03-007 (3) THE COMMONWEALTH OF MASSACHUSETTS-
MAG.1 BOARD OF HEALTH
IV
Application is hereby made for a Permit to Construct (kjor Repair an Individual Sewage Disposal
System at:
Owner
Address
Installer Address ty
Dwelling—No. of Bedrooms....4_. Expansion Attic Garbage Grinder (&o-j*-_
Other fixtures
Septic Tanli:pLiquid capac.(,,�W;�-
�
Other Distribution �x �� Dosing �k ( ) leaching ^
-
Percolation �c� �cad� ���000� by~^ ~__________--.__.. ..----- Datc.-.-
Test Pd l�u l-.�2-'-uioutes per inch Depth of Test D�u6 to Date ''-
� �� P� Nu p� �� D�� � �� BL. � D�� m ground-- '--
-._---
~~ Description of '� ��--'--'-----'-
�-----__--~~~''--'---__-------'-'_-
-_------ ..............................................................................................................................................................................
�
Z ....................... -'''--__-_-.---._'-'`''---_--_ ...... -------.--'-------'---
�� Nature of ur /Btcrudouu--/�oywcrwhen .---------------------._---'-----
----```-`-``----''-------'--`---'-'---'--`-----'----'---------'--------`---'--------
Agreement:
The undersigned agrees to install the aforedescribed Individual Sewage Disposal System in accordance with
, the provisions of TITLE 5 of the State Sanitary Code_ The undersigned further agrees not to place the system in
operation until a Certificate of Compliance has been issued by the board ofhealth.
i7d........� /. '............................................. ..................
Application Approved By--.---' '-'��l���--- .� -__�� ................
/\pyl�udouDisapproved for the foUoui*g --reasons:----__-__..__-________________.__.~="_______
---'--''----''---------''---------''---'----'------'---'------'-----------'------------'-
Permit No "��
----------'--'---'----------' Isaue�------__________________
Date
THE COMMONWEALTH opMASSACHUSETTS
BOARD OF HEALTH
....................... .................OF----------------------------�
Tnt*firatr lit jamp4ianrr
by
THIS IS T0 CERTIFY, That the Individual Sewage Disposal Siutco cuoxuucto] ( ) or Repaired ( )
.-------_--..-----_-----.-'--'-----------_-_-_.----------_------------_.'--.----'.-_--'--
Installer ---
--------'-------'---------------'----------'--'---'-''-----
--------------------------------------------- ---
--------.-'-hua been installed in accordance with the provisions of TlTL2 5 o I6 c State Sanitary Code as described in the
application for Disposal Works Construction Poou lt No - -----.. 0doud----------
THE ISSUANCE OF THUS CERTIFICATE SHALL NOT BE A GUARANTEE THAT THE
SYSTEM WILL FUNCTION SATISFACTORY. '
DATE
-------------'--------------------__-- lonpcctoc---.--_-----------_-__________.__._.
,THE COMMONWEALTH oFMASSACHUSETTS
BOARD OF HEA ��
/
l�o__��/���7/__ -'� -� ---'-����'---- � f/i..
�� �- '-'-' / i1 Fuu-' ..............
Street "e
as shown on the applicatior for Disposal Works Construction Permit No Dated
FORM 1255 HOBBS WARRt;N, INC.. PUBLISHERS
a •
#:,
Pursuant to Mass. General Laws, Chap. 40A, §11, no Special Permit,
or any extension, modification or renewal thereof, shall take
effect until a copy of the decision bearing the certification of
the City Clerk that twenty days have elapsed after the decision has
been filed with the City Clerk and that no appeal has been filed,
or if such an appeal has been filed that it has been dismissed or
denied, is recorded in the "Hampshire County Registry of Deeds or
Land Court, as applicable" and indexed under the name of the owner
of record or is recorded and noted on the owner's certificate of
title. The fee for such recording or registering shall be paid by
the owner or applicant. It is the owner or applicant's
responsibility to pick up the certified decision from the City
Clerk and record it at the Registry of Deeds.
The Northampton Zoning Board of Appeals hereby certifies that a
Special Permit has been granted and that copies of this decision
and all plans referred to in it have been filed with the Planning
Board and the City Clerk.
Pursuant to Mass. General Laws, Chapter 40A, section 15, notice is
hereby given that this decision is filed with the Northampton City
Clerk on the date below.
If you wish to appeal this action, your appeal must be filed
pursuant to M.G.L. Chapter 40A, Section 17, with the Hampshire
Superior Court and notice of said appeal filed with the City Clerk
within twenty (20) days of the date this Decision was filed with
the City Clerk.
Applicant: George W. Page, Jr. - 478 Coles Meadow Road
DECISION DATED: NovembeA 17, 1993
DECISION FILED WITH CITY CLERK: December 1, 1993
Robn C. SusneA
M. San�ond Weil, R.
QCV. (ZLS -,,L
Atex Gh i6 eti.n
-4-
ATTACHMENT A
Water Supply Protection District
SPECIAL PERMIT for:
478 Coles Meadow Road
In Granting the Special Permit, the Zoning Board of Appeals found
that the requested use meets all special regulations set forth in
the Zoning Ordinance, specifically Section 16.7 (C) (1) (a-e) -
Uses by Special Permit.
In making this decision, the Zoning Board of Appeals found:
a. The use is in harmony with the purpose and intent of this
by-law and will promote the purposes of the water Supply
Protection District because:
The property is a large parcel, (17-1/2 acres) , and the
requested use for a single-family residence is the least
offensive use for the property.
b. The use is appropriate to the natural topography, soils and
other characteristics of the site to be developed because:
In considering of the size of the parcel and the size of the
developed portion of it, the applicant is not proposing to
make any gross changes in the topography.
