Loading...
23D-071 (3) 13/52 Ra81RFDAllowable Uplift Wind Fora Win Rail Soon k1 70 80 90 100 110 1 130 150 170 200 240 300 1 380 480 650 900 10 13/52 Rail 3.5 13/52 Rail 4.0 13/52 Rail 4.5 13152 Rail 510 13/52 ROR 53 1352 Rall 6.0 13/52 Ball 6.5 1 113/52 Rail 7.0 7.3/52 Rail 7.5 13/52 Rail 0.0 13!52 Rao 0.5 13152 Rail 9.0 13/52 Roll 9.5 LV52 Roll 10.0 13/52 RaR 13/52 Rail IAFD Allowable Uplift span(Ft) Form(lb) 3.0 1764 3.5 1480 4.0 1243 4.5 1101 5.0 960 5.5 838 6.0 7S6 6.5 690 7.0 651 7.5 590 8.0 533 0.5 510 9.0 480 9.5 444 10.0 1 402 13/52 Rail Zone 3 Span Chart Exposure Wind Ground Snow Load Speed 0 psf 10 psf 20 psf 30 psf 40 psf SO psf 60 psf 70 psf 80 psf 90 Vsf 85 65 6.5 6.5 6.0 5.5 5.0 4.5 4.0 4.0 3.5 100 &0 5.0 &0 IS 5.0 4.5 4.5 4.0 4.0 3.5 110 515 5.5 5.5 55 SA 4.5 4.S 4.0 4.0 3.5 Category 120 5.0 5.0 5.0 5.0 5.0 4.5 4.5 4.0 4.0 3.5 8 130 5.0 I S.0 5.0 1 5.0 5.0 4.5 4.5 4.0 4.0 3.5 140 4.5 45 4.5 45 4.5 4S CS 4.0 4.0 3.5 150 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 3.5 160 4.0 4.0 4.0 4.0__j 4.0 1 4.0 4.0 4.0 4.0 3.5 Exposure Wind Ground Snow Load S eed 0 psf 10 sf 20 sf 30 psf 40 sf 50 sf 60 sf 70 sf 80 sf 90 psf Exposure Wind Ground Snow Load Speed 0 psf 10 psf 20 osf 30 psf 40 psf 50 psf 60 psf 70 psf 80 pst 90 psf 3S 35 Y jL 3S' D Ilia 4s # 3 3s _ 3.5 i6t1 3A j 3:0 a. The table above ONLY includes 13-52 rail capacity check.It does not include roof capacity check b. wind importance factor per ASCE7-05 C. Topographic factor,kit is 1.0 d. Maximum mean roof height is 30 ft. e. Average parapet height Is 0 ft f. Roof pitch is between 7 degree and 27 degree R. Maximum solar panel weight is 60 ibs h. Height of solar panel is between 2"and 10"to roof i. Deflection criteria of L/60 per AC428 Section 4.3 j. The wind speeds above are AS values k. Mounting Systems,Inc.strongly recommends a maximum span of 8 feet,but in any case,not to exceed the maximum span indicated on the chart I. The span length applies to a seismic design category E or less m. Maximum cantilever is L/3 13/52 Rail Zone 2 Span Chart Exposure Wind Ground Snow Load Speed 0 psf 10 sf 20 sf 30 sf 40 psf 50 f 60 sf 70 sf 80 sf 90 sf as 8.5 810 7.0 6.0 5.5 5.0 4.5 4.0 4.0 3.5 loo 7.5 7.5 7.0 6.0 5.5 5.0 4.5 4.0 4.0 3.5 110 7.0 7.0 6.5 6.0 IS 5.0 4.S to U 3.5 Category 120 1 6.5 6.5 6.5 5.5 SA S.0 4.5 4.0 4.0 3.5 8 130 6.0 6.0 6.0 5.5 5.0 4S 4.5 1 4.0 4.0 3.5 140 5.5 5.5 5.5 5.5 5.0 15 4.5 4.5 4.0 4.0 3.5 0 5.0 5.0 5.0 5.0 5.0 4.5 4.S 1 44 1 4.0 3.5 160 S.0 S.0 5.0 5.0 5.0 4.5 4.5 4.0 4.0 35 Exposure Wind Ground Snow Load Speed 0 psf 10 sf 20 psf 30 psf 40 psf 50 psf 60 sf 70 sf 80 psf 90 psf Exposure Wind Ground Snow Load Speed 0 psf 10 psf 20 psf 30 sf 40 psf 50 sf 60 sf 70 f 80 sf 90 sf .5 C�I"i 12 p 3 S. E ±E5 45" -ti 35 160 40 .,. 40 4.Q 4tf. 40, 4:0`. a. The table above ONLY includes 13-52 rail capacity check.It does not include roof capacity check b. Wind importance factor per ASCE7-05 C. Topographic factor,kzt is 1.0 d. Maximum mean roof height is 30 ft. e. Average parapet height is 0 ft f. Roof pitch is between 7 degree and 27 degree g. Maximum solar panel weight Is 60lbs h. Height of solar panel Is between 2"and 10"to roof 1. Deflection criteria of L/60 per AC428 Section 4.3 j. The wind speeds above are ASD values k. Mounting Systems,Inc.strongly recommends a maximum span of 8 feet,but in any case,not to exceed the maximum span indicated on the chart 1. The span length applies to a seismic design category E or less M. Maximum cantilever is 1-13 13/52 Rail Zone 1 Span Chart Exposure Wind Ground Snow Load Speed 0 psf 10 psf 20 psf 30 psf 40 psf 50 psf 60 psf 70 psf 80 psf 90 psf 85 10.0 8.5 7.0 6.0 5.5 5.0 4.5 4.0 4.0 3.5 100 10.0 8.5 7,0 6.0 5.5 5.0 4.5 4.0 4.0 3.5 110 9.5 8.5 7.0 6.0 5.5 5.0 4.5 4.0 4.0 3.5 Category 120 9.0 8.5 7.0 6.0 5.5 5.0 4.5 4.0 4.0 3.5 B 130 8.0 8.0 7.0 6.0 5.5 5.0 4.5 4.0 4.0 3.5 140 7.5 7.5 6.5 6A 5.5 5.0 4.5 4.0 4.0 35 150 7.0 7.0 6.5 6.0 5.5 5.0 4.5 4.0 4.0 3.5 160 7.0 7.0 6,5 6.0 5.5 5.0 4.5 4.0 4.0 3.5 Exposure Wind Ground Snow Load Speed 0 sf 10 psf 20 psf 30 psf 40 psf 50 sf 60 psf 70 sf 80 sf 90 psf Exposure Wind Ground Snow load Speed 0 psf 10 psf 20 psf 30 psf 40 psf 50 p5f 60 psf 70 psf 80 psf 90 psf 85 9A 8.5 7.0 6.0 5.5 5.0 4.5 4.0 4.0 3.5 100 8.5 8.0 7.0 6.0 5.5 5:0 4.5 4.0 4.0 3.5 110 7 _, 7„5 7. :... 4 Category 120 7XI 7.0 6.5 6.0 5.5 $A 4 0 4,0 .:35 !. D 130 6.5 6.5 6.5 6.0 55 5.0` +f5 140 64 6.0 6.0 5S S.0 45 4S 4.(f 3.5 150 5S 5S 5S 5 50 IfS _';. ' ,; 4t1`.., :., 40 160 5.5 5.5 5.5 5.5 5.0 1 , 4.5 -4S 4.01 a. The table above ONLY includes 13-52 rail capacity check.It does not include roof capacity check b. Wind importance factor per ASCE7-05 C. Topographic factor,kzt is 1.0 d. Maximum mean roof height is 30 ft. e. Average parapet height is 0 ft f. Roof pitch is between 7 degree and 27 degree g. Maximum solar panel weight is 60lbs h. Height of solar panel is between 2"and 10"to roof i. Deflection criteria of L/60 per AC428 Section 43 I. The wind speeds above are ASD values k. Mounting Systems,Inc.strongly recommends a maximum span of 8 feet,but in any case,not to exceed the maximum span indicated on the chart 1, the span length applies to a seismic design category E or less m. Maximum cantilever is L/3 irw�N� IrNN�r!l�'C STRUCTURAL ENGINEERS July 21,2014 Mounting Systems,Inc. 820 Riverside Pkwy Sacramento,California 95606 TEL: (855) 731-9996 FAX:(916)287-2269 Attn.:Mounting Systems,Inc.-Engineering Department Re: Engineering Certification for the Mounting Systems, Inc. 13/52 Rail Alpha+System PZSE, Inc.-Structural Engineers has reviewed Mounting Systems, Inc.'s 13/52 rail span charts,rail allowable uplift wind force and performed rail component capacity check including L foot bracket,end clamp and mid- clamp.All information,data and analysis contained within the Mounting Systems, Inc.rail span charts are based on,and comply with Mounting Systems, Inc.'s A1pha Engineering and Technical Data and the following codes: 1. Minimum Design Loads for Buildings and other Structures,ASCE/SEI 7-05 2. 2009 International Building Code,by International Code Council, Inc. 3. 2005 Aluminum Design Manual,by The Aluminum Association 4. AC428,Acceptance Criteria for Modular Framing Systems Used to Support Photovoltaic(PV)Panels, November 1,2012 by ICC-ES This letter certifies that the loading criteria and design basis for the Mounting Systems,Inc. 13/52 rail span charts,rail allowable uplift wind force table and rail components capacity check are in compliance with the above document and codes. If you have any questions on the above,do not hesitate to call. Sincerely, SH OF gyq.c_ PAUL K. ZACHER RUCTURAL Paul Zacher,SE-President No,50100 GISTS SSlONM_ EXP 6/30/703.6 8150 Sierra College Boulevard,Suite 150 • Roseville,CA 95661 • 916.961.3960 P • 916.961.3965 • www.pzse.com 2/20/2015 Power Optimizer I SolarEdge Feature highlights of SolarEdge Power optimizers: • Per-module Maximum Power Point Tracking(MPPT) • Superior efficiency(99.5%peak efficiency,98.8%weighted efficiency) • Mitigates all types of modules mismatch-loss,from manufacturing tolerance to partial shading • Designed for extreme environmental conditions • 25 year reliability and warranty • Advanced,real-time performance measurement • Automatic module DC voltage shut-down for installer and firefighter safety • Embedded by module manufacturers,or connected by installers to c-Si and thin-film modules SolarEdge Technologies Inc.®All Rights Reserved Careers I Contact I Subscribe I RSS Feeds I Terms 8 Conditions http://www.solaredge.us/groups/us/powerbox-power-optimizer 2/2 2!2012015 Power Optimizer I SdarEdge Monitoring Portal Login I Alliance Program English(North America) Search Follow Us CORPORATE SOLUTIONS PRODUCTS TO ORDER SERVICE MEDIA WW is __u - •� !