Loading...
38A-145 (3) 11 -7 professional Rooffrav SOLAR produ Installation Manual 1W Date Modified:08/13/07 Step 5: Installing Modules v _ 9 w _ Slide the two end clamps near the end of the After the first module is secured, slide two inter- support rail and install your end module(first). module clamp sets onto the first module side Carefully square the module to the frame and frame. They are designed to stay in place,freeing tighten the clamps using a 1/2" box wrench or you up to slide and align the next module into place. drive socket. DO NOT OVER-TIGHTEN, we recom- Repeat this procedure until all modules are in- mend a maximum torque of 12 foot pounds to stalled onto the support rail. prevent damage to the module. Upon installation of the last module in the panel, To complete the installation, cut off any excess install the module end clamp to the end of the last support rail not used with a reciprocating saw. module. Before fully tightening the bolts, make You may want to use an extrusion blade. any adjustments needed to create a square and even array. Once all modules are in the position desired, use a 5/16" Socket impact set to 12 ft. Ibs to tighten the bolts on the clamps. Page 7 of 7 COPYRIGHT PROFESSIONAL SOLAR PRODUCTS 2007: All information contained in this manual is property of Professional Solar Products (PSP). TileTrac®is a registered trademark for PSP and is covered under U.S-patent#5,746,029.RoofTrac®and FastJacko is a registered trademark for PSP and is covered under U.S.patent#6,360,491. professional Rooffrav SOLAR pro uctqyvi, Installation Manual Date Modified:08/13/07 UMFor convenience, it is advisable to pre-assemble the bolt, lock washer and clamp into the sliding insert prior to bringing them up to the roof. 1' f. Z 2 Fig. 1 ' Attachment and clamping of the solar modules to NOTE: Clamping hardware is not engineered or TileTrac® or FastJack® attachments works exactly the intended for use on support rail/strut other than same. After the support rails have been fastened, you the Professional Solar Products brand. are ready to install the solar modules. There are two sets of clamps; the outside clamps (end clamp) (Fig. 1) and the inter-module clamps (Fig. 2)that install between the modules. Please note that all module end clamps are specially extruded to fit a specific brand of module as specified in the ordering guide. Page 6 of 7 COPYRIGHT PROFESSIONAL SOLAR PRODUCTS 2007: All information contained in this manual is property of Professional Solar Products (PSP). TileTrac@ is a registered trademark for PSP and is covered under U.S.patent#5,746,029.RoofTrac@ and FastJackO is a registered trademark for PSP and is covered under U.S.patent#6,360,491. professional RoofTrac® SOLAR pro uctqyA, Installation Manual Date Modified:08/13/07 FastJack® Unibit#10 Drill bit atJc ' Version Standard Flashing 2'c��te rs Use of a Unibit®will de- crease drill time to approxi- Rafters mately 3 seconds per hole Installation of the Rooffrac®support rails to the drill a 1/2" hole through the rail. After drilling the hole FastJack®. in the support rail, place the rail over the attachment feet, make any necessary final adjustments and tighten After the FastJack® has been installed (refer to the the 3/8" Bolt& Washer combination to attach the respective installation guide), lay the support rail support rail to the FastJack®. Your support rails are (upside down) next to the attachments. Mark the now secure and ready for installation of the modules. channel adjacent to the attachment devices. Align and mark the intersecting"V" groove on the rail and Page 5of7 COPYRIGHT PROFESSIONAL SOLAR PRODUCTS 2007: All information contained in this manual is property of Professional Solar Products (PSP). TileTrac®is a registered trademark for PSP and is covered under U.S.patent#5,746,029.RoofTrac®and FastJack®is a registered trademark for PSP and is covered under U.S.patent#6,360,491. professional Rooffrov SOLAR products5m, Installation Manual 1w, Date Modified:08/13/07 Step 2: Attaching Support Rails to TileTrac®/Fasdack® ifeTrac version T-wrench Fct s1:JaCi: vet5it7i"'1 on next I;?ag<? 