Loading...
28-057 (3) Kitchen Countertops: Custom granite counter tops(Designer series)standard edge treatment,no backsplash and polished cut out for under mounted sink.Slide-in standing range.Template delivered and installed. Tile Backsplash: Install ceramic tile from the top of the countertop to the bottom of the upper cabinets and stove hood. Appliances Installed: Install owner supplied: stove top,double ovens, refrigerator,dishwasher and microwave to the kitchen area. Install a new supplied range hood above the stove unit and vent out through the exterior wall. Entertainment Center: We will build a wall to wall and floor to ceiling entertainment center,including cabinets with doors and shelving. We will build around a flat screen TV and a gas insert fireplace.(Wood and stain to match kitchen cabinetry) Cleaning: We will keep job site clean at the end of each day.We will do a final cleaning at the end of the project. Includes cleaning of cabinets,tops,floors,walls and glass in kitchen area. Owners Responsibly: Empty all contents out of work area,to pick out paint colors,plumbing fixtures,Decorative electrical fixtures, countertops,knobs and handles,file flooring,tile backsplash,range hood and appliances, We propose to furnish the material and labor necessary for the completion of the above stated work for the sum of: Sixty Eight Thousand Four Hundred& Nineteen Dollars. $68,419.00 Payment as follows: $10,000 upon Start of Demolition. $20,000 upon completion of the rough inspections. $20,000 upon completion of the painting. $10,000 upon completion of the kitchen cabinets $8,419 upon completion of the project. (Certificate of occupancy) All work to be completed in a workmanlike manner according to standard practices. Any alterations or deviations from the above specifications involving extra cost will become an extra charge over and above the estimate.Harlow builders charges a rate of$40 per hr.and 15%of the material cost. All agreements contingent upon strikes,accidents or delays beyond our control. Owner to carry fire tornado and other necessary insurance. Our workers are covered with workman's compensation insurance. Certificate of liability insurance will be sent to the above address upon signing. Note: This proposal may be withdrawn by Harlow Builders if of accepted by within 60 days. Respectfully Submitted by of Harlow Builders. ACCEPTANCE OF PROPOSAL I accept the above stated prices, specifications and conditions. You are hereby authorized to do the work as specified. Payment will be made as outlined. Date Signature Signature Plumbine: Includes: Permit for Plumbing work.Disconnect existing sink,garbage disposal and dishwasher. Reconnect new owner supplied sink,faucet,garbage disposal and dishwasher.Install water to ice maker. Plumbing Fixtures: (Supplied by Owner) (1)Houzer#MD3109 Under mount,stainless steel,double bowl sink.($475 allowance) (1)Delta 467 dst Palo kitchen faucet.($240) (1)Procom 314 HP Garbage Disposal($255) HVAC: Add Honeywell mechanical zoning for existing duct work system so HVAC will operate with two zones. Zone one will be first floor and zone two will be second floor.Zone two thermostat will be located in the master bedroom.First floor thermostat will stay in the existing location. (Due to removal of an existing first floor wall and installation of a steel beam.) We will relocate 3 return ducts to one large floor duct and register. Re-duct 2nd.Floor master bath ducting along new steel beam on first floor and then to closet chase to basement. Equipment Specs: Honeywell zoning package with by pass ducting.(2)Honeywell pro 4000 programmable thermostats. Insulation• We will install spray foam insulation,around the new kitchen window unit. Sheetrock• 1/2"gypsum board applied to the framed ceiling,located on the kitchen side, 1/2 of the house,and areas that need to be patched.Fastened with 11/4"screws,taped,coated(3)applications and sanded to a paint ready surface. We will scrape down the existing first floor textured ceilings and coat with 3 applications of compound and sand to a paint ready surface.