30B-125 (3) re
g
CA>
i
A ---
BEAM BEAM POST POST
L LENGT COLINT SPACING
�. A Ir 10 I/2' 3 5'2 1/2'
Post s acing is measured nter-to-center. t r
Lit
oE5 Qjo1 (ACED $tEL FOOT
Nf�S A iJE DS rntN UrA A 0A
Beam Layout r.k.Miles
07/03/15 21 West
Scale: 1/4"= F 413-247-8300
I
J4 ONO'
City of Northampton 212 Main Street, Northampton, MA 01060
Solid Waste Disposal Affidavit
In accordance of the provisions of MGL c 40, S54, I acknowledge that as
a condition of the building permit all debris resulting from the construction
activity governed by this Building Permit shall be disposed of in a properly
licensed solid waste disposal facility, as defined by MGL c 111, S 150A.
Address of the work: Z'K A1xr"VC;W
The debris will be transported by: 4jc k;k' t
The debris will be received by: c
Building permit number: 5
Name of Permit Applicant ,5 �►�tfi
i
- I_57
Date Signature of Permit Applicant
City of Northampton
Massachusetts
DEPARTMENT OF BUILDING INSPECTIONS
212 Main Street • Municipal Building
Northampton, MA 01060
INSPECTOR
Louis Hasbrouck Chuck Miller
Building Commissioner Assistant Commissioner
HOME OWNER EXEMPTION ACKNOWLEDGEMENT
The State of Massachusetts allows the homeowner the right under 780CMR 108.3.4 to act as his/her
construction supervisor. The state defines "Homeowner" as, " Person(s) who owns a parcel on which
he/she resides or intends to be, a one or two family dwelling, attached or detached structures
accessory to such use and/or farm structures. A person who constructs more than one home in a two-
year period shall not be considered a home owner."
The building department for the City of Northampton wants any person(s)who seek to use the home
owner exemption, to act as their own construction supervisor, to be aware that by doing so you
become responsible for compliance with state building codes and regulations. The inspection
process requires that the building department be called to inspect work at various stages, which include
foundation/footings (before backfill), sonotube holes (before pour), a rough building inspection
(before work is concealed), insulation inspection (if required) and a final building inspection.
The building department requires these inspections before the work is concealed, failure to secure
these inspections can result in failure to obtain a certificate of occupancy until the work can be
inspected.
If the homeowner hires other trades to perform work (electrical, plumbing & gas)the homeowner will be
responsible to make sure that the trades hired secure their proper permits in conjunction to the building
permit issued, and that they get their required inspections. Failure of the individual trades to secure
the permits and inspections as required can DELAY the project until such time as the proper permits
and inspections are made
I, understand the above.
ome owner resident's signature requesting exemption)
I will call to sche ule all required building inspections necessary for the building permit issued to me.
Date_ r- /
Address of work location
The Commonwealth of Massachusetts
r Department of Industrial Accidents
Office of Investigations
x 600 Washington Street
Boston, MA 02111
~ www.mass.gov/dia
Workers' Compensation Insurance Affidavit: Builders/Contractors/Electricians/Plumbers
Applicant Information Please Print Legibly
Name (Business/Organization/Individual): /dre LLC
4
Address: I/_S
City/State/Zip: l 0)o e o Phone #: 111_7 __711 6 - 9 7_1K
Are you an employer? Chec the appropriate box: Type of project(required):
1.❑ I am a employer with 4. ❑ I am a general contractor and I
employees (full and/or part-time).* have hired the sub-contractors 6. F-1 New construction
2.KI am a sole proprietor or partner- listed on the attached sheet. 7. ❑ Remodeling
ship and have no employees These sub-contractors have g, ❑ Demolition
working for me in any capacity. employees and have workers'
insurance.t 9. ,Building addition
[No workers comp.comp. insurance
required.] 5. ❑ We are a corporation and its 10.0 Electrical repairs or additions
3.❑ I am a homeowner doing all work officers have exercised their 11.❑ Plumbing repairs or additions
myself. [No workers' comp. right of exemption per MGL 12.❑ Roof repairs
insurance required.] t c. 152, §1(4), and we have no
employees. [No workers' 13.❑ Other
comp.insurance required.]
*Any applicant that checks box#1 must also fill out the section below showing their workers'compensation policy information.
tHo meowners who submit this affidavit indicating they are doing all work and then hire outside contractors must submit a new affidavit indicating such.
