Loading...
18C-042 (3) C.; I 1 r-V r ' I P I / I CD w. 'V I f I1 II o � � 40. Vapor retarders.Although these are still in the code have exceptions, one must understand that there is a difference between a vapor retarder or barrier and an air barrier.An air barrier is intended to stop air flow(convection) a vapor retarder or barrier is intended to stop molecular moisture transfer(diffusion). A vapor retarder or barrier is effective even if there are some holes or gaps, however an air barrier has to be absolute and complete. If air can leak through an electrical device or through a crack it follows the path of least resistance and carries 99%of the moisture in a structure.This is evident every time one exposes fiberglass insulation and finds black insulation,which has filtered dirt out of the air moving through the insulation.780 CMR R601.2 for vapor retarders and Table N1102.4.2 for air sealing requirements. 41. Unvented attic assemblies. Hot roofs are allowed, but have specific requirements 780 CMR R806.4. 42. Deck ledgers and post must be appropriately attached, bolts or lags. 780 CMR R502.2.2.1 Note:Thrul-oks are engineered for post attachment supporting a railing. Lateral attachment is required for each deck per section 502.2.2.3. 43. Smoke and CO detectors as required. 780 CMR R314 and R315. a. Smokes in each bedroom,within 10' of a bedroom door, and at the bottom of a stair leading to a finished floor above. b. CO within 10' of bedroom doors, at each level,for every 1500 sqft, (plumbing code in the mechanical room) Except if there are no fossil burning fuels or attached garage. c. Heat detector in attached garage, and other large unfinished unconditioned spaces. 44. Closets beneath stair which have doors must be drywalled with%".780 CMR R302.7 45. If there is mechanical equipment or a combustible roof, 30 sqft of space, and 30" measured from top of ceiling joist to bottom of rafters an attic access of minimum RO of 22" x 30" is required to be located in an accessible place. It must be insulated equal to surrounding,gasketed, and secured in place. 46. Clearances above gas stoves and cook tops burners is 24" to non-combustible or 30" to combustibles. Relevant items must be submitted to the building department for approvals before inspections and or Certificates of Occupancy can be issued. Feel free to call if you have any questions. My telephone number is 587-1240 and office hours are Monday through Friday, 8:30 am to 4:30 pm, excepting we close for walk-ins at 12:00 noon on Wednesdays. My email address is: cmiller(p�northamptonma.gov Thank yo or your cooperation on these matters. hucl' iller City of Northampton Assistant Commissioner and Zoning Enforcement 23. Stairs have critical standards, make sure you know the floor finishes when planning. Minimum tread 9", maximum riser 8 W, maximum overall variance for the run is 3/8",4" sphere rule on risers except where the total rise is 30" or less 780 CMR R311.7.4.3 Exception,4 3/8" on balustrade, 6" in the triangle. Graspable rail 1 V minimum and 2" maximum rail, height minimum 34" maximum 38", required for 4 or more risers. Landing to landing constitutes a new run. Minimum 6'8" ceiling height from nosing. Rails must be continuous and returned to the wall if not to newel post. 780 CMR R311.7. 24. Guards 36" minimum height above walking surface, a bench is a walking surface, required for more than 30" above floor or grade within 36",4" sphere rule. 780 CMR R312.1. 25. Floor joist systems that are not equal to 1%2" nominal dimension must be covered with %2" drywall or 5/8" wood structural panel or equivalent with some exceptions.780 CMR R501.3 26. Educate the plumber and electrician about maximum notch and hole sizes,and placement. 