Owner shall be responsible for the security,maintenance,heat,utilities,damage to the work and insurance as of August 1, 2006. AIA Document G704 rm—2000.Copyright ©1963,1978,1992 and 2000 by The American Institute of Architects. All rights reserved. WARNING:This AIA® Document is protected by U.S.Copyright Law and International Treaties.Unauthorized reproduction or distribution of this AIA®Document,or any 1 portion of It,may result in severe civil and criminal penalties,and will be prosecuted to the maximum extent possible under the law. This document was produced by AIA software at 13:21:16 on 07131/2006 under Order No.1 0002194391 which expires on 3/2412007,and is not for resale. User Notes; (465001843) ROBT W. HALL CONSULTING ENGINEERS, INC. 540 MEADOW STREET EXTENSION AGAWAM, MASSACHUSETTS 01001-0002 (413) 789-0960 • FAX (413) 789-3295 Engineer's Final Affidavit August 21, 2006 Project Name: Lilly Library Project Location: 19 Meadow Street, Florence, Massachusetts. This letter is pursuant to Section 116.2 Registered Architectural and Engineering Services of the Massachusetts Building Code. Construction of the Electrical aspects of the above referenced project has been completed. This office has made several periodic on-site observations throughout the Electrical construction process. Based on our observations and to the best of our knowledge and belief,the Electrical aspect of the work has been executed, and is consistent with the intent of the contract documents, the Electrical design modifications required by field conditions, and the Massachusetts State Building Code (780 CMR) 6t" edition and other pertinent laws and ordinances. Very truly yours Robert W. Hall Consulting Engineers, Inc. James E. Sullivan P.E. Subscribed and sworn to before me Electrical Engineer this �J I S Day of 2006. OF MgssgC' 'P'1 •G (Notary Public) :1. E: �, Richard A. Sitnik SULLIVAN y My Commission Expires June 14, 2007 0. 8955 O \GIST ,`SIO.V AL r� ROBT W. HALL CONSULTING ENGINEERS, INC. 540 MEADOW STREET EXTENSION AGAWAM, MASSACHUSETTS 01001-0002 (413) 789-0960 • FAX (413) 789-3295 Engineer's Final Affidavit August 21, 2006 Project Name: Lilly Library Project Location: 19 Meadow Street, Florence,Massachusetts. This letter is pursuant to Section 116.2 Registered Architectural and Engineering Services of the Massachusetts Building Code. Construction of the Mechanical aspects of the above referenced project has been completed. This office has made several periodic on-site observations throughout the Mechanical construction process. Based on our observations and to the best of our knowledge and belief,the Mechanical aspect of the work has been executed, and is consistent with the intent of the contract documents, the Mechanical design modifications required by field conditions, and the Massachusetts State Building Code (780 CMR) 6`" edition and other pertinent laws and ordinances. Very truly yours Robert . Hall Consulti g Engineers, Inc. Robert F. Griffiths P.E. Subscribed and sworn to before me Chief Engineer this `� Day of _2006• OF (Notary Public) Richard A. Sitnik o� FOSERT F My Commission Expires June 14, 2007 ORIFFrrHS MECHANICAL .4, No.33161 WNW- ROBT W. HALL CONSULTING ENGINEERS, INC. 540 MEADOW STREET EXTENSION AGAWAM, MASSACHUSETTS 01001-0002 (413) 789-0960 • FAX (413) 789-3295 Engineer's Final Affidavit August 21, 2006 Project Name: Lilly Library Project Location: 19 Meadow Street, Florence, Massachusetts. This letter is pursuant to Section 116.2 Registered Architectural and Engineering Services of the Massachusetts Building Code. Construction of the Fire Protection aspects of the above referenced project has been completed. This office has made several periodic on-site observations throughout the Fire Protection construction process. Based on our observations and to the best of our knowledge and belief,the Fire Protection aspect of the work has been executed, and is consistent with the intent of the contract documents, the Fire Protection design modifications required by field conditions, and the Massachusetts State Building Code (780 CMR) 6`" edition and other pertinent laws and ordinances. Very truly yours Robert W. Hall Consulting Engineers, Inc. /656ert4F.WGrifit Subscribed and sworn to before me Chief Engineer this Day of 2006. i (Notary Public) F y Richard A. Sitnik WE PFx)TK My Commission Expires June 14, 2007 JAMES A.EDGIN. IFA A.A I N.N.A.R.B. C12 JAMES ti.HANIFAN.A.LA..N R.R.B. KENNETH R.JGNRIE.A.LA. CAOLO & BIENIEK ASSOCIATES , INC . A R C H I T E L T Li R L P L A N N N L Designer's Final Affidavit 2 2CG6 for Project Close Out 'k _a I, Kenneth R. Jodrie, Mass. Registration No. 20062 being a registered✓'Professional Architect / Engineer hereby certify that I or my authorized representatives have made periodic visits to the project site throughout construction, and to the best of my knowledge and understanding the project: Lilly Library Renovations and Addition located at 19 Meadow Street, Florence, MA, Building Permit # has been built / altered in accordance with the approved plans and contract documents, and that such plans conform to the provisions of the Massachusetts State Building Code, 780 CMR 61'edition. ENTIRE PROJECT X ARCHITECTURAL STRUCTURAL MECHANICAL FIRE PROTECTION ELECTRICAL OTHER(specify) (Affix Seal here) (Sig a ure) ED ARC�� (Print Name) cli No.20062 NORTHAMPTON, 6 MA G Of MPS�,P On this 21st day of August, 20 06, before me, the undersigned notary public, personally appeared Kenneth R. Jodrie (name of document signer), proved to me through satisfactory evidence of identification, which was personal knowledge of the identity of the principal, to be the person whose name is signed on the preceding or attached document in my presence. Aag (Official ature and seal of notary) My commission expires November 12, 2010 ZCe,�1fdZL)W-0 -j?4r --&�t�r g' i;79 a.K / LL z"Zk2, 71 -d. ,/p ��/� t�v��� I,t/a � ` sue• On%Gd Ll,l 4, r vo i f+4 4 AL-4- 4�4 `fir j roa,— -lO-0(,p � � G� 0 Z Horn !n i/r26✓�7�vy'v"1 ch,d �1 Mii• `t'. (�9�i�� 'TJ t'lg"Y1��1ly� l x ;a BP-2006-0060 GIS#- COMMONWEALTH OF MASSACHUSETTS ocic:>�i _. CITY OF NORTHAMPTON Lot: -001 Permit: Building Category: BUILDING PERMIT Permit# BP-2006-0060 Project# IS-2006-0077 Est. Cost: $2030000.00 Fee: $0.00 PERMISSION IS HERE-3 Y ° ,"-,'ANTED TO: Const.Class: 3B Contractor: License: Use Group: A3 WESTERN BUILDERS INC 000153 Lot Size(sq. ft.): 16160.76 Owner: NORTHAMPTON CITY OF Zonins:URB Applicant: WESTERN BUILDERS INIC AT: 19 MEADOW ST Applicant Address: Phone: Insurance: 73 PLEASANT ST (413) 46 7-0 171 Workers Compensation GRAN E.'YMAO1033 ISSUED ON: TO PERFORM THE I'OLLOWING WORK:CONSTRUCT 2 STORY ADDITION & RENOVATION CONTROLLED CONSTRUCTION AS PER780CMR-116 POST THIS CARD SO IT IS VISIBLE FROM THE, STREET Inspector of Plumbing Inspector of Wiring D.P.W. Building Inspector Underground:11-ACS"44ervice• Meter: Footings: Rough:,, ough: s.Q3./ J, Ao� House# Foundation: Driveway I final: PARjI!►l. E L�jo�iOS 1�6vis Final: 1, (-06 � Final: 7 C-o Cc C4�1P��TC If-7-d Rough Frame: /w3 Gas: Fire])epartment Fireplace/Chimney: Rough: - 1 �s 0i1: �,.�t Insulation: ,y Final• y ��,""�t�i�, �`�"�A1�; v Final: C� THIS PERMIT MAY BE REVOKED BY THE CITY OF NORTHAMPTON UPUN VIOLATION OF ANY OF ITS RULES AND REGULATIONS. v 0 Certificate of Occu an __Si nature: Date Paid: Amount: moo I Y`TEMPO 'L °4`�PIRES, 9/29/()6 ilding 8/11/05 9:00:00 $0.00 212 Main Street,Phone(413) 587-1240,Fax:(413) 587-1272 Building Comnn issioner-Anthony Patillo . 4 19 NZAL .M. ST fir BP-2006-OOW COMMON ENLTH OF MASSACHUSETTS X=Jftk. 17C-271 CITY OF NORTHAN[PTON �1 psrw1, sulkmg BUILDING PERMIT > a a IS-2QQkZZZ s " m Q=;,CIML 319 convad"m License: 1iaa a"-.-A3 WE ERN BUILDM INC- M A2': 19 MLA=5t .Sa 1lcatit.A atom Il�+t#t�lihtS;: 73-, . ��11442t71 W�ttS 99 GRAMeYMA010W MR=W--, TO PER"XI f 'FOL LOWMG WORK.-CONSTRUCT 2 sTCRY AnOMON&REN MATION CO R N=ZMoV AA lU MMOM6ice POs'=C Yr-YELILE FR() ' TRE.T Impecor st F1 aMag bopmtor of Viring WNW. suave"[uapec"w U mkrsreww.-.4.0 a om. Maier. ,-� Faotir� ' -R�.*q:,C•y�+(��i+��j�°'�. �p+deM p'aaaetatles: /�`R'�"��yi�,/a,,,�IQr" � , D►i.ewey 1rldL- IIItA1.F �d9 �.I" ,�► cam* �ire� .at�emaat Ram"-f9-06��� ��w,•l ioatrtarlo�: M aid$�"�...� Finataj,-JU-Q46 01p ` `.