Loading...
44-086 (99) " 5TRUCTURAL CALCULATION5 DE5IGN AND DRAI=TINGBY: �,e����� TOTAL PV SYSTEM WEIGHT = 1571 L135 GRAY50N ZWINGELBERG/ ARRAY SQUARE AREA = 505.3 5Q FT ARRAY DEAD _ TOTAL PV SYSTEM WEIGHT = 3. 1 I L135/FT2 LOAD ARRAY SQUARE AREA SEPI ARRAY POINT _ TOTAL PV SYSTEM WEIGHT 28.57 LBS 4.5000 in REVISIONS LOAD # OF ATTACHMENT PT5 DESRFTON gar REV ORIGINAL 8/29/2014 A -N�00� O �05���0 A„ O Contractor: ZX V G S COMPOSITION ROOF PV MODULE--, RGS ENERGY 833 W50. BOULDER RD. LOUISVILLE, CO 80027 P 714 9194171 GROUND WEEB t www.PG5Energy.com MOUNTING METHOD I MODULE CLAMP PLYWOOD SCALE: 1" = 8" UNIRAC SHEATHING 4 In —�-�— 8 in �— 16 in --I 50LARMOUNT RAIL Project: CLOPTON-LEVINE RESIDENCE UNIRAC L FOOT 1 157 FLORENCE ROAD FLORENCE, MAO 1 OG2 UNIQUE JOB ID: 10 1 33222 ECO-CP-5Q COMPRE5510N Sheet Title: ECOFASTEN GF-I BRACKET MOUNTING -- "" FLASHING RACKING METMOD Sheet Number: A2.0 RAFTER Sheet 51ze: 5/1 G"x 4" 55 LAG SCREW AN 51 B - I 7" X 1 111 MIN 2-112"THREAD PENETRATION SEALED W/CHEMLINK M I (OR EQUIV.) Engineering Approval: MOUNTING DETAIL 2] 2 SCALE: 1" = 4" � 2in � 4 i — 8 i DE51GN AND DRAFTING BY: ti CONSTRUCTION SUMMARY CONSTRUCTION NOTES G�.AYSON ZWINGELl5ERG�/ 1 .) (28) SOLARWORLD 5W275 MONO BLACK PV MODULES, TOTAL: 7.70 kW5tc. I .) ALL EQUIPMENT SHALL BE INSTALLED IN ACCORDANCE WITH THE MANUFACTURER'S INSTALLATION INSTRUCTIONS. 2.) (28) ENPHASE M250-GO-2LL-S22 MICROINVERTERS, TOTAL: 7.00 kW AC. 2.) ALL OUTDOOR EQUIPMENT SHALL BE KAINTIGHT WITH MINIMUM NEMA-3R RATING. 3.) (55) ATTACHMENT POINTS @ 48" O.C. MAX. 3.) ALL LOCATIONS ARE APPROXIMATE AND REQUIRE FIELD VERIFICATION. 4.) ROOF AREA: GO 13 SQ. FT. SCPI ARRAY AREA: 505 SQ. Ff. ARRAY COVERAGE: 8% REVISIONS DE73CRiPTiON DATE REV ORIGiNAL 'W9;20 i 4 A N SUBPANEL (BASEMENT) PV METER PV LOAD CENTER 1 75° AC DISCONNECT UTILITY METER AND ATS (GARAGE EXT.) Contractor: MAIN SERVICE PANEL C--'j S (GARAGE INT.) RGS ENERGY 833 W 50. BOULDER RD. LOUISVILLE, CO 80027 P7149194171 www.PG5Energy.com 314" EMT CONDUIT T ENTER ATTIC Project: AND CONTI UE TO BASEMENT CLOPTON-LEVINE RESIDENCE O THROUGH I T. CLOSET 1 157 I'OR N ORO6D MAC 48. 00 in TYP. UNIQUE JOB ID: 10 1 33222 I x ; Sheet Title: � � o r� T r. _. 51TE PLAN PV LAYOUT o e o o 0 3 I °PITCH JUNCTION BOX 0 0 0 0 ¢ o d o 264.25 In o o o Sheet Number: o � p f jo E o � o t i i } 9 A 1 .0 ° DRIVEWAY E 1 Sheet Size: PV MODULE ATTACHMENT POINT AN 51 B - 17x11 Engineering Approval: 1 58.75 In 318.25 In I-- 6 ft --+-- 12 ft } 24 ft —� SCALE: P' == 1 2' PROJECT DESCRIPTION Q GRAYS ON �"/ _ GRAYSON ZWINGELBER,G THIS 7.70 kW ROOF-MOUNTED PHOTOVOLTAIC (PV) SYSTEM 15 TO BE INSTALLED AT THE € ''I`l., CLOPTON-LEVINE RESIDENCE AT 1 157 FLORENCE ROAD IN FLORENCE, MASSACHUSETTS. THE ENERGY PRODUCED BY THE PV SYSTEM SHALL BE INTERCONNECTED WITH THE UTILITY GRID THROUGH THE EXISTING ELECTRICAL EQUIPMENT AT THE MAIN SERVICE " SCPI PANEL. NO BATTERIES. � = SHEET INDEX .,:: REVISIONS - P' DE,rWFTION DATE REV T I .O COVER salty Of NOlthampton ,�< OKIGIN.AL 8,12912014 A A 1 .0 SITE PLAN + PV LAYOUT £3uitding Depa�nt A2.0 MOUNTING $ RACKING METHOD Plan FVe 212 Main n Street � 3_ E 1 .0 ELECTRICAL DIAGRAM - ' to0rthampton, NIA 01060 GOVERNING CODES 2014 NATIONAL ELECTRICAL CODE /�g� "` 780 CMK, 8th EDITION EE5lihxeeux UNDERWRITERS LABORATORIES (UL) STANDARDS OSHA 29 CFK 19 10.269 Contractor: SITE SPECIFICATIONS OCCUPANCY: 11 - SINGLE FAMILY DWELLING DESIGN WIND SPEED: 90 MPH EXPOSURE CATEGORY: B t GROUND SNOW LOAD: 40 PSF G S RG5 ENERGY VICINITY MAP 833 �N SO. BOULDER RD. PROJECT LOCATION LOUISVILLE, Co 80027 P714 919 41 1 1 Awww.PG5Encrgy.com JJ� LL4: Project: A4 _i�5 ,a CLOPTON LEVINE RESIDENCE ri 1 157 FLORENCE ROAD FLORENCE, MAO J O G 2 44 - 123 UNIQUE JOB ID: 10 1 33222 Sheet Title: COVER 44 _124 Sheet Number: r , T1 .0 rl -'13 Sheet Size: 4.4 _01b6 ,. ;.,, ANSI B - 1 7" x 1 1 " I Engineering Approval: h ! } -118 r . ...E PARCEL MAP F- 1 AERIAL MAP G GREENFASTEN"' PRODUCT GUIDE - GF-I * `` _ American Wood Council Lag Bolt Pull Out Values � tp h ik t Lag pull-out (withdrawal) capacities (Ibs) in typical roof lumber (ASD) a Lag screw specifications Specific 1y r 5116"shaft* � , a Gravity ) � per inch thread depth w Douglas Fir,Larch .50 266 Douglas Fir,South .46 235 3 Engelmann Spruce,lodgepole Pine .46 v } ' v (MSR 1650 f&higher) 235 Hem,Fir,Redwod (close grain) .43 212 . - Hem,Fir(North) .46 235 Southern Pine .55 307 Thread Depth o Spruce,Pine,Fir 42 205 7D r v Spruce,Pine,Fir 50 266 g, (E of 