Loading...
03-029 (8) OWN y 4 Two views of the same pad mounted transformer at base of Reitt driveway. National Grid customer: J. Peter Reitt 591 Coles Meadow Rd. Northampton, MA 01060 Site Diagram 2 of 2 NW corner of house: current location of utility meter and future solar AC disconnect s� L:1 340 Riverside Drive, Northampton, MA 01062 www.valloysolar.solar 413.584.8844 . : N National Grid customer: p w J. Peter Reitt 591 Coles Meadow Rd. Northampton, MA 01060 �R. Site Diagram 1 of 2 Utility Meterf £' -Solar AC disconnect 240V/60Atr IY PV Array 1- 25 modules - Main Panel PV Array 2—6 modules 31 total modules -Sub-panel 31 Enphase M250 microinverters - REC Meter \l t 340 Riverside Drive, Northampton, MA 01062 www.valloysolar.solar 413.584.8844 MonoX N,�ON Mechanical Properties Electrical Properties(STC Celts 6x10 305 W .................. .................... ---"--. ...................................................... .................................... ......................................................................... . ...... ................................................... Ceti vendor LG MPP voltage(Vmpp) 32.1 Cell type mcno'cryst"Hire? MPP current(Impp) 9.52 Cell dimensions 1565 x I 56 rnm/6 Y 6 in Open circuit voltage(Voc) 40.0 ——---- ---------------------— ......................... a of busbar 3 Short circuit current(Isc) 10.1 Dimensions(L x W x H) 1640 x 1000 x 35 mm Module efficiency 8.6 64,57 x 39.37 x 1.38 1n Operating temperature(*C) -40-+90 Static snow load 54000 Pa/113 PSI- Maximum system voltage(V) 10,0 0(1 E Q,600(U: Static wind load 2,100 Pa/50 psf Maximum series fuse rating -40 -----........... .....................------- Weight 16,8±0.5 kg/3&96 1.1 IL Power tolerance 3 Connector type MC4 ccinrecnor IP 67 I J 1 dde t- ,rat ZS'C,AM "he 111—."Pi,l "'t, by L. e Junction box I. 67 virth 3 bypass diodes F:a11r­:b1 Vt,t-� �1.'a Length of cables 2 x 1000 mm 12 x 39.37.n Electrical Properties(NOCT*) Glass High transm.ssion ten Tled.2iass ............ .. ....................... Frame Anodized aluminum 305 W Maximum power(Pmpp) 223 Certifications and Warranty MPP voltage(Vmpp) 29.4 Certifications IEC 61_21 5,IEC Cl:730-1/-2,UL 1703; MPP current(Impp) 7,59 ISO 90=01,1E'.61701,IEC 62716 Open circuit voltage(Voc) ........................................ .TO......................................... Module fire performance(UL1 703) Tyne 2 ........................... Short circuit current(Isc) Efficiency reduction Product warranty I Ove a rs (from 1000 W/arto 200 Wlm2) <2% Output warranty of Pmax _ine.ar,,,%;arr.ant:Y* N01:"I%­­na1 Cp­:;11q cell[:­:­,,­e�ln­ad�x­,�30,),hvm a:7:r.Ia r­i,nrat­20 (measurement Tolerance_-3%) �I 1,t Y­s8%,')Af-er lno year o,75Sp anneal degradat—,2)81 2:4 f-,,2'va— Dimensions(mm/in) Temperature Coefficients NOCT 45±2'C Pmpp -0)41%j0(: ................ Voc -0.29% . 11, .................... ..— -- .......... ----- ......................... ..............---.._2 ka Isc 0,04%1'C Characteristic Curves I:^ tOWW ,q30:393 1 V a., 4 2—W I Y1 r-ffc 40 2222 'J R Cn I......... N.