24B-048 (6) f
- ' t 1/2'TYPE -1 CLASS t
oe'AL TOP PANFL - BIT. CONIC. SURFACE
1/2'E TOP a BOT , , RESER/LG COURSE
�^a --r.. /1•.1'HOT-dPPEa GALV.
�K".I �I I L_ NUTS!Bd.TS
1„y t:t2 I""CCOAn""cF 201/2 TYPE -t CLASS 7 BIT.
j 3 /U.S.O.O.T.MANUAL ON
CONTRACTOR SHALL PROVIDE ALL MATERIALS,LABOR,EOUIPMENT,PERMITS AND APPURTENANCES NECESSARY TO PROVIDE A COMPLETE PROJECT SIDEWALK �e a3 MAX. MAX, ¢s uwFORw TRAFFIC coNltioL ® - CONIC. 81NDER COURSE
AS INDICATED ON THE PLANS. yw`" DEVICES
THE CONTRACTOR SHALL NOTIFY DIG-SAFE AT LEAST 72 HOURS BEFORE(TEL. 1-800-344-7233)COMMENCEMENT OF CONSTRUCTION. NOTE:SIG"TO BE PLACED
NO EXCAVATION WILL BE ALLOWED WITHOUT A VAUD DIG SAFE NUMBER. ON FACE OF BUKDINO
1:1 Mac i:i MAX. 6'M. ON OTHERWISE
dRECIID.
ALL CONSTRUCTION ACTIVITIES TO CONFORM TO THE CITY OF NORTHAMPTON AND MASS. HIGHWAY SPECIFICATIONS k REQUIREMENTS. N
ACCE<�IBL
THE CONTRACTOR WILL PROTECT al CUTS WITH BARRICADES AND UGHTS. PROVIDE POLICE PROTECTION,AND AGREE TO SAVE THE T-0'MIN.
CITY OF NORTHAMPTON AMID THE OWNER HARMLESS FROM ALL CLAIMS FOR DAMAGES WHATSOEVER. EDGE OF ROADWAY To a usm FOR Au
VAN AGa[y51B1(SPACES
PERMITS WILL BE REWIRED BY CONTRACTOR WHEN WORKING OR OCCUPYING PUBLIC WAY.CONTRACTOR RESPONSIBLE FOR RECEIVING 12'SUB-BASE COURSE
APPROVALS FOR ANY WORK FOR WHICH A PERMIT IS REQUIRED. 2'O.D.GAV. GRAVEL BORROW
MHO TYPE M 1.03.0 TYPE 8
CONTRACTOR TO CONFIRM THE SIZE AND LOCATION OF INVERTS FOR ALL EXISTING STRUCTURES'FO BE CONNECTED TO PROPOSED LINES STEEL POST—\
PRIOR TO COMMENCEMENT OF CONSTRUCTION.TRAFFIC SHALL BE MAINTAINED AT ALL TIMES.
N.T.S. sEAwrr
IT SHALL BE THE CONTRACTOR'S RESPONSIBIUTY TO MAINTAIN ALL UTILITIES FUNCTIONING PROPERLY IN THE AREAS UNDER CONSTRUCTION sLFEVE
PRIOR TO THE TIME WHEN THE FINAL SYSTEM IS PUT INTO USE.ALL PIPES AND STRUCTURES WITHIN THE LIMITS OF THIS CONTRACT TMpp�,H wALX TENSAR SS-i (BXi t00 GEOGRID
SHAD,BE LEFT IN A CLEAN AND OPERABLE CONDITION AT THE COMPLETION OF THE WORK. THE CONTRACTOR SHALL TAKE ALL NECESSARY ---- TIN.GPPw4E OR APPROVED EQUAL. �NSTALL PER
PRECAUTIONS TO PREVENT SAND AND SILT FROM DISTURBED AREAS FROM ENTERING THE SYSTEM.CONTRACTOR IS RESPONSIBLE FOR DAMAGE _ _ ON NAUI MANUFACTURERS RECOMMENDATIONS
SUSTAINED TO ANY EXISTING UTIUTIES AND IT is HIS RESPONSIBILITY TO MAKE REPAIRS TO THE REQUIREMENTS OF THE CITY OR UTILITY COMPANY. -
;I--•�^—CONCRETE PAVERS EARTH I
LOCATIONS OF UTILITIES SHOWN ARE THE RESULT OF SURFACE EVIDENCE AS LOCATED BY FIELD SURVEY. PLANS OF RECORD,AND OTHER AVAILABLE SOURCES. .'(FLUSH W/ADJACENT SURFACE) .�
THESE PLANS W NOT NECESSARILY DEPICT THE EXACT LOCATIONS OF ALL UTILITIES WHICH MAY EXIST. CONTRACTOR TO LOCATE ALL UTILITIES PRIOR TO CONSTRUCTION. - _ i- N T Iv_C
THE CONTRACTOR SHALL PRESERVE AND PROTECT ALL BOUNDS AND PROPERTY MARKS AS SHOWN ON THE PLANS,LOCATED BY THE ENGINEER IN THE FIELD. OR _ _ SAND
LOCATED WRING THE COURSE OF THE CONSTRUCTION.ANY PROPERTY MARKS OR BOUNDS DISTURBED OR DESTROYED FOR REASON SHALL BE RESTORED BY A _
REGISTERED LAND SURVEYOR AT TIE CONTRACTORS EXPENSE. — 7 I
THE CONTRACTOR SHALL BE SOLELY RESPONSIBLE FOR LAYING OUT ALL ITEMS OF THE WORK BASED ON CERTAIN HORIZONTAL CONTROL AND BENCHMARKS SUPPLIED -
BY THE SURVEYOR OF RECORD.ANY DISCREPANCIES SHALL BE IMMEDIATELY REPORTED TO THE ENGINEER. _
TIE CONTRACTOR SHALL THOROUGHLY INFORM HIMSELF/HERSELF AS TO THE REQUIREMENT OF ALL AGENCIES HAVING JURISDICTION WITH THIS PROJECT. POST SET IN WALK
THE CONTRACTOR SHALL KEEP ON SITE AT ALL TIMES COPIES OF DOCUMENTATION OF ALL PERMITS. CATCH r. - - 'T_`\%- '- AND CRATE FRAME
PRIOR TO CONSTRUCTION.CONTRACTOR TO STAKE WORK LIMIT.CONTRACTOR TO DO WHAT IS NECESSARY TO SECURE LIMIT OF CONSTRUCTION TO PREVENT __ - __— �J j j i i''N_
ACCESS BY OTHERS. =-_---
N.T.S. M
ALL EXCAVATION SHALL COMPLY WITH OSHA'S LATEST STANDARDS.ALL REQUIREMENTS OF OSHA'S EXCAVATION SHALL BE PROVIDED BY THE CONTRACTOR,INCLUDING !�.A-t�{I`\j� CEMENT MORTAR
BUT NOT UNITED TO.THE PROVISIONS FOR A COMPETENT PERSON ON SITE AND ANY REQUIRED DOCUMENTATION THAT MAY REQUIRE CERTIFICATION BY THE ENGINEER. FS5LUSHgACCEEW/Ap.IACFNT N.ts. BRICK AS REQUIRED
CONTRACTOR TO DEWATER AS NECESSARY TO KEEP CONSTRUCTION AREA FREE OF WATER,CONTRACTOR SHALL DISCHARGE WATER FROM DEWATFRING TO APPROPRIATE CONCRETE P vEPS SEE PAVEMENT
CEMENT CONCRETE
LOCATION AND WITHOUT SEDIMENTATION. STRUCTURE DETAIL
/-AOJACEM SURFACE SIDEWALK B..
_� 18'TO 2W TAPERED B 2W-f t'
EROSION CONTROLS AS NECESSARY,SHALL BE CONSTRUCTED PRIOR TO START OF CONSTRUCTION AND INSPECTED BY THE CffY. TE j-')T��� rT 7- 1� SECTION,CONIC.BLOCK 6-MIwMUw
U LJ L.f _J OR CONCENTRIC
AREAS SUBJECT TO EROSION SHAM BE MINIMIZED IN TERMS OF P.ME AND AREA, SAND 1"-2" PRECAST CONIC.UNITS. 30
ALL JOINTS
_ 1/i6' PER F'. TO BE SEALED I �\ PPE TO BE Sc O FULL
E GENERAL,WORK REQUIRING EROSION CONTROL INCLUDING EXCAVATIONS, FILLS,DRAINAGE $WALES, DITCHES. ROUGH AND FINISH GRADING,AND STOCKPILING OF EARTH. _-.._ _._._.._ 't11— }� 9E,OF VORTAR OR
EROSION CONTROL MEASURES SHALL BE MAINTAINED UNTIL ALL AREAS ARE STABILIZED. EROSION CONTROL MEASURES SHALL THEN BE REMOVED AND THE AREA ARE TO 6' - GaaVEI N ___ __ i 'SEPHOLE Q NEOPRENE SEAL OPTION.
2'
BE FINISHED GRADED AND PLANTED AS SHOWN ON THE DRAWINGS. - MHD TYPE MI.O3G C ° T - 1� e CONIC.BLOCK OR t' (SEE NOTE) t--
1 R THRU PRECAST I OUP..c
ALL GRAVITY SEWER LINES TO BE 6'e PVC SDR-35 PIPE. CONIC.UNITS,VARIABLE plpE
'fp B'DI4 HOLE IN CENTER
GRAVITY AND SEWER FORCE UNE AND SANITARY SEWER SYSTEM COMPONENTS TO BE INSTALLED TO THE REQUIREMENTS OF THE TOWN OF NORTHAMPTON. AB'3"D14 OF BASE.HOLE TO BE
__ FILLED WITH CLASS
MINIMUM OF 5'-C'OF COVER TO BE MAINTAINED OVER SEWER UNES. SEWER FORCE MAIN TO BE DEPRESSED IN AREAS WHERE UTIUTY CROSSING CONFLICT. MIN.SUMP 6'MIN. PRECAST OR D"CONCRETE.
MINIMUM VERTICAL SEPARATION BETWEEN THE FORCE SEWER UNE AND OTHER UTIUTIES TO BE"NTAINED. 6 X 6 X 6/6 _ AFTER INSTALLATION.
WWM 5-MIN. I TUB
• ALL WATER AND SEWER LINES SHALL HAVE 10 FEET MINIMUM HORIZONTAL SEPARATION OR WATER UNE SHALL BE 18'ABOVE THE SEWER UNE PROVIDED ADEQUATE --- —
COVER IS MAINTAINED.WHERE SEPARATIONS CAN NOT BE MAINTAINED,WATER UNE TO BE ENCASED IN CONCRETE FOR A DISTANCE OF 10' BEYOND CROSSING. 6'SUBBASE
A MINIMUM OF 6 INCH VERTICAL SEPARATION OF SEWER FROM DRAINAGE PIPES TO BE MAINTAINED. - - -' _/
SUBGRADE
NOTE. WEEPHOLES TO BE 4'V.C.PIPE 12-LONG PLACED THROUGH EACH WALL OF GTCH BASH.
IF LOCATIONS,SIZES,ETC.CHANGE FROM THESE PLANS,THE PROPOSED CHANCES SHALL BE SUBMITTED TO THE OWNER/ENGINEER FOR REVIEW AND : t v OUTSIDE ENO TO BE COVERED WITH 1/4'MESH GALVANIZED WIRE SCREEN.PLACE 1/4'C.Y.
APPROVAL PRIOR TO CONSTRUCTION. CEMENT CONCRETE SCREENED GRAVEL(t'TO 1 1/27 AROUND OUTSIDE END OF PIPE.USE A MINIMUM OF 3
-- CURB COMPACTED SUBGRADE WEEPHOLES PER BASIN.
ALL UNSUITABLE ANTI/OR EXCESS MATERIAL SHALL BE REMOVED AND BE DISPOSED OF IN A LEGAL MANNER. EXCESS MATERIAL IS THE PROPERTY OF THE CONTRCTOR IJ.T.S.
AND SHALL BE TRANSPORTED OFF SITE AS PER OWNERS DIRECTION.ALL AREAS DISTURBED SHALL BE RESTORED,WITH GRASS AREAS TO BE LOAMED AND SEEDED AND
AREAS TO BE PAVED AS PER DETAILS. ,� !T 1 r'• --
CO
` PAVEMENT, CURB & SIDEWALK N.T.S. ------
LC) -°"_ -� N.T.S.
BIT.CONIC.CURB.MHO TYPE 2 NQ. OF
SET ON BINDER DIMENSION 'A'=62.38'
s-SHREDDED BARK MODEL k DIM.
( A LOOP S
PS
a tt A An,H arc r + M MULCH(TYP.) NOTE: TB 3 4, ,
. .
LIES EMBEDDED MOUNTING OPTION TB - 5
CD '� F'_ ;' nc.. CU_:'.56
CREATIVE PIPE OR APPROVED EQUAL \ TB - 7 .3 T
3 USE MODEL
S SEE PAVEMENT TB - 9 315.391 7
('T7 s,,r t9�>mml -� �- r STRUCTURE DETAIL TB - 13 134.38' n
r ,,,,
- / __ 12.00' TB - Il 1 0.38' 9
r
Cu RACK
,
_ � O
DASH NUMBER IS THE NUMBER OF BIKES PER RA
7 M TB - 13 HAS AN ADDITONAL 3rd LEG FOR SUPPORT
CD
- �-- USE _ 2. GROUND L VEL FLANGE DETAIL .560'DI'-
(� P.rCVEH�- - E _ _
10.25' RE f W LC S
tV ( h '.ot o h ed V F d' I r I ey. .300'MILD STEEL
I j INSTALLATION L-� 4.00'
Ne tt F t n T PLATE B 7.00' 01A TYP.
1.Standard Enbedded Anchor Mount
Nountlna Dotson s, Enbedded or Surface Mount
r s d cy a d,a1 s aid Creative Plpe bicycle racks are —bedded CREATIVE PIPE
V I 1 I 12'COMPACTED GRAVEL !0 14• drrground Brfore npplying Finish Finish Option I Standard-Hot-DI Galvanized TB - SERIES BIKE RACKS
s•ux a.,cP.,c�nauASS, w.s PER MHO Mt.03.0 TYPE 8 each to of the rack Is drilled 3' above the base P
CLI \ M nx.u.£+a PPE .,.r_a. I and fitted e,th n 6'long, 7/16' dlnnener steel Optional - Powder Cont ( Color Your Choice) MATERIAL,2' SCH. 40 PIPE
cross bar Thls Cross bar s Welded 1 to place,
c...m. !`�/E I/ �'T O. '''. ) �,.� Iles horizontally,and acts n5 an anchor. Optional - PFS Thernopins HC Coat( Color Your Choce) OPTIONAL, 1 I/4'SON.40 PIPE
3 ,�
Q N T.S.
co N.T.S.
c
y �
Q
Q CURRENT DATE: 12/08/98 HORIZ SCALE: N/A
GENERAL CONSTRUCTION DETAILS OJECT NO: 98241
Y vERT SCALE: N/A HUNTLEY PR DRAWING N0: 241 DET
LOT 6 GARCON DRIVE
e O FIELD WORK: FINAL DATE: FILE NO:
CHECKED:COMPS:
NORTHAMPTON, MASSACHUSETTS ALMER H NTUEY, JR. & ASSOCIATES, INC. SHEET No.
/ PREPARED FOR SURVEYORS ENGINEERS LANDSCAPE ARCEOTECTS
SURVEYOR: DESIGN: 30 INDUSTRIAL DRIVE FAST C OF 6
NO. DATE BY REVISIONS ENGINEER: DLL DRAFTING: COG/RJR CARLON MEDICAL, L.L.P. NOSTILWPTON. MASSACHUSETTS 01061 V
SECT10N "B' --- —
1) ALL AREAS THAT ARE DISTURBED DURING GRADING OPERATIONS WHICH WILL NOT BE PAVED WILL RECEIVE 6'LOAM,SEED AND BE COVERED BALED HAY HELD
- ' WITH TOBACCO NETTING. TOGETHER BY
WOODEN STAKES
7 7- ST pp 2) EROSION CONTROL MEASURES SHALL BE INCORPORATED IN THE SEQUENCE OF CONSTRUCTION TO PREVENT SEDIMENT LADEN WATER FROM I"$D. OAK POST
SECTION "A' �.Sp OAK LEAVING THE SITE.
AL COUPLER 3) NATURAL VEGETATION SHALL BE RETAINED WHENEVER FEASIBLE UP TO THE SCHEDULED START OF A CONSTRUCTION ACTIVITY IN THE SUPPORT NET
1"$O,OAK POST A N'E AREA WHERE POSSIBLE.CLEARING SHALL IMMEDIATELY PRECEED CONSTRUCTION ACTIVITY. INDUSTRIAL
"8 RIC POLYPROPYLENE -
SUPPORT NET FILTER F�TO POSTpRCNZo 4) AREAS SUBJECT TO EROSION SHALL BE MINIMIZED IN TERMS OF TIME AND AREA
INDUSTRIAL (S�,�EO00 OR FILTER FABRIC
5) IN GENERAL.WORK REQUIRING EROSION CONTROL INCLUDES EXCAVATIONS,FILLS, DRAINAGE,SWALES AND DITCHES,ROUGH AND FINISH VOW 100 OR
POLYPROPYLENE EQU�-^z GRADING,AND STOCKPILING OF EARTH. APPROVED EQUAL
FILTER FABRIC 1 6ECTON
6) EROSION CONTROL MEASURES SHALL WHERE APPUCAM.E.INCORPORATE AT LEAST THE FOLLOWING PROCEDURES DETAILED ON THIS DRAWING. 1/8-To I/4"
APPROVED 700 OR SE �ON B A) TEMPORARY BARRIER OF HAY BALES TO PREVENT SEDIMENT-LADEN WATER FROM ENTERING STORM ORNN1GE SYSTEMS. CRUSHED STONE
APPROVED EQUAL B) TEMPORARY A
TEMPORARY BARRIER OF HAY BALES TO ACT AS EROSION CHECKS THE TOES OF EMBANKMENTS AND SLOPES.
j BACKF LI
BACKFILL BACKFILL C) TEMPORARY EARTH BERMS TO ACT AS SEDIMENT TRAPS IN AREAS OF EXTREME RUNOFF. fff///
0) TEMPORARY EROSION CHECKS IN DITCHES AND SWALES TO PREVENT SEDIMENT-LADEN WATER FROM ENTERING BODIES OF SURFACE DIRECTION OF SLOPE
WATER.
E) PROVIDE TEMPORARY SLOPE EROSION CONTROL WHERE REQUIRED. � •
I 6.
F) FILL AND GRADING SHALL BE TREATED WITH SLOPE STABIUZATION SEEDING AND HAY MULCH UPON COMPLETION. -- -
7) ADDITIONAL EROSION CONTROL MEASURES SHALL BE INCORPORATED AS DIRECTED BY THE ENGINEER WHEN THE EXISTING
o MEASURES ARE INADEQUATE
.I
8) EROSION CONTROL MEASURES SHALL BE MAINTAINED UNTIL FINISHED GRADE IS STABILIZED. EROSION.CONTROL MEASURES SHALL THEN
BE REMOVED AFTER ALL DISTURBED AREAS ARE STABILIZED WITH A THICK COVER OF GRASS OR ADEQUATE SURFACE TREATMENT AS NOTED
-)I M �..r. .'r!!J N , ; r r r ON THESE PANS AND SPECIFICATIONS.
N.LS.
-- - ai 1 7 ,l, N E
' 1) 'WORK IN OR NEAR WETLANDS"IS DEFINED AS ANY AREA WHERE CONSTRUCTION IS WITHIN A WETLAND OR WITHIN SAi
--- 100 FEET OF A WETLAND(BUFFER)AS DEFINED M.C.L. CH. 131, SAO WETLAND PROTECTION ACT OR AS DEFINED BY
CITY/TOWN BYLAW IN THE CITY/TOWN THE PROJECT IS TO BE LOCATED. N.T.S.
6'-0"
BALES TO 2) MAJOR WETLANDS AND BUFFERS SUBJECT TO APPLICABLE RESTRICTIONS OF THIS CONTRACT ARE INDICATED ON
BUTT -
HE PLANS.
TOGETHER _ TOE OF SLOPE 3) NO MATERIALS SUBJECT TO EROSION SHALL BE STOCKP!LEO OVERNIGHT WITHIN 100 FEET OF A WETLAND, BROOK,
FLOW TOP OF RIVER BANK.OR OTHER AREA DEEMED AS WETLANDS OR BUFFERS BY THE ENGINEER.
'
SUITABLE 4) ALL EXCAVATED MATERIALS SHALL BE CASTED AWAY FROM WETLANDS.BROOKS, RIVERS, OR OTHER AREAS
Ij BACKFIIL DEEMED WETLANDS OR BUFFERS BY THE ENGINEER. I WIDTH VARIES
ENGINEER.4- MIN. (TYP.) r
5) PIPE TRENCHES SHALL BE TOTALLY BAC KF!LiEO AT THE ENO OF EACH WORK DAY, UNLESS APPROVED BY THE _ APPROX. EXISTING GROUND
!{ � GI _
COMPACTED SELECT 6) SEDIMENTATION CONTROL FENCES SHALL BE INSTALLED PRIOR TO CLEARING. SEE PLANS FOR LIMIT. THE
4"MIN.
�. MATERIAL AS REO'C } CONTRACTOR SHALL MAINTAIN THESE FENCES UNTIL FINAL ACCEPTANCE BY THE ENGINEER. 5 1 01
PIPE 7) DISTURBED AREAS SHALL BE GRADED. LOAMED AND SEEDED AND RESTORED WITHIN I �\ PERMEABLE SOIL
J ONE(1) WEEK OF INSTALLATION OF PIPE.
CONCRETE 8) THE FINISHED GRADE OF DISTURBED AREAS SHALL MATCH EXISTING TOPOGRAPHY OF THE AREA PRIOR TO
CONSTRUCTION, UNLESS INDICATED OTHERWISE ON THE PLANS.
BALE HAY ------' 9) THE CONTRACTOR SHALL CONSTRUCT TEMPORARY CROSS DITCHES,CULVERTS AND SWALES,AS NECESSARY TO
HELD IN PLACE MAINTAIN EXISTING SURFACE WATER LEVELS. SUBJECT TO THE APPROVAL OF THE ENGINEER.
-' -
WITH 2"z 6"MIENGINEER.2'x3'-0" -
---- ----- 10) THE FUNCTIONING OF TEMPORARY CULVERTS, DITCHES, SWALES OR CONSTRUCTION OPERATIONS SHALL NOT N.LS
STAKES - 6'-0" CAUSE NOTICEABLE SEDIMENTATION PLUMES. IF PLUMES OCCUR,THE CONTRACTOR SHALL STOP WORK AND
2 PER BALE /-FILL UNDISTURBED INSTALL EROSION CONTROL DEVICES IMMEDIATELY TO PREVENT FURTHER SEDIMENTATION.
MATERIAL 11) ACCUMULATED SEDIMENT SHALL BE REMOVED AND DISPOSED OF BY THE CONTRACTOR AS REQUIRED OR AS
DIRECTED BY THE ENGINEER.
FLOW
co �—_-- - 12 TRANSFER AND/OR STORAGE OF FUELS, LUBRICANTS, ETC.. WILL NOT BE PERMITTED WITHIN SENSITIVE AREAS
- �\ " WITHOUT PRIOR APPROVAL OF THE ENGINEER. TRANSFER WILL NOT BE PERMITTED WITHIN 100 FEET OF A POND, LAKE,
m - TOE OF _! '? r -�'' `,j-I.I A FLOWING BROOK OR RIVER AND NO STORAGE WILL BE ALLOWED EXCEPT IN APPROVED FENCED-SECURED AREAS. 1' MIN,-,
� - SLOPE --
`� N.T.S. 13) EQUIPMENT SHALL NOT BE PARKED WITHIN WETLANDS OR BUFFER AREAS EXCEPT DURING ACTUAL OPERATIONS
C7 _) EXISTING GROUND REQUIRING SAID EQUIPMENT. 1 - __ 2
IZD
6" .MODIFIED ROCK FILL NORTH AMERCA
IN GREEN
-- --- --- MHO M2.02.4 EROSION CONTROL MA-.
CD FOR CHECK DAM OR APPROVED EQUIVLEN-
FOR SWALE OUTLET
di
--,t _ - -
L ICI � 3/4" - 3"GRAVEL
N.T.S. o - - CORE
Do
o-•,
BALES OF HAY L — --.- .!,1
N.T.S.
-'-- ----. CURBING BALED HAY HELD W
3 _ PLACE WITH 2"x2"x3'-0'
STAKES - 2 PER BALE 6 r -
CD
Gu TIER
L
STORM SEWER STRUCTURE _
r-- r— F R(. 1 F _T 1- h;i ��
) L
N.T.S. r _
N.T.S.