2 million PSI and higher grades of MSR and MEL) coM co s - ' 0 W Sec.6-1 } PRODUCT GUIDE - GF-I GREENFASTEN ` .' Specifications z PART I - GENERAL 1.3 SUBMITTAL B. Fasteners(may be supplied by others)to be A. Submit manufacturers written specifications. compatible with chosen roof application and 1.l SUMMARY B. Submit standard product cut sheets. meet specified pull out values as shown in load A. WORK INCLUDES C. Submit installation instructions. test data. 1. GreenFasten solar attachment bracket that D. Submit product specific load test data,showing C. Base flashing is.032 gauge aluminum embossed y - attaches directly to the roof deck. ultimate and allowable load values. to accept EPDM bushing. 2. Provide appropriate bracket and fasteners '• for the roof system. 1.4 UALITYASSURANCE D. Bushing is EPDM. { Q � B. RELATED SECTIONS Installer to be experienced in the installation of E. Stainless steel bonded washer is 302 stainless 1.Section 07600:Flashing and Sheet Metal specified roofing material and snowguards for no less and EPDM. 2.Section 07500:Roofing than 5 years in the area of the project. " y. 3.Division (:Administrative and procedural 2.3 FINISH-Mill Finish u requirements 1.5 DELIVERY/STORAGE/HANDLING A. Bracket is mill finish aluminum 4.Division7:Thermal and Moisture Protection Inspect material upon delivery.Notify manufacturer- within 24 hours of any missing or defective items.Keep B. Base flashing(choose one) F 1.2 SYSTEM DESCRIPTION material dry,covered,and off the ground until installed. .Mill Finish a v A. COMPONENTS: w 2.GreenFasten system consists of aluminum 2.Black-kynar painted l a I PART 2 - PRODUCTS flashing with integral EPDM bushing and one 3.Dark Bronze- kynar painted i 3 bonded stainless steel and EPDM washer. 2.1 MANUFACTURER t 2. Fasteners EcoFasten Solar U PART 3 - EXECUTION t, A.To be of metal compatible with aluminum 289 Harrel St.Morrisville,VT 05661 GreenFasten components. o (877) 859-3947 3.1 EXAMINATION 6P B.Fasteners should be selected for " www.ecofastensolar.com. A. Substrate:Inspect structure on which brackets compatibility with the roof deck. are to be installed and verify that it will withstand C.Fastener strength should exceed or be equal 2.2- MATERIALS any additional loading that it may incurred.Notify o to that of the allowable load of the system. A. Attachment Bracket General Contractor of any deficiencies before v See test data at www.ecofastensolar.com 6000 Series Aluminum (choose one) installing EcoFasten Solar brackets. � .; 3. Sealant(if required by roof manufacturer): I. F-I I B. Verify roofing material has been installed 1 o to be roof manufacturer approved. correct) prior to installing solar attachment brackets. " 7 4. Aluminum attachment bracket 2. L-101 3" y p b j 3. L 102-3., 4. CP-R 3.2 INSTALLATION B. DESIGN REQUIREMENTS: A. Comply with architectural drawings and I. Bracket spacing to be recommended by 5. CP-SQ co project engineer's recommendations for location project engineer. 6. SL-102-6" of system.Comply with Manufacturer's written o� 2. Install a minimum of one fastener assembly. 7. Z-101 installation instructions for installation and layout. 8. Custom ` 3. It is important to design new structures or oassess existing structures to make sure that they can withstand retained loads. 3 .... O s Li: :_ Sec.S-1 GREENFASTEN TI PRODUCT GUIDE GF-I f* Bracket Options - CP-SQ 1 �` c4 Y3 p?, t -. $fr .375-.008 r C s r a o x nxs v o �.000 .025 ? F kl co U a: T - x co 377 HR o - — Ln R% 0 i 0 ;x` BL AR SIDE v s. w Compression Plate 2" X 2" Mill Aluminum $ec.4-4 �. ) J GREENFASTEW PRODUCT GUIDE — GF—I '.. GFI— L 812 J k s f. s- n .� -- 8.00, OOH — .- — -- R.38 0032 z s ! 4 +.e3� b k PS h Lu ..i 541" 3 1 ,jz v ` etc d s p " 0 12.Or3 .125 3 v_ QI fs ;a x g -- --- — + a ..... ..,...�. 3.0 .12 v E v 4.00 ..125 .20 .0, � M I� v Finish Options r BLK = Matte Black 0 LL BRZ = Medium Bronze MLL= Mill Finish Sec.4-2 GREENFASTEN" PRODUCT GUIDE - GF-1 t - Exploded Product View i { w 3 rc ix f � r , } o 4 s 1 c tf E -- 01 if1 O � N C ,g 0 Lij *Note: Numbers correspond with B.O.M,Sec.3-1 � .._. - - Sec.I-i {' ' t � PRODUCT GUIDE Greerfasten G - C tents t E pfoded ProductViev �- Sec. g Installation Instrucians�— Sec, 2 Bill of Materials 'Sec. 3 Cutsheets Sec.4 it t Specifications-}Sec.5 if } € Lag Baft'Pufl-0utValues—Sec. 6 Leakiest Sec.7 r Y :y a l { 5 # E Pill 0 MEW Committed to the Support of Renewable Energy X v.