24D-001 (6) i
/_5 City of Northampton
a S ��4 i`�i�( `o l Building Department
Plan Review
/ 212 Main Street
Northampton, MA 01060
Mounted on North
side and extended up
truss SPF#2 roof rafter -
24"on center
i
Asphalt Shingle--
I
I
- Ironridge XR100 mounting rail
-it 17 4V
- -- _
h _ — :
Ir *1 111
F _
-�—— — - `— -
--
�. .y...... ......: -r Sunpower Module - - -
81.39"x41.18"x1.81"
f32 IV
tv
LLJ
- c _
I
<
---L-foot mounted on Quick-foot with all metal flashing.
Quick-foot base is secured to the roof rafter via two GRK RSS 16"X 3-18"
structural screws.
Li
o
Li
a'
I
G-1. Notes Array tandoffs are to be Array to be installed on Sun power The centerline of the clips Pj; Nam ee2..oiou s""svaon
Y Y Po P Pioneer Valley PhotoVoltaics s,i.r MW
r.yo,a
installed in a staggered the south facing roof of the 61.39" x 41.18"x 1.81" should be 6"ta15"from the Cooperative,Inc.,311 weua street
Oeb:w oI
pattern to even) distribute facility. end of the side frame. suites:Greenfield,78 01301
P Y `I P�{413}772$788 2/2
the array dead load. Roof Truss'are 24"O.C. No. Revislen,issue Date Designer.Christopher Krezmien
Commerdal Operations
rr
w j
U
SUNPOWER E-SERIES COMMERCDAL SOLAR PANELS
SUNPOWER OFFERS THE BEST COMBINED POWER AND PRODUCT WARRANTY
POWER WARRANTY PRODUCT WARRANTY
95%
90% .. _.
i35, `5 zT
8090
759%
5 10 15 20 25 0 5 10 i 5 20 25
Years Years
More guaranteed power:95%for first 5 years,-0.4%/yr.to year 25.8 Combined Power and Product Defect 25 year coverage
that includes panel replacement costs.
ELECTRICAL DATA OPERATING CONDITION AND MECHANICAL DATA
E20-327-COM E19-310-COM Temperature –40°F to+185°F(-40°C to+85°C)
Nominal Power 12(Pnom) 327 W 310W Max load Wind:50 psf, 2400 Pa, 245 kg/m2 front&back
Power Tolerance +5/-3% +5/-3% Snow: 112 psf, 5400 Pa,550kg/m2 front
Avg. Panel Efficiency 13 20.4% 19.3% Impact 1 inch(25 mm)diameter hail at 52 mph(23 rl
resistance
Rated Voltage(Vmpp) 54.7 V 54.7 V Appearance Class B
Rated Current(Impp) 5.98 A 5.67 A Solar Cells 96 Monocrystalline Maxeon Gen II Cells
Open-Circuit Voltage(Voc) 64.9 V 64.4 V Tempered Glass High Transmission Tempered Anti-Reflective
Short-Circuit Current(Isc) 6.46 A 6.05 A Junction Box IP-65 Rated
Maximum System Voltage 1000 V UL; 1000 V IEC Connectors MC4 Compatible
Maximum Series Fuse 20A Frame Class 2 silver anodized
Power Temp Coef. (Pmpp) –0.38%/°C Weight 41 Ibs(18.6 kg)
Voltage Temp Coef. (Voc) –176.6 mV/oC
Current Temp Coef. (Isc) 3.5 mA/oC TESTS AND CERTIFICATIONS
Standard tests UL 1703, IEC 61215, IEC 61730
REFERENCES:
1 All comparisons are SPR-E20-327 vs.a representative conventional panel:240W, Quality tests ISO 9001:2008, ISO 14001:2004
approx.1.6 m2,15%efficiency. EHS Compliance RoHS,OHSAS 18001:2007, lead-free
2 PVEvolution Labs"SunPower Shading Study,"Feb 2013. Ammonia test IEC 62716
3 Typically 7-9%more energy per watt,BEW/DNV Engineering"SunPower Yield Report,"
Salt Spray test IEC 61701 (passed maximum severity)
Jan 2013.
4 SunPower 0.25%/yr degradation vs.1.0%/yr conv.panel.Campeau,Z.et al. PID test Potential-Induced Degradation free: 1 OOOV 10
"SunPower Module Degradation Rate,"SunPower white paper,Feb 2013;Jordan,Dirk Available listings CEC,JET, KEMCO,MCS, FSEC,CSA, UL,TUV
"SunPower Test Report,"NREL,Oct 2012.
5"SunPower Module 40-Year Useful Life"SunPower white paper,Feb 2013.Useful life
is 99 out of 100 panels operating at more than 70%of rated power. _ _
6 Out of all 2600 panels listed in Photon International,Feb 2012. F
7 8%more energy than the average of the top 10 panel companies tested in 2012(151
panels,102 companies),Photon International,March 2013.
8 Compared with the top 15 manufacturers.SunPower Warranty Review,Feb 2013. l
1046mm
9 Some exclusions apply.See warrant'for details.
10 5 of top 8 panel manufacturers were tested by Frounhofer ISE,"PV Module Durability `—i 8 [41.2in]
a
Initiative Public Report,"Feb 2013.
