Loading...
06-057 (4) t edm CONCRETE NOTES 1. CONCRETE SHALL DEVELOP A MINIMUM COMPRESSIVE STRENGTH OF 3500 PSI AT 28 DAYS (UNLESS OTHERWISE NOTED). 2. CURRENT EDITIONS OF THE FOLLOWING SPECIFICATIONS AND STANDARDS WILL APPLY UNLESS OTHERWISE MODIFIED ON THE DRAWINGS OR IN THE JOB SPECIFICATIONS: A. ACI 301 SPECIFICATION FOR STRUCTURAL CONCRETE FOR BUILDINGS. B. ACI 315 MANUAL OF STANDARD PRACTICE FOR DETAILING REINFORCED CONCRETE STRUCTURES. C. ACI 318 BUILDING CODE REQUIREMENTS FOR REINFORCED CONCRETE. D. CRSI RECOMMENDED PRACTICE FOR PLACING REINFORCING STEEL. 3. PORTLAND CEMENT SHALL CONFORM TO ASTM C-150-TYPE I: NORMAL PORTLAND CEMENT. AND!OR TYPE 11: MODIFIED PORTLAND CEMENT. 4. REINFORCING STEEL. SHALL.,CONFORM TO ASTM A-615,GRADE 60. PROVIDE SUPPORTS FOR ALL ON GRADE BAR REINFORCEMENT AT A MAXIMUM SPACING OF 4'-6" OC. CARE SHALL BE TAKEN TO MAINTAIN REINFORCEMENT CLEAR DIMENSION. 5. READY MIX CONCRETE SHALL BE MIXED IN ACCORDANCE WITH ASTM C-94 FOR READY MIX CONCRETE. 6. ALL BAR SPLICES SHALL BE CLASS B TENSION LAP SPLICES, UNLESS OTI IERWISE NOTED. 7. GROUT SHALL BE NONSHRINK,NONMETALLIC GROUT. 166 east street pittsfield,ma 8, CONCRETE EXPOSED TO WEATHER, INCLUDING SLABS ON GRADE, SHALL BE AIR ENTRAINED CONCRETE. AIR ENTRAINMENT SHALL BE 01201 IN THE RANGE OF 5%TO 7% AS PER ASTM C-260. (413)443-2374 9. ALL EXPOSED EDGES SHALL HAVE A 3/4" X s/a" CHAMFER UNLESS OTHERWISE NOTED. fax(413)443-6057 www.edm-ae.com EAR I I I WI WK N(?'t FS PAGE:3 KENTUCKY BLUE GR.FISS 20 CREEPING RED FESCUE 20 20. M_tLCI I PLACED ON SLOPES GREATER THAN I V:4H SHALL BE ANCHORED. MULCH ANCHORAGE SHALL BE A NONASPHALTIC COMMERCIALLY AVAILABLE MULCH ADHESIVE FORMULATED FOR THE PURPOSE OF ANCHORING OR TACKING STRAW N11.11,01. 1"AR111WOaRK NO ILS PAGE: 11. STOCKPILES SHALL BE PLACED AND C0�1PAC'I'ED IN 24" LIFTS 10 A MAXIMUM HEIGHT OF 8 FEET. 12. EXCAVATED SUBSOIL MATERIALS SHALL BE USED AS COMMON DILL. 13, COMMON FILL SHALL MEET THE FOLLOWING REQUIREMENTS: A. REMOVE ALL ORGANIC CONTENT INCLUDING ROOTS, PEAT, ETC. B. REMOVE ALL STONES LARGER THAN 4" IN THE GREATEST DIMENSION. C. SILT AND LOAM MATERIALS ARE NOT ACCEPTABLE AND SHALL: BE REMOVED FROM THE SITE. 14. BANK—RUN GRAVEL SHALL BE SOUND AND DURABLE 15. BANK-RUN GRAVEL SHALL HAVE NO PARTICLES GREATER THAN I2" MAXIMUM DIMENSION. PORTION PASSING THE 4" SQUARE SIEVE SHALL HAVE THE FOLLOWING GRADATION: SIEVE SIZE PERCENT BY WEIGHT PASSING NO. 40 0-70 NO. 200 0-1 16. EXCAVATED SUBSOIL MATERIALS NOT TO BE USED ON THE SITE SHALL BE REMOVED FROM THE SITE. 17. TOPSOIL SHALL BE FREE OF SUBSOIL, WOODY VEGETATION AND STUMPS, ROOTS, BRUSH, STONES, CLAY LUMPS, OR SIMILAR OBJECTS LARGER THAN 2" IN THE GREATEST DIMENSION. 18. TOPSOIL SHALL MEET THE FOLLOWING REQUIREMENTS: A. PH OF THE MATERIAL SHALL BE BETWEEN 5.5 AND 7.6. B. ORGANIC CONTENT SHALL NOT BE I,ESS THAN 2%NOR MORE TI IAN 20%. 19, THE SEED mixTURE SHALL CONSIST OF THE FOLLOWING MIXTURE: VARIETY PERCENT BY WEIGHT PERENNIAL RYE GRASS 60 a q'r . f GC.i!"71 EARTHWORK NOTES 1. AREAS OF WORK SHALL BE SUCH THAT DAMAGE TO EXISTING GROUNDS AND FACILITIES IS KEPT TO A MININIUM. 2. ALL BACKFILL SHALL. BE PLACED AND COMPACTED IN 6" LIFTS UNLESS NOTED OTHERWISE. 3. COMPACTION SHALL BE AS FOLLOWS: UNDER NEW FOUNDATIONS -95% MODIFIED PROCTOR. STOCKPILES -NO REQUIREMENT. ALL OTHER AREAS -90%MODIFIED PROCTOR. PROCTOR TESTING SHALL BE PERFORMED AS PER ASTM D1557. 4. ALL AREAS DISTURBED DURING CONSTRUCTION (NOT WITHIN BUILDING FOUNDATION LIMITS OR PAVEMENT AREAS)SHALL RECEIVE 4" TOPSOIL. 5. ALL AREAS WHERE TOPSOIL WAS APPLIED SHALL RECEIVE LIME, FERTILIZER, AND SEED. 6. LIME AND FERTILIZER SHALL BE APPLIED AT A RATE DETERMINED BY TESTING LABORATORY. THE CONTRACTOR SHALL SEND TOPSOIL SAMPLES TO AN INDEPENDENT TESTING LABORATORY FOR TESTING. 