Loading...
31B-060 OWNER AUTHORIZATION FORM n (Owner's Name) ' owner of the property located at �;7 L 1 Property Address) PZx1r\ &M (Property Tess) hereby authorize Co —O I° �o (Subcontractor) an authorized subcontractor for RISE Engineering,to act on my behalf to obtain a building permit and to perform work on my property. &4 1.4 O ees Signabm Date NIECE c DEC 1 7 2014 The Commonwealth of Massachusetts Department of Industrial Accidents W Office of Investigations W 1 Congress Street, Suite 100 Boston,MA 02114-2017 www mass.gov/dia Workers' Compensation Insurance Affidavit: Builders/Contractors/Electricians/Plumbers Applicant Information Please Print Legibly Name (Business/Organization/Individual): CO-Op Power Address:15A West Street City/State/Zip:West Hatfield, MA 01088 Phone 4:(413)772-8898 Are you an employer? Check the appropriate box: Type of project(required): I.❑0 I am a employer with 20 4. ❑ I am a general contractor and I employees (full and/or part-time).* have hired the sub-contractors 6. ❑New construction 2.❑ 1 am a sole proprietor or partner- listed on the attached sheet. 7. ❑ Remodeling ship and have no employees These sub-contractors have 8• ❑ Demolition working or me in an capacity. employees and have workers' g Y P ty• 9. ❑ Building addition [No workers' comp. insurance comp. insurance.: required.] 5. ❑ We are a corporation and its 10.❑ Electrical repairs or additions 3.❑ I am a homeowner doing all work officers have exercised their 11.❑ Plumbing repairs or additions myself [No workers' comp. right of exemption per MGL 12.❑ Roof repairs insurance required.] t c. 152, §1(4),and we have no employees. [No workers' 13A OtherU.�i7 � comp. insurance required.] *Any applicant that checks box#1 must also fill out the section below showing their workers'compensation policy information. t Homeowners who submit this affidavit indicating they are doing all work and then hire outside contractors must submit a new affidavit indicating such. $Contractors that check this box must attached an additional sheet showing the name of the sub-contractors and state whether or not those entities have employees. If the sub-contractors have employees,they must provide their workers'comp.policy number. I am an employer that is providing workers'compensation insurance for my employees. Below is the policy and job site information. Insurance Company Name:Liberty Mutual Policy#or Self-ins. Lic. #:WC5-31 S-388245-013 Expiration Date:11/02/2015 Job Site Address: City/State/Zip: Nl,` _ Attach a copy of the workers' compensation klicy declaration page(showing the policy number and expiration date). ((� Failure to secure coverage as required under Section 25A of MGL c. 152 can lead to the imposition of criminal penalties of a fine up to$1,500.00 and/or one-year imprisonment, as well as civil penalties in the form of a STOP WORK ORDER and a fine of up to$250.00 a day against the violator. Be advised that a copy of this statement may be forwarded to the Office of Investigations of the DIA for insurance coverage verification. I do hereby certify under the pains and penalties of perjury that the information provided above is true and correct. Sicnature ` Z� 7,� 2 Date: Phone#: •S Official use only. Do not write in this area,to be completed by city or town official. City or Town: Permit/License# Issuing Authority(circle one): 1. Board of Health 2.Building Department 3.City/Town Clerk 4.Electrical Inspector 5.Plumbing Inspector 6.Other Contact Person: Phone#: SECTION 8-CONSTRUCTION SERVICES 8.1 Licensed Construction Supervisor: Not Applicable ❑ Name of License Holder: LvID�H 10 7 S< License Number Add re Expiration ate(El�� � �1---7 a - K 9 SC Si nature Telephone 9.Registered Home Improvement Contractor: ° Not Applicable ❑ Company Name Registration Number Address Expir to ion Date Telephone ` L7 SECTION 10-WORKERS'COMPENSATION INSURANCE AFFIDAVIT(M.G.L.c. 152,§25C(6)) Workers Compensation Insurance affidavit must be completed and submitted with this application. Failure to provide this affidavit will result in the denial of the issuance of the building permit. Signed Affidavit Attached Yes....... n-�— No...... ❑ 11. - Home Owner Exem don The current exemption for"homeowners"was extended to include Owner-occupied Dwellings of one(1) or two(2)families and to allow such homeowner to engage an individual for hire who does not possess a license,provided that the owner acts as supervisor.CMR 780, Sixth