11 Compared with the non-stress-tested control panel.Atlas 25+Durability test report,
Feb 2013. _
12 Standard Test Conditions(1000 W/m2 irradiance,AM 1.5,25` . 46rTtm — - 155gmm -- i
C
13 Based on average of measured power values during production. [1.81 in, [6194tH]
See hfp://www.sunpowercorp.com/facts for more reference information.
For further details,see extended datasheet:wwhv.sunpowercorp.com/datasheets Read safety and installation instructions before using this product. Designed in California
C March 2013 San Power CorporoIi .All rights reserved.SUNPOWER,the SUNPOWER logo,MAXEON,MORE ENERGY.FOR LIFE.,and SIGNATURE are trademarks or registered trademarks of sunpowercorp.com
SanPo—Corporation.Specifications,ncladed in this datasheet are sabiect to change v,nhoat notice.
Docament#505701 Rev A/LTR_EN
POWE t
COWOERCIAL SOLAR PANELS
HIGH PERFORMANCE & EXCELLENT RELIABILITY
EZ�
w.
• 20.4%efficiency . w w.
Captures more sunlight and generates more
power than conventional panels. E20-327 PANELS
• High performance
Delivers excellent performance in real world HIGH EFFICIENCY°
conditions, such as high temperatures, could
and low light.'2 3 Generate more energy per square foot
• Commercial grade E-Series commercial panels convert more sunlight to electricity producing
Optimized to maximize returns and energy 36% more power per panel,'and 60% more energy per square foot over
production, the E-Series panel is a bankable 25 years.3 4
solution for commercial solar applications. HIGH ENERGY PRODUCTION '
Produce more energy per rated watt
More energy to power your operations. High year one performance delivers
7-9% more energy per rated watt.3 This advantage increases over time,
producing 20% more energy over the first 25 years to meet your needs.'
0 120%
More Energy
110% Per Rated Watt
Maxeon®Solar Cells:Fundamentally better. o 100% more,year 1
Engineered for performance, designed for reliability.
0 90% l 35% more,
a year 25
Engineered for peace of mind �° J
Designed to deliver consistent, trouble-free W 0U'° '
energy over a very long lifetime.4' } 60%
503;0
N 0 5 10 15 20 25
Designed for reliability Years
The Sun Power°Maxeon Solar Cell is the only
cell built on a solid copper foundation. Virtually 3 10' Maintains High
impervious to the corrosion and cracking that Rawer at High Temps PHOTON
o d%
degrade Conventional Panels.'S a Na Light-Induced
o b% j Degradation
#1 Ranked in Fraunhofer durability test." -a High Average Watts
100% power maintained in Atlas 25+ >1 4%
m Better Law-Light and
comprehensive PVDI Durability test.'' Spectral Response
w 2%
High-Performance
`o Anti-Reflective Glass
} 0%
sunpowercorp.com
H�J
� I
rC1 FRONT VIE
vi
� J
i
G J E ) li
i;
AS REQ IRED BY
jMODULE MANUFACTURE
Bi
i
PLAN VIEW TILT MOUNT ON FLAT ROOF
C Sale 1"=1'0"
1..
4
'
AS REQUIRED BY
MODULE MANUFACTURE
'
C (C)-FRONT VIE
---- G E
-- - AS REQ IRED BY
MODULE MANUFACTURE
B �
i
A PLAN VIEW FLUSH MOUNT ON PITCHED ROOF __
1..
4
XR10 Rail XR100 Rail XR1000 Rail Internal.Splices
,rrlrr*w1iM .,
". .,.. '•1i•Iw.1111Wy1�r�� �*rrl.r111nwlwryyplWlYli .: ""-_...
A low-profile mounting rail The ultimate residential A heavyweight mounting All rails use internal sL)lices
for regions with light snow. solar mounting rail. rail for commercial projects. for seamless connections.
• 6'spanning capability • 8'spanning capability • 12'spanning capability • Self-tapping screws
• Moderate load capability • Heavy load capability • Extreme load capability • Varying versions for rails
• Clear anodized finish • Clear&black anod.finish • Clear anodized finish • Grounding Straps offered
FlashFoot Slotted L-Feet Standoffs Tilt Legs
1�III
li
Anchor, flash, and mount Drop-in design for rapid rail Raise flush or tilted Tilt assembly to desired
with all-in-one attachments. attachment. systems to various heights. angle, up to 45 degrees.
• Ships with all hardware High-friction serrated face • Works with vent flashing • Attaches directly to rail
• IBC& IRC compliant Heavy-duty profile shape • Ships pre-assembled • Ships with all hardware
• Certified with XR Rails Clear&black anod.finish • Lengths from 3"to 9" • Fixed and adjustable
End Clamps Grounding Mid Clamps,": T Bolt Grounding Lugs Accessories
i r r
Slide in claml2s and secure Attach and ground modules Ground system using the Provide a finished and
modules at ends of rails. in the middle of the rail. rail's top slot. organized look for rails.