C. The applicant has shown that the use has suitable soil for
on-lot sewerage and water systems for an on-site well as
demonstrated by:
Evidence presented in the application which indicated that
there is suitable soil to handle on-lot sewerage and water
systems, adequate for an on-site well.
d. The use will not, during construction or thereafter, have an
adverse environmental impact on groundwater resources in the
district because:
Prior to construction, the applicant has proposed to take
the necessary precautions to assure that no adverse
environmental impact on groundwater resources occurs, and
(after construction, and the land has re-vegetated, the
disturbances are minimal to the lot. )
e. The use will not adversely affect the existing or the
potential quality or quantity of water in the Water Supply
Protection District because:
The use will not increase the quantity of water consumed,
and should cause no adverse affect on the quality of water.
-3-
As a single-family home, this use will generate a smaller
amount of traffic affect than any other use, except for an
agricultural use, allowed in the zone.
4. The requested use will not overload any public water,
drainage or sewer system, or any other municipal system to
such an extent that the requested use or any developed use
in the immediate area or in any other area of the City will
be unduly subjected to hazards affecting health safety or
the general welfare, because:
The use will not draw upon the public water or sewer system
because there will be a private well and a septic system
installed, which meet all applicable criteria for protection
of water resources in this zone.
5. The requested use meets. all special regulations set forth in
the Zoning Ordinance, specifically Sections 16.7 (C) (1) (a-
e) , See "Attachment A", for criteria.
6. The requested use will not unduly impair the integrity of
character of the district or adjoining zones, nor not be
detrimental to the health, morals, or general welfare, and
the use is in harmony with the general purpose and intent of
the Ordinance because:
The overlying zone is Rural Residential in which single-
family dwellings are allowed by right. However, the Water
Shed Supply Protection overlay adds conditions that must be
met, to that right. The size of this parcel, and the size
of the development, are in keeping with the character of the
zone and will protect the zone more effectively than if the
parcel were developed, in a different manner.
In reviewing the Site Plan, submitted with the Special Permit,
the Planning Board:
1. Voted 8-0 to Grant the waivers as listed below because the
applicant has met the criteria under Sections 10. 10, 14 .5
and 16.7 of the Zoning Ordinance, and noted that the
applicant had been very thorough in addressing all of the
criteria.
Requested Site Plan waivers granted: B, B-2, B-3, B-8, B-9,
B-10, and C.
Conditions imposed on the Special Permit Application:
1. Development shall be done according to the plans submitted
with the Special Permit application, Topographic survey,
Coles Meadow Road, Northampton, MA, prepared by: Bruce
Saluk & Associates, Inc. , Marlborough, MA 01752, and
stamped received by the City Clerk's Office on 10-28-93.
-2-
City of Northampton, Massachusetts
Office of Planning and Development s
City Hall • 210 Main Street
Northampton, MA 01060 •(413) 586-6950
FAX(413) 586-3726
•Community and Economic Development `bit
•Conservation•Historic Preservation
•Planning Board•Zoning Board of Appeals
•Northampton Parking Commission
DECISION OF
NORTHAMPTON ZONING BOARD OF APPEALS
APPLICANT: George W. Page, Jr.
ADDRESS: 150 Central Park Drive, Holyoke, MA 01040
OWNER: George W. Page, Jr.
ADDRESS: 158 Central Park Drive, Holyoke, MA 01040
RE LAND OR BUILDINGS IN NORTHAMPTON AT: r , ;
MAP AND PARCEL NUMBERS: _; Now
At a meeting conducted on Nove e, 1993, the Northampton
Zoning Board of A pp eals oti ff , t the re q n, est o`*f George
W. ortge
W. Page, Jr. for n ions o _i on
n p rovi
16.7 (4) in the No amp,ton Zoning Ordinance,
�(✓' V1Iy53.9~ Wad' y'+ N' i, k a H
P�
Zoning Board Members present and voting were: Chairman Robert C.
Buscher, Associate Members: M. Sanford Weil, Jr. , and Alex
Ghiselin.
In granting the Special Permit, the Zoning Board found:
1. The requested use for construction within 200 feet of a
watercourse as defined under Section 16.9 of the Zoning
Ordinance is so designated in Section 16.7 (4) of this
Ordinance.
2 . The requested use bears a positive relationship to public
convenience or welfare because:
The use encourages a low impact use of the property, as a
residential use, and includes protection to avoid the
concerns of Chapter 16. A 17-1/2 acre parcel for a single-
family residence is the most restrictive use to which a
parcel can be developed and one that has the least affect on
the parcel and zone in general. It is to the benefit of the
public to will allow this parcel to be used and with
relatively no effect on the Water Supply Protection
District.
