Loading...
11-002 (10) 2. This project will be required to submit one or more Notice of Intent (NOI) to the U.S. EPA for coverage under the NPDES Stormwater Construction General Permit.A Stormwater Pollution Prevention Plan (SWPPP)must be finalized and implemented. Prior to the start of construction, copies of both the NOI and the final SWPPP shall be submitted to the Northampton DPW for review and may need to be amended to the satisfaction of the Northampton DPW prior to the start of construction. "0'",-,p Jnk- ature f City Engineer Date cc. Planning Board c/o Office of Planning and Development Building Department Conservation Commission c/o Office of Planning and Development M:AStormwater Permits\Permits new applications\Hadenville Road—VA Landfill.doc Page 3 of 3 a. Site Plans for VA Medical Center Landfill Closure, Hadenville Road, Leeds, Massachusetts, Sheets C-1, C-2, C-3, C-4, C-5, C-6, dated 1/14/2008, stamped by Kurt Jelinek, P.E., Nobis Engineering, Inc., Lawrence, MA. b. Stormwater Pollution Prevention Plan for Veteran's Administration Medical Center Landfill, Northampton, MA, dated January 14, 2007, by Nobis Engineering, Inc., Lawrence, MA. 2. The Northampton Department of Public Works (DPW)or its authorized representative shall be provided access to the property to conduct inspections before, during, and after construction activities as necessary. The applicant shall arrange with the DPW to schedule the following inspections: Initial-Inspection, Erosion Control Inspection, Bury Inspection, and Final Inspection. The DPW may also conduct random inspections to ensure effective control of erosion and sedimentation during all phases of construction. 3. At the completion of the work, including construction of stormwater management facilities and landscaping, the applicant shall submit a statement to the DPW from a professional engineer of record in the Commonwealth of Massachusetts certifying that the materials and construction of the stormwater management system was constructed in accordance with the approved plans and will function as designed. All changes to the approved stormwater facilities shall be documented by a professional engineer of record in the Commonwealth of Massachusetts and approved by the DPW prior to submission of the certification statement described above. 4. Annual Reports that are stamped by a Registered Professional Engineer documenting the actions completed as required by the Operation, Maintenance and Inspection Agreement shall be submitted to the Northampton Department of Public Works by October 1" of each year. 5. If construction of the proposed stormwater system has not started within five years of the issue date of this permit, then the permit will expire and a new permit will be required. Construction is defined as clearing, grading, excavation, filling, and installation of drainage structures on the lots specified in this.permit. Specific Permit Conditions: 1. Prior to the start of construction, the applicant shall record an executed Stormwater Operation, Maintenance, and Inspection Agreement that is binding on all subsequent owners of land served by the private stormwater management facility by recording it in the land records of the Registry of Deeds. This agreement shall be approved by the Northampton DPW, signed by the owner, and signed by the Mayor of Northampton. Section 22-85 of the Northampton Stormwater Management Ordinance provides additional guidance for the requirements of this agreement. The applicant shall prepare an operation and maintenance schedule for the proposed stormwater management system and submit it to the DPW for approval prior to final signing of the agreement discussed above. WStormwater Perm its\Permits_new applications\Hadenville Road—VA Landfill.doc Page 2 of 3 s STORMWATER MANAGEMENT PERMIT APIATION DECISION City of Northampton Department of Public Works N ✓ LVOH S Protect Site Name: VA�lediM tenter Landfill- Project Street or Location/Assessor ID: Haydenville Road, Northampton fL?arcR } Applicant Name: Mary Dowling, Medical Center Applicant Address/Phone: 421 North Main Street, Building 3, Leeds, MA 01053 /413-584-4040 Owner Name: David Bourbeau Chairperson, Board of Trustees, Smith Vocational and Agricultural High School Owner Address/Phone: 80 Locust Street Northampton, MA/413-587-1414 Application Submission Date: 11/19/2007 THE FOLLOWING ACTION BY THE NORTHAMPTON DEPARTMENT OF PUBLIC WORKS HAS BEEN TAKEN ON THIS APPLICATION BASED ON INFORMATION PRESENTED: Disapproval of the Stormwater Management Permit Application based on a determination within seven days of the receipt of the application that the application is administratively incomplete (see attached documentation). Approval of the Stormwater Management Permit Application. X Approval of the Stormwater Management Permit Application subject to any conditions, modifications or restrictions required by the Department of Public Works (see below) Disapproval of the Stormwater Management Permit Application based upon a determination that the proposed plan, as submitted, does not meet the purposes set forth in the Northampton Stormwater Management. Standard Permit Conditions: 1. All clearing, grading, drainage, construction, and development shall be conducted in strict accordance with the following plans and information submitted with the application and as amended by any conditions attached to this permit: M:AStormwater Permits\Permits_new applications\Hadenville Road—VA Landfill.doc Page] of 3