• Mill finish & black anod. Parallel bonding T-bolt Easy top-slot mounting • Snap-in Wire Clips
• Sizes from 1.22"to 2.3" Reusable up to 10 times Eliminates pre-drilling • Perfected End Caps
• Optional Under Clamps Mill&black stainless Swivels in any direction • UV-protected polymer
E:1 Design Assistant NABCEP Certified Training
Go from rough layout to fully Earn free continuing education credits,
jot,engineered system. For free. while learning more about our systems.r ,, ,,
$'
RON RI DGE Roof Mount System
IMRW�"
«' D
2
IronRidge builds the strongest roof mounting system in solar. Every component has been tested to the limit
and proven in extreme environments.
Our rigorous approach has led to unique structural features, such as curved rails and reinforced flashings, and
is also why our products are fully certified, code compliant and backed by a 20-year warranty.
"I " Strength Tested fi PE Certified
All components evaluated for superior `f�: Pre-stamped engineering letters
y " structural performance. available in most states.
Class A Fire Rating Design Software
Certified to maintain the fire resistance Online tool generates a complete bill of
rating of the existing roof. materials in minutes.
Integrated Grounding 20 Year Warranty
UL 2703 system eliminates separate ,� Twice the protection offered by
module grounding components. competitors.
The Commonwealth of'tMfassuchusetts � Print Faun
- Department of.lntluslrial Aceidenis
TEE ==': Office of Investigations
1 Congress Street,Suite 100
.Boston, tt1A 02114-2017
WWW.mass.go vldlia
Workers' Compensation Insurance Affidavit: Builders/Contractors/Electricians/Plumber-s
Applicant Information Please Print Legibly
Name (E3usineaslDr an z�ttiot,flstdivitlu tl):PIONEER VALLEY PWOTOVOLTAICS COOPERATIVE
Acldress:311 Wells Street. Suite B
City"Statc%Zip-Greenfield MA 01301 _ Phone 9:413.772.8788 413.772.8668 fax
Are you an employer? Check the appropriate box: Type of project (required):
i.tv I ant a empio,yer with 25 _ 4. 7 1 am a general contractor-and 1
employees(full ad.orpart-time).
have hired the sub-contractors 6. 7 New construction
n
d F7 I ate a sole proprietor or-partner- listed on the attached sheet. 7. ❑ RemoclefinL
These sub contractors have Demolition
ship and have no employers � �.
ezovc have workers'
work trip- for me in air ca achy
addition
.-
t 3o workers* comp. insurance conrP, tnbtsrance.=
required.] �. , We are a corporation and its � l0._ Eiectrica. repairs or additions
,. I a3rr,a homeowner tioitf al! work officers have exercised their 1 l.� Plumbing repairs or additions
, m �
nrw,e f. ' o workers' comp. � G
12.❑ Roof repairs
insurance required.j` c. 152. r 1(-1).and we have no j rPV System
trnploue*es. rNo workers' 13.0 Othe,
y
comp. insurance required.]
*Any applicant that checks uox 01 must also lilt out the section below showing their workers compensation polio\ infurmatiun.
llumeovv°tiers N%tv submit this affidavit indicating,th%n art doing all work and then hire outside contracture must autxmt a nevv affidavit indicating such.
-Contractor that cheek this hox must attached:tn aduittonal $lire,showing air name of the sub-contractors and state whether or not those entities have
empiovc^ea. If the sub-contractors have empiovres,the\ must provide their v,orkers comp polio} number
l am an entplayer that is providitig workers'conipensation insurance for my eniplo gees. Below is tite polio,and job site
information.
Ire urance Company Name:Excelsior/Peerless
Poiicy 4 or Self-Ins. Lic.9: WC 8376525 Expiration Date:01/01/2016
job Site Address:257 Prospect St. C:ity/State/Zip:Northampton MA 01060
Attach a copy ofthe workers' compensation policy declaration page(showing the policy number and expiration date).
Failure to secure covet-age as required antler Section 25A of MGL c. 15' can iead to the imposition of criminal penalties of a
fine up to 51,500.00 and/or one-year imprisonment, as well as civi` penalties in the form of STOP WORK ORDER and a tine
of up to S250.00 a flay against the violator. Be advised that a copti of this statement maN be forwarded to the Office of
investigations of the DIA for insurance coverage verification.
I do hereht-certi t-under th,e ainsand allies, rjurt that the information provided above is true and correet.
Sirrna
Lire, bate 6/4/2015
Phone#:413-772-8788
Official use offal. Igo not write in this area,to be completed bt'citti'or town official.