7. ALL SEED SHALL BE APPLIED AT A MINIMUM RATE OF 50 POUNDS PER 10,000 SQUARE FEET. 8. ALL SEEDED AREAS SHALL BE MULCHED AND MAINTAINED UNTIL 166 east meet THE FIRST MOWING. AREAS WHERE NEW GRASS COVER IS NOT COMPLETE OR SEED DOES NOT GERMIN ATE SHALL BE RESEEDED. Pntsrela m ma 9. TOPSOIL SHALL BE AS EXCAVATED FROM SITE AND STOCKPILED AT 01201, a AN OWNER APPROVED LOCATION. (413)443-2374 10. EXCAVATED SUBSOIL MATERIALS TO BE REUSED ON THE SITE SHALL fax(413)443-6057 BE STOCKPILED AT AN OWNER APPROVED LOCATION. www.adm-ae.com Foundation Detail for 5KW Tower 1 Op View i 112 Rebar r CONCRETE TOWER FOOTING AND PIER TO �' ;:; ;. 5 0 r 18'00" s•�� , 2,°� r.. .1 Side View FINISHE CONCRETE ---1 1-2'0- PIER #5 BAR 03 TIE BAR 5'0" CONCRETE AT 11' OC 45° j FOOING ----T Y P #5 BAR AT 10 1/2' OC BOTH WAYS 3° TYP_ _ CLR 5 CLR NONE 5 Kw FOUNDATION iaRBAN POWER c! rF�u7�� URBAN POWER INC. e r t� CS UPI-3373A dwq r `t cet3e>3s�s-oeoo r it �; 3i�. 01/17/13 SK-01 edm J.-2 x 2 x 3/16 4 2 x 2 x 3/16 —3/8"CONNECTION PLATE (8 PLCS) zo 2.>2.3 1116 L2x2x Vlt w AI ry L2 2.3/16 2 - .2.3/16 4 2.2x 3/16 _4 6' 71/4"-- �-1/2*'CASE PLATE (BOTTOM SECTION) 4'11718" 7' 0 3/4" 1 (8 PLCS) 1 3/8"CONNECTION PLATE 12'7/8"- I (MIDDLE AND TOP 18'21/2" TOWER SECTIONS) (8 PLCS) SECTION 2 TOWER ELEVATION SCALE: 114"= T-O" i, 'MMar76 X- LOCK NIT EACH C' TYE c Cb EFL F EC'CX NsT E4„^.ff tC:.'exa 1C..9WGi4 Tk,* A fpsvtiilry f4o f4 AfM-'W.�l4 WIC" 7*WI-21—r.0114 ...LQ..ryp TOWER AS EMBLY ELEVATION 7/16/2014 # low cost vertical wind turbine,electrical power generator Dimension: 24ft.x 16ft. Weight: approx. 1700 lb Electricity-in modest to good winds it produces approximately 20,OOOKWH per year Contact us for pricing. U40 The UT-10 is designed for the customer who has a large power demand,or wants to supplement their income by selling surplus electricity back to the utility.The UT-10 assembles and installs the same as the smaller units. We are currently offering financial incentives toward the purchase of this turbine in a good wind location. Contact us for details on our current rates. Dimension: 29ft.x 27ft. Weight: approx.3200 lb Electricity-in modest to good winds it produces approximately 49,OOOKWH per year Contact us for pricing. U 5 The UT-25 is a small utility grade turbine designed for municipal utility use or larger factories. This model is currently under design-it will be available when final trials and tests are completed. http:/hwAv.urbanpamrusa.corrJProducts.html 2/3 7/16/2014 law cost vertical windturbine,electrical power generamr Urban Power USA Inc. Products Urban Power USA Inc.will custom build a turbine to fit your business needs and your budget.We guarantee every turbine we sell for ten years.Enjoy the confidence that comes from knowing that all our turbines are handcrafted in Massachusetts,USA to work their best for years to come. Because of the unique design,all UT model turbines can easily be assembled and installed. The Urban Turbine is a true"plug and play"system. Simply assemble the UT,secure it to the roof, plug the power cord into a net metering inverter attached to your buildings electrical system and let the UT do the rest. The UT requires minimal maintenance,is absolutely quiet,and bird/bat friendly-perfect for the urban environment. All UT model turbines are modular and can be stacked to maximize roof area and increase the amount of electricity produced. Please use the comments section of the Contact Us page to indicate the UT model in which you are interested. UK- our smaller unit. Easy to assemble and install. Great for small farms or to be stacked. i I Dimensions: 15ft X 12ft. Weight: approx. 1200 lb Electricity-in modest to good winds it produces approximately 7,000 KWH to 15,000 KWHs per year u p\ ering DIY special pricing. Contact us for more information. i UT-5 The UT-5 s enough power to supply amid sized multi-family apartment building,small machine sho c. The UT-5 is easy to assemble and install. This unit is offered in a standard or high performance model. We are currently offering financial incentives toward the purchase of this turbine in a good wind location.Contact us for details on our current rates. 1/3 http://www.urbanpanerusa.comlProducts.html Foundation Detail for 5 K Tower Top View 1/2 Rebor CONCRETE TOWER FOOTING AND PIER 510# # 18'00" TO 210 Side View FINISHE CONCRETE 2'0 PIER -.