CO
a C
Q CURRENT DATE: 12/08/98 VERIZ SCALE: N/A EROSION CONTROL NOTES AND DETAILS HUNTLEY
cf)/ DRAwENC N0: 2a8EN0T
VERT SCALE: N/A
� LOT 6 GARCON DRIVE
FIELD WORK: FINAL DATE: FILE NO:
° COMPS: CHECKED: NORTHAMPTON, MASSACHUSETTS AtaER HUNTIM. JR. x ASSOCIATES, INC.ENGINEERS LANDSCAPE ARCHITECTS SHEET No.
SURVEYORS
SURVEYOR: DESIGN: DLL PREPARED FOR 30 INDUSTRIAL DRIVE EAST
- — GARCON MEDICAL, L.L.P. xoRrxan�TOx, uASSacx�saTrs 5 QF 6
N0. DATE BY REVISIONS ENGINEER, DL, DRAFTING: RJR/CDG
I
t SPREAD
MERIDIAN OF PLAN BO
OK 147 PgDE 94
•PLANT SO THAT TOP OF ROOT V'A °
N BALL IS EVEN WITH THE
ORTNAMPTON CO FINISHED GRADE �o ` u
ORDWq TE SYSTEM PAINT ALL CUTS OVER I'DIA. / FORM SAUCER WITH c V V o 4" MULCH
3"HIGH CONTINUOUS
2 STRAND TRISTED 72 GUAGE 1\ RIM
PLANTING NOTES GAL. ARE ENCASED IN t"DIA. I -
RUBBER HOSE _ - `:I -
- SPECIFIED PLAN TING
7. ALL NURSERY STOCK SHALL BE IN CONFORMANCE WITH THE AMERICAN STANDARD HARDWOOD STAKES MIX. WATER &TAMP
FOR NURSERY STOCK, AS PUBLISHED BY THE AMERICAN ASSOCIATION OF NURS- TO REMOVE AIR
2 STAKES 2' % 2" \� POCKETS _-
ERYMEN AS TO SIZES AND FORM. DRIVEN (MIN. 18-) FIRMLY - ,-
INTO SUBGRADE PRIOR - ACCESS
2. ALL PLANTS SHALL CONFORM TO THE MEASUREMENTS SPECIFIED IN THE TO BACKFILLING KRAFT PAPER TREE WRAP -_- 1 EASEMENT _
PLANTING UST, EXCEPT THAT PLANTS LARGER THAN THOSE SPECIFIED MAY BE ✓� FROM TOP OF ROOT BALL ` UNDISTURBED OR ` _ - AREA
USED IF APPROVED BY THE LANDSCAPE ARCHITECT. I'✓1 TO FIRST BRANCHES - -- - - - - - - - "
STAKE ABOVE FIRST BRANCHES COMPACTED SUBGRADE 4,584 sa.ft. TNO
OR AS NECESSARY FOR FIRM _ GnON
3. ALL PLANTS SHALL BE NURSERY-GROWN IN ACCORDANCE WITH GOOD HORTICUL- SUPPORT MULCH 4"MIN. J P l 'V•,+- ` vEGETAt(OEp y♦.2 CONSIRU
TO THOSE INnTHE PROJECT LOCAUrY OR AT O LEAST TWO YEARS. SIMILAR FORM SAUCER WITH _ N.i S. -- \ \ BU5`T,,GEED' CARLON I-
5" HIGH CONTINUOUS RIM -- - - ` _ \\ 9,R N REO FOR A47
4. BALLED AND BURLAPPEO PLANTS(B &8) SHALL BE MOVED WITH THE ROOT SYS- _ - - INV. OUT 10'PVC 'y A45A ?REPA
TENS AS SOLID UNITS. THE BALLS SHALL BE FIRMLY WRAPPED WITH BURLAP. SPECIFIED PLANTING MIX ELEV.-145.15' .C^ _ _ _ d45
WATER &TAMP TO - - - _ _r-
5. PLANTING SOIL REMOVE AIR POCKETS
A. PLANTING SOIL SHALL BE A MIXTURE OF 2/3 TOPSOIL AND 1/3 PEAT MOSS 1- t UNDISTURBED OR PROPOSED SEDIMENT CONTROL A4�
):2 X BALL -._ BARRIER/WORK CJMIT LINE r
BY VOLUME. NOTE: _ .- COMPACTED SUBCRADE CONCRETE BLOCK
B. PLANTING SOIL SHALL HAVE A PH VALUE RANGE OF 5.5 TO 7.0. IF STAKING AS REQUIRED CIA. PAVER 'WALK
PLAN NC SOIL DOES NOT FALL WITHIN REQUIRED pH RANGE. LIMESTONE �� _�-p ` L f
OR ALUMINUM SULFATE SHALL BE ADDED TO BRING THE pH WITHIN THE _,_- A39 i `i'
SPECIFIED LIMITS. -
r
B. PLANTING BEDS TO RECEIVE 3-INCH DEPTH OF SHREDDED BARK MULCH OVER N.T.S. _°-J_o�. J,- -�`--�_ '�,pj - C�' go 5
WEED CHECK FABRIC UNLESS OTHERWISE NOTED ON PLAN. _ = r "�_� �465 �t4�X �-
7. ALL PLANT MATERIAL SHALL BE GUARANTEED FOR ONE FULL GROWING SEASON )I� -
(ONE YEAR) AFTER INSTALLATION. A34 `�== �_- - .�-''AT .'-`� '�i I _.-w- �0.� 5A
ROCKFlLL I
CHECK
& ALL AREAS DISTURBED DURING CONSTRUCTION NOT DESIGNATED TO RECEIVE
OTHER TREATMENT SHALL BE LOAMED TO A MINIMUM DEPTH OF 6" AND '� .. i 1N.s 15.._- I 1439 TC RAMP t \`�I / LEGEND
SEEDED IN ACCORDANCE WITH THE FOLLOWING: ` 9.R9'RR >JtLCiNG D -`--�- '�--
�,�' PROPOSED REFUSE ..,, r 2G �p )POSE p �, -�� o IRON PIPE
A. INCORPORATE GROUND LIMESTONE INTO ALL AREAS TO BE SEEDED AT A / 144s - H"A1�ER PAD R 9 O c _
RATE OF 50 LBS./1,000 S.F. �/ X 147.0 TC '�� v t ,C� S -,\ - N J _ ® MONITORING WELL
/' 445 - C�' x 60 �� a WETLAND FLAG
S. APPLY 10-6-4 FERTIUZER TO ALL AREAS TO BE SEEDED AT A RATE OF /j.: INFILTRATION'. N - y 5 p,- (
20 LBS./7,000 S.F. tj6.3 xPONO i !-v m X49,00 %1Y.ra, y ` P ® DRAIN MANHOLE
�o` .. 744.5 - m F F.a - cT- --"'4'y'i SEWER MANHOLE
' C. THOROUGHLY INCORPORATE LIME AND FERTILIZER INTO SEED BED TO DEPTH °' .' VI PROPOSED 1Y
OF 3' BY DISONG OR OTHER APPROVED METHOD. `� RAMPS 1 7 ® CATCH BASIN
a PROPOSED 3 SIGN f{
_ D. SEED WITH THE FOLLOWING MIXTURE, APPLIED AT A RATE OF 10 LBS./ \�. '�� 144s m �l LIGHT - - 6H •-- - p` 1 ELECTRIC VAULT
- 1.000 S.F. �'� V' 2E.. 2E �., +. ,�I
7.1 Tr t43f TC 3G 78.0 ' 1 J •76
6F 47.1 Bc 147.1 TC 11 S ACE 'J ELECTRIC MANHOLE
Y ❑ PROPOSED CATCH BASIN
SEED MIX �. 41.5Iy�� CONCRE�WALK (TYP) // APPROk A Y f'
1 25 J' GAS
SR wC d
9.BY WEIGHT MINIMUM 7, MINIMUM 7. 147'7 T 5' ` ` .9'a' '?,r ♦9>C T i F -S- SEWER
NAME OF SEED IN MIXTURE PURITY GERMINATION POND OVERFLOW\ a._ _`` R R GAS
PDA PRATENSIS (SEE DETAIL. 20 LE'--°-'<- °--���° RA.MP 4E i�'2 TC 3D_ _8.00' ..:. �. Hg. _ - .\\ CONTRAC 4 Y -W- WATER
// 0
.$H - - -
"BARON" .EFT 6 OF 6 -. _- - RELOCATE F E, 0 2J �% 45 d�RKI'ry',.,y ELECTRIC LINE
_ � $PACES'�p7A i
BARON BLUEGRASS 50 90 75 - - ). FENCE LIN - -t-- ""3��'�` BICYCLE RACK \t* ,\ 1 TELEPHONE UNE
FOR E A$PROP _ 147.7 BC o 9y 4 143 TC - ` C CABLE LINE
FESTUCA RUBRA - R CARLON.DRIt� OSEO� '_"-...__ _--° S 1+3 9C' - 1 i'
� "PENNLAWN' _ _ _ - -.
� PENNLAWN FESCUE 25 95 85 _"� ° // ° 10 = j A -o EXISTING FENCE
PROPOSED SEDIMENT CONTROL /i -
Z - - a- , / --- - ----- PROPOSED FENCE
` � o
LPENN PERENNE '
"PENNFlNE" BARRIER/WORK LIMIT LINE - 7C _ __ _ „!__ ?ROPOScO ELECTRIC,
R
Q PENNNE RYECRASS 25 98 95 - + TELEPHONE &CABLE
-- 2C PROPOSED SANITARY SEA
E. MULCH ALL SEEDED AREAS WITH STRAW OR SALT HAY AT A RATE DF -_„_
O
� 50 LBS./1,000 S.F. -- _ - - ��$ ` 1 \ ° A PROPOSED WATER LI NE
. - - - _ yA y f 0 �, ' 1 1 t •�'1 __ .___ -___._ PROPOSED CAS LINE
CD A3
PLANTING SCHEDULE
KEY BOTANICAL NAME COMMON NAME QUANTITY SIZE REMARKS
N LIGHTING NOTES soPnoRw.woRla
\ IFRAXIN05 PENNmvANXA - _ _ -. - -A8 - - A7 + `.0 CIS
U 1. ALL LUMINAIRES SHALL BE ORIENTATED AS INDICATED ON THE SITE PLAN. D. CONCRETE: EACH POLE BASE SHALL BE ONE MONOLITHIC POUR; MINIMUM 28- uNCCODU x+/z 3 cAL' 11,1.]s'eRARw NT.
A15 RECENT SC OUR TREE ('S) 2 1/2-3'CAL 141B.]5'BRANCR HL
O 2. CONTRACTOR TO VERIFY EXACT LAYOUT OF ALL ENTRANCES PRIOR TO INSTALLATION ( ) / / r_ N, „„LLS sEEaESS C7
DAY STRENGTH FC - 3,000 PSI; MINIMUM CEMENT RATIO- 5-1 2 BAGS B SEEDEF'SS (])
CUBIC YARD: MAXIMUM SLUMP 4; POUR WITHIN 45 MINUTES OF MIXING; SEEDL ASH
-� OF ANY POLE BASES. CURE FOR MINIMUM OF SEVEN(7)DAYS.
CD c coRNUS RueRA RNR ELa«ERINC } CIO
3. CONTRACTOR TO LOCATE ALL LUMINAIRES AND POLE BASES AS INDICATED ON PLAN. E. ALL VERTICAL REINFORCING BARS SHALL 8E ONE SINGLE BAR. NO SPLICING e0-].0' - CII 1
OF VERTICAL REINFORCING BARS W1Ll BE ALLOWED. _ �_
4. ALL CONDUCTORS SHALL BE COPPER WI1H TYPE THW INSULATION UNLESS OTHERWISE ---
CJT NOTED. 0 RHODODENDRON 1
5. ALL GROUND CONDUCTORS SHALL BE COPPER. 8. LIGHTING SHALL BE OPERATED FROM DUSK TO 10:00 PM. E :wnw s C.-S 4
SE4 CREfN, SEA CREEK JUNIPER '. 1'-24' � 6'O.Ci
n 6. UNDERGROUND FACILITIES. STRUCTURES AND UTIUTIES HAVE BEEN PLOTTED FROM 9. PARKING LOT LIGHTING SHALL BE HUBBELL MAGNULITER MVA-250H-2FX
AVAILABLE SURVEYS AND RECORDS, AND THEREFORE THEIR LOCATIONS MUST BE TYPE IV MOO. OR APPROVED EQUAL. LAMP HEIGHT SHALL BE 20'. E jur«PERUS c-,ENSIS POTZEA wwPER 1
I
<-I CONSIOERED APPROXIMATE ONLY. THERE MAY BE OTHERS.THE EXISTENCE OF WHICH PP1ZEFUlM !
Q IS PRESENTLY NOT KNOWN.
juMPERUS CHINENSIS
/ 7. STREET UGHT POLE BASES: c :PEIgERWNA torwACr pE�rtiERTJUNIPErt
A. FOOTING SHALL BE SEATED ON DENSE VIRGIN SUBGRADE OR ON COMPACTED R L,E,usmM VULCXtE LODENSE PU T a „•_z4" 4.5'oG
PLAN O RUN-OF-BANK GRAVEL L_O_OENSE
REDUCED 20 0
20 40 60 80 FEEr
r" B. REMOVE ALL EXCESS EXCAVATED MATERIAL FROM SITE. _ I RH0000c ,'BANTA O' R''MPMO 3 Ie'-24' 3.0'a.c. =
Q ': RnOD00ENORON
� C. REINFORCING:INFOR LN NEW BILLET STEEL A-675 DEFORMED.GRADE 40; ALL r �.PWUS auto•PUNIUO a NtF auto PINE z - x z 1/z 1.D'ac NOT TO SCALE
67 REINFORCING SHALL BE SECURELY TIED: 2'MINIMUM CONCRETE COVER OVER _1 10 0 10 20 METERS
/ ALL REINFORCING BARS. �* -- -_---- -�--- ------- - �� -_---- ---_
4 TO BE PROVIDED BY THE CONTRACTOR FOR CARLON DRIVE ROAD CONSTRUCTION PROJECT.
CD
Q CURRENT DATE: 12/08/98 HORIZ SCALE: 1' - 20' PROJECT NO: 98241
GRADING, PLANTING & LIGHTING PLAN HUNTLEY
VEA SCALE: DRAWING No: z4,GP
U7 FIELD WORK: FINAL.DATE: LOT 6 CARLON DRIVE FILE N0:
° COMPS: CHECKED: NORTHAMPTON, MASSACHUSETTS ALMER HUMIEY, TR. & ASSOCIATES, INC. SHEET ND.
SURVEYOR! DESIGN: DLL PREPARED FOR 30 INDUSTRIAL DRIVE EAST A OF G SURVEYORS ENGINEERS LANDSCAPE ARCHITECTS `T CJ
NO DATE BY REVISION$ ENGINEER: DLL DRAFTING: RJR CARLON MEDICAL, L.L.P. NORTHAMPTON, MASSACHUSETTS
MERIDIAN OF PLAN
BOOK 147 PAGE
94
ACCESS
RN EASEMENT
G ` EAAREAN?.._
OORDINA 7)_SYSTEM ` 4.584 Sq.ft.
_— A47
- _ -- IN V. OUT 10" ._—' ..,,� A _
.- - - BORDERING VEGETATED WETS
CONCRETE BLOC
PA
- 76.3" — / --
/
1
- 100 YEAR FLOOD OPOSF[LW000—_ / - p - - ` O` �-` SA
PLAN ELEV.=144.9' RR=([FENCE / \ Ir`J A�Z 1%n R MAN
/ ^
77.5'
6.00'
R
_. _�-' �
'-_ROCKFtLL 150.00'
CHECK DAM • 13 LF4"PVC SOR35 tl n 0 -
_ -% • RAMP - SEWER PIPE CONNECT 11 -
- TO EXISTING 6" PVC 5
/"/ •
SEWER 0
ER PAD r�o PROPOSED EFUSE - pOSC� BuIL.DtiNC tl _
O JEG- r 80 LF10"PVC SDR35
'
rn
�'WHITE 005_ 00 /
ND
PAINTED UNES
NFILLTRAIO o IRON PIPE
POD (�BORDERING VEGETATED WE N 6 0.00' 4.42' �oo, MONITORING WE
LL
A30A. 18' WETLAND FLAG
PROPOSED
--
///: - Q.- _ \ _ -' U• N '� SIG f DRAIN MANHOLE
/. PROPOSED _ MATCH, ® SEWER MANHOLE
N 18.00' LIGHT HPNOIC SIGNS 'sd i -? EXISTN `.BIN HINDUS
R PARK NG "S ACE 18.0 d Rt0'. CON
D VENAY ■ CATCH BASIN
R4 00'
1,20 CRE WALKii BTyp� O .3`. GRAM TE TRB MTHTIBG L: ■
5 CO �, L "Od45 PARKING 'TYPE 2 RB. }, I ELECTRIC VAULT
R=5, R3.00' R32' L. yp�,yd SPACES TOTAL R=4' XI TIN �, ^+ ELECTRIC MANHOLE
_/ R10.00' QJG .+0
RAMP //5 70 LF2"PVC POLYETH YLE '� RIO' \ —5— SEWER
POND OVERFLOW --> __ _- - R3' _8.00' c. - --6- d G� PIPE CONNE T \,��
20 L.F. SEE DETAIL - _ --_ RELOCA IF�rN�E�T_o _ -.. _ PROPOSED y �F'� TO EXIS NG D.I. W ...._._ '._...-_.. GAS
.: SHEET 6 OF 6 -- __ - ��.n BICYCLE RACK d WA R TUB —W— WATER
��"T4o--o R=5'
- FORCCq NE_ag pRQP /. _ t9' R50' Rr` c ELECTRIC LINE
DETENTION POND __- _-. -
CAR DRI -IL- ,-. ° G 1'+.3'
WATER ELEV.-143.57 -". - _ --'15 - 0 10 PAG 5 't Q ,-� --- TELEPHONE UNE
11/23/98 C"OAC-gER61
CABLE LINE
ED -
T1PE A MODIFi EXISTING FENCE
FENCE LOCATION PER
CARLON DRIVE
_iilMai
IN V.Otl>;k 1460 ___ STORM RAIN _ ii ` 100' WETLAND BUFFER
,
gir
-a.
A15 ,,__—_.. __ -_ _ -._ - A9 A8 Al M Oa,+4V1 ��I D--'_'�_-(J
A10 C6f _ C.4
.--t FOROERING VEGETATED WETLAND A18 `.- / All —- ---_ -_- -Ji 1 x C7
V _ A13 / BORDERtNG-VEGET kRVE WETLAND ___ _ _-__ Z
CIO
C77 • ,t\�
O LAND USE C13 C12 -
i
(D dRE -P.U00 ��._ z0a.6 7
O
DO
100*"
r;; r 1 ,iT •0' r p BUF WETLAND
777 p.S,
CT _
BUFFER ZONE
D
>_ P,E't t P.5' 2 0
21!4; S1.,, ,
cn
PLAN REDUCED ---
.-_;�f, 20 0 10 40 50 80 FEET
`\j NOT TO SCALE —' to G to
/
?0 METERS
n CURRENT DATE: 12/08/98 HORIZ SCALE: 1" - 20' PROJECT NO: 98241
Y VERT SCALE:
SITE PLAN HUNTLEY(.!D FIELD WORK: FINAL DATE: LOT 6 CARSON DRIVE(.!D D
r) N0: 241LAY
° COMPS: CHECKED: NORTHAMPTON, MASSACHUSETTS ALDER HcrNTLEY, JR. x ASSOCIATES, INC.
SURVEYOR: DESIGN DLL PREPARED FOR SHEET ND.
SURVEYORS ENGINEERS LANDSCAPE ARCHITECTS
sD TxnusrRTAL DRIVE EAST
— GARCON MEDICAL, L.L.P. �oHTxasaPTOx, MASSACHUSETTS 3 CF 6
t--1 NO. GATE RLti 190NS ENGINEER: DLL DRAFTING: RJR
t
N�roIAN �"9pp„14j°AGE st MASSACHUSETTS
COORDINATE
"a+ndyP G SYSTEM
TON SATE s s Ey N 487978.7857
E 292024.8400
N/F
REBECCA A. KINDT& THOMAS BRITTON PERCY
& DUFF S. KINDT& GAIL E. KINDT
BOOK 4762 PAGE 92 N/F
'N 01'28'x3" / STANLEY& DOROTHY
N/F 103.30- W ELKINS
9 CS 103.07 / BK. 4594 PG. 275
THE CONSERVATION COMMISSION OF amp 131.486 fi
THE CITY OF NORTHAMPTON `8 E
BOOK 4420 PAGE 243 (i993) 2!;
ACCESS D= 10'38'46" d3
EASEMENT R = 530 00' [161.544m] 50 L 7 .. __ ,;.1
AREA L = 98.48' [30.017m] N :_ o I'D/
3.49' 4584. sq.ft. ^.^ t ti /^'1
- - -. ° NOt 43 _
(106?m] 92.202m] _ - - �
[17.578m] W 302.50' [ �- 1 D_21. 8' \140.0 "K' 2 _"1 20.00'
57.67' N 14\'2303' =SO 095
i9.ao8m� -s - p, _. - 324"x$ -3r - - ---°�aaee6" �D3 0s 72m�. �[6 90'00'00"
a, 260.82' [ 1 a m
"• W r'\ _° __- _._ J = 30.00' 9.144m
19'ao06" - - N1Ln ,-'a,°`o. .. �� - - 5.750100 -E _... -- - - ----- X506 1 L = a7 t2 [[ 363 ]]
n t N -_- 43.4
�r TRUSTEES OF GANNETT REALTY TRUST _ i ' � ^ 9�2�c" GARCON DRI- vE w�_w -_ S o F`
w
` BOOK 1352 PAGE 81 (1961) , X29 459 T�� '= °.73 30 00 3? 'E w _ _m aAnRE r.._sr_-
14 m
m 1 LAND COURT BOOK 7 PAGE 68 2$500m� \ 6 6S 1� EAR�� y '� 25 a' w _ - -- --- _ - f n�. BNpD
LAND COURT CASE /30921A a21 59 \ PLAN ELF U/F -` _. --
3 t r\tie PELOPS REALTY TRUST-
BOOK
" W s 161 (1993)
4277 PAGE _ - . . -- ��• CCU �
\ s #= p , + ssnc usErrs N Rr
,-.:-- - -_ _ b•,.'. COORDINATE
1
.v _ r" '---1 ! ____ SYSTEM E 0
��'bj --a r LOT #4 �I LOT #5 N 488003.5493 FND '
E 292237.3963
' �j ' ,N 02 16 59" ✓ r, r; LOT X13 N06'41'14"W
DRAINAGE _
y
Y
EASEMENT 50.89' [15.511m]
N AREA
99,961 soft. ., - --\ - ✓� '�'�, 1` - -IF-- - DRAINAGE
'23'55~ EASEMEN 1
17 35 `i,,t _ ..
- _ .i.., `
FOUND REBAR _ - -„-- .�"-. --°- 15
AT END OF ��___
CONIC RET WALL
J r
_ E: _-. 4B1-02' [146.615m}.
-- - S 15.23 55 - - .� = 03'45 1' i I 1 'n
` - NN 8' [1 , - l ` OT {2 4 of
P-FOaraD_
\ � 1 R = '17000' [356.616m] c
I- T 6C.88' 18 55�m; 1
1. 9J1- 66 30'. _r I I L - 76 86' [23 28m] - - - - 11- N j
CO [20.209m] I j
100' WETLAND BUFFER ` LOT / CONWAY REALTY TRUST 4
` BOOK 2713 PAGE 315 (1986)
lo
CT1 1 ZONE (TYP) _- _- � __ -_
/ �/ry
0 3 �7` ry fry / - -- - - - - AUTOMOTIVE REALTY ASSOCIATES
m LIMITED PARTNERSHIP
O _o�f _^. /l BOOK 3013 PAGE 237 (1987) LEGEND
P O IRON PIPE
2 NOTES:
® MONITORING WELL
U 1. ALL BEAR]PLAN BOOK 147, PAGE 94. NORTHAMPTON COORDINATE SYSTEM. PLAN #17.GS SHOWN ON THIS PLAN ARE REFERENCED TO THE MERIDIAN 7. ALL ELEVATIONS REFER TO USC&GS DATUM. SEE REFERENCE WETLAND FLAG
°
O � DRAIN MANHOLE
-p 2. ALL BOOK AND PAGE NUMBERS REFER TO THE HAMPSHIRE COUNTY 8. WETLAND BOUNDARIES AS RE-FLAGGED IN tHE FIELD ARE BASED UPON m SEWER MANHOLE
OJ REGISTRY OF DEEDS(HCRD). WETLAND BOUNDARIES AS DELINEATED AND FLAGGED (YELLOW/BLACK) i CATCH BASIN
T, BY OTHERS. ALL WETLAND BOUNDARIES CONFIRMED BY NORTHAMPTON _
3. LOCATION OF UTILITIES SHOWN HEREON ARE THE RESULT OF SURFACE CONSERVATION COMMISION UNDER CARLON DRIVE SUBDIVISION NOTICE ELECTRIC VAULT
EVIDENCE AS LOCATED BY FIELD SURVEY.PLANS OF RECORD, OF INTENT(DEP FILE NUMBER 246-393). -�
CT INFORMATION FURNISHED BY THE RESPECTIVE UnUTY COMPANIES.
