Loading...
38A-143 (2) professional Rooffrov SOLAR produc Installation Manual 1W Date Modified:08/13/07 Step 5; Installing Modules 7 a �« Slide the two end clamps near the end of the After the first module is secured, slide two inter- support rail and install your end module(first). module clamp sets onto the first module side Carefully square the module to the frame and frame. They are designed to stay in place,freeing tighten the clamps using a 1/2" box wrench or you up to slide and align the next module into place. drive socket. We recommend a maximum torque Repeat this procedure until all modules are in- of 12-15 foot pounds to prevent damage to the stalled onto the support rail. module. m ry Upon installation of the last module in the panel, To complete the installation, cut off any excess install the module end clamp to the end of the last support rail not used with a reciprocating saw. module. Before fully tightening the bolts, make You may want to use an extrusion blade. any adjustments needed to create a square and even array. Page 7of7 COPYRIGHT PROFESSIONAL SOLAR PRODUCTS 2007: All information contained in this manual is property of Professional Solar Products(PSP). TileTrac@ is a registered trademark for PSP and is covered under U.S.patent #5,746,029.Rooffrac®and FastJack®is a registered trademark for PSP and is professional Rooffrav SOLAR products 0 Installation Manual Date Modified:08/13/07 For convenience, it is advisable to pre-assemble the bolt, lock washer and clamp into the sliding insert prior to bringing them up to the roof. Fig. 1 _ Fig. 2 Attachment and clamping of the solar modules to NOTE: Clamping hardware is not engineered or TileTracs or FastJack®attachments works exactly the intended for use on support rail/strut other than same. After the support rails have been fastened,you the Professional Solar Products brand. are ready to install the solar modules. There are two sets of clamps; the outside clamps (end clamp) (Fig. 1) and the inter-module clamps (Fig. 2)that install between the modules. Please note that all module end clamps are specially extruded to fit a specific brand of module as specified in the ordering guide. Page 6 of 7 COPYRIGHT PROFESSIONAL SOLAR PRODUCTS 2007: All information contained in this manual is property of Professional Solar Products (PSP). TileTracQD is a registered trademark for PSP and is covered under U.S.patent#5,746,029.RoofTrac@ and FastJack®is a registered trademark for PSP and is covered under U.S.patent#6,360,491. professional Rooffrav SOLAR products Installation Manual V'r Date Modified:08/13/07 FastJack® Unibit#10 Drill bit k k. CZ �s Standard Flashing 2 � C ems ' ElUse of a Unibit®will de- crease drill time to approxi- Rafters mately 3 seconds per hole Installation of the Rooffrac®support rails to the drill a 1/2" hole through the rail. After drilling the hole FastJacks. in the support rail, place the rail over the attachment feet, make any necessary final adjustments and tighten After the FastJack® has been installed (refer to the the 3/8" Bolt& Washer combination to attach the respective installation guide), lay the support rail support rail to the FastJacks. Your support rails are (upside down) next to the attachments. Mark the now secure and ready for installation of the modules. channel adjacent to the attachment devices. Align and mark the intersecting"V" groove on the rail and Page 5 of 7 COPYRIGHT PROFESSIONAL SOLAR PRODUCTS 2007: All information contained in this manual is property of Professional Solar Products (PSP). TileTrac®is a registered trademark for PSP and is covered under U.S.patent#5,746,029.RoofTrac®and FastJack®is a registered trademark for PSP and is covered under U.S.patent#6,360,491. professional RoofTrac® SOLAR products D Installation Manual Date Modified:08/13/07 Step 2: Attaching Support Rails to TileTrac®/FastJack® T-wrench ll e (,ra c �e y's i o t-1, 2 TileTrac Device Nut/Washer combo Installation of the RoofTrac®support rails to the over the attachment feet, install the 3/8" washer and TileTrac®. nut and tighten using a 9/16" deep socket wrench. Your support rails are now secure and ready for After the TileTrac® has been