� Power Optimizer Inverter Monitoring Power Optimizer recommend share `,9 SolarEdge Power Optimizers The SolarEdge power optimizer is a DC/DC converter which is connected by installers to each PV module or embedded by module manufacturers, replacing the traditional solar junction box. The SolarEdge power optimizers increase energy output from PV systems by constantly tracking the maximum power point (MPPT) of each module individually. Furthermore, the power optimizers monitor the performance of each module and communicate performance data to the SolarEdge monitoring portal for enhanced,cost-effective module-level maintenance.Each power optimizer is equipped with the unique SafeDCTm feature which automatically shuts down modules'DC voltage whenever the inverter or grid power is shut down. The MPPT per module allows for flexible installation design with multiple orientations,tilts and module types in the same string. When working with SolarEdge Inverters,SolarEdge power optimizers automatically maintain a fixed string voltage,allowing installers even greater flexibility with longer strings and strings of different lengths in order to design optimal PV systems. The SolarEdge power optimizers are compatible with c-5i and thin-film modules and have a 25 year warranty. The following power optimizer models are available: E-WlesMule Add-Qn EgnuMmigns Connected by installers to the PV module and compatible with a wide range of modules I Power Optimizer P Model d Module Power Module Voc t E P300 1 530OW 1<48V 1 P400 i 5400W <80V P405 5405W <125V Download datasheet P-Series Commercial Power Outhniz�ar Commercial solution connecting two modules per power optimizer Power Optimizer Model Module Power ? Module Voc s P600 <_600W` ? <96V P700 5700W` <125V Rated combined STC power of 2 modules connected in series.Module of up to+5%power tolerance allowed. Download datasheet http://www.solaredge.us/groups/us/powerbox-power-optimizer 1/2 =es Single Phase Inverters for North America so I a r SE3000A-US -US/SE5000A-US/SE6000A-US/ SE760OA-US/SE1000OA-US/SE1140OA-US SE30DOA-US SE380OA-US SES000A-US SE6000A-US SE760GA-US SE10000A-US SE1140OA-US OUTPUT Nominal AC Power Output 3000 3800 5000 6000 7600 9980 @ 208V 11400 VA 10000,@ 240V. Max.AC Power Output 3300 4150 5400 is 208V 6000 8350 10800 @ 208V 12000 VA 5951);a7290V _10950,(a1240V AC Output Voltage Min:Nom.-Max!') 183-208-229 Vac AC Output Voltage Min.-Nom-Max.,,, 211-240-264 Vac AC Frequency Min.-Nom:Max!') S9.3-60-60.5(with HI country setting 57-60-605) Hz 24 O'266 48 @ 208V Max.Continuous Output Current 12.5 16 25 32 4715 A GFDI t A Utility Monitoring,Islanding Protection,Country Configurable Thresholds Yeti yes INPUT Recommended Max.DC powern' 3750 4750 6250 7500 9500 12400 14250 W VC) .. .. .. Transformer-less,Ungrounded Yes Max.Input Voltage Soo Vdc Nom.DC Input Voltage 325 @ 2018V./.31510(4)240V Vdc Max.Input Current"') 95 13 16.5 @ 2C8V 18 23 33 @ 208V 343 Adc 15:5 @ 240V 30.5.,@ 240V Max.Input Short Circuit Current 45 Adc Reverse-Polarity Protection Yes Ground-Fault Isolation Detection 600ku Sensitivity Maximum Inverter Efficiency 97.7 98.2 98.3 98,3 98 98 98 CEC Weighted Efficiency 97.5 98 97 5 @ 208V 97.5 97..5 97 @ 208V 975 %98 @ 240V 97.5 @ 240V Nighttime Power Consumption <25 <4 W ADDITIONAL FEATURES Supported Communication Interfaces R5485,RS232,Ethernet,2igBee(optional) Revenue Grade Data,ANSI C12.1 Optional"' Rapid Shutdown—NEC 2014 690.12 Functionality enabled when SolarEdge rapid shutdown kit is installed(" STANDARD COMPLIANCE Safety UL1741,UL1699B,UL1998,CSA 22.2 Grid Connection Standards IEEE1547 Emissions FCC part 15 class B INSTALLATION SPECIFICATIONS AC output conduit size/AWG range 3/4"minimum/16-6 AWG 3/4"minimum/8-3 AWG ................................ ...... DC input conduit size/N of strings/ AWG range, ,,. 3/4"minimum/1-2 strings/16-6 AWG 3/4"minimum J 1-2 strings/14-6 AWG .... ... _............. .. Dimensions with Safety Switch 30.5 x 12.5 x 7/ 30.5 x 12.5 x 7.5/ in/ 305x12.5x10.5J775x315x260 (HxWxD), 775_x.31S,x 172 775 x.315 x 191, rnm Weight with Safety Switch 51 2/23.2 I 54.7/24.7 88 4/40.1 lb/kg .... .. ......1 ....... ........... Cooling Natural Convection Fans(user replaceable) Noise <25 <50 dBA Min.-Max.Operating Temperature 13 to+140/-25 to+60(-40 to+60 version availablelbl) 'F/'C Range Protection Rating NEMA 3R Fnr other regional settings please contact SolarrdRe support Limned to 12S%for locations where the yearly average high temperature is above 77'F/75Y and to 13S%for locations where it is below 77"F/2S'C I detailed lnronnation,refer to hltua/www solaredee usifiles/udfs/inverter do overaizlna auidepdf 'I A higher current source may be used;the inverter will limit its input current to the values stated °I Revenue grade inverter R/N:5ExxxxA-US000NNR2 Rapid shutdown kit P/N:SE1000-RSD:SS °j.411 version P/N:5ExxxxA.U5000NNU4 SkA solar=ee • SolarEdge Single Phase Inverters For North America SE3000A-US/ SE380OA-US/ SE5000A-US/ SE6000A-US/ SE760OA-US/ SE10000A-US i SE1140OA-US s yertpr s i - ,. X The best choice for SolarEdge enabled systems Integrated arc fault protection(Type 1)for NEC 2011 690.11 compliance Superior efficiency(98%) Small,lightweight and easy to install on provided bracket Built-in module-level monitoring Internet connection through Ethernet or Wireless Outdoor and indoor installation Fixed voltage inverter, DC/AC conversion only Pre-assembled Safety Switch for faster installation Optional—revenue grade data,ANSI C12.1 USA GERMANY-ITALY-FRANCE-IAPAN-CHINA-AUSTRALIA-THE NETHERLANDS-ISRAEL www.SOlaredge.us solar=es So larEdge Power optimizer Module Add-On for North America P300 / P400 / P405 P300 P400 P405 (for 60-cell modules) (for 72&96-cell modules) (for thin film modules) INPUT Rated Input DC Power0i 300 400 405 W Absolute Maximum Input Voltage 48 80 125 Vdc (Voc at lowest temperature) MPPT Operating Range 8,48 8 80 12.5 105 Vdc Maximum Short Circuit Current(Isc) 10 Adc Maximum DC Input Current 12.5 Adc ......... .I .................... ximum Efficiency 99.5 % Weighted Efficiency 98.8 % Overvoltage Category 11 OUTPUT DURING OPERATION(POWER OPTIMIZER CONNECTED TO OPERATING SOLAREDGE INVERTER) Maximum Output Current 15 Adc Maximum Output Voltage 60 85 Vdc OUTPUT DURING STANDBY(POWER OPTIMIZER DISCONNECTED FROM SOLAREDGE INVERTER OR SOLAREDGE INVERTER OFF) Safety Output Voltage per Power Optimizer 1 Vdc STANDARD COMPLIANCE EMC FCC Part15 Class B,IEC61000-6-2,IEC61000-6-3 Safety IEC62109-1(class II safety),UL1741 RoHS Yes INSTALLATION SPECIFICATIONS Maximum Allowed System Voltage 1000 Vdc Pxxx-2 series 141 x 212 x 40.5/5.55 x 8.34 x 1.59 mm/in Dimensions(W x L x H) 128x152x27.5/ 128x152x35/ 128x152x48/ PXXX-5 series mm/in 5x5.97x1.08 5x5.97x1.37 5 x5.97x1.89 Pxxx-2 series 950/2.1 gr/lb Weight(including cables) Pxxx-5 series 770/1.7 930/2.05 I 930/2.05 gr/lb Input Connector MC4 Compatible Output Wire Type/Connector Double Insulated;MC4 Compatible ...........I. ....... .....I.. Output Wire Length 0.95/3.0 1.2/3.9 m/ft Operating Temperature Range -40-+85/-40-+185 'C/T Pxxx-2 series IP65/NEMA4 Protection Rating I - Pxxx-S series IP68 NEMA6P Relative Humidity 0-100 % °I Hated SIC power of the module Module of upta+5%power tolerance allowed PV SYSTEM DESIGN USING SINGLE PHASE THREE PHASE 208V THREE PHASE 480V A SOLAREDGE INVERTER"' Minimum String Length 8 10 18 (Power Optimizers) Maximum String Length 25 25 50 (Power Optimizers) Maximum Power per String 5250 6000 12750 W Parallel Strings of Different Lengths Yes or Orientations "I It is not allowed to mlx P405 with P300/P400/P600/P700 In one string 71i • solar - • SolarEdge Power Optimizer Module Add-On For North America P300 / P400 / P405 • r • PV power optimization at the module-level — Up to 25%more energy - Superior efficiency(99.5%) — Mitigates all types of module mismatch losses,from manufacturing tolerance to partial shading — Flexible system design for maximum space utilization — Fast installation with a single bolt — Next generation maintenance with module-level monitoring — Module-level voltage shutdown for installer and firefighter safety USA - GERMANY - ITALY FRANCE - JAPAN - CHINA - ISRAEL - AUSTRALIA www.solaredge.us r � , r, r „ r.. `t 'tr ti R ilt !`It 5 e , n, n � �r r,lr t 't)t�(aWf I'll raerrt� 1 Al F r , � 3. S f2 tlll.ai STi! �� l J c,l, ;it q, r r f v.., tt ti It tit it tt• .+ c c >. �r. r .i rn 4 t. J .n n!+`r. .a Iti Vi­ Fnf =rrs r_t.