� ■"O U 1 I SOLARMOUNT SolarMount Beams Part No. 310132C, 310132C-B, 310168C, 310168C-B, 310168D 310208C, 310208C-B, 310240C, 310240C-B, 310240D, 410144M,410168M, 410204M, 410240M Properties Units SolarMbunt SolarMount HD Beam Height in 2.5 3.0 Approximate Weight(per linear ft) plf 0.811 1.271 Total Cross Sectional Area in' 0.676 1.059 Section Modulus(X-Axis) in3 0.353 0.898 Section Modulus(Y Axis) in 0.113 0.221 Moment of Inertia(X-Axis) in 0.464 1.450 Moment of Inertia(Y-Axis) in 0.044 0.267 Radius of Gyration(X-Axis) in 0.289 1.170 Radius of Gyration(Y-Axis) in 0.254 0.502 SLOT FOR T-BOLT OR SLOT FOR T-BOLT OR 1'728 14" HEX HEAD SCRtT V4"HEX HEAD SCREW -T 2X SLOT FOR SLOT FOR BOTTOM CLIP 2.500 BOTTOM CLIP 3.000 1.316 SLOT FOR O 3�" HEX BOLT SLOT FOR 1.385 HEX BOLT .387 .750 Y Y 1.875 A ►X ►X SolarMount Beam SolarMount HD Beam Dimensions specified in inches unless noted a SolarMount Beam Connection Hardware SolarMount L-Foot Part No. 304000C, 304000D • L-Foot material: One of the following extruded aluminum alloys:6005- i,i; '" T5,6105-T5,6061-T6 Ultimate tensile:38ksi,Yield:35 ksi Finish: Clear or Dark Anodized • L-Foot weight:varies based on height: -0.215 Ibs(98g) • Allowable and design loads are valid when components are Bea assembled with SolarMount series beams according to authorized Bolt UNIRAC documents L-Foot For the beam to L-Foot connection: •Assemble with one ASTM F593 W-16 hex head screw and one errated ASTM F594 3/a'serrated flange nut Flange Nu i' •Use anti-seize and tighten to 30 ft-Ibs of torque Resistance factors and safety factors are determined according to part 1 section 9 of the 2005 Aluminum Design Manual and third-party test Y results from an IAS accredited laboratory NOTE: Loads are given for the L-Foot to beam connection only; be X sure to check load limits for standoff,lag screw,or other attachment method Applied Load Average Safety Design Resistance 0 SLOT roa Direction Ultimate Allowable Load Factor, Load Factor, •HQDWAW Ibs(N) Ibs(N) FS Ibs(N) 4) 1oi t Sliding,Z± 1766(7856) 755(3356) 2.34 1141 (5077) 0.646 Tension,Y+ 1859(8269) 707(3144) 2.63 1069(4755) 0.575 Dimensions specified in inches unless noted I Compression,Y- 3258(14492) 1325(5893) 2.461 2004(8913) 1 0.615 Traverse,X± 486(2162) 213(949) 2.28 323(1436) 0.664 . . . Technical . . . - - :FUNIR SolarMount Mid Clamp Part No.302101 C,302101 D,302103C,302104D, 302105D,302106D y~ Bolt Mid clamp material: One of the following extruded aluminum rra alloys: 6005-T5, 6105-T5, 6061-T6 Mid la a NO ' Ultimate tensile: 38ksi,Yield: 35 ksi Clamp ., • Finish: Clear or Dark Anodized ' 0 Mid clamp weight: 0.050 Ibs(23g) Allowable and design loads are valid when components are assembled according to authorized UNIRAC documents Values represent the allowable and design load capacity of a single mid clamp assembly when used with a SolarMount series beam to retain a module in the direction indicated • Assemble mid clamp with one Unirac'/4"-20 T-bolt and one W-20 ASTM F594 serrated flange nut • Use anti-seize and tighten to 10 ft-Ibs of torque Beam Resistance factors and safety factors are determined according to part 1 section 9 of the 2005 Aluminum Design Manual and third- party test results from an IAS accredited laboratory Applied Load Average Allowable Safety Design Resistance 3.000[STNKE - Direction Ultimate Load Factor, Load Factor, � "�"►Mxxaas Ibs(N) Ibs(N) FS Ibs(N) Qt Tension,Y+ 2020(8987) 891 (3963) 2.27 1348(5994) 0.667 - Transverse,Z± 520(2313) 229(1017) 2.27 346(1539) , 0.665 Y Sliding,X± 1 1194(5312) 1 490(2179) 2.44 1 741 (3295) 1 0.620 ►X Dimensions specified in inches unless noted SolarMount End Clamp Part No.302001C,302002C,302002D,302003C, 302003D,302004C,302004D,302005C,302005D, 302006C,302006D,302007D,302008C,302008D, 302009C,302009D,302010C,3020110,302012C End clamp material: One of the following extruded aluminum alloys: 6005-T5, 6105-T5, 6061-T6 oit Ultimate tensile:38ksi,Yield: 35 ksi • Finish: Clear or Dark Anodized • End clamp weight: varies based on height: -0.058 Ibs(26g) d Clamp Allowable and design loads are valid when components are Serrated assembled according to authorized UNIRAC documents Flange Nut Values represent the allowable and design load capacity of a single end clamp assembly when used with a SolarMount series beam to retain a module in the direction indicated • Assemble with one Unirac W-20 T-bolt and one'/4"-20 ASTM F594 Bea serrated flange nut • Use anti-seize and tighten to 10 ft-Ibs of torque 'LL