(Smooth) Interior Paintina: Entire first floor of the house,ceilings,walls,doors and trim to be painted with 2 coats finish paint after priming. This includes all necessary priming,caulking and nail hole filling. Flooring: Install V7"ulc underlayment plywood,to the garage foyer and half bath areas. Install ceramic tile flooring,to the garage foyer and half bath areas. We will install new oak flooring,to the front foyer of the main house area.We will refinish existing wood floors. Doors: Install Jeldwen continental,smooth surface,solid core,raised 2 panel,interior doors. (1) 1668,(1)2468,(2)2668,(2)4068 bifolds,(1)5068 bifold, (1)2668 door slab with a Johnson sliding door track with valance. Existing 3068 interior glass door to remain.All exterior doors to remain.Partial door jambs to remain. Interior trim: Install 5'/a"speedi base#B400 primed and fingered jointed pine baseboard to the first floor areas. Install 3 1/2"Stafford casings#B225 to the first floor doors and windows. Install 3 5/8"crown molding around the perimeter of first floor ceiling.(Not including the closets.) Install Nantucket MDO primed bead board plywood with#11608 molding and#8144 cap to the%bathroom. Kitchen Cabinets: Springfield woodworks will build and install kitchen cabinets and entertainment center as per plans. Kitchen Cabinetry: cherry wood,stained with coffee Bean finish.Full overlay shaker style doors. Includes pull outs,soft close hardware,drawer extensions and crown moldings. Upper cabinets to reach the ceiling. Cabinet knobs and pulls: (Material by owner) We will install owner supplied knobs and pulls to the kitchen cabinets doors and drawers.(Approx.25) MW PROPOSAL Harlow Builders 336 Coles Meadow Rd. Northampton,Ma 01060 (413)586-0465 Submitted to: March 16,2015 Chuck& Lisa Labee (413)539-4100 165 Sylvester rd. Florence,Ma. 01062 Page 1 of 5 The scope of this project is to renovate the first floor kitchen, dining room and living room areas. We hereby submit specifications and estimates for the work to be performed. All materials and labor to complete. All permits obtained by Harlow Builders. All debris caused by construction removed by Harlow Builders. See attached drawings for details on framing and placement of fixtures. Drawings by Harlow Builders Dated 1/2015 Demolition: Remove existing kitchen appliances,existing kitchen cabinets and countertops. Remove all first floor base board and casings. Remove first floor interior doors.Remove door jambs with doors.(All other door jambs to remain.) Remove Partial wall and ceiling finishes,and framing,to complete our work. Framing work will consist of installing a Steele beam to the living room areas,a new kitchen window,a larger pantry door and a foyer closet door. Remove gas Fireplace,mantle and hearth flooring. In both the front and the garage foyers,we will remove the tile flooring and underlayment down to the sub floor. Framing: We will build a temporary wall in the living room to support the second floor. Frame for a Steele beam to be installed,to replace the existing bearing wall between the two living rooms. Will install a W8x31 Steele beam to the living room areas.Beam will be primed and holes drilled for plates. Frame for a larger kitchen window to be installed. Frame for a larger 4068 door to be installed to the kitchen pantry closet. Frame a wall with a door opening,to the existing garage foyer coat closet area. Window: We will install a 50310 Paradigm slider/picture window unit(1/4—1/2- 1/4)to the kitchen sink area. Window will consist of a white extruded vinyl window with Low E glass,argon gas and no grills. Siding Patch in the siding around the new kitchen window unit, using vinyl siding to match. Electrical: Includes:Permit for electrical work.Disconnect