38A-142 (2) professional RoofTrac®
SOLAR
products.y,L, Installation Manual
Date Modified:08/13/07
Step 5: Installing Modules
1 _
�4
P »
i'
Slide the two end clamps near the end of the After the first module is secured, slide two inter-
support rail and install your end module (first). module clamp sets onto the first module side
Carefully square the module to the frame and frame. They are designed to stay in place,freeing
tighten the clamps using a 1/2" box wrench or you up to slide and align the next module into place.
drive socket. We recommend a maximum torque Repeat this procedure until all modules are in-
of 12-15 foot pounds to prevent damage to the stalled onto the support rail.
module.
a
Upon installation of the last module in the panel, To complete the installation, cut off any excess
install the module end clamp to the end of the last support rail not used with a reciprocating saw.
module. Before fully tightening the bolts, make You may want to use an extrusion blade.
any adjustments needed to create a square and
even array.
Page 7 of 7
COPYRIGHT PROFESSIONAL SOLAR PRODUCTS 2007: All information
contained in this manual is property of Professional Solar Products(PSP).
TileTrac@l is a registered trademark for PSP and is covered under U.S.patent
#5,746,029.Roofrrac61 and FastJack®is a registered trademark for PSP and is
professional Rooffrav SOLAR
productv Installation Manual
Date Modified:08/13/07
For convenience, it is advisable to pre-assemble the bolt, lock washer and clamp into the
sliding insert prior to bringing them up to the roof.
Fig. 2
Fig. 1 g
Attachment and clamping of the solar modules to NOTE: Clamping hardware is not engineered or
TileTrac® or FastJack®attachments works exactly the intended for use on support rail/strut other than
same. After the support rails have been fastened, you the Professional Solar Products brand.
are ready to install the solar modules. There are two
sets of clamps; the outside clamps (end clamp) (Fig.
1) and the inter-module clamps (Fig. 2)that install
between the modules.
Please note that all module end clamps are specially
extruded to fit a specific brand of module as specified
in the ordering guide.
Page 6 of 7
COPYRIGHT PROFESSIONAL SOLAR PRODUCTS 2007: All information contained in this manual is property of Professional Solar Products
(PSP). TileTrac®is a registered trademark for PSP and is covered under U.S.patent#5,746,029.RoofTrac®and Fast)ack®is a registered
trademark for PSP and is covered under U.S.patent#6,360,491.
professional Rooffrav
SOLAR
pro uctqpi, Installation Manual
Date Modified:08/13/07
FastJack®
Unibit#10
Drill bit .
- k .l�.
Standard Flashing
2 cent
Use of a Unibit®will de-
crease drill time to approxi- Rafters
mately 3 seconds per hole
Installation of the RoofTrac®support rails to the drill a 1/2" hole through the rail. After drilling the hole
FastJack®. in the support rail, place the rail over the attachment
feet, make any necessary final adjustments and tighten
After the Fast)ack® has been installed (refer to the the 3/8" Bolt&Washer combination to attach the
respective installation guide), lay the support rail support rail to the FastJack®. Your support rails are
(upside down) next to the attachments. Mark the now secure and ready for installation of the modules.
channel adjacent to the attachment devices. Align
and mark the intersecting "V" groove on the rail and
Page 5 of 7
COPYRIGHT PROFESSIONAL SOLAR PRODUCTS 2007: All information contained in this manual is property of Professional Solar Products
(PSP). TIIeTrac0 is a registered trademark for PSP and is covered under U.S.patent#5,746,029.RoofTrac®and FasUack4l)is a registered
trademark for PSP and is covered under U.S.patent#6,360,491.
professional Rooffrov SOLAR
products. Installation Manual
Date Modified:08/13/07
Step 2: Attaching Support Rails to TileTrac®/FasUacke
0
T-wrench ' € ` ' <
2
` TileTrac Device
Nut/Washer combo
Installation of the RoofTracs support rails to the over the attachment feet, install the 3/8" washer and
TileTrac®. nut and tighten using a 9/16" deep socket wrench.
Your support rails are now secure and ready for
After the TileTrac® has been installed (refer to the installation of the modules.
respective installation guide), lay the support rail
(upside down) next to the attachments, step 1, as
illustrated above. Mark the channel adjacent to the Use of a Unibit®will decrease drill
attachment devices. Align and mark the intersecting time to approximately 3 seconds per
"V" groove drill guide on the rail and drill a 1/2" hole hole
through the rail. After drilling the hole, place the rail
Page 4 of 7
COPYRIGHT PROFESSIONAL SOLAR PRODUCTS 2007: All information contained in this manual is property of Professional Solar Products
(PSP). TileTrac®is a registered trademark for PSP and is covered under U.S.patent#5,746,029.RoofTrac®and Fast lack®is a registered
trademark for PSP and is covered under U.S.patent#6,360,491.
professional Rooffrav
SOLAR
pro du Installation Manual
Date Modified:08/13/07
Insert the splice "A" into the channel and install "B"—the two 5/16" bolts/ lock washers—into the lower
support "C". Tighten using a 1/2" socket. Splice insert is designed to expand into the extrusion walls forcing
the rails into alignment, do not over tighten. Roof Trac® support rails can now can be handled and installed
as one solid rail.