2 TileTrac Device Nut/Washer combo Installation of the RoofTrac®support rails to the over the attachment feet, install the 3/8" washer and TileTrac®. nut and tighten using a 9/16" deep socket wrench. Your support rails are now secure and ready for After the TileTracg has been installed (refer to the installation of the modules. respective installation guide), lay the support rail (upside down) next to the attachments, step 1, as illustrated above. Mark the channel adjacent to the Use of a Unibit®will decrease drill attachment devices. Align and mark the intersecting time to approximately 3 seconds per "V" groove drill guide on the rail and drill a 1/2" hole in hole through the rail. After drilling the hole, place the rail Page 4of7 COPYRIGHT PROFESSIONAL SOLAR PRODUCTS 2007: All information contained in this manual is property of Professional Solar Products (PSP). TileTrac®is a registered trademark for PSP and is covered under U.S.patent#5,746,029.RoofTrac@ and FastJack®is a registered trademark for PSP and is covered under U.S.patent#6,360,491. professional RoofTrac® SOLAR pro uctsvvy Installation Manual Date Modified:08/13/07 Insert the splice "A" into the channel and install "B" —the two 5/16" bolts/ lock washers— into the lower support "C". Tighten using a 1/2" socket. Splice insert is designed to expand into the extrusion walls forcing the rails into alignment, do not over tighten. Roof Trac®support rails can now can be handled and installed as one solid rail. 1/2"Socket B 5/16" bolts/ lock washers LZ A y Insert Extrusion C Lower Support Splice Expansion Feature: RoofTrac®splice kits are designed to hold support rails in alignment and allow for thermal expansion of the aluminum. After fastening the support rails to the attachments, remove one of the 5/16"bolts. Thermal expansion of the aluminum support rails will now be absorbed in the splice connection instead of stressing the roof attachments. The remaining splice kit bolt and assembly will keep the support rails in perfect alignment. Page 3 of 7 COPYRIGHT PROFESSIONAL SOLAR PRODUCTS 2007: All information contained in this manual is property of Professional Solar Products (PSP). TileTrac@ is a registered trademark for PSP and is covered under U.S.patent#5,746,029.RoofTrac®and FastJack®is a registered trademark for PSP and is covered under U.S.patent#6,360,491. professional Rooffrav SOLAR pro uct9w, Installation Manual Date Modified:08/13/07 steps Installation 1) Utilizing the Splice Kit 2) Attaching Support rails to the TileTrac®/FastJack@ 3) Installing modules 4) Cleanup and safety Step 1: Utilizing the Splice Kit It is recommended that you pre-install the splice kit on the ground for easier handling of the sup- port rails. After installing the splices, set the lengths against the building.Typically, the installer on the roof can pull the lengths to the roof without any mechanical equipment and handle the lengths as one unit. Felt Tip Pen Drill Use of a Unibit® will decrease drill Splice holes— time to approxi- mark with mately 3 seconds permanent ink �� per hole pen Uni-Bit@ V-groove I drill guide Lower Support oRT . 1/8"Ga 'Q9/� � 3Upp0 / p Rr Intersections of the reference mark and extended "V"groove. Turn the support rails upside down (as illustrated) so the bottom is facing up. Drill two holes using a 1/2" #10 UniBit®. Drill Place the lower support over the rails to at the intersection of the reference mark and use as a template. Center the lower the "V" groove drill guide. support over the rails and mark along the V-groove drill guide using a small felt pen. Page 2 of 7 COPYRIGHT PROFESSIONAL SOLAR PRODUCTS 2007: All information contained in this manual is property of Professional Solar Products (PSP). TileTrac@ is a registered trademark for PSP and is covered under U.S.patent#5,746,029.RoofTrac@ and FastJack®is a registered trademark for PSP and is covered under U.S.patent#6,360,491. professional Rooffrov Sow productsvvl, Installation Manual Date Modified:08/13/07 APPLICATION: The RoofTrac mounting system consists of sup- / port rails and top-down clamping hardware which is integrated with either a TileTrac or Fast-Jack attachment device. The RoofTrac mounting sys- tem can be utilized on virtually all standard con- struction residential roof-tops, mounting 4' on center,to install the majority of popular framed solar modules. WARNING Symbol Legend All Professional Solar Products (ProSolar) are engineered and tested to withstand stated specifications (as stated on published specification sheets)when installed properly. Fail- Explanation or Install Tip ure to install properly may decrease the performance of in- stallation. ® SAFETY Important product All regional safety requirements should be followed when performance information installing Professional Solar Products. All tools and equip- ment located on the roof should be secured to avoid falling object hazards. All equipment/tools should be properly maintained and inspected prior to use. Any exposed studs Critical for Safety should be protectively capped to help avoid injury. This installation manual is intended for use by professional