780 CMR R502.8 and R602.6. In bearing.studs holes not larger than 40%of a stud no closer than 5/8 to the edge, In interior non-bearing studs holes not larger than 60%of a stud no closer than 5/8 to the edge, or holes in joist are a maximum 1/3 the depth not closer than 2"from the top or bottom or to any other hole. Notches are different. 27. Drilling or notching of more than 50%of the wall plate width of an exterior wall or load bearing partition requires a 16 GA 1%2" strap across the area and 6" beyond each side with 8- 10nd nails.780 CMR R602.6.1 28. Where dryer ducts penetrate the wall they must be sealed with fire caulk. 780 CMR M504.2 29. Dryer ducts must terminate outside of the building, have a backdraft damper, cannot include a screen, and require 3' clearance from windows. 780 CMR M504.4 30. Dryer duct transition is limited to 8' of aluminum flex, must be exposed, and the proper UL listing.780 CMR M504.6.3 31. Dryer duct maximum equivalent length is 35' less 5' per 901 elbow or per manufacturer's specs.780 CM M502.6.4, no screwed connections use foil tape appropriate for the use. 32. Dryer ducts when concealed must have a permanent label or tag within 6'of the duct connection 780 CMR M502.6.5 33. Makeup air is required for dryers exhausting more than 200 CFM. 780 CMR M504.5 34. Makeup air is required for any exhaust hood over 400 CFM.780 CMR M505.2 35. Fireplaces require all combustion air be provided from the exterior and below the firebox, duct work maintaining 1" clearance for 5' from the duct outlet for all fireplaces and airtight doors. 2009 IECC 402.4.3 36. Fire and draft stopping shall be completed before rough inspection.Typical locations,top (ceiling) and bottom (floor) plates, soffits, and every 10' within enclosed cavities.780 CMR R302. 37. Ignition barriers are required over all thermal plastics and must be in place before final. 780 CMR R316. 38. Dwelling/Garage fire separation.An attached garage (within 3' of main structure) is required to have%2" drywall on the garage side of the separation wall and if there is a finished space above the garage all walls must have%2" drywall and the ceiling 5/8" drywall. 780 CMR R302.6 39. Energy aspects shall comply with the stretch energy code. 780 CMR Appendix 115AA or 2009 IECC. a. An initial HERS evaluation is required including insulation levels anticipated. b. A final HERS evaluation confirming code requirements have been met including duct testing. c. A signed copy of the Thermal Bypass Checklist. d. Energy information including mechanical equipment posted on the electric panel. e. Remodeling and Additions can be completed in accordance with IECC 2009 with Energy Star Windows and the Thermal Bypass Checklist. Duct blast testing when practicable. f. All band joist insulation must be enclosed within an air tight cavity, which you must create. 8. Emergency escape is required out of every basement whether habitable or not,each bedroom and walk- in attics. 780 CMR R310.1 9. Crawl spaces can be treated in three different ways,vented (poor idea),exhausted (similar to exhaust only systems),or treating the space with supply and return. See 780 CMR R408 10. Ceiling joist are intended to prevent spread, once raised above the wall plate they become rafters ties and may require up sizing of rafters and increased nailing for example with a 4" slope 8-16nd common are required at each connection. 780 CMR R802.3.1. When there is neither of these a structural ridge is required with a load path to the foundation. 11. Steel straps over the ridge or 1x4 minimum collar ties are required 4'OC in the upper 1/3rd 780 CMR R802.3.1 12. Ridge boards must be the full depth of the cut. 780 CMR R802.3. 13. A complete window and header schedule is required.780 CMR Table R502.5 for header sizing and number of jack studs required. 