$Contractors that check this box must attached an additional sheet showing the name of the sub-contractors and state whether or not those entities have
employees. If the sub-contractors have employees,they must provide their workers'comp.policy number.
I am an employer that is providing workers'compensation insurance for my employees. Below is the policy and job site
information.
Insurance Company Name:
Policy#or Self-ins. Lic. #: Expiration Date:
Job Site Address: City/State/Zip:
Attach a copy of the workers' compensation policy declaration page(showing the policy number and expiration date).
Failure to secure coverage as required under Section 25A of MGL c. 152 can lead to the imposition of criminal penalties of a
fine up to$1,500.00 and/or one-year imprisonment, as well as civil penalties in the form of a STOP WORK ORDER and a fine
of up to$250.00 a day against the violator. Be advised that a copy of this statement may be forwarded to the Office of
Investigations of the DIA for insurance coverage verification.
I do hereby certify under the pains and penalties ofperjury that the information provided above is true and correct.
Signature: Date:
Phone#: V1. - 3 3 o 91 7.5e�r
Official use only. Do not write in this area, to be completed by city or town official
City or Town: Permit/License#
Issuing Authority(circle one):
1.Board of Health 2.Building Department 3. City/Town Clerk 4.Electrical Inspector 5.Plumbing Inspector
6. Other
Contact Person: Phone#:
SECTION 8-CONSTRUCTION SERVICES
8.1 Licensed Construction Supervisor: Not Applicable £
Name of License Holder:
License Number
Address Expiration Date
Signature Telephone
9.Registered Home Improvement Contractor „ . , „ Not Applicable £
Compan Name 7— � Registration Number
Address Expiration Date
✓ �,-/ �..,�ts,., �"A cl OGU Telephone`//7--7,0 Y730/
SECTION 10-WORKERS'COMPENSATION INSURANCE AFFIDAVIT(M.G.L.c.162,§25C(6))
Workers Compensation Insurance affidavit must be completed and submitted with this application. Failure to provide this affidavit will result
in the denial of the issuance of the building permit.
Signed Affidavit Attached Yes. .. £ No...... £
11. Home"Owner:`Exemption
The current exemption for"homeowners"was extended to include Owner-occupied Dwellings of one(1) or two(2)families
and to allow such homeowner to engage an individual for hire who does not possess a license,provided that the owner acts
as supervisor.CMR 780, Sixth Edition Section 108.3.5.1.
Definition of Homeowner:Person(s)who own a parcel of land on which he/she resides or intends to reside,on which there
is,or is intended to be,a one or two family dwelling,attached or detached structures accessory to such use and/or farm
structures.A person who constructs more than one home in a two-year period shall not be considered a homeowner.
Such"homeowner"shall submit to the Building Official,on a form acceptable to the Building Official,that he/she shall be
responsible for all such work performed under the building permit.
As acting Construction Supervisor your presence on the job site will be required from time to time,during and upon
completion of the work for which this permit is issued.
Also be advised that with reference to Chapter 152(Workers'Compensation) and Chapter 153 (Liability of Employers to
Employees for injuries not resulting in Death)of the Massachusetts General Laws Annotated,you may be liable for person(s)
you hire to perform work for you under this permit.
The undersigned"homeowner"certifies and assumes responsibility for compliance with the State Building Code,City of
Northampton Ordinances,State and Local Zoning Laws and State,of Massachusetts General Laws Annotated.
Homeowner Signature.
SECTION 5-DESCRIPTION OF PROPOSED WORK(check all applicable)
New House ❑ Addition � Replacement Windows Alteration(s) Roofing ❑
Or Doors I]
Accessory Bldg. ❑ Demolition ❑ New Signs [❑] Decks [Dk Siding [❑] Other[❑]
Brief Description of Proposed
Work: IL i I 4r t iacked c�'P - 4)e ec— L2L /4 rh o
Alteration of existing bedroom Yes V No Adding new bedroom Yes '�: No
Attached Narrative Renovating unfinished basement Yes No
Plans Attached Roll -Sheet
ta:lf'New house and" addi ion t&exist ng.housing, complete the follownict:
a. Use of building:One Family _ Two Family Other
b. Number of rooms in each family unit: — Number of Bathrooms -�
c. Is there a garage attached?
d. Proposed Square footage of new construction. 94M /yy Dimensions /Z?, ),/a,
e. Number of stories?
f. Method of heating? Fireplaces or Woodstoves Number of each
g. Energy Conservation Compliance. —'"" Masscheck Energy Compliance form attached?
h. Type of construction 4j octal
i. Is construction within 100 ft. of wetlands? Yes No. Is construction within 100 yr. floodplain Yes No
j. Depth of basement or cellar floor below finished grade
k. Will building conform to the Building and Zoning regulations? _Yes No.
