Loading...
347 King St_Permit_20121213STORMWATER MANAGEMENT PERMIT APPLICATION DECISION City of Northampton Department of Public Works Project I Site Name: Northampton Volkswagen & Country Hyundai Project Street or Location I Assessor ID: 347 King St, Northampton, MA I 18D, 051 & 001 Applicant Name: Cosenzi Automotive Realty Limited Partnership Applicant Address/Phone: 40 Russell St, Hadley, MA I 413-570-1302 Application Submission Date:_,l,_,,l"-'/1~3'-'-/2=-0"-'1"-"2=---------------------- THE FOLLOWING ACTION BY THE NORTHAMPTON DEPARTMENT OF PUBLIC WORKS HAS BEEN TAKEN ON THIS APPLICATION BASED ON INFORMATION PRESENTED: Disapproval of the Stormwater Management Permit Application based on a determination within seven days of the receipt of the application that the application is administratively incomplete (see attached documentation). __ Approval of the Stormwater Management Permit Application. _x_ Approval of the Stormwater Management Permit Application subject to any conditions, modifications or restrictions required by the Department of Public Works (see below) __ Disapproval of the Stormwater Management Permit Application based upon a determination that the proposed plan, as submitted, does not meet the purposes set forth in the Northampton Stormwater Management. Standard Permit Conditions: 1. All clearing, grading, drainage, construction, and development shall be conducted in strict accordance with the following plans and information submitted with the application and as amended by any conditions attached to this permit: a. Site Plans, Northampton Volkswagen & Country Hyundai, 347 King St, Northampton, MA, Plan Sheets Tl.1, Ll.1, Ll.2, L2.1, L2.2, L4.1, L5.l, L5.2, L5.3, L5.4 dated 11/09/2012, Plan Sheets 11041 and L3.l dated 12/11/2012, Stamped by Kimberly M. Masiuk, P .E., Associated Builders, Inc. M:\Stonnwater Management Penni ts\ I Stonnwater Penni ts lntemal\Pennits _new applications\King St_347 _ VWHyundai\King St_347 _ VWHyundai_Pennit.doc Page I of3 b. Stormwater Report & Pollution Prevention Plan for Proposed Automobile Dealerships Northampton Volkswagen & Country Hyundai, 347 King St, Northampton, MA, Revised Dated November 9, 2012, Stamped by Kimberly M. Masiuk, P .E., Associated Builders, Inc. 2. The Northampton Department of Public Works (DPW) or its authorized representative shall be provided access to the property to conduct inspections before, during, and after construction activities as necessary. The applicant shall arrange with the DPW to schedule the following inspections: Initial Inspection, Erosion Control Inspection, Bury Inspection, and Final Inspection. The DPW may also conduct random inspections to ensure effective control of erosion and sedimentation during all phases of construction. 3. At the completion of the work, including construction of stormwater management facilities and landscaping, the applicant shall submit to the DPW as-built plans stamped by a professional engineer of record in the Commonwealth of Massachusetts and a statement from a professional engineer of record in the Commonwealth of Massachusetts certifying that the materials and construction of the storm water management system was constructed in accordance with the approved plans and will function as designed. All changes to the approved stormwater facilities shall be documented by a professional engineer of record in the Commonwealth of Massachusetts and approved by the DPW prior to submission of as-built plans and the certification statement described above. 4. Annual Reports that are stamped by a Registered Professional Engineer documenting the actions completed as required by the Operation, Maintenance and Inspection Agreement shall be submitted to the Northampton Department of Public Works by October 1st of each year (see Specific Condition 1 below). 5. If construction of the proposed stormwater system has not started within five years of the issue date of this permit, then the permit will expire and a new permit will be required. Construction is defined as clearing, grading, excavation, filling, and installation of drainage structures on the lots specified in this permit. Specific Permit Conditions: 1. Prior to the issuance of a Building Permit, the applicant shall record an executed Stormwater Operation, Maintenance, and Inspection Agreement that is binding on all subsequent owners of land served by the private stormwater management facility by recording it in the land records of the Registry of Deeds. The maintenance schedule and responsibility for maintenance of all components of the proposed stormwater management system must be adequately specified in Attachment A to this Agreement. The Post-Construction Stormwater Operation and Maintenance Plan Inspection and Maintenance Report submitted as Appendix K in the Stormwater Report must be revised as necessary and approved by the Northampton DPW. This agreement shall be approved by the Northampton DPW and signed by the owner and the Mayor of Northampton. Chapter 281 of the Northampton Stormwater Management Ordinance provides additional guidance for the requirements of this agreement. M:\Stormwater Management Permits\! Stormwater Permits Intemal\Permits_ new applications\King St_347 _ VWHyundai\King St_347_ VWHyundai_Permit.doc Page 2 of3 2. This project will be required to submit one or more Notice oflntent (NOI) to the U.S. EPA for coverage under the NPDES Stormwater Construction General Permit. A copy of the final NOI and Stormwater Pollution Prevention Plan (SWPPP) shall be submitted to the Northampton DPW for approval prior to the start of construction and prior to issuance of a building permit. 3. The proposed stormwater management system is designed to mitigate peak stormwater flows. If, after construction of the proposed system, the system is found to increase stormwater flows to adjacent properties or to the municipal storm drain system, the owner shall redesign and reconstruct the drainage system to prevent any increased stormwater flows to adjacent properties or the municipal storm drain system. 1z/rs /rz-, Date cc. Pl · g Board c/o Office of Planning and Development Building Department M:\Stonnwater Management Penni ts\ I Stonnwater Penni ts Intemal\Pennits _new applications\King St_34 7 _ VWHyundai\King St_347 _ VWHyundai_Pennitdoc Page 3 of3