—IX r—d y 0­41 Z North Anerica Solar Business Tearn od Lctspecificatiorsare subjerttochange k.vitJhoutnotc2. A LG LG Electronics U.S.A.Inc -,L"Life's Good"is aregistrated trademark ofit-GCorp, Life's Good 000 Syivan Ave,Encetvo(A Lil fs:NJ 07632 Ail other LTaderr.ar�s are the property of respective k ` Contact LS-Al-60- Innovation for a Better Life ,vvvW;gsnIarusa.corn CopynghC-52014 LGElectra; cL.AIinqhtsrese.v_ I 06/17,12014 (8 LG Life's Good XIOn W.MtY ErNe9y X'J N Introducing Mori NeON module series,which uses highly efficient n-type materials,an elaborate process a�F�o•• c FFO ucT 60 cell control adopting a semiconductor processing solution ®V 1�1 i: and a double-sided structure.Our R&D concentrates on Intertek developing a product that is not only efficient,but strives Modd to increase practical value for-customers. � l `F N-Type Material -_--_ Near Zero LID(Light Induced Degradation) MonoX�NeON uses n-type cells,boasting The n-type cells used in MonoX0 NeON have ME 16P higher mobility of electric charge,resulting in almost no boron,which may cause the initial higher generation efficiency efficiency to drop,leading to less LID. Nano Level Control Double-Sided Cell Structure .AM AM MM MonoX`)NeON uses the Nano-level process ' The rear of the cell used in MonoX`i`NeON is control predominant in semiconductor designed to contribute to generation;the light processing process,which ensures less beam reflected from the rear of the module is electric loss from internal defects. reabsorbed to generate a great amount of additional power. "Db.Skg. About LG Electronics LG Electro❑s s a muitinat.rna poraten�.nm:nittcd to expanding it,:apace ty m.h soar e _r v busi ;as its future growth engine Our sc,tar energy rc yeses o an wa,launched i• 1935, backed y LG Group`rich expenence in serni-conmic.tors._CL chemistry and electronic imater ols industry.Wo,ucr'ns,=.ily released the h:st MonnX' eerie s tc,the rrm rKet in 2010 v-Nch exr,ortea x,32 counCie,in 2•tear,.In 20 3,P.'onr)0 NeON Kwon°Intsnmo'ar Aware,which Droved its leading innovation n the industry. Customer 1 J.Peter Reitt 591 Coles Meadow Rd. Northampton,MA 01060 Installer Valley Home Improvement,d.b.a. Valley Solar 340 Riverside Dr. Northampton,MA 01062 2 413-584-8844 info(a)valleysolar.solar Drawn by:Patrick Rondeau System—Roof Mount 31 total panels-305W LG modules 31 Enphase M250 microinverters 1—6 module array(220°,SW face) 2—25 module array(124°,SE face) External Wall Basement 20A/240V Intertie Solar AC 60A Breaker Breaker 0 20A/240V Disconnect 60A/240V 2aov 20A/240V Utility Meter Main Panel Sub Panel Rec Meter Combiner panel 200A 125A BUS r lff 340 Riverside Drive, Northampton,MA 01062 Www.valieysoiarsolar 413.584.8844 6119(2015 PVWatts Calculator 2,020 kWh per Year * nia AC En�rgy Energy Va!-,;e ki c n I i,, Sc ,r Rad'at'or, Wih kwh January 1.98 97 19 —4J"�Itl'�'{�Z v'3 F e b ru a r� 3.37 148 29 4.77 224 44 P r i 4.38 194 38 May 4.95 224 44 rune 4.35 188 37 july 4.61 198 39 August 4.30 186 37 S Q p.r C-mb e r 4.53 1193 38 October 4.22 189 37 x. Novsmb-er 2.74 124 24 December 1.14 55 11 WIIIIF:�" 10Z—Z.—"Y Lore aior and Staflon- idenllfficaVor, a_- `7 Requested Location 591 Coles Meadow Rd,Northampton,MA 01060 Weather Data Source (TMY3)CHICOPEE FALLS WESTO,MA 13 mi Latitude 42.2' N Longitude 72.53'W PV System Specifications DC System Size 1,83 kW Module Type Standard Array Type Fixed(roof mount) Array Tilt 45" Array Azimuth 220* System Losses 14% Inverter Efficiency 96% DC to AC Size Ratio 1.1 lnitW 'Econciiiic Comparison Average Cost of Electricity Purchased 0.20 S1kWh from Utility Initial Cost 4.00$[Wdc Cost of Electricity Generated by System 0.13 S1kWh Seier.;ted Iricentives Capacity Based Incentives(CSI) MassCEC-Commonwealth