I. Septic Tank City Sewer Private well City water Supply
SECTION 7a-OWNER AUTHORIZATION-TO BE COMPLETED WHEN
OWNERS AGENT OR CONTRACTOR APPLIES FOR BUILDING PERMIT '
as Owner of the subject
property ,t
hereby authorize Sk7
to act on my behalf, in all matters relafive to wo uthorized by this building permit application.
SrgKafure of Owner Date
as Owner/Authorized
Agent hereby declare"t the state ents and information on the foregoing application are true and accurate,to the best of my knowledge
and belief.
Signed under the pains and penalties of perjury.
Print Name
Signature of Ow a Ag Date
~ ~
Section 4. ZONING AR Information Must Be Completed. Permit Can Be Denied Due To Incomplete Information
Existing Proposed Required by Zoning
Ibis coltinin to be filled in by
Building Department
Lot Size
Frontage
Setbacks Front P�-n7
Rear
Building Height
Bldg.Square Footage
Open Space Footage %
(Lot area minus bldg&pay d
#of Parking Spaces
(volume&Location)
A. Has a Special Permit/Vahance/Flnding ever been issued for/on the site?
NO 0 ' DON7KNOY 0 YES 0
|F YES, date isnued:
IF YES: Was the permit recorded at the Registry ufDeeds?
'
NO «~� uun| mxmn 0 ,c,
IF YES: enter Book and/or Document#
B. Does the site contain a brook, body of water urwetlands? NO e DON7 KNOW 0 YES 0
IF YES, has permit been orneed to beobtained from the Conservation Commission?
Needs to be obtained ��x~� �-�Obtained , Date Issued:
��
C. Dn any signs exist on the property? YES 0 NO
IF YES, describe size, type and location:
D. Are there any proposed changes to or additions of signs intended for the property? Y[5 0 NO 0
IF YES, describe size, type and location: |
E. Will the construction activity disturb(clearing, gradingexcavation,or filling)over 1 acre orioit part ofa common plan
' that will disturb over 1acre? YES NO 42~
|F YES,then a Northampton Storm Water Management Permit from the DPW iorequired.
|
"3 Deparfineht use only „ ,,
t City of Northampton
Building Department
F£�
°iKtf M'C IE "fit P 1, t .t t
212 Main Street SewerlSepttcAuaiCa5111ty
AUG 2 a Room 100
Northampton, MA 01060 Twa sits of 5#ructriraiPtans
M.hon 413-587-1240 Fax 413-587-1272 PIof/Site Plans` s I"` i
p, f w rat ,r
s r t �,� i
�tflerzSpeClfy � F, it ur, ,
E.
APPLICATI014'70/CONSTRUCT,ALTER,REPAIR,RENOVATE OR DEMOLISH A ONE OR TWO FAMILY DWELLING
SECTION 1 -SITE INFORMATION
1.1 Property Address: This section to be completed by office
Ll 6 t6� Map Lot Unit
t
' r
J t —
'— Zone Overlay D'strtct '
It m St Dlstnct CB Distract -,.