Resistance factors and safety factors are determined according to part 1 section 9 of the 2005 Aluminum Design Manual and third- Y party test results from an IAS accredited laboratory A Modules must be installed at least 1.5 in from either end of a beam ►X Applied Load Average Allowable Safety Design Resistance , Direction Ultimate Load Factor, Loads Factor, ' - - Ibs(N) Ibs(N) FS Ibs(N) r� Tension,Y+ 1321 (5876) 529(2352) 2.50 800(3557) 0.605 Transverse,Z± 63(279) 14(61) 4.58 21 (92) 0.330 Sliding,X± 142(630) 52(231) 2.72 79(349) 0.555 Dimensions specified-in inches-unless-noted SolarMount Technical Datasheet Pub 110818-ltd V1.0 August 2011 SolarMount Module Connection Hardware.................................................................. 1 BottomUp Module Clip.................................................................................................1 MidClamp ....................................................................................................................2 EndClamp....................................................................................................................2 SolarMount Beam Connection Hardware......................................................................3 L-Foot...........................................................................................................................3 SolarMountBeams..........................................................................................................4 SolarMount Module Connection Hardware SolarMount Bottom Up Module Clip Part No. 302000C Washer Bottom Up Clip material: One of the following extruded aluminum Bottom ,°)V� (hidden..s alloys: 6005-T5, 6105-T5, 6061-T6 t Up Clip ,,.j no Ultimate tensile: 38ksi,Yield: 35 ksi r Finish: Clear Anodized • Bottom Up Clip weight: --0.031 Ibs(14g) Beam °' Bolt Allowable and design loads are valid when components are assembled with SolarMount series beams according to authorized UNIRAC documents. Assemble with one '/"-20 ASTM F593 bolt, one'/4"-20 ASTM F594 serrated flange nut, and one 1/4"flat washer • Use anti-seize and tighten to 10 ft-Ibs of torque • Resistance factors and safety factors are determined according to part 1 section 9 of the 2005 Aluminum Design Manual and third- party test results from an IAS accredited laboratory Module edge must be fully supported by the beam * NOTE ON WASHER: Install washer on bolt head side of assembly. DO NOT install washer under serrated flange nut Applied Load Average Allowable Safety Design Resistance Direction Ultimate Load Factor, Load Factor, + Ibs(N) Ibs(N) FS Ibs(N) ri x.24 Tension,Y+ 1566(6967) 686(3052) 2.28 1038(4615) 0.662 Y Transverse,X± 1128(5019) 329(1463) 3.43 497(2213) 0.441 A t.oq ►X Sliding,Z± 1 66(292) 1 27(119) 1 2.44 41 (181) 0.619 Dimensions specified in inches unless noted a a S PERFORMANCE UNDER STANDARD TEST CONDITIONS(STC)' PERFORMANCE AT 800 W/m2,NOCT,AM 1.5 Maximum power P 275 Wp Maximum power P 203.1 Wp Open circuit voltage V11, 39.4 V Open circuit voltage Vm 35.7 V Maximum power point voltage V 31.0 V Maximum power point voltage V,Pp 28.1 V Short circuit current 9.58 A Short circuit current 1,, 7.75 A Maximum power point current 8.94A Maximum power point current 7.22 A 'STC 1000 W/ml,25°C,AM is Minor reduction in effi(iericy under partial load conditions at 25'C at 200 W/rW,100% 1)Measuring tolerance(P„)traceable to1LJV Rheinland:+/-2%(T(JV Power Controlled). (+/-2%)of the SIC efficiency(1000W/m2)is achieved _ THERMAL CHARACTERISTICS COMPONENT MATERIALS Cells per module 60 NOCT 48'C Cell type Mono crystalline TC 1 0.04%/°C Cell dimensions 6.14 in x 6.14 in(156 mm x 156 mm) TCv, -0.30%/°C Front Tempered glass(EN 12150) TCP -0.45%/"C Frame Black anodized aluminum Operating temperature -40°C to 85°C Weight 46.7 1 b(21.2 kg) SYSTEM INTEGRATION PARAMETERS 1000 W/m, Maximum system voltage SC 11 1000 V Max,system voltage USA NEC 600 V 800 W/mi Maximum reverse current 16 A Number of bypass diodes 3 g i 600 W/mz a 113 psf downward UL Design Loads` Two rail system 64 psf upward 400 W/mz UL Design Loads' Three rail system 170 psf downward 64 psf upward 200 W/mz 113 psf downward 100 W mz IEC Design Loads' Two rail system 50 psf upward 'Please refer to the Sunmodule installation instructions for the details associated with _._ ._.. these load cases. Module voltage[VI V, ADDITIONAL DATA 1 x4 3744(951) Powersorting' -OWp/+SWp J-Box I P 65 Module leads PV wire per UL4703 with MC4 