--05 BAR CONCRETE /#3 TIE BAR 510" ' Ll FOOING AT 11 QC ---,T Y P 5 BAR AT 10 112, Oc 110, BOTH WAYS 3# TYP CLR CLR .......... NONE 5 Kw FOUNDATION j.:x,,0,.,URBAN POWER URBAN POWE.-R-INC• cs oe proic-cl.110. UPI-3373A SK-01 e-d m 10/7/2014 Smith College Mail-Fw:your phone call message to me Building Commissioner City of Northampton Town of Williamsburg (413) 587-1240 office (413) 587-1272 fax On Mon, Aug 18, 2014 at 8:41 AM, Kim Bierwert <kbierwer @smith.edu> wrote: Louis - I am sorry but I was away and still am away helping one of my swimmers do an English Channel Crossing and we have been hampered by bad weather/sea conditions. You left a message that you had a question for me and if you email me, I will try to answer it or have Mark Maynard (Turbine person from Urbanpower USA in Easthampton) answer it. I am also trying to call your office. Sorry for my not being home. hope all is well. Kim Bierwert (City of Northampton E-mail is a public record except when it falls under one of the specific statutory exemptions . ) (City of Northampton E-mail is a public record except when it falls under one of the specific statutory exemptions . ) https://mail.google.com/mail/u/0/?ui=2&ik=621 f6b91 e9&view=pt&search=inbox&type=148e5bf22cda4Od5&th=148e7f97bbd6b35d&siml=148e7f97bbd... 3/3 10/7/2014 Smith College Mail-Fw:your phone call message to me tour sections. We found it easier to over build the tower and foundation to meet any condition we could find so we don't have to redesign the tower and foundation every time we install one. The foundation has 12 yds of concrete which is 36,000 Ibs and we use a earth anchor foundation which adds the earth on the footings to the anchor with a total foundation weight of 125,000 Ibs of foundation anchor. The concrete is all reinforced with 1/2 re-bar. The tower is likewise over built using much heavier steel than needed for this small turbine. If you have any additional questions please feel free to call me at 413-348-8906. PS: Kim; Good luck on your weather I hope you catch a break and you get the swim in. I am hoping for the best. Mark Maynard President Urban Power USA 180 Pleasant St. Easthampton, MA 01027 This message contains PRIVILEGED AND CONFIDENTIAL INFORMATION intended solely for the use of the addressee(s) named above. Any disclosure, distribution, copying or use of the information by others is strictly prohibited. If you have received this message in error, please advise the sender by immediate reply and delete the original message and any and all attachments. Thank you. From: Kim Bierwert <kbierwer @smith.edu> To: Louis Hasbrouck <Iasbrouck @northamptonma.gov> Cc: Mark Maynard <mmayn5 @yahoo.com>; Lou Ann Bierwert <Ibierwer @smith.edu> Sent: Monday, August 18, 2014 9:07 AM Subject: Re: your phone call message to me Good Morning - Thank you for your quick reply. Mark -Can you clarify for Louis that the turbine foundation is adequate/appropriate for the turbine that is to be installed. Please copy me on your correspondence. If I need to do this, please let me know and I will see to it when I return. I assume/believe it is the way the turbines are "labeled/identified" on the submittals. The weather is killing us right now too much wind -where is a wind turbine when I can really use it :) - it will be very sad if we have prepared for 20 months, come all this way and the weather stops us from making the attempt Best, Kim On Mon, Aug 18, 2014 at 8:56 AM, Louis HasbroucCk uc th ptonma.gov>wrote: hope the weather over there cooperates for yo he permit, bu want to be sure the fo undation/tower for the turbine matcheat goes on top I can't imagine it wouldn't, but the permit says 20,000 K tower plans y 5 KW. I'd like some clarification (likely from the company she to Ill support the turbine before it is installed. Again, I'm sure it's fine but we want verification. Good luck over there. Louis Hasbrouck https://mail.google.com/mail/u/0/?ui=2&ik=621 f6b91 e9&view=pt&search=inbox&type=148e5bf22cda4Od5&th=148e7f97bbd6b35d&siml=148e7f97bbd... 2/3 10/7/2014 Smith College Mail-Fw:your phone call message