and relocate wiring for new construction. Material and labor to install switches,receptacles and ceiling fixtures. (25)Openings (20)Recessed lights with down light trim and bulb. (4)Dimmers (4)Hockey puck Xenon lights with dimmer (2)4' Strips (1)Panasonic 110CFM fan/light unit with switches (Owner to supply decorative fixtures.)All major feeds or wiring to the second floor to be billed stock and time. 2855 2855 2855 2855 — - _- 3068 -- ---- 3068 3068 - Oak Flooring UP--- -- Coat Ceilings Ln III - No Popcorn Ceilings co Plumbing in Wall 4068 ? Remove Wall _--_- 2868 17'-9" 3068 3068 - -7---=2668 T ==T 1668 2668 00 - !;' 2468 2468 N III , 11 C- 43-6 Central Vac 2668 2868 Remove Ceiling -- Tile 30" 30" 24" rn _ 5068 i Y, Lr) M 2668 00 -- 36" 30" - �.. 15" - 24" 0 6068 6068 30" _ Harlow Builders Project EXISTING Chuck & Lisa Labee 165 Sylvestor Road Florence Ma. 01062 p�vQ/4 tgy of Northampton a wng Department Plan Review 212 Main Street Northampton. MA nI Remove Tile install Wood Floor 2855 2855 _ 2855 2855 New 3068 w w 13'-3" Base as o ° i� 11 -10 00 Case Cl) Doors 126 s.f. Tile -- -- —UP— Smooth Ceiling 2'-6.. 8'-2" 2855, CO DINING ROOM w S LIVING ROOM TILE as CL "> - 179 s.f. Weinscoting 240 s.f. -- 4068 r -- OAK FLOOR Chair Rail OAK FLOO�R _ P � 2868 Cl haSe -- gA�I�G R 1668 C L 5'-8" -- 3068 2668 2668 - - - N 18'-9" _ CL _.. 4 L 2468 068 N Q7 °O 2868 7 9 131 s.f- Build wall to wall 43'-6" cv m i entertainment center _ _ New Tiie Floor _ c C° OAK FLOOR 589.5 s.f. 2q 48" m 5068 30 2668 -- _ 21 co Replace Ceiling O 30 24 36 21 co 6 15 � °= 36" C HOOD: 15 12 6068 6068 / 6_440/l� Proposed � + CS Beam4.605 Northampton 9-16-14 lanBearnEngine 4.6.1.0 Materials Database 1492 4:20pm I of I Member Data Description: Member Type:Beam Application:Floor Top Lateral Bracing:Continuous Bottom Lateral Bracing: 0.00 Standard Load: Moisture Condition:Dry Building Code:IBC/IRC Live Load: 40 PLF Deflection Criteria: L/360 live,L240 total Dead Load: 10 PLF Deck Connection:Nailed Member Weight: 31.0 PLF Filename:Beam1 Other Loads Type Trib. Other Dead (Description) Side Begin End Width Start End Start End Category Replacement Uniform(PSF) TOP 0' 0.00" 17' 9.00" 13' 6.00" 33 10 Live 17 9 0 O m 17 9 0 Bearings and Reactions Input Min Gravity Gravity Location Type Material Length Required Reaction Uplift 1 a 0.000" Wall SPF Plate(425psi) N/A N/A 5472# -- 2 17' 9.000" Wall SPF Plate(425 psi) N/A N/A 5472# -- Maximum Load Case Reactions t Used for applying point loads(or line loads)to canying members Live Dead 1 3986# 1485# 2 3986# 1485# Design spans 17 10.750" Product: W 8 x 31 (50ksi) PASSES DESIGN CHECKS Design assumes continuous lateral bracing along the top chord. Design assumes maximum unbraced length of 0.00'along the bottom chord. Allowable Stress Design Actual Allowable Capacity Location Loading Positive Moment 24.48'k# 75.62'k# 32%d 8.87' Total Load D+L Shear 5.47k# 45.60k# 11%d 0' Total Load D+L LL Deflection 0.3223" 0.5965" U666 8.87' Total Load L TL Deflection 0.4424" 0.8948" U485 8.87' Total Load D+L Control: LL Deflection All product names are trademarla of their respective owners Doug Hodgins rk Miles Inc. Copyright(C)2013 by Simpson Strong-Tie Company Inc ALL RIGHTS RESERVED. —Passing is defined as when the member,floorjoist,beam or girdeS shown on this drawing meets applicable design criteria for Loads,Loading Conditions,and Spans listed on this sheet. The design must be reviewed by a qualified designer or design professional as required forapproval.This design assumes product installation according to the manufacturers specifications. City of Northampton 212 Main Street, Northampton, MA 01060 Solid Waste Disposal Affidavit In accordance of the provisions of MGL c 40, S54, I acknowledge that as a condition of the building permit all debris resulting from the construction activity governed by this Building Permit shall be disposed of in a properly licensed solid waste