3 . The requested use will not create undue traffic congestion
or unduly impair pedestrian safety because:
. aw3ekR £& : J� Z2 �Zg! : ITY : E IN C ;Ia» zalC& P»GE : 2
CFF : ( IAL AaLITER ' s LI ;T
&uea :( T LCCATION : ECLeg hEAC3k RD
aE] GIAK AL»IN A : J E A L Pt: J K ( :L£ : mE4e0w ,a C -Cu2-[ O]
z,] k :OLE EE R :
a2RlnAMPTC kA 31C
6IZHAL0WSKI ChARLE3 Z &kLI £ R : E3LE : xZ4D'A Ro Co -253-EO1
5E HENRY 3 !§337
w0RT AMPT2w NA J] EaC
uaYE FETE ; u ± 4LI : E : * ! T( 4 R ,
3E WILL :AYS ST
GGRTBAMPTC * » glE= C
&CiTHAmPI:a LIZvTFJ R » RTweRSHIR 2 ! ATAC :2 [ a ! & -C43-2 j]
zAIL : &O§ TaAe@ !OR H :LI :§
R7 . ; ] & 5
aSRTHA P T C N E ; 2] 255
&: *TnA PT C.4 LIw1T R » GINEK :HIT Zz A T w C D 2P !v -EQ ] -EQ]
xAIL : NC, THA3eT6% aILT3N
RT . ; ] G 5
&CalhAAPTE: RA g1C5E
z(dIL QI c3Re3R;7ION ] ] « T : @ !» -E3 ;-E Q]
JG&2ERTY Ti* : IVI: : C&
A C : GX Z7E
aA �L.: Tx ?3221
a: RlaAMPTCa LIa :IE ; R ; R7NER ;, 1 e Z \ 4T, C ] -( G]
WAIL : NURT8A TO d1L7CN
R2 . ; ] v :
a: RT AMRICw I j ] CaG
K» 35ACHUGETT3 ECx> 3 &; EkLIe CE T CC ) DA ! 9 -E =2-C L]
4IWJ: & DR
�Q ,THANPTCa K ; C1S32
A ;sesaCx ' s EERTIr : :;TICK .. ƒsl—YLJ
DAT: /� ..� — --- ---
O
; fulfturl 2
CI JaS JeR
peHAMPT
"AEPAR ED, : uy/ ?`r/ 'i? CITY CF NCKT, - A?
7 'y F'A� E :
CrFIC14L 3 ;LTTc � ' LIST 1
------ ------- --------- ------- - -- - - -LUtJcC CCATICP, -
. COLE ' . ' p�
--: --_ - -
--------- -------- ------- --------- --
rNDR3S DCFOThY
cc FAIRFIELD A� L CCLr , !EAC^v n'i. C3 -005-CU1
;v0RThA '%IPTCi'v
hnirJtk tARRY F + apy
COLTS ircK� :(n RC
-C14-CO1
liCnThA,hPTCN !!A �� 1 +:j�1
oA471nCCLtS`y,yE A 1 ,r 1 C L E S
-C .17hC ;�1PTCP; Mr 1C -COc,-� �1
�C
F A I R F I E L N L E 1 L : . rE � � v '� �C C3 -CJc-CJ1
t,vRTnA 11PTCty � r. j
FLNK DENN16 L LIriDA _
j4 : CvLCS i• c �1J :� F, L - ;Lc i _ H� C R
tiCgTh +i'iFTC1, " A �-,1C� C I
rhIN LE FRANK P Jn PHYLL " _
56J CCLE � E DC'+ RC a �C ? . �LF � r _ �. 4 R _
tiC -%TnAMPT 't4 Y - � C � � 1C-CC1
u1C�•�
!?CcLtincY LLCYC LInC
4l C0 L C
�0kTnriMPTC,v tvA c:1C� .,
AT THACDEL5 L nEL
15 MAIN ST r^. 4 } � C :�Lt. S
nATFIELD tvA C1 � : : - Jx 1 _
EL F . CL TI`, ? C : T � o
V . F . n . : = 5S0CIATiCN : n C C
' 1 C -f
� - u1
l�CnTnhr; T C N Nr. 1C �C
;CrlI,r �cnn15. c
LInS =EC R,D.aC C LZ :-i Ac _,„ C7
� . HATFIELD
ncJN1 K A L V I N A JEA^, L X14 C C L S � S DC , RC
-t 14 1- 'CLS i,' E4DC"6 RC Ca -Ci1 -C ;1
tvCKTHAMPTCr+ hG ; 1 C i C
r+nURC° DCRCTr, Y
F A ' A F I t t_ ;1rC ^ � S =LtS - - C n Lr -r
+CnTnAPPTCii p l
" CQL :
v v J0mTt' '
. im A T C 1 c6
"�`' iv iY " �, —C J.
Ual IL
V RT
CITY CLERKS OFFICE
NORTHAMPTON MASS.01060
t
WORMY"A'
---- ----------
"..:.::.__..'°.:.:...,. :,'4°.. ,::... , \ /' / i •� i TOPOGRAPHC SURVEY
COTES MEADOW ROAD
0 NORTHAMPTON, MA
POOR asomm W.PAW At
SAM anu•Owlsole-7
SCALAL W
i
F
4
,
„.
1 ,Y4 ,.
1 �{
3xs
'1
,s ♦♦ � +\\,\'�i i � tit
y
�.
il��.r• � ( � <j Syr
-„'-t--•� � ,t��` � �� __i• 111
{ ,� ice`` -- b� .•� ``� i r�,. �I�
Tr* ill
VI
Fir
�,r
\ 13,
-•I 4
(` 2 /fir%'% �=�_�-:,:�.,•T„�”-_U
ti
1
Date Filed ?�S =i? u
File No. _ r7
ZONING PERMIT APPLICATION (510 . 2)
1. Name of Applicant:_ George W. Page, Jr.
Address: 158 Central Park Dr., Holyoke, MA —Telephone: (413) 534-4202 (Home)
(413) 527-2911 (Work)
2 . Owner of Property: same
Address: Same Telephone:
3 . Status of Applicant: % Owner Contract Purchaser
Lessee Other (explain: )
4 . Parcel Identification: Zoning Map Sheet# t1 3 Parcel# 37
Zoning District (s) (include ovqr lays)
Street Address 'zf�
Required
5 . Existin Proposed Barn ..by Zoning
Use of Structure/Property Storage of Classic Ajit- is
(if project is only interior work, skip t0 #6)
Building height 26'
%B1dg. Coverage (Footprint) '
Setbacks - front '
- side L: R: L: 200,R: on,
- rear
Lot size 17-5 Ar
Frontage 294 ft
Floor Area Ratio
%Open Space (Lot area minus
building and parking) 14.5 Ac
Parking Spaces
Loading
Signs
Fill (volume & location)
6. Narrative Description of Proposed Work/Project: (Use additional sheets
if necessary) I wish to build two new structures on the property. One for a
primary residence and one for storage of hobby equipment, antiques, autos. I would
like to continue to use the existing barn for storage.
