Loading...
05-048 (4) 2014 00017134 Restrictive Covenant Bk: 11752Pg: 267 Page: 1 of 1 Recorded: 09/16/2014 01:13 PM Know All Men By These Presents That Jody Cutler& Liisa Tikkala of the real estate 324 Audubon Road, Leeds, MA 01053, more particularly shown as deed book#11629, page#157,document#6619, on 4/29/14 hereby Covenant and Agree that the accessory structure at 324 Audubon Road, Leeds,MA 01053 will be used as a workshop/studio. It will not be used as a dwelling unit or sleeping space without first obtaining a special permit from the Zoning Board of Appeals. Executed as a sealed instrument this (date) Owner's name and signature 130 t( n Other wr's i me and signature tjq Notary Mary E.Casella Notary Public My Commission Expires April 29,2016 Commonwealth of Massachusetts �` r� 21ARY(6E.E,ttD1:�zm `s ,F rivist Strap ZZ Gontimu us a trandoiSL 2x8 rafters, rafters will be tied together at ridge with 2x4 collar ties directly under ridge. 2x8 floor joists with W subfloor, will be tied to rafter tails with HTSQ Simpson angle ties. Insulation: 1" spray foam directly on sheathing, plus 6+" dense-pack cellulose for min. R-25 on all exterior surfaces. Cutler Framing detail, 324 Audubon Rd. �ity of Northampton Mail -Fwd: Collar ties https://mai 1.,-oo-le.com/mail/u/0/?ui=2&ik=3921 lafc3d&view=pt&se... Charles Miller<cmiller @northamptonma.gov> Fwd: Collar ties 1 message Serena Torrey<srtrenewal @gmail.com> Tue,Sep 23,2014 at 7:37 AM To:cmiller @northamptonma.gov Hoping you are well... -Serena Torrey ----------Forwarded message---------- From:Serena Torrey<srtrenewal @g mail.com> Date:Tue,Sep 23,2014 at 6:55 AM Subject: Fwd:Collar ties To:Ihasbrouck@northamptonma.gov Here is Dave's reply regarding the collar ties.Please also see the attached document with framing details specified.Thanks,and let me know if there is anything else I need to do to get that permit going. Hoping you are well... -Serena Torrey ----------Forwarded message---------- From:David Vreeland<dvreeland @verizon.net> Date:Sun,Aug 3,2014 at 8:23 AM Subject: RE:Collar ties To:Serena Torrey<srtrenewal @g mail.com> Hi Serena, Yes,I do agree that the ties can come out. However,some inspectors want to see the ridge tied together with either,metal strapping over the ridge nailed to the rafters,or metal strapping under the ridge board nailed to the rafters,or 2x4s doing the same thing,or a couple timberlok or headlok screws through the ridge board into the end of the rafters.All this is to prevent the roof separating at the ridge during high winds when sometimes you can have a sudden drop in air pressure on one side of the roof and the internal air pressure can push the roof apart. Hope you are having a good summer, Dave David Vreeland,PE Vreeland Design Associates 116 River Road Leyden,MA 01337 P:413-624-0126 F:413-624-3282 E:dvreeland @verizon.net From:Serena Torrey[mailto:srtrenewal @gmail.com] Sent:Friday,August 01,2014 11:33 AM To:David Vreeland Subject:Collar ties Hi Dave. I'm starting this project in an existing attic space,where the rafters come down and tie to the floor joists. I'm thinking I can just take out the old collar ties,since the floor joists tie everything together. Do you agree?Do you think the inspector would want a stamp for this? Let me know, I'm happy to hire you for an official drawing if you think it's needed. Thanks! I of 2 9/23/2014 1:08 PM 23 324 Audubon,Leeds PEA Art Studio -Utility sink --New insulation. sheetrock -Marmoleumfloor --N ew large window in gable end --I nstall cherry desk unit --enclose existing stair ll .