to me t F � Y fig. Fw: your phone call message to me Mark Maynard <mmayn5 @yahoo.com> Mon, Oct 6, 2014 at 8:19 PM Reply-To: Mark Maynard <mmayn5 @yahoo.com> To: "Ihasbrouck @northamptonma.gov" <Hasbrouck @northamptonma.gov>, Kim Bierwert <kbierwer @smith.edu> Hi Louis; This is the email with a follow up conversation about the wind turbine Mark Maynard President Urban Power USA 180 Pleasant St. Easthampton, MA 01027 This message contains PRIVILEGED AND CONFIDENTIAL INFORMATION intended solely for the use of the addressee(s) named above. Any disclosure, distribution, copying or use of the information by others is strictly prohibited. If you have received this message in error, please advise the sender by immediate reply and delete the original message and any and all attachments. Thank you. ----- Forwarded Message ----- From: Louis Hasbrouck <Iasbrouck @northamptonma.gov> To: Mark Maynard <mmayn5 @yahoo.com> Sent: Monday, August 18, 2014 12:43 PM Subject: Re: your phone call message to me Thanks, Mark Louis Hasbrouck Building Commissioner City of Northampton Town of Williamsburg (413) 587-1240 office (413) 587-1272 fax On Mon, Aug 18, 2014 at 12:25 PM, Mark Maynard <mmayn5 @yahoo.com> wrote: Good Morning Louis; The Turbine is a 5 KW turbine which will produce 20,000 KWHs annually. The foundation is the same foundation we use for a single 10 KW turbine (which has twice the surface area) on the same tower height of https://m ai1.gcogIe.com/mail/u/0/?ui=2&ik=621 f6 b91 e9&view=pt&search=inbox&type=148 e5bf22cda40d5&th=148e71`97bbd6b35d&simI=148e7f97bbd... 1/3 7/16/2014 rrgecis Urban Power USA Inc. Projects 180 Pleasant St, Easthampton,MA View from Pleasant St: View from the rooftop: r In eight months,from August 17,2012 to April 17,2013,this turbine produced 3,433 KWHs in Easthampton,MA which is a very poor wind site. Diemand Egg Farm, Wendell, MA During construction phase: Turbine raised into final position: wx Turbine viewed from the road: http:/hwvm.urbanpoiroerusa.convRojects.php 1/3 7/162014 low cost vertical windturbine,electrical power generator Urban Power USA Inc. Urban Power USA-We have been honored as a winner of the"World Changing Ideas" contest by Scientific American! See link on"About Us"page. Urban Power USA, Inc. is joining the ranks of new green sustainable companies. We design and build a new patented type of vertical axis wind turbine called the Urban Turbine to be placed on top of existing flat roof structures with reasonable wind. The Turbine is low cost,lightweight,bird/bat friendly, makes no noise and works well in urban environments. The Urban Turbine is exceptionally versatile and can be specifically adapted to virtually any environment.The Turbine can be stacked to optimize available roof space. Our latest 10 kw turbine is on the grid! The ground mounted unit in Brimfield,Massachusetts is producing power! Check it out on our rp oiects page. Mission Statement Urban Power USA Inc.is committed to promoting low cost environmentally friendlywind generated electricity to all people. Core Values Making a difference is a core value of Urban Power USA Inc.and we have pledged supporting sustainable business practices to achieve this difference. In particular,Urban Power USA Inc.will contribute a portion of corporate profit to local and regional communities for social reinvestment and share its profits with its employees.We believe growth in corporate wealth is just one part of equity and will strive to promote community social benefit. http://www.urbanpowerusa.comlHome.html 1/2 APPROVAL NOT REQUIRED UNDER 6VBviV I$IDN 90NTROL LAW. NOTES: 1 2 7r'' -- LOT 2 IS A FLAG LOT.BUILDING IS PERMITTED ONLY IN 3�17L DETAIL ACCORDANCE WITH THE SPECIAL FLAG LOT PROVISIONS Z ✓ ¢ I n (NO SCALE) OF THE NORTHAMPTON ZONING ORDINANCE. Q i ZONE: SR. 0.36' 140.85' 0.79' `u 33GM 142.00' HIGHWAY LAYOUT TAKEN FROM BOUNDS FOUND AT STA 37+45.91 AND STA 27+61.14. THE PROPERTY IS OWNED BY ROBERT A.AND MARY A.YOUNG. SEE BOOK 37 T PAGE 36. FOR CHAIN CF TITLE SEE BOCK 1390 PAGE 286 BOOK 1280 PAGE 76 BOOK 985 PAGE 275 BOOK 