installers with a working knowledge of construction princi- ples. Tool • Chalk line • 3/16" carbide masonry drill bit • 3/8" masonry drill bit(for tile roof) • Cordless drill • Cordless impact wrench with 1/2" socket Page 1 of 7 COPYRIGHT PROFESSIONAL SOLAR PRODUCTS 2007: All information contained in this manual is property of Professional Solar Products (PSP). TileTrac®is a registered trademark for PSP and is covered under U.S.patent#5,746,029.RoofTrac®and FastJack®is a registered trademark for PSP and is covered under U.S.patent#6,360,491. i Bulk packaging means easier stocking abilities,less packaging waste and quicker,more convenient FaStJack installation.Everything in the photo below is shipped in a recloseable box for storage of extra parts. P—16360 01 The Fast Jacko is available in four convenient sizes. All sizes are packaged in quantities of 18 per box: 18 - 1" Round Posts(3",4-1/2",6"or 7-1/2"tall) 18 Threaded bases 18 - 3/8"x 3/4"SS Hex Bolts 18 - 3/8"SS Flat washers .. 18 - 5/16"x 3"SS Lag bolts ` v 18 5/16"SS Flat Washers Easy Installation: step . shingles . . illus- trated St�p 1: Drill Pilot hole in •. Step,]using integrated drill guide install base using includ • •• into pilot • • ' • • •' -• Thread post through �,,gles,and above Fast Jack Base t0p, or bottom of flashing • fastJock'l) base ost into base s Flashing Template Available for Oatey (Pictured)and standard flashings.Makes cutting in 1 a perfect flashing easy and painless! Kit includes Fast r Jack post threader with knob Step 7: Seal flashing,around the post to waterproof ©Professional Solar Products,Inc March 2006. a Laboratory Tested ° 2,3591bs k; Vertical Pullout. 8081bs FastJac �Sideflxial Pullout!s Patent#6,360,491 Flashable Roof Stanchion FastJack FJ-300-18 The patented design of the FastJack°can be easily expressed as the most innovative,efficient For Oateyll)style fleshings and cost-effective tool of it's kind! Between the precision W machined base and stanchion along with strid engineering and material standards,the FastJack has been laboratory tested to provide 2,359 pounds of strength using only a single lag bolt(included)! r Four Sizes Available! � . Fa .lack" 3" High Part# F1-300-18 For low profile installations using Oatey RO flashings(for composition shingle roof-tops) FastJack® FJ-450-18 41/2" High Part# FJ-450-18 For standardhe�gMfMshi > For installations using standard flashings(for composition&flat rooftops) i 6" High Part# FJ-600-18 • • •• •• For standard flashings(for flat tile rooftops) 7 1/2" High Part# FJ-750 18 • _••• •• For standard flashings(sized for S-(urve tile roofs and/or double flashed installations) The Fast Jacko design is covered under Pat.#6,360,491 using lea.5/16"z 3-1/2"Lag Bolt r •TM t:.- �' . , Commercial FastJack® also available (rated at 4,250 lbs.) Benefits of the FastJack Easy installation of flashings on 318"x 3/4" 318"SS r r t r r • Removable post makes installation on existing ss Hex sott Flat Washer roofs/retrofit quick and easy(refer to the illustration existing roof-tops to the right) • Patented design locates the log bolt directly The post can be under the stanchion providing superior strength Standard&Oatee Flashings installed through values • • • Fast & easy to install saves time and labor slip over the base and under the the top of the delicate shingle r ` flashing costs • Precision machined from extruded aluminum, ; there are no welds to corrode or break e •• Significantly lighter than steel for installer •. - convenience and reduced shipping costs. # y - e • Integrated drill guide insures perfect pilot holes ,g `x . every time- minimizes the possibility of splitting " roof rafters rr' i� • Base design allows virtually any roof flashing to install flat on the roof deck Email us for more information prosolar@prosolar.com U SPECIFICATIONS PV13800TL PV1520OTL 611 .11 '^ O 0 �x .x r ,.a«�� .�.,.i.t°x: sa -•m� 4 x.,. a..,.. .z...;.. "ms :.,�,.az. a� . .�..,.. ms.�,. .t ._,.ot:.: «;. .,.�, , s... ., �.�, o Absolute Maximum Open Circuit Voltage 600 VDC 0 Operating Voltage Range 120-550 VDC MPPT Input Voltage Range 200-500 VDC MPP Trackers 1 2 - o Maximum Operating Input Current 20A 15 A per MPP tracker 18 A per MPP tracker 20 A per MPP tracker ���` �*_".� �� s`- ""iu IN .. b, 4 Vie: Nominal Output Voltage 208 or 240 VAC,1-Ph m AC Voltage Range -12%1+10% 0 208 VAC 3300 W 5200 W 6600 W 6600 W Continuous Output Power 240 VAC 3800 W 5200 W 6600 W 7600 W 208 VAC 15.8 A 25A 31.7 A 31.7 A Continuous Output Current 240 VAC 15.8A 21.6A 27.5A 31.7A E Maximum Backfeed Current OA Nominal Output Frequency 60 Hz a U Output Frequency Range 59.3-60.5 Hz Power Factor Unity,>0.99 v Total Harmonic Distortion(THD) <3% 3 „ . ate x + o E.