�"jp�e"' �l�� Fleat:Q k ,"s,dr,, 4 s� -rats F=t14if MAy B$REVCi1ED BY THE CI QF N0fkTfI i mON`1 z:V (7I.AI'YOl+1°OR ANY OF ITS RULES AND` E IOM. JY Om TwomM N.4.\aV.fo= J�• /®G y Building 811 I/DS A�i10:4Q1-7YWA / . 212 Msis Sw9m P6nw(4 i3)$37-1240.Paz(41:;)587.1272 < l�oldiae Caonar-ANI�y Paiillo Ton PA atE[tA4C7e xv.a *v!►n aanTapxfnn e_a '�� is thOw"XAW ST ep 4 COMMONWEALTH OF MASSACHUSETTS 17c•r/9 CITY OF 14ORTRA►11IMN = `� r lka. 1614021 � ear L.tart� t11+ '+t AQ143' AS=w ZO PRA"AN if!'W POl f pWOVO WQ=ICDNCS'S'PJXT 2 SYKWY AMY' OR&RFAMAMON INWQW,d p wt m" wm.tt�e ".W. tit now" Ron" 49a Ira:�•�l-I$�i �- -oC� "r"ze- iJ���r.�- Ea,� 7�1l1lRY� - Inc 'Hats P22MIT P"Y RR RXVUIIII X DIY tl1,8 O�AiOA - ',`tgOLAIIOr+OF ANY OF PR'S RtJi"A1�lM OIMB, Almost: - . �o tax TA"Paum 0=10s me - W/06 M tUt Sttr�,ll�eaa�at3j f�7.1a40.��c taa 33 SQ�.s�7x ''C� tea�pirsioaer-,� ► t+►nilA 211112tcT♦ Tara •area �nnar�xa�►n T00IZ UZ%RQCTh YVJ TT:CT 6pt)Z';cI [tT • A graphic representation of the structure needs to be installed at the Fire Alarm Control Panel and/or Fire Alarm Annunciator Panel. The structural members should be outlined in black and each fire alarm device should be outlined in red. Points of egress should be indicated with blue shading, if the building is multi-storied floors should be shown one above another. The building name and address should be posted at the top of map. • Alarm verification must be active on all smoke detection zones. • Engraved labels (1"x1") numbering all smoke detectors for identification purposes installed on smoke detectors on main fire alarm system. Numbering sequence to be determined by Fire Department. • Pull Stations referenced in fire protection narrative shall be double action type. • Fire Alarm work permits need to be obtained for the project. • The FD connection for sprinkler system is to be 4" Storz connection with an attached chain, in addition a sign reading "Fire Department Connection" in 3" white letters on a red background is to be mounted above the connection. Also an electric bell, which activates upon water flow, must be located above this sign. • Plans for the fire alarm and calculations sprinkler system need to be submitted to Fire Department as soon as possible for review and approval. •Page 2 k !' • Department n Fire Memorandum X77­_ To: Tony Patillo From: Duane NicholspO Date: July 22, 2005 CC: Brian Duggan =---� Re: 19 Meadow St. Lily Library Secondary to a review of the fire protection narrative and plans that were submitted to me for review, I concur with the issuance of a building permit subject to the following conditions. A Fire Department Emergency Access Key Box is required on the exterior of the structure near the main entrance; a red 120-candela strobe light that actuates upon an alarm condition is required above the Key box. Engraved key tags and proper keys are placed in the Key Box. A Fire Alarm Annunciator panel and/or Fire Alarm Control panel needs to be located at the front entrance. All panels need to be clearly marked with red engraved signage with one-inch white lettering clearly identifying panel. • 5 lb ABC extinguishers are needed located at exits. This shall be in compliance with NFPA relative to maximum travel distance. Appropriate signage in compliance with ADA should be located above. 0 Page 1 J U, 2 5 2005 1 *----------------------------------------------* Official Receipt for Recording in: Hampshire County Registry of Deeds 33 King St. Northampton, Massachusetts 01060 Issued To: TRUSTEES OF LILLY LIBRARY 19 MEADOW ST NORTHAMPTON MA 01060 Recording Fees *----------------------------------------------* Document Recording Description Number Book/Page Amount *----------------------------------------------w DECIS 00019101 8358 26 $75.00 TRUSTEES OF LILLY LIBRARY $75.00 Collected Amounts *----------------------------------------------* Payment Type Amount ----------------------------------------------* Check 8758 $75.00 $75.00 Total Received $75.00 Less Total Recordings: $75.00 Change Due $.00 Thank You MARIANNE DONOHUE - Register of Deeds By: Maureen C Receipt# Date Time 0126696 07/25/2005 11:56a .. A ROBT W. HALL CONSULTING ENGINEERS, INC. MA Reg.No. 19283 — Telephone(413)789-0960 FAX(413)789-3295 CT Reg.No.5982 540 MEADOW STREET EXTENSION, STE. 2 E-mail:rwhall @javanet.com VT Reg. No.2200 AGAWAM, MASSACHUSETTS 01001-0002 ME Reg. No.2182 NH Reg. No. 1716 NY Reg. No.44160 VA Reg. No. 12027 RI Reg. No.6323 June 28, 2005 Project: Lilly Library, 19 Meadow Street, Florence, MA In accordance with Section 127.0 of the Massachusetts State Building Code, I, Robert W. Hall P.E. being a Professional Engineer, certify that the plans for the plumbing, mechanical, electrical and fire protection systems related to the construction have been prepared under my supervision and to the best of my knowledge, such plans conform to the provisions of said Code, all acceptable engineering practices and all applicable laws and ordinances. I will comply with the requirements of Section 127.2.2 (Construction Control) for the plumbing, mechanical, electrical and fire protection portions of the building and submit reports to the Architect for inclusion in his reports as required by Section 127.2.3 of the Code. 9 Robert W. Hall P.E. Subscribed and sworn to before me this % day of 2005. Richard A. Sitnik Notary Public My Commission Expires June 14, 2007 ROBT W. HALL CONSULTING ENGINEERS, INC. (413)789- 960 MA Reg. No. 19283 -- Telephone FAX(413)789-3295 CT Reg. No.5982 540 MEADOW STREET EXTENSION, STE. 2 E-mail:rwhall @javanet.com VT Reg.No.2200 AGAWAM, MASSACHUSETTS 01001-0002 ME Reg. No.2182 NH Reg. No. 1716 NY Reg. No.44160 VA Reg. No. 12027 RI Reg. No.6323 June 28, 2005 Project: Lilly Library, 19 Meadow Street, Florence, MA In accordance with Section 127.0 of the Massachusetts State Building Code, I, Robert W. Hall P.E. being a Professional Engineer, certify that the plans for the plumbing, mechanical, electrical and fire protection systems related to the construction have been prepared under my supervision and to the best of my knowledge, such plans conform to the provisions of said Code, all acceptable engineering practices and all applicable laws and ordinances. I will comply with the requirements of Section 127.2.2 (Construction Control) for the plumbing, mechanical, electrical and fire protection portions of the building and submit reports to the Architect for inclusion in his reports as required by Section 127.2.3 of the Code. ) 1"­Aw Robert W. Hall P.E. Subscribed and sworn to before me this day of 2005. 4Q Richard A. Sitnik Notary Public My Commission Expires June 14, 2007 ROBT W. HALL CONSULTING ENGINEERS, INC. MA Reg.No. 19283 Telephone(413)789-0960 FAX(413)789-3295 CT Reg. No.5982 540 MEADOW STREET EXTENSION, STE. 2 E-mail:rwhall @javanet.com VT Reg. No.2200 AGAWAM, MASSACHUSETTS 01001-0002 ME Reg, No.2182 NH Reg. No. 1716 NY Reg. No.44160 VA Reg. No. 12027 RI Reg. No.6323 June 28, 2005 Project: Lilly Library, 19 Meadow Street, Florence, MA In accordance with Section 127.0 of the Massachusetts State Building Code, 1, Robert W. Hall P.E. being a Professional Engineer, certify that the plans for the plumbing, mechanical, electrical and fire protection systems related to the construction have been prepared under my supervision and to the best of my knowledge, such plans conform to the provisions of said Code, all acceptable engineering practices and all applicable laws and ordinances. I will comply with the requirements of Section 127.2.2 (Construction Control) for the plumbing, mechanical, electrical and fire protection portions of the building and submit reports to the Architect for inclusion in his reports as required by Section 127.2.3 of the Code. 