connectors 11.33(288) Module efficiency 16.10% Fire rating(UL 790) Class C Glass Low iron tempered with ARC 41.30(1050) Version 0.6 15.3 2.5 frame 65.94(1675) bottom VERSION 2.5 FRAME mounting Compatible with both"Top-Down" holes and"Bottom"mounting methods N 4rGrounding Locations: N 4 corners ofthe frame 4locations along the length ofthe module in the extended flanget 1.34 34 -i-x4 L���11.20(107)1 1.22(31) F- 39.41(1001) -I iAll units provided are imperial.SI units provided in parentheses. SolarWorld AG reserves the right to make specification changes without notice. SW-01-6025US 02-2014 hij"6�PIVS�SW:27 m, n da 3�,N,tuv,co3 TUV Power controlled: TUVRhsIMand Lowest measuring tolerance in industry 000007•p13, Every component is tested to meet 3 times IEC requirements J Designed to withstand heavy accumulations of snow and ice J Sunmodule Plus: Positive performance tolerance J 25-year linear performance warranty and 10-year product warranty J Glass with anti-reflective coating J World-class quality DualMied,IEC 81815 '' grnm�ni+m.ict. Fully-automated production lines and seamless monitoring of the process and material ovE 5�+greaeed.lFCevao _ p++� P+riwlk In+paNOn 'y�,,rvnnm..,.F Pnw+�ICnntmllai�n ensure the quality that the company sets as its benchmark for its sites worldwide. SolarWorld Plus-Sorting Pd�gMgN�.F n5.� Plus-Sorting guarantees highest system efficiency.SolarWorld only delivers modules that PliorowiTac PPOOUCr C U.a have greater than or equal to the nameplate rated power. �-"� UL 1703 25 years linear performance guarantee and extension of product warranty to 10 years �" 0 SolarWorld guarantees a maximum performance degression of 0.7%p.a.in the course of ` F- 25 years,a significant added value compared to the two-phase warranties common in the industry.In addition,SolarWorld is offering a product warranty,which has been extended to 10 years.* In accordance with the applicable SolarWorld Limited warranty at purchase. www.solarworld.com/warranty SOLARWORLD solarworld.com We turn sunlight into power. September 4, 2014 To: Code Enforcement Division From: James A. Marx, Jr. P.E. Re: Engineer Statement for Clopton-Levine Residence, 1157 Florence Rd., Florence, MA - Solar Roof Mount Installation I have verified the adequacy and structural integrity of the existing Main Roof 1 (one layer shingles): true cut 2" x 4"rafters at 24" c-c., having roof slope distance 24'-9", pitch 31 deg.; for mounting of solar panels and their installation will satisfy the structural roof framing design-loading requirements of the Massachusetts building code—780 CMR Residential Code 8th Ed. For the installation of the solar mounting, the Unirac Solarmount rails will be to fastened unistrut channel with L-foot supports anchored and with Eco-Fasten Green-Fasten and CP-SQ Bracket located at 48" sp. on the center of the rafters and will be securely fastened to the rafters at with 5/16"x 4" SS lag bolts as shown on drawing A1.0. The mounting system has been designed for wind speed criteria of 90 mph Exp. B and ground snow criteria of 40 psf. The Photovoltaic system and the mounting assemblies will comply with the applicable sections of the Residential Code and loading requirements of roof-mounted collectors. Thereby, I endorse the solar panel installation and certify this design to be structurally adequate. Sincerely, y X14,5 U1 It James A. Marx Jr. G1v1�- Professional Engineer "O MA 36365 ,��' �'�'�`�„ ` 10 High Mountain Road Ringwood,NJ 07456 cc: RGS Energy DocuSign Envelope ID:463BA7F0-B9D2-42DF-8E9B-93B62A13E349 CHANGE ORDER This Change Order modifies and amends the Real Goods Solar Home Improvement Contract for the purchase and installation of a solar photovoltaic system. This Change Order does not modify or amend the terms and conditions of the Contract. Customer Name: Susan Clopton Site Address: 1157 Florence Road Florence, MA 01062 Job #: 10133222 Description Original Revised Difference 117otal System Cost $30,686.36 $29,936.36 -$750.00 Est.Solar Rebate (Assigned to RGS) Rs. 2,000.00 $1,250.00 -$750.00 Contract Price $28,686.36 $28,686.36 $0.00 Downpayment $1,000.00 $1,000.00 $0.00 First Progress Payment $24,917.72 $24,917.72 $0.00 Final Progress Payment $2,768.64 $2,768.64 $0.00 Reason for Change Order: Real Gpods.Wau, C OiYiiCned by: f jV14Ct, (�aU.c{} USa1a, fbin, Signa' EA1F17BDDC14DS._ 1=44483F4B9... Bruce Hallett Susan •Clopton Name Name 8/18/2014 8/18/2014 Date Date CONFIDENTIAL 7/1/2014 The Commonwealth of Massachusetts Department of Industrial Accidents Office of Investigations 600 Washington Street 10 Boston, MA 02111 www mass.gov/dia Workers' Compensation Insurance Affidavit: Builders/Contractors/Electricians/Plumbers Applicant Information Please Print Legibly Name(Business/organization/individual): Alteris Renewables, Inc. dba RGS Energy Address: 32 Taugwonk Spur, Unit A-12 City/State/Zip: Stonington, CT 06378 Phone #: (860)535-3370 Are you an employer?Check the appropriate box: Type of project(required): 1.0 I am a employer with 120 4. ❑ I am a general contractor and 1 6. ❑New construction employees(full and/or part-time).