ELECTRIC MANHOLE
AND OTHER AVAILABLE SOURCES. THIS PLAN DOES NOT NECESSARILY r7
3 9. LOCUS IS SUBJECT TO EASEMENTS AND RESTRICTIONS INCULDING
HIS DEPICT THE EXACT LOCATION OF ALL UTILITIES WHICH MAY EXIST AT
THOSE AS DESCRIBED IN BOOK 1322. PAGE 81 1961 AND BOOK -5 SEWER
THIS TIME DIG-SAFE THE PREMISES SURVEYED. ( )
U CONTACT DIG-SAFE AT 7-800-322-4844 BEFORE EXCAVATION. 4277, PAGE 161 (1993). --- �----- GAS
c-I 4. REFERENCE IS MADE TO A PLAN ENTITLED TOPOGRAPHICAL PLAN OF -W WATER
Q LAND IN NORTHAMPTON. MASSACHUSETTS HAMPSHIRE COUNTY PREPARED -E ELECTRIC UNE
CV FOR R20 CORPORATION". DATED 5/20/94. PREPARED BY ALMER HUNTLEY, TELEPHONE LINE/ JR. &ASSOCIATES. INC. LOCATED IN THE HUNTLEY ARCHIVES: R941.
CABLE LINE
3 5, REFERENCE IS MADE TO A PLAN ENTITLED 'PLAN OF LAND IN - o-- EXISTING FENCE
NORTHAMPTON MASSACHUSETTS PREPARED FOR PELOPS REALTY TRUST".
/ TRUST".DATED 7-31-96. PREPARED BY ALMER HUNTLEY,JR. & PLAN REDUCED
ASSOCIATES. INC. 50 0 50 100 150 200 FEET
CV 6. A FIELD SURVEY WAS PREFORMED ON THE GROUND BETWEEN APRIL
C0 9. 1994 AND MAY 5, 1994.
cp 1D 0 ,D 20 30 48 58 METERS NOT TO SCALE
CD
° 0- CURRENT DATE: 12/08/98 HORIZ SCALE: 1" 50' PROJECT NO: 98241
BOUNDARY & TOPOGRAPHICAL SURVEY HUNTLEY
/ vERT SCALE: DRAWING NO 241EC
'G LOT 6 CARLON DRIVE
. U) FIELD WORK: FINAL DATE: FILE NO:
° COMPs - CHECKED: NORTHAMPTON, MASSACHUSETTS ALMER HUIVT'(,E'Y, 7R. & ASSOCIATES, INC. SHEET NO.
SURVEYOR: DESIGN: DLL PREPARED FOR 30 INDUSTRIAL DRIVE EAST 2 OF G
SURVEYORS ENGINEERS LANDSCAPE ARCHITECTS v
~ N0. DATE BY T REVISIONS ENGINEER: DLL DRAFTING: RJR CARLON MEDICAL, L.L.P. NORTHAMPTON, MASSACHUSETTS
SITE PLAN
PREPARED FOR
CARLON MEDtCAL , L . L . P .
LOCATED AT
LOT 6 , CARLON DRIVE
NORTHAMPTON , MASSACHUSETTS
DECEMBER. 1998
7 SHEET INDEX
PREPARED FOR /
°' SHEET 1 COVER SHEET, LOCUS & INDEX
N MR. MATTHEW M. PITONIAK �. 1 SHEET 2 BOUNDARY & TOPOGRAPHIC SURVEY
CD 125A PLEASANT STREET 5 Nothampton 7
NORTHAMPTON, MASSACHUSETTS 4 1 SHEET 3 SITE PLAN
CD m PROJECT s z SHEET 4 GRADING, PLANTING & LIGHTING PLAN
u SITE ' SHEET 5 EROSION CONTROL NOTES & DETAILS
o
SHEET 6 GENERAL CONSTRUCTION DETAILS
y� YWyW W
3'
cn
v '
ALMER HUNTLEY, JR. & ASSOCIATES, INC. `
CD
CIVIL ENGINEERS & LAND SURVEYORS LOCUS MAP
co cn
• 0 30 INDUSTRIAL DRIVE EAST
cr
NORTHAMPTON, MASSACHUSETTS
Y
s U7
co
H
APPENDIX B
Site Plan
G:\PROJINFO\PROJECTS\98-241\Title.DOC
sewage disposal facilities
water supply facilities
B-8. Existing&proposed:
landscaping,trees and plantings(size&type of plantings)
stone walls,
buffers and/or fencing:
B-9. Signs-existing and proposed:
- Location
dimensions/height
- color and illumination
B-10. Provisions for refuse removal, with facilities for screening of refuse when appropriate:
FOR MAJOR PROJECTS ONLY:
B-11. An erosion control plan and other measures taken to protect natural resources&water supplies:
C. Estimated daily and peak hour vehicles trips generated by the proposed use,traffic patterns for vehicles and
pedestrians showing adequate access to and from the site, and adequate vehicular and pedestrian circulation
within the site.
Site Plans submitted for major projects shall be prepared and stamped by a:
Registered Architect, Landscape Architect, or Professional Engineer
9
SITE PLAN REQUIREMENTS
REQUEST FOR WAIVERS APPLICATION
The application MUST include a site plan containing the information listed below. The Planning Board
may waive the submission of any of the required information, if the Applicant submits this form with a
written explanation on why a waiver would be appropriate. To request a waiver on any required
information, circle the item number and fill in the reason for the request.Use additional sheets if
necessary.
A. Locus plan
B. Site plan(s) at a scale of 1"=40' or greater
B-1. Name and address of the owner and the developer, name of project,date and scale plans:
B-2. Plan showing Location and boundaries of:
- the lot
- adjacent streets or ways
- all properties and owners within 300 feet
- all zoning districts within 300 feet
B-3. Existing and proposed:
-buildings
-setbacks from property lines
-building elevations
-all exterior entrances and exits
(elevation plans for all exterior facades structures are encouraged)
B-4. Present&proposed use of
the land
buildings:
B-5. Existing and proposed topography(for intermediate projects the permit granting authority may accept
generalized topography instead of requiring contour lines):
- at two foot contour intervals
- showing wetlands,streams,surface water bodies
- showing drainage swales and floodplains:
- showing unique natural land features
B-6. Location of-
- parking&loading areas
- public&private ways
- driveways,walkways
- access&egress points
- proposed surfacing:
B-7. Location and description of:
- all stormwater drainage/detention facilities
- water quality structures
- public&private utilities/easements
8
G. Explain how the requested use will promote City planning objectives to the extent possible and will not
adversely effect those objectives,defined in City master study plans(Open Space and Recreation Plan;
Northampton State Hospital Rezoning Plan;and Downtown Northampton: Today,Tomorrow and the
Future).
Proposal use and Site Plan conform to City of Northampotn planning standards and
no variances are requested.
9. I certify that the information contained herein is true and accurate to the best of my knowledge.The
undersigned owner(s) grant the Planning Board permission to enter the property t review this
application.
1l,, �
Date: )09-! �-I&Applicant's Signature:
Date: Owner's Signature:
(If not the same as applicant's)
MAJOR PROJECTS MUST ALSO COMPLETE THE FOLLOWING MAJOR PROJECT APPROVAL
CRITERIA
Does the project incorporate 3 foot sumps into the storm water control system? Yes X No
(IF NO, explain why) Catch basin proposed to be constructed with 4' sump.
Will the project discharge stormwater into the City's storm drainage system? Yes No
(IF NO, answer the following:)
Do the drainage calculations submitted demonstrate that the project has been designed so that there is no
increase in peak flows from pre-to post-development conditions during the: 1, 2,or 10 year Soil
Conservation Service design storm? Yes X No
(IF NO,explain why) Drainage flows into detention pond designed to mitigate peak
discharge rates for the 1,2, 10, 25 and 100-year storm events for the full-subdivision
buildout.
Will all the runoff from a 4/10 inch rainstorm(first flush)be detained on-site for an average of 6
hours? Yes X No
(IF NO, explain why)
Is the applicant requesting a reduction in the parking requirements?
Yes No X
If yes,what steps have been taken to reduce the need for parking, and number of trips per day?
7
How does the project meet the special requirements?(Use additional sheets if necessary)
of Applicable
F. State how the project meets the following technical performance standards:
1. Curb cuts are minimized: One curb cut utilized for access.
Check off all that apply to the project:
use of a common driveway for access to more than one business
___X —use of an existing side street use of a looped service road
2. Does the project require more than one driveway cut?
X NO YES (if yes, explain why)
3. Are pedestrian,bicycle and vehicular traffic separated on-site?
YES X NO(if no,explain why)
FOR PROJECTS THAT REQUIRE INTERMEDIATE SITE PLAN APPROVAL, ONLY, SIGN
APPLICATION AND END HERE.
9. I certify that the information contained herein is true and accurate to the best of my knowledge.The
undersigned owner(s)grant Planning Board permission to enter the property to review this
application.
Date: Applicant's Signature:
Date: Owner's Signature:
(If not the same as applicant's)
f OR PROJECTS THAT REQUIRE A.SPECIAL PERMIT OR WHICH ARE A MAJOR PROJECT, -
applicants MUST also complete the following:
F. Explain why the requested use will:
not unduly impair the integrity or character of the district or adjoining zones: Use is allowed in
this zone. All setbacks and open space requirements are met or excee e .
not be detrimental to the health, morals or general welfare:Medical Office building will be a
benefit to health and general welfare interests. The intended practice is to be general
medicine.
be in harmony with the general purpose and intent of the Ordinance: Medical use is
permitted and would be consistent with the Ordinances.
6
B. How will the requested use promote the convenience and safety of pedestrian movement within the site and
on adjacent streets? Building is located on front setback line adjacent to street line,
walks have been provided on site.
How will the project minimize traffic impacts on the streets and roads in the area? Traffic impacts
are detailed in project manual and reviewed Linder the definitive subdivision plans of
Carlon Drive.
Where is the location of driveway openings in relation to traffic and adjacent streets? Driveway opening
confronts to Northampton Drive standards and was approved under Carlon Drive definitive
plan.
What features have been incorporated into the design to allow for:
access by emergency vehicles: Drive entrance is 24' wide, all drive ailses are 18'
wide, parking area provides adequate turning movement.
the safe and convenient arrangement of parking and loading spaces: Parking has been
designed to facilitate customers while minimizing impervious surfaces.
provisions for persons with disabilities: Handicap parking and ramps are provided in
accordance with ADA Standards.
C. How will the proposed use promote a harmonious relationship of structures and open spaces to:
the natural landscape: Large portion of Lot 6 is to remain open space, landscaping
to blend with existing species, low profile building.
to existing buildings: Building is to be similar in architecture to proposed and
existing buildings in subdivision.
other community assets in the area: City Fire Station is brick masonry structure and
new building is to be masonry structure.
D. What measures are being taken that show the use will not overload the City's resources, including:
water supply and distribution system: Building will require minimal water service
(750 GPD) and will not impact City Water Service.
sanitary sewage and storm water collection and treatment systems: Proposed use will
be minimal (750 GPD) and not impact City Sewer Service.
fire protection,streets and schools: Building will be a new structure meeting current
building codes so fire protection will be a minimal concern. No impact on streets
and sc oo s.
How will the proposed project mitigate any adverse impacts on the City's resources, as listed
above? No adverse impacts on City resources are anticipated.
E. List the section(s)of the Zoning Ordinance that states what special regulations are required for the
proposed project (flag lot,common drive,lot size averaging,etc.)
No special requirements.
5
CITY OF NORTHAMPTON
PLANNING BOARD APPLICATION FOR:
1. Type of Project: X SITE PLAN APPROVAL :
Intermediate Project(Site Plan)
X Major Project(Site Plan Special Permit)
OR SPECIAL PERMIT:
Intermediate Project(with Site Plan Approval)
Major Project(Site Plan Special Permit)
2. Permit is requested under Zoning Ordinance: Section: 10.11 (3) Page: 10. 7
3. Applicant's Name: Mr. Matthew M. Pitoniak
Address: 125A Pleasant Street, Northampton, MA 01060 Telephone:-(413) 586-5364
4. Parcel Identification: Zoning Map# 24B Parcel# 48 Zoning District: HB
Street Address: Lot 6 Carlon Drive
5. Status of Applicant: Owner ; Contract Purchaser Lessee
Other ; (explain)
6. Property Owner: Pelops Realty Trust
Address: 3210 Washington St., Newton Lower Falls, MA Telephone:(617) 527-9800
02 Itz-
7. Describe Proposed Work/Project: (Use additional sheets if necessary):
Construction of 9,00Cr 3.F. Medical Office Building with associated parking, utilities
and drainage appurtenances.
Has the following information been included in the application? Site/Plot Plan X
List of requested waivers X Fee X Signed/Denied Zoning Permit Application X
8. Site Plan and Special Permit Approval Criteria.(If any permit criteria does not apply,explain why)
Use additional sheets if necessary. Assistance for completing this information is available through
the Office of Planning&Development.
A. How will the requested use protect adjoining premises against seriously detrimental uses?
Use is permitted by Zoning, Building and Parking setbacks exceed standards. Medical
office use is not expected to have any detrimental effects on adjoining properties.
How will the project provide for:
surface water drainage: Surface water is treated in accordance with DEP Stormwater
Management Regulations.
sound and sight buffers: Building is single story, hours of operation will coincide
with normal business hours.
the preservation of views,light and air:Building is a single story with landscaping,
no existing mature vegetation will be disturbed.
4
FILING INSTRUCTIONS:
1. Take the original and 14 copies of the application, to the City Clerk's Office. The Clerk
will keep the original and date stamp one complete copy of the application.
2. File the remaining 14 copies of the application at the Office of Planning &Development,
and pay the filing fee.
WHAT HAPPENS AFTER YOU HAVE FILED YOUR APPLICATION?
1. Once a completed application has been filed, we will schedule a Public Hearing for the
next available agenda of the Planning Board, notify your abutters and place a legal ad in
a local paper to appear a minimum of two (2) weeks prior to the hearing date.
2. The public hearing is conducted, applicant must be present, and if all information is
complete, the hearing is closed.
3. Once the hearing is closed, the Board has up to 90 days to make a decision on the permit.
(Planning Board rarely takes that long)
4. Once a decision is made, then the Board has ninety (90) days from the date that the
hearing was closed, to file the decision with the City Clerk's Office. Applicant receives a
copy of the decision.
5. After the decision has been filed with the City Clerk's Office, a twenty (20) day appeal
period begins.
6. Once the twenty (20) day appeal period passes, (without an appeal being filed) the
applicant must pick up a Certified copy of the decision from the City Clerk's Office and
record it at the Registry of Deeds. Permit is not valid until recorded at Registry of
Deeds.
7. Proof that the decision has been filed at the Registry of Deeds must be brought to the
Building Department, before a Building Permit will be issued.
The short time frame for issuing a Special Permit, Site Plan Approval, or a Site Plan
Special Permit is two (2) to three (3) months. The long time frame is four (4) to six (6)
months.
3
6. Fill in the property owner's name, or state: "Same as above" if the owner is the applicant.
7. Give a detailed description of the proposed work/project. Use additional sheets, if required.
Check-off if a Sketch Plan or Site/Plot Plan and a list of requested waivers has been included
with the application.
Planning Board reserves the right to postpone or continue any hearing if the Board determines
that adequate detail has not been submitted with the application (i.e. location of buildings,signs,
parking spaces, etc).
Planning Board also reserves the right to decline consideration of any new information submitted
for the first time at the public hearing and which was not available for public consideration,prior
to the hearing.
.8. Answer the questions on how the proposed work/project meets the approval criteria. Use
additional sheets, if required.
9. Sign and date the application and complete the following pages as per instructions.
STREAMLMNG THE PERMIT>PROCESS-
It is highly recommended that the applicant review the completed application with the Senior_
Planner,prior to making the required number of copies and filing the application. Doing this
will help identify any additional information which should be included, and could prevent the
public hearing from being continued for lack of information. An appointment can be-scheduled
by calling the Office of Planning&Development at : (413) 587-1266.
SUBMITTAL REQUIREMENTS:
ALL APPLICATIONS MUST BE COLLATED AND STAPLED IN 15 COMPLETE PACKAGES.
The following information must be included in the submittal for Site Plan Approval, a Special Permit,
and/or a Site Plan Special Permit:
* The completed application and 15 collated copies of all information(including the
signed, dated and denied Zoning Permit Application - "Z-Form" and any additional
information the applicant wishes to submit) attached to EACH copy of the application.
If there are blueprints, the application must include 6 full sets of blueprints, the
remaining 9 copies may be reduced copies of the original prints. Please attach a folded
copy of the blueprints to EACH copy of the application.
* If the property abuts or is within 300 feet of the City boundary,you must
get abutters list from the neighboring Town's Assessor.
* The Filing Fee: $120.00 for Intermediate Projects or$220.00 for Major Projects.
2
CITY OF NORTHAMPTON
APPLICATION FOR A
PLANNING BOARD-'SPECIAL PERMIT& SITE PLAN APPROVAL PERMIT 10/98
A SEPARATE APPLICATION MUST BE FILED FOR EACH PERMIT REQUESTED
PLEASE PRINT OR TYPE ALL INFORMATION
PERMIT INSTRUCTIONS:
1. Check off the Type of permit:
Information can be obtained from the Zoning Permit Application denial,the Building
Department and/or the Office of Planning & Development(OPD).
Intermediate Projects:
- New construction or additions of between 2,000 and 4,999 square feet of gross floor area
(excluding single family homes and agricultural uses).
- Projects which require 6 - 9 additional parking spaces.
- Projects which require a Special Permit or Site Plan Approval,do not qualify as a Major
Project, and are not a sign.
- Projects which require Site Plan Approval, and do not require a Special Permit.
- Planned Village Projects which require Site Plan Approval and arc-not Major Project.
Major Projects:
X New construction or additions of 5,000 square feet or more of gross floor area.
Commercial Parking lots and parking garages
Except for the CBD, establishments selling foods prepared on the premises where
consumption is primarily off the premises and retail establishments selling principally
convenience goods.
Automobile service stations
Projects which require 10 or more additional parking spaces.
Rural Residential Incentive and Planned Business Park projects.
2. Fill in the specific section and page of the Zoning Ordinance, that shows why the Special Permit
is required. This information can be obtained from the Zoning Permit Application denial,the
Building Department or from OPD.
3. Fill in the applicant's name, address and phone number.
4. Fill in the parcel's Zoning Map &Parcel ID, and zoning district(s), including any overlay
districts. Information can be obtained from the Zoning Permit Application denial,
the Building Department and/or the Office of Planning & Development (OPD).
5. Check off the status of the applicant.
1
APPENDIX A
to
Site Plan Approval Permit
f.
G:\PROJINFO\PROJECTS\98-241\Tit1e.DOC
tZ^�
CT�>
n—
ZZ
'"tea
y
e- rts�
v I
Y
° a
Lot 6 Abutters
City of Northampton
Assessor's Map No. 24B & 24D
�—, Scale: 1" =200'
'D
�aa J F N
m N �
r m
ABUTTER LIST
Charles E. &Jane Bibeau Automotive Realty Associates
65 Barrett St. 31 State Street-9`h Floor
Northampton,MA 01060 Boston,MA 02109
Map 24B-009 Map 24B-049
George E.&Christen C. Guyette Victoria C. Weaver
63 Barrett Street 37 Barrett Street
Northampton,MA 01060 Northampton,MA 01060
Map 24B-011 Map 24B-012
r.,
Pelops Realty Trust Kathleen Yarrows
P.O. Box 369 6 Denise Court
Tax Department Northampton,MA 01060
Boston,MA 02101-0369 Map 24B-013
Map 24B-046,048,257
Thomas Britton Percy&Rebecca A.Kindt C/o Peter Paniczko
Duff S.Kindt&Gail E.Kindt Plumb Auto
40 Barrett Street 125 Carlon Drive
Northampton,MA 01060 Northampton,MA 01060
Map 24B-044 Map 24B-046 Lot 4&5 Carlon Drive
Richard C. &Particia A. Martin,Trustees Stanley&Dorothy Elkins
75 Harrison Avenue 17 Kensington Avenue
Northampton,MA 01060 Northampton,MA 01060
Map 24B-044 Map 24B-045
C/o Northampton Planning Department Robert E.&Judy C. Suiiivatl
(Re: Fire House—King Street) 31 Barrett Street
pa Main Street Northampton,MA 01060
Northampton,MA 01060 Map 24B-024
Map 24B-048 Lot 7 Carlon Drive
1
pa
\projinfo\projects\98-241\wpa\abutters.doc
SECTION 5
Abutter List
G:\PROJINFO\PROJECTS\98-241\Title.DGC
POND ROUTING BY STOR-IND METHOD
POND START FLOOD PEAK PEAK ------ PEAK FLOW ------- ---Qout---
NO. ELEV. ELEV. ELEV. STORAGE Qin Qout Qpri Qsec ATTEN. LAG
(FT) (FT) (FT) (AF) (CFS) (CFS) (CFS) (CFS) ($) (MIN)
1 142.5 146.0 145.4 1.23 20. 81 5.57 5.57 0.00 73 42. 6
3 145.0 149.0 145.4 0.00 .74 .73 0 .2
4 144 .6 148.9 145.0 0.00 . 69 .68 0 .2
5 144.4 147.7 145.0 0.00 1.38 1.38 0 .2
6 144 .4 147.7 145.0 0.00 1.50 1.49 0 .2
7 144.5 147.0 146.3 .03 9.17 8.76 4 4.4
8 144 .0 147.8 145.0 0. 00 2.87 2.86 0 . 1 .m
9 143. 1 149.3 144.5 0.00 4.28 4.27 0 .2
10 142.5 150.0 143.9 0.00 4.27 4.26 0 .2
11 144 .2 150.2 146.0 0. 00 10.36 10.36 0 0.0
13 145.5 148.7 146.0 0.00 .74 .73 1 .2
14 145.5 148.7 146.8 0.00 3.90 3.88 1 .1
16 145.3 149.0 147.1 0.00 4.61 4.58 1 .2
21 145.0 146.0 145.7 .02 3.38 3.18 6 1.0
22 144 .5 146.0 145.9 .02 3. 18 3.16 3. 11 .05 1 .5
23 142.0 148.0 146. 6 0. 00 1.13 1.12 1. 12 0.00 1 0.0
w
w
w
so
�w
ws
Data for 98241 Carlon Medical -- Proposed
98241 Lot 6, Carlon Drive Proposed 100Yr.
Prepared by Almer Huntley Jr. and Associates, Inc. 7 Dec 98
HydroCAD 5.01 000451 (c) 1986-1998 Applied Microcomputer Systems
RUNOFF BY SCS TR-20 METHOD: TYPE III 24-HOUR RAINFALL= 6.50 IN, SCS U.H.