7 . Attached Plans : Sketch Plan g Site Plan
8 . Certification: I hereby certify that the information contained herein
is true and accurate to the best of my knowledg .
�� cant's Signature:
Date �3 A ppli g �
THIS SECTION FOR OFFICIAL USE ONLY:
Alaproved as presented/based on information presented 3 -
_ZOenied as presented--Reason: 1
Special Permit and/or Sit. p an Required:
i ing u ed: variance Required. J i
ignat r o ' ng Inspector Date
NOTE: Issuance of a zoning permit does not relieve an applicant's burden to comply with all zoning requirements and obtain all required permits
from the Board of Health,Conservation Commission, Department of Public Works and other applicable permit granting authorities.
iel _
Aft
Am
-lip
--- �IN15u>=D GRADE
• L 24 I
Q — — GAS 'TRAP WISH Rf MOVAM
" N00 D
MIN. COMPAC'tr-D GKAYFL
cA – 4-0'
—
DIAM•
COMPACTED bC KF-F NED
c.�
GRAVEL
AI C H P)A�)N
NOT 10 5C-ALt
-- 2"X 2' HARDWOOD STAKES OK
itIi�� d t f C: ft DP R C 2 PERP)ALV-)
NYLON DOOKIP VALV-`
-PtRt GT►ON Or- �LOKI li 'I. !
Or StRAW PARALLEL 10 CONSOUK`_
I tt f ; ,.i
{ UNDI!)I QED EXtS1I9G GK&M
J � = I� g�T NAYP�ALf:S
4f' Die;'
� � INTO SIJDGRAf�E
t �
L'
Soir: A1.L 5t NLL- D1✓
NAY?2LLI �1AK�D INMA 1ND41P0A - NAY
E7jKxND5 Pt%RPr-,NDIC UL.AK 'f0
61ZOUND 4llRPAGY.,
WOODC-ti P0515 Al b" 6PAGIt4G
MIRAFI SEDtM�NT CONTROL pA�iZ1C -- "� / DIRt z-floN or r i ow
NATURAL 1DAGK1+lLl. —_I�i�i- I' - I •�•. '... ''� it• i-�_ :;):- :f.l� t�l � -
irDGE
ARIMUM 2 Dt;PTN
UND1511JRP��D �ll>�GP.ADE• ----- k
'riZOSfON COHjRdL SiL�ATiON F�NCF� D�'fP�ll�
�` 1 1 op
✓ —so'--� INFILTRATOR SYSTEM
I�e� twa,way c.NR..w16,..g1
4.k'.ri•.•>+2 J f1wE .`,.
4....24:x0 `\4^ly \ � \ �� !' 3 �:�' __ 11.wE :'✓�...- �..�\\\.. li
I
�� q �—li'�r bnnN \1 ��\` � �Ial * TY..�.w•. x. tw✓.u.. �_
4 / r �� `�`�---.._...__—._. 'eo ♦->4aNC we, .�5 4e4'nierd./ �'•,
t / .wu uw...-4 >..l;.r T.wc �✓.:K>: �� 4 SGC-r w/v A-H•Cr>�
..[...fs. � r �...•.4 _!�___ 4 � thy....., w«sc '- `�. l• �r
.. x.- �'.. \\ T �'�•l� 1. aw...4..e Ir..�/
...`��`:c z) z,»ww., ` ' 3s•' ___L��J �,. {\ i ,rmyarya._._���_" --a...
i ....rwuo«,n«w t' �\ w..:[ � r � ra:• _ eNe,..e... ��>,- u,.,«....
' tr Prc Pa. 1.Y.'aJ `�'• I "\ — � I.XW.r.MF INr OP IW•YY
!o a-w...,•.w e..— i.1, _ - \.`1 /+ra,F/Gf l NTS� elYr r.R..•W
—777—.. 4.._ra .• _
V
i Y Yloi r rY.•r.Ilw W rl..
i- ^� , � r-___ \r� 4 .Dent .I.•r..rs n r r M
•7 kwaf 'S '. � � » .. I.•.l�a.WYIIY.YYr»M»
~yl.
'I✓ i�a
t1w r'I N.or rn�!
Yurl lot�.Y eYaa./Wml.W r iYelYlfII
w1Y . ...I.Y.rt .YY Y.n. 1rNw.r A� • YY Nn.���. � IN Y.Y Y■li r1 OW fYnna
\I�Y4..� �• .nla YsN..t r.wY r!.ri• 1 ..N.ar m _ _ ti..w.v «. Y M n.w». �r`
.Y n.>.1.oi � •� u.P e...IIY.e.11/1 r•NYa O M.YIF. 1.
ylY�_ InK�I.r•»Nlrlr.,the n I m _ W N Y.I -r
Irt.•Mt,...» .l.L.fW M" m•o M.l•n Wl»Iw YY 11Y1
tO� ».eY�Y 1.4.�Y�Y.a.I�W�MUi M � it.Y � 1 � .Y• P•�.u'aita 1.♦l,Mt.rt >•ww4E O..gtYl(
II•..i.ld�ll� e, _
J
y � �
i
Issued By Northampton Conservation Commission
Signaturels)
This Order must be signed by a majority of the Conservation Commission.