* have hired the sub-contractors 2.F1 am a sole proprietor or partner- listed on the attached sheet. E] Remodeling ship and have no employees These sub-contractors have 8. ❑ Demolition working for me in any capacity. workers' comp. insurance. 9. ❑ Building addition [No workers'comp. insurance 5. ❑ We are a corporation and its required.] officers have exercised their 10.❑ Electrical repairs or additions 3.❑ I am a homeowner doing all work right of exemption per MGL 11.0 Plumbing repairs or additions myself. [No workers' comp. c. 152, §1(4),and we have no 12.❑ Roof repairs insurance required.] t employees. [No workers' 13.❑ Other solar panels comp. insurance required.] *Any applicant that checks box#1 must also fill out the section below showing their workers'compensation policy information. t Homeowners who submit this affidavit indicating they are doing all work and then hire outside contractors must submit a new affidavit indicating such. $Contractors that check this box must attached an additional sheet showing the name of the sub-contractors and their workers'comp.policy information. I am an employer that is providing workers'compensation insurance for my employees. Below is the policy and job site information. Insurance Company Name: Zurich American Insurance Co. Policy#or Self-ins. Lic.#: WC5852405 Expiration Date: 01/01/2015 Job Site Address: 1157 Florence Road City/State/Zip: Florence, MA 01062 Attach a copy of the workers'compensation policy declaration page(showing the policy number and expiration date). Failure to secure coverage as required under Section 25A of MGL c. 152 can lead to the imposition of criminal penalties of a fine up to$1,500.00 and/or one-year imprisonment,as well as civil penalties in the form of a STOP WORK ORDER and a fine of up to$250.00 a day against the violator. Be advised that a copy of this statement may be forwarded to the Office of Investigations of the DIA for insurance coverage verification. I do hereby certif and r the pains and penalties of perjury that the information provided above is true and correct. Si nature: Date:. U I Phone#: (860)535-3370 Official use only. Do not write in this area,to be completed by city or town official City or Town: Permit/License# Issuing Authority(circle one): 1.Board of Health 2.Building Department 3.City/Town Clerk 4. Electrical Inspector 5.Plumbing Inspector 6.Other Contact Person: Phone#: SECTION 8-CONSTRUCTION SERVICES 8.1 Licensed Construction Supervisor: Not Applicable ❑ Name of License Holder Gary Beals 101487 License Number 61 Turnpike Road,Ashby, MA 01431 11/7/14 Ad J: Expiration Date 978-855-8568 Signat a Telephone 9.Registered Home Improvement Contractor: Not Applicable ❑ Alteris Renewables dba RGS Energy 162709 Company Name Registration Number 32 Taugwonk Spur,A-12, Stonington, CT 06378 4/6/15 Address Expiration Date T v_ Telephone 860-535-3370 SECTION 10-WORKERS'COMPENSATION INSURANCE AFFIDAVIT(M.G.L.c. 152,§25C(6)) Workers Compensation Insurance affidavit must be completed and submitted with this application. Failure to provide this affidavit will result in the denial of the issuance of the building permit. Signed Affidavit Attached Yes....... 0 No...... ❑ 11. - Home Owner Exemption The current exemption for"homeowners"was extended to include Owner-occupied Dwellings of one(1) or two(2)families and to allow such homeowner to engage an individual for hire who does not possess a license,provided that the owner acts as supervisor.CMR 780, Sixth Edition Section 108.3.5.1. Definition of Homeowner:Person(s)who own a parcel of land on which he/she resides or intends to reside,on which there is,or is intended to be,a one or two family dwelling,attached or detached structures accessory to such use and/or farm structures.A person who constructs more than one home