RUNOFF SPAN = 10-20 HRS, dt= .10 HRS, 101 POINTS
SUBCAT AREA Tc WGT`D PEAK Tpeak VOL
NUMBER (ACRE) (MIN) --GROUND COVERS (%CN) -- CN C (CFS) (HRS) (AF)
1 1.40 22.6 100$71 71 - 3.42 12.28 .35
2 2. 16 19. 8 100%58 58 - 3.26 12.25 .34
PM 3 1. 40 12.2 37%58 21%98 42%71 72 - 4. 44 12.13 .37
5 . 15 6. 6 60%98 40%71 87 - .74 12.04 .05
7 .29 6.5 50%98 50%71 85 - 1.38 12.04 .10
9 .13 6.1 70%98 30$71 90 - . 69 12.03 .05
4" 10 .29 6.5 70%98 30%71 90 - 1.50 12.04 . 11
12 2.55 25.7 7098 30%71 90 - 9. 17 12.30 .99
16 .14 6.1 70%98 30%71 90 - .74 12.03 .05
17 .14 6.1 70598 30%71 90 - .74 12.03 .05
21 .18 2.1 5%61 95%98 96 - 1. 15 11.99 .07
22 .56 5.5 80%98 20%71 93 - 3. 17 12.02 .22
23 .18 1. 6 5%61 95%98 96 - 1.13 11. 99 .07
24 .20 6.0 100%98 98 - 1.14 12.03 .08
REACH ROUTING BY STOR-IND+TRANS METHOD
REACH BOTTOM SIDE PEAK TRAVEL PEAK
NO. DIAM WIDTH DEPTH SLOPES n LENGTH SLOPE VEL. TIME Qout
(IN) (FT) (FT) (FT/FT) (FT) (FT/FT) (FPS) (MIN) (CFS)
2 - 5. 0 5.0 2.00 2. 00 .070 1000 .0001 .3 54.3 6.42
NM
Proposed Conditions
100 Year Storm Routing
POND ROUTING BY STOR-IND METHOD w
POND START FLOOD PEAK PEAK ------ PEAK FLOW ------- ---Qout---
NO. ELEV. ELEV. ELEV. STORAGE Qin Qout Qpri Qsec ATTEN. LAG
(FT) (FT) (FT) (AF) (CFS) (CFS) (CFS) (CFS) (%) (MIN)
1 142.5 146.0 144. 8 .97 15.85 4.48 4.48 0.00 72 41.1
3 145.0 149.0 145.3 0.00 .56 .56 0 .2 wr
4 144 .6 148. 9 144. 9 0. 00 .53 .53 1 .2
5 144.4 147.7 144. 9 0.00 1.04 1.03 0 .2
6 144.4 147.7 144. 9 0.00 1.16 1.16 0 .2
7 144.5 147.0 146. 1 .02 7.09 6.81 4 3.9 *
8 144.0 147. 8 144. 9 0.00 2.19 2.18 0 . 1
9 143.1 149.3 144.2 0.00 3.27 3.26 0 .2
10 142 .5 150.0 143. 6 0.00 3.26 3.23 1 .2
11 144 .2 150.2 145. 8 0.00 8.09 8.09 0 .1 w
13 145.5 148.7 145.9 0.00 .57 .57 1 .2
14 145.5 148.7 146.6 0.00 3.06 3.04 1 .1
16 145.3 149.0 146.5 0.00 3. 61 3.59 0 . 1 wA
21 145.0 146. 0 145.7 .02 2.70 2.53 6 1.0
22 144 .5 146. 0 145. 9 . 02 2.53 2.46 2.41 .05 3 2.8
23 142.0 148.0 146.5 0.00 .90 .90 . 90 0.00 0 .1
w�
aw
r
Data for 98241 Carlon Medical -- Proposed
98241 Lot 6, Carlon Drive Proposed 25Yr.
Prepared by Almer Huntley Jr. and Associates, Inc. 7 Dec 98
HydroCAD 5.01 000451 (c) 1986-1998 Applied Microcomputer Systems
Awr
RUNOFF BY SCS TR-20 METHOD: TYPE III 24-HOUR RAINFALL= 5.20 IN, SCS U.H.
RUNOFF SPAN = 10-20 HRS, dt= .10 HRS, 101 POINTS
SUBCAT AREA Tc WGT' D PEAK Tpeak VOL
NUMBER (ACRE) (MIN) --GROUND COVERS (%CN) -- CN C (CFS) (HRS) (AF)
1 1. 40 22. 6 100%71 71 - 2.32 12.29 .24
2 2. 16 19. 8 10058 58 - 1. 88 12.28 .21
3 1.40 12.2 37%58 21%98 42%71 72 - 3. 04 12. 13 .25
5 .15 6. 6 60%98 40%71 87 - .56 12. 04 .04
7 .29 6.5 50%98 50$71 85 - 1.04 12.04 .08
9 .13 6. 1 70%98 30%71 90 - .53 12.03 .04
10 .29 6.5 70%98 30%71 90 - 1.16 12.04 .09
12 2.55 25.7 70%98 30%71 90 - 7.09 12.30 .76
16 .14 6.1 70%98 30%71 90 - .57 12.03 .04
17 . 14 6.1 70%98 30%71 90 - .57 12. 03 .04
21 .18 2. 1 5%61 95$98 96 - .91 11.99 .06
22 .56 5. 5 80$98 20%71 93 - 2.49 12.02 .18
23 .18 1. 6 5%61 95%98 96 - . 90 11. 99 .06
24 .20 6.0 100%98 98 - . 91 12.03 .07
REACH ROUTING BY STOR-IND+TRANS METHOD
REACH BOTTOM SIDE PEAK TRAVEL PEAK
NO. DIAM WIDTH DEPTH SLOPES n LENGTH SLOPE VEL. TIME Qout
(IN) (FT) (FT) (FT/FT) (FT) (FT/FT) (FPS) (MIN) (CFS)
Il1R
2 - 5.0 5. 0 2.00 2. 00 . 070 1000 .0001 .3 59.3 4.55
po
Proposed Conditions
25 Year Storm Routing
pp
so
so
POND ROUTING BY STOR-IND METHOD
POND START FLOOD PEAK PEAK ------ PEAK FLOW ------- ---Qout---
NO. ELEV. ELEV. ELEV. STORAGE Qin Qout Qpri Qsec ATTEN. LAG
(FT) (FT) (FT) (AF) (CFS) (CFS) (CFS) (CFS) (%) (MIN)
�w
1 142.5 146.0 144.6 .86 13.35 3.78 3.78 0.00 72 41.9
3 145.0 149.0 145.3 0. 00 . 48 .47 1 .3
4 144. 6 148.9 144.9 0.00 .46 .46 1 .2
5 144 .4 147.7 144. 9 0.00 .88 .88 no 0 .2
6 144 .4 147.7 144.9 0.00 1.00 1.00 0 .2
7 144 .5 147.0 146.0 . 01 6.13 6.13 0 1.2
8 144 .0 147.8 144. 8 0.00 1. 88 1.87 0 .2 no
9 143. 1 149.3 144.1 0. 00 2. 80 2.77 1 .2
10 142.5 150.0 143.5 0.00 2.77 2.78 0 .'2
11 144 .2 150.2 145.7 0.00 7.35 7.35 0 0.0
13 145.5 148.7 145.9 0. 00 .49 .49 1 .2 o
14 145.5 148.7 146.5 0.00 2.66 2.65 1 . 1
16 145.3 149.0 146.4 0.00 3.14 3.12 0 .1
21 145.0 146.0 145.7 .02 2.38 2.25 6 1.0 as
22 144.5 146.0 145. 9 . 02 2.25 2. 17 2.13 .05 3 .9
23 142.0 148.0 146.5 0. 00 .79 .80 . 80 0.00 0 . 1
.eA
so
w�.
we
Data for 98241 Carlon Medical -- Proposed
98241 Lot 6, Carlon Drive Proposed 10Yr.
Prepared by Almer Huntley Jr. and Associates, Inc. 7 Dec 98
HydroCAD 5.01 000451 (c) 1986-1998 Applied Microcomputer Systems
Pw
RUNOFF BY SCS TR-20 METHOD: TYPE III 24-HOUR RAINFALL= 4 . 60 IN, SCS U.H.
RUNOFF SPAN = 10-20 HRS, dt= . 10 HRS, 101 POINTS
SUBCAT AREA Tc WGT'D PEAK Tpeak VOL
NUMBER (ACRE) (MIN) --GROUND COVERS (RCN) -- CN C (CFS) (HRS) (AF)
40
1 1.40 22. 6 100%71 71 - 1.84 12.29 .19
2 2.16 19.8 100%58 58 - 1.32 12.30 .15
3 1.40 12.2 37%58 21%98 42%71 72 - 2. 42 12.13 .20
5 .15 6. 6 60%98 40%71 87 - . 48 12.05 .04
7 .29 6.5 50%98 50%71 85 - .88 12.05 .07
9 .13 6.1 70%98 30%71 90 - . 46 12.03 .03
10 .29 6.5 70%98 30%71 90 - 1. 00 12.04 .07
12 2.55 25.7 70%98 30%71 90 - 6. 13 12.30 .66
16 .14 6.1 70%98 30%71 90 - .49 12.03 .04
17 .14 6.1 70%98 30%71 90 - . 49 12.03 .04
21 .18 2.1 5%61 95%98 96 - . 80 11.99 .05
22 .56 5.5 80%98 20%71 93 - 2.17 12.02 .15
23 . 18 1. 6 5%61 95%98 96 - .79 11.99 .05
40 24 .20 6. 0 100%98 98 - . 81 12.03 .06
REACH ROUTING BY STOR-IND+TRANS METHOD
REACH BOTTOM SIDE PEAK TRAVEL PEAK
NO. DIAM WIDTH DEPTH SLOPES n LENGTH SLOPE VEL. TIME Qout
(IN) (FT) (FT) (FT/FT) (FT) (FT/FT) (FPS) (MIN) (CFS)
AR!
2 - 5.0 5.0 2.00 2.00 .070 1000 . 0001 .3 63.6 3.57
ON
pm Proposed Conditions
10 Year Storm Routing
POND 23 DMH 1
Qin = .49 CFS @ 11.99 HRS, VOLUME= .03 AF
Qout= .48 CFS @ 11. 99 HRS, VOLUME= . 03 AF, ATTEN= 0$, LAG= .1 MIN
pw Qpri= .48 CFS @ 11. 99 HRS, VOLUME= .03 AF
Qsec= 0.00 CFS @ 0. 00 HRS, VOLUME= 0.00 AF
ELEVATION CUM.STOR STOR-IND METHOD
(FT) (CF) PEAK STORAGE = 54 CF
142.0 0 PEAK ELEVATION= 146.4 FT
144.0 25 FLOOD ELEVATION= 148.0 FT
146.0 50 START ELEVATION= 142.0 FT
147.5 67 SPAN= 10-20 HRS, dt=.l HRS
148.0 80 Tdet= 20.2 MIN ( .03 AF)
I # ROUTE INVERT OUTLET DEVICES
1 P 146.0' 10" CULVERT
n=.01 L=175' S=. 006'/ ' Ke=.S Cc=.9 Cd=. 6
2 S 147.5' 20' BROAD-CRESTED RECTANGULAR WEIR X 1.81
Q=C L H^1.5 C=O, 0, 0, 1.94, 1.92, 1.89, 1. 92, 1.97
Primary Discharge
AA1A1=Culvert
Secondary Discharge
AAAi2=Broad-Crested Rectangular Weir
OR
POND 21 Drainage Swale
Qin = 1.47 CFS @ 12.00 HRS, VOLUME= . 10 AF
Qout= 1.34 CFS @ 12.02 HRS, VOLUME= .08 AF, ATTEN= 9%, LAG= 1.4 MIN
ELEVATION AREA INC.STOR CUM.STOR STOR-IND METHOD w
(FT) (SF) (CF) (CF) PEAK STORAGE = 879 CF
144.5 100 0 0 PEAK ELEVATION= 145.6 FT
145.0 440 135 135 FLOOD ELEVATION= 146.0 FT
146.0 2000 1220 1355 START ELEVATION= 145.0 FT
SPAN= 10-20 HRS, dt=.1 HRS
Tdet= 68. 6 MIN ( .08 AF)
a�
# ROUTE INVERT OUTLET DEVICES
1 P 145.5' 10' BROAD-CRESTED RECTANGULAR WEIR X 1.81
Q=C L H^1.5 C=O, 0, 0, 1.94, 1. 92, 1. 89, 1. 92, 1. 97
POND 22 Infiltration Pond
Qin = 1.34 CFS @ 12.02 HRS, VOLUME= .08 AF
Qout= 1.52 CFS @ 12.11 HRS, VOLUME= .07 AF, ATTEN= 0%, LAG= 5.1 MIN
Qpri= 1.48 CFS @ 12.11 HRS, VOLUME= .04 AF
Qsec= .05 CFS @ 12. 13 HRS, VOLUME= . 03 AF
ELEVATION AREA INC.STOR CUM.STOR STOR-IND METHOD
(FT) (SF) (CF) (CF) PEAK STORAGE = 1014 CF
144.5 100 0 0 PEAK ELEVATION= 145.9 FT on
145.0 750 213 213 FLOOD ELEVATION= 146.0 FT
146.0 1130 940 1153 START ELEVATION= 144.5 FT
SPAN= 10-20 HRS, dt=.1 HRS
Tdet= 101.8 MIN ( .07 AF) *
# ROUTE INVERT OUTLET DEVICES
1 S 144.5' EXFILTRATION
V= .002778 FPM over (SURFACE AREA - 100 SF)
2 P 145. 8 ' 25' BROAD-CRESTED RECTANGULAR WEIR X 1. 81
Q=C L H^1.5 C=O, 0, 0, 1. 94, 1. 92, 1. 89, 1. 92, 1. 97
■w
Primary Discharge
AAA2=Broad-Crested Rectangular Weir
Secondary Discharge so
AAA1=Exfiltration
w
POND 13 CB 3
Qin = .27 CFS @ 12. 04 HRS, VOLUME= .02 AF
Qout= .27 CFS @ 12.04 HRS, VOLUME= .02 AF, ATTEN= 1%, LAG= .3 MIN
ELEVATION CUM.STOR STOR-IND METHOD
(FT) (CF) PEAK STORAGE = 4 CF
145.5 0 PEAK ELEVATION= 145.8 FT
147.5 25 FLOOD ELEVATION= 148.7 FT
148.7 40 START ELEVATION= 145.5 FT
SPAN= 10-20 HRS, dt=.1 HRS
Tdet= .5 MIN ( .02 AF)
Pa
# ROUTE INVERT OUTLET DEVICES
1 P 145.5' 15" CULVERT
n=.015 L=12' S=.005 '/ ' Ke=.5 Cc=. 9 Cd=.6
POND 14 CB 4
Qin = 1.54 CFS @ 12.03 HRS, VOLUME= .11 AF
Qout= 1.53 CFS @ 12.03 HRS, VOLUME= .11 AF, ATTEN= 1%, LAG= .1 MIN
ELEVATION CUM.STOR STOR-IND METHOD
(FT) (CF) PEAK STORAGE = 9 CF
145.5 0 PEAK ELEVATION= 146.2 FT
147.5 25 FLOOD ELEVATION= 148.7 FT
148.7 40 START ELEVATION= 145.5 FT
SPAN= 10-20 HRS, dt=.1 HRS
Tdet= .3 MIN ( .11 AF)
# ROUTE INVERT OUTLET DEVICES
1 P 145.5' 15" CULVERT
n=.015 L=23' S=.005'/' Ke=.5 Cc=. 9 Cd=. 6
POND 16 DMH 2
Qin = 1.80 CFS @ 12.03 HRS, VOLUME= .13 AF
Qout= 1.79 CFS @ 12.03 HRS, VOLUME= .13 AF, ATTEN= 0%, LAG= .1 MIN
ELEVATION CUM.STOR STOR-IND METHOD
(FT) (CF) PEAK STORAGE = 10 CF
145.3 0 PEAK ELEVATION= 146.1 FT
147.3 25 FLOOD ELEVATION= 149.0. FT
149.0 46 START ELEVATION= 145.3 FT
SPAN= 10-20 HRS, dt=.1 HRS
Tdet= .2 MIN ( .13 AF)
# ROUTE INVERT OUTLET DEVICES
1 P 145.3' 15" CULVERT
n=.015 L=210' S=.005'/' Ke=.5 Cc=.9 Cd=. 6
POND 9 DMH 4
w�
Qin = 1. 48 CFS @ 12.06 HRS, VOLUME= .11 AF
Qout= 1. 49 CFS @ 12.06 HRS, VOLUME= . 11 AF, ATTEN= 0$, LAG= .2 MIN
ELEVATION CUM.STOR STOR-IND METHOD
(FT) (CF) PEAK STORAGE = 9 CF
143. 1 0 PEAK ELEVATION= 143.8 FT
144.0 11 FLOOD ELEVATION= 149.3 FT ,
145.0 24 START ELEVATION= 143.1 FT
146.0 36 SPAN= 10-20 HRS, dt=.1 HRS
147.0 49 Tdet= .3 MIN ( .11 AF)
148.0 61 an
149.3 78
# ROUTE INVERT OUTLET DEVICES
1 P 143.1' 15" CULVERT no
n=.015 L=107 ' S=.005'1 ' Ke=.5 Cc=.9 Cd=.6
POND 10 DMH 3 No
Qin = 1.49 CFS @ 12.06 HRS, VOLUME= . 11 AF
Qout= 1. 49 CFS @ 12.06 HRS, VOLUME= .11 AF, ATTEN= 0$, LAG= .2 MIN
wo
ELEVATION CUM.STOR STOR-IND METHOD
(FT) (CF) PEAK STORAGE = 9 CF
142.5 0 PEAK ELEVATION= 143.2 FT ao
143. 0 6 FLOOD ELEVATION= 150.0 FT
144.0 19 START ELEVATION= 142.5 FT
146.0 44 SPAN= 10-20 HRS, dt=.1 HRS
148.0 69 Tdet= .3 MIN ( .11 AF)
150.0 94
# ROUTE INVERT OUTLET DEVICES
Ire
1 P 142.5` 15" CULVERT
n=.015 L=200' S=.0051/' Ke=.5 Cc=.9 Cd=.6
POND 11 DMH 6
Qin = 4. 09 CFS @ 12.30 HRS, VOLUME= .49 AF
Qout= 4. 09 CFS @ 12.30 HRS, VOLUME= . 49 AF, ATTEN= 0%, LAG= 0.0 MIN
ELEVATION CUM.STOR STOR-IND METHOD
(FT) (CF) PEAK STORAGE = 13 CF
144 .2 0 PEAK ELEVATION= 145.3 FT
146.2 25 FLOOD ELEVATION= 150.2 FT
148.2 50 START ELEVATION= 144.2 FT
150.2 75 SPAN= 10-20 HRS, dt=. 1 HRS
Tdet= .1 MIN ( .49 AF)
# ROUTE INVERT OUTLET DEVICES
1 P 144.2' 24" CULVERT '
n=.015 L=30' S=.005 '/' Ke=.5 Cc=. 9 Cd=. 6
ewe
POND 6 CB 8
Qin = .56 CFS @ 12.05 HRS, VOLUME= .04 AF
Qout= .55 CFS @ 12.05 HRS, VOLUME= .04 AF, ATTEN= 0%, LAG= .3 MIN
ELEVATION CUM.STOR STOR-IND METHOD
(FT) (CF) PEAK STORAGE = 4 CF
144.4 0 PEAK ELEVATION= 144.8 FT
145.0 8 FLOOD ELEVATION= 147.7 FT
146. 0 20 START ELEVATION= 144.4 FT
147.0 33 SPAN= 10-20 HRS, dt=.1 HRS
147.7 41 Tdet= .3 MIN ( .04 AF)
# ROUTE INVERT OUTLET DEVICES
1 P 144 .4' 15" CULVERT
n=. 015 L=26' S=.012'/ ' Ke=.5 Cc=.9 Cd=. 6
POND 7 CULVERT 24"
Qin = 3.39 CFS @ 12.31 HRS, VOLUME= .36 AF
Qout= 3.39 CFS @ 12.33 HRS, VOLUME= .36 AF, ATTEN= 0%, LAG= 1.4 MIN
ELEVATION AREA INC.STOR CUM.STOR STOR-IND METHOD
(FT) (SF) (CF) (CF) PEAK STORAGE = 397 CF
144.5 4 0 0 PEAK ELEVATION= 145.6 FT
145.0 200 51 51 FLOOD ELEVATION= 147.0 FT
At 146.0 900 550 601 START ELEVATION= 144.5 FT
147.0 3600 2250 2851 SPAN= 10-20 HRS, dt=.1 HRS
Tdet= 2.7 MIN ( .36 AF)
# ROUTE INVERT OUTLET DEVICES
1 P 144.7' 24" CULVERT
n=.015 L=60' S=.005'/ ' Ke=.5 Cc=.9 Cd=. 6
" POND 8 DMH 5
Qin = .98 CFS @ 12.05 HRS, VOLUME= .07 AF
Qout= . 99 CFS @ 12.06 HRS .07 AF, ATTEN= 0%, LAG= .2 MIN
ELEVATION CUM.STOR STOR-IND METHOD
(FT) (CF) PEAK STORAGE = 7 CF
144.0 0 PEAK ELEVATION= 144.6 FT
145.0 13 FLOOD ELEVATION= 147.8. FT
146. 0 25 START ELEVATION= 144.0 FT
147.0 38 SPAN= 10-20 HRS, dt=.1 HRS
147.8 48 Tdet= .3 MIN ( .07 AF)
# ROUTE INVERT OUTLET DEVICES
1 P 144.0' 15" CULVERT
n=.015 L=161' 5=.0051/ ' Ke=.S Cc=.9 Cd=. 6
w
POND 3 CB 7
Qin = .25 CFS @ 12.05 HRS, VOLUME= .02 AF
Qout= .25 CFS @ 12.06 HRS, VOLUME= .02 AF, ATTEN= 0%, LAG= .4 MIN
ELEVATION CUM.STOR STOR-IND METHOD "
(FT) (CF) PEAK STORAGE = 3 CF
145.0 0 PEAK ELEVATION= 145.2 FT
146.0 12 FLOOD ELEVATION= 149.0 FT
147.0 25 START ELEVATION= 145.0 FT
148.0 37 SPAN= 10-20 HRS, dt=.1 HRS
149.0 50 Tdet= .3 MIN ( .02 AF)
on
# ROUTE INVERT OUTLET DEVICES
1 P 145.0' 15" CULVERT
n=.015 L=20' S=.09'/ ' Ke=.5 Cc=.9 Cd=.6 am
POND 4 CB 5
Qin = .25 CFS @ 12.04 HRS, VOLUME= .02 AF 00
Qout= .25 CFS @ 12.04 HRS, VOLUME= .02 AF, ATTEN= 1%, LAG= .3 MIN
ELEVATION CUM.STOR STOR-IND METHOD
(FT) (CF) PEAK STORAGE = 3 CF No
144. 6 0 PEAK ELEVATION= 144.8 FT
145.0 5 FLOOD ELEVATION= 148.9 FT
146. 0 18 START ELEVATION= 144.6 FT no
147.0 30 SPAN= 10-20 HRS, dt=.1 HRS
148.0 43 Tdet= .3 MIN ( .02 AF)
148.9 48
on
# ROUTE INVERT OUTLET DEVICES
1 P 144. 6' 15" CULVERT
n=.015 L=25' S=.0548 '/' Ke=.5 Cc=. 9 Cd=.6
POND 5 CB 9
Qin = . 44 CFS @ 12.05 HRS, VOLUME= .03 AF ow
Qout= . 44 CFS @ 12.06 HRS, VOLUME= .03 AF, ATTEN= 0%, LAG= .3 MIN
ELEVATION CUM.STOR STOR-IND METHOD
(FT) (CF) PEAK STORAGE = 4 CF ow
144. 4 0 PEAK ELEVATION= 144.7 FT
145.0 8 FLOOD ELEVATION= 147.7 FT
146.0 20 START ELEVATION= 144.4 FT aie
147.0 33 SPAN= 10-20 HRS, dt=.1 HRS
147.7 41 Tdet= .4 MIN ( .03 AF)
# ROUTE INVERT OUTLET DEVICES
1 P 144.4 ' 15" CULVERT
n=.015 L=30' S=.01'1 ' Ke=.S Cc=.9 Cd=.6
sa
(
REACH 2 Barrett St.Brook
Qin = 1.03 CFS @ 13.73 HRS, VOLUME= .34 AF
Qout= .67 CFS @ 16.98 HRS, VOLUME= .24 AF, ATTEN= 34%, LAG= 195.4 MIN
DEPTH END AREA DISCH
(FT) (SQ-FT) (CFS) 5' x 5' CHANNEL STOR-IND+TRANS METHOD
0.0 0.0 0.00 SIDE SLOPE= 2 '/ ' PEAK DEPTH= .77 FT
. 5 2. 6 .32 n= . 07 PEAK VELOCITY= .2 FPS
1. 0 5.5 . 97 LENGTH= 1000 FT TRAVEL TIME = 103.7 MIN
1.5 8 . 6 1. 87 SLOPE= .0001 FT/FT SPAN= 10-20 HRS, dt=.1 HRS
2.2 13. 1 3.36
3.0 19.5 5. 82
4 .0 28.0 9.46
5. 0 37.5 13. 94
POND 1 Detention Pond
Qin = 7.28 CFS @ 12. 11 HRS, VOLUME= .72 AF
Qout= .83 CFS @ 13.75 HRS, VOLUME= .23 AF, ATTEN= 89$, LAG= 98.3 MIN
Qpri= .83 CFS @ 13.75 HRS, VOLUME= .23 AF
Qsec= 0.00 CFS @ 0.00 HRS, VOLUME= 0.00 AF
ELEVATION CON.AREA INC.STOR CUM.STOR WET.AREA STOR-IND METHOD
