CONSTRUCTION CONTROL DOCUMENT
Project Title: �/�/p�W/3ate :
Project Location:44141W /�1{✓.al e°' =' / Map : /?GG Parcel :/29 Zone:C//�,o
Scope of Project
,001_Ai2Ar 111A6 �}�r9- ti�9,�ic,�Tfilie�v r s✓�a'w•9c.� �irS'GVoacK
Af
In accordance with SECTION 116.0-116.4.2 of the sixth edition of the Massachusetts State Building
Code: I, 1#442,01el< /WC C.L.ClSk'y Mass.Registration Number Y/T Iql
being a registered professional Engineer/Architect hereby certify that I have prepared or directly
supervised the preparation of all design plans,computations and specifications concerning:
[ ] Entire Project [ ] Architectural [ ] Structural [ ]Mechanical
[ ]Fire Protection [ ]Electrical Other(specify) Cl U!L
for the above named project and that to the best of my know dge, such plans,computations and
specifications meet the applicable provisions of the Massachusetts State Building Code,all acceptable
engineering practices and all applicable laws for the proposed project.
Furthermore,I understand and AGREE that I shall perform the necessary professional services and be
present on the construction site on a regular and periodic basis to determine that the work is proceeding in
accordance with the documents approved by the building permit and shall be responsible for the following
as specified in section 116.2.2:
1. Review of shop drawings, samples and other submittals of the contractor as required by the
construction contract documents as submitted for the building permit, and approval for the
conformance to the design concept.
2. Review and approval of the quality control procedures for all code-required controlled materials.
3. Be present at intervals appropriate to the stage of construction to become generally familiar with the
progress and quality of the work and to determine, in general, if the work is being performed in a
manner consistent with the construction documents.
I shall submit periodically,in a form acceptable to the building official,a progress report with the
pertinent comments. Upon completion of the work,I shall submit to the building official a final report as
to the satisfactory completion and readiness of the project for occupan
Signature of registered professional : �C
S bscri d sworn before me this--_-, 5—�k day of `//C�e
my commission expires on su t 1Ty t�D
Notary Public �.
Building Department
413-587-1240------fax 413-587-1272
HUNTLEY
HUNTLEY ASSOCIATES, P.C.
SURVEYORS.ENGINEERS.LICENSED SITE PROFESSIONALS
March 24,2006 --
City of Northampton,Building Dept. —
212 Main Street
Northampton,MA 01060 MI A R 2 7 2`106
Attn: Mr.Louis Hasbrouck,Inspector
RE: Forsander Apartments
Huntley Project No. 04-076
Dear Mr. Hasbrouck:
Huntley Associates, P.C. (HAPQ is pleased to provide the following information relative to the
Forsander Apartments Site Improvements project. HAPC is contracted with the Northampton Housing
Authority to complete the overall site design and Site Plan, as well as minor Construction
Administration and Monitoring.
As part of Construction Administration, HAPC will review and approve or disprove shop drawings
submitted by the selected General Contractor,Whitney Trucking.Please note that a representative from
the Northampton Housing Authority will allocate more time for site visits and construction monitoring
efforts.
Please find enclosed the signed Construction Control Document. If you have any questions or
comments,please contact me at our office.
Sincerely,
HUNTLEY ASSOCIATES,P.C.
Mark McClusky,P.E.
Engineering Project Director
cc.Jon Hite,NHA,Director
W' 04-076FOR D MI CORR SP T RS 032406 TR
30 INDUsTRiAL DRIVE EAST.NORTHAMPTON, MASSACHUSETTS 01060.(413) 584 FAX(413) 586-9159
1885 STATE STREET•SCHENECTADY, NEw YORK 12304 .(518) 393-4767.FAX(518) 393-3510
16-18 REYNOLDS AVENUE.ONEONTA, NEw YORK 13820.(607) 432-3300.FAX(607) 432-8313