-Insta0 new HVAC system -Bulk-in sheking in imee walls i . o in N t 1 UP MEMO J Stt:I IUN ii-GUNS I KU(;I IVN StKVK;Lb- 8.1 Licensed Construction Supervisor: Not Applicable ❑ Name of License Holder: S(! r C�/ CS-07S70 -1 License Number fie�U 7- 31-�d f-s ,Q Cpl �u n.� ���"� �f a!h -�Y (� � 0( C.7��7 Address t Expiration Date Signature Telephone 9.Realstered Home Improvement Contractor: Sere.�� -(–D,r—1 Not Applicable ❑ Company Name Registration Number i sg tf'( z�34 r 51- � Y�l ,'�, i�lc 0/070 ;"yld NUUfC�S CXLJIIdl1U11 Ue1lC Telephone 6q S MOSS SECTION 10-WORKERS'COMPENSATION INSURANCE AFFIDAVIT(M.G.L.c. 152,§25C(6)) V1f0F€hrseit� l3�li �i Ii�sdrdl�h0 dfitidtfltt� f hellill�t�� �slliifii(lf3ttiiil fiii � �ii��lii�: i=difhr8 ��� il iHi dlddiili vtiiil is�lf in the demal of the MUa t e of the b0dih el ilt: Ti �t�e Affiddvit Atfuh6d §:...::: d N 11. -Home Owner Exemption The current exemption for"homeowners"was extended to include Owner-occupied Dwellings of one(1) or two(2)families and to allow such homeowner to engage an individual for hire who does not possess a license,provided that the owner acts as supervisor.CMR 780, Sixth Edition Section 108.3.5.1. ll_t2„!.2_ii _frT_______�___..__.T_..__._ /_l__.1__ ______ _ _______1 _fl_._J _.____I_:_i_ 1__/_1__ _.____/_._1_ .1__.._ ueilnluon u� nurneowner: rerson ts�wno own a parcel of lams on wmcn neisne rescues or mlenus w reslue,on wmcn here is,or is intended to be,a one or two family dwelling,attached or detached structures accessory to such use and/or farm structures.A person who constructs more than one home in a two-year period shall not be considered a homeowner. Such"homeowner”shall submit to the Building Official,on a form acceptable to the Building Official,that he/she shall be responsible for all such work performed under the building permit. As acting Construction Supervisor your presence on the job site will be required from time to time,during and upon completion of the work for which this permit is issued. Also be advised that with reference to Chapter 152(Workers' Compensation) and Chapter 153(Liability of Employers to Employees for injuries not resulting in Death)of the Massachusetts General Laws Annotated,you may be liable for person(s) vnn hire-to ne-rfnrrn xvnrk fn r vnn nn�te-r this"e-rnit J—...--t........... ...,.....,. .0........... .....,21......... The undersigned"homeowner"certifies and assumes responsibility for compliance with the State Building Code,City of Northampton Ordinances,State and Local Zoning Laws and State of Massachusetts General Laws Annotated. Homeowner Signature SECTION 5-DESCRIPTION OF PROPOSED WORK(check all applicable] New House F7 Addition ❑ Replacement Windows Alterations) Roofing Or Doors Accessory Bldg. ❑ Demolition ❑ New Signs [0] Decks [Q Siding[0] Other[EX Brief Description of Proposed11 µ Work: eK)vtvPr'd c�c,r u9L t,7C -� !4 f,1 541,JI,O Alteration of existing bedroom Yes_ No Adding new bedroom Yes X No Attached Narrative - Renovating unfinished basement Yes No Plans Attached Roll -Sheef 6a.If New house and or addition to existing housing, complete the following: a. Use of building :One Family Two Family Other b. Number of rooms in each family unit: Number of Bathrooms % L. is a io e c yarcyc O I Iw U. d. Proposed Square footage of new construction. Dimensions e. Number of stories? f. Method of heating? Fireplaces or Woodstoves Number of