(FT) (SF) (CF) (CF) (SF) PEAK STORAGE = 27993 CF
142.0 10928 0 0 10928 PEAK ELEVATION= 144.0 FT
143.0 13650 12264 12264 13678 FLOOD ELEVATION= 146.0 FT
}' 144.0 16484 15045 27309 16545 START ELEVATION= X42.,5 FT
145. 0 20611 18509 45818 20700 SPAN= 10-20 HRS, dt=.1 HRS
146.0 24405 22481 68299 24531 Tdet= 383.7 MIN ( .09 AF)
# ROUTE INVERT OUTLET DEVICES
1 S 145.5' 10' BROAD-CRESTED RECTANGULAR WEIR X 1. 81
Q=C L H^1.5 C=O, 0, 0, 1. 94, 1.92, 1. 89, 1.92, 1.97
2 3 142.5' .25 ' x l' ORIFICE/GRATE
Q=. 6 Width 2/3 SQR(2g) (H^1.5 - (H-Height] ^1.5)
3 P 142.5' 18" CULVERT
n=.015 L=60' 5=.005'/ ' Ke=. S Cc=. 9 Cd=. 6 TW=144 '
4 3 143.5' .67 ' x l' ORIFICE/GRATE
Q=.6 Width 2/3 SQR(2g) (H^1. 5 - (H-Height] ^1.5)
Primary Discharge
AAA3=Culvert
AAA2=Orifice/Grate
AAA4=Orifice/Grate
Secondary Discharge
AAA1=Broad-Crested Rectangular Weir
wo
«p
SUBCATCHI�NT 22 SUBCATCHMENT 22
PEAK= 1.27 CFS @ 12.02 HRS, VOLUME= .09 AF No
PERCENT CN SCS TR-20 METHOD
80.00 98 PAVEMENT/BUILDING TYPE III 24-HOUR ■w
20.00 71 GRASS RAINFALL= 2.90 IN
100.00 93 TOTAL AREA = .56 AC SPAN= 10-20 HRS, dt=.1 HRS
Method Comment Tc (min) w
TR-55 SHEET FLOW Segment ID: 3.2
Grass: Short n=.15 L=20' 22=2.9 in s=.015
TR-55 SHEET FLOW Segment ID: 1.3 ,
Smooth surfaces n=.011 L=75' 22=2. 9 in s=.01
SHALLOW CONCENTRATED/UPLAND FLOW Segment ID: 1.0
Paved Kv=20.3282 L=120' s=.01 '/' V=2.03 fps
Total Length= 215 ft Total Tc= 5.5
SUBCATCHI4ENT 23 DB 23 Parking an
PEAK= .49 CFS @ 11.99 HRS, VOLUME= .03 AF
PERCENT CN SCS TR-20 METHOD
5.00 61 Landscaping TYPE III 24-HOUR
95.00 98 Parking RAINFALL= 2. 90 IN
100.00 96 TOTAL AREA = .18 AC SPAN= 10-20 HRS, dt=.l HRS
Method Comment Tc (min)
TR-55 SHEET FLOW Segment ID: 1.3
Smooth surfaces n=.011 L=70' P2=2.9 in s=.01 '/ ' No
SHALLOW CONCENTRATED/UPLAND FLOW Segment ID: .3
Paved Kv=20.3282 L=30' s=.005 '/ ' V=1.44 fps
. Total Length= 100 ft Total Tc= 1.6 no
SUBCATCHMENT 24 DB 24 Building Roof ow
PEAK= .50 CFS @ 12.03 HRS, VOLUME= .04 AF
PERCENT CN SCS TR-20 METHOD go,
100.00 98 Building Roof TYPE III 24-HOUR
TOTAL AREA = .20 AC RAINFALL= 2.90 IN
SPAN= 10-20 HRS, dt=.1 HRS
s�
Method Comment Tc (min)
DIRECT ENTRY Segment ID: Roof Drain 6.0
MP
No
SUBCATCHMENT 16 DRAINAGE AREA 16
PEAK= .27 CFS @ 12.04 HRS, VOLUME= .02 AF
PERCENT CN SCS TR-20 METHOD
70. 00 98 PAVEMENT TYPE III 24-HOUR
30.00 71 GRASS RAINFALL= 2.90 IN
100.00 90 TOTAL AREA = .14 AC SPAN= 10-20 HRS, dt=.1 HRS
Method Comment Tc (min)
TR-55 SHEET FLOW 4.1
Grass: Dense n=.24 L=20' P2=2.9 in s=.02
TR-55 SHEET FLOW 1.0
Smooth surfaces n=.011 L=50' P2=2. 9 in 5=.01
SHALLOW CONCENTRATED/UPLAND FLOW Segment ID: 1.0
Paved Kv=20.3282 L=125' 5=.01 '/ ' V=2. 03 fps
Total Length= 195 ft Total Tc= 6.1
SUBCATCHMENT 17 DRAINAGE AREA 17
PEAK= .27 CFS @ 12. 04 HRS, VOLUME= .02 AF
PERCENT CN SCS TR-20 METHOD
70.00 98 PAVEMENT TYPE III 24-HOUR
30. 00 71 GRASS RAINFALL= 2.90 IN
100.00 90 TOTAL AREA = . 14 AC SPAN= 10-20 HRS, dt=.1 HRS
Method Comment Tc (min)
TR-55 SHEET FLOW 4.1
Grass: Dense n=.24 L=20' P2=2. 9 in s=.02
TR-55 SHEET FLOW 1.0
Smooth surfaces n=.011 L=50' P2=2. 9 in s=.01
SHALLOW CONCENTRATED/UPLAND FLOW Segment ID: 1.0
Paved Kv=20.3282 L=125' 5=.01 '/ ' V=2.03 fps
Total Length= 195 ft Total Tc= 6.1
SU13CATCM4ENT 21 DB 21 Parking
PEAK= .49 CFS @ 11.99 HRS, VOLUME= .03 AF
PERCENT CN SCS TR-20 METHOD
5.00 61 Landscaping TYPE III 24-HOUR
po 95. 00 98 Parking RAINFALL= 2. 90 IN
100.00 96 TOTAL AREA = .18 AC SPAN= 10-20 HRS, dt=.1 HRS
Method Comment Tc (min)
TR-55 SHEET FLOW Segment ID: 1.7
Smooth surfaces n=.011 L=100' P2=2. 9 in s=.01
SHALLOW CONCENTRATED/UPLAND FLOW Segment ID: •4
PP Paved Kv=20.3282 L=50' 5=.01 '/ ' V=2.03 fps
SHALLOW CONCENTRATED/UPLAND FLOW Segment ID: 0.0
Grassed Waterway Kv=15 L=10' s=5 '/ ' V=33.54 fps
Total Length= 160 ft Total Tc= 2.1
SUBCATCHMENT 10 DRAINAGE AREA 10
we
PEAK= .56 CFS @ 12.05 HRS, VOLUME= .04 AF
PERCENT CN SCS TR-20 METHOD
70.00 98 PAVEMENT TYPE III 24-HOUR
30.00 71 Grass RAINFALL= 2.90 IN
100.00 90 TOTAL AREA = .29 AC SPAN= 10-20 HRS, dt=.1 HRS
Method Comment Tc (min)
TR-55 SHEET FLOW 4.1
Grass: Dense n=.24 L=20' P2=2.9 in s=.02
TR-55 SHEET FLOW 1.1 '
Smooth surfaces n=.011 L=50' P2=2.9 in s=. 0075
SHALLOW CONCENTRATED/UPLAND FLOW Segment ID: 1.3
Paved Kv=20.3282 L=140' s=. 0075 '/ ' V=1.76 fps ew
Total Length= 210 ft Total Tc= 6.5
SUBCATCHMENT 12 DRAINAGE AREA 12 ►
PEAK= 3.39 CFS @ 12.31 HRS, VOLUME= .36 AF
PERCENT CN SCS TR-20 METHOD ■w
70.00 98 PAVEMENT/Buildings TYPE III 24-HOUR
30.00 71 GRASS / SOIL GROUP C RAINFALL= 2. 90 IN
100.00 90 TOTAL AREA = 2.55 AC SPAN= 10-20 HRS, dt=.1 HRS w"
Method Comment 1'c (min)
TR-55 SHEET FLOW 1.3
Smooth surfaces n=.011 L=50' P2=2.9 in s=. 005
TR-55 SHEET FLOW 15.0
Grass: Dense n=.24 L=50' P2=2. 9 in s=.005
SHALLOW CONCENTRATED/UPLAND FLOW 8.4
Short Grass Pasture Kv=7 L=250' s=.005 '/ ' V=.49 fps
PARABOLIC CHANNEL Segment ID: 1.0
W=15' D=1' a=10 sq-ft Pw=15.2' r=. 659'
s=.0075 '/ ' n=.03 V=3.25 fps L=200' Capacity=32.5 cfs ■*
Total Length= 550 ft Total Tc= 25.7
e
wo
w.
No
x pal
SUBCATCHMENT 5 DRAINAGE AREA 5
PEAK= .25 CFS @ 12.05 HRS, VOLUME= .02 AF
PERCENT CN SCS TR-20 METHOD
60.00 98 PAVEMENT TYPE III 24-HOUR
40. 00 71 Grass RAINFALL= 2.90 IN
100.00 87 TOTAL AREA = .15 AC SPAN= 10-20 HRS, dt=.1 HRS
Method Comment Tc (min)
TR-55 SHEET FLOW 4.1
Grass: Dense n=.24 L=20' P2=2.9 in s=.02
TR-55 SHEET FLOW 1.1
Smooth surfaces n=. 011 L=50' P2=2.9 in s=.0075
SHALLOW CONCENTRATED/UPLAND FLOW Segment ID: 1.4
Paved Kv=20.3282 L=150' s=.0075 '/ ' V=1.76 fps
Total Length= 220 ft Total Tc= 6.6
SUBCATCHMENT 7 DRAINAGE AREA 7
PEAK= .44 CFS @ 12.05 HRS, VOLUME= .03 AF
PERCENT CN SCS TR-20 METHOD
50. 00 98 PAVEMENT TYPE III 24-HOUR
50.00 71 Grass RAINFALL= 2.90 IN
100.00 85 TOTAL AREA = .29 AC SPAN= 10-20 HRS, dt=.1 HRS
Method Comment Tc (min)
TR-55 SHEET FLOW 4.1
Grass: Dense n=.24 L=20' P2=2. 9 in s=.02
TR-55 SHEET FLOW 1.1
Smooth surfaces n=.011 L=50' P2=2. 9 in s=.0075
SHALLOW CONCENTRATED/UPLAND FLOW Segment ID: 1.3
Paved Kv=20.3282 L=140 ' s=. 0075 '/ ' V=1.76 fps
Total Length= 210 ft Total Tc= 6.5
SUBCATCHMENT 9 DRAINAGE AREA 9
PEAK= .25 CFS @ 12.04 HRS, VOLUME= .02 AF
PERCENT CN SCS TR-20 METHOD
70.00 98 PAVEMENT TYPE III 24-HOUR
MR 30.00 71 Grass RAINFALL= 2.90 IN
100.00 90 TOTAL AREA = 13 AC SPAN= 10-20 HRS, dt=.1 HRS
Method Comment Tc (min)
TR-55 SHEET FLOW
4.1
Grass: Dense n=.24 L=20 ' P2=2. 9 in s=.02
TR-55 SHEET FLOW 1.1
Smooth surfaces n=.011 L=50' P2=2.9 in s=.0075
SHALLOW CONCENTRATED/UPLAND FLOW Segment ID: •9
Paved Kv=20.3282 L=100' s=.0075 '/' V=1.76 fps
----------
Total Length= 170 ft Total Tc= 6.1
Im
so
SUBCATCHMENT 1 DRAINAGE AREA 1
PEAK= . 64 CFS @ 12.32 HRS, VOLUME= .07 AF
PERCENT CN SCS TR-20 METHOD
100.00 71 Grass/Natural TYPE III 24-HOUR
TOTAL AREA = 1.40 AC RAINFALL= 2. 90 IN
SPAN= 10-20 HRS, dt=.1 HRS
Method Comment Tc (min)
TR-55 SHEET FLOW Segment ID: GRASS 22.6
Woods: Light underbrush n=.4 L=100' 22=2.9 in s=.02
SUBCATCHMENT 2 DRAINAGE AREA 2
PEAK= . 19 CFS @ 12.48 HRS, VOLUME= .04 AF arb
PERCENT CN SCS TR-20 METHOD
100.00 58 GRASS / SOIL GROUP C TYPE III 24-HOUR +'s
TOTAL AREA = 2. 16 AC RAINFALL= 2.90 IN
SPAN= 10-20 HRS, dt=.1 HRS
Method Comment Tc (min) 00
TR-55 SHEET FLOW Segment ID: GRASS 19. 8
Grass: Dense n=.24 L=100' P2=2.9 in S=.01
SUBCATCHMENT 3 DB 3 Overland to Pond
PEAK= . 86 CFS @ 12.15 HRS, VOLUME= .08 AF No
PERCENT CN SCS TR-20 METHOD
37. 00 58 Grass, Hyd. B TYPE III 24-HOUR
21.00 98 Detention Pond RAINFALL= 2.90 IN
42.00 71 Grass Hyd. C SPAN= 10-20 HRS, dt=.1 HRS
100.00 72 TOTAL AREA = 1.40 AC
Method Comment Tc (min)
TR-55 SHEET FLOW Segment ID: 12.2
Grass: Short n=.15 L=100' 22=2.9 in s=.013
ws
:
POND ROUTING BY STOR-IND METHOD
POND START FLOOD PEAK PEAK ------ PEAK FLOW ------- ---Qout---
NO. ELEV. ELEV. ELEV. STORAGE Qin Qout Qpri Qsec ATTEN. LAG
(FT) (FT) (FT) (AF) (CFS) (CFS) (CFS) (CFS) ($) (MIN)
1 142.5 146.0 144.0 .64 7.28 . 83 .83 0.00 89 98.3
3 145.0 149.0 145.2 0. 00 .25 .25 0 .4
4 144.6 148.9 144.8 0.00 .25 .25 1 .3
g 5 144.4 147.7 144.7 0.00 .44 .44 0 .3
6 144 .4 147.7 144 . 8 0. 00 .56 .55 0 .3
7 144.5 147.0 145. 6 .01 3. 39 3.39 0 1.4
8 144.0 147.8 144.6 0. 00 .98 .99 0 .2
9 143.1 149.3 143. 8 0.00 1. 48 1. 49 0 .2
10 142.5 150.0 143.2 0. 00 1.49 1.49 0 .2
11 144.2 150.2 145.3 0.00 4.09 4.09 0 0.0
13 145.5 148.7 145. 8 0.00 .27 .27 1 .3
14 145.5 148.7 146.2 0. 00 1.54 1. 53 1 .1
16 145.3 149.0 146. 1 0.00 1. 80 1.79 0 .1
21 145.0 146. 0 145.6 .02 1. 47 1.34 9 1. 4
22 144.5 146.0 145.9 . 02 1.34 1.52 1.48 .05 0 5.1
23 142.0 148.0 146.4 0.00 . 49 .48 . 48 0. 00 0 .1
4,
RUNOFF BY SCS TR-20 METHOD: TYPE III 24-HOUR RAINFALL= 2.90 IN, SCS U.H.
RUNOFF SPAN = 10-20 HRS, dt= .10 HRS, 101 POINTS
SUBCAT AREA Tc WGT'D PEAK Tpeak VOL
NUMBER (ACRE) (MIN) --GROUND COVERS (%CN) -- CN C (CFS) (HRS) (AF)
1 1. 40 22. 6 100%71 71 - .64 12.32 .07
2 2.16 19.8 100558 58 - .19 12.48 .04
3 1.40 12.2 37%58 219698 42%71 72 - .86 12.15 .08
5 .15 6. 6 60%98 40%71 87 - .25 12.05 .02
7 .29 6.5 50$98 50%71 85 - .44 12.05 .03 wee
9 . 13 6.1 70%98 30%71 90 - .25 12.04 .02
10 .29 6.5 70%98 30%71 90 - .56 12.05 .04
12 2.55 25.7 70%98 30$71 90 - 3.39 12.31 .36
16 . 14 6. 1 70%98 30%71 90 - .27 12.04 .02
17 .14 6. 1 70%98 30%71 90 - .27 12.04 .02
21 .18 2. 1 5$61 95%98 96 - . 49 11.99 .03
22 .56 5.5 80%98 20%71 93 - 1.27 12.02 .09
23 .18 1. 6 5%61 95%98 96 - .49 11.99 .03
24 .20 6.0 100%98 98 - .50 12.03 .04
REACH ROUTING BY STOR-IND+TRANS METHOD iw
REACH BOTTOM SIDE PEAK TRAVEL PEAK
NO. DIAM WIDTH DEPTH SLOPES n LENGTH SLOPE VEL. TIME Qout an
(IN) (FT) (FT) (FT/FT) (FT) (FT/FT) (FPS) (MIN) (CFS)
2 - 5.0 5.0 2.00 2.00 .070 1000 . 0001 .2 103.7 .67
.w
on
op
!
Data for 98241 Carlon Medical -- Proposed Page 1
Prepared by Almer Huntley Jr. and Associates, Inc. 7 Dec 98
HydroCAD 5. 01 000451 (c) 1986-1998 Applied Microcomputer Systems
f
WATERSHED ROUTING
SUBCATCHMENT 1 = DRAINAGE AREA 1 -> REACH 2
SUBCATCHMENT 2 = DRAINAGE AREA 2 -> REACH 2
SUBCATCHMENT 3 = DB 3 Overland to Pond -> POND 1
SUBCATCHMENT 5 = DRAINAGE AREA 5 -> POND 3
SUBCATCHMENT 7 = DRAINAGE AREA 7 -> POND 5
SUBCATCHMENT 9 = DRAINAGE AREA 9 -> POND 4
SUBCATCHMENT 10 = DRAINAGE AREA 10 -> POND 6
SUBCATCHMENT 12 = DRAINAGE AREA 12 -> POND 7
SUBCATCHMENT 16 = DRAINAGE AREA 16 -> POND 13
SUBCATCHMENT 17 = DRAINAGE AREA 17 -> POND 14
SUBCATCHMENT 21 = DB 21 Parking -> POND 21
SUBCATCHMENT 22 = SUBCATCHMENT 22 -> POND 14
OR SUBCATCHMENT 23 = DB 23 Parking -> POND 23
SUBCATCHMENT 24 = DB 24 Building Roof -> POND 21
REACH 2 = Barrett St.Brook ->
POND 1 = Detention Pond -> REACH 2
POND 1 secondary = Detention Pond -> REACH 2
POND 3 = CB 7 -> POND 9
POND 4 = CB 5 _ -> POND 9
POND 5 = CB 9 -> POND 8
POND 6 = CB 8 -> POND 8
POND 7 = CULVERT 24" -> POND 11
.,
POND 8 = DMH 5 -> POND 9
POND 9 = DMH 4 -> POND 10
POND 10 = DMH 3 -> POND 1
POND 11 = DMH 6 -> POND 1
POND 13 = CB 3 -> POND 16
POND 14 = CB 4 -> POND 16
POND 16 = DMH 2 -> POND 11
POND 21 = Drainage Swale -> POND 22
POND 22 = Infiltration Pond -> POND 1
POND 23 = DMH 1 -> POND 21
POND 23 secondary = DMH 1 -> POND 21
(
ew
Proposed Conditions
2 Year Storm Routing
POND ROUTING BY STOR-IND METHOD
POND START FLOOD PEAK PEAK ------ PEAK FLOW ------- ---Qout---
NO. ELEV. ELEV. ELEV. STORAGE Qin Qout Qpri Qsec ATTEN. LAG
(FT) (FT) (FT) (AF) (CFS) (CFS) (CFS) (CFS) (%) (MIN)
1 142.5 146.0 145.5 1.29 21.22 5.78 5.78 0.00 73 41.5
3 145.0 149.0 145.4 0.00 .74 .73 0 .2
4 144 .6 148. 9 145.0 0.00 .69 .68 0 .2
5 144.4 147.7 145.0 0.00 1.38 1.38 0 .2
6 144 .4 147.7 145.0 0.00 1.50 1.49 0 .2
7 144.5 147.0 146.3 .03 9.17 8.76 4 4.4
8 144. 0 147. 8 145.0 0.00 2.87 2.86 0 .1
9 143.1 149.3 144.5 0.00 4.28 4.27 0 .2
10 142 .5 150.0 143.9 0.00 4.27 4.26 0 .2
11 144 .2 150.2 146.0 0.00 10.36 10.36 0 0.0
13 145.5 148.7 146.0 0.00 .74 .73 1 .2
14 145.5 148.7 146.8 0.00 3.90 3.88 1 .1
16 145.3 149.0 147.1 0.00 4. 61 4.58 1 .2 �.
so
no
rw
ws
tee.
,.w
so,
Data for 98241 Carlon Medical -- Exist
98241 Lot 6, Carlon Drive Existing 100Yr.
Prepared by Almer Huntley Jr. and Associates, Inc. 7 Dec 98
HydroCAD 5.01 000451 (c) 1986-1998 Applied Microcomputer Systems
RUNOFF BY SCS TR-20 METHOD: TYPE III 24-HOUR RAINFALL= 6.50 IN, SCS U.H.
RUNOFF SPAN = 10-20 HRS, dt= . 10 HRS, 101 POINTS
SUBCAT AREA Tc WGT'D PEAK Tpeak VOL
NUMBER (ACRE) (MIN) --GROUND COVERS (%CN) -- CN C (CFS) (HRS) (AF)
1 1.40 22. 6 100%71 71 - 3.42 12.28 .35
2 2.16 19. 8 100%58 58 - 3.26 12.25 .34
3 1.96 14.0 20%58 35%98 15%98 30%71 82 - 7.61 12.14 .65
5 . 15 6. 6 60%98 40%71 87 - .74 12.04 .05
7 .29 6.5 50%98 50%71 85 - 1.38 12.04 .10
9 . 13 6. 1 70%98 30%71 90 - .69 12.03 .05
OR 10 .29 6.5 70%98 30%71 90 - 1.50 12.04 .11
12 2.55 25.7 70%98 30%71 90 - 9.17 12.30 .99
16 .14 6.1 70%98 30%71 90 - .74 12.03 .05
17 . 14 6. 1 70%98 30%71 90 - .74 12.03 .05
22 .56 5.5 80%98 20%71 93 - 3. 17 12. 02 .22
REACH ROUTING BY STOR-IND+TRANS METHOD
REACH BOTTOM SIDE PEAK TRAVEL PEAK
NO. DIAM WIDTH DEPTH SLOPES n LENGTH SLOPE VEL. TIME Qout
(IN) (FT) (FT) (FT/FT) (FT) (FT/FT) (FPS) (MIN) (CFS)
2 - 5.0 5. 0 2.00 2. 00 .070 1000 . 0001 .3 53. 8 6. 63
Existing Conditions
100 Year Storm Routing
i
�r
w
POND ROUTING BY STOR-IND METHOD
POND START FLOOD PEAK PEAK ------ PEAK FLOW ------- ---Qout---
NO. ELEV. ELEV. ELEV. STORAGE Qin Qout Qpri Qsec ATTEN. LAG
(FT) (FT) (FT) (AF) (CFS) (CFS) (CFS) (CFS) ($) (MIN)
ewe
1 142.5 146.0 144.9 1.02 16.12 4.74 4.74 0.00 71 39.3
3 145.0 149.0 145.3 0.00 .56 .56 0 .2
4 144. 6 148.9 144. 9 0.00 .53 .53 1 .2 ,
5 144 . 4 147.7 144. 9 0.00 1.04 1.03 0 .2
6 144.4 147.7 144. 9 0.00 1.16 1. 16 0 .2
7 144.5 147.0 146.1 .02 7.09 6.81 4 3.9
8 144.0 147.8 144.9 0. 00 2.19 2. 18 0 .1
9 143. 1 149.3 144.2 0.00 3.27 3.26 0 .2
10 142.5 150.0 143. 6 0.00 3.26 3.23 1 .2
11 144.2 150.2 145. 8 0.00 8.09 8.09 0 .1
13 145.5 148.7 145. 9 0.00 .57 .57 1 .2
14 145.5 148.7 146.6 0.00 3.06 3.04 1 .1
16 145.3 149.0 146.5 0. 00 3.61 3.59 0 .1
w�
�w.
w.
wea
so
Data for 98241 Carlon Medical -- Exist
98241 Lot 6, Carlon Drive Existing 25Yr.
Prepared by Almer Huntley Jr. and Associates, Inc. 7 Dec 98
HydroCAD 5.01 000451 (c) 1986-1998 Applied Microcomputer Systems
P
RUNOFF BY SCS TR-20 METHOD: TYPE III 24-HOUR RAINFALL= 5.20 IN, SCS U.H.