installed (refer to the installation of the modules. respective installation guide), lay the support rail (upside down) next to the attachments, step 1, as illustrated above. Mark the channel adjacent to the Use of a Unibit®will decrease drill attachment devices. Align and mark the intersecting time to approximately 3 seconds per "T groove drill guide on the rail and drill a 1/2" hole hole through the rail. After drilling the hole, place the rail Page 4of7 COPYRIGHT PROFESSIONAL SOLAR PRODUCTS 2007: All information contained in this manual is property of Professional Solar Products (PSP). TileTrac®is a registered trademark for PSP and is covered under U.S.patent#5,746,029.RoofTrac@ and FastJack®is a registered trademark for PSP and is covered under U.S.patent#6,360,491. professional Rooffrov SOLAR product9pt, Installation Manual 'VC Date Modified:08/13/07 Insert the splice "A" into the channel and install "B"—the two 5/16" bolts/ lock washers—into the lower support "C". Tighten using a 1/2" socket. Splice insert is designed to expand into the extrusion walls forcing the rails into alignment, do not over tighten. Roof Trac®support rails can now can be handled and installed as one solid rail. 1/2" Socket B 5/16" bolts/ lock washers A Insert Extrusion L l C Lower Support Splice Expansion Feature: Roof7rae splice kits are designed to hold support rails in alignment and allow for thermal expansion of the aluminum. After fastening the support rails to the attachments, remove one of the 5116"bolts.Thermal expansion of the aluminum support rails will now be absorbed in the splice connection instead of stressing the roof attachments.The remaining splice kit bolt and assembly will keep the support rails in perfect alignment Page 3of7 COPYRIGHT PROFESSIONAL SOLAR PRODUCTS 2007: All information contained in this manual is property of Professional Solar Products (PSP). TIIeTrac®is a registered trademark for PSP and is covered under U.S.patent#5,746,029.RoofTrac@ and FastJack®is a registered trademark for PSP and is covered under U.S.patent#6,360,491. professional RoofTrac® SOLAR products Installation Manual Date Modified:08/13/07 steps Installation 1) Utilizing the Splice Kit 2) Attaching Support rails to the TileTrac®/FastJack® 3) Installing modules 4) Cleanup and safety Step 1: Utilizing the Splice Kit It is recommended that you pre-install the splice kit on the ground for easier handling of the sup- port rails.After installing the splices, set the lengths against the building. Typically,the installer on the roof can pull the lengths to the roof without any mechanical equipment and handle the lengths as one unit. Felt Tip Pen Drill Use of a Unibit® .�. will decrease drill mark witth h Splice holes— time to approxi- permanent ink mately 3 seconds pen Uni-Bits per hole Ilfll r I � I I I I ; V-groove I I drill guide 1 I 1 I Lower Support 1�1 SGpp 1/8"Gap oRrR'9q pOQr Intersections of the Rq'i reference mark and extended "V"groove. Turn the support rails upside down (as illustrated) so the bottom is facing up. Drill two holes using a 1/2" #10 UniBit®. Drill Place the lower support over the rails to at the intersection of the reference mark and use as a template. Center the lower the "V" groove drill guide. support over the rails and mark along the V-groove drill guide using a small felt pen. Page 2of7 COPYRIGHT PROFESSIONAL SOLAR PRODUCTS 2007: All information contained in this manual is property of Professional Solar Products (PSP). TileTrac®is a registered trademark for PSP and is covered under U.S.patent#5,746,029.Roof rrac@)and FastJack®is a registered trademark for PSP and is covered under U.S.patent#6,360,491. professional Rooffrar SOLAR productsyvli., Installation Manual `Vr Date Modified:08/13/07 APPLICATION: The RoofTrac mounting system consists of sup- port rails and top-down clamping hardware which is integrated with either a TileTrac or Fast lack attachment device.The RoofTrac mounting sys- tem can be utilized on virtually all standard con- struction residential roof-tops, mounting 4' on center, to install the majority of popular framed solar modules. AAWARNING Symbol Legend All Professional Solar Products (ProSolar) are