disposal facility, as defined by MGL c 111, S 150A. Address of the work: The debris will be transported by: The debris will be received b �� Y� \1 Building permit number: Name of Permit Applicant Date Signature of Permit Applicant City of Northampton- Massachusetts w�S 3 clt{ 't; s DEPARTMENT OF BUILDING INSPECTIONS 212 Main Street • Municipal Building M . Northampton, MA 01060 INSPECTOR Louis Hasbrouck Chuck Miller Building Commissioner Assistant Commissioner HOME OWNER EXEMPTION ACKNOWLEDGEMENT The State of Massachusetts allows the homeowner the right under 780CMR 108.3.4 to act as his/her construction supervisor. The state defines "Homeowner" as, " Person(s) who owns a parcel on which he/she resides or intends to be, a one or two family dwelling, attached or detached structures accessory to such use and/or farm structures. A person who constructs more than one home in a two- year period shall not be considered a home owner." The building department for the City of Northampton wants any person(s)who seek to use the home owner exemption, to act as their own construction supervisor, to be aware that by doing so you become responsible for compliance with state building codes and regulations. The inspection process requires that the building department be called to inspect work at various stages, which include foundation/footings (before backfill), sonotube holes (before pour), a rough building inspection (before work is concealed), insulation inspection (if required) and a final building inspection. The building department requires these inspections before the work is concealed, failure to secure these inspections can result in failure to obtain a certificate of occupancy until the work can be inspected. If the homeowner hires other trades to perform work (electrical, plumbing &gas)the homeowner will be responsible to make sure that the trades hired secure their proper permits in conjunction to the building permit issued, and that they get their required inspections. Failure of the individual trades to secure the permits and inspections as required can DELAY the project until such time as the proper permits and inspections are made I, understand the above. (Home owner/resident's signature requesting exemption) will call to schedule all required building inspections necessary for the building permit issued to me. Date Address of work location The Commonwealth of Massachusetts y Department of Industrial Accidents Office of Investigations s 600 Washington Street Boston, MA 02111 www.mass.gov/dia Workers' Compensation Insurance Affidavit: Builders/Contractors/Electricians/Plumbers Applicant Information i Please Print Legibly Name (Business/Organization/Individual): Address: `33 CcA e_S w\ City/State/Zip: Phone #: Are you an employer? Check the appropriate box: Type of project(required): 1.D I-'am a employer with <S� 4• ❑ I am a general contractor and I employees (full and/or part-time).* have hired the sub-contractors 6. F1 New construction 2.❑ I am a sole proprietor or partner- listed on the attached sheet. 7. ❑ Remodeling ship and have no employees These sub-contractors have g, ❑ Demolition working for me in any capacity. employees and have workers' 9 ❑ Building addition [No workers' comp. insurance comp. insurance.$ required.] 5. ❑ We are a corporation and its 10.❑ Electrical repairs or additions 3.❑ I am a homeowner doing all work officers have exercised their 11.❑ Plumbing repairs or additions myself. [No workers' comp. right of exemption per MGL 12.