RUNOFF SPAN = 10-20 HRS, dt= .10 HRS, 101 POINTS
SUBCAT AREA Tc WGT'D PEAK Tpeak VOL
�w
NUMBER (ACRE) (MIN) --GROUND COVERS (%CN) -- CN C (CFS) (HRS) (AF)
1 1.40 22. 6 100%71 71 - 2.32 12.29 .24
2 2.16 19.8 100%58 58 - 1.88 12.28 .21
on 3 1.96 14.0 20%58 35%98 15%98 30%71 82 - 5. 61 12. 15 .48
5 .15 6. 6 60%98 40%71 87 - .56 12.04 .04
7 .29 6.5 50%98 50%71 85 - 1.04 12.04 .08
9 .13 6.1 70%98 30%71 90 - .53 12.03 .04
10 .29 6.5 70%98 30%71 90 - 1. 16 12.04 .09
12 2.55 25.7 70%98 30%71 90 - 7.09 12.30 .76
16 .14 6.1 70%98 30%71 90 - .57 12.03 .04
17 .14 6.1 70%98 30%71 90 - .57 12.03 .04
22 .56 5.5 80%98 20%71 93 - 2.49 12.02 .18
REACH ROUTING BY STOR-IND+TRANS METHOD
REACH BOTTOM SIDE PEAK TRAVEL PEAK
NO. DIAM WIDTH DEPTH SLOPES n LENGTH SLOPE VEL. TIME Qout
(IN) (FT) (FT) (FT/FT) (FT) (FT/FT) (FPS) (MIN) (CFS)
2 - 5.0 5. 0 2.00 2.00 . 070 1000 . 0001 .3 58.5 4.80
Existing Conditions
25 Year Storm Routing
POND ROUTING BY STOR-IND METHOD
POND START FLOOD PEAK PEAK ------ PEAK FLOW -------
---Qout---
NO. ELEV. ELEV. ELEV. STORAGE Qin Qout Qpri Qsec ATTEN. LAG
(FT) (FT) (FT) (AF) (CFS) (CFS) (CFS) (CFS) ($) (MIN)
1 142.5 146.0 144.7 .90 13.76 4.06 4. 06 0.00 70 39.5
3 145.0 149.0 145.3 0.00 .48 .47 1 .3
4 144.6 148.9 144.9 0.00 .46 .46 1 .2
5 144.4 147.7 144.9 0.00 . 88 . 88 0 .2
6 144.4 147.7 144.9 0.00 1.00 1.00 0 .2
7 144.5 147.0 146.0 . 01 6. 13 6. 13 0 1.2
po 8 144.0 147.8 144 .8 0.00 1.88 1.87 0 .2
9 143.1 149.3 144.1 0.00 2.80 2.77 1 .2
10 142.5 150.0 143.5 0. 00 2.77 2.78 0 .2
11 144.2 150.2 145.7 0. 00 7.35 7.35 0 0.0
on 13 145.5 148.7 145.9 0.00 .49 .49 1 .2
14 145.5 148.7 146.5 0.00 2. 66 2.65 1 . 1
16 145.3 149.0 146.4 0. 00 3. 14 3. 12 0 .1
�s
RUNOFF BY SCS TR-20 METHOD: TYPE III 24-HOUR RAINFALL= 4.60 IN, SCS U.H. wa
RUNOFF SPAN = 10-20 HRS, dt= .10 HRS, 101 POINTS
SUBCAT AREA Tc WGT'D PEAK Tpeak VOL
NUMBER (ACRE) (MIN) --GROUND COVERS (%CN)-- CN C (CFS) (HRS) (AF)
1 1.40 22.6 100%71 71 - 1. 84 12.29 .19 .�
2 2 .16 19.8 100%58 58 - 1.32 12.30 .15
3 1.96 14.0 20$58 35%98 15%98 30%71 82 - 4.70 12. 15 .41
5 .15 6. 6 60%98 40%71 87 - .48 12. 05 .04
7 .29 6.5 50%98 50%71 85 - .88 12.05 .07 as
9 . 13 6.1 70%98 30%71 90 - .46 12.03 .03
10 .29 6.5 70%98 30%71 90 - 1.00 12.04 .07
12 2 .55 25.7 70%98 30%71 90 - 6. 13 12.30 .66
16 . 14 6.1 70%98 30%71 90 - . 49 12.03 .04 ...
17 .14 6.1 70%98 30%71 90 - .49 12.03 .04
22 .56 5.5 80%98 20%71 93 - 2.17 12.02 .15
w�
REACH ROUTING BY STOR-IND+TRANS METHOD
REACH BOTTOM SIDE PEAK TRAVEL PEAK
NO. DIAM WIDTH DEPTH SLOPES n LENGTH SLOPE VEL. TIME Qout "
(IN) (FT) (FT) (FT/FT) (FT) (FT/FT) (FPS) (MIN) (CFS)
2 - 5.0 5.0 2.00 2.00 .070 1000 . 0001 .3 62. 1 3.85
No
no
ww
Data for 98241 Carlon Medical -- Exist
98241 Lot 6, Carlon Drive Existing Mr.
Prepared by Almer Huntley Jr. and Associates, Inc. 7 Dec 98
HydroCAD 5.01 000451 (c) 1986-1998 Applied Microcomputer Systems
WATERSHED ROUTING
SUBCATCHMENT 1 = DRAINAGE AREA 1 -> REACH 2
SUBCATCHMENT 2 = DRAINAGE AREA 2 -> REACH 2
SUBCATCHMENT 3 = DRAINAGE AREA 3 -> POND 1
SUBCATCHMENT 5 = DRAINAGE AREA 5 -> POND 3
SUBCATCHMENT 7 = DRAINAGE AREA 7 -> POND 5
SUBCATCHMENT 9 = DRAINAGE AREA 9 -> POND 4
SUBCATCHMENT 10 = DRAINAGE AREA 10 -> POND 6
SUBCATCHMENT 12 = DRAINAGE AREA 12 -> POND 7
SUBCATCHMENT 16 = DRAINAGE AREA 16 -> POND 13
SUBCATCHMENT 17 = DRAINAGE AREA 17 -> POND 14
P" SUBCATCHMENT 22 = SUBCATCHMENT 22 -> POND 14
REACH 2 = Barrett St.Brook ->
POND 1 = Detention Pond -> REACH 2
POND 1 secondary = Detention Pond -> REACH 2
POND 3 = CB 7 -> POND 9
POND 4 = CB 5 -> POND 9
POND 5 = CB 9 POND 8
POND 6 = CB 8 -> POND 8
POND 7 = CULVERT 24" -> POND 11
POND 8 = DMH 5 -> POND 9
POND 9 = DMH 4 -> POND 10
POND 10 = DMH 3 -> POND 1
POND 11 = DMH 6 -> POND 1
POND 13 = CB 3 -> POND 16
POND 14 = CB 4 -> POND 16
POND 16 = DMH 2 -> POND 11
O
PM
on Existincr Conditions
10 Year Storm Routing
OR
POND 14 CB 4
Qin = 1.54 CFS @ 12.03 HRS, VOLUME= .11 AF
Qout= 1.53 CFS @ 12.03 HRS, VOLUME= . 11 AF, ATTEN= 1%, LAG= .1 MIN
ELEVATION CUM.STOR STOR-IND METHOD
(FT) (CF) PEAK STORAGE = 9 CF
145.5 0 PEAK ELEVATION= 146.2 FT
147.5 25 FLOOD ELEVATION= 148.7 FT
148.7 40 START ELEVATION= 145.5 FT
SPAN= 10-20 HRS, dt=.1 HRS
Tdet= .3 MIN ( .11 AF)
# ROUTE INVERT OUTLET DEVICES
1 P 145.5' 15" CULVERT
!w n=.015 L=23' S=.005'/ ' Ke=.5 Cc=. 9 Cd=.6
POND 16 DMH 2
Qin = 1. 80 CFS @ 12. 03 HRS, VOLUME= . 13 AF
go Qout= 1.79 CFS @ 12.03 HRS, VOLUME= . 13 AF, ATTEN= 0%, LAG= .1 MIN
ELEVATION CUM.STOR STOR-IND METHOD
(FT) (CF) PEAK STORAGE = 10 CF
145.3 0 PEAK ELEVATION= 146.1 FT
- 147.3 25 FLOOD ELEVATION= 14q.0 FT
149.0 46 START ELEVATION= 145.3 FT
SPAN= 10-20 HRS, dt=.l HRS
Tdet= .2 MIN ( .13 AF)
# ROUTE INVERT OUTLET DEVICES
1 P 145.3' 15" CULVERT
n=.015 L=210' S=.005'/' Ke=.5 Cc=.9 Cd=. 6
40
POND 10 DMH 3
w�
Qin = 1.49 CFS @ 12.06 HRS, VOLUME= . 11 AF
Qout= 1.49 CFS @ 12.06 HRS, VOLUME= .11 AF, ATTEN= 0$, LAG= .2 MIN
ELEVATION CUM.STOR STOR-IND METHOD
(FT) (CF) PEAK STORAGE = 9 CF
142.5 0 PEAK ELEVATION= 143.2 FT
143.0 6 FLOOD ELEVATION= 150.0 FT see
144. 0 19 START ELEVATION= 142.5 FT
146.0 44 SPAN= 10-20 HRS, dt=.1 HRS
148.0 69 Tdet= .3 MIN ( .11 AF)
150.0 94 am
# ROUTE INVERT OUTLET DEVICES `
1 P 142.5 ' 15" CULVERT
r�
n=.015 L=200' S=. 005'/ ' Ke=. 5 Cc=. 9 Cd=. 6
POND 11 DMH 6 go
Qin = 4 .09 CFS @ 12.30 HRS, VOLUME= .49 AF
Qout= 4.09 CFS @ 12.30 HRS, VOLUME= . 49 AF, ATTEN= 0%, LAG= 0.0 MIN s�
ELEVATION CUM.STOR STOR-IND METHOD
(FT) (CF) PEAK STORAGE = 13 CF
144.2 0 PEAK ELEVATION= 145.3 FT w�
146.2 25 _ FLOOD ELEVATION= 150.2 FT
148.2 50 START ELEVATION= 144.2 FT
150.2 75 SPAN= 10-20 HRS, dt=.1 HRS
Tdet= .1 MIN ( .49 AF) 111A4
# ROUTE INVERT OUTLET DEVICES
1 P 144.2' 24" CULVERT Nr
n=.015 L=30' S=.005'/ ' Ke=.5 Cc=.9 Cd=.6
POND 13 CB 3
Qin = .27 CFS @ 12.04 HRS, VOLUME= .02 AF
Qout= .27 CFS @ 12.04 HRS, VOLUME= .02 AF, ATTEN= 1%, LAG= .3 MIN
ELEVATION CUM.STOR STOR-IND METHOD
(FT) (CF) PEAK STORAGE = 4 CF
145.5 0 PEAK ELEVATION= 145.8 FT wiaa
147.5 25 FLOOD ELEVATION= 148.7 FT
148.7 40 START ELEVATION= 145.5 FT
SPAN= 10-20 HRS, dt=.1 HRS
Tdet= .5 MIN ( .02 AF)
# ROUTE INVERT OUTLET DEVICES
1 P 145.5' 15" CULVERT No
n=.015 L=12 ' S=.005'/' Ke=.5 Cc=. 9 Cd=.6
POND 7 CULVERT 24"
Qin = 3.39 CFS @ 12.31 HRS, VOLUME= .36 AF
Qout= 3.39 CFS @ 12.33 HRS, VOLUME= .36 AF, ATTEN= 0%, LAG= 1.4 MIN
ELEVATION AREA INC.STOR CUM.STOR STOR-IND METHOD
(FT) (SF) (CF) (CF) PEAK STORAGE = 397 CF
144.5 4 0 0 PEAK ELEVATION= 145.6 FT
1I! 145.0 200 51 51 FLOOD ELEVATION= 147.0 FT
146.0 900 550 601 START ELEVATION= 144.5 FT
147.0 3600 2250 2851 SPAN= 10-20 HRS, dt=.1 HRS
Tdet= 2.7 MIN ( .36 AF)
# ROUTE INVERT OUTLET DEVICES
1 P 144.7 ' 24" CULVERT
n=.015 L=60' 5=.005'/ ' Ke=.S Cc=. 9 Cd=. 6
POND 8 DMH 5
Qin = . 98 CFS @ 12.05 HRS, VOLUME= .07 AF
Qout= .99 CFS @ 12.06 HRS, VOLUME= .07 AF, ATTEN= 0$, LAG= .2 MIN
ELEVATION CUM.STOR STOR-IND METHOD
(FT) (CF) PEAK STORAGE = 7 CF
144.0 0 PEAK ELEVATION= 144.6 FT
145. 0 13 FLOOD ELEVATION= 147.8 FT
00 146.0 25 START ELEVATION= 144.0 FT
147.0 38 SPAN= 10-20 HRS, dt=.1 HRS
147. 8 48 Tdet= .3 MIN ( .07 AF)
# ROUTE INVERT OUTLET DEVICES
1 P 144. 0' 15" CULVERT
n=.015 L=161' 5=.005'/ ' Ke=.S Cc=.9 Cd=.6
POND 9 DMH 4
Qin = 1.48 CFS @ 12.06 HRS, VOLUME= .11 AF
Qout= 1.49 CFS @ 12.06 HRS, VOLUME= .11 AF, ATTEN= 0%, LAG= .2 MIN
ELEVATION CUM.STOR STOR-IND METHOD
(FT) (CF) PEAK STORAGE = 9 CF
143.1 0 PEAK ELEVATION= 143.8. FT
144 .0 11 FLOOD ELEVATION= 149.3 FT
145.0 24 START ELEVATION= 143.1 FT
146.0 36 SPAN= 10-20 HRS, dt=.1 HRS
wo 147.0 49 Tdet= .3 MIN ( . 11 AF)
148.0 61
149.3 78
# ROUTE INVERT OUTLET DEVICES
1 P 143.1' 15" CULVERT
n=.015 L=107' S=.005'/ ' Ke=.S Cc=.9 Cd=. 6
POND 4 CB 5
Qin = .25 CFS @ 12.04 HRS, VOLUME= .02 AF
Qout= .25 CFS @ 12.04 HRS, VOLUME= .02 AF, ATTEN= 1%, LAG= .3 MIN
ELEVATION CUM.STOR STOR-IND METHOD
(FT) (CF) PEAK STORAGE = 3 CF
144 . 6 0 PEAK ELEVATION= 144.8 FT
145. 0 5 FLOOD ELEVATION= 148.9 FT we
146.0 18 START ELEVATION= 144 .6 FT
147.0 30 SPAN= 10-20 HRS, dt=.1 HRS
148.0 43 Tdet= .3 MIN ( .02 AF)
148.9 48 an
# ROUTE INVERT OUTLET DEVICES
1 P 144. 6' 15" CULVERT w
n=.015 L=25' S=. 0548 '/' Ke=.5 Cc=. 9 Cd=. 6
POND 5 CB 9 seA
Qin = .44 CFS @ 12.05 HRS, VOLUME= . 03 AF
Qout= .44 CFS @ 12.06 HRS, VOLUME= .03 AF, ATTEN= 0$, LAG= .3 MIN
ELEVATION CUM.STOR STOR-IND METHOD
(FT) (CF) PEAK STORAGE = 4 CF
144.4 0 PEAK ELEVATION= 144.7 FT
145.0 8 FLOOD ELEVATION= 147.7 FT
146.0 20 START ELEVATION= 144.4 FT
147.0 33 SPAN= 10-20 HRS, dt=.1 HRS
147.7 41 Tdet= .4 MIN ( .03 AF) w`
# ROUTE INVERT OUTLET DEVICES
1 P 144.4 ' 15" CULVERT
n=.015 L=30' S=. 01'1 ' Ke=.5 Cc=.9 Cd=. 6
POND 6 CB 8 op
Qin = .56 CFS @ 12.05 HRS, VOLUME= .04 AF
Qout= .55 CFS @ 12.05 HRS, VOLUME= .04 AF, ATTEN= 0%, LAG= .3 MIN
ELEVATION CUM.STOR STOR-IND METHOD
(FT) (CF) PEAK STORAGE = 4 CF
144.4 0 PEAK ELEVATION= 144.8 FT
145.0 8 FLOOD ELEVATION= 147.7 FT
146.0 20 START ELEVATION= 144.4 FT
147. 0 33 SPAN= 10-20 HRS, dt=. 1 HRS
147.7 41 Tdet= .3 MIN ( .04 AF) �1R
# ROUTE INVERT OUTLET DEVICES
1 P 144.4 ' 15" CULVERT
n=.015 L=26' S=.012 '/ ' Ke=.5 Cc=.9 Cd=.6
.w.
POND 1 Detention Pond
Qin = 7. 14 CFS @ 12. 14 HRS, VOLUME= . 80 AF
Qout= 1.23 CFS @ 13.23 HRS, VOLUME= .31 AF, ATTEN= 83%, LAG= 65.8 MIN
Qpri= 1.23 CFS @ 13.23 HRS, VOLUME= .31 AF
Qsec= 0. 00 CFS @ 0.00 HRS, VOLUME= 0.00 AF
ELEVATION CON.AREA INC.STOR CUM.STOR WET.AREA STOR-IND METHOD
(FT) (SF) (CF) (CF) (SF) PEAK STORAGE = 28317 CF
142.0 10928 0 0 10928 PEAK ELEVATION= 144.1 FT
143.0 13650 12264 12264 13678 FLOOD ELEVATION= 146.0 FT
144. 0 16484 15045 27309 16545 START ELEVATION= 142.5 FT
145.0 20611 18509 45818 20700 SPAN= 10-20 HRS, dt=.l HRS
146. 0 24405 22481 68299 24531 Tdet= 311.9 MIN ( . 17 AF)
# ROUTE INVERT OUTLET DEVICES
1 S 145.5' 10' BROAD-CRESTED RECTANGULAR WEIR X 1.81
Q=C L H^1.5 C=O, 0, 0, 1. 94, 1.92, 1. 89, 1.92, 1.97
2 3 142.5' .25' x 1' ORIFICE/GRATE
Q=.6 Width 2/3 SQR(2g) (H^1.5 - [H-Height] -1.5)
3 P 142.5' 18" CULVERT
n=.015 L=60 ' 5=.005'/ ' Ke=.S Cc=.9 Cd=. 6 TW=144'
4 3 143.5' .67' x l' ORIFICE/GRATE
Q=. 6 Width 2/3 SQR(2g) (H^1.5 - [H-Height] ^1.5)
Primary Discharge
AAA3=Culvert
'-.AA2=Orifice/Grate
AAA4=Orifice/Grate
Secondary Discharge
AAA1=Broad-Crested Rectangular Weir
POND 3 CB 7
Qin = .25 CFS @ 12.05 HRS, VOLUME= .02 AF
w
Qout= .25 CFS @ 12.06 HAS, VOLUME= .02 AF, ATTEN= 0%, LAG= .4 MIN
ELEVATION CUM.STOR STOR-IND METHOD
(FT) (CF) PEAK STORAGE = 3 CF
145.0 0 PEAK ELEVATION= 145.2 FT
146.0 12 FLOOD ELEVATION= 149.0 FT
147.0 25 START ELEVATION= 145.0 FT
148.0 37 SPAN= 10-20 HRS, dt=.1 HRS
149.0 50 Tdet= .3 MIN ( .02 AF)
# ROUTE INVERT OUTLET DEVICES
1 P 145.0' 15" CULVERT
n=.015 L=20' 5=.09'/ ' Ke=.S Cc=.9 Cd=. 6
REACH 2 Barrett St.Brook
Qin = 1.46 CFS @ 13.20 HRS, VOLUME= .42 AF
Qout= .86 CFS @ 16.31 HRS, VOLUME= .31 AF, ATTEN= 42%, LAG= 186.9 MIN
DEPTH END AREA DISCH
(FT) (SQ-FT) (CFS) 5' x 5 ' CHANNEL STOR-IND+TRANS METHOD
0.0 0.0 0.00 SIDE SLOPE= 2 '/ ' PEAK DEPTH= .91 FT
.5 2. 6 .32 n= .07 PEAK VELOCITY= .2 FPS
1.0 5.5 .97 LENGTH= 1000 FT TRAVEL TIME = 97.1 MIN '
1.5 8.6 1.87 SLOPE= .0001 FT/FT SPAN= 10-20 HRS, dt=.1 HRS
2.2 13.1 3.36
3.0 19.5 5.82
4. 0 28.0 9.46
5.0 37.5 13.94
we
. ■w
w
.rya
M.
SUBCATCHMENT 16 DRAINAGE AREA 16
PEAK= .27 CFS @ 12.04 HRS, VOLUME= .02 AF
PERCENT CN SCS TR-20 METHOD
70. 00 98 PAVEMENT TYPE III 24-HOUR
30.00 71 GRASS RAINFALL= 2.90 IN
100. 00 90 TOTAL AREA = .14 AC SPAN= 10-20 HRS, dt=.1 HRS
Method Comment Tc (min)
TR-55 SHEET FLOW 4 .1
Grass: Dense n=.24 L=20 ' P2=2. 9 in s=.02
TR-55 SHEET FLOW 1.0
Smooth surfaces n=.011 L=50' P2=2. 9 in s=. 01
SHALLOW CONCENTRATED/UPLAND FLOW Segment ID: 1.0
Paved Kv=20.3282 L=125' s=. 01 '/ ' V=2.03 fps
Total Length= 195 ft Total Tc= 6.1
SUBCATCHMENT 17 DRAINAGE AREA 17
PEAK= .27 CFS @ 12. 04 HRS, VOLUME= .02 AF
PERCENT CN SCS TR-20 METHOD
70. 00 98 PAVEMENT TYPE III 24-HOUR
30.00 71 GRASS RAINFALL= 2. 90 IN
100. 00 90 TOTAL AREA = . 14 AC SPAN= 10-20 HRS, dt=.1 HRS
Method Comment Tc (min)
TR-55 SHEET FLOW 4. 1
Grass: Dense n=.24 L=20' P2=2. 9 in s=.02
TR-55 SHEET FLOW 1.0
Smooth surfaces n=. 011 L=50' P2=2. 9 in s=.01
! SHALLOW CONCENTRATED/UPLAND FLOW Segment ID: 1.0
Paved Kv=20.3282 L=125' s=.01 '/ ' V=2.03 fps
Total Length= 195 ft Total Tc= 6.1
SUBCATCHMENT 22 SUBCATCHMENT 22
PEAK= 1.27 CFS @ 12.02 HRS, VOLUME= .09 AF
PERCENT CN SCS TR-20 METHOD
80.00 98 PAVEMENT/BUILDING TYPE III 24-HOUR
20.00 71 GRASS RAINFALL= 2.90 IN
100.00 93 TOTAL AREA = .56 AC SPAN= 10-20 HRS, dt=.l HRS
Method Comment
Tc (min)
TR-55 SHEET FLOW Segment ID: 3.2
Grass: Short n=.15 L=20' P2=2. 9 in s=.015
TR-55 SHEET FLOW Segment ID: 1.3
Smooth surfaces n=.011 L=75' P2=2.9 in s=.01
SHALLOW CONCENTRATED/UPLAND FLOW Segment ID: 1.0
Paved Kv=20.3282 L=120' s=.01 '/' V=2.03 fps
Total Length= 215 ft Total Tc= 5.5
3UBCATCHMENT 10 DRAINAGE AREA 10
w"
PEAK= .56 CFS @ 12.05 HRS, VOLUME= .04 AF
PERCENT CN SCS TR-20 METHOD
70.00 98 PAVEMENT TYPE III 24-HOUR Mw
30. 00 71 Grass RAINFALL= 2.90 IN
100.00 90 TOTAL AREA = .29 AC SPAN= 10-20 HRS, dt=.1 HRS
Method Comment Tc (min) on
TR-55 SHEET FLOW 4.1
Grass: Dense n=.24 L=20' 22=2.9 in s=.02
TR-55 SHEET FLOW 1. 1 w
Smooth surfaces n=.011 L=50' P2=2.9 in s=.0075
SHALLOW CONCENTRATED/UPLAND FLOW Segment ID: 1.3
Paved Kv=20.3282 L=140' s=.0075 '/ ' V=1.76 fps No
Total Length= 210 ft Total Tc= 6.5
3UBCATCHMENT 12 DRAINAGE AREA 12
PEAK= 3.39 CFS @ 12.31 HRS, VOLUME= .36 AF
PERCENT CN SCS TR-20 METHOD '
70.00 98 PAVEMENT/Buildings TYPE III 24-HOUR
30.00 71 GRASS / SOIL GROUP C RAINFALL= 2.90 IN
100.00 90 TOTAL AREA = 2.55 AC SPAN= 10-20 HRS, dt=.1 HRS on
Method Comment Tc (min)
TR-55 SHEET FLOW 1.3
Smooth surfaces n=.011 L=50' P2=2. 9 in s=. 005 '/ ' so
TR-55 SHEET FLOW 15.0
Grass: Dense n=.24 L=50' P2=2.9 in s=.005
SHALLOW CONCENTRATED/UPLAND FLOW 8.4
Short Grass Pasture Kv=7 L=250' s=. 005 '/' V=.49 fps oft
PARABOLIC CHANNEL Segment ID: 1.0
W=15' D=1' a=10 sq-ft Pw=15.2' r=. 659'
s=.0075 '/ ' n=.03 V=3.25 fps L=200' Capacity=32.5 cfs ewr
Total Length= 550 ft Total Tc= 25.7
wo
so
am
w
SUBCATCHMENT 5 DRAINAGE AREA 5
PEAK= .25 CFS @ 12.05 HRS, VOLUME= .02 AF
PERCENT CN SCS TR-20 METHOD
60.00 98 PAVEMENT TYPE III 24-HOUR
40.00 71 Grass RAINFALL= 2.90 IN
100.00 87 TOTAL AREA = .15 AC SPAN= 10-20 HRS, dt=.1 HRS
Method Comment Tc (min)
TR-55 SHEET FLOW 4. 1
Grass : Dense n=.24 L=20' P2=2. 9 in s=.02
TR-55 SHEET FLOW 1.1
Smooth surfaces n=.011 L=50' P2=2. 9 in s=.0075
SHALLOW CONCENTRATED/UPLAND FLOW Segment ID: 1.4
Paved Kv=20.3282 L=150' s=.0075 '/ ' V=1.76 fps
Total Length= 220 ft Total Tc= 6.6
SUBCATCHMENT 7 DRAINAGE AREA 7
ON PEAK= . 44 CFS @ 12.05 HRS, VOLUME= . 03 AF
PERCENT CN SCS TR-20 METHOD
50.00 98 PAVEMENT TYPE III 24-HOUR
50. 00 71 Grass RAINFALL= 2.90 IN
100.00 85 TOTAL AREA = .29 SPAN= 10-20 HRS, dt=.1 HRS
Method Comment Tc (min)
TR-55 SHEET FLOW 4.1
Grass: Dense n=.24 L=20' P2=2.9 in s=.02
TR-55 SHEET FLOW 1.1
Smooth surfaces n=.011 L=50' P2=2. 9 in s=.0075
SHALLOW CONCENTRATED/UPLAND FLOW Segment ID: 1.3
Paved Kv=20.3282 L=140' s=.0075 '/' V=1.76 fps
Total Length= 210 ft Total Tc= 6.5
SUBCATCHMENT 9 DRAINAGE AREA 9
PEAK= .25 CFS @ 12.04 HRS, VOLUME= .02 AF
PERCENT CN SCS TR-20 METHOD
70.00 98 PAVEMENT TYPE III 24-HOUR
30.00 71 Grass RAINFALL= 2.90 IN
100.00 90 TOTAL AREA = .13 AC SPAN= 10-20 HRS, dt=.1 HRS
Method Comment
Tc (min)
TR-55 SHEET FLOW 4.1
Grass: Dense n=.24 L=20' P2=2. 9 in s=.02
No TR-55 SHEET FLOW 1.1
Smooth surfaces n=.011 L=50' P2=2. 9 in s=.0075
SHALLOW CONCENTRATED/UPLAND FLOW Segment ID: •9
Paved Kv=20.3282 L=100' s=.0075 '/ ' V=1.76 fps
----------
Total Length= 170 ft Total Tc= 6.1
OR
Mw
SUBCATCHMENT 1 DRAINAGE AREA 1
we
PEAK= .64 CFS @ 12.32 HRS, VOLUME= .07 AF
PERCENT CN SCS TR-20 METHOD
100.00 71 Grass/Natural TYPE III 24-HOUR
TOTAL AREA = 1.40 AC RAINFALL= 2.90 IN
SPAN= 10-20 HRS, dt=.1 HRS
Method Comment .w
Tc (min)
TR-55 SHEET FLOW Segment ID: GRASS 22.6
Woods: Light underbrush n=.4 L=100' P2=2.9 in s=.02 '/ '
SUBCATCHMENT 2 DRAINAGE AREA 2
PEAK= .19 CFS @ 12.48 HRS, VOLUME= .04 AF ...