„. ,. Peak Efficiency 98.3% CEC Efficiency 97.5 Tare Loss <1 W L m Ambient Temperature Range(full power) -13°F to+122°F(-25°C to+50°C) Storage Temperature Range -40°F to+185°F(-40°C to+85°C) Relative Humidity(non-condensing) 0-100% Optional SolrenView Web-based Monitoring External Optional Revenue Grade Monitoring External External Communication Interface RS-485 �.r . 'Y dl L Safety Listings&Certifications UL 1741/IEEE 1547,UL1699B,CSA C22.2#107.1,FCC part 15 A&B Testing Agency ETL CSA Standard 10 year Optional Extended warranties,to 15&20 years ' ��'"'„�. ..�,z z��'�� ��y<'�” v'b s�,..t:fi�-^& � ��.•+ � .�'�a `rte'� ^",,, e!v �vwx?��` t v�,.°t.a �a r t�'s,ysa ^za3` �'�g` ��+�� ��.�� - DC Disconnect Standard,fully-integrated Dimensions(H x W x D) 17.5 x 15.8 x 8.5 in. 26.8 x 15.8 x 8.5 in. (445 x 401 x 216 mm) (680 x 401 x 216 mm) Weight 43 Ibs(19.5 kg) 65 Ibs(29.5 kg) Enclosure Rating Type 4 Enclosure Finish Aluminum SrOLECTRIA R E N E W A B L E s www.solectria.com I inverters @solectria.com 1 978.683.9700 SOLECTRIA RENEWABLES nE = 5. ` MR 3 5. t IN s l E`w< 4�. 3 IF�+ . E`i k� %`,L a....,„. ,,..4 € R �t. a.% € 4i� t...s 3 '+....« �5,.«, t5 v Solectria Renewables'PVI 3800TL, 5200TL,6600TL and 7600TL are compact, transformerless, single-phase inverters with the highest peak and CEC efficiencies in the industry.These inverters come standard with an integrated DC disconnect, Y optional DC arc-fault detection and interrupt, 1 or 2 MPPtracker(s),and a user- interactive LCD and keypad.Its small and lightweight design make for quick and easy installation and maintenance.The inverters have an innovative passive cooling design. �.§ They don't have fans,so no fan noise or fan failures over the lifetime.These inverters "y x include an enhanced DSP control,comprehensive protection functions,and advanced thermal design enabling highest reliability and uptime.They also come with a standard 10 year warranty with options for 15 and 20 years. IN; ££Yi E•ipk C �� US � s r � Multi-crystal line Type Nominal output(Pmpp) W 230 235 240 245 250 Voltage at Pmax(Vmpp) V 30.1 303 30.5 30.7 30.9 Current at Pri(Impp) A 7.7 7.8 7.9 8.0 8.1 Open circuit voltage(Voc) V 37.1 37.4 37.7 38.0 38.2 Short circuit current(Isc) A 8.2 8.3 8.3 8.4 8.6 Output tolerance % +3/-0 No.of cells&connections PCs 60 in series Cell type 6"Multi-crystalline silicon Module efficiency % 14.2 14.5 14.8 15.2 15.5 Temperature coefficient of Pmpp %/K -0.43 -0.43 -0.43 -0.43 -0.43 Temperature coefficient of Voc %/K -0.32 -0.32 -0.32 -0.32 -0.32 Temperature coefficient of Isc %/K 0.048 0.048 0.048 0.048 0.048 X All data at STC(Standard Test Conditions).Above data may be changed without prior notice. Mono-crystal line Type Nominal output(Pmpp) w 245 250 255 260 Voltage at Pmax(Vmpp) V 30.3 30.5 30.8 31.0 Current at Pmax(Impp) A 8.1 8.2 8.3 8.4 Open circuit voltage(Voc) V 37.4 37.5 37.7 37.8 Short circuit current(Isc) A 8.6 8.7 8.8 8.9 Output tolerance % +3/-0 No.of cells&connections PCs 60 in series Cell type 6"Mono-crystalline silicon Module efficiency % 15.2 15.5 15.8 16.1 Temperature coefficient of Pmpp %/K -0.45 -0.45 -0.45 -0.45 Temperature coefficient of Voc %/K -0.33 -0.33 -0.33 -0.33 Temperature coefficient of Isc %/K 0.032 0.032 0.032 0.032 X All data at STC(Standard Test Conditions).Above data may be changed without prior notice. Module Diagram (unit:mm,inch) I-V Curves Q,,­[AI [AI B 8.5033 n Intid.kmd=IAWWIne I,D00.ron937) IAWmmf39.37g DETAILA OI_tingC.Tanp=S'C 4mm'CABLE& 4-WCABLE& -OP_-- P=25 .1 CONNECTOR CONNECTOR � 4975LOTrHRU --OW.,ogCeATop=45'C I o sCperamg Cd p-65°Css GROUNDMARK 80.31) C-tw VdragelVl sy 0tcid.irratl=l,1W W/m' It Iritld.b2d=1AWWlm' DETAILB hldd.krad=900 Wfm' 4%042 Inad.lrrad=6W W.m i 16.6(0.65 GROUNDHOLE '1 --------'�-_` e (2.4") 71(043") s - Imadk2d-]WWIm' .. 939 36.97 \ 1.&(0.071 C A 30 r) CeAtemp.=25'C 983136.70") C 2455(9.6) SECTION C-C VoR49erV1 Installation Safety Guide 46°C±2 Only qualified personnel should install or perform maintenance. 