14. Wood walls shall be capped with double plates to provide overlapping at corners and intersecting walls with bearing partitions,joints staggered 2' minimum.780 CMR R602.3.2 a. Exception: A single plate may be used or plates may be excluded over lintels provided the plates/lintels are adequately connected by a 3" x 6" plate .036 galvanized steel nailed to each segment with 6-8d nails 15. All framing materials which are not code prescriptive must have stamped engineering. a. LVLs b. I-joist and or Floor Truss c. Roof truss 16. All I-Joist need to be protected from fire with %2 drywall or 5/8 wood structural panel. (R501.3) 17. A braced wall plan identifying appropriate braced wall areas where required (R301.1) and braced wall method being used. 780 CMR 602.10. a. Garage corners and large corner window/door layout may require special solutions. b. All corners must be appropriately attached to the foundation. c. When using PFH (R602.10.3.3) or PFG (R602.10.3.4)the nailing requirement is 4" and 3" respectively using 8d common nails or galvanized box nails. PNEUMATIC nails must be full headed with the temper and shank sizing meeting the strict code requirement. 18. When nailing sheathing make sure your pneumatic nailers' pressure is properly set. Nails set too deep perforate the sheathing weakening it and contribute to building damage in high wind events. 19. Ceiling heights minimum 7'for habitable spaces, 6'8"for bathrooms includes tub/shower area if a shower head is used,6'8" for basements, 6'4" at beams/ducts. 780 CMR R305.1. MA amended 20. Hazardous glazing locations,within 24" of a door, or within 60" of a stair,or across from hot tubs, spas, bathtubs within 60" if not 60" above the walking surface, and other locations.780 CMR R308.4 21. Windows over 72" above grade with the opening less than 24 above the finished floor shall meet the 4" sphere rule. Order restrictors. 780 CMR R612.2 22. Egress and emergency escape requirements shall be strictly met. a. Basements, habitable attics, and all sleeping rooms require emergency escape. 780 CMR R310 b. Windows within 44" of floor, DH 3.3 sqft min window size, Casement 20"x41" exception 5 sqft at 1"floor. Minimum clear opening 20"x24" or 24"x20". 780 CMR R310.1.1 c. Two doors remote as possible at the normal level of travel,opening measured from the face of the slab to the stop with door at 90 degrees,one 32" and one 28" minimum 78" high. 780 CMR R311.2 d. Landing at each door 36" out and the width of the door minimum 36", maximum step 7 3/"from the top of the threshold and only in-swinging doors. 780 CMR R311.3 City of Northampton s;c�� Massachusetts . A DEPARTMENT OF BUILDING INSPECTIONS - 212 Main Street • Municipal Building Northampton, MA 01060 INSPECTOR Robert and Nora Langston May 29, 2015 80 Damon Road Northampton, MA 01060 Subject Location: 685 Bridge Road Map Block: 18C-042 Ms.and Mr. Langston, Your building permit application with plans dated 5-21-15 has been approved as drawn and per this memo. All work must meet all applicable codes whether noted or not included within this memo. Please follow up on the following items: These items will need to be accomplished as the project moves forward and before rough inspections; 1. A minimum 15' side set back must be maintained for the addition. 2. A minimum 4' side and rear set base must be maintained for the garage. 3. The driveway can be no wider than 15'curb cut at the street side of the sidewalk. 4. A DPW permit is required for any change to the existing curb cut. 5. All structural elements must have continuous load paths to appropriate bearing. 6. Energy aspects must meet the requirements of the 2009 IECC. 7. Smoke, Heat and CO detectors throughout the structure to current building codes. 8. An emergency escape window is required within every bedroom, basement and walk-in attic. 9. An air barrier is required between the tub and the wall cavity. 