961 PAGE 9 BOOK 751 FAG 65 BOOK 618 PAGE 449 BOOK 219 PAGE 177 r I M THOMAS J. JR. AND GLORIA H. TUPE.RKE(ZSIS v r 2 Q 800K 1622 PAGE 116 O h PLAN BOOK 64 PAGE 62 o e © 86" 43' E LIAPd J. RYAN AND MARGARET M. BOUCHER 00.00' k( 900K 3181 �__ 1160.76' PAGE 127 a 9 L 450.00' 693.55'6+E W w a `r0 3 950' w iu LOT I 00.OOh PR SED IRON PIN SET 0 O 3 O N m 3.000 ACx D ING J d� it IN STONES p z m 1875' SEE DETAIL BIO p m N88.35'57"WW w w LOT 2 l_I�iI Z w a la2.00' in 03 r 12.638 A _ o ry Z . O C ' Y W 294.15 O �N I' • m0 } O Q =m 1634.6&' m a I WESTERN �� pp 1390.53' !11 MASS 1S_TTS �J--N 84• 21' O7" PAULINE G.WALKER) ACHL r (' a BOOK 1313 PAGE 243 EDWARD D.AND JEAN A.ANSANITIS GIRL W IN OSTON ES FOUND 900k 1478 PAGE 3g1 � SCOUT � PLAN BOOK 44 PAGE IB BOOK 1556 PAGE 14 D COUNCIL, INC. PLAN BOOK 67 PAGE 112-113 LEGEND O IRON PIN FOUND suslry E53 PECOPOE CCPPmPATION • IRON PIN TO BE SET ❑ GRANITE HIGHWAY BOUND FOUND A U.YMONUMENTEO POINT PLAN OF LAND IN REPORT THAT THIS PLAN HAS BEEN PREPARED IN CONFORMITY WITH THE L STONEWAL µ+"ol NORTHAMPTON,MASSACHUSETTS RULES AND REGULATIONS OF THE PREPARED FOR REGISTERS OF OEECS OF THE � 1AM.aC�NI 3 COMMONWEALTH OF MASSACHUSETTS. 13u05 ROBERTA. AND MARY A. YOUNG r i°=100' JULY 15, 1991 r 0, PREPARED BY SCALE RICHARD J.LABARGE, SR., PLS FEET 200 100 O 100 200 UNIT C-9, I STADLER ST. -BELCHERTOWN, MA 01007 C.T.M. The Commonwealth of Massachusetts p� Department of Industrial Accidents "4 Office of Investigations 600 Washington Street Boston, MA 02111 www.mass.gov/dia Workers' Compensation Insurance Affidavit: Builders/Contractors/Electricians/Plumbers Applicant Information Please Print Legibly Name (Business/Organization/Individual): Address: 2CA 1 10 l City/State/Zip: N* G1U5"- Phone #: Z �Z Are you an employer? Check the appropriate box: Type of project(required): 1.❑ I am a employer with 4. ❑ I am a general contractor and I employees (full and/or part-time).* have hired the sub-contractors 6. New construction 2.❑ I am a sole proprietor or partner- listed on the attached sheet. 7. ❑ Remodeling ship and have no employees These sub-contractors have g, ❑ Demolition working for me in any capacity. employees and have workers' [No workers' comp. insurance comp. insurance.$ 9. E] Building addition rewired.] 5. ❑ We are a corporation and its 10.❑ Electrical repairs or additions 3.L am a homeowner doing all work officers have exercised their 11.❑ Plumbing repairs or additions myself. [No workers' comp. right of exemption per MGL 12.❑ Roof repairs insurance required.] t c. 152, §1(4),and we have no employees. [No workers' 131-1 Other comp. insurance required.] *Any applicant that checks box#1 must also fdl out the section below showing their workers'compensation policy information. tHo meowners who submit this affidavit indicating they are doing all work and then hire outside contractors must submit a new affidavit indicating such. IContractors that check this box must attached an additional sheet showing the name of the sub-contractors and state whether or not those entities have employees. If the sub-contractors have employees,they must provide their workers'comp.policy number. I am an employer that is providing workers'compensation insurance for my employees. Below is the policy and job site information. Insurance Company Name: Policy#or Self-ins. Lie. #: Expiration Date: Job Site Address: City/State/Zip: Attach a copy of the workers' compensation policy declaration page(showing the policy number and expiration date). Failure to secure coverage as required under Section 25A of MGL c. 152 can lead to the imposition of criminal penalties of a fine up to$1,500.00 and/or one-year imprisonment, as well as civil penalties in the form of a STOP WORK ORDER and a fine of up to$250.00 a day against the violator. Be advised that a copy of this statement may be forwarded to the Office of Investigations of the A for insurance coverage verification. I do hereby certify pai and penalties ofperjury that the information provided above is true and correct. Signature: c Date: H ) Phone#: — Official use