each g. Energy Conservation Compliance. Masscheck Energy Compliance form attached? h. Type of construction i. Is construction within 100 ft.of wetlands? Yes No. Is construction within 100 yr. floodplain Yes No j. Depth of basement or cellar floor below finished grade k. Will building conform to the Building and Zoning regulations? Yes No. I. Septic Tank City Sewer Private well City water Supply SECTION 7a-OWNER AUTHORIZATION-TO BE COMPLETED WHEN OWNERS AGENT OR CONTRACTOR APPLIES FOR BUILDING PERMIT 1, ti as Owner of the subject property hereby authorize A —T�>P—�–�e to act on my be h in a matters relati to ork authorized by this building permit applic ti n. Signature of Owner Date as Owner/Authorized Agent hereby declare that the statements and information on the foregoing application are true and accurate,to the best of my knowledge and belief. Signed under the pains and penalties of perjury. -S"Q Ce via I off Print Name ISignature of Owner/Agent Date Section 4. ZONING AI14Qformation Must Be Complelid. Per ' Can Be Denied Due To Incomplete Information Fvietina PrnnncM Pen111rPl1 by 7nnina ._.....,....5 ...,r.,...... ..,,y.....,..-.1 .........b This column to be filled in by Building Department Lot Size Frontage Setbacks Front Side L: R: L: R: Rear Building Height Bldg.Square Footage % Open Space Footage % (Lot area minus bldg&paved arkir«Q #of Parking Spaces Fill: volume&Location A. Has a Special Permit/Variance/Finding ever been issued for/on the site? NO DONT KNOW 0 YES 0 IF YES, date issued: IF YES: Was the permit recorded at the Registry of Deeds? NO 0 DONT KNOW 0 YES C) IF YES: enter Book Page and/or Document# B. Does the site contain a brook, body of water or wetlands? NO 0 DONT KNOW 0 YES IF Wr, hoc y YPrmit hPPn nr npprll to he-nhtPinari frnm tha rnncary;lHnn rnmmiccinn7 ..SOO �fe'T- a r,y Needs to be obtained 0 Obtained 0 , Date Issued: C. Do any signs exist on the property? YES NO IF YES, describe size, type and location: r1 Are 4-k- , nrnr. -A (+-- fn >AA;finnr f inr.r 'ntenilerl fnr fhe r.rnnnrf..7 VCC � Alm v. ni c ci 1cI c ally Ni vNwcu a iaj lVC3 w v auuiuul is vi 315113 111L ucu I c1 a IV Ni uNcl cy : I u IF YES, describe size, type and location: E. Will the construction activity disturb(dearing,grading,excavation,or filling)over 1 acre or is it part of a common plan that will disturb over 1 acre? YES 0 NO IF YES,then a Northampton Storm Water Management Permit from the DPW is required. Department use only City of Northampton Status of Permit: I � uilding Department Curb Cut/Driveway Permit >; 212 Main Street Sewer/Septic Availability, LEIelcf�c, --2 201 4 Room 100 Water/Well Availability rthampton, MA 01060 Two Sets of Structural Plans P -— _ Q4 41 -587-1240 Fax 413-587-1272 Plot/Site Plans ortharnpicn MA UQ5 inspections Other Specify 01060 APPLICATION TO CONSTRUCT,ALTER, REPAIR,RENOVATE OR DEMOLISH A ONE OR TWO FAMILY DWELLING SECTION 1 -SITE INFORMATION This section to be corn leted b office I: �iaaa Ai�dss t'- ---�! Map Lot Unit L J>, AA Zone Overlay District 01053 Elm St.District CS District SECTION-2-PROPERTY OWNERSHIP/AUTHORIZED AGENT 2.1 Owner of Record: Name(P,06) Current Mailing Address: 3Ok— !3,0 Telephone Signature 2.2 Autho ed Agent: SC'f.e0 -ybi-,re/ s- ea )er 121ar 0100,0 Name(Print) Current Mailing Address: 7 175' Signature Telephone SECTION 3-ESTIMATED CONSTRUCTION COSTS Item Estimated Cost(Dollars)to be Official Use Only completed by ermit applicant 1. Building (a)Building Permit