Solar 11 Rebates Rate:$0,75-Maximum Amount:$8,500.00 httpllpvwatts.mel.gov/pvwatts.php 1/2 6/19/2015 P"'Vatts Calculator N R E 7 ,955 kWh per Year * ar P A� Energy y Value -Sc�, Zadiatioin E n e ra IV kWh rn 2 f day f Wth', n U a n/ 1,77 362 71 iF a b ru a ry 3.00 658 lio parch 3.97 805 158 April 4.12 778 153 May 4.83 928 183 N'n 4.30 784 154 e juiy 4,52 818 161 August 4.26 774 163 September 4.20 765 151 I W- octo'--er 3,65 699 138 "ovember 2.43 462 91 221 44 Loca4ion anc!Station Identification Requested Location 591 Coles Meadow Rd,Northampton,MA 01060 Weather Data Source (TMY3)CHICOPEE FALLS WESTO.MA 13 mi Latitude 42.21 N Longitude 72,53'W PV Svstern Specifications DC System Size 7.625 kW Module Type Standard Array Type Fixed(roof mount) Array Tilt 45' Array Azimuth 124' System Losses 14% Inverter Efficiency 96% DC to AC Size Ratio 1.1 1;nitiai Ecowicrnnic Comparison Average Cost of Electricity Purchased 0.20$/kWh from Utility Initial Cost 4.00$[Wdc Cost of Electricity Generated by System 0.17$/kWh Sek>tod Incentives Capacity Based Incentives(CBI) MassCEC-Commonwealth Solar It Rebates Rate:50.75-Maximum Amount:S8.500,00 http�lipvwafts.nrel.gov/pvwatts.php 1/2 Facing NW — top right roof, 25 panels, pyramid. Note roof immediately below. Snow guards anticipated. yy wy Facing N — top right roof, 6 panels, no z snow guard anticipated Facing SW — top right roof, 25 panels, note deck and roof where snow guards needed 340 Riverside Drive, Northampton, MA 01062 _www.valleysolar.soiar 413.584.8844 N ., -. 4) National Grid customer: J.Peter Reitt 591 Coles Meadow Rd. Northampton,MA 01060 Site Diagram 1 of 2 e, Exterior'Wall Utility Meter Solar AC disconnect 240V/60A PV Array 1-25 modules Basement Main Panei PV Array 2—6 modules -Main Panel 31 total modules Sub-panel 31 Enphase M250 microinverters REC Meter 340 Riverside Drive,Northampton, MA 01062 www.valleysolar.solar 413.584.8844 Vreeland Design Associates An integrative approach to design engineering and site planning Date: August 19, 2014 To: Nelson Shifflett Valley Solar 340 Riverside Drive Northampton, MA 01062 From: David Vreeland, P.E. Vreeland Design Associates Re: J. Peter Reitt, 591 Coles Meadow Rd,Northampton, MA: Structural assessment of existing house roof to support proposed solar arrays. On 7/7/15, I conducted a site visit and investigated the existing roof framing in the area of the proposed PV panel installations. The 2-story,hipped roof house, was constructed in 2003. The existing rafters are 2x10 installed at 16" on-center, spanning 15'-6", with a roof pitch of 12/12. The hip rafters are 2— 14" LVL. There is potential for snow to slide off the panels onto a lower, shallow pitch roof and part of a first floor deck area below. The ceiling/roof of the lower roof is a cathedral ceiling, but the architectural plans indicate 2x8 rafters at 16" on-center, spanning 10'-6". The lower roof has adequate strength to support the additional snow, up to 70 psf snow load. However, it is suggested that snow guards be installed below the solar panels on the upper roof to reduce the possible wear on the shingles on the lower roof and increase the safety of the deck below. I have reviewed the mounting details for the proposed solar arrays. Based on a PV panel unit weight of 37±lbs, with the attachment points of the array placed at a maximum of 4' on center and staggered to minimize the load to any one