only. Do not write in this area, to be completed by city or town official City or Town: Permit/License# Issuing Authority(circle one): 1. Board of Health 2. Building Department 3. City/Town Clerk 4. Electrical Inspector 5. Plumbing Inspector 6. Other Contact Person: Phone#: City of Northampton Massachusetts4 4 1 "^ 4 DEPARTMENT OF BUILDING INSPECTIONS „ }' 212 Main Street • Municipal Building �Ir, Northampton, MA 01060 sr yt wjtit INSPECTOR Louis Hasbrouck Chuck Miller Building Commissioner Assistant Commissioner HOME OWNER EXEMPTION ACKNOWLEDGEMENT The State of Massachusetts allows the homeowner the right under 780CMR 1 08.3.4 to act as his/her construction supervisor. The state defines "Homeowner" as, " Person(s) who owns a parcel on which he/she resides or intends to be, a one or two family dwelling, attached or detached structures accessory to such use and/or farm structures. A person who constructs more than one home in a two- year period shall not be considered a home owner." The building department for the City of Northampton wants any person(s)who seek to use the home owner exemption, to act as their own construction supervisor, to be aware that by doing so you become responsible for compliance with state building codes and regulations. The inspection process requires that the building department be called to inspect work at various stages, which include foundation/footings (before backfill), sonotube holes (before pour), a rough building inspection (before work is concealed), insulation inspection (if required) and a final building inspection. The building department requires these inspections before the work is concealed, failure to secure these inspections can result in failure to obtain a certificate of occupancy until the work can be inspected. If the homeowner hires other trades to perform work (electrical, plumbing & gas) the homeowner will be responsible to make sure that the trades hired secure their proper permits in conjunction to the building permit issued, and that they get their required inspections. Failure of the individual trades to secure the permits and inspections as required can DELAY the project until such time as the proper permits and inspections are made 1, �;, ,a)0=2Z:'AJCl" understand the above. (Home owner/resident's signature requesting exemption) will call to schedule all required building inspections necessary for the building permit issued to me. Date r — )� - 1y Address of work location zq 7 e e- 9 - SECTION 8-CONSTRUCTION SERVICES 8.1 Licensed Construction Supervisor: Not Applicable ❑ Name of License Holder: License Number Address Expiration Date Signature Telephone 9. Registered Home Improvement Contractor: Not Applicable ❑ Company Name Registration Number Address Expiration Date Telephone SECTION 10-WORKERS' COMPENSATION INSURANCE AFFIDAVIT(M.G.L, c. 152, § 25C(6)) Workers Compensation Insurance affidavit must be completed and submitted with this application. Failure to provide this affidavit will result in the denial of the issuance of the building permit. Signed Affidavit Attached Yes....... ❑ No...... ❑ 11. - Home Owner Exemption The current exemption liar"homeowners"was extended to include Owner-occupied Dwelliw,,s of one(I) or two(2) families and to allow such homeowner to engage an individual for hire who does not possess a license,provided that the owner acts as supervisor.CVll2 780, Sixth Edition Section 108.3.5.1. Definition of homeowner:Person(s)who own a parcel of land on which he/she resides or intends to reside,on which there is,or is intended to be, a one or two family dwelling,attached or detached structures accessory to such use and/or farm structures. A person who constructs rnore than one home in a two-year period shall not be considered a homeowner. Such"homeowner"shall submit to the Building Official,on a form acceptable to the Building Official,that he/she shall be responsible for all such work performed under the buildin}!permit. As acting Construction Supervisor your presence on the job site will be required from time to time,during and