1/2" Socket B
5/16" bolts/
lock washers
A
y
Insert
Extrusion '
C
Lower
Support
Splice Expansion Feature:
Rooffrae splice kits are designed to hold support rails in alignment and allow
for thermal expansion of the aluminum. After fastening the support rails to the
attachments, remove one of the 5/16"bolts.Thermal expansion:of the
aluminum support rails will now be absorbed in the splice connection instead of stressing
the roof attachments.The remaining splice kit bolt and assembly will keep the support rails
in perfect alignment.
Page 3of7
COPYRIGHT PROFESSIONAL SOLAR PRODUCTS 2007: All information contained in this manual is property of Professional Solar Products
(PSP). TiteTrac(&is a registered trademark for PSP and is covered under U.S.patent#5,746,029.RoofTrac@ and FasUack®is a registered
trademark for PSP and is covered under U.S.patent#6,360,491.
professional Rooffrav SOLAR
products Installation Manual
Date Modified:08/13/07
steps Installation
1) Utilizing the Splice Kit
2) Attaching Support rails to the TileTrac®/FastJack®
3) Installing modules
4) Cleanup and safety
Step 1: Utilizing the Splice Kit
It is recommended that you pre-install the splice kit on the ground for easier handling of the sup-
port rails. After installing the splices, set the lengths against the building. Typically, the installer
on the roof can pull the lengths to the roof without any mechanical equipment and handle the
lengths as one unit.
Felt Tip Pen Drill =
Use of a Unibit®
will decrease drill
Splice holes—
mark with time to approxi-
permanent ink I I I I I mately 3 seconds
pen Uni-Bit@ per hole
n
I •
I
V-groove
drill guide
I
I
I
I
Lower Support -4 S�AA
1/8"Gap �q2 SvAp
Intersections of the oRr�i
reference mark and
extended "V"groove.
Turn the support rails upside down (as
illustrated) so the bottom is facing up. Drill two holes using a 1/2" #10 UniBit®. Drill
Place the lower support over the rails to at the intersection of the reference mark and
use as a template. Center the lower the "V" groove drill guide.
support over the rails and mark along the
V-groove drill guide using a small felt pen.
Page 2 of 7
COPYRIGHT PROFESSIONAL SOLAR PRODUCTS 2007: All information contained in this manual is property of Professional Solar Products
(PSP). TileTrac®is a registered trademark for PSP and is covered under U.S.patent#5,746,029.RootTrac@ and FastJack®is a registered
trademark for PSP and is covered under U.S.patent#6,360,491.
professional Rooffrov
SOLAR
pro uctsyA, Installation Manual
Date Modified:08/13/07
APPLICATION:
The RoofTrac mounting system consists of sup-
port rails and top-down clamping hardware which
is integrated with either a TileTrac or FastJack
attachment device.The RoofTrac mounting sys-
tem can be utilized on virtually all standard con-
struction residential roof tops, mounting 4' on
center, to install the majority of popular framed
solar modules.
AAWARNING =
Solar Products ProSolar are engineered
All Professional ( )
and tested to withstand stated specifications (as stated on
published specification sheets) when installed properly. Fail- Explanation or Install Tip
ure to install properly may decrease the performance of in-
stallation.
SAFETY Important product
All regional safety requirements should be followed when performance information
installing Professional Solar Products. All tools and equip-
ment located on the roof should be secured to avoid falling
object hazards. All equipment/tools should be properly
maintained and inspected prior to use. Any exposed studs Critical for Safety
should be protectively capped to help avoid injury.
This installation manual is intended for use by professional
installers with a working knowledge of construction princi-
ples.
Tool
• Chalk line
• 3/16" carbide masonry drill bit
• 3/8" masonry drill bit(for tile roof)
• Cordless drill
• Cordless impact wrench with 1/2"socket
Page 1 of 7
COPYRIGHT PROFESSIONAL SOLAR PRODUCTS 2007: All information contained in this manual is property of Professional Solar Products
(PSP). TileTrac®is a registered trademark for PSP and is covered under U.S.patent#5,746,029.RoofTrac®and Fastfack®is a registered
trademark for PSP and is covered under U.S.patent#6,360,491.