40-85°C Be aware of dangerous high DC voltage. DC 1,000 V(IEC) •Do not damage or scratch the rear surface of the module. DC 600 V(UL) Do not handle or install modules when they are wet. 15 n [Printed Date July 2U 121 ^ Sales&Marketing HYUNDAI Jl Pn�ceoo rsc�emevd 121"Fl.,Hyundai Bldg.,75,Yul ok-ro,Jon no- u,Seoul 110-793,Korea tttttYYY erw,w�,dHvaa�'< Y 9•, 9 9 9 rsc Tel:+82-2-746-8406,7422,8525 Fax:+82-2-746-7675 HEAVY INDUSTRIESCO.,ITD. www.hyundaisolar.com Black-Black Multi-crystalline Type HiS-M230MG(BK)I HiS-M235MG(BK) HiS-M240MG(BK) HiS-M245MG(BK) HiS-M250MG(BK) MG-Series Mono-crystalline Type HiS-S245MG(BK)I HiS-S250MG(BK)I HiS-S255MG(BK) HiS-S260MG(BK) 983 mm(38.7")(W)x 1,645 mm(64.76")(L)x 35 mm(1.38")(H) Approx.19.0 kg(41.9 Ibs) 60 cells in series(6 x 10 matrix) 4 mm2(12AWG)cables with polarized weatherproof connectors, IEC certified(UL listed),Length 1.0 m(39.4") IP65,weatherproof,IEC certified(UL listed) 3 bypass diodes to prevent power decrease by partial shade Front:High transmission low-iron tempered glass,3.2 mm(0.126") Encapsulant:EVA Back Sheet:Weatherproof film(Black) Clear anodized aluminum alloy type 6063(Black) IEC 61215(Ed.2)and IEC 61730 byTOV Rheinland UL listed(UL 1703),Class C Fire Rating Output power tolerance+3/-0% ISO 9001:2000 and ISO 14001:2004 Certified Advanced Mechanical Test(5,400 Pa)Passed(IEC) /Mechanical Load Test(40 Ibs/ft')Passed(UL) Delivered ready for connection Pre-confectioned cables IEC(UL)certified and weatherproof connectors Integrated bypass diodes 10 years for product defect 10 years for 90%of warranted min.power 25 years for 80%of warranted min.power X Important Notice on Warranty The warranties apply only to the PV modules with Hyundai Heavy Industries Co.,Ltd:s logo(shown below)and product serial number on it. c us PV CYCLE HYUNDAI •�,r' °"""° LISTED >}." t HEAVY INDUSTRIES CO.,LTD. 3 Laurel St Subcontractor List 1. Kevin Greenlaw — Roof Prep and mounting hardware installation. 2. Dan Whiteley (Whiteley Electric) — Electrician. All electrical aspects of PV installation. 3 Laurel St Project Narrative Installation of 45 Hyundai HiS-S260MG-solar p-h.otovoltaic_modules and--2 Solectria Renewables PVI 660OTL inverters . Panels will be mounted using Fastjack, and Rooftrac mounting hardware. Mounting feet to be attached using 5/16" X 3 %" stainless steel lags penetrating minimum 3" into rafters. Rafters aFe2X12 @ 1 n_C_ This system is designed to withstand 55 psf snowload and 100 mph windload. Please see attached datasheets for the Hyundai panels, Solectria Inverters, and Fastjack and Rooftrac mounting hardware. DATE(MWDDIYYYY) AC RE® CERTIFICATE OF LIABILITY INSURANCE 9/3/2014 THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER. THIS CERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW. THIS CERTIFICATE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING INSURER(S), AUTHORIZED REPRESENTATIVE OR PRODUCER,AND THE CERTIFICATE HOLDER. IMPORTANT: If the certificate holder is an ADDITIONAL INSURED, the policy(ies) must be endorsed. If SUBROGATION IS WANED, subject to the terms and conditions of the policy,certain policies may require an endorsement.A statement on this certificate does not confer rights to the certificate holder in lieu of such endorsement(s). PRODUCER Phone: (978)597-6789 CONTACT Doris Garnhum Fax: (978)597-6587 NAME: PHOE L.F.Robbins Insurance Agency** AICN,No,Ext: (978)433-2777 NC No): (978)433-6425 E-MAIL dgarnhum @Ifrobbins.com 241 Main Street ADDRESS:___ BX 634 INSURER(S)AFFORDING COVERAGE NAIC# Townsend,Massachusetts 01469 INSURER A: Travelers Insurance Co. 87726 INSURED INSURER B: Peerless Insurance Company 24198 Transformations,Inc INSURER C: 8 Coppersmith Way INSURER D: Townsend,MA 01469-4412 INSURER E INSURER F: COVERAGES CERTIFICATE NUMBER: REVISION NUMBER: THIS IS TO CERTIFY THAT THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED. NOTWITHSTANDING ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS CERTIFICATE MAY BE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS, EXCLUSIONS AND CONDITIONS OF SUCH POLICIES.LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS. INSR TYPE OF INSURANCE ADDL SUBR POLICY EFF POLICY EXP LIMITS LTR WV POLICY NUMBER MWDD/YYYY MM/DDIYYYY COMMERCIAL GENERAL LIABILITY EACH OCCURRENCE $ DAMAGE TO RENTE CLAIMS-MADE D OCCUR PREMISES(Ea occur ence) $ MED EXP(Any one person) $ PERSONAL&ADV INJURY $ GEN'L AGGREGATE LIMIT APPLIES PER: GENERAL AGGREGATE $ POLICY 1:1 PRO-JECT ❑ LOC PRODUCTS-COMP/OP AGG $ OTHER: $ AUTOMOBILE LIABILITY COMBINED SINGLE LIMIT $ Ea accident ANY AUTO BODILY INJURY(Per person) $ ALL OWNED SCHEDULED BODILY INJURY(Per accident) $ AUTOS AUTOS NON-OWNED PROPERTY DAMAGE HIRED AUTOS AUTOS Per accident $ UMBRELLA LIAB _ OCCUR EACH OCCURRENCE $ EXCESS LIAB CLAIMS-MADE AGGREGATE $ DED RETENTION$ $ WORKERS COMPENSATION 4/2/2014 4/2/2015 STATUTE ER H A AND EMPLOYERS'LIABILITY YIN 6KUB-0326N39-A-14 ANY PROPRIETOR/PARTNER/EXECUTIVE E.L.EACH ACCIDENT $ 500,000 OFFICER/MEMBER EXCLUDED? N❑ N I'�` N (Mandatory in NH) E.L.DISEASE-EA EMPLOYE $ 500,000 If yes,describe under DESCRIPTION OF OPERATIONS below E.L.DISEASE-POLICY LIMIT I $ 500,000 B Installation/Builders Risk IM 8275253 4/25/2014 