upon completion of the work for which this permit is issued. Also be advised that with reference to Chapter 152(Workers' Compensation) and Chaptcr 153 (Liability of Employers to Employees for injuries not resulting in Death)of the Massachusetts General Laws Annotated,you may be liable for person(s) you hire to perform work for you under lis permit. The undersigned"homeowner"ccrtifi d assumes r honsibility for compliance with the State Building Code,City of Northampton Ordinances, State and o iLa s and State of Massachusetts General Laws Annotated. Ilomeowner Signature SECTION 5-DESCRIPTION OF PROPOSED WORK(check all applicable) New House ❑ Addition ❑ Replacement Windows Alteration(s) Roofing Or Doors (] Accessory Bldg. ❑ Demolition ❑ New Signs [0] Decks [0 Siding [O] Other[p]--*" Brief Description of Proposed 0 �, 9 fU Work: c3 .mss a���G.n e5j zc2 �yi� �RM? rwt Alteration of existing bedroom Yes a/ No Adding new bedroom Yes I-"'N Attached Narrative Renovating unfinished basement Yes ./'No Plans Attached Roll -Sheet 6a. If New house and or addition to existing housing, complete the following: a. Use of building : One Family Two Family Other_ b. Number of rooms in each family unit: Number of Bathrooms c. Is there a garage attached? d. Proposed Square footage of new construction. Dimensions _ e. Number of stories? f. Method of heating? Fireplaces or Woodstoves Number of each g. Energy Conservation Compliance. Masscheck Energy Compliance form attached? h. Type of construction i. Is construction within 100 ft. of wetlands? Yes No. Is construction within 100 yr. floodplain Yes No j. Depth of basement or cellar floor below finished grade k. Will building conform to the Building and Zoning regulations? Yes No . I. Septic Tank City Sewer Private well_ City water Supply SECTION 7a-OWNER AUTHORIZATION -TO BE COMPLETED WHEN OWNERS AGENT OR CONTRACTOR APPLIES FOR BUILDING PERMIT I, , as Owner of the subject property hereby authorize _ to act on my behalf, in all matters relative to work authorized by this building permit application. Signature of Owner Date as Owner/Authorized Agent hereby declare that the statements and information on the foregoing application are true and accurate, to the best of my knowledge and belief. Signed under the pains and penalties of perjury. Print Name Signature of O r/Agent Date Section 4. ZONING All Information Must Be Completed. Permit Can Be Denied Due To Incomplete Information Existing Proposed Required by Zoning This column to be filled in by Building Departmcnt Lot Size i Z C AC Frontage vo C"V\ Setbacks Front Side L: R: Rear Building Height Z(, �K ' Bldg. Square Footage 0/1 Open Space Footage (Lot area minus bldg&paved parking) #of Parking Spaces Fill: (volume&Location) A. Has a Special Permit/Variance/Finding ever been issued for/on the site? NO O DONT KNOW YES O IF YES, date issued: IF YES: Was the permit recorded at the Registry of Deeds? NO O DONT KNOW O YES O IF YES: enter Book Page and/or Document# B. Does the site contain a brook, body of water or wetlands? NO � DONT KNOW O YES O IF YES, has a permit been or need to be obtained from the Conservation Commission? Needs to be obtained O Obtained O Date Issued: C. Do any signs exist on the property? YES O NO Q/ IF YES, describe size, type and location: D. Are there any proposed changes to or additions of signs intended for the property? YES O NO IF YES, describe size, type and location: E. Will the construction activity disturb (clearing, grading, excav ion, or filling)over 1 acre or is it part of a common plan that will disturb over 1 acre? YES O NO IF YES,then a Northampton Storm Water Management Permit from the DPW is required. r-� r j Department use only 4, City of Northampton Status of Permit: At n , Building Department Curb Cut/Driveway Permit 212 Main Street Sewer/Septic Availability Room 100 Water/Well Availability tectnc.Plum'omg G°'i';spections orthampton, MA 01060 Two Sets of Structural Plans Northarr.ptc,n.k"F.0"Oeo p one 413-587-1240 Fax 413-587-1272 Plot/Site Plans Other Specify APPLICATION TO CONSTRUCT,ALTER, REPAIR, RENOVATE OR DEMOLISH A ONE OR TWO FAMILY DWELLING SECTION 1 -SITE INFORMATION 1.1 Property Address: This section to be completed by office .