Loading...
Haydenville Rd Cell Tower_Permit_20110804~ ., City of Northampton Department of Public Works STORMWATER MANAGEMENT PERMIT APPLICATION DECISION Project I Site Name: Northampton MA-5025 -Raw Land Cell Tower Project Street or Location I Assessor ID: 0 Haydenville Road, Leeds, MA I 11-002-001 Applicant Name: Global Tower Assets, LLC (H. Castagnaro) Applicant Address/Phone: 238 Littleton Road, Suite 205B. Westford, MA 01886 I 561-982-1955 Owner Name: Smith Vocational & Agricultural High School c/o City of Northampton Owner Address/Phone: 80 Locust Street, Northampton, MA 01060 Application Submission Date: ~7 /~2_6~/2_0_1_1 __________________ _ THE FOLLOWING ACTION BY THE NORTHAMPTON DEPARTMENT OF PUBLIC WORKS HAS BEEN TAKEN ON THIS APPLICATION BASED ON INFORMATION PRESENTED: Disapproval of the Stormwater Management Permit Application based on a determination within seven days of the receipt of the application that the application is administratively incomplete (see attached documentation). __ Approval of the Stormwater Management Permit Application. _x_ Approval of the Stormwater Management Permit Application subject to any conditions, modifications or restrictions required by the Department of Public Works (see below) __ Disapproval of the Stormwater Management Permit Application based upon a determination that the proposed plan, as submitted, does not meet the purposes set forth in the Northampton Stormwater Management. Standard Permit Conditions: 1. All clearing, grading, drainage, construction, and development shall be conducted in strict accordance with the following plans and information submitted with the application and as amended by any conditions attached to this permit: a. GTP (Global Tower Partners) Northampton MA-5025, 0 Haydenville Rd., Leeds, MA, Site Plans, Sheets T-1, C-1(1), C-1(2), C-01, C-02A, C-02B, C-02C, C-03A, C-03B, Z-1, Z-2, Z-3, Z-4, Z-5, Dated 7/7/2011, Stamped by Jesse M. Moreno, P.E., ProTerra Design Group, LLC. M:\Srormwater Program\Stormwater Permits lnternal\Permits_new applications\Haydenville Rd Cell Tower.doc Page 1 of3 b. Limited Stormwater Hydrology Report for Upgrade of a Gravel Access Road & Installation of a Telecommunications Facility MA-5025 Northampton, Dated July 21, 2011, Stamped by Jesse M. Moreno, P.E., ProTerra Design Group, LLC. c. Northampton MA-5025, Leeds, MA, Details Sketches SK-1 and SK-2, dated August 3, 2011, and submitted by Jesse M. Moreno, P.E., ProTerra Design Group, LLC. 2. The Northampton Department of Public Works (DPW) or its authorized representative shall be provided access to the property to conduct inspections before, during, and after construction activities as necessary. The applicant shall arrange with the DPW to schedule the following inspections: Initial Inspection, Erosion Control Inspection, Bury Inspection, and Final Inspection. The DPW may also conduct random inspections to ensure effective control of erosion and sedimentation during all phases of construction. 3. At the completion of the work, including construction of stormwater management facilities and landscaping, the applicant shall submit a statement to the DPW from a professional engineer of record in the Commonwealth of Massachusetts certifying that the materials and construction of the stormwater management system was constructed in accordance with the approved plans and will function as designed. All changes to the approved stormwater facilities shall be documented by a professional engineer of record in the Commonwealth of Massachusetts and approved by the DPW prior to submission of the certification statement described above. 4. Annual Reports that are stamped by a Registered Professional Engineer documenting the actions completed as required by the Operation, Maintenance and Inspection Agreement shall be submitted to the Northampton Department of Public Works by October 1st of each year (see Specific Condition 1 below). 5. If construction of the proposed stormwater system has not started within five years of the issue date of this permit, then the permit will expire and a new permit will be required. Construction is defined as clearing, grading, excavation, filling, and installation of drainage structures on the lots specified in this permit. Specific Permit Conditions: 1. Prior to issuance of a Building Permit or start of construction, the applicant or property owner(s) shall record an executed Stormwater Operation, Maintenance, and Inspection Agreement that is binding on all subsequent owners of land served by the private stormwater management facility by recording it in the land records of the Registry of Deeds. The maintenance schedule and responsibility for maintenance of the proposed stormwater management system must be adequately specified in Attachment A to this Agreement. This agreement shall be approved by the Northampton DPW and signed by the owner and the Mayor of Northampton. Section 22-85 of the Northampton Stormwater Management Ordinance provides additional guidance for the requirements of this agreement. 2. This project may be required to submit one or more Notice of Intent (NOi) to the U.S. EPA for coverage under the NPDES Stormwater Construction General Permit. A copy of M:\Stormwater Program\Stormwater Permits Internal\Permits_new applications\Haydenville Rd Cell Tower.doc Page 2 of 3 the final NOi and Stonnwater Pollution Prevention Plan (SWPPP) shall be submitted to the Northampton DPW for approval prior to the start of construction and prior to issuance of a building pennit. 3. The proposed stonnwater drainage system in the area of the proposed cell tower compound shall be completed in accordance with sheet Z-1 which specifies a 3 '6" Wide by 2' Deep Infiltration Trench outside of the southwestern and a portion of the southeastern fence line. 4. Prior to the start of construction test pits shall be conducted by a Certified Soil Evaluator or Certified Professional Soil Scientist in the area of the proposed infiltration trenches A and B to confirm at least a two foot separation between the seasonal high ground water and the bottom of the proposed trenches. Test Pit logs shall be submitted to the DPW for approval. 5. The proposed stonnwater management system is designed to mitigate peak stonnwater flows. If, after construction of the proposed system, the system is found to increase stonnwater flows to Haydenville Road or to adjacent properties, or cause increased erosion, the owner shall redesign and reconstruct the drainage system to prevent any increased and/or erosive stonnwater flows. 6. Prior to construction, the applicant must secure all necessary pennits and approvals from the Massachusetts Highway Department for construction work in the State Highway System layout and proposed stonnwater discharges to the stonnwater system owned and operated by the Commonwealth of Massachusetts. 7. All stonnwater systems shall be installed as proposed and stabilized prior to receiving drainage flows. cc. Planning Board c/o Office of Planning and Development Building Department Conservation Commission c/o Office of Planning and Development M:\Stormwater Program\Stormwater Permits lnternal\Permits_new applications\Haydenville Rd Cell Tower.doc Page 3 of3