'Robert W. Hall P.E. Subscribed and sworn to before me this day of A_—y,_Q 2005. �17, _L l4- Richard A. Sitnik Notary Public My Commission Expires June 14, 2007 interconnected or integrated with multiple fire protection systems functioning simultaneously when activated. Preparer of Narrative Report — An individual who has taken charge of a project and has knowledge of required and non-required fire protection systems and buildings life safety systems. The designer in charge of a specific design for a fire protection system may prepare their portion of the Narrative Report to be submitted to the individual who has "taken charge". The individual who has "taken charge" shall compile the data from the designer of each system and prepare a single, comprehensive and coordinated final Narrative Report describing each system and when applicable a description of how each system interfaces with the building life safety system's integration and sequence of operation. The take charge individual may be the architect, engineer of record, and the designer of any of the fire protection systems or an independent qualified consultant. Underground Piping: Thoroughly flush at a rate as required by NFPA 13 d) Fire Alarm System The fire alarm system will be tested in accordance with NFPA 72 Article 7-2 as applicable. Section 2—Equipment and Tools a) Identification of equipment and procedures to be used to verify system performance - Manufacturer's instructions - Specifier's special instructions - Narrative Report, sequence of operation section - Flow measuring devices—pitot for backflow flush Smoke Magnets Communication radios Section 3—Approval Requirements a) Method of approval required from code official that system satisfies all operational code compliance requirements—written. 100% testing is required. b) Documentation to be submitted to code officials at completion verifying that systems are in compliance with all laws, regulations and standards and pre- approved narrative reports. Robt. W. Hall, Consulting Engineers provide written confirmation C) Documentation as required by 780 CMR, Section 903.4 Robt. W. Hall Consulting Engineers will certify sprinkler system Sprinkler contractor will provide record drawings Sprinkler contractor will provide copies of Materials, Test, Performance, and Completion certificates. DEFINITIONS Fire Protection Systems Fire Protection Systems — Automatic sprinkler systems, fire detection system, fire alarm notification system, smoke control system, kitchen hood suppression system, etc. Building Life Safety System Building Life Safety System — A combination of fire protection systems and other building fire protection features such as automatic door closers, emergency generators, emergency egress lighting, elevator systems, etc., sprinkler pressure switch or automatic alarm initiating device shall automatically: a. Sound all audible devices throughout the building. b. Flash all visual signals throughout the building. C. Flash an alarm LED and sound an audible signal at the FACP. Upon Acknowledgement the alarm LED shall light steadily and the audible shall silence. Subsequent alarms shall re-initiate this sequence. d. Initiate the transmission of an alarm signal to the Lennox Fire Dispatch. The Dispatch Office contacts the Lennox Fire Department. e. Visually indicate the alarm initiating device and location via the FACP LED display. 903.1.1 (1.c) TESTING CRITERIA Section 1 —Testing Criteria Personnel a) GC shall coordinate all testing and schedule Robt W. Hall Consulting Engineers and the local authorities for witnessing the sprinkler contractor and electrical contractors tests. b) Robt. W. Hall Consulting Engineers will require the following tests to be performed: 1. Witness of underground flushing. 2. Robt. W. Hall, Consulting Engineers must perform a walkthrough prior to installation of any ceilings 3. Robt W. Hall will perform a final walkthrough, and witness alarm tests. 4. The Fire Protection Contractor will provide a certificate of completion for the sprinkler system upon project completion. C) System criteria: Wet Sprinkler System: Hydrostatically test at a pressure of 200 psi for two hours without a loss in pressure. Opening of the inspectors test connection shall initiate an alarm at the main fire alarm panel and building within 90 seconds. 2" drain test shall be conducted. Static and Residual pressures must be recorded on test certificate. b) New Automatic sprinkler systems and components — building will be 100% sprinkled. System is designed in accordance with NFPA 13. The building is predominantly an ordinary group II hazard. The attic is considered to be an ordinary group I hazard. Light hazard areas include the offices and crawl spaces. C) Seismic considerations—sprinkler system shall be seismically braced d) Standpipe systems were not required by CMR 780 and were not provided Section 5—Features Used in the Design Methodology a) Building occupant notification and evacuation procedures The building is provided with a fire alarm system. If a fire is detected either by sprinkler system flow switches, manual pull stations, or smoke detectors. The building occupants will be notified via A/V Devices. 903.1.1 (Lb) SEQUENCE OF OPERATION Section 1 a) An operational description of either a system or specific devices within a system and the "resulting action" associated with the operation of the system or specific devices. WET SPRINKLER SYSTEM System operates automatically upon the fusing of a single fire sprinkler. Operational Sequence: 1. The activation of a single sprinkler will discharge water and close the contacts of a pressure switch. 2. Closed contact on the pressure switch will provide an alarm contact for the alarm control panel. 3. Closed contact will activate local alarm indication including strobes, horns and bells. 4. Closed contract will send signal through local alarm panel to central station, central station will then notify fire department. FIRE ALARM SYSTEM 1. The building has a fire alarm system with partial smoke detection and full sprinkler coverage. The system utilizes audio/visual annunciation to notify the occupants of an alarm condition. The activation of any manual station, Section 3—Design Responsibility for Fire Protection Systems (sprinkler system) a) The professional engineer (PE) provides a partial design and specifies the design criteria to be used by the installing contractor who finalizes the system layout, provides calculations to confirm the design criteria. The PE reviews and approves the installing contractor's final layout and calculations. The PE is considered the engineer of record and certifies system installation for code compliance at completion. Section 4—Fire Protection Systems to be installed Fire Alarm System a) The fire alarm system is an addressable system b) The fire alarm panel control panel will be located in the front vestibule at the main entrance. A knox box will be located outside the vestibule. C) Manual pull stations shall be located at all exits. Smoke detector coverage will be provided in corridors, lobbies, and public library areas. The smoke detectors are spot type d) Sprinkler pressure and tamper switches will be supervised. e) Notification appliances will be installed to ADA and NFPA guidelines. 0 The floor plans indicate locations of all devices. g) The system will operate as general alarm. The initiation of any device, manual pull station, smoke, or sprinkler flow will initiate a general alarm condition. All audible/visual devices will sound until reset at the fire alarm control panel. All alarm and trouble conditions will be sent to a central station monitoring station through a new digital dialer. Sprinkler System a) Water supply and fire mains. A new 6" fire main will be provided to the building. The main is dedicated to the sprinkler system. Existing hydrants are to remain. The systems will be hydraulically designed based on an ordinary group II hazard occupancy. The system design shall be based on a minimum discharge density of 0.20 gpm/sf over the hydraulically most remote 1500 sf and shall include a 250 gpm hose allowance. The 1500sf design area will be reduced based on the use of quick response sprinklers as allowed by NFPA 13. In sloped ceiling areas the design area will be increased by 30% as required by NFPA 13. FIRE PROTECTION SYSTEMS NARRATIVE REPORTS Project Summary The project involves the complete renovation of the existing Library and additions. The building will be provided with complete sprinkler coverage. The sprinkler system serving the first and second floors is a wet system and the system crawl space is a glycol loop.. The building will also be provided with a fire alarm system. The fire alarm system has partial detection and full annunciation. Smoke detection is provided for the corridors, lobby and public library areas. 