❑ Roof repairs insurance required.] t c. 152, §1(4), and we have no employees. [No workers' 13T1 Other comp.insurance required.] *Any applicant that checks box#1 must also fill out the section below showing their workers'compensation policy information. tHo meowners who submit this affidavit indicating they are doing all work and then hire outside contractors must submit a new affidavit indicating such. $Contractors that check this box must attached an additional sheet showing the name of the sub-contractors and state whether or not those entities have employees. If the sub-contractors have employees,they must provide their workers'comp.policy number. I am an employer that is providing workers'compensation insurance for my employees. Below is the policy and job site information. Insurance Company Name: S Policy#or Self-ins.Lic.#: Q Expiration Date: / Job Site Address: V W�) City/State/Zip: \ Attach a copy of the workers' compensation policy declaration page(showing the policy number and expiration date). Failure to secure coverage as required under Section 25A of MGL c. 152 can lead to the imposition of criminal penalties of a fine up to $1,500.00 and/or one-year imprisonment, as well as civil penalties in the form of a STOP WORK ORDER and a fine of up to $250.00 a day against the violator. Be advised that a copy of this statement may be forwarded to the Office of Investigations of the DIA for insurance coverage verification. I do hereby certify under the pains and pe alties of perju that the information provided above is true and correct. �✓� � 1 ` Si ature: Date: Phone#: Official use only. Do not write in this area, to be completed by city or town official City or Town: Permit/License# Issuing Authority(circle one): 1.Board of Health 2.Building Department 3. City/Town Clerk 4.Electrical Inspector 5.Plumbing Inspector 6. Other Contact Person: Phone#: SECTION 8-CONSTRUCTION SERVICES 8.1 Licensed Construction Supervisor: Not Applicable £ Name of License Holder: .'3 c License Number Address Expiration Date — <Z) Signature Telephone 9.Registered Home.lmarovementConuactor Not Applicable £ _,. Company Name Registration Number 3'36 C'D t � Address-__7 Expiration Date Qz� \ t\tz �� � Telephone SECTION 10-WORKERS.'COMPENSATION INSURANCE AFFIDAVIT(M.G.L.c.162,§25C(6)) Workers Compensation Insurance affidavit must be completed and submitted with this application. Failure to provide this affidavit will result in the denial of the issuance of the building permit. Signed Affidavit Attached Yes....... £ No...... £ 3 11. ome Owner Ege'mption The current exemption for"homeowners"was extended to include Owner-occupied Dwellings of one(1) or two(2)families and to allow such homeowner to engage an individual for hire who does not possess a license,provided that the owner acts as supervisor.CMR 780, Sixth Edition Section 108.3.5.1. Definition of Homeowner:Person(s)who own a parcel of land on which he/she resides or intends to reside,on which there is,or is intended to be,a one or two family dwelling,attached or detached structures accessory to such use and/or farm structures.A person who constructs more than one home in a two-year period shall not be considered a homeowner. Such"homeowner"shall submit to the Building Official,on a form acceptable to the Building Official,that he/she shall be responsible for all such work performed under the building permit As acting Construction Supervisor your presence on the job site will be required from time to time,during and upon completion of the work for which this permit is issued. Also be advised that with reference to Chapter 152(Workers'Compensation) and Chapter 153 (Liability of Employers to Employees for injuries not resulting in Death)of the Massachusetts General Laws Annotated,you may be liable for person(s) you hire to perform work for you under this permit. The undersigned"homeowner"certifies and assumes responsibility for compliance with the State Building Code,City of Northampton Ordinances,State and Local Zoning Laws and State of Massachusetts General Laws Annotated. Homeowner Signature. ti SECTION 5-DESCRIPTION OF PROPOSED WORK(check all applicable) New House ❑ Addition ❑ Replacement Windows Alteration(s) Roofing ❑ Or Doors 171 Accessory Bldg. ❑ Demolition New Signs [aj Decks [C] Siding[O] Other[O] Brief Description of Proposed Work: N"-J V, of%.0 e-3sa( %'M W\ Alteration of existing bedroom Yes It"- No Adding new bedroom Yes '�_ No Attached Narrative Renovating unfinished basement Yes // No Plans Attached Roll -Sheet sa. If.New`hotise and,br:add"i tlorrta exis6A=hvusln'g;corntilete ttie460 owina: a. Use of building:One Family Two Family Other b. Number of rooms in each family unit: Number of Bathrooms c. Is there a garage attached? I�-_s - d. Proposed Square footage of new construction. Dimensions e. Number of stories?