10. If permeable insulation is used air sealing and an air sealing inspection is required at the exterior and interior skins.Typically the sheathing and drywall. Note:The 2012 IECC with MA amendments is the non-stretch energy code and the new Stretch Code expected to be completed in 2015. As of August 4th 2011 the 81h Edition MA code is the 2009 IRC with MA amendments. In the following are some generic requirements which seem to be problematic. This is not intended to be comprehensive, nor is it a substitute for purchasing and reading the MA codes. Read only international codes are available on line at.http://publicecodes.cyberregs.com/icod one must also consider the MA amendments to these codes which can be found at www.mass.gov/dps/bbrs . The current relevant building codes are: 2009 IBC, 2009 IEBC,2009 IMC,2009 IRC, 2009 or 2012 IECC,AA115, MA amendments. 1. Structures shall conform to 780 CMR 8th Edition 1 and 2 family building codes with MA amendments. 2. Grading plan for structures being constructed required. 780 CMR R401.3 for drainage requirements. 3. A basement drainage system is required in all basements 780 CMR R405.2.3.except those in group I soils(table R405.1) 4. Foundations that retain earth and enclose interior space require damp proofing 780 CMR R406.1.or if high water table or severe soils waterproofing 780 CMR R406.2. 5. Through wall form ties must be removed from both faces and patched with hydraulic cement.780 CMR R406.2 of amendments. 6. Foundation anchor bolts must be%" and be embedded a minimum of 7" into the concrete. 10" bolts! 780 CMR R403.1.6 7. CMU foundations require 3/8" parging before damp proofing. 780 CMR R406.1 see exceptions. , i r r KUL A 01 l, l�f Ca It r I r 1 t -too Elm r di 77 ` sit . TAT fi J 4 - r: V°'"I ._,, old s n r � o mw � f / i s i 18z � I I i � i . I 1 Wlvk 7 1 x s r�� Pic t*XINA 5 Come VAT, 6> 4;% 'Df Of 17 tlf P6�L � Fo rl. N6W/ REoCATED CLAR-6 Ctxr City of Northampton 212 Main Street, Northampton, MA 01060 Solid Waste Disposal Affidavit In accordance of the provisions of MGL c 40, S54, I acknowledge that as a condition of the building permit all debris resulting from the construction activity governed by this Building Permit shall be disposed of in a properly licensed solid waste disposal facility, as defined by MGL c 111, S 150A. Address of the work: (p � �-+ �� � *� N'o 'd��"'� ��" `� , A,, The debris will be transported by: FS The debris will be received by: � J3k A S' a Building permit number: Name of Permit Applicant - 2r - � Date Signature of Permit Applicant Information and Instructions Massachusetts General Laws chapter 152 requires all employers to provide workers' compensation for their employees. Pursuant to this statute,an employee is defined as"...every person in the service of another under any contract of hire, express or implied,oral or written." An employer is defined as"an individual,partnership,association,corporation or other legal entity,or any two or more of the foregoing engaged in a joint enterprise,and including the legal representatives of a deceased employer,or the receiver or trustee of an individual,partnership,association or other legal entity,employing employees. However the owner of a dwelling house having not more than three apartments and who resides therein,or the occupant of the dwelling house of another who employs persons to do maintenance,construction or repair work on such dwelling housd or on the grounds or building appurtenant thereto shall not because of such employment be deemed to be an employer." MGL chapter 152, §25C(6)also states that"every state or local licensing agency shall withhold the issuance or renewal of a license or permit to operate a business or to construct buildings in the commonwealth for any applicant who has not produced acceptable evidence of compliance with the insurance coverage required." Additionally,MGL chapter 152,§25C(7)states"Neither the commonwealth nor any of its political subdivisions shall enter into any contract for the performance of public