903.1.1 (La) BASIS (METHODOLOGY) OF DESIGN Section 1 —Building Description a) Building"Use" Group—The building is a Library Use Group A-3. b) Building height—approximately 42'-6" ft—highest point above grade. C) Number of floors above grade—2 d) Number of floors below grade—0 e) Square footage per floor, First Floor 5500 sf and Second Floor 4004 sf f) High storage of commodities within a building usually over 12 ft. —none Section 2—Applicable Laws,Regulations and Standards a) 780 CMR code sections "Fire Protection System Requirements" - 904.2 requires sprinkler protection - 914.2.1 does not require standpipe systems - 917.4.1 requires a fire protective signaling system - 918.5 Automatic fire detection systems are exempted due to full sprinkler protection b) NFPA Standards and Edition used for design of each specific fire protection system - NFPA 13 "Sprinkler Systems", 2002 ed NFPA 72. "National Fire Alarm Code." C) Applicability of specialized codes (plumbing, elevator, and electrical, architectural access) 524 CMR, Elevator Regulations— 102.2, 1/9/98 edition Fire Protection Construction Documents Narrative Report for Lily Library Northampton, Massachusetts By �I Robt. W. Hall Consulting Engineers, Inc. 540 Meadow Street Ext. Agawam, MA 01001 Tel: (413) 789-0960 June 27, 2005 CONSTRUCTION CONTROL AFFIDAVIT PROJECT NUMBER: 200449 DATE: June 27, 2005 PROJECT TITLE: Renovations and Expansion PROJECT LOCATION: 19 Meadow Street, Florence, MA NAME OF BUILDING: Lilly Library SCOPE OF PROJECT: Renovation of an existing two story 4,200 s.f. masonry library building &construction of a new two story 5,300 s.f. steel framed addition and related sitework IN ACCORDANCE WITH SECTION 116.0 OF THE MASSACHUSETTS STATE BUILDING CODE, CH EDITION, I, KENNETH R. JODRIE, MASS. REGISTRATION NO. 20062, BEING A REGISTERED PROFESSIONAL ARCHITECT/ENGINEER HEREBY CERTIFY THAT I HAVE PREPARED OR DIRECTLY SUPERVISED THE PREPARATION OF ALL DESIGN PLANS, COMPUTATIONS AND SPECIFICATIONS CONCERNING: ENTIRE PROJECT X ARCHITECTURAL STRUCTURAL MECHANICAL FIRE PROTECTION ELECTRICAL OTHER(specify) FOR THE ABOVE NAMED PROJECT AND THAT, TO THE BEST OF MY KNOWLEDGE, SUCH PLANS, COMPUTATIONS AND SPECIFICATIONS MEET THE APPLICABLE PROVISIONS OF THE MASSACHUSETTS STATE BUILDING CODE, ALL ACCEPTABLE ENGINEERING PRACTICES AND ALL APPLICABLE LAWS FOR THE PROPOSED PROJECT. I FURTHER CERTIFY THAT I SHALL PERFORM THE NECESSARY PROFESSIONAL SERVICES AND BE PRESENT ON THE CONSTRUCTION SITE ON A REGULAR AND PERIODIC BASIS TO DETERMINE THAT THE WORK IS PROCEEDING IN ACCORDANCE WITH THE DOCUMENTS APPROVED FOR THE BUILDING PERMIT AND SHALL BE RESPONSIBLE FOR THE FOLLOWING AS SPECIFIED IN SECTION 116.2.2: 1. Review of shop drawings, samples and other submittals of the contractor as required by the construction contract documents as submitted for building permit, and approval for conformance to the design concept. 2. Review and approval of the quality control procedures for all code-required controlled materials. 3. Special architectural or engineering professional inspection of critical construction components requiring controlled materials or construction specified in the accepted engineering practice standards listed in Appendix B. PURSUANT TO SECTION 116.2.3, 1 SHALL SUBMIT PERIODICALLY, A PROGRESS REPORT TOGETHER WITH PERTINENT COMMENTS TO THE BUILDING INSPECTOR. UPON COMPLETION OF THE WORK, I SHALL SUBMIT A FINAL REPORT AS TO THE SATISFACTORY COMPLETION AND READINESS F THE PROJECT FOR OCCUPANCY. ignatur On this 27"'day of June, 20 05, before me,the un ersigned notary pub'c, personall ppeared Kenneth R. Jodrie (name of document signer), proved to me through satisfactory e ' of identification, which was personal knowledge of the identity of the principal, to be the person whose name is signed on the preceding or attached document in my presence. (Official&nature and seal of notary) My commission expires November 12,2010 i S W � 0 5 v February 22,2005 The Commonwealth of Massachusetts William Francis Galvin,Secretary of the Commonwealth Kenneth Jodrie Massachusetts Historical Commission Caolo&Bieniek Associates,Inc. 521 East Street Chicopee,MA 01020 RE: Lilly Library,Florence(Northampton), MA;MHC#27924 Dear Mr. Jodrie: The Massachusetts Historical Commission is in receipt of the updated project plans as well as the written comments of the Northampton Historical Commission concerning the proposed project referenced above. The MHC has previously determined that the Lilly Library meets the criteria for listing in the National Register of Historic Places ('36 CFR 60)and is currently included in MHC's Inventory of Historic and Archaeological Assets of the Commonwealth. The Lilly Library currently has no substantial additions and its historic setting is intact. The proposed project involves the construction of a 5,200-square-foot, one-and two-story,rear addition clad in fiber-cement shingles and panels. Double-hung windows in the historic library will be replaced with aluminum windows. The MHC understands that the east-elevation parapet of the proposed addition has been reduced by approximately 1.5 feet to allow greater visibility and prominence of the historic building, based upon the recommendations of the Northampton Historical Commission. The MHC notes that the proposed project does not require any notable demolition, and thus the project does not trigger a Massachusetts Environmental Policy Act review for historic properties. After a review of MHC files and the information submitted, I have determined that the proposed project will have "no adverse effect"(36 CFR 800.5(b))on the Lilly Library. MHC strongly encourages the proponent to take into consideration the thoughtful and constructive comments of the Northampton Historical Commission. MHC echoes these comments,particularly with regard to the use of fiber siding and concrete. MHC strongly encourages the exploration of a more compatible material. With regard to your request for MHC's determination that this is a partially preserved building pursuant to the Massachusetts State Building Code,MHC offers the following comments.The Lilly Library meets the definition of historic building(780 CMR 3409.1.1) as"any building or structure evaluated by the MHC to be individually eligible for listing in the National Register of Historic Places." The Lilly Library should be considered to be a partially preserved building(780 CMR 3409.3) as a"building or structure certified as a historic building by the Massachusetts Historical Commission...." These comments are offered to assist in compliance with Section 106 of the National Historic Preservation Act of 1966,as amended(36 CFR 800)and M. G. L. Chapter 9, Section 26-27C, as amended by Chapter 254 of the Acts of 1988(950)CMR 71.00): Please do not hesitate to contact Ann Lattinville of my staff should you have any questions. Sincerely, � t Brona Simon Deputy State Historic Preservation Officer Massachusetts Historical Commission FEB 2-8 xc: Lou Martin, DHCD , MBLC CAOLO&9OW AS=- Martine Hargraves, Lilly Library 220 Morrissey Boulevard,Boston,Massachusetts 02125 (617)727-8470 • Fax: (617)727-5128 www.state.ma.us/sec/mhe 780 CMR: STATE BOARD O 7 TIONS AND STANDARDS THE MASSACHUSETTS STA UII-DING CODE TABLE 1304.2.10 BUILDING EF ELOPE REQUII2EMENTS mate Zone 14a Glazin Area O r 10%but neater than 25%of Abov rade Wall Area Above-Grade Walls: uous lation etal Framing Wood Framin (or avera e i lation value)* (c.1.=continuous insulation) g Framed or Masonry<35 psf. R-7 R-13+R-3 c.i. R-11 9 Masonry z 35 psf. R-5 R-11+R-3 c.i. R-11 Window Assemblies: SHGC(maximum) U-Value(maximum) PF<0.25 OS 0.6 0.25:5 PF<0.50 0.6 0.6 PF z 0.50 0.7 0.6 Skylights-U-Value(maximum) X 0.8 Roof Assemblies:(either/or) Insulation Between Framing Continuous Insulation All-Wood Joist/Trusn R-25 R-19 Non-wood Joist/Truss R-25 R-20 Concrete Slab or Deck NA R-19 Metal Purlin with Thermal Break R-30 R-20 Metal Purlin w/o Thermal Break X R-20 Floor Assemblies:(eitherlor) Insulation Between Framing Continuous Insulati on All-Wood Joist/Truss R-25 R-18 Non-wood Joist/Truss R-25 R-19 Concrete Slab or Deck NA R-19 Slab,Perimeter,and Below-Grade Wall R-5 TABLE 1304.2.11 BUILDING ENVELOPE REQUIREMENTS Climate Zone 14a Glazing Area Over 25%but not greater than 40%of Above Grade Wall Area Above-Grade Walls: (or averContinuous Insulation Metal Framing Wood Framing a a insulation value)* (c-i.