engineered and tested to withstand stated specifications (as stated on published specification sheets) when installed properly. Fail- Explanation or Install Tip ure to install properly may decrease the performance of in- stallation. SAFETY Important product All regional safety requirements should be followed when performance information installing Professional Solar Products. All tools and equip- ment located on the roof should be secured to avoid failing object hazards. All equipment/tools should be properly maintained and inspected prior to use. Any exposed studs Critical for Safety should be protectively capped to help avoid injury. This installation manual is intended for use by professional installers with a working knowledge of construction princi- ples. Tool List • Chalk line • 3/16" carbide masonry drill bit • 3/8" masonry drill bit(for tile roof) • Cordless drill • Cordless impact wrench with 1/2"socket Page 1 of 7 COPYRIGHT PROFESSIONAL SOLAR PRODUCTS 2007: All information contained in this manual is property of Professional Solar Products (PSP). TileTrac0 is a registered trademark for PSP and is covered under U.S.patent#5,746,029.Roof rrac®and FastJack®is a registered trademark for PSP and is covered under U.S.patent#6,360,491. -- --------- I Higher Cell Efficiency Conventional Selective-Emitter Cell:Max.19.3% Ag front electrode Enhancing quantum efficiency PERL Cell:Max.20.4% ARC at short wavelength 20** Higher Module Output Minimizing front contact resistance 275 W,280 W,285 W x White backsheet ft- n,en'itte, Minimizing back side electron- P-typi,Si wafer hole pair recombination I Lower Temperature Coefficient p,AI-LELSF Enhancing quantum efficiency Lower output loss at higher temperature at long wavelength w, au 'AnwAW Minimizing back contact Affordable Price Al hack electrode resistance Premium mono-crystalline technology with affordable price Electrical Characteristics Mono-crystalline Type Nominal output(Pmpp) W 265 270 275 Voltage at Pmax(Vmpp) V 31.3 31.4 31.6 Current at Pmax(Impp) A 8.5 8.6 8.7 Open circuit voltage(Voc) V 38.1 38.2 38.4 Short circuit current(Isc) A 9.0 9.2 9.3 Output tolerance % +3/-0 No.of cells&connections PCs 60 in series Cell type 6"Mono-crystalline silicon with PERL technology(Hyundai cell,Made in Korea) Module efficiency % 16.2 16.5 16.8 Temperature coefficient of Pmpp %/K -OA5 -0.45 -OA5 Temperature coefficient of Voc %[K -0.33 -0.33 -0.33 Temperature coefficient of Isc %/K 0.032 0.032 0.032 X All data at STC(Standard Test Conditions).Above data may be changed without prior notice. Module Diagram (unit:Trim,inch) IN Curves C_tW S'C SC 45X 4%07-L11 65C W h) MWILA (3937) 8-07 SLOT THRU 4.WCABLE& 4—ICARE& CONNECTOR CONNECTOR Cmrem(A] Vokge M GROUND MAIII DETAILS 1)00~ 4X043 it GX -2 11(04r) 8DOW/ ROUNDHOLE 60(24' 9W37-56-) in Mm . W/W 998(39,291 C L213(I--j) SEcnON1 C-C o I . . . . . . . Vokige M Installation Safety Guide 46•C t 2 •Only qualified personnel should install or perform maintenance. -40-85•C••Be aware of dangerous high DC voltage. DC 1,000 V 0EQ •Do not damage or scratch the rear surface of the module. DC 600V(UL) Do not handle or install modules when they are wet. 15A Printed Date:March 20151 Sales&Marketing cted on FSC,,05ed -to,Jongno-qu,Seoul 110-793,Korea A&HYUNDAI o4n_dlyp�pe, 2nd A.,Hyundai Bldg.,75,Yulgok Fs C Tel:+82-2-746-4671,7635,8556 Fax:+82-2-746-7675 HEAVY INDUSTRIES v m SPECIFICATIONS :11 TL PV1520OTL PV16600TL .11 '^ 0 n 0 v b O o Absolute Maximum Open Circuit Voltage 600 VDC 0 Operating Voltage Range 120-550 VDC ; MPPT Input Voltage Range 200-500 VDC MPP Trackers 1 2 0 Maximum Operating Input Current 20A 15 A per MPP tracker 18 A per MPP tracker 20 A per MPP tracker 0 y, Nominal Output Voltage 208 or 240 VAC,1-Ph m AC Voltage Range -12%/+10% 0 208 VAC 3300 W 5200 W 6600 W 6600 W Continuous Output Power v 240 VAC 3800 W 5200 W 6600 W 7600 W 208VAC 15.8A 25A 31.7A 31.7A o Continuous Output Current 240 VAC 15.8 A 21.6 A 27.5 A 31.7 A E Maximum Backfeed Current OA Nominal Output Frequency 60 Hz a v Output Frequency Range 59.3-60.5 Hz Power Factor Unity,>0.99 Total Harmonic Distortion(THD) <3% v c A Peak Efficiency 98.3% v CEC Efficiency 97.5% 0 Tare Loss <1 