rafter, the existing roof framing is adequate to support the proposed PV arrays. Please contact me if you have any questions or need additional information. Sincerely, �-,'a of ss�c DAVID A. yG VREELAND W"'C,; i CIVIL W David Vreeland, PE � �NO.4631 Vreeland Design Associates °gs GISTSQ NA 116 116 River Road, Leyden, MA 01337 Phone: (413) 624-0126 Email: dvreeland @verizon.net Fax: (413) 624-3282 The Commonwealth of Massachusetts C�1 Department of Industrial Accidents Office of Investigations ' r 600 Washington Street Boston, MA 02111 www.mass.gov/dia Workers' Compensation Insurance Affidavit: Builders/Contractors/Electricians/Plumbers Applicant Information 1,� Please Print Legibly Name (Business/Organization/Individual): �CLG�-e v, 1� ,-V D�C�`.�('L�i') 'i'Z� -TO L, Address: '-�d ��`�yK�' City/State/Zip: '" A of-P_aCC a`Ph e #: SA Are you an employer? Check the appropriate box: Type of project(required): 1.M I am a employer with 19 4. [] I am a general contractor and I 6 E] New construction employees(full and/or part-time).* have hired the sub-contractors 2.❑ I am a sole proprietor or partner- listed on the attached sheet. 7. ❑ Remodeling ship and have no employees These sub-contractors have g. E)Demolition working for me in any capacity. employees and have workers' 9 Building addition [No workers' comp.insurance comp. insurance.$ required.] 5. F1 We are a corporation and its 10.❑ Electrical repairs or additions 3.❑ I am a homeowner doing all work officers have exercised their 11.❑ Plumbing repairs or additions myself. [No workers' comp. right of exemption per MGL 12.❑ Roof repairs insurance required.] t c. 152, §1(4), and we have no employees. [No workers' l3.❑ Other comp. insurance required.] *Any applicant that checks box#1 must also fill out the section below showing their workers'compensation policy information. t Homeowners who submit this affidavit indicating they are doing all work and then hire outside contractors must submit a new affidavit indicating such. lContractors that check this box must attached an additional sheet showing the name of the sub-contractors and state whether or not those entities have employees. If the sub-contractors have employees,they must provide their workers'comp.policy number. I am an employer that is providing workers'compensation insurance for my employees. Below is the policy and job site information. Insurance Company Name: n Y)D AO ze CCU U 2 Policy#or Self ins. L ir.R. C_�r) 0 0 1,22 ! Expiration Date: a Job Site Address: l` l by A- 6 City/State/Zip: : Attach a copy of the workers' compensation policy declaration page(showing the policy number and expiration date). Failure to secure coverage as required under Section 25A of MGL c. 152 can lead to the imposition of criminal penalties of a fine up to $1,500.00 and/or one-year imprisonment, as well as civil penalties in the form of a STOP WORK ORDER and a fine of up to $250.00 a day against the violator. Be advised that a copy of this statement may be forwarded to the Office of Investigations of the DIA for insurance coverage v rification. I do hereby certify the pains a d penalti perjury that the information provided above is true and correct- Si ature: I " 1 r, ; ��^� Date: ` l�_2 Phone#: \\,2D- �y Official use only. Do not write in this area,to be completed by city or town official City or Town: Permit/License# Issuing Authority(circle one): 1.Board of