=continuous insulation Framed or Masonry<35 psf. R-7 R-13+R-3 c.i. R-11 Masonry z 35 psf. R-5 R-11+R-3 c.i. R-11 Window Assemblies: SHGC(maximum) U-Value(maximum) PF<0.25 0.4 0.5 0.25 s PF<0.50 0.5 0.5 PF z 0.50 0.6 0.5 Skylights-U-Value(maximum) X 0.8 Roof Assemblies:(either/or) Insulation Between Framing Continuous Insulation All-Wood Joist/Ttuss R-30 R-23 Non-wood Joist/Truss R-30 R-24 Concrete Slab or Deck NA R-23 Metal Purlin with Thermal Break X R-24 Metal Purlin w/o Thermal Break X R-24 Floor Assemblies:(either/or) Insulation Between Framing Continuous Insulation All-Wood Joist/Truss R-25 R-18 Non-wood Joisv truss R-25 R-19 Concrete Slab or Deck NA R-19 Slab,Perimeter,and Below-Grade Wall R-5 *For masonry walls,average R-value shall be calculated based on the assumption of isothermal planes,using methodology in 1997 ASHRAE Fundamentals Handbook,Chapter 22. 228 780 CMR-Sixth Edition 6/8/01 (Effective 4/26/01) Lighting Application Worksheet Massachusetts Commercial Code COMcheck-EZ Software Version 3.0 Release 2b Section 1: Allowed Lighting Power Calculation A B C D Total Floor Allowed Allowed Area Watts Watts Building Type ($2) (watts/$2) (B x C) Library 9504 1.5 14256 Total Allowed Watts = 14256 Section 2: Actual Lighting Power Calculation A B C D E F Fixture Fixture Description/ Lamps/ # of Fixture ID Lamp Description/Wattage Per Lamp/Ballast Fixture Fixtures Watt. x E A, Al 48" T8 32W /Electronic 3 3 88 264 B, E, El 48" T8 32W / Electronic 2 21 59 1239 F, F1, G Twin Tube 13W /Electronic 2 26 32 832 K, Kl Quad 2-pin 26W / Electronic 2 19 54 1026 L Triple 4-pin 32W /Electronic 1 29 35 1015 N Twin Tube 8/9W /Electronic 1 1 11 11 J Other/ Electronic 2 2 70 140 I Other/Electronic 2 72 121 8712 Total Actual Watts = 13239 Section 3: Compliance Calculation If the Total Allowed Watts minus the Total Actual Watts is greater than or equal to zero, the building complies. Total Allowed Watts = 14256 Total Actual Watts = 13239 Project Compliance= 1017 Lighting PASSES: Design 7%better than code Exceptions: Areas requiring lighting during daylight hours [ ] 6. Tandem wired one-lamp and three-lamp ballasted luminaires. Exceptions: Electronic high-frequency ballasted luminaires not on same switch Section 4: Compliance Statement The proposed lighting design represented in this document is consistent with the building plans, specifications and other calculations submitted with this permit application. The proposed lighting system has been designed to meet the Massachusetts Commercial Code requirements in COMcheck-EZ Version 3.0 Release 2b and to comply with the mandatory requirements in the Requirements Checklist. -1-->/1,1P &1,+k "IjI Qk- 0 7a 7 Principal Lighting Designer-Name Signat Date Permit Number Lighting Compliance Certificate Checked By/Date Massachusetts Commercial Code COMcheck-EZ Soffware Version 3.0 Release 2b Data filename: I:\083-41-2\ELECTR-1\COMCHE–I.CCK Section 1: Project Information Project Name: Lilly Public Library Designer/Contractor: Dilip Nakrani Document Author: Telephone: Date: C 7/0 0 6 Section 2: General Information Building Use Description by: Whole Building Type Project Type: Addition Building Type Floor Area Library 9504 Section 3: Requirements Checklist Bldg. Dept. Use Interior Lighting [ ] 1. Total actual watts must be less than or equal to total allowed watts Allowed Watts Actual Watts Complies(Y/N) 14256 13239 YES Exterior Lighting [ ] 2. Type(s) of exterior lighting sources: V_Fluorescent V Metal Halide —High-Pr. Sodium Exceptions: Specialized signal, directional, and marker lighting; lighting highlighting exterior features of historic buildings; advertising signage; safoty or security lighting; low-voltage landscape lighting. Controls, Switching, and Wiring [ ] 3. Master switch at entry to hotel/motel guest room. [ ] 4. Minimum of two switches, dimmer, or occupancy sensor in each space. Exceptions: Only one luminaire in space; Security lighting, 24 hour lighting; The area is a corridor, storage, restroom, retail sales area or lobby. [ ] 5. Photocell/astronomical time switch on exterior lights. 6. OPERATIONS MANUALS AND MAINTENANCE MANUALS HVAC • Four complete sets of maintenance manuals shall be submitted. The manuals will include the manufacturer's name and model number of all installed equipment and systems. The manual will be complete with all manufacturer's literature, parts lists, filter charts and wiring diagrams. Provide a description of the EMS operating features, control wiring diagrams and sequence of operations.Engineer will review manuals for completeness. • Four complete sets of operating manuals shall be submitted. The manual will include operating instructions for all installed equipment and systems including preparation for starting,summer operation,winter operation,shutdown and draining. LIGHTING Four complete sets of maintenance manuals shall be submitted.The manuals will include the manufacturers name and model number of all installed lighting fixtures, sensors and power equipment. The manual will be complete with all manufacturers literature, parts lists, equipment components. All items submitted as shop drawings for approval shall be included in these manuals. 7. RECORD DRAWINGS AND CONTROL DOCUMENTS When the building is ready for occupancy, the General Contractor shall provide the following items: • As-Built drawings for the HVAC, electrical and lighting systems - Drawings will be produced using a computer aided drafting (CAD) software package compatible with AutoCad 2000. Provide computer drawing files and one set of hard copies of each drawing. • Copy of the final Balance Report 6 of 6 5. TESTING HVAC • All systems and equipment will be inspected by the Engineer for physical damage and general conformance to the Contract Documents. • The Engineer will inspect each piece of equipment for unusual noise: or vibration. Any items found in either of these conditions shall be corrected and noises or vibration dampened as directed. • The Automatic Temperature Control Contractor will perform all necessary calibration, testing and debugging required for a complete and operational system as outlined in the Contract Documents. The ATC Contractor shall notify the Engineer prior to beginning acceptance testing. All acceptance testing shall be performed in the presence of the Owner's representative. • Manufacturers of the following equipment shall provide startup commissioning of their equipment.The manufacturer's representative will check for proper operation,installation and wiring. All commissioning and testing shall be performed in the presence of the Owner's representative. • Packaged rooftop air conditioner • High efficiency boiler • After installation is complete and prior to final acceptance, all air and water systems shall be balanced to within 5% of the design conditions shown on the Contract Documents. The Balancing Contractor shall be a certified AABC or NEBB independent agency specializing in testing and balancing of air and water systems. The Engineer shall be notified prior to the start of balancing. The HVAC Contractor, the Sheet Metal Contractor and the ATC Contractor shall be available to assist the Balancing Contractor and make adjustments necessary to balance the systems. LIGHTING Demonstrate that all occupancy sensors are operating at their desired settings and provide coverage to insure that there are no dead spot areas in the space. Demonstrate that all emergency and exit light fixtures operate in the emergency mode. Demonstrate that all high intensity discharge fixtures are of the same color. Demonstrate that all lamps in all fixtures are functioning. Demonstrate that the time clocks and photocells controlling the driveways, parking lot and security lighting do so at the predescribed times. 