On this 21st day of OCtober 1 991 before me
personally appeared 10Av,:?,o d ,yGicit— , to me Known to ce the
person described in and who executed the foregoing instrument and acknowledged;hat he:she executed
the same as his/her free act and deed. Ai YNE Mt FEIDEN
NOTARY PUBLIC
NY COMMISSION EXPIRES JAN. 18. lcod
Notary Public My commission expires
The acoticant.the owner.arty person aggneved by this Order.any owner of land abutting the iand upon wnicn the oroocsed work is to De
cone.or any ten residents-ot the city or town in wnicn sucn land is iodated,are hereby notified of their ngnt to request:ne Department of
Environmental Protection to issue a Superseding Order, providing the request is made by certified mall or hand ceiivery to me Department,
with the aDoroonate filing fee and Fee Transmiral Form as orov eed in 310 CMR 10.03(7),within ten days from the Bate of issuance of this
Determination.A copy of the request snail at the same time tie sent by certified mail or hand cefivery to the Conservation Commission
and the applicant.
Detach on dotted line and submit to the Northampton Conservation Comm, prior to commencement of work.
..................................................................................................................................................................................................................
To Northampton Conservation Commission :ssu:ngAutnor:y
Please De advised that the Order of Conditions for the protect at Coles tMeadow�Road
-�;e Number 246- 298 ^as been recorded atme Recism o�r natty sh�re County and
has oeen noted in the chain of title of:he at'ectee property in accordance with General Condition 8 on 19
It recorded land. the instrument hummer wnicn idenIIfies this 5ansacton I
if regstered land, the cccument number wnicn identifies this transaction is
S:-Zrra::. Cuc�n:
thereof shall contain language substantially as follows: "This property may be subject
to the Northampton Wetlands Protection Ordinance, the Wetlands Protection Act, an Order
of Conditions, and/or a Determination of applicability from the Northampton
Conservation Commission";
22) Any fill used in this project shall be clean fill, including soil, gravel, rock, and
loam. The applicant is prohibited from using demolition materials, asphalt, large
chunks of concrete, tree stumps and limbs, and general refuse;
23) The contractor is responsible with the applicant and property owner for any violation
and the penalties under the law for such violation. While all activities regulated by
this Order are being performed and during the construction phase for this project, an
on-site foreman, or project engineer, shall have a copy of this permit at the site, be
familiar with the conditions of this permit, and adhere to such conditions. A copy of
the plans and Order must always be on-site and in all excavating machinery when work
is being performed;
24) All required permits must be obtained from the Planning Board, Zoning Board, Department
of Public Works, & Building Inspector prior to the start of this project and all
permits must be complied with. Army Corps of Engineers 404 permits and Water Quality
Certifications must be obtained prior to the start of projects involving fill within
wetlands;
25) Upon completion of the project, the Applicant shall submit a statement that all worts
has been done in conformance with the provisions of the approved Order of Conditions
and request a Certificate of Compliance. (if checked) Statement shall be by a
Professional Engineer or by a Wetlands Consultant who has been approved by the
Commission:
[�J YES ( ] NO
26) (if checked) An "As Built" plan shall be included with the project engineer's
statement, detailing the post-development conditions of the site: [ ]YES [x] No.
27) 441- .0ewd 91�eex � DB N• it LsrC'.7fe'/` M,.i be
saved ,
�1f� t-' i, l c
e l►1 clic•�' H
rl a redfr1i 1
cCorduhce /c.-, f5
(speccond 2/13/91)
Plans:
TITLE DATED SIGNED & STAMPED BY: ON FILE:
Pond Dredging Plan
George W, Page, Jr. 3-1-91 Janes Gracia PE Cons. Comm.
Cons. Comm.
Cons. Comm.
Cons. Comm.
Cons. Comm.
Special Conditions:
13) All construction areas shall be restored to original condition or better upon
completion of the project, including vegetation;
14) No area within the 100 year floodplain, any wetland, or area within 100 feet of a
wetland or 40 feet of a 100 year floodplain, as defined in 310 CMR 10, and Chapter 24,
shall be permissible disposal sites, unless such areas are specifically approved by the
Commission;
15) Excavated material and topsoil stockpiles shall be located and stabilized so as to
minimize washing into wetland areas or waterways;
16) Adequate measures shall be taken to prevent erosion and siltation of all disturbed
areas, and shall be implemented prior to any construction. Sedimentation and erosion
control devices shall be placed according to standards set in the U.S.D.A. Soil
Conservation Service, "Guidelines for Soil and Water Conservation in Urbanizing Areas
of Massachusetts". Placement shall be directed at the site by the project engineer in
order to accomplish maximum control of erosion and ensure than no eroded materials will
reach wetland resource areas. Hay bales must be staked. Silt fencing must be placed
in a dug trench with sufficient porosity to allow detained water to pass while trapping
suspended sediments;
17) The areas of construction shall remain in a stable condition at the close of each
construction day. Erosion controls shall be inspected at this time, and maintained or
reinforced to meet specifications in the plans and this order;
18) This Order of Conditions shall apply to any successor in interest or successor in
control;
19) Members and agents of the Conservation Commission shall have the right to enter and
inspect the premises to evaluate compliance with the Conditions and to require the
submittal of any data deemed necessary for that evaluation;
20) The Applicant shall notify the Commission, in writing, as to the date that work will
be commencing on the project. Said notification must be received by the Commission no
sooner than ten (10) days and no later than five (5) days prior to the commencement of
the approved activity;
21) The owner of the property described in this Order must advise any potential buyer of
the property that any construction upon or alteration to said property, including brush
clearance, may require action by the Northampton Conservation Commission and any
instrument conveying any or all of the owner's interest in said property or any portion
5-3A
Therefore, the Northampton Conservation Comm. . hereby finds that the following conditions are
necessary, in accordance with the Performance Standards set forth in the regulations, to protect those inter-
ests checked above.The Conservation Commission orders that all work shall be performed
in accordance with said conditions and with the Notice of Intent referenced above.To the extent that the fol-
lowing conditions modify or differ from the plans, specifications or other proposals submitted with the Notice
of Intent. the conditions shall control.