SECTION 2-PROPERTY OWNERSHIP/AUTHORIZED AGENT
2.1 Owner of Record:
Name(Print) Current Mailing Address:
yi_3-- 5.35-20.29
yt'�f 3(.L7 ` ' G1.// i• Telephone
Signature
2.2 Authorized Agent:
Name(Pri Current Mailing Address:
Signature Telephone
SECTION 3-ESTIMATED CONSTRUCTION COSTS
Item Estimated Cost(Dollars)to be Official Use Only
completed by ermit applicant
1. Building (a)Building Permit Fee
2. Electrical (b) EstimatedTotal Cost of
Construction from 6
3. Plumbing Building Permit Fee
4. Mechanical(HVAC)
5. Fire Protection
6. Total=(1 +2+3+4+5) .2 U Check Number
ThlSr Section For Official Use Only
Date
Building Permit Number: Issued:
Signature:
Building Commissioner/Inspector of Buildings Date
File#BP-2016-0212
APPLICANT/CONTACT PERSON PARZYBOK EZRA J&BROOKSLEY E WILLIAMS
ADDRESS/PHONE 30 NORWOOD AVE FLORENCE01062(413)585-8448 O
PROPERTY LOCATION 46 NORWOOD AVE
MAP 30B PARCEL 125 ZONE URB
THIS SECTION FOR OFFICIAL USE ONLY:
PERMIT APPLICATION CHECKLIST
ENCLOSED REQUIRED DATE
ZONING FORM FILLED OUT dzn
Fee Paid 0
Building Permit Filled out
Fee Paid
Typeof Construction: CONSTRUCT 12 X 12 DECK
New Construction
Non Structural interior renovations
Addition to Existing
Accessory Structure
Building_Plans Included:
Owner/Statement or License 179788
3 sets of Plans/Plot Plan
THE FOLLOWING ACTION HAS BEEN TAKEN ON THIS APPLICATION BASED ON
INF"MATION PRESENTED:
Approved Additional permits required(see below)
PLANNING BOARD PERMIT REQUIRED UNDER:§
Intermediate Project: Site Plan AND/OR Special Permit With Site Plan
Major Project: Site Plan AND/OR Special Permit With Site Plan
ZONING BOARD PERMIT REQUIRED UNDER: §
Finding Special Permit Variance*
Received&Recorded at Registry of Deeds Proof Enclosed
Other Permits Required:
Curb Cut from DPW Water Availability Sewer Availability
Septic Approval Board of Health Well Water Potability Board of Health
Permit from Conservation Commission Permit from CB Architecture Committee
Permit from Elm Street Commission Permit DPW Storm Water Management
Demolition Delay
Z /-,- ol 2-4(
Signature of Building Official Date
Note: Issuance of a Zoning permit does not relieve a applicant's burden to comply with all zoning
requirements and obtain all required permits from Board of Health,Conservation Commission,Department
of public works and other applicable permit granting authorities.
* Variances are granted only to those applicants who meet the strict standards of MGL 40A. Contact Office of
Planning&Development for more information.
46 NORWOOD AVE BP-2016-0212
GIs#: COMMONWEALTH OF MASSACHUSETTS
Map:Block: 30B- 125 CITY OF NORTHAMPTON
Lot: - PERSONS CONTRACTING WITH UNREGISTERED CONTRACTORS
Permit: Buildinq DO NOT HAVE ACCESS TO THE GUARANTY FUND (MGL c.142A)
Category: Deck BUILDING PERMIT
Permit# BP-2016-0212
Project# JS-2016-000360
Est. Cost: $2000.00
Fee: $50.00 PERMISSION IS HEREBY GRANTED TO:
Const. Class: Contractor: License:
Use Group: SKY AGNITTI 179788
Lot Size(sq. ft.): 13599.00 Owner: PARZYBOK EZRA J&BROOKSLEY E WILLIAMS
Zoning. URB Applicant: PARZYBOK EZRA J & BROOKSLEY E WILLIAMS
AT. 46 NORWOOD AVE
Applicant Address: Phone: Insurance:
30 NORWOOD AVE (413) 585-8448 (�
FLORENCEMA01062 ISSUED ON.812812015 0:00:00
TO PERFORM THE FOLLOWING WORK.CONSTRUCT 12 X 12 DECK
POST THIS CARD SO IT IS VISIBLE FROM THE STREET
Inspector of Plumbing Inspector of Wiring D.P.W. Building Inspector
Underground: Service: Meter:
Footings:
Rough: Rough: House# Foundation:
Driveway Final:
Final: Final:
Rough Frame:
Gas: Fire Department Fireplace/Chimney:
Rough: Oil: Insulation:
Final: Smoke: Final:
THIS PERMIT MAY BE REVOKED BY THE CITY OF NORTHAMPTON UPON VIOLATION OF
ANY OF ITS RULES AND REGULATIONS.
Certificate of Occupancy Signature:
FeeType: Date Paid: Amount:
Building 8/28/2015 0:00:00 $50.00
212 Main Street,Phone(413)587-1240, Fax: (413)587-1272
Louis Hasbrouck—Building Commissioner