4/25/2015 DESCRIPTION OF OPERATIONS I LOCATIONS I VEHICLES(ACORD 101,Additional Remarks Schedule,may be attached if more space is required) CERTIFICATE HOLDER CANCELLATION Holder's Nature of Interest:Certificate Holder SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE City of Northampton THE EXPIRATION DATE THEREOF, NOTICE WILL BE DELIVERED IN tY p ACCORDANCE WITH THE POLICY PROVISIONS. Northampton,MA AUTHORIZED REPRESE E ©1988-2014 ACORD CORPORATION.All rights reserved. ACORD 25(2014/01) The ACORD name and logo are registered marks of ACORD The Commonwealth of Massachusetts Department of IndustrialAccidents Office of Investigations W I Congress Street, Suite 100 Boston,MA 02114-2017 www mass.gov/dia Workers' Compensation Insurance Affidavit: Builders/Contractors/Electricians/Plumbers Applicant Information Please Print Legibly Name (Business/Organization/Individual): Ned Wilson - Transformations Inc. Address:8 Coppersmith Way City/State/Zip:Townsend MA 01469 Phone #:978-597-0542 Are you an employer?Check the appropriate box: Type of project(required): 1.❑ I am a employer with 4. ❑■ I am a general contractor and I employees (full and/or part-time).* have hired the sub-contractors 6. ❑New construction 2.❑ I am a sole proprietor or partner- listed on the attached sheet. 7. ❑ Remodeling ship and have no employees These sub-contractors have g, ❑ Demolition working for me in any capacity. employees and have workers' 9 ❑ Building addition [No workers' comp, insurance comp. insurance.# required.] 5. ❑ We are a corporation and its 10.0 Electrical repairs or additions 3.❑ I am a homeowner doing all work officers have exercised their 11.❑ Plumbing repairs or additions myself. [No workers' comp. right of exemption per MGL 12.❑Roof repairs insurance required.] t c. 152,§1(4),and we have no Solar Panels employees. [No workers' 13.❑■ Other comp. insurance required.] *Any applicantthat checks box 41 must also fill out the section below showing their workers'compensation policy information. t Homeowners who submit this affidavit indicating they are doing all work and then hire outside contractors must submit a new affidavit indicating such. +Contractors that check this box must attached an additional sheet showing the name of the sub-contractors and state whether or not those entities have employees. If the sub-contractors have employees,they must provide their workers'comp.policy number. I am an employer that is providing workers'compensation insurance for my employees. Below is the policy and job site information. Insurance Company Name:Travelers Insurance Co Policy#or Self-ins. Lic.#:6KUB-0326N39-A-14 Expiration Date:4/2/2015 Job Site Address: 3 Laurel St City/State/Zip:Northampton MA 01060 Attach a copy of the workers' compensation policy declaration page(showing the policy number and expiration date). Failure to secure coverage as required under Section 25A of MGL c. 152 can lead to the imposition of criminal penalties of a fine up to$1,500.00 and/or one-year imprisonment, as well as civil penalties in the form of a STOP WORK ORDER and a fine of up to$250.00 a day against the violator. Be advised that a copy of this statement may be forwarded to the Office of Investigations of the DIA for insurance coverage verification. I do hereby certify and r the pains and penalties of perjury that the information provided above is true and correct. Signature: Date:9119/2014 Phone#: 9785970542 Official use only. Do not write in this area,to be completed by city or town official. City or Town: Permit/License# Issuing Authority(circle one): 1.Board of Health 2. Building Department 3.City/Town Clerk 4.Electrical Inspector 5. Plumbing Inspector 6.Other Contact Person: Phone#: SECTION 8-CONSTRUCTION SERVICES 8.1 Licensed Construction Supervisor: Not Applicable ❑ Name of License Holder:Ned Wilson CS-106150 License Number 131 Hayes Hill Rd PO Box 135 Mill River MA 01244 7/5/2015 Address y��'�" � � Expiration Date 413) 854-1453 Signature Telephone 9.Re-gistered Home Improvement Contractor: Not Applicable ❑ Ned Wilson - Transformations Inc. 172166 Company Name Registration Number 131 Hayes Hill Rd PO Box 135 Mill River MA 01244 5/31/2016 Address Expiration Date Telephone(413) 854-1453 SECTION 10-WORKERS'COMPENSATION INSURANCE AFFIDAVIT(M.G.L.c. 152,§25C(6)) Workers Compensation Insurance affidavit must be completed and submitted with this application. Failure to provide this affidavit will result in the denial of the issuance of the building permit. Signed Affidavit Attached Yes....... EI No...... ❑ 11. - Home Owner Exemption The current exemption for"homeowners"was extended to include