C:it-v or Town: Permit)License#
Issuing:Authority {circle one):
1. Board of Health 2. Building Department 3. City'Town Clerk a. Electrical Inspector 5. Plumbing Inspector
+6. Other
Contact Person: Phone#:
., �''� r.�, :t*fi,rrj•r>?t-'rr-;L.{xE=cr�.��r. r.�f'���l�tr..,�r.r�,�+rr;�:f�!'/,i
Otlicu atf Con-sumer affairs and Business Reg.ul a,.inn
t 0 Pl-iTk Plaza- guilt•5 30
Bosion,Massachu5 is 02 116
Home hnprovu--ment C.unlTuvlor Rvgisualian
.., Res>Earc�tion: 1•t[.'i07'
... Typc: Pri-mt Cori>{radfort
tearatf�r.; aettPL'utt: I m ZaLM.l
PIONEER VALLEY PHOTO"VOLTAICS GOC)
PHILIPPE RIGOLLAA)
311 WELLS ST SMITE B
GREENFIELD MA D1301
Up&ce Address me rttuto card.Mark rtasau for chug{
L Addrexx —Rmrasl —' RoaMmmrat L..t.ostCArd
fh 4"9NtJA a 1 Cf .'ti:S.5�2'W.•.�1+•t::
�•` tftraa tr{ uc+u ef'Affmr4,dc nryatra(rtui va&t Fm intirvittrl—mly
CUE:IMPROVEMENT CONTRACTOR #y+tort t4c sa�irutr.0 )xr:. lrt atl r.We+a...0
1*cVmtmt-m i+s1t)fit "type_ flfrtx of Gang+.. it(tmi-and gs,44 vRcjz.m.Nw,
,.*+f�t{iftaliutt: fdl9di)at6 I'uumle Cu.y:»'e rli:t
W llnxk f.' a-Suter i1 1,
BAS[Oa.itla 113116
pull taPF P.f�t)I,I A,11.�._
iaREENFIL-D,6Mkl'3n1 �V.►tcrte Lt" .. Not volidmt t
t/rr"tncted UuuAdjvg.tat apt+ ww Rrtrttl:w#aclt AAtmamt mttttrtttlx awatte�rtn rtt n'N.tttitt 5'ilw
t mn k,,.+tfatrt'tw,f3lifrCLAW leant tt++l1(n".tr1 HOart offluild"-lt ta/gmom oral%tawlWetf{r
t"7gt@lourtl�ltWte t.x.w{s2txafRWk11 t4tt1fi4Rw
;.rC @rteN:.t"b"•ttt'�,"l'}I�q :w:
t:lifftil.'YflPtlEll T:fi 1v
LA l'At'Nil'Y"±1t11
CrtnM MA dit!fAl
extra-itrw,rarsarauttme•-+tddttr.nfttwry,.nebtur''rt.•.
'At��ef�L,:taiwt�.G+wrtt�ttrr'nmrr�r:adeta�..r)Ytlkasfitt:. ,.'`
raw ArSU�{r t+srwt►r«a++. �it -.wrw.lWc.;aaortl7r",. ..+ '.. cs. ,- t4offavort
t+av+rrramat:utHa�. ;'�CIZb
ROOF-MOUNTED SOLAR ARRAY DEAD WEIGHT LOADING CALCULATION
OVERVIEW
Project Name LANDER GRINSPOON ACADEMY -SOUTH ROOF
Address NORTHAMPTON, Massachusetts
The flushed to the roof solar array being installed consists of an array of 147 modules(PORTRAIT orientation)at a 4.00:12 pitch and
a roof mounting system.The mounting system includes a series of L-feet on Ecofasten Quikfoot and all metal flashing that represent
discrete points of contact with the roof structure. Each support is secured to the top chord of the engineered roof trusses via two GRK
RSS 5/16"x 3-1/8"structural screws.
ROOF STRUCTURE COMMENTS
top chord of Solar engineered truss 1.Roofing Material:
Height 6 inches Asphalt shingle
Width 2 inches 2.Roof pitch: 4.00:12
Rafterspacing 24 inches on center
SOLAR MODULE ARRAY WEIGHT CALCULATION 71 3. Horizontal S an:27'
Photovoltaic modules Units Unit Wt. Total Wt. Comments
Solar module(s) 147 41 6027 Solar module SPR-E20-327
Subtotal 6027
Mounting System Units Unit Wt. Total Wt.