Edition Section 108.3.5.1. Definition of Homeowner:Person(s)who own a parcel of land on which he/she resides or intends to reside,on which there is,or is intended to be,a one or two family dwelling,attached or detached structures accessory to such use and/or farm structures.A_person who constructs more than one home in a two-year period shall not be considered a homeowner. Such"homeowner"shall submit to the Building Official,on a form acceptable to the Building Official,that he/she shall be responsible for all such work performed under the building permit As acting Construction Supervisor your presence on the job site will be required from time to time,during and upon completion of the work for which this permit is issued. Also be advised that with reference to Chapter 152(Workers' Compensation) and Chapter 153(Liability of Employers to Employees for injuries not resulting in Death)of the Massachusetts General Laws Annotated,you may be liable for person(s) you hire to perform work for you under this permit. The undersigned"homeowner"certifies and assumes responsibility for compliance with the State Building Code,City of Northampton Ordinances, State and Local Zoning Laws and State of Massachusetts General Laws Annotated. Homeowner Signature SECTION 5-DESCRIPTION OF PROPOSED WORK(check all applicable) 7 New House ❑ Addition ❑ Replacement Windows Alteration(s) ❑ Roofing ❑ Or Doors 171 Accessory Bldg. ❑ Demolition ❑ New Signs [O] Decks [M Siding[O] Other[f]'' Brief Des on of Proposed Work: I ipti C^ \ ­a s-v� ( � 7.n ` �j C Alteration of existing bedroom Yes No Adding new bedroom Yes '� No Attached Narrative Renovating unfinished basement Yes A- No Plans Attached Roll -Sheet 6a,If Newhouse and or addition to exist!no housir ig, COM016te the following: /V lc� a. Use of building : One Family _N�_ Two Family Other b. Number of rooms in each family unit: Number of Bathrooms c. Is there a garage attached? d. Proposed Square footage of new construction. Dimensions e. Number of stories? f. Method of heating? Fireplaces or Woodstoves Number of each g. Energy Conservation Compliance. Masscheck Energy Compliance form attached? h. Type of construction i. Is construction within 100 ft. of wetlands? Yes No. Is construction within 100 yr. floodplain Yes No j. Depth of basement or cellar floor below finished grade k. Will building conform to the Building and Zoning regulations? Yes No . 1. Septic Tank City Sewer Private well City water Supply SECTION 7a-OWNER AUTHORIZATION-TO BE COMPLETED WHEN OWNERS AGENT OR CONTRACTOR APPLIES FOR BUILDING PERMIT ty\ A pass�e as Owner of the subject property hereby authorize � w to act on my behalf, in all matters relative to work authorriiz-ed� by this building permit application. ignature of Owner Date 1 V�1�C_V\C� �; '�(— as Owner/Authorized Agent hereby declare that the statements and information on the foregoing application are true and accurate, to the best of my knowledge and belief. Signed under the pains and penalties of perjury. C Pri t Name onature of Owne a I Dat Section 4. ZONING All Information Must Be Completed. Permit Can Be Denied Due To Incomplete Information Existing Proposed Required by Zoning This column to be filled in by Building Department Lot Size Frontage _ .. Setbacks Front Side L: R:" L: R:? Rear Building Height Bldg. Square Footage " Open Space Footage % (Lot area minus bldg&paved parking) #of Parking Spaces Fill: volume&Location A. Has a Special Permit/Variance/Finding ever been issued for/on the site? NO 0 DON'T KNOW YES IF YES, date issued: IF YES: Was the permit recorded at the Registry of Deeds? NO Q DONT KNOW Q YES Q IF YES: enter Book I Page and/or Document#1 B. Does the site contain a brook, body of water or wetlands? NO Q DONT KNOW e YES IF YES, has a permit been or need to be obtained from the Conservation Commission? Needs to be obtained Q Obtained Q , Date Issued: C. Do any signs exist on the property? YES Q NO IF YES, describe size, type and location: D. Are there any proposed changes to or additions of signs intended for the property? YES Q NO I& IF YES, describe size, type and location: E. Will the construction activity disturb(clearing,grading,excavation, or filling)over 1 acre or is it part of a common plan that will disturb over 1 acre? YES Q NO T IF YES,then a Northampton Storm Water Management Permit from the DPW is required. ' ' - 4epartmeftt use only:.,; City of Northampton Status}6f ormit:, Building Department Curb Cut/l rlyew y PetrrtI i 212 Main Street sey>dr!