�, } rt It t,F r,t>c r,.,. I,.i,':rz.. - r r �� ) o h o. �r✓r tt �ntt t 1r t t of r t f •.v �1t r x ..t r,, ( n 1'af'fr,,-1a"wrr !)I flfe irt, urd,;n<i ,1 t tat,v, .t ll trc t i t d i s t.,i t 1!,,A 1 14 S k i i { 1 a -v1}F}C3[ It, yr .ri -rl3 S' ` Iiyy n n r -ct .,� t e� 1 r � t i h „` ,r. s rr lr r t...i t o } {te�itsot uu mn ;Ort ur , ., ., u,r .;•ier, ,,,! _; s ,wtl 11 I ill °t_ 11,10:on , v itc ?tl. yX7 F (If Sf}( 1iz-1� R(.1 t r� . .t-- ,v c n t n r !ttc �r a s sic x` r' K , .r Shrrain nu 1'avuurrf t .£ n, .,n ,f 'tcr ( u.;chat r t a t n A r rr f t nid I W 1 `. I c 0,11 14 i 11a ,oli f+ p Its i - t k n,t t. x !-t d, oh, in,2 i , rat 1 d o r i c u l" i F it, d'.tt r r c r eM W ,Itit t cr t�.. , ,1 r ! <t �-.[ - , u cr t3; f h. r i c r ft.• t ce '11an Jilt, ilc ?a.tt c fort n 0.pR,a OttS lild 4"-1Rt tiR ( \EZ 1 [�( 'S i.. lUI ti. (If C,41.i( 1 "rrHti..t[It Et 1" 1 r 7I In, ..n.,rt Y ,.it It )e:tt.r 1'3 't N )r l' rt, ,,r`,i, r, m..,!�.h, -;� t m i 0 1,. 1 um , r. ub r ru- 1 I,xf i,c u i t M j^t c I Qnt , t, r tad oatt, '(hr t(r :vtr h,:t....:r l i. t t `` t v �, i a t 1 r of w 1 r r 11(cure 1 v m o J - 11 .i, s u : , �dti 1 1 t r t .n t it r' t" n..'t"Niorl ,r.�t:cr., x .i �.c , ..r r it tv af..,cu�.Miri.;,+ttut,I,,<l), n c < ;L c .: t d t o i,n t m R 1 to ia ld- Ii. 0M,♦FRStltt OFSY t711 4,,t a r 5 il .t., ti.."A" s... v c:....ti tll.�e: 3cd ,,.n tri. 1, r i E ~i i .,J t > t r ,-. v a t n ,tit I'Mtc,i lymrl by , ,mt.x,i t cu h ri.> . > t It N11r, i 1 ,rr it:, t Cr i r I t n r t I 't the 1 1 it}i hat r , c,, ll nrt d ,t t t r GC p s t r 1111 1 n s a ! tr tt r n t t{,,t 1, l"', u un r tt.rc t. t;, r r tl t t t ah r, o r 1 r r d t t l r e,r t 7 1 ,7 r t t c n r tn2 rx 1,t •� ( i t Alm n c +t r, t t n r c n t i sa 1 i r t o tst nl r r t ah t t ., 7 t_' t r 1 lr u s r+ irt,Q lv,wd l, r.. nu tt r 1 [ :,,,r,, of t I > t I ri b f I r + ,.,, e n .i'r�r t ,t r r,..rti� t „Nt .i t n. t ,,, „i. ,it ,r;,, ,n, t it rtS i ,) ar t ti111i�SSUY L)FS71RIi 73'7 4 .h c t m 1C a , r r , r_ a. 1 -, i t ht r , ,nr t ),I l r ); t I,I ,r, t lt tc._a 11 I it I . r i,r n t n n h t i t�,Kr :t- r a n r .tf' r :�.. }t,( rott e r I'd I r I a .v"r,101.1 1t Jr ! r5t t 1 r ( rl.; ili Y r r( 't t'. 'i tt" t1 r t r c .r .rd h t It ! ,>..: (,a ,-{.i i .< .r, ,tit r, ui r n r ,1&i ,itl a ne .7,t .. L ... .. ..,.n ...,a..,a. ,. r` r` ` ' "It S(3i"r4'iT t.ST ANDI (;�.�;AY 1312 E,it.ff O[ IIEiS A(iRF3 Ill F T ra+, 1 nd.ha t an t r,�:a*n .. rd Y i:1(I�t:RI !.)f 1 f 1F: SYS 1 E1L OR 1vY till( 1,16f,111 l tit I ar tr a I f!A 1 ( .Yi Sf fa \N1' I .,.i( R`l OR LOSS (l f IE i 1(1:[R lR1 ti1FR. n R(}r'ERS l)1ti]\{if, P'tRSO'v.li. {4.l( R1 OR (}I.1l Hr TO a n^ �� ( 1{rf2Lsf': I f[.A f f,tif 1 SS SC{:ff a 2r_ ttt. 4.ine 1.Sti(AI Ill ;'I\[) ti( c- �:� t e t `11( R ( OR LOSS ���S { A(,SP3) M' A P'I,R FY'S (iROSS t Sf t 3. (6f "`k f R 1i 1), ()R A]f I f I I f\ RY" SCCIf r u. P f ("5' S f 1 113 LF!Y \R]Sl\�C ()1 "t Of OR Rf.i_A!T1,(4 T( �'il ua,l.t c 'Prolrtrtr Tw.uts/rec no o—i'!ial IS;' A0 I_41A F FXCf 1) THE re t .- at .+ la r -,y_t tr ..•. :3k( �,! Lf PAYVIItI YO( ttif) LtF sVIRII. llIA1' 11 VS 14 A I AiR R1lPfRf:,,f ti,T.lFlO\ O1 1Iff D IIIA(rf 5 o r m1 cr (hill Ytit,OR WF' i XP[!{"f r(}Iti?{`i K IN Tf1L(,1SF{)} �1ti1 ,r+c F at "i? ntc t .vui t r 1^ i a.� h:,t i ,f"n (W I ;)SS Ift Rf,[,`,)( R. not id s = i llt rbh�a r ,i c , i eatcr. .It v {;L:wo Sfi;AIA. lil. MADI 10 YOf VI,A[V,,T US(3R -Y 'Y 1 i)any aspect of the relationship between You and Us,whether based in contract,tort,statute or any other legal theory;(ii)this Agreement or any other agreement concerning the subject matter hereof; (iii) any' breach, delault, or termination of this A-reemenC and (iv)the nterpretation,validity,or enforceability of this Agreement,including the determination of the scope or applicability oFthis Section 5(each,a '`Dispute"). Prior to commencin-,arbitration s party must first send a written"Notice of Di s ute'via certified mail to the other party. The Notice of Dispute must describe tthc nature and Masts for the Dispute and the relief sought. IfpYou and We are unable to resolve the Dispute within thirtv (30) days. then either party, may commence arbitration- The arbitration shall be administered by iAMS pursuant to its Streamlined Arbitration Rules and Procedures tavailahle at: http,,`www amsadr.comirules-streamliiied-arbitration the-.IA MS Rules")and under the rules set forth in this Agreement. Itie arbitrator shall be boun�by the terms of this Agreement. No matter the circumstances,the arbitrator shalt not award punitive, special,exemplary, indirect or consequential damages to either party. If You initiate arbitration, You shall be responsible to pay S2S0. 411 attorneys' tees_travel expenses, and other costs of the arbitration shall be borne by You and Us in accordance with the.)AMS Rules and applicable law. The arbitration shall be conducted at a mutually agreeable Location near Your Property. Judgment on an arbitration award may e entered in any court of competent jurisdiction. Nothing in this Section 5 shall preclude You or We from seeking provisional remedies in aid of arbitration from a court of competentjurisdiction. NOTICE:BY INITIALING IN THE SPACE BELOW YOU ARE AGREEING TO HAVE ANY DISPUTE ARISING OUT OF THE MATTERS INCLUDED iN THE"ARBITRATION OF DISPUTES"PROVISION DECIDED BY NEUTRAL ARBITRATION AS PROVIDED BY APPLICABLE LAW AND YOU ARE GIVING UP ANY RIGHTS YOU MiGHT POSSESS TO HAVE THE DISPUTE LITIGATED IN A COURT OR JURY TRIAL. BY INITIALING IN THE SPACE BELOW YOU ARE GiViNG UP YOUR JUDICIAL. RIGHTS TO DISCOVERY AND .APPEAL. IF YOU REFUSE TO SUBMIT TO ARBITRATION AFTER AGREEING TO THiS PROVISION, YOU MAY BE COMPELLED TO ARBITRATE. YOUR AGREEMENT TO THiS ARBITRATION PROVISION IS VOLUNTARY. YOU HAVE READ AND UNDERSTAND THE FOREGOiNG AND AGREE TO SUBMIT DISPUTES ARISING;OUT OF THE MATTERS INCLUDED IN THE"ARBITRATION OF DISPUTES" PROVISION O T NEUTRAL ARBITRATION. iIWE AGREE TO ARBITRATION AND WAIVE THE RIGHT TO A JURY TRIAL: 6.NOTICE TO CUSTOMERS A. LIST OF DOCUMENTS TO BE INCORPORATED INTO THE CONTRACT: (i)this Agreement,(ii)the Additional Terms and Conditions,(iii)the Customer Packet,and(iv)the Work Order, These documents are expressly incorporated into this Agreement and apply to the relationship between You and Us. B. IT IS NOT LEGAL FOR US TO ENTER YOUR PREMISES UNLAWFULLY OR COMMIT ANY BREACH OF THE PEACE TO REMOVE GOODS INSTALLED UNDER THIS AGREEMENT. C. DO NOT SIGN THIS AGREEMENT BEFORE YOU HAVE READ ALI,OF ITS PAGES. You acknowledge that You have read and received a legible copy of this Agreement,that We have signed the Agreement,and that You have read and received a legible copy of every document tfat We have signed curing the negotiation. D. DO NOT SIGN 'THIS AGREEMENT iF THIS AGREEMENT CONTAINS ANY BLANK SPACES. You are entitled to a completely filled in copy of this Agreement,signed by both You and Us,before any work may be started. E. YOU MAY CANCEL THIS TRANSACTION AT ANY TIME PRIOR TO THE LATER OF: (1)MIDNIGHT OF THE THIRD (3RO)BUSINESS DAY AFTER THE TRANSACTION DATE,OR(11)THE START OF INSTA X'i'IO ' T SYSTEM. SEE THE NOTICE OF CANCELLATION BELOW FOR AN EXPLANATION OF THIS RIGHT. VIVINT SOLAR DEVELOPER,LLCM CUSTOMER(S): By: By. - - Printed Name: � © - il.. Printed Na Title: ---- -- By. ---- — ------ Printed Name: Transaction Date: 57' _ �l� FOR INFORMATION ABOUT CONTRACTOR REGISTRATION REQUIREMENTS, CONTACT THE MASSACHUSETTS OFFICE OF CONSUMER AFFAIRS AND BUSINESS REGULATION: TEN PARK PLAZA,SUITE 5170, BOSTON,MA 02116, (617)973-8700 OR 888-283-3757. -----------------------------------------___----. NOTICE OF CANCELLATION Transaction Date: AR No.: YOU MAY CANCEL"PHIS TRANSACTION,WITHOUT ANY PENA.L7`Y OR OBLIGATION,WITHIN THREE(3)BUSINESS DAYS OF 'THE ABOVE DATE, OR (IF LATER) UNTIL THE START OF iNSTALLATION OF THE SYSTEM. IF YOU CANCEL,ANY PROPERTY TRADED IN,ANY PAYMENTS MADE BY YOU UNDER THE CONTRACT OR SALE,AND ANY NEGOTIABLE INSTRUMENT EXECUTED BY YOU WILL BE RETURNED WITHIN TEN (10) BUSINESS DAYS FOLLOWING RECEIPT BY THE SELLER OF YOUR CANCELLATiON NOTICE, AND ANY SECURITY INTEREST ARISING OUT OF THE TRANSACTION WiLL, BE CANCELLED. IF YOU CANCEL,YOU MUST MAKE AVAILABLE TO THE SELLER AT YOUR RESIDENCE, IN SUBSTANTIALLY AS GOOD CONDITION AS WHEN RECEIVED, ANY GOODS DELIVERED TO YOU UNDER THIS CONTRACT OR SALE, OR YOU MAY, IF YOU WISH, COMPLY WITH THE INSTRUCTIONS OF THE SELLER REGARDING THE RETURN SHIPMENT OF THE GOODS AT THE SELLER'S EXPENSE AND RISK. IF YOU DO MAKE THE GOODS AVAILABLE TO THE SELLER AND THE SELLER DOES NOT PICK THEM UP WITHIN TWENTY(20)DAYS OF THE DATE OF YOUR NOTICE OF CANCELLATION,YOU MAY RETAIN OR DISPOSE OF'THE GOODS WIL OU'r ANY FURTHER OBLIGATION. IF YOU FAIL TO MAKE THE GOODS AVAILABLE TO THE SELLER,OR IF YOU AGREE TO RETURN THE GOODS TO THE SELLER AND FAIL TO DO SO, THEN YOU REMAIN LIABLE FOR PERFORMANCE OF ALL OBLIGATiONS UNDER THE CONTRACT. TO CANCEL"THIS TRANSACTION, MAIL, OR DELIVER A SIGNED AND DATED COPY OF THIS CANCELLATION NOTICE OR ANY OTHER WRITTEN NOTICE,OR SEND A TELEGRAM,TO VIVINT SOLAR DEVELOPER,LLC,AT 4931 N 300 W,PROVO,UT 84604 PRIOR TO 'THE LATER OF: (I) MIDNIGHT OF THE THIRD(31U)BUSINESS DAY AFTER THE TRANSACTION DATE,OR(1I)THE START OF INSTALLATION OF THE SYSTEM. I HEREBY CANCEL THIS TRANSACTION: Date: Customer's Signature. J i 4 J� "YM Ag CEO 1 11 p K"ins 1 AI, Nk" 1; i to 'T Vol A 'AM, k K K 'o "sh; f Ak P 041 1 PA HP n ADT ITAMAIN11H A M A k ;K" QY-. 