General Conditions
1 . Failure to comoiv with ail conditions stated herein, and with all related statutes and other regulatory meas-
ures, shall be deemed cause to revoke or modify this Order.
2. This Order does not grant any property rights or any exclusive privileges:it does not authorize any injury
to private prooerty or invasion of private rights.
3. This Order does not relieve the permittee or any other person of the necessity of complying with all
other applicable federal, state or local statutes, ordinances, oy-laws or regulations.
4. The work autnorized hereunder shall be comoleted within three years from the date of ,his Order unless
either of the foilowing apply:
fat the work is a maintenance dredging project as provided for in the Act: or
(b) the time for completion has peen extended to a specified date more than three years, but less ;han
fivevears, from the cafe of issuance and both that date and the special circumstances warranting
the extended time Period are set forth in this Order.
5. This Order may be extended by the issuing authority for one or more periods of uo to three vears each
upon application to the issuing authority at least 30 days prior to the expiration date of the Order.
o. Any fill used in connection with this project shall be clean fill, containing no trash.refuse, rubbish or de-
bris, including but not limited to lumber, bricks, plaster,wire,lath,paper, cardboard, pipe, tires, ashes.
refrigerators.motor vehicles or parts of any of the foregoing.
7. No work snail be undertaken until ail administrative appeal periods from this Order have elapsed or. if
such an appeal has been filed, until all proceedings before the Department have been compieted.
B. No work shall be undertaken until the Final Order has been recorded in the Registry of Deecs or the Land
Court for the district in which the land is located, within the chain of title of the affected property. In the
case of recorded land, the Final Order shall also be noted in the Registry's Grantor Index under the name
of the owner of the land upon which the orcoosed work is to be done. In the case of registered land. the
Final Order snail also be noted on the Land Court Certificate of Title of the owner of the land upon which
the cropdsed work is to be done.The recording information shall be submitted to the Commission
on the fcrr at the-end of this Order prior to commencement of the work.
9. A sign shall be displayed at the site not less than two square feet cr more than three scuare feet in size
bearing the words. 'Massachusetts Department of Environmental Protection,
File Number 246- 298
10. Where the Department of Environmental Protection is requested to make a determination and to issue
a Superseding Order, the Conservation Commission shall be a party to all agency prcceedincs and
hearings before the Department.
11. Upon completicn of the work described herein, the applicant shall forthwith request in wrting that a
Certificate of C_,mpliance ce issued stating that the work has been satisfactonly compieted.
12. The work snail contcrm to the foilcwing Plans and special conditions:
5-2
. . .
310 CIVIR 10.99
Form oEP Re No.
(To Do vv~*wDyosP)
---'
Commonwealth �pr�m
' ofmasuacnuuetns Avphca ' PLa
� ^
I&sm ID: 03-7
Order of Conditions
Massachusetts Wetlands Protection Act
G.L. c, 1 31, §40 AND THE
00DZBAMPI00 WETLANDS PROTECTION ORDINANCE
Northampton Conservation Couunission
To George Pgge- Jr-
From -- --
(NameofApplicant) (Name ofpropertyowner)
156 {eu1zraI Park Drive
mo A z�ress
Aooreas
T his Droer/s/ssuyo and delivered asfoUo:vu:
�— by hand delivery to applicant orrepresen��weon (oate)
—
XX oyoe�ifiod�aii return receipt raoues�edon IU (oate)
Road
project is|oouzedat Coles Meadow
Northampton, M&
The property iarecorded at'the Registry of Hampshire County
Boo 3629 Pace
Certificate /a
fioare(i�regiatere�> �
The Notice of Intent for thiy project was filed on (dale)
The public hearing was closed on uu (date)
^
Findings
The Northampton hou reviewed the aboveref6renced Notice of
Intent ano plans unonaone|oa public I)earmgonrne project. Based ontne information ava'|ao/e :ot."e
Conservation CommissiorL at this time,the C hasoetermmed that
the area onwA/cn the orocnsed work is'to oe acne issignificant to the following interests ina000roan:ewith
the Presumptions of Significance set forth in the regulations'or each Area Subject to Protection Uncer tne
Act(check usaopnzphane):
Pubi�a water Flood control C3 Land containing shellfish
'
'Y. d ��
Private S�ormdamugmpr�von on ,°
Fisheriea Ground *atersupp|y Provmndonofpo||udon Protection of wildlife habitat
Total Filing Fee Submitted $725 State Share $190 -
CityiTown Share $375 (1/2 fee in excess of S25)
Total Refund 161ue S 0 City/Town Portion S State Portion S -Q-
Effective 11110,189 5'1
3 -
Should any violation of the water quality standards or the terms of
this certification occur as a result of the proposed activity, this
Division will direct that the condition be corrected. Non-compliance on
the part of the permittee will be cause for this Division to recommend
the revocation of the permit(s) issued therefor or to take such other
action as is authorized by the General Laws of the Commonwealth.
Substantial civil and criminal penalties are authorized under MGL Ch. 21,
Section 42 for discharging into Massachusetts waters in violation of an
order or permit issued by this Division.
This certification does not relieve the applicant of the duty to
comply with any other statutes and regulations.
Please contact Gary Dulmaine (617-292-5673) if you have questions
about this document.