Health 2.Building Department 3. City/Town Clerk 4.Electrical Inspector 5.Plumbing Inspector 6.Other Contact Person: Phone#: SECTION 8-CONSTRUCTION SERVICES 8.1 Licensed Con structi�on� `Supervisor: ` Not Applicable ❑ Name of License Holder: t` 5 l swl ��`�� 0 G 0 UL kve,6 1�0� � License Number ?.0 `t[221 t Address 13-5sLt Expiration Date L� =t�2z. gnature Telephone 9.Registered Home Improvement Contractor: Not Applicable ❑ Company Nafne Registration Number 7-koren&_ CA o(62- Address Expiration Date Telephone'At2i"VVA 1cOzz SECTION 10-WORKERS'COMPENSATION INSURANCE AFFIDAVIT(M.G.L.c.152,§25C(6)) Workers Compensation Insurance affidavit must be completed and submitted with this application.Failure to provide this affidavit will result in the denial of the issuance of the building pen-nit. Signed Affidavit Attached Yes....... No...... ❑ Owner Es� r -pti®n The current exemption for"homeowners"was extended to include Owner-occupied Dwellings of one(1) or two(2)families and to allow such homeowner to engage an individual for hire who does not possess a license,provided that the oymer acts as supervisor.CIAR 780, Sixth Edition Section 108.3.5.1. Definition of Homeowner:Person(s)who own a parcel of land on which he/she resides or intends to reside,on which there is,or is intended to be,a one or two family dwelling,attached or detached structures accessory to such use and/or farm structures.A person who constructs more than one home in a t%,2-year perlod sball not be considered a homeowner. Such"homeowner"shall submit to the Building Official,on a form acceptable to the Building Official,that he/she shall be responsible for all such work performed under the building permit. As acting Construction Supervisor your presence on the job site will be required from time to time,during and upon completion of the work for which this permit is issued. Also be advised that with reference to Chapter 152(Workers'Compensation) and Chapter 153 (Liability of Employers to Employees for injuries not resulting in Death)of the Massachusetts General Laws Annotated,you m y be liable for person(s) you hire to perform work for you under this permit. The undersigned"homeowner"certifies and assumes responsibility for compliance with the State Building Code,City of Northampton Ordinances,State and Local Zoning Laws and State of Massachusetts General Laws Annotated. Homeowner Signature Section 4. ZONING All Information Must Be Completed. Permit Can Be Denied Due To Incomplete Information Existing Proposed Required by Zoning This column to be filled in by Building Department Lot Size Frontage Setbacks Front Side L. R. L::... R Rear Building Height Bldg. Square Footage % Open Space Footage (Lot area minus bldg&paved parking) #of Parkin S aces _....... Fill: volume&Location _... __ _._...._ .._. _.............._..__. A. Has a Special Permit/Variance/Finding ever been issued for/on the site? NO 0 DONT KNOW YES 0 IF YES, date issued: IF YES: Was the permit recorded at the Registry of Deeds? NO 0 DONT KNOW YES 0 IF YES: enter Book Pages and/or Document# B. Does the site contain a brook, body of water or wetlands? NO 0 DONT KNOW ^ YES IF YES, has a permit been or need to be obtained from the Conservation Commission? Needs to be obtained Obtained , Date Issued C. Do any signs exist on the property? YES NO IF YES, describe size, type and location: D. Are there any proposed changes to or additions