Con%truction Super-,i�ijr
CS-107968
BENJAMIN CUMBIE
46 OLD ORCHARD STREET
Groton MA 01450
1111912017
--------------
Unrestricted-Buildings of anv use group which
contain less than 35,000 cubic feet(99 1 M3)Of
enclosed space.
Failure to possess a current edition of the Massachusetts
State Building Code is cause for revocation of this license,
For DPS Licensing information visit: www.Mass.Gov/DPS
off nsumerzAna fs,&Business Regulation License or registration valid for individul use only
Office of Consumer Affairs&Business Regulation g y
HOME IMPROVEMENT CONTRACTOR before the expiration date. if found return to:
Registration: 1$0293 Type: Office of Consumer Affairs and Business Regulation
Expiration: 10/30/2016 Individual 10 Park Plaza-Suite 5170
Boston,MA 02116
BENJAMIN R.CUMBIE
BENJAMIN CUMBIE
46 OLD ORCHARD ST
GROTON,MA 01450
Undersecretary Not valiewithout signature
PERL : Pas�,!vaf.od Ernittei, R(.-,;,)i- Locoliv
Higher Cell Efficiency
Conventional Selective-Emitter Cell:Max.19.3%
Ag fmnt electrode Enhancing quantum efficiency PERL Cell:Max.20.4%
at short wavelength
ARC Minimizing front contact Higher Module Output
resistance 275 W,280 W,285 W
x White backsheet
rr- n,ernitter • Minimizing back side electron-
P-type Si wafer hole pair recombination I Lower Temperature Coefficient
P,Al-LBSF r
c Enhancing quantum efficiency Lower output loss at higher temperature
at long wavelength
Minimizing back contact Affordable Price
Albx*eieamde resistance Premium mono-crystalline technology with affordable price
Electrical Characteristics
Mono-crystalline Type
Nominal output(Pmpp) W 265 270 275
Voltage at Pmax(Vmpp) v 31.3 31.4 31.6
Current at Pmax(Impp) A 8.5 8.6 8.7
Open circuit voltage(Voc) V 38.1 38.2 38.4
Short circuit current(isc) A 9.0 9.2 9.3
Output tolerance % +3/-0
No.of cells&connections PCs 60 in series
Cell type 6"Mono-crystalline silicon with PERL technology(Hyundai cell,Made in Korea)
Module efficiency % 16.2 16.5 16.8
Temperature coefficient of Pmpp %/K -DA5 -DA5 -0.45
Temperature coefficient of Voc %/K -0.33 -0.33 -0.33
Temperature coefficient of Isc %/K 0.032 0.032 0.032
X-A11 data atSTC(Standard Test Conditions).Above data maybe changed without prior notice.
Module Diagram (unit:rarrijinch) I-V Curves
C—AIN
lo
2YC
7 45'
,4X07-L11 65T
HOLES
DETAILA
(39.3 39371 'Lo"",u
4.WCABLE& 4—ICABLE&
(00iECMR CONNECTOR
ir s to is
VokwM
C.�W
/GROUND ImwW
FX DEMILB
4K04.2 "31 800ww
..DH.l 601247 600W/rW
954(37-56) 400W/m=4------- ------2ww/,w
1.1 11100
C 25319.96') 30 SECTON CC
WNW[VI
-------------
Installation Safety Guide 46°C t 2
Only qualified personnel should install or perform maintenance. -40-85°C••
Be aware of dangerous high DC voltage. DC 1,000 V(lEC)
•Do not damage or scratch the rear surface of the module. DC 600V(UL)
15A
•Do not handle or install modules when they are wet.