W 2 m n Ambient Temperature Range(full power) -13°F to+122°F(-25°C to+50°C) Storage Temperature Range -40°F to+185°F(-400C to+85°C) Relative Humidity(non-condensing) 0-100% Optional SolrenView Web-based Monitoring External Optional Revenue Grade Monitoring External External Communication Interface RS-485 3 Safety Listings&Certifications UL 1741/IEEE 1547,UL1699B,CSA C22.2#107.1,FCC part 15 A&B Testing Agency ETL CSA Standard 10 year Optional Extended warranties,to 15&20 years DC Disconnect Standard,fully-integrated Dimensions(H x W x D) 17.5 x 15.8 x 8.5 in. 26.8 x 15.8 x 8.5 in. (445 x 401 x 216 mm) (680 x 401 x 216 mm) Weight 43 lbs(19.5 kg) 65 Ibs(29.5 kg) Enclosure Rating Type 4 Enclosure Finish Aluminum SMECTR/A R E N!E W A S L E S www.solectria.com ( inverters @solectria.com 978.683.9700 �; �},�� .; �,t...; ,. _. ', �` � ._ .::. z ? t ; , Y 1 i DESIGN CALCULATIONS FOR THE FARMHOUSE 15 Laurel Street Northampton, Mass. August 4, 20!4 BENJAMIN NICKERSON ARCHITECT 54 «EIS:ANT STREET WOODSTOCK, VERMON{ - . - » © � y \ \ NV HI C' _ t.1 .��vt1lJ NIGtiC RSC�►J !r m r to.3 74, NRE9. a'r f1' f44 !/tlF «wi )AT U-7- 2 r��r�7�s• z.Y�Q���r?��G 45 1 Ai Pict...45P--EST $y .j ii. 3Z'c:4 ---� ;n�`-t \ r'•�v�s vr,�fa' ri u�: ^ ``""`v., L•,JGvYfY!)G'L/ Jt••' ��' .'.rv.57i7�1'ij1 :tea�✓ir'rh�?' r / `'�"'t,. - �r>L.c3T Z GG� 5 �•,...��nnxovl.-- J t.t-c.euR,-:.se �-r� ` �` ?Y�'V•.P.F9.G^lW i il'tz%6 1t 3U'.T`,T Yi:•(x! 1•f�v2-1,>i `� \\ Ili? 2Y45gWs.'P V.t:w IT - �irxl..nh'U Pw•,FFtw 8r11�%nx,Ca�1R.+c?W7 •\/X� �3" Sr•*r..a�s•.rr YL':AuAJ'1C ey-.1f _ _ �ry.i .r9•.V-P. ' u.-.t..�,✓ t'.�/(t \ ra luT"w.11cG SM li 1> _�, ,�.�• v' W4-G RAP rISD-X-.Li n•r %% ° v -.ry�� _ A'SmAtj"GwtFYatnti !t I s ;max° c Coco li 11''IY.-iA3""i -u0 Tly�4 1(p`CG..� .Y � t�C•C'G!.-- 1 i r ��'IL�+IYEIG� `:\ 1 Oat.Ftivt izrr '—'Z 7,2A e; �.� i '_�.^ F..w,:,,'1'L',i..ciF-^. - �' '1h•t�.�-i n i •r.�.,�, ��"� �, ,�� 4� "'Yf.i>•. Ze.`.a�..z~ate wi... w..u.�-a.`.r - w P'�-is .� t J n'..a•L-� vrr.JY�.w'Mti.ly :.cfy 1'. ...n,.:�-»,,,a. >`�_ Z- •�Y: _.... bA .vir-I'h-tt,tQV,vn,r"`l 2•ZV.rt.ytw TI1•..nor.'4�+ _-_i __ __.�—+th-r•T� � � 'r< ti S C­ 5117P6 eRf.^e M.H.•f� �1 ,�,sr,•�c2� RL..e..�e« ►.-.e��•Y � � �"c.e or...•,..o. �tlo'�r.PeZ. ♦Turn r'V3 Ni,r+T fw-1 tL � rK-..erw,�vsesr~wc.e+...rrt �.rwn•.i he..ao ,i;:i0'GauG••t��,,,,� i._-' L.AMnpi 72#G� C.70 A' ti.1,�1�-..1 k-�[�Ll� �A-A� ;v�-rte• ' PV Layout Plan — 15 Laurel St. PV Array Ilia StatementofWork: The Photovoltaic system is composed of33 Hyundai 27O Watt panels. The STC rating for the system isA.91kW. The Photovoltaic system will be affixed to the roof structure with Professional Solar Product's(Pro-Solar) Rooff rac mounting system in accordance to the manufacturer specifications. ProSolar's rail enhancers(part#ARE-20)will be added to further reinforce the racking system. The lag bolts will penetrate the rafters bya minimum of3.S''. The fast Jacks or mounting feet will be spaced 4'on center and the static load will be distributed equally among associated rafters. VVe will not exceed the � manufacturer's recommendations for cantilever distance or deviate from the installation guide in any way. This installation will exceed local static load and wind load requirements. Information and Instructions Massachusetts General Laws chapter 152 requires all employers to provide workers' compensation for their employees. Pursuant to this statute, an employee is defined as"...every person in the service of another under any contract of hire, express or implied,oral or written." An employer is defined as"an individual,partnership,association, corporation or other legal entity,or any two or more of the foregoing engaged in a joint enterprise,and including the legal representatives of a deceased employer,or the receiver or trustee of an individual,partnership, association or other legal entity,employing employees. However the owner of a dwelling house having not more than three apartments and who resides therein, or the occupant of the dwelling house of another who employs persons to do maintenance, construction or repair work on such dwelling house or on the grounds or building appurtenant thereto shall not because of such employment