of signs intended for the property? YES 0 NO IF YES, describe size, type and location: E. Will the construction�activit'y disturb(clearing,grading, excavation, or filling)over i acre or is it part of a common plan that will disturb over 1 acre? YES 0 NO IF YES,then a Northampton Storm Water Management Permit from the DPW is required. SECTION 5-DESCRIPTION OF PROPOSED WORK(check all applicable) New House ❑ Addition ❑ Replacement Windows Alteration(s) ❑ Roofing ❑ Or Doors ❑ Accessory Bldg. ❑ Demolition ❑ New Signs [C]] Decks [M Siding[CIj Other So aK Z✓JV P6 A/ r Brief Description of Proposed Work: � N� a�/ �✓ (svrar� Jo✓t.els c,A rc c�. Alteration of existing bedroom Yes dC No Adding new bedroom Yes _�_No Attached Narrative Renovating unfinished basement Yes No Plans Attached Roll -Sheet 6a.if Flew:house`and or addition to existing housing,complete the following: a. Use of building :One Family ✓ Two Family Other b. Number of rooms in each family unit: //5 Number of Bathrooms 5 � c. Is there a garage attached? d. Proposed Square footage of new construction. Dimensions e. Number of stories? f. Method of heating? Fireplaces or Woodstoves Number of each g. Energy Conservation Compliance. Masscheck Energy Compliance form attached? h. Type of construction i. Is construction within 100 ft.of wetlands? Yes No. Is construction within 100 yr. floodplain Yes No j. Depth of basement or cellar floor below finished grade k. Will building conform to the Building and Zoning regulations? r Yes No. I. Septic Tank City Sewer Private well City water Supply SECTION 7a-OWNER AUTHORtZATION-TO BE COMPLETED WHEN OWNERS AGENT OR CONTRACTOR APPLIES FOR BUILDING PERMIT I, 960,1 b zA a _16i i' ,as Owner of the subject property , hereby authorize E ��� « �t �� �� ��n�amt CO 13—P �'�** x C_ to act on my behalf,in all matters tive to work autho ' ed by this building permit application. J S' nature of Owner Date as Owner/Authorized Agent hereby declare that the statements an information on the foregoing application are true and accurate,to the best of my knowledge and bell Gf. Signed under the pains and penalties of perjury. Print Name Signatur Owner/Age Date Department use only . City of Northampton Status of Permit: I- ( Building Department Curb Cut/Driveway Permit A 21 20�� 212 Main Street Sewer/Septic Availability. f Room 100 WaterMell Availability Electric,Plumbing&Gas Inspections orthampton, MA 01060 Two'Sets of Structural Plans Northampton,AAA optione 3-587-1240 Fax 413-587-1272 Plott.Site Plans Other Specify- APPLICATION TO CONSTRUCT,ALTER,REPAIR,RENOVATE OR DEMOLISH A ONE OR TWO FAMILY DWELLING SECTION 1 -SITE INFORMATION 1.1 Property Address: ? / I � ` This section to be completed by office Map Lot Unit — Zone 47 94-vt fa T�L%.�./ /A Zone Overlay District Elm St.District CB District SECTION 2-PROPERTY OWNERSHIP/AUTHORIZED AGENT 2.1 Owner of Record. r;� / r) G1 ✓ -1 i3+ 41 l - r < t Name(Print) Current Mailing Address: Telephone Signat 1,d. 2.2 Authorized Acient: \IOAr-A t ro.