PERCENT CN SCS TR-20 METHOD
100.00 58 GRASS / SOIL GROUP C TYPE III 24-HOUR
TOTAL AREA = 2.16 AC RAINFALL= 2.90 IN
SPAN= 10-20 HRS, dt=.l HRS
Method Comment
Tc (min)
TR-55 SHEET FLOW Segment ID: GRASS 19.8
Grass: Dense n=.24 L=100' P2=2.9 in 5=.01 '/ '
SUBCATCHMENT 3 DRAINAGE AREA 3
PEAK= 2.18 CFS @ 12.16 HRS, VOLUME= .20 AF
PERCENT CN SCS TR-20 METHOD
20.00 58 GRASS / SOIL GROUP B TYPE III 24-HOUR wr
35.00 98 Pavement/Building RAINFALL= 2. 90 IN
15.00 98 Detention Pond SPAN= 10-20 HRS, dt=.1 HRS
30.00 71 Grass/Soil C
100.00 82 TOTAL AREA = 1.96 AC a
Method Comment Tc (min)
TR-55 SHEET FLOW Segment ID: GRASS 12.2
Grass: Short n=.15 L=100' P2=2 .9 in s=.013 '/ '
SHALLOW CONCENTRATED/UPLAND FLOW Segment ID: GRASS 1.8
Short Grass Pasture Kv=7 L=160' s=.044 '/' V=1.47 fps
---------- u,a
Total Length= 260 ft Total Tc= 14.0
wwn
Rw
ww
POND ROUTING BY STOR-IND METHOD
POND START FLOOD PEAK PEAK ------ PEAK FLOW ------- ---Qout---
NO. ELEV. ELEV. ELEV. STORAGE Qin Qout Qpri Qsec ATTEN. LAG
(FT) (FT) (FT) (AF) (CFS) (CFS) (CFS) (CFS) ($) (MIN)
po
1 142.5 146.0 144 .1 .65 7. 14 1.23 1.23 0. 00 83 65.8
3 145.0 149.0 145.2 0.00 .25 .25 0 . 4
4 144.6 148.9 144.8 0.00 .25 .25 1 .3
5 144 .4 147.7 144 .7 0.00 . 44- .44 0 .3
6 144.4 147.7 144.8 0.00 .56 .55 0 .3
7 144.5 147.0 145.6 .01 3.39 3.39 0 1.4
40 8 144.0 147.8 144.6 0. 00 .98 .99 0 .2
9 143.1 149.3 143.8 0.00 1.48 1. 49 0 .2
10 142.5 150.0 143.2 0. 00 1.49 1.49 0 .2
11 144.2 150.2 145.3 0. 00 4.09 4.09 0 0.0
13 145.5 148.7 145. 8 0.00 .27 .27 1 .3
14 145.5 148.7 146.2 0.00 1.54 1.53 1 .1
16 145.3 149.0 146.1 0.00 1. 80 1.79 0 .1
OR
..
RUNOFF BY SCS TR-20 METHOD: TYPE III 24-HOUR RAINFALL= 2.90 IN, SCS U.H.
RUNOFF SPAN = 10-20 HRS, dt= .10 HRS, 101 POINTS
SUBCAT AREA Tc WGT'D PEAK Tpeak VOL
NUMBER (ACRE) (MIN) --GROUND COVERS ($CN)-- CN C (CFS) (HRS) (AF)
1 1.40 22.6 100%71 71 - .64 12.32 .07
2 2.16 19.8 100%58 58 - . 19 12.48 .04
3 1. 96 14.0 20%58 35%98 15%98 3071 82 - 2. 18 12. 16 .20
5 . 15 6.6 60%98 40%71 87 - .25 12.05 .02
7 .29 6.5 50%98 50%71 85 - .44 12.05 .03
9 .13 6.1 70%98 30%71 90 - .25 12.04 .02 w�
10 .29 6.5 70%98 30%71 90 - .56 12.05 .04
12 2.55 25.7 709698 30%71 90 - 3.39 12.31 .36
16 . 14 6. 1 70%98 30%71 90 - .27 12.04 . 02
17 .14 6. 1 70%98 30%71 90 - .27 12. 04 .02
22 .56 5.5 80$98 20$71 93 - 1.27 12.02 .09
w�
REACH ROUTING BY STOR-IND+TRANS METHOD
REACH BOTTOM SIDE PEAK TRAVEL PEAK
NO. DIAM WIDTH DEPTH SLOPES n LENGTH SLOPE VEL. TIME Qout
(IN) (FT) (FT) (FT/FT) (FT) (FT/FT) (FPS) (MIN) (CFS)
2 - 5.0 5.0 2.00 2 . 00 .070 1000 .0001 .2 97.1 .86
s
w�
Data for 98241 Carlon Medical -- Exist
OR 98241 Lot 6, Carlon Drive -- Existing 2Yr.
Prepared by Almer Huntley Jr. and Associates, Inc. 7 Dec 98
HydroCAD 5.01 000451 (c) 1986-1998 Applied Microcomputer Systems
WATERSHED ROUTING
SUBCATCHMENT 1 = DRAINAGE AREA 1 -> REACH 2
SUBCATCHMENT 2 = DRAINAGE AREA 2 -> REACH 2
SUBCATCHMENT 3 = DRAINAGE AREA 3 -> POND 1
SUBCATCHMENT 5 = DRAINAGE AREA 5 -> POND 3
SUBCATCHMENT 7 = DRAINAGE AREA 7 -> POND 5
SUBCATCHMENT 9 = DRAINAGE AREA 9 -> POND 4
SUBCATCHMENT 10 = DRAINAGE AREA 10 -> POND 6
SUBCATCHMENT 12 = DRAINAGE AREA 12 -> POND 7
SUBCATCHMENT 16 = DRAINAGE AREA 16 -> POND 13
SUBCATCHMENT 17 = DRAINAGE AREA 17 -> POND 14
Pw SUBCATCHMENT 22 = SUBCATCHMENT 22 -> POND 14
REACH 2 = Barrett St.Brook ->
POND 1 = Detention Pond -> REACH 2
POND 1 secondary = Detention Pond -> REACH 2
POND 3 = CB 7 -> POND 9
POND 4 = CB 5 -> POND 9
POND 5 = CB 9 -> POND 8
POND 6 = CB 8 -> POND 8
POND 7 = CULVERT 24" -> POND 11
POND 8 = DMH 5 -> POND 9
POND 9 = DMH 4 -> POND 10
POND 10 = DMH 3 -> POND 1
POND 11 = DMH 6 -> POND 1
POND 13 = CB 3 -> POND 16
POND 14 = CB 4 -> POND 16
POND 16 = DMH 2 -> POND 11
Existing Conditions
2 Year Storm Routing
OM
20
A5
OL
Iz
AL
A4
/7\
/D, 7
LL
T
zi
C�
202 \❑ ❑ 60
/22\
A
0 SUBF-PTCHMENT REACH Sul N K
Schematic Routing, Diagram
Existing Conditions
_a�a—�a--ate •,
J e
'QE QL4
O II
1 13 i
- = u f
I
ILI
i
i
Q
t
i
I� v
o r�
I I I 150 flT;I
°-.
to o to --a 30 �o so ytrFxs
. � Pacu6cT rw.
DEFINITIVE SUBDIVISION ° °
N0RTNAYPTON, MASSACHUSETTS S++E� N0
_
CF
RRSPARm FOR 2
` L
i PELOPS REALTY TRUST �� yo
. N0. CAT-, BY P.�+:.RC�S 4Y k cy, LLL � E:TT3
I go
The hydrologic conditions for the pre- and post-developed conditions of the site were modeled
using Hydro-CAD Rel. 5.01. This is a hydrology and hydraulics program based on the SCS TR-55
and TR-20 methodology. The soil runoff curve numbers and time of concentration were developed
using SCS TR-55 standard procedures for calculating travel times. The rainfall data used in the
ON models was an SCS Type III, 24-hour storm distribution. The rainfall data was obtained from the
National Weather Service Technical Publication Number 40.
„ The existing site is composed of a series of complex drainage basins due to the partially developed
condition of the parcel. The overall drainage pattern is to the west and east. Storm water from the
site generally flows either easterly into the detention pond or westerly into the Barrett Street Marsh.
The detention pond was constructed as a component of the drainage infrastructure for Carton Drive
to mitigate increases in peak runoff rates as a result of the new roadway and associated lot
development.
The overall drainage patterns will remain essentially the same. The storm water from the new
building and the perimeter paving area will be collected in drainage swales and conveyed to a water
* quality swale, infiltration basin and overflow to the detention pond
Pre-Development Post-Development
Storm Q (cfs) Q (cfs)
2 2.2 1.5
10 4.7 2.2
25 5.6 2.4
100 7.6 3.1
The above table indicates the post-development storm water discharges are slightly lower than the
pre-development discharge due to the incorporation of on-site vegetated drainage swales and
inclusion of an infiltration basin.
The attached runoff calculations consist of a full routing diagram, drainage basin description, time
of concentration calculations, and peak flow rates for the two year event. The attached calculations
also contain summary calculations for the ten, twenty-five and one-hundred year events.
SECTION 4
Storm Water Runoff Calculations
G:\PROJINFO\PROJECTS\98-241\Title.DOC
►M Vanasse Hangen Brustlin,Inc.
41-
Conclusions
The proposed seven lot subdivision is projected to generate approximately 77 vehicle
trips during the weekday morning peak hour,266 vehicle trips during the weekday
evening peak hour and 291 vehicle trips during the Saturday midday peak hours.
Analyses of the signalized and unsignahzed intersections in the study area indicate that
traffic at the intersections operates at fairly high levels of service.The addition of site-
generated traffic to these intersections will have no measurable impact on existing levels
of operation.
L:W506000CS\REPORTSW041TIAS.DOC 13 Conclusions
I - U I I - I I
rM Vanasse Hangen Brustlin,Inc.
ILI
Stopping Sight Distance
' To identify any potential safety problems associated with access to and egress from the
subdivision, stopping sight distance (SSD)measurements were conducted along King
Street and along Barrett Street.
L The American Association of State Highway and Transportation Officials(AASHTO)'
defines minimum stopping sight distance as the length of roadway visible to the driver
that is sufficient to allow a vehicle to stop before reaching a stationary object in its path.
As discussed previously, the posted speed limit is 30 mph on King Street and 25 mph on
ss Barrett Street.AASHTO indicates that for travel speeds of up to 35 mph,the required
minimum sight distance is approximately 250 feet.Actual sight distance measurements
`W along King Street at the proposed subdivision roadway indicate that available sight
distance is 400 feet to the north and 600 feet to the south. Similar measurements along
Barrett Street at the proposed subdivision roadway indicate that there is 600 feet or more
of available sight distance looking to the east and west.Therefore, available sight
distances greatly exceed the minimum requirements.
L
L
P0
L
r=
as
................................................................................................
'A Policy on Geometri c Design of Hiohways and Streets;AASHTO,Washington,D.C.,(1984).
L:\0506aDOCS\REPORTSWORTIAS.DOC 12 Traffic Operations Analysis
VM Vanasse Hangen Brustlin,Inc.
Unsignalized Intersection Capacity Analysis
The results of the unsignalized intersection analyses conducted for the study-area
intersections are summarized in Table 4. Also included in the table are the analysis
I go results for the intersections of the proposed subdivision roadway with both King Street
and Barrett Street.
t
Table 4
Unsignalized Intersection Capacity Analysis Summary
OR 1996 Existing 1999 No-Build 1999 Build
Location Period V/C' Delay" LOS"' V!C Delay LOS V/C Delay LOS
I on Barrett Street at Weekday Evening 0.01 4 A 0.01 5 A/B 0.09 5 A/B
Denise Court and Saturday Midday 0.01 5 A/B 0.01 5 AB 0.10 5 AB
Proposed Subdivision
Roadway
Barrett Street at Weekday Evening 0.07 5 A/B 0.08 5 A/B 0.08 6 B
Hampton Gardens Saturday Midday 0.05 5 A/B 0.05 5 A/B 0.06 5 AB
A!
Barrett Street at Weekday Evening 0.27 8 B 0.29 9 B/C 0.39 10 B/C
Jackson Street Saturday Midday 0.28 8 B 0.30 8 B 0.38 9 B
King Street at Weekday Evening 0.27 18 C
Proposed Subdivision Saturday Midday 0.35 27 D
Road
:i V/C=Volume to capacity ratio.The V/C ratio applies to the most critical minor street approach or lane group which is typically the left-turn exiting the side street.
Delay in seconds per vehicle for the most critical minor street approach or lane group.
"' LOS=Level of Service of the critical minor street approach or lane group.
The analysis indicates that the critical turning movements at the unsignalized study are
intersections of Barrett Street at Denise Court, at Hampton Gardens, and at Jackson Street
operate at LOS C or better under existing and No-Build peak hour conditions.Under
1999 Build conditions,the addition of site-generated traffic to the intersection of Barrett
! Street at Hampton Gardens will result in a slight increase in delay for vehicles exiting
Hampton Gardens.At the intersection of Barrett Street and Denise Court, traffic exiting
Denise Court will operate at LOS A/B under both 1999 No-Build and Build conditions.
Under Build conditions,traffic exiting the proposed subdivision roadway becomes the
critical movement at the intersection. This traffic exiting the proposed subdivision
roadway is projected to operate at LOS A/B.
Results of the unsignalized capacity analysis at the intersection of the subdivision road at
King Street indicate that under Build conditions,vehicles exiting the subdivision road
onto King Street will operate at LOS D or better.
:•A L:\05060\DOCS\REPORTSWORTIAS.DOC 11 Traffic Operations Analysis
I - f"ll-, fl--� rmw_
r"W, I r�' V-
IlI1_) Vanasse Hangen Brustlin,Inc.
Signalized Intersection Capacity Analysis
The results of the signalized intersection analyses conducted for the study-area
J'' intersections are summarized in Table 3.
Table 3
Signalized Intersection Capacity Analysis Summary
1996 Existing 1999 No-Build 1999 Build
Location Period VIC' Delay- LOS" V/C Delay LOS V/C Delay LOS
King Street at Super Weekday Evening 0.74 15 B/C 0.78 16 C 0.79 17 C
Stop&Shop/Pot Saturday Midday 0.73 15 B/C 0.77 16 C 0.80 17 C
Pourri Mall Driveway
King Street at Weekday Evening 0.47 6 B 0.50 6 B 0.87 7 B
Barrett Street Saturday Midday 0.51 6 B 0.55 6 B 0.59 7 8
V/C Volume to Capacity Ratio
Overall Intersection delay measured in seconds.
LOS=Level of Service
As shown in the table,both signalized study area intersections operate at good levels of
service (LOS C or better)during the weekday evening and Saturday Midday peak hour
periods. These level of operations will continue under 1999 No-Build and 1999 Build
T conditions.
r
r
.5
±'" L.WSOWIC OSSREPORTSWORTIAS.DOC 10 Traffic Operations Analysis
I I I I I F` - U1.1-11 irl-, t ,-
Il■i>r Vanasse Hangen Brustlin,Inc.
r
Traffic Operations Analysis
p Y
Level-of-Service Criteria
F Level of service(LOS) is the term used to denote the different operating conditions that
occur on a given roadway facility under various traffic volume loads. LOS is a qualitative
low measure of the effect of a number of factors including roadway geometries,travel speed,
travel delay, freedom to maneuver,and safety. Level of service provides an index to the
operational qualities of a roadway segment or intersection.The evaluation criteria from
the 1985 Highway Capacity Manual'were used to analyze study area intersections.These
criteria are described in the Appendix of this report and the results of the level-of-service
analysis are noted below.
Six levels of service are defined for each type of facility.They are given letter designa-
tions from"A" to"F," with LOS A representing the best operating conditions and LOS F
representing the worst. It should be noted that the level-of-service designation is reported
differently for signalized and unsignalized intersections.For signalized intersections,the
analysis considers the operation of all traffic entering the intersection and the level-of-
service designation i..for cverall conditions at the intersection.For unsignalized intersec-
tions,however, the analysis assumes that traffic on the mainline is not affected by traffic
on the side streets.Thus, the level-of-service designation is for the critical movement
exiting the side street,which is generally the exiting left-turn movement.
Level-of-service analyses were conducted for 1996 Existing and 2001 Build conditions for
the study-area intersections. A summary of the analysis is tabulated and described below.
V1:
1S.
r'
Highway Caoacip Manual Special Report 209;Transportation Research Board,Washington,D.C.(1985).
tJ
L:k05060,DOCSXREPORTSWORTIAS.DOC 9 Traffic Operations Analysis
k;;
LD.05060 5060-NET 09/10/96 15.54
US Signalized Intersection
L Neg Negligible
a
_ L, --- Project Limits
0 0
Q U CO CO
I: ,oy o
roo N 0 �
130 �S --3.5 u�z�n Ne
9
f" 205 �/ �, 200 CO
{—Neg ,J,ua
15 -1 ; Barrett street � Ne 9
¢+ ry p 210 t , h t t 9
~
185, S �Ne9
40 ru'i a°'i°� ; 95 1
Ne
135
1 1
1 1
t t
1 i
1 1
t t
t t
t t
iL------------------
! O
O
� O O
1
°
t
°U�
N
` Subdivision Access Road 1 °
f-1 1
1
.. 1 10,' h
Lt 55 L Ln
1-7 0
t
t ------------------
s e--
1 t
1 ! 25
in[; L-------------t C41°n o �-5
N n ro f�,- 0
Sup er Stop&Shop 210 J 1 (' Pot Pourri
Driveway 10� ,° Mail
W
80.--� Driveway
1
rn
Y
tN.t to Scale
Inc.
MR 1999 Build Saturday Midday Figure 6
1
Peak Hour Volumes
AW
hr
ASr
t," 1D.05060 5060-NET 09110/9615:54
OSignalized Intersection
a Neg Negligible
v
N --- Project Limits
m o a
r.,M p U CO CO
h .-
5'r N aoi
{-12.5 d v
45 Z z z Neg
— 180 1 ~195 -4�
1�► r—Neg Jo w`°1 �Ne
195 Neg- J Barrett Street y Neg
790, � g
OC t 40 c c i 90 S
�y ; Z ; Neg h
mV 1 t 135 1 2
co
ar ! 1
1 1
1
1 1
1 1
1 1
1 1
1 1
t i
1 L-------------------
S r�
1
4
' 1
t f-
C)n
t
Subdivision Access Road
t 10J I I
t
a 60�
N CO
t Q,
_ t
t
t t
k t
1 1
1 t 30
L-------------, N C N X15
80
". Super Stop&Shop `1 1 (' Pot Pourri
` Driveway 155--► Mall
g5 N r- Driveway
Z
a
Y
Not to Scale
n.sse Hai Brustlin,Inc.
�. 1999 Build Weekday Evening Figure 5
Peak Hour Volumes
M Vanasse Hangen Brustlin,Inc.
Table 2
Trip Distribution
Direction Percent of New Site Traffic
Route (To/From) Assigned to Route
King Street North 34
South 42
Jackson Street North 11
South 13
' Total all Routes 100
Based on the trip distribution shown in Table 2, site generated traffic was assigned to the
roadway networks and added to the 1999 No-Build traffic volumes. The resulting 1999
Build weekday evening and Saturday midday peak hour traffic volume networks are
shown in Figures 5 and 6,respectively.
er
16
1
t>
a
im
L10506WOCS\REPORTSW0RTIAS.DOC 8 Future Conditions
jr
�n p Vanasse Hangen Brustlin,Inc.
r#
Table 1
Project Trip Generation
54
Project Component
General Medical Specialty Quality
Office Office Retail Restaurant
Time Period Direction (12,000 sf) (12,000 sf) (24,000 sf) (8,000 so Total
Weekday Morning Enter 34 25 NA' 6 65
To Peak Hour Exit 4 7 NA 1 12
Total 38 32 NA 7 77
N
w_ Weekday Evening Enter 7 14 74 43 131
Peak Hour Exit 32 35 55 18 135
Total 39 49 129 61 266
Saturday Midday Enter 4 25 85 47 153
Peak Hour Exit 4 18 82 42 138
Total 8 43 167 89 291
Weekday Daily Enter 141 150 539 376 1,196
Exit 141 160 539 377 1197
Total 282 300 1,078 733 2,393
Saturday Daily Enter 22 54 565 370 1,011
Exit 22 54 565 370 1011
Total 44 108 1,130 740 2,022
NA=Not available.ITE does not provide trip generation data for specialty retail centers for the weekday morning commuter peak
period from 7:00 to 9:00 AM.Trip generation during this time period is expected to be nominal since most retail uses open after 9:00
AM.
The proposed development will generate a total of 162 vehicle trips(two-way total)
during the weekday morning peak hour,358 vehicle trips(two-way total) during the
'• weekday evening peak hour and 307 vehicle trips (two-way total)during the Saturday
midday peak hour.
Trip Distribution and Assignment
The distribution of site-generated traffic is expected to follow existing traffic patterns
currently observed in the study area.Based on these travel patterns, the distribution
summarized in Table 2 was developed.