be deemed to be an employer." MGL chapter 152, §25C(6)also states that"every state or local licensing agency shall withhold the issuance or renewal of a license or permit to operate a business or to construct buildings in the commonwealth for any applicant who has not produced acceptable evidence of compliance with the insurance coverage required." Additionally, MGL chapter 152, §25C(7)states"Neither the commonwealth nor any of its political subdivisions shall enter into any contract for the performance of public work until acceptable evidence of compliance with the insurance requirements of this chapter have been presented to the contracting authority." Applicants Please fill out the workers' compensation affidavit completely, by checking the boxes that apply to your situation and, if necessary, supply sub-contractor(s)name(s),address(es)and phone number(s)along with their certificate(s)of insurance. Limited Liability Companies(LLC)or Limited Liability Partnerships(LLP)with no employees other than the members or partners,are not required to carry workers' compensation insurance. If an LLC or LLP does have employees,a policy is required. Be advised that this affidavit may be submitted to the Department of Industrial Accidents for confirmation of insurance coverage. Also be sure to sign and date the affidavit. The affidavit should be returned to the city or town that the application for the permit or license is being requested,not the Department of Industrial Accidents. Should you have any questions regarding the law or if you are required to obtain a workers' compensation policy,please call the Department at the number listed below. Self-insured companies should enter their self-insurance license number on the appropriate line. City or Town Officials Please be sure that the affidavit is complete and printed legibly. The Department has provided a space at the bottom of the affidavit for you to fill out in the event the Office of Investigations has to contact you regarding the applicant. Please be sure to fill in the permit/license number which will be used as a reference number. In addition,an applicant that must submit multiple permit/license applications in any given year,need only submit one affidavit indicating current policy information(if necessary)and under"Job Site Address"the applicant should write"all locations in (city or town)."A copy of the affidavit that has been officially stamped or marked by the city or town may be provided to the applicant as proof that a valid affidavit is on file for future permits or licenses. A new affidavit must be filled out each year. Where a home owner or citizen is obtaining a license or permit not related to any business or commercial venture (i.e. a dog license or permit to burn leaves etc.)said person is NOT required to complete this affidavit. The Office of Investigations would like to thank you in advance for your cooperation and should you have any questions, please do not hesitate to give us a call. The Department's address,telephone and fax number: The Commonwealth of Massachusetts Department of Industrial Accidents Office of Investigations 1 Congress Street, Suite 100 Boston, MA 02114-2017 Tel. # 617-727-4900 ext 406 or 1-877-MASSAFE Revised 7-2010 Fax # 617-727-7749 www.mass.gov/dia The Commonwealth of Massachusetts Print Farm Department of Industrial Accidents { Office of Investigations I Congress Street, Suite 100 Boston,MA 02114-2017 www.mass.gov/dia Workers' Compensation Insurance Affidavit: Builders/Contractors/Electricians/Plumbers Applicant Information Please Print Lezibly Name (Business/Organization/Individual): Transformations,Inc-Benjamin Cumbie Address: 323 West Main Street City/State/Zip: Ayer, MA 01432 Phone #: 978-597-0542 Are you an employer?Check the appropriate box: Type of project(required): 1.0 I am a employer with 14 4. ❑ I am a general contractor and I employees(full and/or part-time).* have hired the sub-contractors 6. ❑ New construction 2.❑ I am a sole proprietor or partner- listed on the attached sheet. 7. ❑ Remodeling ship and have no employees These sub-contractors have g. ❑ Demolition working for me in any capacity. employees and have workers' insurance.