work until acceptable evidence of compliance with the insurance requirements of this chapter have been presented to the contracting authority.." Applicants Please fill out the workers'compensation affidavit completely,by checking the boxes that apply to your situation and,if necessary,supply sub-contractor(s)name(s),address(es)and phone number(s)along with their certificate(s)of insurance. Limited Liability Companies(LLC)or Limited Liability Partnerships(LLP)with no employees other than the members or partners,are not required to carry workers' compensation insurance. If an LLC or LLP does have employees,a policy is required. Be advised that this affidavit may be submitted to the Department of Industrial Accidents for confirmation of insurance coverage. Also be sure to sign and date the affidavit. The affidavit should be returned to the city or town that the application for the permit or license is being requested,not the Department of Industrial Accidents. Should you have any questions regarding the law or if you are required to obtain a workers' compensation policy,please call the Department at the number listed below. Self-insured companies should enter their self-insurance license number on the appropriate line. City or Town Officials Please be sure that the affidavit is complete and printed legibly. The Department has provided a space at the bottom of the affidavit for you to fill out in the event the Office of Investigations has to contact you regarding the applicant. Please be sure to fill in the permit/license number which will be used as a reference number. In addition,an applicant that must submit multiple permit/license applications in any given year,need only submit one affidavit indicating current -----------policy-information-cif-necess-a y)-and-under"Job-Site Address"the-applicant-sheuld_write-all_lo-cations in (cityor town)."A copy of the affidavit that has been officially stamped or marked by the city or town may be provided to the applicant as proof that a valid affidavit is on file for future permits or licenses. A new affidavit must be filled out each year.Where a home owner or citizen is obtaining a license or permit not related to any business or commercial venture (i.e.a dog license or permit to burn leaves etc.)said person is NOT required to complete this affidavit. The Department's address,telephone and fax number: The Commonwealth of Massachusetts Department of Industrial Accidents 1 Congress Street, Suite 100 Boston, MA 02114-2017 Tel. # 617-727-4900 ext. 7406 or 1-877-MASSAFE Fax# 617-727-7749 Revised 02-23-15 www.mass.gov/dia The Commonwealth of Massachusetts Department of Industrial Accidents a I Congress Street,Suite 100 Boston,MA 02114-2017 www.mass.gov/dia Workers' Compensation Insurance Affidavit:Builders/Contractors/Electricians/Plumbers. TO BE FILED.WITH THE PERNUTTING AUTHORITY. Applicant Information Please Print Le 'bl Name (Business/Organization/Individual): Address: A,,A I i , City/State/Zip: Phone#: 3 — . Are you an employer?Check the appropriate box: Type of project(required): 1.Q I am a employer with employees(full and/or part-time).* 7. []New construction 2.7 1 am a sole proprietor or partnership and have no employees working for me in $, E]Remodeling A capacity.[No workers'comp,insurance required.] r ,/ 9. ❑Demolition 3. I am a homeowner doing all work myself[No workers'comp.insurance required.]t 10 Building addition 4.❑I am a homeowner and will be hiring contractors to conduct all work on my property. I will ensure that all contractors either have workers'compensation insurance or are sole 11.0 Electrical repairs or additions proprietors with no employees. 12.7 Plumbing repairs or additions 5.❑I am a general contractor and I have hired the sub-contractors listed on the attached sheet. 13.❑Roof repairs These sub-contractors have employees and have workers'comp.insurance.1 6.