Y:.
r}'
I
L'- L:\05MOkDOCS\REPORTSWORTIAS.DOC 7 Future Conditions
r
F Ir �' U Ir�"�` Ir "' I I
; R M Vanasse Hangen Brust in,Inc.
plow
+' layout of the subdivision,VHB has estimated that a possible development scenario for
the six available lots could include:
12,000 square feet of general office space;
• 12,000 square feet of medical office space;
p1 • 24,000 square feet of retail space;and,
8,000 square feet of restaurant space.
This development program was used to estimate the trip generating potential of the
project.
l Traffic volumes generated by most land uses generally follow well-established patterns
with respect to magnitude,duration, and temporal distribution of traffic. For this reason,
empirical methods of predicting trip generation potential of land uses can be employed.
The Institute of Transportation Engineers (ITE)has established trip generation rates for
numerous land uses based on actual traffic counts at developments located nationwide.
These trip generation rates have been standardized and published in Trip Generation'.
Based on the published data,trip-generation estimates were calculated for the proposed
subdivision. The resulting total trips generated are shown in Table 1.
Trio Generation,Fitth Edition;Institute of Transportation Engineers,Washington,DC(1991).
L,
LAOSO MD0MREPORTSW0RTIAS.Doc 6 Future Conditions
rL�.:
j
LD 05060 5060-NET 09110196 15:54
OSignalized Intersection
ZL Neg Negligible
E
Z3 tP
Qj 0
Q, 0 CO
y O
C
CO CD
as
In CD
CV
ry
110 35 Ln LO
4-170 OD'2
N.9
Ln
o 15 200 B arrett Neg
170---, Street
S Ne Neg
g
55
Neg
135
top
25
C14 5
C14 30
Super Stop&Shop ('0' Pot Pourri
Driveway 200 Mall
10
80 CO Driveway
TNot to Scale
Van2sse Hangen Bmsdin,Inc.
1999 No-Build Saturday Midday Figure 4
Peak Hour Volumes
LO 05060 5060-NET 09110/%15:54
OS Signalized Intersection
.2
Neg Negligible
0 0
Z3
is Q) CO
CV
Cli 65
C.,
110 C14
"—45
X150 �Z
Neg
5 195 Barrett Ne
15,5---, Ma Street �Ne g
g
Neg 190 Neg
----,
55
Neg
.7 135
0%LO
i-30
CN 1.0 4 15 80
Super Stop&Shop
150 Pot Pourri
--,/
Driveway LO 0 0
5 LO M V Mail
C*4 r,
85 Driveway
TNot to Scale
Vanasse Hangen Brusdin,Inc.
1999 No-Build Weekday Evening Figure 3
Peak Hour Volumes
f- t- U- t-- t- I-- r- r- rl," U-1 r r- I
IM Vanasse Hangen Brustlin,Inc.
Future Conditions
"~ To determine future travel demands on the roadway network independent of the
proposed project, traffic volumes in the study area were projected to the design year of
1999. Traffic volumes on the roadway network at that time will include all existing traffic,
any new traffic due to normal traffic growth,and traffic related to any specific
development projects expected to be completed by 1999. Anticipated site-generated
traffic volumes were then added to the projected 1999 traffic volumes to reflect 1999
Build conditions with the proposed development in place.
Background Traffic Growth
Traffic growth is a function of the expected land development in the region.To predict a
rate at which traffic can be expected to grow during the five-year forecast period,both
historical traffic growth and planned area developments were examined.
To estimate an annual traffic growth rate for the area,historical data provided by the
Massachusetts Highway Department (MHD)were reviewed. Based on MHD data
gathered on King Street south of Barrett Street in 1991 and 1994,it was determined that
area traffic volumes have increased an average of 1.5 percent per year in recent years.
To reflect 1999 traffic conditions Y P rior to full occupancy of the proposed subdivision
P P P
existing weekday evening and Saturday peak hour traffic volumes were increased by 1.5
percent for the three-year period from 1996 to 1999 (a total of 4.5%) . The resulting 1999
No-Build traffic volume networks are shown in Figures 3 and 4.
Site-Generated Traffic Volumes
As described previously,while one of the subdivision lots may house a new Fire Station,
there are no definitive tenants for the lots. As a result,and to provide a conservative
analysis, the traffic assessment assumes commercial use of all of the subdivision lots.
Based on the subdivision plans and taking into consideration access,parking and
drainage requirements,the five remaining lots could accommodate a total of
approximately 56,000 square feet of building area.The building area on the individual
lots is estimated to range from 7,500 to 15,000 square feet. VHB reviewed the City of
Northampton Zoning Ordinance to determine typical allowable uses for the subdivision
lots.These include office,retail and restaurant which typically generate more traffic than
other types of uses. Based on the development character in the area of the site and the
l:\0506000CS\REPORTSWORTIAS.occ 5 Future Conditions
4L
LD 05060 5060-NET 09110/06 15'54
OS Signalized Intersection
rpm Neg Negligible
S tP
CO
CO
1 80 LO
-10S CV
35 LO Ln
'4-160 7-
9
5 19 0 N
ry ----,160 o fa'rrett Street .) � 0 eg
175---, S j—O
50
Neg
130 CP
ra 0)
00
25
CO LO 5
CS,LO C14 30
Super Stop&Shop Pot Pourri
Driveway 190 U�Ln 0 Mall
10 C.)to CO
04 r
'IMP 75 Driveway
0•
tNot to Scale
2�
Vanasse Hangen Brustfin,Inc.
1996 Existing Saturday Midday Figure 2
Peak Hour Volumes
ir it,
L0.05060 5060-NET 09/10/96 15:54
OSignalized Intersection
7;5 Neg Negligible
o E
Z3 un
4n
CV(0 60 4)LO
1 .5 N Cn
0
�—45
4-140
Neg (n
25 185 Ln Neg
145---, Barrett Steet Neg
Neg-J S r-Neg
180--,
oC 50
Neg---o.
130
1z;0 LO
30
�n M U, •-15
(D 75
Super Stop&Shop
145 Pot Pourri
M C
Driveway 5 'T LO N Mall
80 T C4 r- Driveway
qu
qu
-L-M
'`Not to Scale
VanasseHangenBmsflin,Inc.
1996 Existinc,Weekday Eveninc, Figure I
Existing C, 0
Peak Hour Volumes
VM Vanasse Hangen Brustlin,Inc.
lc
Jackson Street at Barrett Street
.1w Barrett Street intersects Jackson Street from the east to form an unsignalized T-type
intersection.Both of the Jackson Street approaches and the Barrett Street approach
provide single lanes.Vehicles entering Jackson Street from Barrett Street are controlled by
a STOP sign.Given the proximity of the Jackson School,a crossing guard is stationed at
- the intersection before and after school hours to assist pedestrians crossing the
intersection.
r
Existing Traffic Volumes
s Traffic volumes were counted manually at the study-area intersections in September
1996. Manual turning movement and vehicle classification counts were conducted during
the weekday evening(4:00 to 6:00 PM) and Saturday midday (11:00 AM to 1:00 PM)peak
periods at the following locations:
> King Street at Barrett Street
> King Street at Super Stop &Shop driveway and Pot Pourri Mall driveway
> Barrett Street at Denise Court
+ > Barrett Street at Hampton Gardens
> Barrett Street at Jackson Street
ii'' Turning movement counts were not conduc ed d...ring the morning peak hour because
this is not the highest traffic period. The morning peak hour typically includes commuter
traffic while the weekday evening peak hour includes both commuter and retail-related
traffic.
Seasonal Traffic Volumes
To evaluate the potential for seasonal fluctuation of traffic volumes on Kung Street,
historical traffic data were reviewed for a nearby Massachusetts Highway Department
(MHD)permanent count station.Station 11,located in Northampton on King Street north
of the project area and south of the Hatfield Town Line,was chosen as the closest station
on a roadway with similar characteristics. The most recent data indicate that traffic
volumes in September are approximately 5 percent higher than those occurring during an
average month.To allow for conservative analysis, the observed peak-hour volumes
were left unadjusted,in order to represent average annual conditions.The weekday
evening and Saturday midday peak-hour traffic volumes are shown on the study-area
networks depicted in Figures 1 and 2,respectively.
L:105WIDOCSIREPORTSWORTIAS.DOC 4 Existing Conditions
i'Il.[> Vanasse Hangen Brustlin,Inc.
t
9)west of downtown Northampton.Jackson Street is fronted primarily by residences or
undeveloped land, and the Jackson St. School,which is situated on the west side of the
rir street adjacent to the intersection with Barrett Street.
Denise Court
Denise Court is a local dead-end roadway that forms a T-intersection on the north side of
Barrett Street,approximately 600 feet west of its junction with King Street.There are 11
residences along Denise Court.There is no traffic control at the intersection of Denise
Court and Barrett Street.
Hampton Gardens
Hampton Gardens is a local dead-end roadway that forms a T-intersection on the north
side of Barrett Street.This roadway provides access to a residential subdivision.There is
no traffic control at the intersection of Hampton Gardens and Barrett Street.
Intersection Geometrics
King Street at Barrett Street
Barrett Street intersects King Street from the west and a driveway to Willard Concrete
intersects King Street from the east t., forr- a four-way intersection under signal control.
Both the northbound and southbound approaches of King Street consist of two general
purpose lanes.The Barrett Street approach is a single lane,though it flares to a sufficient
width to allow some right-turning traffic to proceed on red if there are no more than two
or three left-turning vehicles queued at the signal.The driveway to Willard concrete
provides a single intersection approach lane.The signal is semi-actuated,with detectors
on Barrett Street.The northbound King Street traffic is given a protected lead-green
phase to facilitate left turns onto Barrett Street.
4" King Street at
Super Stop & Shop Driveway
and Pot Pourri Mall Driveway
The driveways to Super Stop &Shop plaza, on the west side of King Street, and to
Pot Pourri Mall,on the east side,form a four-way intersection with King Street.The King
Street northbound and southbound intersection approaches provide two general purpose
lanes and an exclusive left-turn lane.The Super Stop &Shop driveway provides two
general purpose lanes and the Pot Pourri Mall driveway provides a single lane.The
intersection is controlled by a semi-actuated signal,with vehicle detectors on both
commercial driveways and on the King Street northbound and southbound left-tum
lanes.If necessary,left turns are given a protected lead green phase.
L:\05060OOCS\REPORTSWORTIAS.DOC 3 Existing Conditions
Y
Iii a Vanasse Hangen Brustlin,Inc.
r"
Existing Conditions
To establish a basis for evaluating the transportation impacts associated with the
proposed subdivision,it is necessary to review the existing roadway system in the
vicinity of the project site.This extends to both the roadways and the intersections among
them. This evaluation includes an inventory of roadway and intersection geometries, the
collection of peak hour volumes, and an observation of speeds along King Street and
Barrett Street in the vicinity of the proposed site. A summary of existing conditions in the
study area is provided in the following section.
Roadway Geometries
King Street
King Street is a four-lane,bi-directional arterial roadway under town jurisdiction that
�1R generally runs in a north-south direction. Directional travel is separated by a double
yellow centerline in the vicinity of the project site,except for a raised median near,:'le
intersection with the Super Stop &Shop driveway. The posted speed limit in the vicinity
of the site is 30 miles per hour(mph) in both the northbound and southbound directions.
Also known as U.S. Route 5 and State Route 10,King Street is a heavily traveled
commercial thoroughfare with many curb cuts along its right-of-way. King Street has
vertical granite curbing,and concrete sidewalks are set back from the roadway,separated
by grass buffers.
Barrett Street
Barrett Street is a two-lane,bi-directional local collector road linking residential areas to
King Street from the west. Barrett Street runs in an east-west direction. Directional traffic
} flows are separated by a yellow centerline marking. Land use along Barrett Street is
primarily residential.An asphalt sidewalk,set back from the roadway with a grass
buffer,runs along the south side of the roadway.The posted speed limit for this road is
25 miles per hour in both directions.
Jackson Street
Jackson Street is another two-lane bi-directional local roadway that generally runs in a
north-south direction. Directional traffic flows on Jackson Street are separated by a
double yellow centerline. An asphalt sidewalk,set back from the roadway with a grass
buffer, runs along the west side of the roadway.This road serves the residential areas
north and west of King Street,as well as providing a through route to Elm Street (Route
i
l:\05050\DOCS\REPORTSWORTIAS.DOC 2 Existing Conditions
IM Vanasse Hangen Brustlin,Inc.
Introduction
Vanasse Hangen Brustlin,Inc. (VHB)has been retained by Stop &Shop Supermarket Co.,
Inc. to evaluate the potential traffic impacts associated with a proposed subdivision
f located in Northampton,Massachusetts.The site is located near the southwest comer of
the intersection of King Street and Barrett Street.A description of the development plan,
the study area,and the study methodology is presented below.
Project Description
Stop &Shop Supermarket Co.,Inc. currently owns approximately 13.2 acres of land
behind the existing Mobil Station at the corner of King Street and Barrett Street in
Northampton,MA.The current proposal is to subdivide the land into six individual lots.
While there are no definitive development plans,it is proposed that one of the lots will
house a new Fire Station. Access to the subdivision will be provided by a new roadway
that will intersect King Street approximately 400 feet south of Barrett Street and will
intersect Barrett Street approximately 600 feet west of King Street.
For the purposes of this analysis, the project is assumed to be full developed b 1999.
P P Y P J Y P Y
L
YM
L:\O5O6MDOCS\REPORTSWORTIAS.DOC 1 Introduction
„ 9 � .. � �:
M Vanasse Hangen Brustlin,Inc.
Figures
Description Figure No. p Following Page
glib
M
1 1996 Existing Weekday Evening Peak Hour Traffic Volumes..................4
'4 2 1996 Existing Saturday Midday Peak Hour Traffic Volumes....................4
3 1999 No-Build Weekday Evening Peak Hour Traffic Volumes.................5
4 1999 No-Build Saturday Midday Peak Hour Traffic Volumes...................5
5 1999 Build Weekday Evening Peak Hour Traffic Volumes......................8
6 1999 Build Saturday Midday Peak Hour Traffic Volumes........................8
l:\05060\DOCS\REPORTSWORTIAS.DOC SV
r tO t-A 9-- r,,"",
Vanasse Hangen Brustlin,Inc.
Tables
Table No. Description Page
I Project Trip Generation............................................................................7
2 Trip Distribution........................................................................................8
3 Signalized Intersection Capacity Analysis Summary.............................10
4 Unsignalized Intersection Capacity Analysis Summary.........................11
L:\0506(ADOCS\REPOFtTSWORTIAS.DOC
i
mnese Hangen Brustlin,mc
Contents
`
Introduction............................................................................................................................l
PmjeoDaschphnn---------------------------------------1
BxisdnaConditions...............................................................................................................2
Roadway Geomotrico................................................................................................................2
-
Intersection Goomehico.............................................................................................................3
ExistingTraffic Voiumoo............................................................................................................4
FutureConditions..................................................................................................................5
BaokQmundTraMicGm*th---------------------------------'S
She-GeneratedTraffioVolumeo-------------------------------.S
Trip Distribution and Assignment -------------------------------7
mm
Traffic Operations Analysis.................................................................................................9
Lnvel-of-ServiceChteha-----------------------------------g
Signalized Intersection Cupac/iy Analysis................. ....... ...... ..........................................10
�m UnaignoUoed Intersection Capacity Analysis...........................................................................11
StoppingSight Distance..........................................................................................................12
mw
Conclusions...........................................................................................................................13
Appendix
�]
��
Traffic Impact and Access Study
Proposed Subdivision
Northampton,
Massachusetts
Prepared for: Stop & Shop Supermarket Co., Inc.
P.O. Box 1942
Boston, Massachusetts 02105
Prepared by: VM/Vanasse Hangen Brustlin, Inc.
Transportation, Land Development,Environmental Services
101 Walnut Street
P.O. Box 9151
Watertown,Massachusetts 02272
fr
September 1996
The proposed use of this lot is for a Medical Office Building. The structure is to be a
single story 9,000 square foot facility with three office suites. The facility is to be sited
on Lot 6 of the Carlon Drive subdivision. Lot 6 is located midway between King Street
and Barrett Street on the southerly side of Carlon Drive. The facility is to utilize the curb
entrance off Carlon Drive constructed by the City of Northampton
Parking is to be provided on-site with all traffic exiting onto Carlon Drive. The City of
Northampton site parking requirements mandate one parking space for every 200 square
feet of floor space resulting in 45 parking spaces required.
A detailed traffic study was performed by VHBIVanasse Hangen Brustlin, Inc. of
Watertown, Massachusetts for Stop & Shop Supermarket Co, Inc. for the Carlon Drive
subdivision dated September 1996. This traffic assessment reported on the existing
conditions at the site, the intersection of Barrett and King Street and the immediate
roadway network. The report also included assessment of the future conditions on the
immediate transportation network with the site fully developed.
The VHB report assumed a mixed-use development including General Office, Medical
Office, Specialty Retail and a restaurant use. The development to date has included the
City of Northampton Fire Station (Lot 7), Plumb Auto (Lots 4 & 5), Medical Office (Lot
6) and Commercial Retail (Lot 2). Lot 3, at this time, is still available and its future use
is unknown. The construction of a medical office on one of the lots was included in the
r original impact assessment and thefore the project traffic impacts in the VHB report
would be valid.
The VHB report predicted daily traffic flow for the development based upon the ITE
(Institute Traffic Engineers)trip generation data and the above mixed uses. The
constructed uses are smaller in scale than those assumed in the report and therefor the
r associated impacts, such as traffic, are expected to be less. The full development of the
project was concluded to have no measurable impact of the existing levels of service for
the immediate transportation network.
Attached is a copy of the VHB Traffic Impact and Access Study prepared for Stop &
Shop Supermarket Co., Inc., dated September 1996.
G:\PROJINFO\PROJECTS\98-291\traffrep.doc
Of
SECTION 3
Traffic Assessment
G:\PROJINFO\PROJECTS\98-241\Title.DOC
hay mulch. The interior slopes of the drainage swales will be loamed, seeded and covered with an
erosion control mat made of tackified straw held with biodegradable netting.
D. Traffic Assessment: A brief traffic assessment has been prepared paraphrasing the report prepared by
VHBNanasse Hangen Brustlin,Inc. for Stop & Shop Supermarket Co., Inc. for the construction of
Carlon Drive. The assessment indicated no measurable impact on the existing levels of service for the
immediate transportation network.
IV. Summary
The work described in this application has been planned to conform to the development standards of the
PO City of Northampton. The impacts of this project have been analyzed and fall within those projected in
the Definitive Plan filing prepared for the Carlon Drive Subdivision. During site preparation and
construction activities and installation of the site drainage system,the proposed erosion controls and soil
stabilization procedures will insure that the work will not impact any adjacent wetlands. The proposed
work and site management strategies will satisfy all Performance Standards for activities in the vicinity
of Resource Areas, as specified in the Massachusetts Wetlands Protection Act.
4% G:\PROJINFO\PROJECTS\98-241\Tit1e.DOC
l
PROJECT DESCRIPTION
I. Introduction
This special permit application is being submitted to the City of Northampton Planning Board to describe
site development activities proposed for property located at Lot 6, Carlon Drive and now belonging to
Pelops Realty Trust. Currently,the parcel is currently undeveloped,the result of a recently approved and
constructed commercial subdivision.
During site development work,vehicular access, parking areas, a medical office building, service utilities
and storm water management facilities are to be constructed, portions of which are proposed to be
located within the buffer zone of the adjacent Barrett Street Marsh. A separate environmental filing has
been prepared for the Conservation Commission.
H. Site Description
The site is irregular in shape containing approximately 4.7 acres, extending from its southerly boundary
against Trustees of Gannett Realty Trust northerly abutting Barrett Street. The parcel is bounded on the
west by the Barrett Street marsh owned by the City of Northampton and on the east by several
commercial properties and Carlon Drive. The portion of the parcel upon which construction is proposed
is generally flat to very gently rolling. Most of the project area was historically agricultural use and more
recently part of the Graves Equipment facility.
The lot contains a significant area of Bordering Vegetated Wetlands and the storm water management
facilities for the Carlon Drive Subdivision.
III.Description of Work
A. Structures and Landscaping_A new 9,000 square foot medical office building is to be constructed
with required parking and vehicular access. All work is to occur within the 100-foot buffer zone and no
work is proposed within any resource areas including the 100-year flood plain.
B. Drainage: Runoff from the impervious surfaces will be routed around the parking and vehicular
access area via vegetated drainage swales,where infiltration and removal of Total Suspended Solids will
occur prior to entry into the storm detention pond constructed for Carlon Drive. The storm water
management will closely follow that proposed for the subdivision and will result in no increase in off site
peak discharge rates. The annual groundwater recharge capacity will be matched on site.
Drainage facilities associated with planned construction on the site have been designed to contain the
storm water runoff from the"first flush" storm of 0.5". The storm water system constructed for the
subdivision was designed to mitigate any increase in peak discharge rates for the statistical 2, 10 and 25
year storms and to prevent any additional impacts from the 100 year storm.The project has been
designed to conform to the 1997 DEP Storm Water Management policies. Further, Total Suspended
Solids are removed from runoff by means of semi-annual pavement sweepings, deep sump drainage
structures and vegetated swales.
C. Erosion and Sediment Control: Sediment control will consist of double-staked haybales placed at the
limit of work to protect Resource Areas and their buffers where the Resource Areas and their buffers are
located down-slope of the work. Siltation fence will be installed only where space is insufficient to
properly install a haybale barrier. Erosion control shall consist of seeding with a grass and legume seed
mix suitable for eventual mowing(given the intended use of the site), followed by application of a strewn
G:\PROJINFO\PROJECTS\98-241\Title.DOC
SECTION 2
Project Description
G:\PROJINFO\PROJECTS\98-241\Title.DOC
aw
HUNTLEY
ALMER HUNTLEY,JR. &ASSOCIATES,INC.
SURVEYORS ENGINEERS LANDSCAPE ARCHITECTS
December 22, 1998
City of Northampton
Planning Board
City Hall
210 Main Street
Northampton, MA 01060
RE: Site Plan: Lot 6, Carlon Drive
Northampton,Massachusetts
(Huntley Project No. 98241)
Dear Planning Board Members:
On behalf of Mr. Matthew Pitoniak,we are submitting 15 copies of a site plan for proposed work
involving the construction of a medical office building on Lot 6, Carlon Drive. As noted in the
accompanying application, the work proposed for this project will take place on Lot 6 'iocatrd off
Carlon Drive.
We look forward to meeting with the Board to continue our discussion of this project in detail. If
of upon review of the enclosed information you have any questions, please call our office. Thank
you for your consideration in this matter.
Very truly yours,
ER HUNTLEY,JR. & ASSOICATES. INC.
ow
David Loring P.E.
Project Manager
i
Enclosures
cc: Mr. Matthew Pitoniak
G:\PROJINFO\PROJECTS\98-241\Tit1e.DOC
(800)227-7723 •(413)584-7444 •FAX(413)586-9159 a 30 INDUS RiAL DRrvE EAsr P.O.Box 568 NORTHAMPTON,MA 01061
SECTION I
Cover Letter
G:\PROJINFO\PROJECTS\98-241\Title.DOC
TABLE OF CONTENTS
SECTION ITEM
1 Cover Letter
2 Project Description
r 3 Traffic Assessment
4 Storm Water Runoff Calculations
5 Abutter List
Appendix A Site Plan Approval Permit
Appendix B Site Plan
G:\PROJINFO\PROJECTS\98-241\Title.DOC
PROJECT MANUAL
For
Carlon Medical, L.L.P.
LOT 6, CARLONDRIVE
NORTHAMPTON, M4
DECEMBER 22, 1998
PREPARED FOR:
Mr. Matthew M. Pitoniak
125A Pleasant Street
Northampton, MA. 01061
PREPARED BY:
HUNTLEY_
Almer Huntley, Jr. &Associates
30 Industrial Drive East
Northampton, MA 01061 NIF
! (413) 584-7444 FAX(413) 586-9159 DAVID�.
LORING
CIVIL
No. 3.9818
�d7MAL /1/12�9u
G:\PROJINFO\PROJECTS\98-241\Title.DOC
City of Northampton, Massachusetts Oq`� TO
Office of Planning and Development s�
City Hall • 210 Main Street
Northampton, MA 01060 • (413)586-6950
FAX(413) 586-3726
•Community and Economic Development �<
•Conservation •Historic Preservation
• Planning Board•Zoning Board of Appeals
• Northampton Parking Commission `
TO•. Anthony Patillo, Building Inspector
RE: Permit application
FROM: Laura Krutzler, Board Secretary/OP
DATE:
Would you please review and return the,����
C
enclosed application
f
before the Planning Board/Zoning Board of
Appeals meeting scheduled for �� r �� so
that we can advise the Boards of any
concerns you may have.
r�u 2�x a
Thank you.
M ,
V m
11O OO
_ _ a
-
b
\ 9
0
ro hl \
f >f
Lot 6 Abutters
City of Northampton
Assessor's Map No. 24B & 24D
CD
Scale: P =200'
.J S v