* 9. ❑ Building addition [No workers comp.comp. insurance required.] 5. ❑ We are a corporation and its 10.❑ Electrical repairs or additions 3.❑ I am a homeowner doing all work officers have exercised their 11.❑ Plumbing repairs or additions myself. [No workers' comp. right of exemption per MGL 12.❑ Roof repairs insurance required.] t c. 152, §1(4),and we have no Solar PV ststem employees. [No workers' 13.❑✓ Other comp. insurance required.] *Any applicant that checks box#1 must also fill out the section below showing their workers'compensation policy information. t Homeowners who submit this affidavit indicating they are doing all work and then hire outside contractors must submit a new affidavit indicating such. *Contractors that check this box must attached an additional sheet showing the name of the sub-contractors and state whether or not those entities have employees. If the sub-contractors have employees,they must provide their workers'comp.policy number. I am an employer that is providing workers'compensation insurance for my employees Below is the policy and job site information. Insurance Company Name: Travelers Insurance Co. Policy#or Self-ins. Lic.#: 6 KUB-0326N39-A-15 Expiration Date:4/2/2016 Job Site Address:15 Laurel St City/State/Zip:Northampton, MA 01060 Attach a copy of the workers' compensation policy declaration page(showing the policy number and expiration date). Failure to secure coverage as required under Section 25A of MGL c. 152 can lead to the imposition of criminal penalties of a fine up to $1,500.00 and/or one-year imprisonment,as well as civil penalties in the form of a STOP WORK ORDER and a fine of up to$250.00 a day against the violator. Be advised that a copy of this statement may be forwarded to the Office of Investigations of the DIA for insurance coverage verification. I do hereby--ce.!!&under the pa irs and enalties?LEErLua that the in formation provided above is true and correct. u — bgiWnly Igned by8 yminC mb DN -ben; C mble,o 0 1=ben@tmnsfonnabons —,c U 5/08/2015 Signature: D rzois.oso7isa9w-oaoo Date Phone#:978-597-0542 Official use only. Do not write in this area,to be completed by city or town officiaL City or Town: Permit/License# Issuing Authority(circle one): 1. Board of Health 2.Building Department 3. City/Town Clerk 4. Electrical Inspector 5.Plumbing Inspector 6. Other Contact Person: Phone#: SECTIONS-CONSTRUCTION SERVICES 8.1 Licensed Construction Supervisor: Not Applicable ❑ Name of License Holder: wu1 G et . C-S— 16-1 Ot LicenseNumber Wlp oLj�,, o�c+tv�� �'t5 l LkLia, b244L t, I k°t ( 7-- k_1 Address Expiration Date �p­ -760— `7V� Signature Telephone 9.Registered Home Imorovement Contractor: Not Applicable ❑ a4 �� ou.YttL — !ati.l� arca,.�-Itontc ,7.aL, lei k `dt,U Z°t Company Name Registration Number a L C>L L� tyuA A Alt 'Sr . (,+ _T--A i AA Vq 62-44 b (D I a / 2n 1 (o Adrtracc Expiration Date ���rsyrea Memi�cumbK Telephone Sb?.-1166-119 Z SECTION 10-WORKERS'COMPENSATION INSURANCE AFFIDAVIT(M.G.L.c.152,§25C(6)) Workers Compensation Insurance affidavit must be completed and submitted with this application.Failure to provide this affidavit vrill result in the denial of the issuance of the building permit. Signed Affidavit Attached Yes....... No...... ❑ 11. —Home Owner Exemption The current exemption for"homeowners"was extended to include Owner-occupied Dwellings of one(1) or two(2)families and to allow such homeowner to engage an individual for hire who does not possess a license,provided that the owner acts as supervisor.CMR 780, Sixth Edition Section 108.3.5.1. Definition of Homeowner:Person(s)who own a parcel of land on which he/she resides or intends to reside,on which there is,or is intended to be,a one or two family dwelling,attached or detached structures accessory to such use and/or farm structures.A person who constructs more than one home in a two-year period shall not be considered a homeowner. Such"homeowner"shall submit to the Building Official,on a form acceptable to the Building Official,that he/she shall be responsible for all such work performed under the building permit. As acting Construction Supervisor your presence on the job site will