5of6 The existing air-cooled condensing unit has been relocated to the new roof. The existing ductwork has been reworked to accommodate dampers for zone control. There are five zones for this system,each with it's own thermostat • New packaged rooftop air conditioning unit A new 12-ton capacity, high efficiency packaged rooftop unit provides heating, cooling and ventilation to the Library addition. The heating section of the unit burns natural gas and has a capacity of 203 MBH. The system has seven zones for heating and cooling,each with it's own thermostat • High efficiency condensing boiler The boiler has an input capacity of 203 MBH. A system of hydronic piping distributes hot water to the coil at AHU-1 and finned tube radiation located at the perimeter of the building. LIGHTING The ambient lighting system for the reading areas and office areas shall consist of indirect fixtures with solid state electronic ballasts and T5 and/or T'8 and compact fluorescent lamp technology.2 T8 lamp electronic ballasts shall be rated for 59 watt input or less and for those fixtures containing 3 T8 lamps,ballasts shall not exceed 88 watts. The ambient lighting system for corridors, toilets and storage rooms shall be similar to that described above, except these fixtures shall be lens type and/or recessed fluorescent down lights in lieu of indirect type.Ambient lighting in attic shall be wraparound fluorescent type. The--ambient lighting system in areas with sufficient ceiling heights shall utilize indirect type lighting fixtures.These fixtures shall contain electronic ballasts and T5 lamp technology. Exterior lighting shall consist of wall mounted fluorescent fixtures to illuminate all exit ways and to provide building security. Pole mounted lighting shall be provided to illuminate the driveways and new parking areas. These fixtures shall all be high intensity discharge type. Fixtures greater than 100 watts shall have a minimum efficiency of 60 lumens per watt. POWER DISTRIBUTION The main electric service shall be 120/ 208 volt three phase 4 wire.208 volt,three phase shall be utilized for all motors of/a horsepower or greater, all air handling units, condensing units, and elevator. Electrical panel boards shall be located through out the facility to reduce the lengths of wiring.These panel boards shall be 120/208 volt. 4of6 maintain airflow through HVAC unit by bypassing air from the supply to the return duct. Bypass air is modulated based upon system monitoring of supply duct pressure. Operator access to the system shall be through the Operators Panel via touch screen display. All air handlers with airflows of 2000 cfin and above will have a duct-mounted smoke detector in the unit discharge to shut the unit down upon sensing smoke. The smoke detectors will be an integral part of the fire alarm system. In the event of activation of the fire alarm system,all fans under the control of the BAS will automatically shut down. The boiler/burner will be provided with a microprocessor controller to monitor all functions of the boiler/burner and the hydronic heating system. The damper at the top of the elevator shaft shall be powered closed and shall open when the space thermostat determines that the temperature at the top of the shaft exceeds 85° F or when the smoke detector determines a smoke condition at the top of the shaft. Damper shall also open when there is a loss of power to the damper actuator. LIGHTING Ambient lighting in all small reading areas, offices, corridors, toilet rooms and storage rooms shall be controlled by adjustable time occupancy sensors or lighting switches. Lighting in large reading areas shall be controlled by localized switching.All lighting shall be 120 volts. Exterior lighting shall be controlled by time clocks and photocells. The photocell shall energize the lighting at dusk and the time clock shall de-energize the lighting at a pre- determined time. Emergency lighting shall be provided in all places of assembly, corridors, stairwells and at all means of egress. Emergency lighting shall consist of power packs integral with the lighting fixtures or self-contained wall mounted fixtures.LED type exit lighting shall be provided at all building exits and pathways leading to such.All emergency lighting shall provide a minimum of 90 minutes of illumination upon a loss of commercial power. 4. SYSTEMS AND EQUIPMENT CAPACITIES HVAC ■ Existing air handling unit The existing 7-'/a ton capacity split system air conditioner has been retrofitted with a hot water heating coil for year round use. 3 of 6 • Toilet Rooms: 75 cfm per fixture • Elevator Machine Room:As required to keep the temperature below 85 degrees F. Equipment: • Heating and cooling equipment and system capacity has been determined in accordance with Chapters 25 and 26 of the ASH RAE 1997 Handbook of Fundamentals. • All new equipment shall meet the minimum efficiency requirements of The Massachusetts State Building Code,780 CMR 13 ENERGY CONSERVATION. • Equipment efficiency shall be verified by the equipment manufacturer or through and approved certification program. LIGHTING The installed interior lighting power identified in accordance with 780 CMR1308.6.1 shall not exceed the interior power allowance developed in accordance with 1308.6.2. Interior Power Allowance: The interior lighting power allowance shall be determined by the Building Area method described in 780 CMR 1308.6.2.1. Table 1308.6.2 Building Watts per square foot Library 1.5 The designed footcandles for the various types of spaces is as follows: ■ 50 footcandles ambient lighting shall be provided in all reading and office areas. ■ 20 footcandles ambient lighting shall be provided in all corridors,toilet rooms and storage areas. 3. SEQUENCE OF OPERATIONS AND INTERACTIONS HVAC Changeover/Bypass VAV Systems will be provided for the control of the air-handling units. The Changeover/Bypass VAV system shall provide temperature control of multiple zones with a constant volume single-zone HVAC unit. Variable air volume control shall be provided for each zone to maintain zone temperature within the heating/cooling setpoints. The system shall monitor the temperature and setpoints of the zones and automatically change the heat/cool mode of the HVAC unit to satisfy zone requirements.The system shall 2of6 ROBT. W. HALL CONSULTING ENGINEERS, INC. MA Reg. No. 19283 Telephone(413)789-0960 CT Reg. No.5982 FAX(413)789-3295 VT Reg.No.2200 540 MEADOW STREET EXT., SUITE 2 ME Reg.No.2182 NH Reg.No.1716 AGAWAM, MASSACHUSETTS 01001-0002 NY Reg.No.44160 VA Reg. No. 12027 RI Rea. No.6323 Narrative Report for Compliance with Section 1302.8.4.1 of the Massachusetts State Building Code (780 CMR) —"Approval and Acceptance" Project: Lilly Library Renovation and Expansion,Florence,MA Owner:The Lilly Library Association, 19 Meadow Street,Florence,MA Date: July 12,2005 1. DESIGN INTENT The Lilly Library is a two story masonry bearing wall structure with wood floor and roof framing.The total occupied building square footage, excluding the basement crawl space and attic, is 4,180 s.f.. The occupancy is A-3 (Assembly—Library) and the building construction type is 3-B (Combustible/Unprotected).The proposed construction will renovate the existing building and provide a new two story addition of 5,324 square feet for a total building size of 9,504 s.f.The occupancy and construction type will remain unchanged. The building, both old and new sections, will be fully sprinld ered and in compliance with all current codes including the Massachusetts Accessibility Code and ADA.. The Lilly Library is listed on the Massachusetts Historical Commission's "Inventory of Historic and Archaeological Assets" and has official status as a partially preserved historic building. The existing structure is therefore exempt from the seismic upgrades required by 780 CMR and the proposed addition is designed to be compliant with all seismic requirements. 