Loading...
Laurel St Housing Permit 20110714City of Northampton Department of Public Works STORMWATERMANAGEMENT PERMIT APPLICATION DECISION Project I Site Name: Laurel Street Housing Project Street or Location I Assessor ID: Corner of Laurel and Grove St/ Map 38A, Parcel 102 Applicant Name: Toby Millman c/o Agora Homes and Development, LLC Applicant Address/Phone: 25 E. Elizabeth St., Skaneateles, NY 13152 I 315-554-8181 Owner Name: Hospital Hill LLC c/o MassDevelopment Owner Address/Phone: 160 Federal St., Boston, MA 02110 Application Submission Date: ==-=-=~=--------------------- THE FOLLOWING ACTION BY THE NORTHAMPTON DEPARTMENT OF PUBLIC WORKS HAS BEEN TAKEN ON THIS APPLICATION BASED ON INFORMATION PRESENTED: Disapproval of the Stormwater Management Permit Application based on a determination within seven days of the receipt of the application that the application is administratively incomplete (see attached documentation). __ Approval of the Stormwater Management Permit Application. __x_ Approval of the Stormwater Management Permit Application subject to any conditions, modifications or restrictions required by the Department of Public Works (see below) __ Disapproval of the Storm water Management Permit Application based upon a determination that the proposed plan, as submitted, does not meet the purposes set forth in the Northampton Stormwater Management. Standard Permit Conditions: 1. All clearing, grading, drainage, construction, and development shall be conducted in strict accordance with the following plans and information submitted with the application and as amended by any conditions attached to this permit: a. Laurel Street Housing, Laurel and Grove Streets, Northampton, Massachusetts, Stormwater Discharge Permit Plans Sheets Sl, S3, S4, SS Dated June 10, 2011, stamped by Mark B. Darnold, P.E., The Berkshire Design Group, Inc. M :\Stormwater Program\Stormwater Permits Internal\Permits _new applications\Agora Housing Laurel St.doc Page I of 3 b. Stormwater Drainage Report for Laurel Street Housing, Northampton, MA Dated June 8, 2011, including MA DEP Checklist for Stormwater Report, stamped by Mark Darnold, P.E. 6/20/2011, The Berkshire Design Group, Inc. 2. The Northampton Department of Public Works (DPW) or its authorized representative shall be provided access to the property to conduct inspections before, during, and after construction activities as necessary. The applicant shall arrange with the DPW to schedule the following inspections: Initial Inspection, Erosion Control Inspection, Bury Inspection, and Final Inspection. The DPW may also conduct random inspections to ensure effective control of erosion and sedimentation during all phases of construction. 3. At the completion of the work, including construction of stormwater management facilities and landscaping, the applicant shall submit a statement to the DPW from a professional engineer of record in the Commonwealth of Massachusetts certifying that the materials and construction of the stormwater management system was constructed in accordance with the approved plans and will function as designed. All changes to the approved stormwater facilities shall be documented by a professional engineer of record in the Commonwealth of Massachusetts and approved by the DPW prior to submission of the certification statement described above. 4. Annual Reports that are stamped by a Registered Professional Engineer documenting the actions completed as required by the Operation, Maintenance and Inspection Agreement shall be submitted to the Northampton Department of Public Works by October 151 of each year (see Specific Condition 1 below). 5. If construction of the proposed stormwater system has not started within five years of the issue date of this permit, then the permit will expire and a new permit will be required. Construction is defined as clearing, grading, excavation, filling, and installation of drainage structures on the lots specified in this permit. Specific Permit Conditions: L Prior to issuance of a Building Permit, the applicant or property owner(s) shall record an executed Stormwater Operation, Maintenance, and Inspection Agreement that is binding on all subsequent owners of land served by the private stormwater management facility by recording it in the land records of the Registry of Deeds. The maintenance schedule and responsibility for maintenance of the proposed dry wells on each lot must be adequately specified in Attachment A to this Agreement. This agreement shall be approved by the Northampton DPW and signed by the owner and the Mayor of Northampton. Section 22-85 of the Northampton Stormwater Management Ordinance provides additional guidance for the requirements of this agreement. 2. This project may be required to submit one or more Notice of Intent (NOi) to the U.S. EPA for coverage under the NPDES Stormwater Construction General Permit. A copy of the final NOI and Stormwater Pollution Prevention Plan (SWPPP) shall be submitted to the Northampton DPW for approval prior to the start of construction and prior to issuance of a building permit. M:\Stormwater Program\Stormwater Permits Internal\Permits_new applications\Agora Housing Laurel St.doc Page 2 of 3 3. The proposed Dry Well 1 located on Lot 4 has been designed with a depth of 0.67 feet, a 6 inch perforated pipe, and with no setback from the building. The DPW requests that the applicant redesign this structure in an alternate location with at least 10 foot separation from the building (per MA DEP guidance) and with a greater depth to improve its functionality. Within 60 days of the issuance of this permit, the applicant must submit a plan showing the revised location and design for approval by the DPW. cc. Planning Board c/o Office of Planning and Development Building. Department Conservation Commission c/o Office of Planning and Development M:\Stormwater Program\Stormwater Permits Internal\Permits_new applications\Agora Housing Laurel St.doc Page 3 of 3