be required from time to time,during and upon completion of the work for which this permit is issued. Also be advised that with reference to Chapter 152(Workers'Compensation) and Chapter 153(Liability of Employers to Employees for injuries not resulting in Death)of the Massachusetts General Laws Annotated,you may be liable for person(s) you hire to perform work for you under this permit. The undersigned"homeowner"certifies and assumes responsibility for compliance with the State Building Code,City of Northampton Ordinances,State and Local Zoning Laws and State of Massachusetts General Laws Annotated. Homeowner Signature SECTION 5-DESCRIPTION OF PROPOSED WORK(check all applicable) New House ❑ Addition ❑ Replacement Windows Alteration(s) ❑ Roofing ❑ Or Doors 1­1 Accessory Bldg. ❑ Demolition ❑ . New Signs [O] Decks [Q Siding[0] Other[L7] Brief Description of Proposed Work: lnstallauon oC a solar PV system.See attached diagram. a Alteration of existing bedroom Yes No Adding new bedroom Yes x No Attached Narrative Renovating unfinished basement Yes No Plans Attached Roll -Sheet 6a.If New house and or addition to existing housing,complete the following: a. Use of building:One Family Two Family_ Other b. Number of rooms in each family unit_ Number of Bathrooms c. Is there a garage attached? d. Proposed Square footage of new construction. Dimensions e. Number of stories? f. Method of heating? Fireplaces or Woodstoves Number of each g.. Energy Conservation Compliance. Masscheck Energy Compliance form attached? h. Type of construction i. Is construction within 100 ft.of wetlands? Yes No. Is construction within 100 yr. floodplain Yes No j. Depth of basement or cellar floor below finished grade k. Will building conform to the Building and Zoning regulations? Yes No. I. Septic Tank City Sewer Private well City water Supply SECTION 7a-OWNER AUTHORIZATION-TO BE COMPLETED WHEN OWNERS AGENT OR CONTRACTOR APPLIES FOR BUILDING PERMIT 'V0-&WA0texIJC— , =Ac as Owner of the subject property cc� hereby authorize w.4--n OAS IC-A to act on my behalf,in all matters relative to work authorized by this building permit application. Marty POUtry "" 05/07/2015 Signature of Owner Date l rcA+l ca�wtb►t S.�ilf as Owner/Authorized Agent hereby declare that the statements and info[mation on the foregoing application are true and accurate,to the best of my knowledge and belief. Signed under the pains and penalties of perjury. Print Name /2b 1S Signa pre of Owner/Agent Date Section 4. ZONING All Information Must Be Completed.Permit Can Be Denied Due To Incomplete Information Existing Proposed Required by Zoning This column to be filled in by Building Department Lot Size Frontage Setbacks Front Side L: R: L: R: Rear Building Height Bldg.Square Footage % Open Space Footage % (Lot area minus bldg&paved Arkin #of Parking Spaces Fill: volume&Location A. Has a Special Permit/Variance/Finding ever been issued for/on the site? NO ) DONT KNOW Q YES Q IF YES, date issued: IF YES: Was the permit recorded at the Registry of Deeds? NO Q DONT KNOW 0 YES 0 IF YES: enter Book Page and/or Document# B. Does the site contain a brook, body of water or wetlands? NO DONT KNOW Q YES Q IF YES, has a permit been or need to be obtained from the Conservation Commission? Needs to be obtained Q Obtained Q , Date Issued: C. Do any signs exist on the property? YES O NO O IF YES,describe size, type and location: D. Are there any proposed changes to or additions of signs intended for the property.? YES 0 NO IF YES, describe size,type and location: E. Will the construction activity disturb(clearing,grading,excavation,or filling)over 1 acre or is it part of a common plan that will disturb over 1 acre? YES Q NO O IF YES,then a Northampton Storm Water Management Permit from the DPW is required. �1 Department use only City of Northampton Status of Permit: MAY Ii2.015 y! �' Department Curb Cut/Driveway Permit Building De p 212 Main Street Sewer/Septic Availability EI ctric,Plumbing&Gas Inspections Room 100 WaterNVeil Availability Northam ton,MA 01060 orthampton, MA 01060 Two Sets of Structural Plans phone 413-587-1240 Fax 413-587-1272 PIotlSite Plans Other Specify APPLICATION TO