� t-� I]IiU- 'n ti\� Map Lot Unit c A a C Zone Overlay District Elm St.District CB District SECTION 2-PROPERTY OWNERSHIPIAUTHORIZED AGENT 2.1 Owner of Record: Name(Pr t) 1 Current Mailing Address _ Telephone Signature 2.2 Authorized Agent: Name(Print) Current Mailing Address: Signature Telephone SECTION 3-ESTIMATED CONSTRUCTION COSTS Item Estimated Cost(Dollars)to be Official Use Only completed by ermit applicant 1. Building (a)Building Permit Fee 2. Electrical 2 (b) Estimated Total Cost of lJ Construction from 6 3. Plumbing Building Permit Fee 4. Mechanical (HVAC) 5. Fire Protection 6. Total = 0 +2 +3+4 +5) Check Number A. r This Section For Official Use Only Building Permit Number: Date Issued: Signature: Building Commissioner/Inspector of Buildings Date File#BP-2015-0177 APPLICANT/CONTACT PERSON BIERWERT KIM G&LOU ANN �J f k",y m ADDRESS/PHONE 297 HAYDENVILLE RD LEEDS (413)584-7256() Y5 PROPERTY �O�E� MAP 06 PARCEL 0570 019ZONE DSR(100)/E RD m5i c—&8� 0,5'I t Mim,THIS SECTION FOR OFFICIAL USE ONLY: PERMIT APPLICATION CHECKLIST ENCLOSED REQUIRED DATE ZONING FORM FILLED OUT Fee Paid Building Permit Filled out Fee Paid Typeof Construction:_CONSTRUCT WIND TURBINE New Construction Non Structural interior renovations Addition to Existing Accessory Structure Building-Plans Included: Owner/StatetUgM or License 3 sets of P s/Plot Plan THE F OWING ACTION HAS BEEN TAKEN ON THIS APPLICATION BASED ON INF MATION PRESENTED: pproved Additional permits required(see below) PLANNING BOARD PERMIT REQUIRED UNDER:§ Intermediate Project: Site Plan AND/OR Special Permit With Site Plan Major Project: Site Plan AND/OR Special Permit With Site Plan ZONING BOARD PERMIT REQUIRED UNDER: § Finding Special Permit Variance* Received&Recorded at Registry of Deeds Proof Enclosed Other Permits Required: Curb Cut from DPW Water Availability Sewer Availability Septic Approval Board of Health Well Water Potability Board of Health Permit from Conservation Commission Permit from CB Architecture Committee Permit from Elm Street Commission Permit DPW Storm Water Management Demolition Delay d=�4j t� f� Signature of Building Official Date Note: Issuance of a Zoning permit does not relieve a applicant's burden to comply with all zoning requirements and obtain all required permits from Board of Health,Conservation Commission,Department of public works and other applicable permit granting authorities. * Variances are granted only to those applicants who meet the strict standards of MGL 40A. Contact Office of Planning&Development for more information. 297 HAYDENVILLE RD BP-2015-0177 GIs#: COMMONWEALTH OF MASSACHUSETTS Map:Block: 06-057 CITY OF NORTHAMPTON Lot: -001 PERSONS CONTRACTING WITH UNREGISTERED CONTRACTORS Permit: Building DO NOT HAVE ACCESS TO THE GUARANTY FUND (MGL c.142A) Category: WIND TURBINE BUILDING PERMIT Permit# BP-2015-0177 Project# JS-2015-000134 Est. Cost: $53000.00 Fee: $318.00 PERMISSION IS HEREBY GRANTED TO: Const. Class: Contractor: License: Use Group: Homeowner as Contractor Lot Size(sq. ft.): 550162.80 Owner: BIERWERT KIM G&LOU ANN zonin--: SR(I00)/ Applicant: BIERWERT KIM G & LOU ANN AT. 297 HAYDENVILLE RD Applicant Address: Phone: Insurance: 297 HAYDENVILLE RD (413) 584-7256-0 LEEDSMA01053 ISSUED ON.1011612014 0:00:00 TO PERFORM THE FOLLOWING WORK.CONSTRUCT WIND TURBINE POST THIS CARD SO IT IS VISIBLE FROM THE STREET Inspector of Plumbing Inspector of Wiring D.P.W. Building Inspector Underground: Service: Meter: Footings: Rough: Rough: House# Foundation: Driveway Final: Final: Final: Rough Frame: Gas: Fire Department Fireplace/Chimney: Rough: Oil: Insulation: Final: Smoke: Final: THIS PERMIT MAY BE REVOKED BY THE CITY OF NORTHAMPTON UPON VIOLATION OF ANY OF ITS RULES AND REGULATIONS. Certificate of Occupancy Signature: FeeType: Date Paid: Amount: Building 10/16/2014 0:00:00 $318.00 212 Main Street, Phone(413)587-1240, Fax: (413)587-1272 Louis Hasbrouck—Building Commissioner