_ Q f. Method of heating? N&VgZ-� Fireplaces or Woodstoves t10 Number of each n� g. Energy Conservation Compliance. Masscheck Energy Compliance form attached? h. Type of construction k i. Is construction within 100 ft. of wetlands? Yes No. Is construction within 100 yr. floodplain Yes No j. Depth of basement or cellar floor below finished grade / k. Will building conform to the Building and Zoning regulations? Ve Yes No. I. Septic Tank City Sewer Private well City water Supply SECTION 7a-OWNER AUTHORIZATION-TO BE COMPLETED WHEN OWNERS AGENT OR CONTRACTOR APPLIES FOR,BUILDING PERMIT I, QJI msk LC as Owner of the subject property hereby authorize S O S to act on Y he alf, i II matters relative to work authorized by this building permit application. Signature of Owner Date I, JG'°k M(0 \ u % \Jl � as Owner/Authorized Agent hereby declare that the statements and information on the foregoing application are true and accurate,to the best of my knowledge and belief. Signed under the pains and penalties of perjury. \®� Print Name Signature of Owner/Agent Date ^ Y , Section 4. ZONING All Information Must Be Completed. Permit Can Be Denied Due To Incomplete Information Existing Proposed Required by Zoning This column to be filled in by Building Department Lot Size t — Frontage __..__» Setbacks Front Side L:= R- ____.1 L:= R, Rear f Building Height Cy Bldg.Square Footage Open Space Footage --_T % _____, j (Lot area minus bldg&paved parking) #of Parking Spaces Fill: ....__........�.._,,........._.___............�...:; ._ 1_,._..........,V....__._...__w_�,.......w.Mx, volume&Location)/ ----- -- - - -----— A. Has a Specia"ermit/Variance/Finding ever been issued forfbn the site? NO Q DONT KNOW 0 YES IF YES, date issued:, f IF YES: Was the permit reco ed at the Registry of Dee s? NO Q DONT OW Q YES 0 IF YES: enter Book I age and/or Document 0 B. Does the site contain a brook, body of wa er or etlands? NO Q DONT KNOW Q YES 0 IF YES, has a permit been or need to be o ained from the Conservation Commission? Needs to be obtained Q 0 aineo Q , Date Issued: 1 r C. Do any signs exist on the property? Y � �Q NO Q IF YES, describe size, type and location: ! ~� D. Are there any proposed changes to or additions of signs intended for the property? YES Q NO IF YES, describe size, type and location: E. Will the construction activity disturb(clearing, grading,excavation,or filling)over 1 acre or is it part of a common plan that will disturb over 1 acre? YES O NO Q IF YES,then a Northampton Storm Water Management Permit from the DPW is required. ��+,�is2oU�rt -- — 1 City of Northampton status of perttt a' � �' �ru x'�M1'4 i Building Department utrr8 it a,rFerfri a J... ... q,sa �rPhS7sk K fip Na7 a4y sx yii MAR 18 2015 212 Main Street Sewer/R QIC Awarra�,l�tx 34 rP � .ai }t`'Kr"rw<1k:�s�,�-,� w}u'a.e �.� n '• C�a , ,i Room 100 VUatertlAle-I VA" vaila�lhty 7s ', Electric, Plumbing N rthampton, MA 01060 TwelSets d °Strtctttrl Plansk ��s a ;rx,i�l ¢ ;;y g&Gas Inspeoti Northampton,MA fie° -587-1240 Fax 413-587-1272 PiofiSltelPlars ,"�r5 h '7 i'' yogi ,fir' ��" i ' k ' vyr ,r m d �.2,t`{ ul,y Otfter S�ecifjFF APPLICATION TO CONSTRUCT,ALTER,REPAIR,RENOVATE OR DEMOLISH A ONE OR TWO FAMILY DWELLING SECTION 1 -SITE.INFORMATION 1.1 Property Address: This section to be completed by office f S 'V 2�®r Lot }r Unit 2i t r i ` 1 .., '' i(•F 3 F if I` 'YS'{ E., ! -,yF E�Zone r a ,-- � , OyerlaY Dtsfrict t .._ r Elm SttDistrtct n..