Loading...
17C-211 (19) A ,JR. ASSOC.,INC. LETTER OF TRANSMITTAL urvey: -;ftgmeers Landscape Architects —30 Industrial Drive East P.O. Box 568 Northampton, Massachusetts 01061 DATE: July 7,2000 JOB NO.: 00-023 (413) 584-7444 ATTENTION:Mr.Anthony Patillo RE: Florence Savings Bank Addition TO: Mr.Anthony Patillo ZPA Building Inspector City of Northampton 212 Main Street Northampton,MA 01060 WE ARE SENDING YOU ❑ Attached ❑ Under separate cover via the following items: ❑ Shop drawings ❑ Prints ❑ Plans ❑ Samples ❑ Specifications ❑ Copy of letter ❑ Change Order ❑ COPIES DATE NO. DESCRIPTION 2 7/5/00 1 of 2 Site Locus plan 2 7/5/00 2 of 2 Conceptual Site Plan 1 Zoning Permit Application 1 Check for$10.00 (ZPA Fee) THESE ARE TRANSMITTED as checked below: ❑ For approval ❑ Approved as submitted ❑Resubmit copies for approval ❑ For your use ❑ Approved as noted ❑ Submit copies for distribution ❑ As requested ❑ Returned for corrections ❑ Return corrected prints ❑ For review and comment ❑ ❑ FOR BIDS DUE ❑ PRINTS RETURNED AFTER LOAN TO US REMARKS: I can be reached at 584-7444 ex 109 if you have any questions or require additional information.Thank You COPY TO: File SIGNED: Paul Dethier If enclosures are not as noted, kindly notify us at once \\HUNTLEY1\ADMIN\PROJINFO\PROJECTS\00-023\Patillotrans Ol.doc S 10. Do any signs exist on the property? YES X NO IF YES. describe size,type and location: There are 'Florence Savings Bank'signs located on the south and east exterior walls of the existing bank building There is also a 'Florence Savings Bank customer parking ' sign located off of Depot Avenue at the entrance to the parking area. Are there any proposed changes to or additions of signs intended for the property?YES NO X IF YES, describe size,type and location: The signs located on the existing bank building will remain The customer parking sign will be relocated to the entrance of the proposed parking area. 11. ALL INFORMATION MUST BE COMPLETED, or PERMIT CAN BE DENIED DUE TO LACK OF INFORMATION. This column to be filled in by the Building De artment Required Existing Proposed By Zoning i Lot size 29,060±sq. ft. 29,060±sq. ft. Frontage Main St. 80.34± Main St. 80.34± Keyes St. 292.19± Keyes St. 292.19±fmnt 01 Setback - - side L: 0' R:0' L: 0' R: 0' - rear 122.33'+ 26.58'+' Building height 2 story 2 story Bldg. Square footage 26,955±sq. ft. 16,774±sq.ft.Addition 43,709±sq.ft. Total (existing addition %Open Space: (Lot area minus bldg. 28% 28% &paved parking) # of Parking Spaces 24 16 Total on FSB site 119 space # of Loading Docks 0 0 Fill: N/A (volume & location) 13. Certification: I hereby certify that the information contained herein is true and a urate to the best of my knowledge. DATE: o APPLICANT'S SIGNATURE: d NOTE: lssuan a of a zoning permit does not relieve an applicant's�en comply with all zoning requirements and obtain all required Permits from the Board of Health, Conservation Co partment of Public Works and other applicable permit granting authorities. File No. ZONING PERMIT APPLICATION (§10.2) P0 PLEASE$trl� PLEASE TYPE OR PRINT ALL INFORMATION 1. Name of Applicant: Florence Savings Bank Address: 85 Main Street, Florence, MA 01062 Telephone: (413)586-1300 2. Owner of Property: Same as above Address: Telephone: 3. Status of Applicant: X Owner Contract Purchaser Lessee Other(explain): 4. Job Location: 85 Main Street Florence Parcel Id: Zoning Map# r��� Parcel# District(s): GB General Business (TO BE FILLED IN BY THE BUILDING DEPARTMENT) 5. Existing Use of Structure/Property 85 Main Street is the current location of the main branch office for the Florence Saving Bank. Also located on this parcel is a 24 space parking lotto the rear of the building. The entrance for this parking lot is located on Depot Avenue. To the North on this lot is a wood frame house that was recently purchased by the bank. 5. Description of Proposed UseNJork/ProjecUOccupation: (Use additional sheets if necessary): The bank is proposing a 16,774 sq.ft. addition to be added to the north side of the existing building. The 24 space parking lot would be removed and the remaining area would become open space. The existing wood frame house to the north would be removed and replaced with a 16 space parking area. Also associated with this project would be the required storm water management structures, lighting, and plantings. 7. Attached Plans: X Sketch Plan Site Plan Engineered/Surveyed Plans Answers to the following 2 questions may be obtained by checking with the Building Dept or Planning Department Files. 8. Has a Special Permit/Variance/Finding ever been issued for/on the site? NO DON'T KNOW X YES IF YES, date issued: IF YES: Was the permit recorded at the Registry of Deeds? NO DON'T KNOW X YES IF YES: enter Book Page and/or Document# 9. Does the site contain a brook, body of water or wetlands?NO X DON'T KNOW YES IF YES, has a permit been or need to be obtained from the Conservation Commission? Needs to be obtained Obtained date issued: File#MP-2001-0009 APPLICANT/CONTACT PERSON Florence Savings Bank ADDRESS/PHONE P O Box 60700 (413)586-1300 PROPERTY LOCATION 85 MAIN ST-FLORENCE MAP 17C PARCEL 211 ZONE GB THIS SECTION FOR OFFICIAL USE ONLY: PERMIT APPLICATION CHECKLIST ENCLOSED REQUIRED DATE (,q NI' NG F-O M FILLED UT -Fee-Paid Building Pen-nit Filled out Fee Paid Typeof Construction: PROPOSED 16,774 SQ FT ADDITION New Construction Non Structural interior renovations Addition to Existing Accessory Structure Building Plans Included: Owner/Statement or License 3 sets of Plans/Plot Plan THE FOLLOWING ACTION HAS BEEN TAKEN ON THIS APPLICATION: __-Approved as presented/based on information presented. _ enied as presented: c, t=' Special Permit and/or Site Plan Required undo 1., Lam- PLANNING BOARD ZOl,�l' ; BO.ARD Received& Recorded at Registry of Deeds Proof Enclosed _ Finding Required under: § «'Z_,ONING BOARD OF APPEALS Received&Recorded at Registry of Deeds Proof Enclosed _ Variance Required under: § _ ___w/ZONING BOARD OF APPEALS Received&Recorded at Registry of Deeds Proof Enclosed _ Other Permits Required: Curb Cut from DPW Water Availability __—Sewer Availability Septic Approval Board of Health __-_Well Water Potability Board of Health Permit from Crvation Commissio _-_Permit from CB Architecture Committee Signature of Building Official Date Note: Issuance of a Zoning permit does not relieve a applicant's burden to comply with all zoning requirements and obtain all required permits from Board of Health,Conservation Commission,Department of public works and other applicable permit granting authorities.