Loading...
17C-222 (11) y NO'T'E: IN ORDER TI IAI"I'I[IS APPLICA11ON MAY 11F ACCtiPI'ED,'1'111{DATA CALLED FOR BELOW MUST BL >. i FORTI I'I I IA r _ WE CAN DET'E'RMINE.FROM'1111:APPLICA]ION ANDTl1Ii ACCOMPANYING PLANS WHATT11E.FXISTING CONDITIONS ARE ANI) WHAT'llIE FUTURE COND1711ONS WILL RE. Plans,in duplicate,mustbe filed with this application before a permit will be granted,one of which,upon issuance of the permit shall be kept at the site during the progress of the work. New...............❑ /� (L ,1 Addition........n No. -D, Zone.!,.�'. ......., Type.................... Map.... •t... Parcel.4 ;,,. ..�... Alterations ....❑ Repair............❑ t T CITY OF NORTHAMPTON Demolition....❑ • MASSACHUSETTS Application for other than a Dwelling Permit (To be filled out in ink OR on a typewriter) Date..................................� To the Building Inspector: Application for a permit is hereby made according to the following:-- 1. Location, Street and No/,;3-�a7....Ma. ..i. .... n S.t.....F..l.o.r.e.n.c..e . ... . . .. .. . . . . .. . .. .. . ..................................................................... 2. Nearest cross street ................................ .. .............................. Lot No.................... Tim Shea Address 96 Maple 586-2028 3. Owner's name............................................. ............................................................. 4. Architect's name..................... Address ...........MA-U.... 8 6-5 7 7 5 5. Builder's name Britt Construction Address Northampton 584-6903 ............................................................................ ............................................. 6. Use of building, Present.P.ost of.f.ice lProposed ... Addipg loading dock campy 7. Building fronts on how many Streets?...........1......................................................................................................... 8. Is building in fire district?........................................................................................................................................ 9. Size of building,Width in f[. o n s i d'e w a f kLen th Ino n"'s'i'd'e w'aTk' o i n e g He tlin t.... ....s.t.n.r. .D.O 10. Distance of building from Street Line................ left lot line..........., right lot line..........., rear lot line........... if. Type of construction(check one): 1--A.......... 1-B .......... 1-C .......... II.......... III .......... IV .......... V .......... Stories B l 2 3 4 5 6 7 Roof Story heights in ft. 'Chickn's of walls in ins. Material of walls Material of floor/roof Design live load Design dead load Occupancy or Use No.of persons/families No,of stairs 12. Soil under footing is.......G.> .aue.l. _..._..._.- - .......................................................... 13. Depth of footing below gradc.G r a d e beam ft. Will piles be used?................... ...... ..... ................ 14. Area of entire building(Present plus new) ....Lo.a.d.i.0 g...do.c.k....-...4.5.0....s q....f.t._...................... sq.ft. 15. Type of roof--flat....................... pitched................... Material of roof coverin g ........Rubber ......................................... 16. No.of elevators.....r A.... Method of heating..........A N.A.A.... System ............. N ............... Fuel ................................. 17. Are live loads noted on drawings? .bit.••.••••• Are all other structural conditions noted on drawings?.G.Q-r•.r•e•c•t i o n s 18. Building(will be)(is)equipped with sprinklers?........N.A.................... With sprinkler alarm?............NA............ 19. Is building to be used as a factory,workshop or mercantile or other establishment employing 10 or more persons? ................................................... I.....,..................................................................................................................... 20. Is building to be used as an office building,dormitory,hotel,family hotel,apartment or boarding house,lodging house or tenement house having 8 or more rooms above the second story? .......A ..,...,.„...... 21. How many exits(per floor)to street? ........N.A......................................................................................................... 22. Is building a"Place of assembly” as defined by the General Laws? ..........NA­...................................................... 23. Will building conform to the General Laws? ..Y.E.S............... Building and Zoning Ordinances? ......................... 24. If a garage,distance from nearest building? ...N A................................................................................................... 25. If an addition,alteration or demolition,when was building erected?......S ti>+II ZP_...19L9.0.......L.0AB LN.G....RAMP 26. Estimated costs:~ The undersigned certifies that the above statements are true to the best General$..... ? 0 0 0..................... of h' e owledge an _ Plumbing......................................... t Gas Piping....................................... ? Signa f ner,architect or en ineer Sprinklers........................................ ITTEN DISCRIPTION OF WORK TO BE DONE Heating............................................ (Use blank half of reverse side,if necessary) Rein orce structure per Architects specificati Electric............................................ ............................................................................................................... Other Install bollards in front of each post ; T $............................................ t✓j "` r ,�� �% -r. P14f.4,6P c Date Filed 10/31 /90 File No. ZONING PERMIT APPLICATION Zoning Ordinance Section 10.2 1. Name of Applicant: Tim Shea Address: Telephone: 2 . Owner of Property: Tim S h e Address: 96 Maple St . Fiorer�E�4ephone: 6-2028 3 . Status of Applicant: X Owner Contract Purchaser Lessee Other (explain: ) 4 . Parcel Identification: Zoning Map Sheet# Parcel# , Zoning District (s� Street AddressIX n /TWA) Sl7 5 . Compliance with Zoning: Existing Proposed Use of Structure/Property loading n .,m Same Size of Structure (sq. ft. ) Bui= tc-!(X' % Raffle g Coverage , --te Same Setbacks - front 9 s € . - side , - rear Lot Size Frontage Floor Area Ratio % Open Space Parking Spaces Loading Spaces 6 same Signs Fill (volume & location) 6 . Narrative Description of Proposed Work/Proiect: (Use additional sheets if necessary) Reinforce existing laoding ramp per Architects specifications . Install bollards in front of each post . 7 . Attached Plans: X Sketch Plan Site Plan 8 . Certification: I hereby certify that the information contained herein is true and accurate to the b of my ledge. Date: Applicant 's Signatur THIS SECTION FOR OFFICIAL USE ONLY °r -1�- Approved as presented Denied as presented Reason for Denial: Signature of Building Inspector Date K City of Northampton REQUIRED INSPECTIONS ' 1 . Footings and Walls BUILDING DEPARTMENT 2 . Structural Components in Place 3 . Complete Building No. 667 Office of the Building Inspector Date November 7 lg 90 BUI DING P RMIT THIS MAY CERTIFY THAT Tim Shea Insp. on Site — Foundations has permission to reinforce loading dock Insp. of Plumbing — Rough situated on 125 Main Street, Florence Insp. of Plumbing — Finish provided that the person accepting this permit shall in every re- Insp. of Wiring — Rough spect conform to the terms of the application on file in this office, and to the provisions of the Statutes and the Ordinances relating Insp. of Wiring — Finish to the Construction, Maintenance and Inspection of Buildings in Insp. of Health (Septic Tanks) the City of Northampton. Any violation of any of the terms above noted is an immediate revocation of this permit. Expires six Building Insp. — Rough months from date. Building Insp. — Finish Note: A certificate of occupancy will be issued by this office upon return of this card signed by the Plumbing, Wiring and Building Smoke Detectors (Fire Dept.) Inspectors. Gas Inspection THIS CARD MUST BE DISPLAYED IN A CONSPICU US LAC r ON THE PREMISES Certificate of Occupancy Building In or PRINT.SHOP