Very truly yours,
Brian Donahoe, Director
Division of Water
Pollution Control
cc: Conservation Commission, Town, Hall, Northampton, MA 01060
BD/GD/yg
gracia.wqc
r
2 -
In accordance with the provisions of MGL Ch. 21, s. 43, 314 CMR 9. 00
and Section 401 of the Federal Water Pollution Control Act as amended
(Public Law 95-217) , this Division has determined that the project has
been designed to minimize impacts to waters and wetlands and that there
is reasonable assurance that the project can be conducted in a manner
which will not violate applicable water quality standards, as required
by 314 CMR 9. 04. The Division issues this Water Quality Certification
relative to this project, subject to the following conditions:
1. This project could result in a violation of water quality standards
adopted by this Division. Inland waters and wetlands not classified
by name in MA Water Quality Standards (314 CMR 4 . 00) are classified
as Class B, High Quality Waters, and are protected by anti-
degradation provisions of these standards. Therefore, reasonable
care and diligence shall be taken by the contractor to assure that
the proposed activity will be conducted in a manner which will
minimize violations of said standards.
2 . Prior to construction, erosion and sedimentation controls shall be
installed, to prevent the flow of silt and sediment into any
wetlands or waterways. The controls, such as silt fencing and hay
bales, shall be inspected and maintained throughout construction
and shall remain in place until all disturbed areas have
stabilized. ;
3 . A copy of this certification shall be provided to the contractor
and a copy shall be kept at the work site.
4. Dewatering discharges from the work area shall be effectively
filtered or settled to remove, silt prior to being discharged to
waters or wetlands.
5. Discharges from any dewatering shall not cause scouring of stream
bed, wetlands, or erosion of,_adjacent upland areas.
6. Emergent vegetation shall not be dredged.
7. Approval for the disposal of the ,dredged material shall be obtained
from the Division of Solid Waste Management in the DEP Western
Regional Office located in Springfield.
8 . Dredging shall be done during low water conditions while there is
no surficial connection between the pond and Broad Brook normally
July, August, and early September.
9. This division shall be notified of any changes in plans affecting
waters or wetlands. The Division will determine whether the
changes require a revision to this certification.
(t�x Commonwealth of Massachusetts
Executive Office of Environmental Affairs
Department of
Environmental protection
William F. Weld
Govemor
Daniel S.Greenbaum
Commissioner
July 1, 1992
James A. Gracia Re: Water Quality Certification
99 Glendale Street BRP WP 40, T # 31002
Easthampton, MA 01027 Wetland File # 246-293
Dredging
Northampton
Dear Mr. Gracia:
The Department of Environmental Protection, Division of Water
Pollution Control has reviewed your application for Water Quality
Certification filed on behalf of George Page for work located at Coles
Meadow Road, Northampton.
The proposed project involves the dredging of approximately 3 , 700
square feet (548 cubic yards) of an existing man-made pond for the
purpose of creating habitat for an introduced population of trout. The
pond is currently too shallow to sustain a trout population. it is
proposed to deepen the man made pond an average of four feet over the
3 ,700 square feet. This pond borders Broad Brook. There is no
surficial outlet from the pond to Broad Brook.
A tracked or rubber tired excavator will be used to dredge the
pond. The equipment will impact a small amount of wetland and will work
from one area to limit impacts to surrounding wetlands. All dredged
spoils will be placed within a ring of silt fence located outside of the
the
wetland boundary for dewatering. The dredged material is classified as
Division of Water Pollution Control (DWPC) Type A, Category I Materials.
After dewatering, the spoils will be trucked to a field located
approximately 500 feet upgradient of the pond and will be graded and
seeded. Emergent vegetation within the pond has been located and these
areas will be avoided during dredging. There is no emergent vegetation
within the central area of the pond.
The dredging will be completed during low water conditions. Under
this condition, there is no surface connection between the pond and
Broad Brook. As a result, sedimentation impacts to the brook are
expected to be avoided. The maximum duration of dredging is expected to
be approximately 2 days.
One Winter Street • Boston,Massachusetts 02108 • FAX(617)556-1049 • Telephone(617)292-5500
�iL � � � � �
f
9. HOW DOES PROJECT COMPLY WITH SPECIAL PERMIT CRITERIA
First, Applicant's lot meets the other minimum requirements of Section
16.9, namely, the lot size is well in excess of 80,000 square feet and the coverage
of impervious surfaces is well below fifteen(15) percent.
Second, the proposed use meets the specific criteria of Section 16.7 (C) (1).
Applicant's proposal meets the goals of Section 16 by providing a system that
recharges all drainage run off from impervious surfaces on site, prevents
contamination of groundwater by use of gas and oil traps in the driveway area, and
by installation of subsurface sewage disposal system meeting Title S requirements,
and controls soil erosion and sedimentation by use of a hay bale barrier during
construction.
Specifically, the proposal:
(a) "is in harmony with the purpose and intent of the By-Law and will
promote the purposes of the Water Supply Protection District" by providing a low
impact (residential) use that is designed to avoid any reduction of the quality or
quantity of the public drinking water resources;
(b) "is appropriate to the natural topography, soils, and other
characteristics of the site to be developed";
(c) "has suitable soil for on-lot sewerage and water systems";
(d) "will not, during construction or thereafter, have an adverse
environmental impact on groundwater resources in the district"; and
(e) "will not adversely affect the existing or potential quality and
quantity of water in the Water Supply Protection District".
C:\CSB\MSC\PAGE.DOC 1
i r
E. Catch basin four shall discharge by outlet pipe under the cart path
shown on the plan to a stone masonry endwall. At the endwall will be a
nprap apron twelve feet long and eight feet wide. The total depth of the
apron shall be at least twenty-four inches, with twelve inches or more of
angular stone on top of a twelve inch gravel base.
F. All work shall take place outside the 100 foot wetland buffer zone.
Staked hay bales, as shown on Exhibit "D" shall be placed immediately
outside the 100 foot buffer zone during construction to prevent soil erosion
and sedimentation into the buffer area.