in a two-year period shall not be considered a homeowner. Such"homeowner"shall submit to the Building Official,on a form acceptable to the Building Official,that he/she shall be responsible for all such work performed under the building permit. As acting Construction Supervisor your presence on the job site will be required from time to time,during and upon completion of the work for which this permit is issued. Also be advised that with reference to Chapter 152(Workers' Compensation) and Chapter 153 (Liability of Employers to Employees for injuries not resulting in Death)of the Massachusetts General Laws Annotated,you may be liable for person(s) you hire to perform work for you under this permit. The undersigned"homeowner"certifies and assumes responsibility for compliance with the State Building Code,City of Northampton Ordinances,State and Local Zoning Laws and State of Massachusetts General Laws Annotated. Homeowner Signature SECTION 5-DESCRIPTION OF PROPOSED WORK(check all applicable) New House Addition ❑ Replacement Windows Alteration(s) ❑ Roofing ❑ Or Doors EJ Accessory Bldg. ❑ Demolition ❑ New Signs [❑] Decks [p Siding [01 Other[p] solar Brief Description of Proposed Work: Installation of o 7.7kW r f nmmnted solar army using 28 SolarWorld S W275 Mono mod,des,28 Gnphasc M250-60-211-S22 micro inverters k all associated elconcaI work. Alteration of existing bedroom Yes X No Adding new bedroom Yes X No Attached Narrative Renovating unfinished basement Yes x _No Plans Attached Roll -Sheet 6a. If New house and or addition to existing housina, complete the following: a. Use of building :One Family X Two Family Other b. Number of rooms in each family unit: Number of Bathrooms c. Is there a garage attached? d. Proposed Square footage of new construction. Dimensions e. Number of stories? f. Method of heating? Fireplaces or Woodstoves Number of each g. Energy Conservation Compliance. Masscheck Energy Compliance form attached? h. Type of construction i. Is construction within 100 ft.of wetlands? Yes X No. Is construction within 100 yr. floodplain Yes X No j. Depth of basement or cellar floor below finished grade k. Will building conform to the Building and Zoning regulations? X Yes No . I. Septic Tank City Sewer Private well City water Supply SECTION 7a-OWNER AUTHORIZATION-TO BE COMPLETED WHEN OWNERS AGENT OR CONTRACTOR APPLIES FOR BUILDING PERMIT I John&Susan Clopton-Levine as Owner of the subject property hereby authorize Alteris Renewables dba RGS Energy to act on my behalf,in all matters relative to work authorized by this building permit a1p/plicabon. see signed contract attached ((r I� Signature of Owner Da111("P I Alteris Renewables dba RGS Energy as Owner/Authorized Agent hereby declare that the statements and information on the foregoing application are true and accurate,to the best of my knowledge and belief. Signed under the pains and penalties of perjury. Kim Hendel Print Name r� Signa re of caner/Agent D to Section 4. ZONING All Information Must Be Completed. Permit Can Be Denied Due To Incomplete Information Existing Proposed Required by Zoning This column to be filled in by Building Department Lot Size Frontage Setbacks Front Side L: R: L: R: Rear Building Height Bldg. Square Footage % Open Space Footage % (Lot area minus bldg&paved parking) #of Parking Spaces Fill: volume&Location A. Has a Special Permit/Variance/Finding ever been issued for/on the site? NO 0 DON'T KNOW O YES O IF YES, date issued: IF YES: Was the permit recorded at the Registry of Deeds? NO 0 DONT KNOW O YES O IF YES: enter Book Page and/or Document# B. Does the site contain a brook, body of water or wetlands? NO O DON'T KNOW O YES O IF YES, has a permit been or need to be obtained from the Conservation Commission? Needs to be obtained Q Obtained O Date Issued: C. Do any signs exist on the property? YES O NO IF YES, describe size, type and location: D. Are there any proposed changes to or additions of signs intended for the property? YES O NO O IF YES, describe size, type and location: E. Will the construction activity disturb(clearing,grading,excavation,or filling)over 1 acre or is it part of a common plan that will disturb over 1 acre? YES n NO O IF YES,then a Northampton Storm Water Management Permit from the DPW is required. Department use only of Northampton Status of Permit: Q v ing Department Curb Cut/Driveyay Permit D2 Main Street SewerlSeptic Availability , SEA' I a 2 14 Room 100 WateriWeN