Printed Date,March 2015 1
Sales&Marketing A& HYUNDAI
21 Fl.,Hyundai Bldg.,75,Yulgok-ro,Jongno-gu,Seoul 110-793,Korea
FSC Tel:+82-2-746-4671,7635,8556 Fax:+82-2-746-7675 HEAVY INDUSTRIES
V
N
SPECIFICATIONS 800 0r TL PV1660OTL PV17•rr
O
E[
V
¢ O
0
Absolute Maximum Open Circuit Voltage 600 VDC c
Operating Voltage Range 120-550 VDC
MPPT Input Voltage Range 200-500 VDC
MPP Trackers 1 2
o
Maximum Operating Input Current 20A 15 A per MPP tracker 18 A per MPP tracker 20 A per MPP tracker
'o
L
Nominal Output Voltage 208 or 240 VAC,1-Ph
AC Voltage Range -12%1+10%
0
208 VAC 3300 W 5200 W 6600 W 6600 W
Continuous Output Power
240 VAC 3800 W 5200 W 6600 W 7600 W
208 VAC 15.8 A 25A 31.7 A 31.7 A e
Continuous Output Current
240 VAC 15.8 A 21.6 A 27.5 A 31.7 A E
0
Maximum Backfeed Current OA
Nominal Output Frequency 60 Hz
u
Output Frequency Range 59.3-60.5 Hz
Power Factor Unity,)0.99
Total Harmonic Distortion(THD) (3% ;
m
a
A
Peak Efficiency 98.3
CEC Efficiency 97.5%
0
Tare Loss c1 W t
m
a
Ambient Temperature Range(full power) -13°F to+122°F(-25°C to+50°C)
Storage Temperature Range -40°Fto+185 1F(-40°C to+85°C)
Relative Humidity(non-condensing) 0-100%
Optional SolrenView Web-based Monitoring External
Optional Revenue Grade Monitoring External
External Communication Interface RS-485
Safety Listings&Certifications UL 1741/IEEE 1547,UL1699B.CSA C22.2#107.1,FCC part 15 A&B
Testing Agency ETL CSA
Standard 10 year
Optional Extended warranties,to 15&20 years
DC Disconnect Standard,fu lly-integrated
17.5x15.8x8.5in. 26.8x15.8x8.5in.
Dimensions(H x W x D) (445 x 401 x 216 mm) (680 x 401 x 216 mm)
Weight 43 Ibs(19.5 kg) 65 Ibs(29.5 kg)
Enclosure Rating Type 4
Enclosure Finish Aluminum
G" ECTRIA
R E k B W A•L E www.solectria.com I inverters @solectria.com 978.683.9700
oil IPF W
f'
A
i
m.
i
tD
tv
_. ,�t...C. k ¢?l -)
10 A
LV
1
r
DESIGN CALCULATIONS FOR
THE GREEK REVIVAL
21 Laurel Street
Northampton, Mass.
August 4, 2014
BENJAMIN NICKERSON
ARCHITECT
54 PLEASANT STREET
WOODSTOCK,VERMONT
f-0 A
Nil (�
uJ p
�> No.3749
9 '7 b'OODGIOCK
�, VT �v
%
_ _-._ _ 1 � a•a. a
FM of
' i j ✓f�N 'TJ op E5
zc zr t ?�Y t)ST Ar, ZD►A-
UOT
-vim•=��-
7,t� C s,}"?LS'-h �c:� ..0 r_ ``, Y.:•_l1SF,l,uA3 11.:X�P'N.1TJ
NO 3149:
it sj�P�.ix.ThPt r �;, ' �j e� .�� -,may. ,4iE%•T 7 L� '�'�'�
A, Zz.A4
2rp�axi ✓ J 4 TZ
?(f e•ll'b FOR-MAP- !1�I4 P 2r 84iaaLt3;F Gii _ \ ,�� •;�f!' ..�^E-%'T`+.It:r. .
rd .T-�`i^,d''. ra.. .. t !4+'k'L�.--' I f
�f
4S ux,.scavj uur-c ,"t ,F`ix.. '},�c• Y' a. 4'b'rf 3
_
f
_z 4'f5h.p OF °It"fbsss.+bvj�__�-••"'1 t �� _. _ r. "--'j 1• �' .n r,u'T>�
v a+
sy� �>�,yc rry h.'4 i t't.s x"a+x7uikt.'v Rh G1tt•CL..J 4' ._. l.,,-j C"24"
A3°, 2A,
t1
�i
P
�
I z n u, c },
r`a i�
per.
'Am rvr,a£P4
en"lk e,,!D _ r w-rows CAll I to
111 5`A ww'
[alt.
17+.+whtfb4.y,r,.{+.M♦ '-., I 1fu L!'AY.-,yf a,anaa, j � 1Si'�!W.
�mf
PV�Q ��� —
~ ^���~,`^^ ~ ^=~^ 21 ~~~~~e^ ~.
PV Array
-rLATE
ETT
u^` .
` — - -- -^
/
~'~_ ^_-_ _- _-
Statement ofWork: The Photovoltaic system is composed nf33 Hyundai 27U Watt panels. The 5T[rating for the system isO.91kW. The Photovoltaic system
will be affixed to the roof structure with Professional Solar Product's(Pro-Solar) RoofTrac mounting system in accordance to the manufacturer specifications.
ProSolar's rail enhancers (part#ARE-20)will be added to further reinforce the racking system. The lag bolts will penetrate the rafters bya minimum nf].S''.
The fast Jacks or mounting feet will be spaced 4' on center and the static load will be distributed equally among associated rafters. VVe will not exceed the �
manufacturer's recommendations for cantilever distance or deviate from the installation guide in any way. This installation will exceed local static load and wind
load requirements.