C.\CSB\IvIISC\PAGE.DOC 1
8. NARRATIVE DESCRIPTION OF THE PROPOSED PROJECT
The Applicant wishes to build a single family residence with garage and
pool. A special permit is required because the proposed improvements are partly
within 200 feet of a water course in the Water Supply Protection District. The
signed, dated and denied Zoning Application is attached as Exhibit "E".
The wetlands adjacent to the water course were marked when Applicant
applied for and received a permit to dredge the pond and grade around it. A copy
of a Water Quality Certification dated July 1, 1992, and the Order of Conditions
by the Conservation Commission detailing the dredging project are attached as
Exhibit "A".
The location of the proposed improvements are shown on the topographical
survey plan dated August 3, 1993 by Bruce Saluk & Assoc., Inc., submitted with
the Application. Some of the features include:
A. A proposed subsurface sewage disposal system located as shown on
the plan. The application for a disposal works construction permit was
approved June 3, 1991, and a Disposal Works Construction Permit issued
that same day. See Exhibit "B". The approved design is attached as
Exhibit "C".
B. The two catch basins to be located at the northwesterly end of the
driveway adjacent to the house (hereinafter referred to as "catch basin one"
and "catch basin two") shall be constructed pursuant to the detail attached
as Exhibit "D", which includes a gas and oil trap.
C. Catch basins one and two shall discharge through an outlet pipe into
the catch basin three. Water shall then discharge through an outlet pipe to
the catch basin four located on the northerly side of the property, all as
shown on the plan.
D. There shall be a foundation drain around the house which shall
discharge into either catch basin three or into catch basin four. The roof
gutters and down spouts shall also discharge into a pipe leading to catch
basin three or catch basin four, as shown on the plan.
protect natural resources & water supplies
C. Estimated daily and peak hour vehicle trips generated by the proposed use,
traffic patterns for vehicles and pedestrians showing adequate access to and
from the site, and adequate vehicular and pedestrian circulation within the site.
CONSULT ZONING FOR INFORMATION REQUIRED FOR MAJOR PROJECTS.
Site Plans submitted for major projects shall be prepared (and stamped) by a registered Architect,
Landscape Architect, or Professional Engineer
A. LOCUS (show where your project is on this or another map)
(dell\pb\siteplan.pb 3/6192)
r
SITE PLAN REQUIREMENTS--OPTIONAL REQUEST FOR WAIVER
The application MUST include a site plan and documentation with the following
information. Upon written request, the Planning Board may waive the submission of any
of the required information, provided that the Applicant provides some written
information on each of the items and explains why a waiver is appropriate.
For each requested waiver circle the item number and fill in the reason for your
request in the space provided. Use additional sheets if necessary. See the Zoning
Ordinance for all site plan requirements.
Applicant had existing topographical
CB) Site plan(s) at a scale of 1" = 40' showing. survey at scale of 1" = 20'
B-1. Name and address of the owner and the developer, name of the project, date
and scale of plans;
Location and boundaries of the lot, adjacent streets or ways, location and owners
names of all adjacent properties and those within 300 feet of the property line,
and all zoning district boundaries; Survey shows areas of lot (total 17 acres)
in which improvements have been made or are proposed
Existing and proposed buildings, setbacks from property lines, building
elevations, and all exterior entrances and exits (elevation plans of all exterior
facades structures are encouraged); Setbacks not shown, but can be determined
from scale. Elevations not shown, but not applicable to special permit
B-4. Present & proposed use of the land and buildings; request.
B-5. Existing and proposed topography at two foot contour intervals, showing
wetlands, streams, surface water bodies, drainage swales, floodplains, and
unique natural land features (for intermediate projects the permit granting
authority may accept generalized topography instead of requiring contour
lines);
B-6. Location of parking & loading areas, public & private ways, driveways, walkways,
access & egress points, proposed surfacing;
B-7. Location and description of all stormwater drainage facilities, (including
applicable calculations and drainage public & private utilities, sewage disposal
facilities, and water supply;
CB-8. Existing & proposed landscaping, trees and plantings (size &type of plantings),
stone walls, buffers, and fencing; Not applicable to special permit request.
B-9.' Location, dimensions, height, color, illumination of existing and proposed signs;
Not applicable to residential use.
B-�,)Provisions for refuse removal, with facilities for screening of refuse when
ppr opriate; Not applicable to residential use.
B-11 An erosion control plan (for major projects only) and other measures taken to
CITY NORTHAMPTON
SPECIAL PERMIT WD SITE PLAN APPLICATION
1. PERMIT AUTHORITY(IES): ZBA x Planning Board Council
2. Applicant's Name: GEORGE W. PAGE, JR.
Address: 158 Central Park Dr, 1 oke MA Telephone: (413) 527-2911 (w)
3. Property Owner: GEORGE W. PAGE, JR.
Address: 158 Central Park Dr, Holyoke, MA Telephone: (413) 527-2911 (W)
01040
4. Status of Applicant:Owner x Contract Purchaser Lessee
Other (explain)
S. Parcel Identification: Zoning Map # ri Parcel ! Zoning District:RR WSP
Street Address:- 2m-VT-W.-V=r, �a
6. Special Permit requested under Zoning Ordinance Section 16 . 7 , Pg 16 - 4
7. Site Plan is for:Intermediate Project x or Major Project
None (only for a Sign)
8. Narrative Description of the Proposed Project (Use additional sheets if
necessary): See Attached.
9. How does project comply with Special Permit criteria: (See Applicant's Guide for
criteria-use additional sheets is necessary) See Attached.
10. Site Plan, with any requests for waivers, must be attached.
11. Certified Abutters List from Assessors' Office must be attached.
12. 1 certify that l have read the permit criteria and that the information contained
herein is true and accurate to the best of my knowledge. I (or the landowner
if I am not the landowner) grant the Zoning Board and Planning Board
permission to enter the property to review this application.
Date: Applicant's Signature: / � w �a