2. BASIS OF DESIGN The following are the assumptions used to calculate the capacities and parameters for the building components: HVAC Indoor Design Conditions: • 72 degrees F.heating when occupied,55 degrees F.heating when unoccupied • 78 degrees F. cooling when occupied,90 degrees F. cooling when unoccupied Outdoor Design Conditions: • -1 degrees F.winter • 86 degrees F.DB,73 degrees F.WB summer Ventilation: • Offices: 20 cfn per person • Reading Rooms: 15 cfin per person • Stacks and Corridors:0.10 cfm per square foot C:\windows\TEMP\4122 HVAC-Elec Narative.docl of 6 ENERGY CONSERVATION MANDATORY CHECKLIST FOR NEW CONSTRUCTION (OTHER THAN LOW-RISE RESIDENTIAL) 780 CMR, 1301.8.1 Owner/Agent Name: 1—lL�I � _'jyL`,i Phone: q 13— 5R7- 1 Sod Owner/Agent Address: 9�134 a t _00 City/State/Zip: +lie a It 1N1 fl in 0 6 .r- Project Name: F Gc 1 110, City/Town 7I LIAI Site Address: M�/Applicant's Name: - l� i� Q1u 8yj Signature:Applicant's Phone: ( g7— J S 0 3 Date of Application: I 4 i 0) I. Envelope Compliance Option (check ONE) Trade-Off (1304.5) - Attach software Compliance Report(COMcheck-EZ) ❑ Appendix J(1301.2 - For buildings up to 10,000 sf only) - Attach Appendix J compliance documentation ❑ Systems Analysis (1309)- Attach Registered Architect's or Engineer's report ❑ Prescriptive (1304.2)- Complete this section, and attach copy of applicable TablV(1304.2.1 through 13.4.2.12 Climate Zone (from Table 1303.1) ❑ Zone 12a ❑ Zone 13a ne 14a a. Gross above-grade wall area d OO sq.ft. i b. Total window& glass door area ��p� sq.ft. c. Glazing %o (100 x b=a) % Table 9 utilized: II. HVAC (check ONE) ❑ Simple Systems &Equipment (1305.2) Complex Systems & Equipment(1305.3) ❑ Systems Analysis (1309)-Attach Registered Architect's or Engineer's report III. Lighting (check ONE) JiBuilding Area Method (1308.6.2.1) }Attach Compliance Documentation (COMcheck-EZ or other) El Space-by-Space Method (130$.6.2.2) ❑ Systems Analysis (1309)-Attach Registered Architect's or Engineer's report IV. Approval & Acceptance Construction Documents (1301.8.4.1) Attach a narrative report describing the HVAC, Lighting, and Electric Distribution systems, including: �or.0�cial'Use>.O-NLY �' � �����`�5=���❑ ' 1. Design Intent 2. Basis of Design x; 3. Sequence of operation/systems interaction 4. Description of the systems(capacities, etc.) -�"complete`si O� Testing requirements/criteria acceptance `-5ections''��of reporter 6. Requirement for submittal of operation manuals and maintenance manuals ❑:. 7. Requirement for submittal of record drawings and control documents t 06`22/2005 10:13 FAX 860 231 7240 THE WATTS GROUP, LLC X002 ACORD,N CERTIFICATE OF LIABILITY INSURANCE DATE 6/22/2005 I / PRODUCER THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION THE WATTS GROUP, LLC ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE 65 LASALLfi ROAD, SUITE zo9 HOLDER. THIS CERTIFICATE DOES NOT AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW. WEST HARTBORD CT 06107 INSURERS AFFORDING COVERAGE NAIC# _ INSURED r I INSJRERA: ARCH INSURANCE COMPANY WESTERN BUILDERS, INC. INSURERS: INSURER C, GREAT AbORICAN _ 73 PLEASANT STREET GRANBY MA 01033 INSURER D- I „ NSURER E COVERAGES THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED.NOTWITHSTANDING ANY REOUIREMENT,TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS CERTIFICATE MAY BE ISSUED OR MAY PERTAIN,THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS,EXCLUSIONS AND CONDITIONS OF SUCH POLICIES.AGGREGATE LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS. IN9R A0O*U POLICY NUMB2R POLICY EFFECTIVE POLICY EXPIRATION LIMITS GENERAL UABIUTY EACH OCCURRENCE 5 1,0-0.0, A X COMMERCIALOENERALUAeIUTY I1 GPP '.OZZ101 6{1/2005 6/1/2006 PREM6c a 9 300,000 CLAIMS MADE a OCCUR MED EX?(Anyone Pelson)_, S 10,000 PERSONAL u AOV INJURY S 1.000,000 GENFRALAGCREGATE S 2,000,000_ FGEI'L GG REGATELIMITAPPLIE5PER, PRODUCTS CAMP/CPaCO S Z,000,000 LICY F7 PRO• 8 LOC AUYOMOSILE LIABILITY COMBINED SINGLE LIMIT S (Ea eCCID6n1) X ANY ALTO ALL OWNED ALTOS BODILY INJURY 5 X SCfIEDULED AUTOS (Per peron) X HIRED AUTOS BODILY INJURY (Peraco0enq X NON-OWNED AUTOS PROPERTY DAMAGE S (Pcr accidcnO GARAGE LIABILITY AUTO ONLY•CA ACCIDENT b ANY AUTO OTHER THAN CA ACC 5 AUTO ONLY- AGG $ EXCESSIVMBRELLA LIABILITY EACH OCCURRENCE F OCCUR F7 CLAIMS MADE AGGREGATE S 5 DEDUCTIBLE --' RETENTION 5 $ A WORKERS COMPENSATION AND 11 MCI 2022001 6/1/2005 6/1/2006 X WCSTATU• 0TH- EMPLOYERS'LIABILITY EL,CACI-IACCIDENT S 1,000,000 ANY PROPRICTOP/PARTNERiF-XECUTNE OFFICERYMEMHER EXCLUOE01 E.L.DISEASE-EA EMPLOYEE S 1,000,000 If m,drenbcundcr E.L.DISEASE-POLICY LIMIT $ 1,000,000 SPECIAL PROVISIONS WIDw OTHER Lsaaed and/or rented equip: C Contractors Equip PI IMP 195 59 15 02 4/1/2005 4/1/2006 $ 500,000 limit of covorage DESCRIPTION OF OPERATIONS i LOCATION3,VEHICLES I EXCLUSIONS ADDED BY ENDORSEMENT I SPECIAL PROVISIONS Project: Renovation and Addition to Lilly Library, Northampton MA It is hereb agreed an underateod the following are named au additional insureds: City of Nor�hampten an The Trustees of Lilly Library CERTIFICATE HOLDER CANCELLATION SHOULD ANY OF THE ABOVE DCSCRIBED POLICIES BE CANCELLED BEFORE THE EXPIRATION DATE THEREOF,THE ISSUING INSURER WILL ENDEAVOR TO MAIL 30 DAYS MUTYEN City of Northampton NOTICE TO THE CERTIFlCATE HOLDER NAMED TO TH!?LEFT,BUT FAILURE TO DO SO SHALL attn: Joe Cook 210 Main Strout IM POS LIGATION OR LIABIUTY OF ANY KIND UPON THE INSURER ITS AGENTS OR R RESENT IVES. THORIZE PRESENTATIVE Northampton MA 01060 ACORD 25(2001108) ®A O D CORPO al 988 Fsoe 1 of 1 O DEPARTMENT OP BUILDI)\'C INSPECTIONS 212 Alain Strcet Municipal Building hrorthampton, Hass_ 01060 1�-VOR CWS COMTENSATION: LNSURA-NCF AI 1 MA'M, (]icxasJpermitfcc) 13 P _,:s6 ` gin-ET Y-Nf�% (sur.._Vd ty/s1=rip)', do hereby certify, under thc..pPiru and penalties Df nerJUry, hzt �(v') I am an employer providing dic followins' Ni, orlcrs colnncns on cove^c,c nor u)y emplovees tvortang on uiis job: r 1a2 H t r�S�dtx L�rw l I 1rvC ..:Z�?2�J _ l• (Insur-_-D=Comp_=�) (Pouc•Number) (r:-pircion Dom) I am a sole prooncror homeowner (circ:e one) and have hired the cows actors fisted beloo �ing worker's cor oe,2 non policies: T,) 6t StArt)nxY) v f4r., r4o-M O 01 L4--iO raCTS -. .. -. lNamc 0f Conlmc-Lor) (Innumnc_- Company/-Poi:ic;' Ntumhrr) (Name of Coommor) (Lastlra cc Comoan`i?o!ie; Nummcr) CLi-Diration Due) (Name of Loan-aClo,) (Lnsuranec Compan)•/Poliq- Nambj) (E\-pirrion Datc) (Name of Contmclor) (Insu=c-_ Compaay/Policy Numb-s) (EaPiiz6on Date) . (atrx i�oo.!c'u�.ifa« z�:y cn indudr iaformaaoo pacniaias to.1l oxan.cc:�) O I am a sole proprietor and have no one working for me. ( ) I am..a home owner performing all the work myself. NOTE:ptesc be ew-art th..utJe bomcouv�n wbo splay pet to cm c=,—.rjoo c r^,air work on a d­e1-z of ant wort ih-- ityro-_tmrr is%Iia h the bot.ow rtaicto or oo the Qvcta6 zaptutcn tbc�n rT oocmalty o_-c-r.16-V d to be csxployc�uade the wvcirts o��r--�..:;io�Att(GLl St?y i(5)�:.pptin�oa lry n bomaoa•oc fcr c tie5v_or pcnaa n::r eid�x the IcipJ rt+a of m esployor under dw Workoe,Coa�omstioa Aec {uadrnta ad thsx a°OPY or Chia=U=D-W=t y be for�to tbo pcparimcvt of ofr,.or 4ax•ow for tbe o°"Q''-b'e��+oo a'td t}t�.t[_+7t7•e to soauc tovcrn�tmdct soetiofl 25 A of t.tdL S 52 ew fed to the i�itioo of Cimiasl pca�lties oomiSrzg of a rmc of up to s 1,5oo.00 rndtor b=pr60=3c=of up to oac year e.ad ava pars)uo io d,form orn Stop work Once sad a fin of s 100.00 t dzy tjasi mr- t For dcpvua--_•j u.c on,y permit Numbcs Nbp- !_ Lot K c Sita-tturc of Li crmiacc LbLe Versionl.7 Commercial Building Pennit May 15,2000 Inde enden.tStructura[Engineering Structural Peer Review Required' A M Yes es � No SECTION 1 t=tOWNER 1t OR1Z ION TO Sj=1 OMR WHER' 'OWNERS AGENq OR GpPtTRACTOR APPLIESvF�F SBIYtLr{171� PI=KNIT -e— ft v Gl L/�S ( t ,as Owner of the subject property hereby authorize I �cs Fttit N �}�v l t�ij'L`�t i~L '1 lS����' SM�r_l �w(�rrP r'f 1M ito act on my behalf,in all matters relative to work authorized by this building permit application. Signa re of Owner Date 1, as Owner/Authorized Agent hereby declare that the statements and information on the foregoing application are true and accurate,to the best of my knowledge and belief. Signed under the pains and D enalties of Dedury. Print Name Signature of Owner/Agent Date 101 Licensed Construction Supervisor: Not Applicable 0 i 2 � Name of License Holder: �ryltl"t ua �v'�i YtSnrl �� f�r I License Number '�$- `�I LV dl.. 5�,rt+=�; Sc� N r�n�►:.vl� hr,p, �(a`15 � � :,�.-, ZflG�"(Q I Address Expiration Date Signature � ) Telephone SEGTI6N'13`WORKERS'GIVIPE1 .Si4i�O.N,INSUEtA�10E APFtDAIT4(M�GL ac X52,§Z*oG{S)� °j Workers Compensation Insurance affidavit must be completed and submitted with this application. Failure to provide this affidavit will result in the denial of the issuance of the building permit. Signed Affidavit Attached Yes ® No r, j Versionl.7 Commercial Building Permit May 15,2000 RES�UB:fEG Eor� 9=PROFEsr ;> to> ncirI � sa�> mrsan�u. CaNSTE (iCON�Q1ft :PAtSU ''T® BDffiR t1C MOj�aE ti�[ 3s0C'F,fQk�EI�IGL©SED SPACE 9.1 Registered Architect KE.n1 N E.'T hl• �. �o�Rl CAOLO 4K LIEN l E1L Not Applicable. D 2vvG-2 Name(Registrant): Registration Number 71 Addres t� rq� Expiration Date Signa re Telephone 9.2 ..egistered Professional En, Name Area of Responsibility It54o MEAVOW STR- T.