$eptic Av allablllty • 8 HIS i Room 100 x'lltatortiliell A ibb ll �- tY �= - ___ Northampton, MA 01060 Two Seth oftructurl Prins Electric, Piurnalng&s c s i North n. 9n 3-587-1240 Fax 413-587-1272 Pldt/8tte I l �mpto MA 0 � APPLICATION TO CONSTRUCT,ALTER,REPAIR,RENOVATE OR DEMOLISH A ONE OR TWO FAMILY DWELLING SECTION 1 -`SITE INFORMATION 1.1 Property Address: This section to be completed by office tZ,T Lq rj7_1 e.Q&CAI- ��� , Map Lot Unit Zone Overlay District C�t Gto'C� Elm St.District CB District SECTION 2-PROPERTY OWNERSHIP/AUTHORIZED AGENT 2.1 Owner of Record: Name(Print) Current Mailing A dress: 5-u 173 Telephone Sgnature 2.2 Authorized Agent: Imo; A �„� . �t rw'�i�a �►�.id, �E� Na a(Print) Current Mailing Addre s: / 77,E lt'1 b n r Telephone -T SECTION 3-ESTIMATED CONSTRUCTION COSTS Item Estimated Cost(Dollars)to be Official Use Only com feted by ermit applicant 1. Building (a)Building Permit Fee 2. Electrical (b)Estimated Total Cost of Construction from 6 3. Plumbing Building Permit Fee 4. Mechanical(HVAC) 5. Fire Protection 6. Total=(1 +2+3+4+5) P, -70 t Check Number This Section For Official Use Only Date Building Permit Number: Issued: Signature: Building Commissioner/Inspector of Buildings Date File#BP-2015-0715 APPLICANT/CONTACT PERSON CO-OP POWER INC ADDRESS/PHONE 15A WEST ST WEST HATFIELD (413)772-8898 Q PROPERTY LOCATION 15 LANGWORTHY RD MAP 3 1 B PARCEL 060 001 ZONE URA(91)/URC00)/ THIS SECTION FOR OFFICIAL USE ONLY: PERMIT APPLICATION CHECKLIST ENCLOSED REQUIRED DATE ZONING FORM FILLED OUT Fee Paid Building-Permit Filled out Fee Paid Typeof Construction: INSTALL ATTIC KNEE WALL INSULATION&AIR SEAL New Construction Non Structural interior renovations Addition to Existing Accessory Structure Building Plans Included• Owner/Statement or License 107864 3 sets of Plans/Plot Plan THE FOLLOWING ACTION HAS BEEN TAKEN ON THIS APPLICATION BASED ON INFgAMATION PRESENTED: !/Approved Additional permits required(see below) PLANNING BOARD PERMIT REQUIRED UNDER:§ Intermediate Project: Site Plan AND/OR Special Permit With Site Plan Major Project: Site Plan AND/OR Special Permit With Site Plan ZONING BOARD PERMIT REQUIRED UNDER: § Finding Special Permit Variance* Received&Recorded at Registry of Deeds Proof Enclosed Other Permits Required: Curb Cut from DPW Water Availability Sewer Availability Septic Approval Board of Health Well Water Potability Board of Health Permit from Conservation Commission Permit from CB Architecture Committee Permit from Elm Street Commission Permit DPW Storm Water Management emaLtii Delay / /OY-4� Signature of Building Official Date Note: Issuance of a Zoning permit does not relieve a applicant's burden to comply with all zoning requirements and obtain all required permits from Board of Health,Conservation Commission,Department of public works and other applicable permit granting authorities. *Variances are granted only to those applicants who meet the strict standards of MGL 40A. Contact Office of Planning&Development for more information. 15 LANGWORTHY RD BP-2015-0715 GIs#: COMMONWEALTH OF MASSACHUSETTS Map:Block: 31 B-060 CITY OF NORTHAMPTON Lot: -001 PERSONS CONTRACTING WITH UNREGISTERED CONTRACTORS Permit: Building DO NOT HAVE ACCESS TO THE GUARANTY FUND (MGL c.142A) Category: INSULATION BUILDING PERMIT Permit# BP-2015-0715 Project# JS-2015-001392 Est.Cost: $2711.00 Fee: $55.00 PERMISSION IS HEREBY GRANTED TO: Const.Class: Contractor: License: Use Groin: CO-OP POWER INC 107864 Lot Size(sq.ft.): 4660.92 Owner: BASILE LEONARD Zoning-:URA 91 /URC(lo)/ Applicant: CO-OP POWER INC AT: 15 LANGWORTHY RD Applicant Address: Phone: Insurance: 15A WEST ST (413) 772-8898 O WC WEST HATFIELDMA01088 ISSUED ON:111312015 0:00:00 TO PERFORM THE FOLLOWING WORK.INSTALL ATTIC, KNEE WALL INSULATION &AIR SEAL POST THIS CARD SO IT IS VISIBLE FROM THE STREET Inspector of Plumbing Inspector of Wiring D.P.W. Building Inspector Underground: Service: Meter: Footings: Rough: Rough: House# Foundation: Driveway Final: Final: Final: Rough Frame: Gas: Fire Department Fireplace/Chimney: Rough: Oil: Insulation: Final: Smoke: Final: THIS PERMIT MAY BE REVOKED BY THE CITY OF NORTHAMPTON UPON VIOLATION OF ANY OF ITS RULES AND REGULATIONS. Certificate of Occupancy Signature: FeeType: Date Paid: Amount: Building 1/13/2015 0:00:00 $55.00 212 Main Street,Phone(413)587-1240,Fax: (413)587-1272 Louis Hasbrouck—Building Commissioner