IronRidge XR100 rail 13248 0.068 900.9 Lbs/inch
M215 Enphase 0 3.50 0.0 Lbs/inch
L feet on Quikfoot base 272 0.35 95.2 supports include all hardware
L feet on S-5-N clamp 0 0.54 0.0 supports include all hardware
L feet on VersaBracket VB-47 0 0.64 0.0
Eco-fasten with 8 screws and flashing 0 2.69 0.0 supports include all hardware
Stand-off with roof boot(single support) 0 1.13 0.0 and roof boots
Stand-off with roof boot(double support) 0 1.70 0.0
L-foot with hanger bolt(single support) 0 0.53 0.0
X-Flash 0 0.94 0.0 with flashing & hardware
Quickfoot standoff with doubble support 0 2.00 0.0 with hanger bolt&hardware
Splice bar kits 50 0.50 25.0
Module and rail grounding 0 1.75 0.0
Module universal end clips 80 0.20 16.0
Module mounting clips 256 0.16 41.6
Subtotal 1078.7
Total solar module array weight 7106.7 Ibs
POINT LEAD CALCULATION;
Number of support stand-off 272
Total solar module array weight_ 7105.7
Point load 26.1 Ibs
S-TR113UTED LOAD CALCULATION
Photovoltaic module array area Array 1 Void space rray 3
Module width (horizontal) 61.39 inches 61.39 inches 0 inches
Module length (vertical) 41.18 inches 41.18 inches 0 inches
Intermodule spacing 0.25 inches 0.25 inches 0 inches
Number of module columns 147 1 0
Number of module rows 1 1 0
Array area 2591 square feet 18 Isquare feetl 0 1 square feet
Total array area 2574 square feet
Distributed load 2.8 Ibs/sf
Truss 4
top cord : 2x4 webbing : 2x4
84
bottom cord : 2x6 11I
11
1291/2 1 9°. —} 84 1 93 I 1291/2
528 1/2
Truss 5
webbing : 2x4
top and bottom cord : 2x6 108
12
N
1 A9 112 r
140 } 68 d 108 # 68 1 1441/2 #—
528 1/2 IL
Pioneer Valley PhoWells lcs Cooperarive,Inc, or�„anmeaer Gl 3/ ,5
311 Wells Srteet Lander Grinspoon Academy
Suite B,Greenfield,MA 01301 257 Prospect St. 5/28/2015
P.(413)772-8188 Northampton,MA 01060
oaW Grant Rocco
r
Truss 2
webbing : 2x4
top and bottom cord : 2x
X32
1qA 112
135 1/2 124 I 124 135 112
518 1/2
Truss 3 3 webbing : 2x4
top and bottom cord : 2x4 6 -
�3
123 123 i 36 I 123 # 12
528 1/2
Pioneer Valley Phot ells tr Cooperative,Inc., P Lander Grins n Academy
2/3
371 Wells Street � Y
Suite a Greenfield,MA 01301 257 Prospect St. 5/28/2015
P 14131772-8758 Northampton,MA 01060
Grant Rocco
A
top and bottom strings : 2x6
1 114
�t6
116 112
132 { 132 R- 132 132 } 132
66
\— webbing : 2x4
Truss 1
Pioneer Valley P 1 MljB S Cooperative,Inc., oLander Grinspoon Academy 1 /3
311 Welts Street
Suite B,Greenfield,MA 01301 257 Prospect St 5/28/2015
P:(413)7728788 Northampton,MA 01060
Grant Rocco
LGA-Northampton, MA
Utility Meter&
Interconnection Circuit Inverters,Solar Production
Breaker in Mechanical Meter,and Utility Solar
Room Disconnect at west exterior
wall
a
3 k=
South Roof
Sub-array
Lander Grinspoon Academy (Solomon Schechter School)
Contact: Blair Barondes (treasurer)
Facility: 257 Prospect St. Northampton, MA 01060
Phone:413-585-1628
e-mail: bbarondes @att.net
Bali/Seldon Residence Roof Structure 6/3/2025
Ball/Seldon Residence Roof
Page z
To summarize, in our opinion, the past roof performance to date has shown the roof to
ProactivebyDesign be structurally adequate to support imposed loads and in the future the existing roof
will also adequately support the proposed solar panels.
If we can be of further assistance, please call Jonathan Rugg (603) 232-8794 or Carl,
Goldknopf(603) 232-9792.
Very truly yours,
GZA GEOENVIRONMENTAL, INC.
r r
'Jonathan Rugg Carl Goldknopf, P.E.
Project Manager Senior Consultant
Bradford W. Roberts, P.E.
Principal/CR/Division Manager
Attachments: -Photovoltaic Panel Catalog Sheet f�
-Roof Framing Information
An Equal Opportunity Employer M/F/VIH
June 8, 2015
Prouctive Design
Mr. Christopher Krezmien
Pioneer Valley PhotoVoltaics Cooperative Inc.
311 Wells Street, Suite B
Greenfiled, MA o13o1
Re: Grinspoon Academy(Salomon Schechter School), Prospect St., Northampton
GZA File No. 02.0172356.00 T2
Dear Mr. Krezmien,
At your request GZA has reviewed the information you provided on the roof structure
at the Grinspoon Academy(Solomon Schechter School), at 257 Prospect Street,
Northampton, MA. The purpose of this review was to provide an opinion as to the
372',Vest Street,Suite�oo structure's ability to support a proposed rooftop photovoltaic system. You have also
Keene,NH 03431
603.28 3 0300 provided a catalog cut on the proposed photovoltaic (PV) panels. Both the roof
structure information and the information on the proposed roof and the PV panels are
attached to this letter for reference.
In our opinion, the roof system will adequately support the proposed PV panels. We
base this opinion on several assumptions.
The roof is framed with wood trusses with 2x6 top and bottom chords and 2x4 webs.
Shop drawings for the original trusses are not available.The photographs and reports
you have provided suggest the roof and structure to be in good condition and
performing well.
We assume that the panels will be installed parallel the existing roof,eliminating any
additional wind load.The PV panels will be oriented to the south and we assume that
the PV panels will shed snow better than the asphalt shingle roof, due to melting and
smooth surface. Further,the smooth surface and melting effect of the PV panels will
serve to decrease the snow load that the roof system will experience.The information
provided indicates that the PV system will weigh approximately 2.8 psf.This additional
load is less than 1o%of the snow load that the roof system was designed to resist.