❑we are a corporation and its officers have exercised their right of exemption per MGL c. 14.Q Other 152,§1(4),and we have no employees.[No workers'comp.insurance required.] *Any applicant that checks box#1 must also fill out the section below showing their workers'compensation policy information. t Homeowners who submit this affidavit indicating they are doing all work and then hire outside contractors must submit a new affidavit indicating such. tContractors that check this box must attached an additional sheet showing the name of the sub-contractors and state whether or not those entities have employees. If the sub-contractors have employees,they must provide their workers'comp.policy number. I am an employer that is providing workers'compensation insurance for my employees. Below is the policy and job site information. Insurance Company Name: Policy#or Self-ins.Lie.#: Expiration Date: Job Site Address: City/State/Zip: __..._—_ Attach-a_co-p_y_ofthe_workers_compensatioii-policy-declaration-page_(showing_the_pnlic_y,-mumber-and_expiration-date), _____._ Failure to secure coverage as required under MGL c. 152,§25A is a criminal violation punishable by a fine up to$1,500.00 and/or one-year imprisonment,as well as civil penalties in the form of a STOP WORK ORDER and a fine of up to$250.00 a day against the violator.A copy of this statement may be forwarded to the Office of Investigations of the DIA for insurance coverage verification. I do hereby ce i under the pains and penalties of perjury that the information provided above is true and correct. Sienature: Date: " n l Phone Official use only. Do not write in this area,to be completed by city or town official City or Town: Permit/License# Issuing Authority(circle one): 1.Board of Health 2.Building Department 3.City/Town Clerk 4.Electrical Inspector 5.Plumbing Inspector 6. Other Contact Person: Phone#: SECTION 8-CONSTRUCTION SERVICES 8.1 Licensed Construction Supervisor: Not Applicable ❑ Name of License Holder: License Number Address Expiration Date Signature Telephone Not Applicable ❑ 9..Registered Home Improvement Contractor PP Company Name Registration Number Address Expiration Date Telc SECTION 10-WORKERS'COMPENSATION INSURANCE AFF '' %1.G.L.c.152,§25C(6)) Workers Compensation Insurance affidavit must be completed and s�t`,,nitted with this application. Failure to provide this affidavit will result in the denial of the issuance of the building permit. Signed Affidavit Attached Yes....... 9111, No...... ❑ :. 11 ;::Home Owner Exemption I'he current exemption for"hom,,owners"was extend,, .'lude Owner-occupied Dwellings of one(1) or two(2)families and to allow such homeowner to engage an individual who does not possess a license,provided that the owner acts as supervisor.C NI R 780 Sixth Edition Section !' Definition of Homeowner:Person(s)who own a purr nd on which he/she resides or intends to reside,on which there is,or is intended to be, a one or two family dwelling, c , . or detached structures accessory to such use and/or farm structures. A person who constructs more than one :i two-year period shall not be considered a homeowner. Such"homeowner"shall submit to the Building OI"i-.e ,rm acceptable to the Building Official,that he/she shall be responsible for all such work performed under the permit. As acting Construction Supervisor your presence ou site will be required from time to time,during and upon completion of the work for which this permit is issue_'. Also be advised tl,;it with reference to Chapter 152(A Compensation) and Chapter 153(Liability of Employers to Employees for injuries not resulting ill Death)of the V setts General Laws Annotated,you may be liable for person(s) you hire to perform work for you under this permit. The undersigned"homeowne "certifies and assumes: ity for compliance with the State Building Code,City of Northampton Ordi i,inccs, S IA,eal Zoning I of Massachusetts General Laws Annotated. Homeowner Sigwiture � J SECTION 5-DESCRIPTION OF PROPOSED WORK(check'a11 applicable) New House ❑ Addition Replacement Wjr(dows Alteration(s) Roofing Or Doors [L7f Accessory Bldg. Demolition ❑ New Signs [❑] Decks [0 Siding[❑] Other[❑] Brief Desiption oJ Proposed _,� ��� c^ Work: �t e ,S%"Z.,�t�i S i�-t� -el�. 