Owner-occupied Dwellings of one(1) or two(2)families and to allow such homeowner to engage an individual for hire who does not possess a license,provided that the owner acts as supervisor.CMR 780, Sixth Edition Section 108.3.5.1. Definition of Homeowner:Person(s)who own a parcel of land on which he/she resides or intends to reside,on which there is,or is intended to be,a one or two family dwelling,attached or detached structures accessory to such use and/or farm structures.A person who constructs more than one home in a two-year period shall not be considered a homeowner. Such"homeowner"shall submit to the Building Official,on a form acceptable to the Building Official,that he/she shall be responsible for all such work performed under the buildine permit. As acting Construction Supervisor your presence on the job site will be required from time to time,during and upon completion of the work for which this permit is issued. Also be advised that with reference to Chapter 152(Workers'Compensation) and Chapter 153 (Liability of Employers to Employees for injuries not resulting in Death)of the Massachusetts General Laws Annotated,you may be liable for person(s) you hire to perform work for you under this permit. The undersigned"homeowner"certifies and assumes responsibility for compliance with the State Building Code,City of Northampton Ordinances,State and Local Zoning Laws and State of Massachusetts General Laws Annotated. Homeowner Signature SECTION 5-DESCRIPTION OF PROPOSED WORK(check all applicable) New House ❑ Addition ❑ Replacement Windows Alteration(s) Roofing Or Doors E] Accessory Bldg. ❑ Demolition ❑ New Signs t]] Decks [Q Siding[O] Other[� Brief Description of Proposed Work: Installation of 45 solar panels on roof of house.Please see attached narrative and datasheets for more detailed description of work to be performed. Alteration of existing bedroom]ayes No Adding new bedroom Yes No Attached Narrative Renovating unfinished basement Yes F77-1 No Plans Attached Roll -Sheet sa. If New house and or addition to existing housing, complete the following: a. Use of building: One Family Two Family Other b. Number of rooms in each family unit: Number of Bathrooms c. Is there a garage attached? d. Proposed Square footage of new construction. Dimensions e. Number of stories? f. Method of heating? Fireplaces or Woodstoves Number of each g. Energy Conservation Compliance. Masscheck Energy Compliance form attached? h. Type of construction i. Is construction within 100 ft. of wetlands? F] Yes 1-1 No. Is construction within 100 yr. floodplain—ayes ONo j. Depth of basement or cellar floor below finished grade k. Will building conform to the Building and Zoning regulations? �_Yes No. I. Septic Tank F-1 City Sewer Private well City water Supply SECTION 7a-OWNER AUTHORIZATION-TO BE COMPLETED WHEN OWNERS AGENT OR CONTRACTOR APPLIES FOR BUILDING PERMIT I, Transformations Inc. as Owner of the subject property hereby auth rize Ned Wilson to act on m behalf,utters relative to work authorized by this building permit application. J4 ' 11 2 d Signature of wner Date l Ned Wilson as Owner/Authorized Agent hereby declare that the statements and information on the foregoing application are true and accurate,to the best of my knowledge and belief. Signed and the pains and penalties of perjury. 011 Pnn Name V-1im q A &o/ Signature of Owner/Agent Date Section 4. ZONING All Information Must Be Completed. Permit Can Be Denied Due To Incomplete Information Existing Proposed Required by Zoning This column to be filled in by Building Department Lot Size Frontage Setbacks Front Side L: R: L: R: Rear Building Height Bldg. Square Footage % Open Space Footage % (Lot area minus bldg&paved parking) #of Parking Spaces Fill: (volume&Location A. Has a Special. Permit/Variance/Finding ever been issued for/on the site? NO ® DON'T KNOW Q YES IF YES, date issued: IF YES: Was the permit recorded at the Registry of Deeds? NO O DON'T KNOW 0 YES IF YES: enter Book Page and/or Document# B. Does the site contain a brook, body of water or wetlands? NO Q DON'T KNOW © YES IF YES, has a permit been or need to be obtained from the Conservation Commission? Needs to be obtained © Obtained ® , Date Issued: C. Do any signs exist on the property? YES © NO e IF YES, describe size, type and location: D. Are there any proposed changes to or additions of signs intended for the property ? YES ® NO Q IF YES, describe size, type and location: E. Will the construction activity disturb(clearing, grading, excavation, or filling)over 1 acre or is it part of a common plan that will disturb over 1 acre? YES O NO O IF YES, then a