Availability N a pton, MA 01060 Two Sets of Structural Plans 1240 Fax 413-587-1272 Plot/Site Plans Electric,Plumbing MAC low ton., Other Specify PLICATION TO CONSTRUCT,ALTER,REPAIR,RENOVATE OR DEMOLISH A ONE OR TWO FAMILY DWELLING SECTION 1 -SITE INFORMATION 1.1 Property Address: This section to be completed by office Map Lot Unit 1157 Florence Road Zone Overlay District Elm St.District CB District SECTION 2-PROPERTY OWNERSHIP(AUTHORIZED AGENT 2.1 Owner of Record: John & Susan Clopton-Levine 1 157 Florence Road, Florence, MA 01062 Name(Print) Current Mailing Address: see signed contract attached 413-575-5052 Telephone Signature 2.2 Authorized Accent: Alteris Renewables dba P6 rAerq y 32 Taugwonk Spur,A-12,Stonington, CT 06378 Name(Print) Current Mailing Address: 860-535-3370 Signature Telephone SECTION 3-ESTIMATED CONSTRUCTION COSTS Item Estimated Cost(Dollars)to be Official Use Only com leted by ermit applicant 1. Building 6,000 (a)Building Permit Fee 2. Electrical 24,000 (b)Estimated Total Cost of Construction from 6 3. Plumbing Building Permit Fee 4. Mechanical(HVAC) 5. Fire Protection 6. Total=(1 +2+3+4+5) 30,000 Check Number This Section For Official Use Only Building Permit Number: Date Issued: Signature: Building Commissioner/Inspector of Buildings Date File#BP-2015-0322 APPLICANT/CONTACT PERSON REAL GOODS SOLAR INC ADDRESS/PHONE 32 TAUGWONK SPUR RD UNIT Al2 STONINGTON (860)535-3370 Q PROPERTY LOCATION 1157 FLORENCE RD MAP 44 PARCEL 086 001 ZONE THIS SECTION FOR OFFICIAL USE ONLY: PERMIT APPLICATION CHECKLIST ENCLOSED REQUIRED DATE ZONING FORM FILLED OUT Fee Paid Building Permit Filled out Fee Paid Typeof Construction: INSTALL 7.7KW ROOF MOUNTED SOLAR SYSTEM New Construction Non Structural interior renovations Addition to Existine Accessory Structure Building,Plans Included: Owner/Statement or License 101487 3 sets of Plans/Plot Plan THE FOLLOWING ACTION HAS BEEN TAKEN ON THIS APPLICATION BASED ON INFORMATION PRESENTED: pproved Additional permits required(see below) PLANNING BOARD PERMIT REQUIRED UNDER:§ Intermediate Project: Site Plan AND/OR Special Permit With Site Plan Major Project: Site Plan AND/OR Special Permit With Site Plan ZONING BOARD PERMIT REQUIRED UNDER: § Finding Special Permit Variance* Received&Recorded at Registry of Deeds Proof Enclosed Other Permits Required: Curb Cut from DPW Water Availability Sewer Availability Septic Approval Board of Health Well Water Potability Board of Health Permit from Conservation Commission Permit from CB Architecture Committee Permit from Elm Street Commission Permit DPW Storm Water Management 'ti la Signature of Building Official Date Note: Issuance of a Zoning permit does not relieve a applicant's burden to comply with all zoning requirements and obtain all required permits from Board of Health,Conservation Commission,Department of public works and other applicable permit granting authorities. * Variances are granted only to those applicants who meet the strict standards of MGL 40A. Contact Office of Planning&Development for more information. 1157 FLORENCE RD BP-2015-0322 GIS#: COMMONWEALTH OF MASSACHUSETTS Map:Block: 44-086 CITY OF NORTHAMPTON Lot: -001 PERSONS CONTRACTING WITH UNREGISTERED CONTRACTORS Permit: Building DO NOT HAVE ACCESS TO THE GUARANTY FUND (MGL c.142A) Category: SOLAR PANELS BUILDING PERMIT Permit# BP-2015-0322 Project# JS-2015-000599 Est. Cost: $30000.00 Fee: $180.00 PERMISSION IS HEREBY GRANTED TO: Const.Class: Contractor: License: Use Group REAL GOODS SOLAR INC 101487 Lot Size(sa.ft.): 61855.20 Owner. CLOPTON SUSAN M&JOHN P LEVIN zonine: Applicant: REAL GOODS SOLAR INC AT. 1157 FLORENCE RD Applicant Address: Phone: Insurance: 32 TAUGWONK SPUR RD UNIT Al2 (860)535-3370 O Workers Compensation STONINGTONCT06378 ISSUED ON.912212014 0:00:00 TO PERFORM THE FOLLOWING WORK.-INSTALL 7.7KW ROOF MOUNTED SOLAR ARRAY POST THIS CARD SO IT IS VISIBLE FROM THE STREET Inspector of Plumbing Inspector of Wiring D.P.W. Building Inspector Underground: Service: Meter: Footings: Rough: Rough: House# Foundation: Driveway Final: Final: Final: Rough Frame: Gas: Fire Department Fireplace/Chimney: Rough: Oil: Insulation: Final: Smoke: Final: THIS PERMIT MAY BE REVOKED BY THE CITY OF NORTHAMPTON UPON VIOLATION OF ANY OF ITS RULES AND REGULATIONS. Certificate of Occupancy SiSnature: FeeType: Date Paid: Amount: Building 9/22/2014 0:00:00 $180.00 212 Main Street,Phone(413)587-1240, Fax: (413)587-1272 Louis Hasbrouck—Building Commissioner