Fee 2. Electrical p (b)Estimated Total Cost of Construction from 6 3. Plumbing i Oro Building Permit Fee 4. Mechanical (HVAC) 5. Fire Protection U�' 6. Total=(1 +2+3+4+5) I 3L1' 5 0 v,C 0 Check Number This Section For Official Use Only Puilgi6(f P @FFFIi€NuFl1§@F P @t@ l�I±lllttl' Signature: Building Commissioner/Inspector of Buildings Date File#BP-2015-0243 APPLICANT/CONTACT PERSON SERENA TORRY ADDRESS/PHONE 158 PLEASANT ST PLAINFIELD (413)634-8088 PROPERTY LOCATION 324 AUDUBON RD MAP 05 PARCEL 048 001 ZONE RR(100)/WSP(100)/WP(20)/ THIS SECTION FOR OFFICIAL USE ONLY: PERMIT APPLICATION CHECKLIST ENCLOSED REQUIRED DATE ZONING FORM FILLED OUT Fee Paid Building Permit Filled out Fee Paid Typeof Construction: CONVERT GARAGE ATTIC TO STUDIO SPACE New Construction Non Structural interior renovations i Addition to Existing- Accessory Structure Building Plans Included: Owner/Statement or License 078904 3 sets of Plans/Plot Plan THE FOLLOWING ACTION HAS BEEN TAKEN ON THIS APPLICATION BASED ON INFO=Proved TION PRESENTED: Additional permits required(see below) PLANNING BOARD PERMIT REQUIRED UNDER:§ Intermediate Project: Site Plan AND/OR Special Permit With Site Plan Major Project: Site Plan AND/OR Special Permit With Site Plan ZONING BOARD PERMIT REQUIRED UNDER: § Finding Special Permit Variance* Received&Recorded at Registry of Deeds Proof Enclosed Other Permits Required: Curb Cut from DPW Water Availability Sewer Availability Septic Approval Board of Health Well Water Potability Board of Health Permit from Conservation Commission Permit from CB Architecture Committee Permit from Elm Street Commission Permit DPW Storm Water Management D 1' ' Dela Sig ure of Building Official Date Note: Issuance of a Zoning permit does not relieve a applicant's burden to comply with all zoning requirements and obtain all required permits from Board of Health,Conservation Commission,Department of public works and other applicable permit granting authorities. * Variances are granted only to those applicants who meet the strict standards of MGL 40A. Contact Office of Planning&Development for more information. 324 AUDUBON RD BP-2015-0243 G1S#: COMMONWEALTH OF MASSACHUSETTS Map:Block: 05 -048 CITY OF NORTHAMPTON Lot: -001 PERSONS CONTRACTING WITH UNREGISTERED CONTRACTORS Permit: Building DO NOT HAVE ACCESS TO THE GUARANTY FUND (MGL c.142A) Category: renovation BUILDING PERMIT Permit# BP-2015-0243 Project# JS-2015-000461 Est. Cost: $34500.00 Fee: $210.00 PERMISSION IS HEREBY GRANTED TO: Const. Class: Contractor: License: Use Group: SERENA TORRY 078904 Lot Size(sq. ft.): 388119.60 Owner: CUTLER JODY zoning: RR(100)/WSP(100 /�WP(20)/ Applicant. SERENA TORRY AT: 324 AUDUBON RD Applicant Address: Phone: Insurance: 158 PLEASANT ST (413) 634-8088 PLAINFIELDMA01070 ISSUED ON:912912014 0:00:00 TO PERFORM THE FOLLOWING WORK.-CONVERT GARAGE ATTIC TO STUDIO SPACE POST THIS CARD SO IT IS VISIBLE FROM THE STREET Inspector of Plumbing Inspector of Wiring D.P.W. Building Inspector Underground: Service: Meter: Footings: Rough: Rough: House# Foundation: Driveway Final: Final: Final: Rough Frame: Gas: Fire Department Fireplace/Chimney: Rough: Oil: Insulation: Final: Smoke: Final: THIS PERMIT MAY BE REVOKED BY THE CITY OF NORTHAMPTON UPON VIOLATION OF ANY OF ITS RULES AND REGULATIONS. Certificate of Occupancy Signature: FeeType• Date Paid: Amount: Building 9/29/2014 0:00:00 $210.00 212 Main Street,Phone(413)587-1240,Fax: (413)587-1272 Louis Hasbrouck—Building Commissioner