` CB Dlstnct SECTION 2-PROPERTY OWNERSHIP/AUTHORIZED AGENT 2.1 Owner of Record: Name(Print) Current Mailing Address: 4(3- '351- 4toa Telephone Signature 2.2 Authorized Agent: Name(Print) Current Mailing Address: 9 3 4- �'� a Signature Telephone SECTION 3-ESTIMATED CONSTRUCTION COSTS.7F Item Estimated Cost(Dollars)to be Official Use Only completed by ermit applicant 1. Building �—� !® (a)Building Permit Feb i 2. Electrical /©0p (b)Estimated Total Cost of Construction from 6 3. Plumbing Q ® Building Permit Fee J 4. Mechanical(HVAC) 5. Fire Protection �p 6. Total=(1 +2+3+4+5) Check Number This S ction For Official Use'Only Date Building Permit Number: Issued: Signature: Building Commissioner/Inspector'of Buildings Date File#BP-2015-0867 APPLICANT/CONTACT PERSON HARLOW BUILDERS ADDRESS/PHONE 336 COLES MEADOW RD NORTHAMPTON01060(413)586-0465 PROPERTY LOCATION 165 SYLVESTER RD MAP 28 PARCEL 057 001 ZONE THIS SECTION FOR OFFICIAL USE ONLY: PERMIT APPLICATION CHECKLIST ENCLOSED REQUIRED DATE ZONING FORM FILLED OUT Fee Paid Buildiny,Permit Filled out Fee Paid Tyneof Construction: REMODEL KITCHEN OPEN WALL&INSTALL BEAM,NEW DOORS&TRIM New Construction Non Structural interior renovations Addition to Existing Accessory Structure Building Plans Included: Owner/Statement or License 052460 3 sets of Plans/Plot Plan THE FOLLOWING ACTION HAS BEEN TAKEN ON THIS APPLICATION BASED ON INFO,,jMATION PRESENTED: pproved Additional permits required(see below) PLANNING BOARD PERMIT REQUIRED UNDER:§ Intermediate Project: Site Plan AND/OR Special Permit With Site Plan Major Project: Site Plan AND/OR Special Permit With Site Plan ZONING BOARD PERMIT REQUIRED UNDER: § Finding Special Permit Variance* Received&Recorded at Registry of Deeds Proof Enclosed Other Permits Required: Curb Cut from DPW Water Availability Sewer Availability Septic Approval Board of Health Well Water Potability Board of Health Permit from Conservation Commission Permit from CB Architecture Committee Permit from Elm Street Commission Permit DPW Storm Water Management D molif Delay /r Si re of Build' g Official Date Note: Issuance of a Zoning permit does not relieve a applicant's burden to comply with all zoning requirements and obtain all required permits from Board of Health,Conservation Commission,Department of public works and other applicable permit granting authorities. *Variances are granted only to those applicants who meet the strict standards of MGL 40A. Contact Office of Planning&Development for more information. 165 SYLVESTER RD BP-2015-0867 GIs#: COMMONWEALTH OF MASSACHUSETTS MapBlock: 28-057 CITY OF NORTHAMPTON Lot: -001 PERSONS CONTRACTING WITH UNREGISTERED CONTRACTORS Permit: Building DO NOT HAVE ACCESS TO THE GUARANTY FUND (MGL c.142A) Category:renovation BUILDING PERMIT Permit# BP-2015-0867 Project# JS-2015-001685 Est. Cost: $68419.00 Fee: $408.00 PERMISSION IS HEREBY GRANTED TO: Const. Class: Contractor: License: Use Group: HARLOW BUILDERS 052460 Lot Size(sa. ft.): 615677.04 Owner: LABBEE CHARLES A JR&LISA A Zoning: Applicant. HARLOW BUILDERS AT. 165 SYLVESTER RD Applicant Address: Phone: Insurance: 336 COLES MEADOW RD (4131586-0465 Workers Compensation NORTHAMPTONMA01060 ISSUED ON:312412015 0:00:00 TO PERFORM THE FOLLOWING WORK.-REMODEL KITCHEN, OPEN WALL & INSTALL BEAM, NEW DOORS & TRIM POST THIS CARD SO IT IS VISIBLE FROM THE STREET Inspector of Plumbing Inspector of Wiring D.P.W. Building Inspector Underground: Service: Meter: Footings: Rough: Rough: House# Foundation: Driveway Final: Final: Final: Rough Frame: Gas: Fire Department Fireplace/Chimney: Rough: Oil: Insulation: Final: Smoke: Final: THIS PERMIT MAY BE REVOKED BY THE CITY OF NORTHAMPTON UPON VIOLATION OF ANY OF ITS RULES AND REGULATIONS. Certificate of Occupancy Signature: FeeType• Date Paid: Amount: Building 3/24/2015 0:00:00 $408.00 212 Main Street,Phone(413)587-1240,Fax: (413)587-1272 Louis Hasbrouck—Building Commissioner