Information and Instructions
Massachusetts General Laws chapter 152 requires all employers to provide workers' compensation for their employees.
Pursuant to this statute, an employee is defined as"...every person in the service of another under any contract of hire,
express or implied, oral or written."
An employer is defined as"an individual,partnership,association,corporation or other legal entity,or any two or more
of the foregoing engaged in a joint enterprise, and including the legal representatives of a deceased employer, or the
receiver or trustee of an individual,partnership, association or other legal entity, employing employees. However the
owner of a dwelling house having not more than three apartments and who resides therein, or the occupant of the
dwelling house of another who employs persons to do maintenance, construction or repair work on such dwelling house
or on the grounds or building appurtenant thereto shall not because of such employment be deemed to be an employer."
MGL chapter 152, §25C(6)also states that"every state or local licensing agency shall withhold the issuance or
renewal of a license or permit to operate a business or to construct buildings in the commonwealth for any
applicant who has not produced acceptable evidence of compliance with the insurance coverage required."
Additionally, MGL chapter 152, §25C(7)states"Neither the commonwealth nor any of its political subdivisions shall
enter into any contract for the performance of public work until acceptable evidence of compliance with the insurance
requirements of this chapter have been presented to the contracting authority."
Applicants
Please fill out the workers' compensation affidavit completely,by checking the boxes that apply to your situation and, if
necessary, supply sub-contractor(s)name(s),address(es)and phone number(s)along with their certificate(s)of
insurance. Limited Liability Companies(LLC)or Limited Liability Partnerships(LLP)with no employees other than the
members or partners, are not required to carry workers' compensation insurance. If an LLC or LLP does have
employees, a policy is required. Be advised that this affidavit may be submitted to the Department of Industrial
Accidents for confirmation of insurance coverage. Also be sure to sign and date the affidavit. The affidavit should
be returned to the city or town that the application for the permit or license is being requested,not the Department of
Industrial Accidents. Should you have any questions regarding the law or if you are required to obtain a workers'
compensation policy,please call the Department at the number listed below. Self-insured companies should enter their
self-insurance license number on the appropriate line.
City or Town Officials
Please be sure that the affidavit is complete and printed legibly. The Department has provided a space at the bottom
of the affidavit for you to fill out in the event the Office of Investigations has to contact you regarding the applicant.
Please be sure to fill in the permit/license number which will be used as a reference number. In addition,an applicant
that must submit multiple permit/license applications in any given year,need only submit one affidavit indicating current
policy information(if necessary)and under"Job Site Address"the applicant should write"all locations in (city or
town)."A copy of the affidavit that has been officially stamped or marked by the city or town may be provided to the
applicant as proof that a valid affidavit is on file for future permits or licenses. A new affidavit must be filled out each
year. Where a home owner or citizen is obtaining a license or permit not related to any business or commercial venture
(i.e. a dog license or permit to burn leaves etc.)said person is NOT required to complete this affidavit.
The Office of Investigations would like to thank you in advance for your cooperation and should you have any questions,
please do not hesitate to give us a call.
The Department's address,telephone and fax number:
The Commonwealth of Massachusetts
Department of Industrial Accidents
Office of Investigations
1 Congress Street, Suite 100
Boston, MA 02114-2017
Tel. # 617-727-4900 ext 406 or 1-877-MASSAFE
Revised 7-2010 Fax # 617-727-7749
www.mass.gov/dia
The Commonwealth of Massachusetts Print f=orm
Department of Industrial Accidents
Office of Investigations
M 1 Congress Street, Suite 100
Boston, MA 02114-2017
1_17"
www.massgov/dia
Workers' Compensation Insurance Affidavit: Builders/Contractors/Electricians/Plumbers
Applicant Information Please Print Legibly
Name (Business/Organization/Individual):
Transformations,Inc-Benjamin Cumbie
Address: 323 West Main Street
City/State/Zip: Ayer, MA 01432 Phone #: 978-597-0542
Are you an employer?Check the appropriate box: Type of project(required):
1.❑✓ I am a employer with 14 4. ❑ I am a general contractor and I 6. ❑ New construction
employees(full and/or part-time).* have hired the sub-contractors
2.❑ I am a sole proprietor or partner- listed on the attached sheet. 7. ❑ Remodeling
ship and have no employees These sub-contractors have g• ❑ Demolition
working for me in any capacity. employees and have workers' 9. ❑ Building addition
[No workers' comp. insurance comp.insurance.:
required.] 5. ❑ We are a corporation and its 10.❑ Electrical repairs or additions
3111 am a homeowner doing all work officers have exercised their 11.❑ Plumbing repairs or additions
myself. [No workers' comp. right of exemption per MGL 12.❑ Roof repairs
insurance required.] t c. 152, §1(4),and we have no Solar PV ststem
employees. [No workers' 13.❑ Other
comp.insurance required.]