CONSTRUCT,ALTER,REPAIR,RENOVATE OR DEMOLISH A ONE OR TWO FAMILY DWELLING SECTION 1 -SITE INFORMATION This section to be completed by office 1.1 Property Address: Map q, Lot Unit 15 Laurel Street Northampton,MA 01060 zone Overlay District Elm St District CB District SECTION 2-PROPERTY OWNERSHIPIAUTHORIZED AGENT 2.1 Owner of Record: Transformations,Inc 323 West Main Street Ayer,Ma 01432 Name(Print) Current Mailing Address: 978_772-1390 �trniN��MMaRy varo, Marty Poutry Telephone Signature 2.2 Authorized Agent: _ 1Q-A&1"— —i✓La4+1�5>rC w+4Ti6►JG 3�1L Slotµ oi. t►1 Name(Print) Current Mailing Address: Signa a Telephone SECTION 3-ESTIMATED CONSTRUCTION COSTS Item Estimated Cost(Dollars)to be Official Use Only completed by ermit applicant 1. Building (a)Building Permit Fee 2. Electrical (b)Estimated Total Cost of Construction from 6 3. Plumbing Building Permit Fee Z�C6-.eO 4. Mechanical(HVAC) 5. Fire Protection 21 94 14 6. Total=(1 +2+3+4+5) 43,000 Check Number This Section For Official Use Onl Date Building Permit Number: Issued: Signature: Building Commissionerlinspector of Buildings Date File#BP-2015-1085 APPLICANT/CONTACT PERSON TRANSFORMATIONS INC ADDRESS/PHONE 8 COPPERSMITH WAY TOWNSEND01469(978)597-0542 PROPERTY LOCATION 15 LAUREL ST MAP 38a PARCEL 143 ZONE THIS SECTION FOR OFFICIAL USE ONLY: PERMIT APPLICATION CHECKLIST ENCLOSED REQUIRED DATE ZONING FORM FILLED OUT Fee Paid Building Permit Filled out Fee Paid Typeof Construction: INSTALL ROOF MOUNTED 8.58 KW SOLAR ARRAY New Construction Non Structural interior renovations Addition to Existing Accesso1y Structure Building Plans Included: - Owner/Statement or License 3 sets of Plans/Plot Plan THE FOLLOWING ACTION HAS BEEN TAKEN ON THIS APPLICATION BASED ON INFORMATION PRESENTED: Approved Additional permits required(see below) PLANNING BOARD PERMIT REQUIRED UNDER:§ Intermediate Project: Site Plan AND/OR Special Permit With Site Plan Major Project: Site Plan AND/OR Special Permit With Site Plan ZONING BOARD PERMIT REQUIRED UNDER: § Finding Special Permit Variance* Received&Recorded at Registry of Deeds Proof Enclosed Other Permits Required: Curb Cut from DPW Water Availability Sewer Availability Septic Approval Board of Health Well Water Potability Board of Health Permit from Conservation Commission Permit from CB Architecture Committee Permit from Elm Street Commission Permit DPW Storm Water Management Dela ��/��/✓ Sign ure of it ng Official Date Note: Issuance of a Zoning permit does not relieve a applicant's burden to comply with all zoning requirements and obtain all required permits from Board of Health,Conservation Commission,Department of public works and other applicable permit granting authorities. * Variances are granted only to those applicants who meet the strict standards of MGL 40A. Contact Office of Planning&Development for more information. 15 LAUREL ST BP-2015-1085 GIS#: COMMONWEALTH OF MASSACHUSETTS Map:Block: 38a- 143 CITY OF NORTHAMPTON Lot: - PERSONS CONTRACTING WITH UNREGISTERED CONTRACTORS Permit: Building DO NOT HAVE ACCESS TO THE GUARANTY FUND (MGL c.142A) Category: SOLAR PANELS BUILDING PERMIT Permit# BP-2015-1085 Project# JS-2015-002058 Est. Cost: $43000.00 Fee: $258.00 PERMISSION IS HEREBY GRANTED TO: Const. Class: Contractor: License: Use Group: TRANSFORMATIONS INC_ Lot Size(sq. ft.): 14606.00 Owner: TRANSFORMATIONS INC Zoning: Applicant: TRANSFORMATIONS INC AT. 15 LAUREL ST Applicant Address: Phone: Insurance: 8 COPPERSMITH WAY (978) 597-0542 TOWNSENDMA01469 ISSUED ON.511212015 0:00:00 TO PERFORM THE FOLLOWING WORK.-INSTALL ROOF MOUNTED 8.58 KW SOLAR ARRAY POST THIS CARD SO IT IS VISIBLE FROM THE STREET Inspector of Plumbing Inspector of Wiring D.P.W. Building Inspector Underground: Service: Meter: Footings: Rough: Rough: House# Foundation: Driveway Final: Final: Final: Rough Frame: Gas: Fire Department Fireplace/Chimney: Rough: Oil: Insulation: Final: Smoke: Final: THIS PERMIT MAY BE REVOKED BY THE CITY OF NORTHAMPTON UPON VIOLATION OF ANY OF ITS RULES AND REGULATIONS. Certificate of Occupancy Signature: FeeType• Date Paid: Amount: Building 5/12/2015 0:00:00 $258.00 212 Main Street, Phone(413)587-1240,Fax: (413)587-1272 Louis Hasbrouck—Building Commissioner