0 nwoo " . n . _ !1V to! H, I wq' v I W, vx—. N NORM (,I,ered Pel'N'W w a AAvn min r"Wj w ym. w.W,w a 29,PREM R kNo M!"Al r—1i 7 , —I, 7----TT,77—,7—i-TRT,—7, -7,-11 7,; n m o .:gat r lid Wow,, \r' P 11 1 i K 1% 1,P.Q ( FYW X 11 R F W It V 0 v ,rr �'!x ':fn�"w � "x V� on Pip !Kw! 10, W! [PI %MMIRI, 'W (MIN > W - A"Au At 11V 10 "—nAVw IV XN M D H T( ) %"; Wj , (h R ( R1 H & ; !i loll"I � , CI�';r")";t F. 1m) Md A v? 5 Ruth K MY RK `AH) Q K IN, Nim w Mc ( FUT! pf)v I k YD i K MR f typ Ow" WA 1 1 W ,I j�" �,ro 'A� VKH Q YW FM \(j%f Ts At 1 Wi 0, ("k, 167 - V — M' �- IMO T V" TW %" n\pf R1 1" TJM (" f- PO WX QIQ if L! 1, W. —:f " 0 novy (•) ly 'qw! WAYAW \I%h WF\hi% xn WIR)V p) ny (MV00 It fM4 M , 1 N-P WX MI W AN p N myt fj 4 Av 14 M WK TL TMENDWN 11 NNO NV U%IRS K (4 '1'1 3301 N.Thanksgiving Way,Ste.500.Lehi,UT 84043 Employer Identification No.: 80-0756438 9 0 Phone.(87?)404-4129 Fax.(801)765-5758 Massachusetts HIC License No-: 17F1848 F-Mil� qupport;a.viv vivant. solar" wwwa.vivintsolar.corn intsolar.cora A R No,: ;7� RESIDENTIAL POWER PURCHASE AGREEMENT Fins RESIDLNTIAL POWER PURCHASE AGREEMENT(this"Agreement')is entered into b� and between VIVIN'T SOLAR DEVELOPER. LLC.a Delaware limited liability company("lie "Us". Our")and the undersigned ustorneris)("You".-Your").as of the Transaction Date set forth below. Full Name a vu Fu I I Name ul.j-,w, 41 P,p,,-,,0. Y,, ❑ Customer(s): Telephone No.: E-Mail. ----------- Property Street Address: Address: ('try.County,State,Zip 1p 1.SERVICES A, DESIGN AND INSTALLATION,'N We will clesign install,service and maintain a solar photovoltaic System on Your Property,which will include all solar panels.inOcriers.meters,and off.eicomponcrit,(colfectiveby,,the 'stem"),m funher described in the'Customer Packet and ilic Work Order that We will provide to You hereafter All material portions of the System will be installed I'%!Our employed technicians and electricians,and not subcontractors. Your eration. We will (i)design, install and connect the System in material compliance will all applicable laws; (n)complete all required co(T(ih)obtain all required certifications and permits. In order to design a System that meets Your needs,You agree that We may obtain Your ili,,pections: in We may electrical usage history from Your electric tailitv(the 'I tilay")and You shall provide i's with copies of Your I olity hills as reasonably request - Other naa ')St to You. ther than'the activation fee described in Section_I,B,1A'c will design and install the Svstcit, , B. ACTIVATION. You agree to pay ITS it one-urneactivation lee in the amount of S__ We will intercori the System with the Utility,and Cause the System to ucricrate energy measured in kilowatt hours ('14'h")(the "Etter Ills-tallation of the System generally takes one day and is anticipated to begin and be substaruElly complete between two(2)and six(6)weeks herea ter. C. OWNERSHIP OF sysTEm. We Shall ti%vn the Systeni as Our sole personal property. You will have no property interest in the System. D. OPERA FIONSAND MAINTENANCE We will operate and maintain the System(i)at(,)in sole cost and expense:(it)in good condition;and(ill)in material compliance with all applicable laws and permits and the Utility's requirements. E. INSURANCE. We carry commercial general liability insurance.workers compensation insurance and proper, insurance on the System. For more information concerning Our insurance,and t6 obtain a copy of Our certificate of insurance,please visit: 2.TERM,PRICE,PAVNI ENTS.AND FINANCIAL DISCLOSURES A. ENERGY PRICE. For all Energy produced by the S Y shall $0. -----o --­­per kWh(tile"EnerZy Price").Plus applicable taxes. uood ituti estimate of System output,measured in kilowatt hours, System, n Us 'File Energy Price hall increase each y�ear by two and niZ,,�nms estinia NOT FOR THE SALE OF A AN will be pro Oidevito You in the Customer packet. HIS AGRFFMENr IS E SALE )F FNFRGY BY I iS I J Y( A SOLAR ENERGY DEVICE. B. TERM. This Agreement shall be effective its of the Transaction Dine and continue until the twentieth(20"')anniversary the In Service Date(the "Term") The"[n-Service Date"Shall he the first clay alter all of the l'ollowine,have been aachieved �i)the System has installed and iscasable of generating Energv,(6)all permits necessary to operate the systern have been obtained,i ill)the System has been'JuterWrInCLIed with the Utility, (iv)all Ze'r'fificates required under law or�v the Utilitv have be completed or received. inspections and c been C( C. PAYMENTS. Beginning with the first month following the In Service Date and throughout the I'crin, We will send You an invoice reflecting charges for Energy produced by the System in the previous month You Shall make monthly payments to I is by amornatic payment deduction from Your designated checOng account on credit card. It is Your responsibility to ensure that there are adequate funds or adequate credit limit. There is no finarm charge associated with this Agreement For all t ore than ten(10)days past due,We may impose a late charge equal to Twenty Five Dollars(S2, and interest at an annual raIC-Often Percent,`l(f��a�),mpelinis'a"pplicible taxes. If You continue to fail to make any payment within ten ft0j days after We give You written nolice.then We may exercise all remedies mailable to Us pursuant to Section 13(b). D. RENEWAL At the end of the term, ou may elect io(i)continue with this Agreement on a year-to-year basis;(it)enter into,it new Agreement with 11's and cancel this Agreement;(in)purch�,e ffie Systcrn at the end of the'Perm and cancel this Agreement(the"Purchase Option"):or(iv)cancel this zYreement and llre[Tie System removed at no cost to You. You will need to notity,F:S in writing concerning Your election sixty,(60)days prior to the end o the Term. If You elect the Purchase Option, the "Purchase Option Price- will be the then-current fair market value of the System based on an independent apyraiser's valuation of'similarly sized photovoltaic Systems in Your ��,)grapluc region. I he apFruser valuation will be provided to You in Option p writing and will be binding. If'Wc receive Your payment of the Purchase In r cc.costs o the appralsa,applicable taxes.and all other amounts then owing and unpaid hereunder,We will transfer ownership of the System to You at the end of the Term on an"As Is.Where is basis. if You elect to have the System removed,We will remove the System from Your 11 thin ruri(90)days after the end of the Fermi. IF YOU DO NOT NOTIFY US OF ""'T roW, YOUR ELECTION TO CANCEL BY SENDING A WRITTEN NOTICE TO CS, THEN THIS AGREEMENT WILL AUTOMATICALLY RENEW ON A Y EAR-rO-YEAR BASIS UNTIL YOU NOTIFY US IN WRITING OF YOUR ELECTION TO CANCEL AT LEAST SIXTY(60) DAYS PRIOR TO THE END OFI HE RENEWAL"TERM. E. CREDIT CHECK. In connection with the execution of this Agreement and at any time during the Ferm,You hereby authorize Us to(i)obtain Your credit rating and report from credit reporting%ncies:(it)to report Your payment pert'ormance under this Agreement to'credit reporting agencies:and I -S (iii)disclose this and other nil'ormation toOu�atfihlnes and actual or prospective lenders,financing panics,investors-IUSUICI and acquirers. WE MAY HAVE PRESCREENED YOUR CREDIT. PRESCRFENING OF CREDIT DOES NOT IMPACT YOUR CREDIT SCORE. YOU CAN CHOOSE 1'0 STOP RECEIVING"PRESCREENED"OFFERS OF CREDIT FROM US AND OTHER COMPANIES BY CALLING TOLL-FREE (888) 567-8688. SEE PRFSCREEN & OPT-OUT NOTICE(SECTION 29) BELOW FOR MORE INFORMATION ABOUT PRESCRFENED OFFERS. 