*Any applicant that checks box#1 must also fill out the section below showing their workers'compensation policy information.
t Homeowners who submit this affidavit indicating they are doing all work and then hire outside contractors must submit a new affidavit indicating such.
:Contractors that check this box must attached an additional sheet showing the name of the sub-contractors and state whether or not those entities have
employees. If the sub-contractors have employees,they must provide their workers'comp.policy number.
I am an employer that is providing workers'compensation insurance for my employees. Below is the policy and job site
information.
Insurance Company Name: Travelers Insurance Co.
Policy# or Self-ins.Lic. #: 6 KUB-0326N39-A-15 Expiration Date:4/2/2016
Job Site Address:21 Laurel St City/State/Zip:Northampton, MA 01060
Attach a copy of the workers' compensation policy declaration page(showing the policy number and expiration date).
Failure to secure coverage as required under Section 25A of MGL c. 152 can lead to the imposition of criminal penalties of a
fine up to $1,500.00 and/or one-year imprisonment, as well as civil penalties in the form of a STOP WORK ORDER and a fine
of up to$250.00 a day against the violator. Be advised that a copy of this statement may be forwarded to the Office of
Investigations of the DIA for insurance coverage verification.
I do hereby certi under the pains and enalties of er' that the information provided above is true and correct.
DigiWlymg ed by B-pm C..bi.
., .. — Dr.co C meie,o u.mai be�@nmmfdn.tio� m«om,_U 5/08/2015
Signature °'�'°,5°5°"55z"°°°° Date
Phone#:978-597-0542
Official use only. Do not write in this area,to be completed by city or town official,
City or Town: Permit/License#
Issuing Authority(circle one):
1. Board of Health 2. Building Department 3. City/Town Clerk 4.Electrical Inspector 5.Plumbing Inspector
6. Other
Contact Person: Phone#:
SECTIONS-CONSTRUCTION SERVICES
8.1 Licensed Construction Supervisor: (" Not Applicable ❑
Name of License Holder: ,,u1 "`^fit LS— 16-1
LicenseNumber
W(o ofd o4c+t44r�. -3b`5 11q. p2446 %I( t
Address Expiration Date
Mq�by
l Cf,ClZ -T 6p_ `7 1 Z
Signature _ Telephone
9.Registered Home Improvement Contractor. Not Applicable ❑
Company Name Registration Number
a L "I'-> C ZI—A A 91, ST . &1Zf`--A , AA v9 a 7-44 Jr. la 1 3, 1 20 t 6
Address Expiration Date
�N�ef'evy.nmcwtie
Telephone %L-76b-_11417_
SECTION 10-WORKERS'COMPENSATION INSURANCE AFFIDAVIT(M.G.L.c.152,§25C(6))
Workers Compensation Insurance affidavit must be completed and submitted with this application. Failure to provide this affidavit will result
in the denial of the issuance of the building permit.
Signed Affidavit Attached Yes....... No...... ❑
11. -Home Owner Exemption
The current exemption for"homeowners"was extended to include Owner-occupied Dwellings of one(1) or two(2)families
and to allow such homeowner to engage an individual for hire who does not possess a license,provided that the owner acts
as supervisor.CMR 780, Sixth Edition Section 108.3.5.1.
Definition of Homeowner:Person(s)who own a parcel of land on which he/she resides or intends to reside,on which there
is,or is intended to be,a one or two family dwelling,attached or detached structures accessory to such use and/or farm
structures.A person who constructs more than one home in a two-year period shall not be considered a homeowner.
Such"homeowner"shall submit to the Building Official,on a form acceptable to the Building Official,that he/she shall be
responsible for all such work performed under the building permit.
As acting Construction Supervisor your presence on the job site will be required from time to time,during and upon
completion of the work for which this permit is issued.
Also be advised that with reference to Chapter 152(Workers'Compensation) and Chapter 153(Liability of Employers to
Employees for injuries not resulting in Death)of the Massachusetts General Laws Annotated,you may be Gable for person(s)
you hire to perform work for you under this permit.
The undersigned"homeowner"certifies and assumes responsibility for compliance with the State Building Code,City of
Northampton Ordinances,State and Local Zoning Laws and State of Massachusetts General Laws Annotated.