>�rn�Cti�, CcX1L Q-o.6o� �o�al Name(Print Current Mailing Address: 4l3-GSLk -`1522 Signature Telephone SECTION 3-ES (MATED CONSTRUCTION COSTS Item Estimated Cost(Dollars)to be Official Use Only com leted by ermit applicant 1. Building (a)Building Permit Fee 2. Electrical b Estimated Total Cost of 3 �0 ' 'Z ��' U-o ( ) Construction from 6 3. Plumbing Building Permit Fee 4. Mechanical(HVAC) 5.Fire Protection 6. Total=0 +2+3+4+5) S-0— Check Number r This Section For Official Use Only Building Permit Number: Date Issued: Signature: Building Commissionertinspector of Buildings Date 7� i File#BP-2016-0080 APPLICANT/CONTACT PERSON VALLEY HOME IMPROVEMENT INC ADDRESS/PHONE P O BOX 60627 FLORENCE01062(413)584-7522 PROPERTY LOCATION 591 COLES MEADOW RD MAP 03 PARCEL 029 001 ZONE RR(100)/WSP(100)/RI(32)/ THIS SECTION FOR OFFICIAL USE ONLY: PERMIT APPLICATION CHECKLIST ENCLOSED REQUIRED DATE ZONING FORM FILLED OUT Fee Paid Building Permit Filled out Fee Paid Typeof Construction: INSTALL ROOF MOUNTED SOLAR ARRAY New Construction l (w Non Structural interior renovations Addition to Existing Accessory Structure Building Plans Included: Owner/Statement or License 060300 3 sets of Plans/Plot Plan THE FOLLOWING ACTION HAS BEEN TAKEN ON THIS APPLICATION BASED ON INFORMATION PRESENTED: Approved Additional permits required(see below) PLANNING BOARD PERMIT REQUIRED UNDER:§ Intermediate Project: Site Plan AND/OR Special Permit With Site Plan Major Project: Site Plan AND/OR Special Permit With Site Plan ZONING BOARD PERMIT REQUIRED UNDER: § Finding Special Permit Variance* Received&Recorded at Registry of Deeds Proof Enclosed Other Permits Required: Curb Cut from DPW Water Availability Sewer Availability Septic Approval Board of Health Well Water Potability Board of Health Permit from Conservation Commission Permit from CB Architecture Committee Permit from Elm Street Commission ,Permit DPW Storm Water Management e lition Delay ture o B ui i g Of cial Date Note: Issuance of a Zoning permit does not relieve a applicant's burden to comply with all zoning requirements and obtain all required permits from Board of Health,Conservation Commission,Department of public works and other applicable permit granting authorities. *Variances are granted only to those applicants who meet the strict standards of MGL 40A. Contact Office of Planning&Development for more information. 591 COLES MEADOW RD BP-2016-0080 GIs#: COMMONWEALTH OF MASSACHUSETTS Map:Block: 03 -029 CITY OF NORTHAMPTON Lot:-001 PERSONS CONTRACTING WITH UNREGISTERED CONTRACTORS Permit: Building DO NOT HAVE ACCESS TO THE GUARANTY FUND (MGL c.142A) Category: SOLAR PANELS BUILDING PERMIT Permit# BP-2016-0080 Project# JS-2016-000151 Est.Cost: $36250.00 Fee:$217.50 PERMISSION IS HEREBY GRANTED TO: Const. Class: Contractor: License: Use Group: VALLEY HOME IMPROVEMENT INC 060300 Lot Size(sg. ft.): 281049.12 Owner: REITT BARBARA B Zoning: RR(100)/WSP(100)/RI(32)/ Applicant: VALLEY HOME IMPROVEMENT INC AT: 591 COLES MEADOW RD Applicant Address: Phone: Insurance: P O BOX 60627 (413) 584-7522 Workers Compensation FLORENCEMA01062 ISSUED ON.81412015 0:00:00 TO PERFORM THE FOLLOWING WORK:INSTALL ROOF MOUNTED 9.4 KW SOLAR ARRAY POST THIS CARD SO IT IS VISIBLE FROM THE STREET Inspector of Plumbing Inspector of Wiring D.P.W. Building Inspector Underground: Service: Meter: Footings: Rough: Rough: House# Foundation: Driveway Final: Final: Final: Rough Frame: Gas: Fire Department Fireplace/Chimney: Rough: Oil: Insulation: Final: Smoke: Final: THIS PERMIT MAY BE REVOKED BY THE CITY OF NORTHAMPTON UPON VIOLATION OF ANY OF ITS RULES AND REGULATIONS. Certificate of Occupancy Signature: FeeType• Date Paid: Amount: Building 8/4/2015 0:00:00 $217.50 212 Main Street,Phone(413)587-1240,Fax: (413)587-1272 Louis Hasbrouck—Building Commissioner