'T'� S�d S -� Alteration of existing bedroom Yes No Adding new bedroom Yes No Attached Narrative Renovating unfinished basement Yes No Plans Attached Roll -Sheet +acs.. , nm^,-,^: �MIBflr93 sa..lff� �ui.houseandoradditio. otexistin housin comfii'efoilaw[n a. Use of building : One Family Two Family Other b. Number of rooms in each family unit: _ Number of Bathrooms 3 �— c. Is there a garage attached? i� ��✓ / d. Proposed Square footage of new construction. Dimensions 1 e. Number of stories? f. Method of heating? Fireplaces or Woodstoves Number of each g. Energy Conservation Compliance, Masscheck Energy Compliance form attached? h. Type of construction Z i. Is construction within 100 ft. of wetlands? Yes No. Is construction within 100 yr. floodplain Yes �No j. Depth of basement or cellar floor below finished grade_ k. Will building conform to the Building and Zoning regulations? Yes No. I. Septic Tank City Sewer `� Private well City water Supply SECTION 7a-OWNER AUTHORIZATION-TO BE COMPLETED WHEN OWNERS AGENT OR CONTRACTOR APPLIES FOR BUILDING P7gVT 1 as Owner of the subject property hereby authorize to act on my behalf, in all matters relative to work authorized by this building permit application. Signature of Owner ate (:;(K as Owner/Au 4adzed- -AA�ent hereby declare that the statements and information on the foreaoirg application are true and accurate,to the best of my knowledge and belief. Signed under the pains and penalties of perjury. Print Namq J-2 r t ignature of Owner/Agent rate Section 4. ZONING All Information Must Be Completed. Permit Can Be Denied Due To Incomplete Information Existing Proposed Required by Zoning This column to be filled in by Building Department Lot Size F-0 Frontage Setbacks Front L!=A Side L 241, R:i-1 R10 LEW Rear Building Height Bldg.Square Footage 0/,o IFT Open Space Footage % (Lot area minus bldg&paved parking) #of Parking Spaces _-- ---------------- Fill: (volume&Location) .............. ------ A. Has a Spe ial. Permit/Variance/Finding ever been issued for/on the site? NO F DON7 KNOW 0 YES 0 IF YES, date issued: IF YES: Was the permit recorded at the Registry of Deeds? NO 0 DON'T KNOW O YES 0 IF YES: enter Book Page and/or Document# B. Does the site contain a brook, body of water or wetlands? NO DON7 KNOW 0 YES 0 IF YES, has a permit been or need to be obtained from the Conservation Commission? Needs to be obtained 0 Obtained 0 Date Issued: C. Do any signs exist on the property? YES NO e( IF YES, describe size, type and location: D. Are there any proposed changes to or additions of signs intended for the property? YES 0 NO Q IF YES, describe size, type and location: E. Will the construction activity disturb(clearing,grading,ex9trvation, or filling)over 1 acre or is it part of a common plan that will disturb over 1 acre? YES 0 NO (D IF YES,then a Northampton Storm Water Management Permit from the DPW is required. �1. MAY 2 ( [QiS `, y of Northampton `=I B qilding Department Ll �__.. „4t+ors 12 Main Street Room 100 Northampton, MA 01060 ; phone 413-587-1240 Fax 413-587-1272 b. APPLICATION TO CONSTRUCT,ALTER, REPAIR,RENOVATE OR DEMOLISH A ONE OR TWO FAMILY DWELLING SECTION 1 -SITE INFORMATION 1.1 Property Address: This section to be completed by office A ap' LotUnit No Zone Overlay District Elm St!District co District SECTION 2-PROPERTY OWNERSHIP/AUTHORIZED AGENT 2.1 Owner of Record: 1Ut fC 0 �1r�_i 1 ►�i GrS"�r\l �S lV eA �-�6 V-b r.J Name(Pr' ) Current Mailing Address: QV "�.