3.LIMITED W A. LIMITED INSTALLATION WARRANTY. We Provide a workmanship warranty that the Sys(ern ;hall'tie free from material defects in deaf and woikinariship under normal operating conditions for the ferm, We further warrant that alf'rooftop penetrations We install shall be waters t as of the date of vr' in a ition to.not in lieu installation. We do not Provide any warranty 10 You with respect to any component of the Svstcm. Ariv manufactm s w of,this limited installation warranty. This warranty does not cover problems resulting f'roin exposure to harmful nialcrial.�arid chemicals, fire, flood, earthquake,or other acts ot'god,vandalism,after anon ofsyslern by any one not authorized by Us,or any othei-CaLse beyond Our control. B. MANUFACTURERS' WARRAN riEs. -1 the System-s solar modules carry a mininiurn manufacturer's warranty of twenty(20)years as follows: (a)during the first ten(lo)years of use,the modules'electrical Output will not degtade by more than tell percent( from the originally output;and (b)durin7 the first mcniv (20)years of use,the modules'electrical output will ri�)t)degrade by more than twenty pet-cent(20'0',,)from the originally rated 01m.f!c System's inverters carrya minimum manufacturer's warranty of ten(I) years against defects or component breakdowns. During the Ictim We will-n force these warranties tar the fullest extent posSi hie C. DISCLAIMFR OF WARRANTY Ex(:FPF AS SET FORTH IN THIS SECTION 3, WE MAKE NO OTHER WARRANTY TO YOU OR ANY OTHER PERSON, WHETHER EXPRESS, IMPLIED OR STATUTORY, AS TO HIE MERCHANTABILITY OR FITNESS FOR ANY PURPOSE OF THE EQUIPMENT, INSTALLATION, DESIGN, OPERATION, OR MAINTENANCE OF THE SYSTEM. ITIF' PRODUCTION OR DELIVERY OF ENERGY, OR ANY OTHER ASSOCIATED SERVICE OR MATTER HEREUNDER. ALI. OF WI UK IF WE HEREBY EXPRESSLY DISCLAIM. OUR LIABILITY FOR ANY BREACH OF ANY WARRANTY I IS LIMITED TO REPAIRING THE SYSTEM OR YOUR PROPERTY TO FIFF EXTENT REQUIRED UNDER THIS AGREEMENT. YOU ACKNOWLEDGE THAT WE ARE RELYING ON THIS SECTION,3.C. AS A CONDITION AND MATERIAL INDUCEMENT TO ENTER INTO THIS AGREEMENT. THERE ARE NO WARRANTIES WHICH EXTEND BEYOND THE DESCRIPTION OF THE FACT HEREOF. 4.REMOVAL OF THE sys,rFm You shall not make ativ Alterations(as defined in Section 9tc to the System. If You want to make repairs,(it improvements to Your Property that require he temporary removal'fth System or that could interfere with its performance or operation,YOU must give Us at least thirty(30)days'prior written none, U " " t ,a You agree that ans,repair or improvement to Your Property S�A not materially after Your roof where he Svstem is installed. As cr Ninety-Nine % sation for()or removal,storage,anti turf System,You agree to pay to-(is a lee equal to Four Hundred and lied or� Dofars#4�11( We remove the System, You shall be required to pay the Shutdown Payment(as defined in Section t5)if the Svstern is not reinstalled r,tv 7 w ill (10)days of removal. 16 the event of an emergency,affecting the System,You shall contact Us immediately. It'We are unable to timely respond,You may(at Your own expense)contract with a licensed and qualified solar installer to remove the System as necessary to make repairs required by the emergency. You shall be responsible for any damage to the System that results fro_m actions taken Iry Your contractor- s.ARBITRATION OF DISPUTES Most customer concerns can be resolved quickly, and amicably by calling Our customer service department at(877) 404-4129. If Our customer service department is unable to resolve Your concern,�"06`and We agree to resolve any Dispute(as defined below)through bind' arbitration or small claims court instead of courts of general jurisdiction. BY SIGNING BELOW. YOU ACKNOWLEDGE AND AGREE THAT(1)YOU-ARE I IFREBY WAIVING THE RIGHT TO A TRIAL BY JURY,AND(11)YOU MAY BRING CLAIMS AGAINST US ONLY IN YOUR INDIVIDUAL CAPACITY,AND NOT AS A PLAINTIFF OR CLASS MEMBER IN ANY PURPORTED CLASS OR REPRESENTATIVE PROCEEDING. YOU and We agree to arbitrate all disputes, claims and controversies arising out of or relating to mounting Sy'Ster iS BOM Item no. Description Weight Quantity add. Items Sum 706-0061 Cross rail connector 48x31 0.157 Ibs 36 0 36 707-0023 L-foot 11mm fast attach 0.241 Ibs 27 0 27 702-0205 MEC CS RH 35mm 0.000 Ibs 24 0 24 700-0102 MC 30-40mm-w/Bonding Plate 0.000 Ibs 36 0 36 712-0136 Weeblug Alpha+pa 0.000 Ibs 15 0 15 807-0131 ACC Wire Management Clip 0.000 Ibs 0 0 0 807-0134 Omega Wire Management Clip 0.000 Ibs 0 0 0 712-0148 Rail/Microinverter Attachment-M8x20mm T-Boll 0.000 Ibs 0 0 0 712-0147 Rail/Microinverter Attachment-M8x25mm T-Bol 0.000 Ibs 0 0 0 800-1087 BR 10/48 CS; 14ft 13.623 Ibs 12 0 12 800-1085 BR 10/48 CS; 16ft 13.623 Ibs 6 0 6 706-0057 Splice,external,f.BR 10/48 CS 0.427 Ibs 1 3 1 0 3 Total 258.663 Ibs M a Q Developer: Page 11 of 11 Date 6/16/2015 MS Version 2.0.32.0 e 3 0,rD U,, (D 0 N O 1 U'i 28.92 ft I 3.23 ft (I 3.23 ft I i I i i i I 9.28 ft rw 9.28 ft I I � I 3.23 ft 3.23 ft 3.00 ft 28.92 ft 3.00 ft L__..1 Feld i Edges Corner v, �o -a rq o' ro N O O W O N —h O N Alpha' ° ° n « 3 05, ru (D o m rh « C c M N r~ �+ o � N � O N to 2.71 ft BI I ( C I Attachment splice ri Top layer A=GS 1014814It[13ft 5.O1In] 6.54 ft Lower Layer B=GS 10148 16 ft C=GS 10148 16 ft[14 ft 11.37 W YW C B C L/) W < m m O M N p O ~ W N N O N Alpha' '+� mounting S'4'sterTIS Rail Stress Deflection under load (% A=L/60) Length Load capacity Roof area (%yield) Rail Cantilever Cantilever Attachment Field 60.3 % 68.7 % 0.0 in Edges 60.3 % 68.7 % 0.0 in Comer 63.3 % 71.2 % 0.0 in Cross rail Stress Deflection under load (% A=L/60) Length Load capacity Roof area (% yield) Rail Cantilever Cantilever Attachment Field 78.4 % 37.2 % 0.0 in 76.2 % Edges 78.4 % 37.2 % 0.0 in 76.2 % Comer 81.1 % 38.6 % 0.0 in 180.0 % The system was successfully verified. Notes • Only the statics of the solar substructure are analyzed.The rails are designed as multi-box girders with cantilever, and uniform load distribution • The values for material durability are taken from the technical manual of the manufacturer. a a Developer: Page 8 of 11 Date 6/16/2015 MS Version 2.0.32.0 mounting Configuration Fastener capacity Description L-foot 11mm fast attach Max. pressure load 816 lbf Max. suction load -816 Ibf Max. lateral load 677 Ibf fastener distance 24.02 in Rail Description GS 10/48 Moment of inertia Iz 0.16 in A4 Moment of inertia ly 0.24 in A4 cc Resistance moment Wz 0.21 in^3 a Resistance moment Wy 0.24 in^3 a Cross section area 0.55 in"2 yield stress 21.2 ksi Modulus of elasticity 10100.0 ksi Cross rail Description GS 10/48 Moment of inertia Iz 0.16 in A4 Moment of inertia ly 0.24 in^4 Resistance moment Wz 0.21 in^3 Resistance moment Wy 0.24 in"3 Cross section area 0.55 in^2 yield stress 21.2 ksi Modulus of elasticity 10100.0 ksi Load Developer: Page 7 of 11 Date 6/16/2015 MS Version 2.0.32.0 mounting Module field layout Module manufacturer Trina Solar Module length 65.0 in Module type TSM-260 PD05.08 Module width 39.1 in Module power 260.00 Watt Frame height 1.4 in Number of modules 24 Modul weight 41.00 Ibs Module orientation Landscape Overall power output 6.2 kWp Q 1 f 0.61 - I I* , i 1 ft 7 34 Developer: Page 6 of 11 Date 6/16/2015 MS Version 2.0.32.0 mounting systems max action [Ib/ft] (Lower layer) usability validation [lb/ft] Roof area Pressure Pressure Suction Suction Pressure Pressure Suction Suction orthogonal parallel orthogonal parallel orthogonal parallel orthogonal parallel Field 141.300 57.080 -45.670 3.520 141.300 57.080 -45.670 3.520 Edges 141.300 57.080 -94.010 3.520 141.300 57.080 -94.010 3.520 Corner 141.300 57.080 -148.400 3.520 141.300 57.080 -148.400 3.520 s a Developer: Page 5 of 11 Date 6/16/2015 MS Version 2.0.32.0 mounting Syst"�,r1- S Load combinations (ASD) LFK1: Ed=D LFK2: Ed=D+L LFK3: Ed=D+(L,or S or R) LFK4: Ed=D+0.75* L+0.75* (L,orSor R) LFK5: Ed=D+(0.6*W or 0.7* E) LFK6a: Ed=D+0.75* L+0.75*(0.6*W)+0.75*(L,or S or