Loading...
06-003 (3) i�o4„�tt/►Mp�� Y y � 8 j�lassacliicsetis � DEPARTMENT OF BUILDING INSPECTIONS ? INSPECTOR 212 Main Street ' Municipal Building Northampton, Mass. 01060 AS A HOMEOWNER I UNDERSTAND THAT I MAY APPLY FOR AND RECEIVE A BUILDING PERMIT FOR A HOME OR ADDITION I INTEND TO LIVE IN. I ALSO UNDERSTAND THAT I AM RESPONSIBLE FOR KNOWING THE STATE BUILDING CODE AND ZONING ORDINANCE OF THE CITY OF NORTHAMPTON. BEING A HOMEOWNER AND NOT A PROFESSIONAL CONTRACTOR IN NO WAY ABSOLVES ME OF ANY RESPONSIBILITY TO INSURE THAT ALL FACETS OF THE RULES AND REGULATIONS ARE COMPLIED WITH. NOTES and Data — (For department use) „w >1 IV. IDENTIFICATION - To be completed by all applicants Name Mailing address — Number, stmt, city, and State ZIP code Tel. No. owner or Lessee Builder's 2. License No. Contractor 3. Architect or Engineer I hereby certify that the proposed work is authorized by the owner of record and that I have been authorized by the owner to make this application as his authorized agent and we agree to conform to all applicable laws of this jurisdiction. Signature of applicant Address Application date 00 NOT WRITE BELOW THIS LINE V. PLAN REVIEW RECORD - For office use Plans Review Required Check Plan Review Date Plans By Date Plans By Notes Fee Started Approved BUILDING $ PLUMBING $ MECHANICAL $ ELECTRICAL $ OTHER $ VI. ADDITIONAL PERMITS REQUIRED OR OTHER JURISDICTION APPROVALS Date D Permit or Approval Check Obtai ed Number By Permit or Approval Check Obta t ed Number By BOILER PLUMBING CURB OR SIDEWALK CUT ROOFING ELEVATOR SEWER ELECTRICAL SIGN OR BILLBOARD FURNACE STREET GRADES GRADING USE OF PUBLIC AREAS OIL BURNER WRECKING OTHER OTHER VII. VALIDATION Building �l ( FOR DEPARTMENT USE ONLY Permit number l� Building Use Group Permit issued —�' t—� �!� 19 �/ � Building Fire Grading �y Permit Fee $ Live Loading Certificate of Occupancy $ Occupancy Load Approved by: Drain Tile Plan Review Fee $ TITLE t` CITY OF NORTHAMPTON $. .� MASSACHUSETTS r • $ OFFICE of the INSPECTOR of BUILDINGS Page - Plot Z;- APPLICATION FOR INSPECTOR ZONING PERMIT AND BUILDING PERMIT z IMPORTANT — Applicant to complete all items in sections: 1, 11, 111, IV, and IX. O ZONING I• AT (LOCATION) t �• DISTRICT LOCATION IN 0.) (STREET) OF BETWEEN AND BUILDING CROSS STREET) (CROSS STREET) LOT SUBDIVISION LOT BLOCK SIZE V1 II. TYPE AND COST OF BUILDING — All applicants complete Parts A — D A. TYPE OF IMPROVEMENT D. PROPOSED USE — For"Wrecking" most recent use m M 1 New building Residential Nonresidential 2 Addition(If residential, enter number 12 ❑ One family 18 ❑ Amusement, recreational of new housing units added, if any, in Part D, 13) 13 ❑ Two or more family - Enter 19 ❑ Church, other religious number of units- - - - 20 Industrial 3 ❑ Alteration (See 2 above) 14 Transient hotel, motel, ❑ 21 IL ] Parking garage 4 Repair, replacement or dormitory - Enter number 5 ❑ Wrecking (If multifamily residential, of units ------- - -- 22 L Service station, repair garage enter number of units in building in 15 ❑ Garage 23 Hospital, institutional Part D, 13) r- 16 LJ Carport 24 ❑ Office, bank, professional 6 El (relocation) 17 Other - Sp,ciJy G Q 25 ❑ Public utility 7 ❑ Foundation only - 26 ❑ School, library, other educational 1 B. OWNERSHIP / � � � r 27 ❑ Stores, mercantile 8 ❑ Private (individual, corporation, 28❑ Tanks, towers nonprofit institution, etc.) 29❑ Other - Specify 9 ❑ Public (Federal, State, or local government) C. COST (Omit cents) Nonresidential - Describe in detail proposed use of buildings, e.g., food processing plant, machine shop, laundry building of hospital, elementary 10. Cost of improvement................ u Q.&C school, secondary school, college, parochial school, parking garage for department store, rental office building, office building at industrial plant. To be installed but not included If use of existing building is being changed, enter proposed use. in the above cost a. Electrical..................... b. Plumbing ..................... c. Heating, air conditioning.......... d. Other (elevator, etc.)............. 11. TOTAL COST OF IMPROVEMENT $ OOO-UU III. SELECTED CHARACTERISTICS OF BUILDING — For new buildings and additions, complete Parts E — L; for wrecking, complete only Part J, for all others skip to IV. E. PRINCIPAL TYPE OF FRAME G. TYPE OF SEWAGE DISPOSAL J. DIMENSIONS 30❑ Masonry (wall bearing) 4.0 Public or private company 48. Number of stories.............. ❑ 4.1 ❑ Private (septic tank, etc.) 49. Total square feet of floor area, 31 Wood frame p all floors, based on exterior 32 Structural steel dimensions ..................... 33 ❑ Reinforced concrete H. TYPE OF WATER SUPPLY 34 ❑ Other - Specify 4.2 ❑ Public or private company 50. Total land area, sq. ft. .......... 4.3 ❑ Private (well, cistern) K. NUMBER OF OFF-STREET PARKING SPACES 51. Enclosed ....................... F. PRINCIPAL TYPE OF HEATING FUEL I. TYPE OF MECHANICAL 35 ❑ Gas Will there be central air 52. Outdoors........................ 36 ❑ Oil conditioning? L. RESIDENTIAL BUILDINGS ONLY 37 ❑ Electricity 44 F1 Yes 45 53. Number of bedrooms.............. 38 ❑ Coal 39 ❑ Other - Specify Will there be an elevator° Full.......... _ 54. Number of 46 Yes 47 I'D No bathrooms Partial....... City of Northampton REQUIRED INSPECTIONS � e 1 . Footings and Walls BUILDING DEPARTMENT 2 Placetural Components in 3 . Complete Building No. 449 Office of the Building Inspector Date July 3, 1989 19 BUI DING P RMIT THIS MAY CERTIFY THAT Christopher Lovett Insp. on Site — Foundations has permission to install above ground pool 24' diameter Insp. of Plumbing.— Rough situated on 600 Haydenvi 1 le Road Insp. of Plumbing — Finish provided that the person accepting this permit shall in every re- Insp. of Wiring — Rough spect conform to the terms of the application on file in this office, and to the provisions of the Statutes and the Ordinances relating, Insp. of Wiring — Finish to the Construction, Maintenance and Inspection of Buildings in Insp. of Health (Septic Tanks) the City of Northampton. Any violation of any of the terms above noted is an immediate revocation of this permit. Expires six Building Insp. — Rough months from date. Building Insp. — Finish Note: A certificate of occupancy will be issued by this office upon return of this card signed by the Plumbing,Wiring and Building Smoke Detectors (Fire Dept.) Inspectors. Gas Inspection THIS CARD MUST BE DISPLAYED IN A CONSPIC OUS PL THE PREMISES Certificate of Occupancy Building Inspector PflIN, T SN P