�a.0 ��^ Telephone (� Signature 2.2 Authorized Agent: Name(Print) Current Mailing Address: Signature Telephone SECTION 3-ESTIMATED CONSTRUCTION COSTS Item Estimated Cost(Dollars)to be Official Use Only completed by ermit applicant 1. Building qZ 6R, (a)Building Permit Fee 2. Electrical (b)Estimated Total Cost of iii Construction from 6 3. Plumbing Lm Building Permit Fee 3; _ 4. Mechanical (HVAC) ` 6.0 5. Fire Protection 6. Total=(1 +2+3+4+5) 2'D 6-6 CI Check Number This Section For Official Use Only uilding Permit Number: Date `Issued: Signature: Building Commissioner/Inspector of Buildings Date -,o N n o k( sEE �o'TE 5 File#BP-2015-1160 e pLCoT PLAN APPLICANT/CONTACT PERSON LANGSTON ROBERT&NORA V £ ADDRESS/PHONE 80 DAMON RD#5111 NORTHAMPTON01060(413)588-7414 Q LAN R PROPERTY LOCATION 685 BRIDGE RD MAP 18C PARCEL 042 001 ZONE URB(100)/ THIS SECTION FOR OFFICIAL USE ONLY: PERMIT APPLICATION CHECKLIST ENCLOSED REQUIRED DATE ZONING FORM FILLED OUT Fee Paid Building Permit Filled out - Fee Paid Typeof Construction: CONSTRUCT 2 STORY ADDITIONQ BEDRMS 1/2 BATH&2 FULL)&CONSTRUCT 21 X 20 DET GARAGE&REMODEL INTERIOR New Construction Non Structural interior renovations Addition to Existing - Accessory Structure Buildinp,Plans Included: Owner/Statement or License aoaZum,C- 3 sets of Plans/Plot Plan THE FO LOWING ACTION HAS BEEN TAKEN ON THIS APPLICATION BASED ON INFOJkMA TION PRESENTED: Approved Additional permits required(see below) PLANNING BOARD PERMIT REQUIRED UNDER:§ Intermediate Project: Site Plan AND/OR Special Permit With Site Plan Major Project: Site Plan AND/OR Special Permit With Site Plan ZONING BOARD PERMIT REQUIRED UNDER: § Finding Special Permit Variance* Received&Recorded at Registry of Deeds Proof Enclosed Other Permits Required: Curb Cut from DPW Water Availability Sewer Availability Septic Approval Board of Health Well Water Potability Board of Health Permit from Conservation Commission Permit from CB Architecture Committee Permit from Elm Street Commission Permit DPW Storm Water Management elay 19 0;1 S ure of Bu' ing ff ial Date Note: Issuance of a Zoning permit does not relieve a applicant's burden to comply with all zoning requirements and obtain all required permits from Board of Health,Conservation Commission,Department of public works and other applicable permit granting authorities. * Variances are granted only to those applicants who meet the strict standards of MGL 40A. Contact Office of Planning&Development for more information. 685 BRIDGE RD BP-2015-1160 GIs#: COMMONWEALTH OF MASSACHUSETTS MM:Block: 18C-042 CITY OF NORTHAMPTON Lot:-001 PERSONS CONTRACTING WITH UNREGISTERED CONTRACTORS Permit: Building DO NOT HAVE ACCESS TO THE GUARANTY FUND (MGL c.142A) Category: ADDITION BUILDING PERMIT Permit# BP-2015-1160 Project# JS-2015-001439 Est.Cost: $120000.00 Fee: $720.00 PERMISSION IS HEREBY GRANTED TO: Const.Class: Contractor: License: Use Group: Homeowner as Contractor Lot Size(sy. ft.): 11543.40 Owner: LANGSTON ROBERT&NORA zoning.URB(100)/ Applicant: LANGSTON ROBERT & NORA AT: 685 BRIDGE RD Applicant Address: Phone: Insurance: 80 DAMON RD #5111 (413) 588-7414 () NORTHAMPTONMA01060 ISSUED ON:912912015 0:00:00 TO PERFORM THE FOLLOWING WORK.-CONSTRUCT 2 STORY ADDITION(2 BEDRMS,1/2 BATH& 2 FULL)& CONSTRUCT 21 X 20 DET GARAGE & REMODEL INTERIOR POST THIS CARD SO IT IS VISIBLE FROM THE STREET Inspector of Plumbing Inspector of Wiring D.P.W. Building Inspector Underground: Service: Meter: Footings: Rough: Rough: House# Foundation: Driveway Final: Final: Final: Rough Frame: Gas: Fire Department Fireplace/Chimney: Rough: Oil: Insulation: Final: Smoke: Final: THIS PERMIT MAY BE REVOKED BY THE CITY OF NORTHAMPTON UPON VIOLATION OF ANY OF ITS RULES AND REGULATIONS. Certificate of Occupancy Signature: FeeType: Date Paid: Amount: Building 9/29/2015 0:00:00 $720.00 212 Main Street,Phone(413)587-1240,Fax: (413)587-1272 Louis Hasbrouck—Building Commissioner