R) LFK6b: Ed=D+0.75 * L+0.75* (0.7 * E)+ 0.75*S LFK7: Ed=0.6* D+0.6*W LFK8: Ed=0.6* D+0.7* E max action [lb/ft'] Roof area Pressure Pressure Suction Suction orthogonal parallel orthogonal parallel Field 21.370 8.633 -6.907 0.532 Edges I 21.370 8.633 -14.220 0.532 C Corner I 21.370 8.633 -22.440 0.532 max action [lb/ft] (Top layer) Roof area Pressure Pressure Suction Suction orthogonal parallel orthogonal parallel Field 57.890 23.390 -18.710 1.442 Edges 57.890 23.390 -38.520 1.442 Corner 57.890 23.390 -60.800 1.442 Developer: Page 4 of 11 Date 6/16/2015 MS Version 2.0.32.0 (mounting systerTis Loads Snow load Importance factor fl: 1.00 Ground snow load pg= 40.000 Ib/ft2 Shape factor CS= 0.738 Snow load-flat pr= 28.000 Ib/ft2 Snow load-sloped ps= 20.680 lb/ft' Wind load Basic wind speed v= 100.00 mph Terrain category B: Urban and suburban areas,wooded areas,or other terrain with numerous closely spaced obstructions having the size of single-family dwellings or larger. Wind Gust Velocity Pressure q= 15.230 Ib/ft2 M CL Roof areas a Distributed Wind Loading per Base Rail Pressure fib/ft] Suction [lb/ft] Field 20.632 -37.137 Edges 20.632 -70.148 Corner 20.632 -107.286 Dead load Module area Ati,= 17.65 ft2 Modul weight Gti,= 41.00 Ibs Dead load gm= 2.369 Ib/ft2 Developer: Page 3 of 11 Date 6/16/2015 MS Version 2.0.32.0 AW mounting ,Y,I t f,:�i I S Building data Site data Country USA IBC 2012 Terrain height 0 ft Building specifications Rooftype Gable roof Building length 34 ft 11.00 in Building width 29 ft 2.48 in Building height 25 ft 0.00 in Roof specifications Roofing Composition shingle Rafter width 2.0 in Roof pitch 22° Rafter height 6.0 in +a Rafter spacing 24.0 in a 9 /c Developer: Page 2 of 11 Date 6/16/2015 MS Version 2.0.32.0 mounting systems Project Information Contact Name 4341998 Street address 50 Warner St City,State,ZIP Florence, MA,01062 Phone Email t CL Q Developer: Page 1 of it Date 6/16/2015 MS Version 2.0.32.0 DC Safety Switch Notes: Rated for max operating condition of inverter NEC 690.35 compliant U "opens all ungrounded conductors N o cb � i; Notes: SE6000A-US-U Inverter Specs: U) CEC ALL CONDUCTORS AC 240V EM5 AC Operating Voltage 240V �E� Continuous Max Output 25A 0 SHALL BE COPPER °��? DC Maximum Input Current 18A tn�LLo Solar Edge Optimizer Specs: P300 DC Input Power 30OW U DC Max Input Voltage 8-48V DC Max Input Current 12.5A Design Conditions: DC Max Output Current 15A ASHRAE 2013 Max String Rating 525OW Highest Monthly 2%DB Design Temp 32.5°c. Module Specs: 24 PV MODULES PER INVERTER=6240 WATTS STC Lowest Min.Mean Extreme DB -26.9°C Trina Solar TSM-260PD05.08 1 STRING OF 12 PV MODULES VOC Temp coefficient V/°C 1 STRING OF 12 PV MODULES SOLAREDGE Short Circuit Current(Isc) 9.00A U Open Circuit Voltage(Voc) 38.2V S INVERTER System Specs: -- -- — Operating Current(Imp) 8.50A 4 Max DC Voltage 500V Operating Voltage(Vmp) 30.6V 12 ti DDC SAFETY Nominal DC Operating Voltage 350V Max Series Fuse Rating 15A ' o SWITCH Max.DC Current per String 15A STC Rating(Pmax) 260W �> - Nominal AC Current 25A Power Tolerance -0/+3% >_�A SOLAREDGE Lt L2 N P300 OPTIMIZERS a — g m 0 0 0 o a o 12 o - � Q �� U _ Siemens RLNF222R Z Q N _ GON240V UNFUSEU ZOOA ; �1 0 0 0 = = NEMA3 Z Ui S OR EQUIVALENT X Ir 0 Y W J 2 m SOLAREDGE Vis-Metering U P300 OPTIMIZERS r V2S-2S n y Q — 40A S p SHEE ET EXISTING NAME: 240V/200A AC z ---------------------- LOAD-CENTER ♦– c z C9 SRECIANSI VISIBLE WITH 1-2 POLE 20A t 1 Q METER LOCKABLE SOLAR BREAKER 'KNIFE'A/C 2 DISCONNECT _ SHEET !� L - NUMBER: PV WIRE IN FREE AIR INTO THWN-2 IN 3/4"EMT MINIMUM 8 AWG CU WIRE(RATED 90 DEG C)IN 3/4"EMT O CONDUIT, KEEP UNDER 2%VOLTAGE DROP. MINIMUM 0 CONDUIT.Ll,L2,AND NEUTRAL;8 AWG GROUND WIRE. 10 AWG CU WIRE EACH(RATED 90 DEG C).6AWG BARE KEEP UNDER 1.5%VOLTAGE DROP. COPPER EGC OR BAWG INSULATED EGC IN CONDUIT. W a { N V/ N O N PV MODULE,TYP.MOUNT •cl) N TO RAFTERS OF COMP. o m SHINGLE ROOF,PARALLEL L-FOOT WITH CONNECTION C 2 WITH PLANE OF ROOFO m z o0 O°TZ Of MID CLAMP DETAIL LL FLASHING WITH Z� WATERPROOF SEALANT m L Q 3 MOUNTING NOT TO SCALE O O c PV40 DETAIL LL LL c J °� U 5/16"Ox 4112"MINIMUM STAINLESS STEEL LAG SCREW TORQUE=13E2 ft-Ibs. PV ARRAY TYP. ELEVATION END CLAMP DETAIL NOT TO SCALE 2 L-FOOT DETAIL N NOT TO SCALE NOT TO SCALE 3 # d PERMITTED LEVELING L-FOOT WITH CONNECTION FOOT SPACING J END CLAMP rn _N FRAMING BELOW SHOWN END CLAMP V DASHED FOR CLARITY 2"\ V I I I I PHOTOVOLTAIC MODULE PV4.0 d' n a p I g m o a END CLAMP � V I I I I I I I I I I I PHOTOVOLTAIC MODULE Z m Q I I I I I I I I I I I CANTILEVER=U3 L=PERMITTED SPACING > Z Uj OR LESS VERIFY WITH QUICK CONFIGURATOR OUTPUT W Lu LU I W J z Z m W I I I I I I I I I I I I I C3 F- I I I I I I I Z Z o SHEET I I I I I I I I I I I I I NAME: I I I I I I L-FOOT WITH MID CLAMP L-FOOT WITH CONNECTION Q CONNECTION O W I I I I M'ID 1 MID CLAMP PV4.0 ROOF FRAMING PERMITTED LEVELING FOOT SPACING PV SYSTEM MOUNT DETAIL SHEET NUMBER: MODULES IN PORTRAIT/LANDSCAPE SCALE:N.T.S. ° C-i NOT TO SCALE N G m 1 pA O z rn m N � Cn Z G) m c co m z G) z o rn w z 0-1 N Q 3 1 A co n C N D r m oN o M mZ w r� w _ cnn! N m 6X O O n Z c= D= INSTALLER:VIVINT SOLAR # # Richardson Residence INSTALLER NUMBER:1.877.404.4129 m ROOF m m r % to - MA LICENSE:MAHIC 170848 PLAN Florence,MA 011062 UTILITY ACCOUNT NUMBER:6320152016 DRAWN BY:WES S-4341998 Last Modified:6/16/2015 t of Northampton 50 Warner St, Florence MA 01062 Bu'ildingDepartment U C s Plan Review N 212 Main Street I Northampton, MA 01060 ��8 I i rYEMD C3$F ED LLO PV SYSTEM SIZE: I I I v 6.24 kW DC I 7 f J I LOCKABLE DISCONNECT SWITCH,INVERTER ANSI METER LOCATION, &UTILITY METER LOCATION I I 105'OF 1"PVC CONDUIT FROM JUNCTION BOX TO ELEC PANEL I I • I I I I I N I I � d D I I \ I J I JUNCTION BOX ATTACHED TO ARRAY USING ECO HARDWARE TO m I KEEP JUNCTION BOX OFF ROOF rn I O I I Z m I I I I wWZm I J w J I I I F co to < � ZZ � o SHEET NAME: I i I wg I I ~ � CL SHEET NUMBER: PV SYSTEM SITE PLAN °. (24)Trina TSM-260 PD05.06 MODULE v1- SCALE: 1/16"= 1'-0" > Page 2of2 B. Loading Criteria 10 PSF = Dead Load roofing/framing 40 PSF= Live Load (ground snow load) 5 PSF= Dead Load solar panels/mounting hardware Total Dead Load=15 PSF The above values are within acceptable limits of recognized industry standards for similar structures and in accordance with the 2009 International Residential Code. Analysis performed of the existing roof structure utilizing the above loading criteria indicates that the existing rafters will support the additional panel loading without damage, if installed correctly. C. Solar Panel Anchorage 1. The solar panels shall be mounted in accordance with the most recent "Mounting System Inc. Installation Manual", which can be found on the Mounting System Inc. website (usa.mounting- systems.info/en/solar-mounting-systems-company). If during solar panel installation, the roof framing members appear unstable or deflect non-uniformly, our office should be notified before proceeding with the installation. 2. The solar panels are 1 1/2"thick and mounted 4 '/z"off the roof for a total height off the existing roof of 6". At no time will the panels be mounted higher that 6"above the existing plane of the roof. 3. Maximum allowable pullout per lag screw is 205 Ibs/inch of penetration as identified in the National Design Standards (NDS) of timber construction specifications for Spruce-Pine-Fir assumed. Based on our evaluation, the pullout value, utilizing a penetration depth of 2 1/2", is less than the maximum allowable per connection and therefore is adequate. Based on the variable factors for the existing roof framing and installation tolerances, using a thread depth of 2 '/2"with a minimum size of 5/16" lag screw per attachment point for panel anchor mounts will be adequate with a sufficient factor of safety. 