Homeowner Signature
SECTION 5-DESCRIPTION OF PROPOSED WORK(check all aaalicaksiel
New House F-1 Addition ❑ Replacement Windows Alteration{s) ❑ Roofing ❑
Or Doors []
Accessory Bldg. ❑ Demolition ❑ . New Signs [r-3) Decks [p Siding[01 Other[c9
Brief Description of Proposed
Work: Installation of a solar PV system.See attached diagram. W
Alteration of existing bedroom Yes " No Adding new bedroom Yes x No
Attached Narrative Renovating unfinished basement Yes No
Plans Attached Roll -Sheet
ea.If New house and or addition to existing housinct,complete the following:
a. Use of building:One Family Two Family Other
b. Number of rooms in each family unit: Number of Bathrooms
c. Is there a garage attached?
d. Proposed Square footage of new construction. Dimensions
e. Number of stories?
f. Method of heating? Fireplaces or Woodstoves Number of each
g.. Energy Conservation Compliance. _Masscheck Energy Compliance form attached?
h. Type of construction
i. Is construction within 100 ft.of wetlands? Yes No. Is construction within 100 yr. floodplain Yes No
j. Depth of basement or cellar floor below finished grade
k. Will building conform to the Building and Zoning regulations? Yes No.
I. Septic Tank City Sewer Private well City water Supply
SECTION 7a-OWNER AUTHORIZATION-TO BE COMPLETED WHEN
OWNERS AGENT OR CONTRACTOR APPLIES FOR BUILDING PERMIT
o,twv4�r rr t , T' kc as Owner of the subject
property
hereby authorize `TC4A&raC.VAA-ntAS Imm C_
to act on my behalf,in all matters relative to work authorized by this building permit application.
Marty Poutry m
05107/2015
Signature of Owner Date
I, rtA4LI, d,",- AC as Owner/Authorized
Agent hereby declare that the statements and information on the foregoing application are true and accurate,to the best of my knowledge
and belief.
Signed under the pains and penalties of perjury.
/"
Print Name
t, Za tS
Signa ure of Owner/Agent Date
Section 4. ZONING All Information Must Be Completed.Permit Can Be Denied Due To Incomplete Information
Existing Proposed Required by Zoning
This column to be tilled in by
Building Department
Lot Size
Frontage
Setbacks Front
Side L: R: L: R:
Rear
Building Height
Bldg.Square Footage %
Open Space Footage %
(Lot area minus bldg&paved
parking)
#of Parking Spaces
Fill:
volume&Location)
A. Has a Special Permit/Variance/Finding ever been issued for/on the site?
NO ) DONT KNOW 0 YES Q
IF YES,date issued:
IF YES: Was the permit recorded at the Registry of Deeds?
NO (�) DONT KNOW 0 YES Q
IF YES: enter Book Page and/or Document#
B. Does the site contain a brook, body of water or wetlands? NO DONT KNOW O YES O
IF YES, has a permit been or need to be obtained from the Conservation Commission?
Needs to be obtained O Obtained Q , Date Issued:
C. Do any signs exist on the property? YES 0 NO Q
IF YES, describe size, type and location:
D. Are there any proposed changes to or additions of signs intended for the property.? YES 0 NO
IF YES, describe size,type and location:
E. Will the construction activity disturb(clearing,grading,excavation,or filling)over 1 acre or is it part of a common plan
that will disturb over 1 acre? YES 0 NO Q
IF YES,then a Northampton Storm Water Management Permit from the DPW is required.
Department use only
f Northampton Status of Permit:
g Department Curb CutlDrivewray Permit
21 Main Street Sewer/Septic Availability
Gac InGpection oom 100 WaterNVell Availability
Electric,Plu 'c'n9 MA 01 ton, MA 01060 Tura Sets of Structural Plans
Noftr`n)r p one 413-587-1240 Fax 413-587-1272 Plot/Site Plans
Other Specify
APPLICATION TO CONSTRUCT,ALTER,REPAIR,RENOVATE OR DEMOLISH A ONE OR TWO FAMILY DWELLING
SECTION 1 -SITE INFORMATION
is section to be completed by office
1.1 Property Address:
Map Lot_ Unit
21 Laurel Street
Northampton,MA 01060 Zone Overlay District
Elm St District CB District
SECTION 2-PROPERTY OWNERSHIP/AUTHORIZED AGENT
2.1 Owner of Record:
Transformations,Inc 323 West Main Street Ayer,Ma 01432
Name(Print) Current Mailing Address: 978-772-1390
Marty Poutry
rry rwmr.�rasmveom,xK,ai
Telephone
Signature
2.2 Authorized Aaeent":
�y.e =„L _i r Sic LAC �flw dt ou bz
Name(Print) Current Mailing Address:
QCeg -23\-'7S-I4f
Signa a Telephone
SECTION 3-ESTIMATED CONSTRUCTION COSTS
Item Estimated Cost(Dollars)to be Official Use Only
completed by rmit applicant
1. Building (a)Building Permit Fee
2. Electrical (b)Estimated Total Cost of
Construction from 6
3. Plumbing Building Permit Fee
4. Mechanical(HVAC)
5. Fire Protection
6. Total=(1 +2+3+4+5) 43,000 Check Number
This Section For Official Use Only
Building Permit Number: IIsssued.