Version l.7 Commercial Building Permit May 15,2000
SECTION 10-STRUCTURAL PEER REVIEW(780 CMR 110.11)
Independent Structural Engineering Structural Peer Review Required Yes No O
SECTION 11 -OWNER AUTHORIZATION-TO BE COMPLETED WHEN
OWNERS AGENT OR CONTRACTOR APPLIES FOR BUILDING PERMIT
1, as Owner of the subject property
hereby authorize to
act on my behalf, in all matters relative to work authorized by this building permit application.
Signature of Owner Date
Christopher Krezmien
as Owner/Authorized
Agent hereby declare that the statements and information on the foregoing application are true and accurate, to the best of my knowledge
and belief.
Signed under the pains and penalties of perjury.
Christopher Thomas Krezmien
Print Name
04/22/2015
Signature of Owner/Agent Date
SECTION 12-CONSTRUCTION SERVICES
10.1 Licensed Construction Supervisor: Not Applicable ❑
Name of License Holder: Christopher Thomas Krezmien CS-103150
License Number
85 Van Nuys Rd. Colrain MA 01340 06/20/2015
Address Christopher �� y n a`K p a Expiration Date
Val yP V I IcC 1
0 op
Krezmien am (413) 772-9074
g squ ap
_ Date.2015 06 08 14:40:29-04'00
Signature Telephone
SECTION 13-WORKERS'COMPENSATION INSURANCE AFFIDAVIT(M.G.L.c.152,§25C(6))
Workers Compensation Insurance affidavit must be completed and submitted with this application. Failure to provide this affidavit will result
in the denial of the issuance of the building permit.
Signed Affidavit Attached Yes 0 No 0
Version 1.7 Commercial Building Permit May 15,2000
SECTION 9-PROFESSIONAL DESIGN AND CONSTRUCTION SERVICES-FOR BUILDINGS AND STRUCTURES SUBJECT TO
CONSTRUCTION CONTROL PURSUANT TO 780 CMR 116(CONTAINING MORE THAN 35,000 C.F.OF ENCLOSED SPACE)
9.1 Registered Architect:
Not Applicable ❑
Name(Registrant):
Registration Number
Address
Expiration Date
Signature Telephone
9.2 Registered Professional Engineer(s):
Name Area of Responsibility
Address Registration Number
Signature Telephone Expiration Date
Name Area of Responsibility
Address Registration Number
Signature Telephone Expiration Date
Name Area of Responsibility
Address Registration Number
Signature Telephone Expiration Date
Name Area of Responsibility
Address Registration Number
Signature Telephone Expiration Date
9.3 General Contractor
Pioneer Valley Photo Voltaics Cooperative Not Applicable ❑
Company Name:
Christopher Krezmien
Responsible In Charge of Construction
311 Wells st. Greenfield MA 01301
Christopher DlN ally algnaa y Dbtlswpnar Kreemleo
Address D Cl.V.1 arNrexmkgo=Pb ear
Valley P�o10 Vollalc Cooperalrve.
Krezmien emaPe^^s�aa (413) 772-9074
�a aq a,aa o�c=DS
Dale:20t 5.060814.3948
Signature Telephone
Versionl.7 Commercial Building Permit May 15,2000
SECTION 9-PROFESSIONAL DESIGN AND CONSTRUCTION SERVICES-FOR BUILDINGS AND STRUCTURES SUBJECT TO
CONSTRUCTION CONTROL PURSUANT TO 760 CMR 116(CONTAINING MORE THAN 35,000 C.F.OF ENCLOSED SPACE)
9.1 Registered Architect:
Not Applicable i
....... ........
Name(Registrant):
.. .
Registration Number
Address
Expiration Date
Signature Telephone
9.2 Registered Professional Engineer(s):
GZA GEOENVIRONMENTAL,IN . ...................... ..... ._ m._ — . ._ Area of Responsibility
-_,.-.... __1_1_______
ty
�w �.. . _
372 WEST ST SUITE 100 KEENE NTH 03431 [31968_
Address Registration Number
ivs ;(603)232-8792
Signature Telephone Expiration Date m
.............................................._ ..... ....
Name Area of Responsibility
Address _
Registration Number
E
Signature Telephone Expiration Date
Name Area of Responsibility
€ I
Address Registration Number
Signature Telephone Expiration Date
Name Area of Responsibility
i
......_......... __.._... _.__
Address Registration Number
i i 1
Signature Telephone Expiration Date
9.3 General Contractor
Pioneer Valley Photo Voltaics Cooperative Not Applicable ❑
Company Name:
Christopher Krezrnienmm�
Responsible In Charge of Construction
311 Wells st. Greenfield NfA 01301
___._...
Address
Christopher Krezmien ,,�< < _
a. � ;(413)772-907.4
Signature __Telephone
Version 1.7 Commercial Building Permit May 15,2000
8. NORTHAMPTON ZONING
Existing Proposed Required by Zoning
This column to be filled in by
Building Department
Lot Size
Frontage
Setbacks Front
Side L: R: L: R:
Rear
Building Height
Bldg. Square Footage %
Open Space Footage %
(Lot area minus bldg&paved
parking)
#of Parking Spaces
Fill:
(volume&Location)
A. Has a Special Permit/Variance/Finding ever been issued for/on the site?
NO ® DON'T KNOW O YES
IF YES, date issued:
IF YES: Was the permit recorded at the Registry of Deeds?