4. Considering the roof slopes, the size, spacing, condition of roof, the panel supports shall be placed at and attached to no greater than every fourth roof rafter as panels are installed perpendicular across rafters and no greater than the panel length when installed parallel to the rafters (portrait). No panel supports spacing shall be greater than four (4) rafter spaces or 64" o/c, whichever is less. 5. Panel supports connections shall be staggered to distribute load to adjacent rafters. Based on the above evaluation, with appropriate panel anchors being utilized the roof system will adequately support the additional loading imposed by the solar panels. This evaluation is in conformance with the 2009 International Residential Code, current industry standards and practice, and based on information supplied to us at the time of this report. Should you have any questions regarding the above or if you require further information do not hesitate to contact me. Ve truly yours, �N OF Scott E. Wyssli , PE CM y MA License No. 505 ° s0 9p� FGIs-T �SS/ONAL V to 3301 North Thanksgiving Way, Suite 500 Structural Group Lehi, UT 84043 P: (801) 234-7050 Scott E. Wyssling, PE Head of Structural Engineering Scott.wysslingC@vivintsolar.com June 17, 2015 Mr. Dan Rock, Project Manager Vivint Solar 150 Padgette Street, Unit A Chicopee, MA 01022 Re: Structural Engineering Services Richardson Residence 50 Warner St, Florence MA S-4341998 6.24 kW System Dear Mr. Rock: Pursuant to your request, we have reviewed the following information regarding solar panel installation on the roof of the above referenced home: 1. Site Visit/Verification Form prepared by a Vivint Solar representative identifying specific site information including size and spacing of rafters for the existing roof structure. 2. Design drawings of the proposed system including a site plan, roof plan and connection details for the solar panels. This information was prepared by the Design Group and will be utilized for approval and construction of the proposed system. 3. Photovoltaic Rooftop Solar System Permit Submittal identifying design parameters for the solar system. 4. Photographs of the interior and exterior of the roof system identifying existing structural members and their conditions. Based on the above information we have evaluated the structural capacity of the existing roof system to support the additional loads imposed by the solar panels and have the following comments related to our review and evaluation: Description of Residence: The existing residence is typical wood framing construction with the roof system consisting of assumed 2x6 dimensional lumber at 16" on center. The attic space is finished and the photos indicate that there was no access to visually inspect the size and condition of the roof rafters. All wood material utilized for the roof system is assumed to be Spruce-Pine-Fir#2 or better with standard construction components. The existing roofing material consists of composite asphalt shingles. Our review of the photos of the exterior roof does not indicate any signs of settlement or misalignment caused by overstressed underlying members. Stability Evaluation: A. Wind Uplift Loading 1. Refer to attached MSI calculations sheet for ASCE/SEI 7-10 Minimum Design Loads for Buildings and other Structures, wind speed of 90 mph based on Exposure Category"B" and 22 degree roof slopes on the dwelling areas. Ground snow load is 40 PSF for Exposure "B", Zone 3 per (ASCE/SE17-10). 2. Total area subject to wind uplift is calculated for the Interior, Edge and Corner Zones of the dwelling. The Commonwealth of Massachusetts Department of Industrial Accidents U1V Office of Investigations 1 Congress Street,Suite 100 Boston,MA 02114-2017 www mass.gov/dia Workers'Compensation Insurance Affidavit: Builders/Contractors/Electricians/Plumbers Applicant Information Please Print Legibly Name (Business/Organization/Individual): Vivint Solar Developer, LLC Address:3301 North Thanksgiving Way,Suite 500 City/State/Zip:Lehi, LIT 84043 Phone#:801-377-9111 Are you an employer?Check the appropriate box: Type of project(required): 1.RT lam a employer with 214 4. ❑ I am a general contractor and I employees(full and/or part-time).* have hired the sub-contractors 6. E]New construction 2.❑ 1 am a sole proprietor or partner- listed on the attached sheet. 7. ❑ Remodeling ship and have no employees These sub-contractors have g, ❑Demolition working for me in any capacity. employees and have workers' 9 ❑Building addition [No workers' comp. insurance comp.insurance.t required.] 5. ❑ We are a corporation and its 10.0 Electrical repairs or additions 3.❑ 1 am a homeowner doing all work officers have exercised their 11.❑ Plumbing repairs or additions myself. [No workers' comp. right of exemption per MGL 12.❑Roof repairs insurance required.]t c. 152,§1(4),and we have no Solar Installation employees. [No workers' 13.■ Other comp.insurance required.] *Any applicant that checks box#I must also fill out the section below showing their workers'compensation policy information. t Homeowners who submit this affidavit indicating they are doing all work and then hire outside contractors must submit a new affidavit indicating such. Contractors that check this box must attached an additional sheet showing the name of the sub-contractors and state whether or not those entities have employees. If the sub-contractors have employees,they must provide their workers'comp.policy number. I am an employer that is providing workers'compensation insurance for my employees. Below is the policy and job site information. Insurance Company Name:Zurich American Insurance Company Policy#or Self-ins. Lic.#:WC 509601300 (�I Expiration Date:11/1/2015 �,, d Job Site Address:&_ rJ rloem t')� City/State/Zip:F 1±(/7 Attach a copy of the workers'compensation policy declaration page(showing the policy number and expiration date). Failure to secure coverage as required under Section 25A of MGL c. 152 can lead to the imposition of criminal penalties of a fine up to$1,500.00 and/or one-year imprisonment, as well as civil penalties in the form of a STOP WORK ORDER and a fine of up to$250.00 a day against the violator. Be advised that a copy of this statement may be forwarded to the Office of Investigations of the DIA for insurance coverage verification. I do hereby certify under the pains and penalties of perjury that the information provided above is true and correct Signature: /,/'tli Date:11/4/2014 Phone#: 801-2296459 Official use only. Do not write in this area,to be completed by city or town official. City or Town: Permit/License# Issuing Authority(circle one): 1.Board of Health 2.Building Department 3.City/Town Clerk 4.Electrical Inspector 5.Plumbing Inspector 6.Other Contact Person: Phone#: SECTION 8-CONSTRUCTION SERVICES 8.1 Licensed Construction Supervisor: Not Applicable ❑ Name of License Holder: John A Jalbert CS070940 _ License Number 150 Padgette St C o pee, MA 0 1022 03/25/2017 _ Addre Expiration Date 413-331-0769 Sig ure Telephone 8.Reaistered Home Improvement Contractor. Not Applicable ❑ Vivint Solar DevelQper/John A Jalbert 170848 Company Name Registration Number 3301 N Thanksgiving Way#500 Lehi-LIT 84043 7/21/2015 _ Address Expiration Date Telephone 413-331-0769 SECTION 10-WORKERS'COMPENSATION INSURANCE AFFIDAVIT(M.G.L.c.152,§25C(6)) Workers Compensation Insurance affidavit must be completed and submitted with this application. Failure to provide this affidavit will result in the denial of the issuance of the building permit. Signed Affidavit Attached Yes....... ❑ No...... ❑ 11. - Home Owner Exemption The current exemption for"homeowners"was extended to include Owner-occupied Dwellings of one(1) or two(2)families and to allow such homeowner to engage an individual for hire who does not possess a license,provided that the owner acts as supervisor.CMR 780, Sixth Edition Section 108.3.5.1. Definition of Homeowner:Person(s)who own a parcel of land on which he/she resides or intends to reside,on which there is,or is intended to be,a one or two family dwelling,attached or detached structures accessory to such use and/or farm structures.A person who constructs more than one home in a two-year period shall not be considered a homeowner. Such"homeowner"shall submit to the Building Official,on a form acceptable to the Building Official that he/she shall be responsible for all such work performed under the buildine permit. As acting Construction Supervisor your presence on the job site will be required from time to time,during and upon completion of the work for which this permit is issued. Also be advised that with reference to Chapter 152(Workers'Compensation) and Chapter 153(Liability of Employers to Employees for injuries not resulting in Death)of the Massachusetts General Laws Annotated,you may be liable for person(s) you hire to perform work for you under this permit. The undersigned"homeowner"certifies and assumes responsibility for compliance with the State Building Code,City of Northampton Ordinances,State and Local Zoning Laws and State of Massachusetts General Laws Annotated. Homeowner Signature SECTION 5-DESCRIPTION OF PROPOSED WORK(check all applicable) New House ❑ Addition F-1 Replacement Windows Alterations) Roofing Or Doors D Accessory Bldg. ❑ Demolition ❑ New Signs [01 Decks [p Siding[0] Other[[3] Brief Description of Proposed nil C.