` M-* NrA. .Mk . Q too I 19283 . Address ) Registration Number Signature Telephone Expiration Date Robert W Hall �F1 PKOTEGTUM4 Name Area of Responsibility 540 Meadow Street; Agawam, ' MA 01001 35959 Address „ Registration Number. x . ..6/30/06 Signature Telephone Expiration Date. t Robert W Half {-{V •C- I Name _ Area of Responsibility t�MPqdn�7 S rPet. Agawam. MA -01001 8. 617 Address (\ Registration.Number 6/30/06 Signature Telephone ^ Expiration Date Rnhart IJ Hn11 tI..-TTZI" AQL-' i Name Area of Responsibility 540 '.Meadow .Street A awatn. . MA 01001 Fi4L995: Address Registration Number 709 Signature Telephone Expiration Date C �-T ,l S 01-11.150 SEAM 1 45 r F UICTO fZA Name Area of Responsibility Address Registration Number Signature Telephone Expiration Date 9.3 General Contractor \1l tS 1��1►.� ��t w t�4 Not Applicable❑ Company Name: 11 I I �ar�(ldv► lAer-4rcrl -To Qn Responsible In Charge of Construction 1 ra,_i ST. n b r 0 1221 j Add r ss d,�r Signature Telephone Versionl.7 Commercial Building Permit May 15,2000 Existing Proposed Required by Zoning This column to be filled in by :r Building Department Lot Size I I Frontage Setbacks Front Side Ream L-_ u-B iTdm—g Fle-lvff - 32 D I Bldg.Square Footage % Open Space Footage % (L.ot area minus bldg&paved F-,0 parking) #of Parking Spaces + �� Fill: , '�--- voiume&Location) 1 A. Ha a Special Permi ariance/Finding ever been issued for/on the site? NO DONT KNOW 0 YES IF YES, date issued: 2^ + D IF YES: Was the permit recorded at the Registry of Deeds? NO "0 DON-KNOW 0 YES IF YES: enter Book ; Paged and/or Document#f B. Does the site contain a brook, body of water or wetlands? NO DONT KNOW 0 YES 0 IF YES, has a permit been or need to be obtained from the Conservation Commission? Needs to be obtained Obtained , Date Issued: I C. Do any signs exist on the property? YES NO 0 - uND SAC„ c HP- '-Rohl'(' IF YES, describe size, type and location: I � IO «Ll L L D. Are there any proposed changes to or additions of signs intended for the property? YES NO IF YES, describe size, type and location: I~W eL-N�V1y (2111A t a+`i' E. Will the construction activity disturb(clearing,grading,excavation,or filling)over 1 acre or is it part of a common plan that will disturb over 1 acre? YES 0 ' NO IF YES,then a Northampton Stone Water Management Permit from the DPW is required. Versionl.7 Commercial Building Permit May 15,2000 SECd®I WT I ONEF �. O ;t1II?3aX100r, Interior Alterations ❑ Existing Wall Signs ❑ Demolition❑ Repairs❑ Additions ❑ Accessory Building❑ Exterior.Alteration ❑ Existing Ground Sign❑ New Signs❑ Roofing❑ Change of Use❑ Other❑ Brief Description Enter a brief description.here. Of Propos 7t ork: e sn s• -+te e err mesr .a wle I USE GROUP(Check as applicable) CONSTRUCTION TYPE A Assembly AA ❑ A-2 ❑ A-3 1A ❑ _ A-4 13. A-5 ❑ SIR 1 B E. B Business ❑ 2A ❑ E Educational ❑ 213 I ❑ F Factory C3. F-1 ❑ F-2 ❑ 2C ❑ H Hi h Hazard ❑ 3A ❑ 1 institutional ❑ 1-1 ❑ 1-2 ❑ I-3 ❑ 313 M Mercantile ❑ 4 ❑` R Residential ❑ R-1 ❑ R-2 ❑ R-3 ❑ 5A ❑ S Storage ❑ S-1 ❑ S-2 ❑ 56 ❑ U Utility ❑ Specify: M Mixed Use E! Specify S Special Use E3 Specify C MPLE .T�}},S�S CT }F C1ST1@7G BCI}L 11 ��k}]�IL�E GO Iii I MAYA fiO}�JS A t�fTtO}�1S D C �CF)#NPE-fN'zIJSE Existing Use Group: A-3 LI�}A—RY Proposed Use Group: 1 A- 3 L4bXA'R 1 � e F�cistin9 Hazard Index 780 CMR 34):4 �'t Proposed Hazard Index 780 CMR 34): SEC ION�6i7iLl7it�GiE1GFTDE2E BUILDING AREA EXISTING PROPOSED NEW CONSTRUCTION " x ' Floor Area per Floor(sf) 1 5t Zoo 1S1 2"°j 20 ]0 2nd 3rd 3rd 4 4th 4th i Total Area(so i ) °o p Total Proposed New Construction st)^ - Total Height(ft) I 5 Total Height ft 7.Water Supply(M.G.L.c.40,§54) 7.1 Flood Zone Information: 7.3 Sewage Disposal System: Public Private ❑ Zone Outside Flood Zone Ed Municipal Q' On site disposal system E] , Versionl.7 Commercial Building Permit May 15,2000 -- �- _ City q ,Northampton 2005 Build" g Department JUL + � Iv�am Street . J .. Ro m,100 NWalampipri, MA 01060 �.°1 1 .. p�l.a�Zne- 9=587='-240 Fax 413-587-1272 APPLICATION TO CONSTRUCT,REPAIR,RENOVATE,CHANGE THE USE OR OCCUPANCY OF,OR DEMOLISH ANY BUILDING . OTHER THAN A ONE OR TWO FAMILY DWELLING �SECtf� �h�EtttEORMA' - ��- ,�, '�"''� secfio''fo-fs"'ecOt'tl�etecliby�ffiee�,"��r5�r-fir rLor EeNiC-F_ Mk -e>(ovZ. .__.. SECTIOlal2� {'ROPERaI'nOWt3ERS Ipffik`JT JbRiZED�AGEI�T � 2.1 Owner of Record: I 0 1A- &4r "at o 2 S Name(Print) ' Current Mailing Address: 1 z-- Signature r )61-Wo Telephone 22 A{{uthorize Agent: Name(Print) Curren t Mailing Address: Signature Telephone SECTIOi1f 3 .:EST(IVIAEDtONSTRUCT(L)IV*COSTS Item Estimated-Co (Dollars)to be tliciaLUse Cral}� completed b y permit applicant Al 1. Building {a, Build�rg'Perrt Fee s 4� 2. Electrical {b>Est►mated Tptal Ova, 1-19 z' a,p�J Cons#ucfioctrom-..6. 3. Plumbing ! 1 ,,13u�1��ngPerml£Fee 4. Mechanical(HVAC) , 5. Fire Protection ` 6. TotaU=(1 +2+3+4+5) �-,.:�3 ;a �. �:� i taeck Number 'rhos"Sect►g�„For..uDflica"1 `se�n'1- i3lldmgPer ►!1"�rrl�?`er pates - y. Signature: BuOdirt rComm}ssionerllnspecfQrofBuildings -Date 6 File#BP-2006-0060 APPLICANT/CONTACT PERSON WESTERN BUILDERS INC ADDRESS/PHONE 73 PLEASANT ST GRANBY (413)467-9171 PROPERTY LOCATION 19 MEADOW ST MAP 17C PARCEL 278 001 ZONE URB THIS SECTION FOR OFFICIAL USE ONLY: PERMIT APPLICATION CHECKLIST ENCLOSED REQUIRED DATE ZONING FORM FILLED OUT Fee Paid Building Permit Filled out Fee Paid Typeof Construction: CONSTRUCT 2 STORY ADDITION&RENOVATION New Construction Non Structural interior renovations Addition to Existing Accessory Structure Building Plans Included: Owner/Statement or License 000153 3 sets of Plans/Plot Plan /1f� THE FOLLOWING ACTION HAS BEEN TAKEN ON THIS APPLICATION BASED ON INF94MATION PRESENTED: Approved Additional permits required(see below) PLANNING BOARD PERMIT REQUIRED UNDER:§ Intermediate Project: Site Plan AND/OR Special Permit With Site Plan Major Project: Site Plan AND/OR Special Permit With Site Plan ZONING BOARD PERMIT REQUIRED UNDER: § Finding Special Permit Variance* Received&Recorded at Registry of Deeds Proof Enclosed Other Permits Required: Curb Cut from DPW Water Availability Sewer Availability Septic Approval Board of Health Well Water Potability Board of Health Permit from Conservation Commission Permit from CB Architecture Committee Permit from Elm Street C ssion 2.0 Signature of Building Official Date Note: Issuance of a Zoning permit does not relieve a applicant's burden to comply with all zoning requirements and obtain all required permits from Board of Health,Conservation Commission,Department of public works and other applicable permit granting authorities. *Variances are granted only to those applicants who meet the strict standards of MGL 40A. Contact Office of Planning&Development for more information. 19 MEADOW ST BP-2006-0060 GIS#: COMMONWEALTH OF MASSACHUSETTS MR:Block: 17C-278 CITY OF NORTHAMPTON Lot: -001 Permit: Building Category: BUILDING PERMIT Permit# BP-2006-0060 Project# JS-2006-0077 Est.Cost: $2030000.00 Fee: $0.00 PERMISSION IS HEREBY GRANTED TO: Const.Class: 3B Contractor: License: Use Group: A3 WESTERN BUILDERS INC 000153 Lot Size(sa.ft.): 16160.76 Owner: NORTHAMPTON CITY OF Zoning URB Applicant. WESTERN BUILDERS INC AT: 19 MEADOW ST Applicant Address: Phone: Insurance: 73 PLEASANT ST (413) 467-9171 Workers Compensation GRANBYMA01033 ISSUED ON. TO PERFORM THE FOLLOWING WORK.-CONSTRUCT 2 STORY ADDITION & RENOVATION CONTROLLED CONSTRUCTION AS PER780CMR-116 POST THIS CARD SO IT IS VISIBLE FROM THE STREET Inspector of Plumbing Inspector of Wiring D.P.W. Building Inspector Underground: Service: Meter: Footings: Rough: Rough: House# Foundation: Driveway Final: Final: Final: Rough Frame: Gas: Fire Department Fireplace/Chimney: Rough: Oil: Insulation: Final: Smoke: Final: THIS PERMIT MAY BE REVOKED BY THE CITY OF NORTHAMPTON UPON VIOLATION OF ANY OF ITS RULES AND REGULATIONS. Certificate of Occupancy Signature• FeeType: Date Paid: Amount: Building 8/11/05 0:00:00 $0.00 212 Main Street,Phone(413)587-1240,Fax: (413)587-1272 Building Commissioner-Anthony Patillo