Signature:
Building Commissioner/tnspectorof Buildings Date
File#BP-2015-1086
APPLICANT/CONTACT PERSON TRANSFORMATIONS INC
ADDRESS/PHONE 8 COPPERSMITH WAY TOWNSEND01469(978) 597-0542
PROPERTY LOCATION 21 LAUREL ST
MAP 38A PARCEL 142 ZONE
THIS SECTION FOR OFFICIAL USE ONLY:
PERMIT APPLICATION CHECKLIST
ENCLOSED REQUIRED DATE
ZONING FORM FILLED OUT
Fee Paid
Building Permit Filled out o
Fee Paid
Typeof Construction: INSTALL ROOF MOUNTED 8.58 KW SOLAR ARRAY
New Construction
Non Structural interior renovations
Addition to Existina
Accessory Structure
Buildin Plans Included:
Owner/Statement or License 107968
3 sets of Plans/Plot Plan
THE FOLLOWING ACTION HAS BEEN TAKEN ON THIS APPLICATION BASED ON
INFORMATION PRESENTED:
pproved Additional permits required(see below)
PLANNING BOARD PERMIT REQUIRED UNDER:§
Intermediate Project: Site Plan AND/OR Special Permit With Site Plan
Major Project: Site Plan AND/OR Special Permit With Site Plan
ZONING BOARD PERMIT REQUIRED UNDER: §
Finding Special Permit Variance*
Received&Recorded at Registry of Deeds Proof Enclosed
Other Permits Required:
Curb Cut from DPW Water Availability Sewer Availability
Septic Approval Board of Health Well Water Potability Board of Health
Permit from Conservation Commission Permit from CB Architecture Committee
Permit from Elm Street Commission Permit DPW Storm Water Management
e io a
Sig e o uil O fic' Date
Note: Issuance of a Zoning permit does not relieve a applicant's burden to comply with all zoning
requirements and obtain all required permits from Board of Health,Conservation Commission,Department
of public works and other applicable permit granting authorities.
* Variances are granted only to those applicants who meet the strict standards of MGL 40A. Contact Office of
Planning&Development for more information.
21 LAUREL ST BP-2015-1086
GIs#: COMMONWEALTH OF MASSACHUSETTS
Map:Block: 38A- 142 CITY OF NORTHAMPTON
Lot: - PERSONS CONTRACTING WITH UNREGISTERED CONTRACTORS
Permit: Building DO NOT HAVE ACCESS TO THE GUARANTY FUND (MGL c.142A)
Category: SOLAR PANELS BUILDING PERMIT
Permit# BP-2015-1086
Project# JS-2015-002059
Est. Cost: $43000.00
Fee:$258.00 PERMISSION IS HEREBY GRANTED TO:
Const. Class: Contractor: License:
Use Group: TRANSFORMATIONS INC 107968
Lot Size(sq. ft.): 18499.00 Owner: TRANSFORMATIONS INC
zoning: Applicant. TRANSFORMATIONS INC
AT: 21 LAUREL ST
Applicant Address: Phone: Insurance:
8 COPPERSMITH WAY (978) 597-0542 WC
TOWNSENDMA01469 ISSUED ON.511212015 0:00:00
TO PERFORM THE FOLLOWING WORK.-INSTALL ROOF MOUNTED 8.58 KW SOLAR
ARRAY
POST THIS CARD SO IT IS VISIBLE FROM THE STREET
Inspector of Plumbing Inspector of Wiring D.P.W. Building Inspector
Underground: Service: Meter:
Footings:
Rough: Rough: House# Foundation:
Driveway Final:
Final: Final:
Rough Frame:
Gas: Fire Department Fireplace/Chimney:
Rough: Oil: Insulation:
Final: Smoke: Final:
THIS PERMIT MAY BE REVOKED BY THE CITY OF NORTHAMPTON UPON VIOLATION OF
ANY OF ITS RULES AND REGULATIONS.
Certificate of Occupancy SiEnature:
FeeType: Date Paid: Amount:
Building 5/12/2015 0:00:00 $258.00
212 Main Street,Phone(413)587-1240, Fax: (413)587-1272
Louis Hasbrouck—Building Commissioner