-L4 Alt Ck: Installation of roof mount�e{d- photovoltaic ,olar systems # of modules Ja o exist ng Fel ro ri" Yes i n o ing iliee e room vY sO a No hQ�'L IIQu Attached Narrative Renovating unfinished basement Yes No Plans Attached Roll -Sheet Ga. If New house and or addition to existing housing, complete the following: a. Use of building :One Family Two Family Other b. Number of rooms in each family unit: Number of Bathrooms c. Is there a garage attached? d Proposed Square footage of new construction. Dimensions e. Number of stories? f. Method of heating? Fireplaces or Woodstoves Number of each g. Energy Conservation Compliance. Masscheck Energy Compliance form attached? h. Type of construction i_ Is construction within 100 ft.of wetlands? Yes -No. Is construction within 100 yr. floodplain Yes No j. Depth of basement or cellar floor below finished grade k. Will building conform to the Building and Zoning regulations? Yes No. I. Septic Tank City Sewer Private well„_ City water Supply SECTION 7a-OWNER AUTHORIZATION-TO BE COMPLETED WHEN OWNERS AGENT OR CONTRACTOR APPLIES FOR BUILDING PERMIT 1, as Owner of the subject property hereby authorize to act on my behalf, in all matters relative to work authorized by this building permit application. Signature of Owner Date I, Vivint Solar Developer as Owner/Authorized Agent hereby declare that the statements and information on the foregoing application are true and accurate,to the best of my knowledge and belief. Signed under the pains and penalties of perjury Savina Cervone _ Print e a5 Signature of Owner/Ag nt Date r Section 4. ZONING All Information Must Be Completed. Permit Can Be Denied Due To Incomplete Information Existing Proposed Required by Zoning This column to be filled in by Building Department Lot Size Frontage Setbacks Front Side L: R: L: R: Rear Building Height Bldg.Square Footage % Open Space Footage (Lot area minus bidg&paved parking) ft of Parking Spaces Fill: (volume&Location A. Has a Special Permit/Variance/Finding ever been issued for/on the site? NO O DONT KNOW O YES O IF YES, date issued: IF YES: Was the permit recorded at the Registry of Deeds? NO © DONT KNOW Q YES Q IF YES: enter Book Page and/or Document#, B. Does the site contain a brook, body of water or wetlands? NO O DONT KNOW O YES O IF YES, has a permit been or need to be obtained from the Conservation Commission? Needs to be obtained O Obtained O , Date Issued: i C. Do any signs exist on the property? YES Q NO IF YES, describe size, type and location: D. Are there any proposed changes to or additions of signs intended for the property? YES © NO O IF YES, describe size, type and location: E. Will the construction activity disturb(clearing,grading,excavation,or filling)over 1 acre or is it part of a common plan that will disturb over 1 acre? YES O NO O IF YES,then a Northampton Storm Water Management Permit from the DPW is required. Department use only C' of Northampton Status of Permit: 8 ding Department Curb CuUDriveway Permit JUL 3 0 206 12 Main Street Sewer/SepticAvailabil Room 100 Water/Well Availability mpton, MA 01060 Two Sets of Struclurat Plans Electric,PiUfY1D'ton, 6fi6i1 -5 -1240 Fax 413-587-1272 PlottSite Plans Northamp - Other Specify APPLICATION TO CONSTRUCT,ALTER,REPAIR,RENOVATE OR DEMOLISH A ONE OR TWO FAMILY DWELLING SECTION 1 -SITE INFORMATION 1.1 Property Address. This section to be completed by office 50 Ctv-mr Map Lot Unit 1'jort°� oe, "IA (001- Zone Overlay District Elm St District CB District SECTION 2-PROPERTY OWNERSHIP/AUTHORIZED AGENT 2.1 Owner of Record: Il Nam rint) Telephone jS Signature 2.2 Authorized Agent: Savina Cervone 150 Padgette St, Chicopee, MA 01022 _ Name int) I Current Mailing Address: rmAiQ CQ/U)M� 413-331-0769 _ 9-i9mfure Telephone SECTION 3-ESTIMATED CONSTRUCTION COSTS Item Estimated Cost(Dollars)to be Official Use Only completed by ermit applicant 1 Building l �Q' (a)Building Permit Fee 2. Electrical 16 QQ (b)Estimated Total Cost of l�f 954Q Construction from 6 3, Plumbing Building Permit Fee 4 Mechanical(HVAC) 5. Fire Protection 6 Total =0 +2+3+4+5) Check Number 5 This Section For Official Use Only Date Building Permit Number IIssue& Signature Building Commissioner/inspector of Buildings Date File#BP-2016-0124 APPLICANT/CONTACT PERSON VIVINT SOLAR DEVELOPER LLC ADDRESS/PHONE 150 PADGETTE ST UNIT B CHICOPEE01022(413)331-0769 PROPERTY LOCATION 50 WARNER ST MAP 23D PARCEL 071 001 ZONE URB(100) THIS SECTION FOR OFFICIAL USE ONLY: PERMIT APPLICATION CHECKLIST ENCLOSED REQUIRED DATE ZONING FORM FILLED OUT Fee Paid �eQ c44 Building Permit Filled out Fee Paid Typeof Construction: INSTALL ROOF MOUNTED 6.24KW SOLAR ARRAY New Construction Non Structural interior renovations Addition to Existing Accessory Structure Building Plans Included: Owner/Statement or License 070940 3 sets of Plans/Plot Plan THE FOLLOWING ACTION HAS BEEN TAKEN ON THIS APPLICATION BASED ON INFORMATION PRESENTED: Approved Additional permits required(see below) PLANNING BOARD PERMIT REQUIRED UNDER:§ Intermediate Project: Site Plan AND/OR Special Permit With Site Plan Major Project: Site Plan AND/OR Special Permit With Site Plan ZONING BOARD PERMIT REQUIRED UNDER: § Finding Special Permit Variance* Received&Recorded at Registry of Deeds Proof Enclosed Other Permits Required: Curb Cut from DPW Water Availability Sewer Availability Septic Approval Board of Health Well Water Potability Board of Health Permit from Conservation Commission Permit from CB Architecture Committee Permit from Elm Street Commission Permit DPW Storm Water Management m 'tion la Signature of Building A0ficial Date Note: Issuance of a Zoning permit does not relieve a applicant's burden to comply with all zoning requirements and obtain all required permits from Board of Health,Conservation Commission,Department of public works and other applicable permit granting authorities. * Variances are granted only to those applicants who meet the strict standards of MGL 40A.Contact Office of Planning& Development for more information. 50 WARNER ST BP-2016-0124 G1S#: COMMONWEALTH OF MASSACHUSETTS Map:Block: 23D-071 CITY OF NORTHAMPTON Lot: -001 PERSONS CONTRACTING WITH UNREGISTERED CONTRACTORS Permit: Building DO NOT HAVE ACCESS TO THE GUARANTY FUND (MGL c.142A) Category: SOLAR ELECTRIC SYSTEM BUILDING PERMIT Permit# BP-2016-0124 Project# JS-2016-000213 Est. Cost: $31200.00 Fee: $75.00 PERMISSION IS HEREBY GRANTED TO: Const. Class: Contractor: License: Use Groin: VIVINT SOLAR DEVELOPER LLC 070940 Lot Size(sq. ft.): 18774.36 Owner: DONALDSON R CHERYL TRUSTEE&RICHARDSON ALYSSA J&KYLE J Zonin4: URB(100)/ Applicant: VIVINT SOLAR DEVELOPER LLC AT. 50 WARNER ST Applicant Address: Phone: Insurance: 150 PADGETTE ST UNIT B (413) 331-0769 WC CHICOPEEMA01022 ISSUED ON.81312015 0:00:00 TO PERFORM THE FOLLOWING WORK.INSTALL ROOF MOUNTED 6.24KW SOLAR ARRAY POST THIS CARD SO IT IS VISIBLE FROM THE STREET Inspector of Plumbing Inspector of Wiring D.P.W. Building Inspector Underground: Service: Meter: Footings: Rough: Rough: House# Foundation: Driveway Final: Final: Final: Rough Frame: Gas: Fire Department Fireplace/Chimney: Rough: Oil: Insulation: Final: Smoke: Final: THIS PERMIT MAY BE REVOKED BY THE CITY OF NORTHAMPTON UPON VIOLATION OF ANY OF ITS RULES AND REGULATIONS. Certificate of Occupancy Signature: FeeType: Date Paid: Amount: Building 8/3/2015 0:00:00 $75.00 212 Main Street,Phone(413)587-1240,Fax: (413)587-1272 Louis Hasbrouck—Building Commissioner