Loading...
Fairway Village_Permit Amendment_20111112STORMWATER MANAGEMENT PERMIT Amendment to Permit City of Northampton Department of Public Works Project I Site Name: =-F=ai=-rw-'-'--=ay,,.__.V"""'il=la'""g"'""e ____________________ _ Project Street or Location I Assessor ID: 455 Spring Street, Leeds. MA 01053 / 16A-020 Applicant Name: Fairway Village Condo Association, Inc. Applicant Address/Phone: 455 Spring Street, Leeds, MA 010531413-582-9973 (Pat Taylor) Application Submission Date: -'-'--=~"""'-"-=---------------------- THE FOLLOWING ACTION BY THE NORTHAMPTON DEPARTMENT OF PUBLIC WORKS HAS BEEN TAKEN ON THIS APPLICATION FOR AN AMENDMENT OF AN ACTIVE PERMIT BASED ON INFORMATION PRESENTED: ___ Approval of the Stormwater Management Permit Amendment. X Approval of the Stormwater Management Permit Amendment subject to any conditions, modifications or restrictions required by the Department of Public Works ___ Disapproval of the Stormwater Management Permit Amendment based upon a determination that the proposed plan, as submitted, does not meet the purposes set forth in the Northampton Stormwater Management. Standard Permit Conditions: 1. All clearing, grading, drainage, construction, and development shall be conducted in strict accordance with the plans, information, and conditions specified in the Stormwater Management Permit Approval dated August 4, 2011 and as amended by any conditions attached to this permit amendment and by the following revised plan: a. Fairway Village, Leeds, MA, Amended Stormwater Permit Asphault Paving & Improvements Plans, Sheet D.1, revision dated October 10, 2011, Stamped by Mark B. Darnold, P.E. The Berkshire Design Group, Inc. 2. Annual Reports that are certified by a Registered Professional Engineer or other qualified stormwater professional as approved by the DPW documenting the actions completed as required by the Operation, Maintenance and Inspection Agreement shall be submitted to the Northampton Department of Public Works by October 1st of each year (see Specific Condition 1 below). Page 1of2 Specific Permit Conditions: 1. Within 60 days of the issuance of this amendment, the applicant shall record an executed Stormwater Operation, Maintenance, and Inspection Agreement that is binding on all subsequent owners of land served by the private stormwater management facility by recording it in the land records of the Registry of Deeds. The maintenance schedule and responsibility for maintenance of the proposed stormwater management system must be adequately specified in Attachment A to this Agreement. This agreement shall be approved by the Northampton DPW and signed by the owner and the Mayor of Northampton. Section 22-85 of the Northampton Stormwater Management Ordinance provides additional guidance for the requirements of this agreement. 2. Stormwater Permit Plan Sheet D.3 for Fairway Village dated August 4, 2011, stamped by Mark B. Darnold, P.E. The Berkshire Design Group, Inc. and approved by the DPW as part of the Stormwater Management Permit Approval dated August 4, 2011 is no longer required due to the project changes as documented in Amended Plan Sheet D.1 referenced above. 3. Specific Permit Conditions 3 and 4 from the Stormwater Management Permit Approval dated August 4, 2011 are not required due to the project changes as documented in Amended Plan Sheet D.l referenced above. cc. Planning Board c/o Office of Planning and Development Building Department 11/vz./tt Date Conservation Commission c/o Office of Planning and Development Page 2 of 2