NO ® DON'T KNOW Q YES
IF YES: enter Book Page and/or Document#
B. Does the site contain a brook, body of water or wetlands? NO DONT KNOW 0 YES
IF YES, has a permit been or need to be obtained from the Conservation Commission?
Needs to be obtained ® Obtained ® , Date Issued:
C. Do any signs exist on the property? YES O NO
IF YES, describe size, type and location:
D. Are there any proposed changes to or additions of signs intended for the property? YES 0 NO
IF YES, describe size, type and location:
E. Will the construction activity disturb(clearing,grading, excavation,or filling)over 1 acre or is it part of a common plan
that will disturb over 1 acre? YES ® NO O
IF YES,then a Northampton Storm Water Management Permit from the DPW is required.
Version 1.7 Commercial Building Permit May 15,2000
SECTION 4-CONSTRUCTION SERVICES FOR PROJECTS LESS THAN 35,000
CUBIC FEET OF ENCLOSED SPACE
Interior Alterations ❑ Existing Wall Signs ❑ Demolition❑ Repairs❑ Additions ❑ Accessory Building❑
Exterior Alteration ❑ Existing Ground Sign❑ New Signs❑ Roofing❑ Change of Use❑ Other ✓❑
Brief Description The installation of 147 solar panels on the south and east facing roofs of the school
Of Proposed Work:
SECTION 5-USE GROUP AND CONSTRUCTION TYPE
USE GROUP(Check as applicable) CONSTRUCTION TYPE
A Assembly ❑ A-1 ❑ A-2 ❑ A-3 ❑ 1A ❑
A-4 ❑ A-5 ❑ 16 ❑
B Business ❑ 2A ❑
E Educational ❑✓ 2B I ❑
F Factory ❑ F-1 ❑ F-2 ❑ 2C ❑
H High Hazard ❑ 3A ❑
Institutional ❑ 1-1 ❑ 1-2 ❑ 1-3 ❑ 36 ❑
M Mercantile ❑ 4 ❑
R Residential ❑ R-1 ❑ R-2 ❑ R-3 ❑ 5A ❑
S Storage ❑ S-1 ❑ S-2 ❑ 56 ❑
U Utility ❑ Specify:
M Mixed Use ❑ Specify:
S Special Use ❑ Specify:
COMPLETE THIS SECTION IF EXISTING BUILDING UNDERGOING RENOVATIONS,ADDITIONS AND/OR CHANGE IN USE
Existing Use Group: Proposed Use Group:
Existing Hazard Index 780 CMR 34): Proposed Hazard Index 780 CMR 34):
SECTION 6 BUILDING HEIGHT AND AREA
BUILDING AREA EXISTING PROPOSED NEW CONSTRUCTION OFFICE USE ONLY
Floor Area per Floor(sf)
151 St
2nd 2nd
3rd 3rd
4th
4th
Total Area(sf) Total Proposed New Construction(sf)
Total Height(ft)
Total Height ft
7.Water Supply(M.G.L.c.40,§54) 7.1 Flood Zone Information: 7.3 Sewage Disposal System:
Public ❑ Private ❑ Zone Outside Flood Zone❑ Municipal ❑ On site disposal system❑
, 3ID.; ✓ Versionl.7 Commercial Buildin Permit Ma 15,2000
Department use only
' ;� ` `'
.�� o�'y City of Northampton Status of Permit:
i Qua° Building Department Curb CuttDriveway Permit -
'� 212 Main Street Sewer/Septic Availability
Room 100 Water/Well Availability
Northampton, MA 01060 Two Sets of Structural Plans
phone 413-587-1240 Fax 413-587-1272 Plot/Site Plans
Other Specify
APPLICATION TO CONSTRUCT,REPAIR,RENOVATE,CHANGE THE USE OR OCCUPANCY OF,OR DEMOLISH ANY BUILDING
OTHER THAN A ONE OR TWO FAMILY DWELLING
SECTION 1 -SITE INFORMATION
1.1 Property Address: This section to be completed by office
257 Prospect St. Northampton MA 01060 Map Lot Unit
Zone Overlay District
Elm St.District CB District
SECTION 2-PROPERTY OWNERSHIP/AUTHORIZED AGENT
2.1 Owner of Record:
Lander Grinspoon Academy (Solomon SchechteyM 257 Prospect St. Northampton MA 01060
Name(Print) Current Mailing Address:
(413) 585-1628
Signature see attachment A Telephone
2.2 Authorized Agent:
Pioneer Valley Photo Voltaic Cooperative 311 Wells St. Greenfield MA 01301
Name(Print) „ „„soD„arKa ma„ Current Mailing Address:
Christopher DNg"Y"algaa° y
o�:c „11a1oD„erKraamla„aP,o„e (413) 772-9074
Valley P„olo VW1alc CooDararlve.
