11-002 (10) 2. This project will be required to submit one or more Notice of Intent (NOI) to the U.S.
EPA for coverage under the NPDES Stormwater Construction General Permit.A
Stormwater Pollution Prevention Plan (SWPPP)must be finalized and implemented.
Prior to the start of construction, copies of both the NOI and the final SWPPP shall be
submitted to the Northampton DPW for review and may need to be amended to the
satisfaction of the Northampton DPW prior to the start of construction.
"0'",-,p Jnk-
ature f City Engineer Date
cc. Planning Board c/o Office of Planning and Development
Building Department
Conservation Commission c/o Office of Planning and Development
M:AStormwater Permits\Permits new applications\Hadenville Road—VA Landfill.doc
Page 3 of 3
a. Site Plans for VA Medical Center Landfill Closure, Hadenville Road, Leeds,
Massachusetts, Sheets C-1, C-2, C-3, C-4, C-5, C-6, dated 1/14/2008, stamped by
Kurt Jelinek, P.E., Nobis Engineering, Inc., Lawrence, MA.
b. Stormwater Pollution Prevention Plan for Veteran's Administration Medical
Center Landfill, Northampton, MA, dated January 14, 2007, by Nobis
Engineering, Inc., Lawrence, MA.
2. The Northampton Department of Public Works (DPW)or its authorized representative
shall be provided access to the property to conduct inspections before, during, and after
construction activities as necessary. The applicant shall arrange with the DPW to
schedule the following inspections: Initial-Inspection, Erosion Control Inspection, Bury
Inspection, and Final Inspection. The DPW may also conduct random inspections to
ensure effective control of erosion and sedimentation during all phases of construction.
3. At the completion of the work, including construction of stormwater management
facilities and landscaping, the applicant shall submit a statement to the DPW from a
professional engineer of record in the Commonwealth of Massachusetts certifying that
the materials and construction of the stormwater management system was constructed in
accordance with the approved plans and will function as designed. All changes to the
approved stormwater facilities shall be documented by a professional engineer of record
in the Commonwealth of Massachusetts and approved by the DPW prior to submission of
the certification statement described above.
4. Annual Reports that are stamped by a Registered Professional Engineer documenting the
actions completed as required by the Operation, Maintenance and Inspection Agreement
shall be submitted to the Northampton Department of Public Works by October 1" of
each year.
5. If construction of the proposed stormwater system has not started within five years of the
issue date of this permit, then the permit will expire and a new permit will be required.
Construction is defined as clearing, grading, excavation, filling, and installation of
drainage structures on the lots specified in this.permit.
Specific Permit Conditions:
1. Prior to the start of construction, the applicant shall record an executed Stormwater
Operation, Maintenance, and Inspection Agreement that is binding on all subsequent
owners of land served by the private stormwater management facility by recording it in
the land records of the Registry of Deeds. This agreement shall be approved by the
Northampton DPW, signed by the owner, and signed by the Mayor of Northampton.
Section 22-85 of the Northampton Stormwater Management Ordinance provides
additional guidance for the requirements of this agreement. The applicant shall prepare an
operation and maintenance schedule for the proposed stormwater management system
and submit it to the DPW for approval prior to final signing of the agreement discussed
above.
WStormwater Perm its\Permits_new applications\Hadenville Road—VA Landfill.doc
Page 2 of 3
s
STORMWATER MANAGEMENT PERMIT
APIATION DECISION
City of Northampton
Department of Public Works N ✓ LVOH
S
Protect Site Name: VA�lediM tenter Landfill-
Project Street or Location/Assessor ID: Haydenville Road, Northampton fL?arcR
}
Applicant Name: Mary Dowling, Medical Center
Applicant Address/Phone: 421 North Main Street, Building 3, Leeds, MA 01053 /413-584-4040
Owner Name: David Bourbeau Chairperson, Board of Trustees, Smith Vocational and
Agricultural High School
Owner Address/Phone: 80 Locust Street Northampton, MA/413-587-1414
Application Submission Date: 11/19/2007
THE FOLLOWING ACTION BY THE NORTHAMPTON DEPARTMENT OF PUBLIC
WORKS HAS BEEN TAKEN ON THIS APPLICATION BASED ON INFORMATION
PRESENTED:
Disapproval of the Stormwater Management Permit Application based on a
determination within seven days of the receipt of the application that the
application is administratively incomplete (see attached documentation).
Approval of the Stormwater Management Permit Application.
X Approval of the Stormwater Management Permit Application subject to any
conditions, modifications or restrictions required by the Department of
Public Works (see below)
Disapproval of the Stormwater Management Permit Application based upon
a determination that the proposed plan, as submitted, does not meet the
purposes set forth in the Northampton Stormwater Management.
Standard Permit Conditions:
1. All clearing, grading, drainage, construction, and development shall be conducted in
strict accordance with the following plans and information submitted with the application
and as amended by any conditions attached to this permit:
M:AStormwater Permits\Permits_new applications\Hadenville Road—VA Landfill.doc
Page] of 3