Northampton Storm Water Management Permit from the DPW is required. Department use only City of Northampton Status of Permit: I Building Department Curb Cut/Driveway Permit 2 3 2014 212 Main Street Sewer/Septic Availability LJ LJ Room 100 Water/ Well Availability am c.Plumbing a Gas Inspsathm Northampton, MA 01060 Two Sets of Structural Plans Northam n,MAQt 413-587-1240 Fax 413-587-1272 Plot/Site Plans Other Specify APPLICATION TO CONSTRUCT,ALTER,REPAIR, RENOVATE OR DEMOLISH A ONE OR TWO FAMILY DWELLING SECTION 1 -SITE INFORMATION 1.1 Property Address: This section to be completed by office Map 3 9 a Lot Unit 3 Laurel St � Zone Overlay District Elm St.District CB District SECTION 2-PROPERTY OWNERSHIP/AUTHORIZED AGENT 2.1 Owner of Record: Transformations Inc. 8 Coppersmith Way,Townsend MA 01469 Name W7/61110-11 Current Mailing Address: 978-597-0542 Telephone Signature 2.2 Authorized Agent: Ned Wilson PO Box 135 Mill River MA 01244 Name V a Current Mailing Address: i� 413-854-1453 Signature Telephone SECTION 3-ESTIMATED CONSTRUCTION COSTS Item Estimated Cost(Dollars)to be Official Use Only completed by ermit applicant 1. Building (a) Building Permit Fee 2. Electrical (b)Estimated Total Cost of Construction from 6 3. Plumbing Building Permit Fee 4. Mechanical(HVAC) 5. Fire Protection 6. Total=(1 +2+3+4+5) 330 3 13, 00 717;eck Number This Section For Official Use Only Building Permit Number: Date Issued: Signature: Building Commissioner/Inspector of Buildings Date File#BP-2015-0348 APPLICANT/CONTACT PERSON TRANSFORMATIONS INC ADDRESS/PHONE 8 COPPERSMITH WAY TOWNSEND (978)597-0542 PROPERTY LOCATION 3 LAUREL ST-LOT 4 MAP 38A PARCEL 145 001 ZONE THIS SECTION FOR OFFICIAL USE ONLY: PERMIT APPLICATION CHECKLIST ENCLOSED REQUIRED DATE ZONING FORM FILLED OUT Fee Paid Building Permit Filled out 001. a �. i Fee Paid ' 6 40 Tvneof Construction: INSTALL 45 PANELS ROOF MOUNTED SOLAR ARRAY New Construction Non Structural interior renovations Addition to Existing Accessory Structure Building Plans Included: Owner/Statement or License 106150 3 sets of Plans/Plot Plan THE FOLLOWING ACTION HAS BEEN TAKEN ON THIS APPLICATION BASED ON INFORMATION PRESENTED: Approved Additional permits required(see below) PLANNING BOARD PERMIT REQUIRED UNDER:§ Intermediate Project: Site Plan AND/OR Special Permit With Site Plan Major Project: Site Plan AND/OR Special Permit With Site Plan ZONING BOARD PERMIT REQUIRED UNDER: § Finding Special Permit Variance* Received&Recorded at Registry of Deeds Proof Enclosed Other Permits Required: Curb Cut from DPW Water Availability Sewer Availability Septic Approval Board of Health Well Water Potability Board of Health Permit from Conservation Commission Permit from CB Architecture Committee Permit from Elm Street Commission Permit DPW Storm Water Management ti Delay S r of ui ding O icial Date Note: Issuance of a Zoning permit does not relieve a applicant's burden to comply with all zoning requirements and obtain all required permits from Board of Health,Conservation Commission,Department of public works and other applicable permit granting authorities. *Variances are granted only to those applicants who meet the strict standards of MGL 40A. Contact Office of Planning&Development for more information. 3 LAUREL ST-LOT 4 BP-2015-0348 GIs#: COMMONWEALTH OF MASSACHUSETTS Map:Block: 38A- 145 CITY OF NORTHAMPTON Lot: -001 PERSONS CONTRACTING WITH UNREGISTERED CONTRACTORS Permit: Building DO NOT HAVE ACCESS TO THE GUARANTY FUND (MGL c.142A) Category: SOLAR PANELS BUILDING PERMIT Permit# BP-2015-0348 Project# JS-2015-000636 Est. Cost: $33813.00 Fee: $202.88 PERMISSION IS HEREBY GRANTED TO: Const. Class: Contractor: License: Use Group: TRANSFORMATIONS INC 106150 Lot Size(sq. ft.): 14331.24 Owner: TRANSFORMATIONS INC Zonine: Applicant: TRANSFORMATIONS INC AT. 3 LAUREL ST - LOT 4 Applicant Address: Phone: Insurance: 8 COPPERSMITH WAY (978) 597-0542 WC TOWNSENDMA01469 ISSUED ON.9/24/2014 0:00:00 TO PERFORM THE FOLLOWING WORK.-INSTALL 45 PANELS ROOF MOUNTED SOLAR ARRAY POST THIS CARD SO IT IS VISIBLE FROM THE STREET Inspector of Plumbing Inspector of Wiring D.P.W. Building Inspector Underground: Service: Meter: Footings: Rough: Rough: House# Foundation: Driveway Final: Final: Final: Rough Frame: Gas: Fire Department Fireplace/Chimney: Rough: Oil: Insulation: Final: Smoke: Final: THIS PERMIT MAY BE REVOKED BY THE CITY OF NORTHAMPTON UPON VIOLATION OF ANY OF ITS RULES AND REGULATIONS. Certificate of Occupancy Signature: FeeType: Date Paid: Amount: Building 9/24/2014 0:00:00 $202.88 212 Main Street,Phone(413)587-1240,Fax: (413)587-1272 Louis Hasbrouck—Building Commissioner