Krezmien e , ^'sloe
@pvspuare°coop,c=US
Signature 0a1a 20150608X0383'�� Telephone
SECTION 3-ESTIMATED CONSTRUCTION COSTS
Item Estimated Cost(Dollars)to be Official Use Only
completed by ermit applicant
1. Building $82,453.00 (a)Building Permit Fee
2. Electrical $$4,695.00 (b)Estimated Total Cost of
Construction from 6
3. Plumbing Building Permit Fee
4. Mechanical(HVAC)
5. Fire Protection
6. Total=(1 +2+3+4+5) Check Number
This Section For Official Use Only
Building Permit Number Date
Issued
db �
Signature:
Building Commissioner/Inspector of Buildings Date
File#BP-2015-1302
APPLICANT/CONTACT PERSON PIONEER VALLEY PHOTOVOLTAICS
ADDRESS/PHONE 311 WELLS ST-SUITE B GREENFIELD01301 (413)772-8788
PROPERTY LOCATION 257 PROSPECT ST
MAP 24D PARCEL 001 001 ZONE URB(100)/
THIS SECTION FOR OFFICIAL USE ONLY:
PERMIT APPLICATION CHECKLIST
ENCLOSED REQUIRED DATE
ZONING FORM FILLED OUT
Fee Paid
Building Permit Filled out ►b d
Fee Paid
Typeof Construction: INSTALL ROOF MOUNTED 147 PANELS SOLAR ARRAY
New Construction
Non Structural interior renovations
Addition to Existing
Accessory Structure
Building Plans Included:
Owner/Statement or License 103150
3 sets of Plans/Plot Plan
THE FOLLOWING ACTION HAS BEEN TAKEN ON THIS APPLICATION BASED ON
INFO ATION PRESENTED:
Approved Additional permits required(see below)
PLANNING BOARD PERMIT REQUIRED UNDER:§
Intermediate Project: Site Plan AND/OR Special Permit With Site Plan
Major Project: Site Plan AND/OR Special Permit With Site Plan
ZONING BOARD PERMIT REQUIRED UNDER: §
Finding Special Permit Variance*
Received&Recorded at Registry of Deeds Proof Enclosed
Other Permits Required:
Curb Cut from DPW Water Availability Sewer Availability
Septic Approval Board of Health Well Water Potability Board of Health
Permit from Conservation Commission Permit from CB Architecture Committee
Permit from Elm Street Commission Permit DPW Storm Water Management
D olitio elay
Si e f Building Off ial Date
Note: Issuance of a Zoning permit does not relieve a applicant's burden to comply with all zoning
requirements and obtain all required permits from Board of Health,Conservation Commission,Department
of public works and other applicable permit granting authorities.
* Variances are granted only to those applicants who meet the strict standards of MGL 40A. Contact Office of
Planning&Development for more information.
257 PROSPECT ST BP-2015-1302
GIs#' COMMONWEALTH OF MASSACHUSETTS
Map:Block: 24D-001 CITY OF NORTHAMPTON
Lot: -001 PERSONS CONTRACTING WITH UNREGISTERED CONTRACTORS
Permit: Building DO NOT HAVE ACCESS TO THE GUARANTY FUND (MGL c.142A)
Category: SOLAR PANELS BUILDING PERMIT
Permit# BP-2015-1302
Project# JS-2015-002393
Est. Cost: $167148.00
Fee: $1002.00 PERMISSION IS HEREB Y GRANTED TO:
Const. Class: Contractor: License:
Use Group: PIONEER VALLEY PHOTOVOLTAICS 103150
Lot Size(sq. ft.): 154638.00 Owner: Lander Grinspoon Academy
Zoning:URB(100)/ Applicant: PIONEER VALLEY PHOTOVOLTAICS
AT. 257 PROSPECT ST
Applicant Address: Phone: Insurance:
311 WELLS ST - SUITE B (413) 772-8788 Workers
Compensation
GREEN FIELDMA01301 ISSUED ON.611612015 0:00:00
TO PERFORM THE FOLLOWING WORK.-INSTALL ROOF MOUNTED 147 PANELS SOLAR
ARRAY
POST THIS CARD SO IT IS VISIBLE FROM THE STREET
Inspector of Plumbing Inspector of Wiring D.P.W. Building Inspector
Underground: Service: Meter:
Footings:
Rough: Rough: House# Foundation:
Driveway Final:
Final: Final:
Rough Frame:
Gas: Fire Department Fireplace/Chimney:
Rough: Oil: Insulation:
Final: Smoke: Final:
THIS PERMIT MAY BE REVOKED BY THE CITY OF NORTHAMPTON UPON VIOLATION OF
ANY OF ITS RULES AND REGULATIONS.
Certificate of Occupancy Siunature:
FeeType: Date Paid: Amount:
Building 6/16/2015 0:00:00 $1002.00
212 Main Street, Phone(413)587-1240,Fax: (413)587-1272
Louis Hasbrouck—Building Commissioner