Loading...
23D-081 (7) 5TU _�v Toll Free (877) 3-STURDY All home improvement contractors and subcontractors Springfield (413) 543-1681 engaged in home improvement contracting, unless specifi- N Worcester (508) 797-6600 cally exempt from registration by Provisions of Chapter 142A TOTAL HOME RENOVATION New Haven (203) 848-2118 of the general laws, must be registered with the WWW.SturdyHome.com Commonwealth of Massachusetts. Inquiries about istra- 459 Main St.•Indian Orchard, MA 01151 Fax (413) 543-3200 q P.O.Box 51033•Indian Orchard, MA 01151 ton and status should be made to the Director, Home Improvement Contract Registration, MA REG.#151711 Member Better Business Bureau CT REG.#601525 Fully Licensed & Insured One Ashburton Place,Room 1301,Boston,MA 02108 Submitted to: 4 WZ e"cG Cb o d A- (617)727-8598 PHQNfI o �GL• iV !U,�_ 12,14 IN WORK# We hereby submit specifications and estimates for work to be performed and materials to be used: r --7 ,,f(..�•�-L v - ,Y?A Lt S 1 - y Cam, /J O l.•L•• �'� S /�7/i�u.. Tc� S � !iJ_� �`'S'n' Iti 3 �� `v�-�r�� �-L cal-�/•�.�—� l✓� �^�f�� ks� f2e �� +i J� r ,r.�fo�pl/c k1 i vi-v. r �`�-i '�q'�u r S' Y Z-< a r Or L.wato, Q2►� � 'K I✓f S �6��1 I° t L 2fiZ 1 —1�� l l� WORK SCHEDULE Contractor will not begin the work or order the materials before the third day following the signing of this Agreement,unless specified herein.Contractor will begin the work on or about (date).Barring delay caused by circumstances beyond Contractor's control,the work will be completed by (date).The Owner hereby acknowledges and agrees that the scheduling dates are approximate and that such delays that are not avoidable by the Contractor including,but not limited to strikes,Acts of God,shortages of materi- als,accidents,and all other delays beyond its control,shall not be considered as violations of this Agreement. WARRANTY The Contractor warrants that the work furnished hereunder shall be free from defects in materials and workmanship for a period of following completion and shall comply with the requirements of this Agreement.In the event any defect in workmanship or materials,or damage caused by the Contractor,its subcontractors,employees or agents,is discovered after completion of any job,including cleanup,the Contractor shall,at its own expense,forthwith remedy,repair,correct,replace,or cause to be remedied,repaired or replaced,such dam- age or such defect in materials and workmanship.The foregoing warranties shall survive any inspection performed in connection with the agreed-upon work. We Pro ose hereby to furnish material and labor-complete in a cordance with above specifications,for the sum of: yrA '­f dollars($ T110 - ) Payment to be made as follows: clk AL �,($ 0 upon signin !tJ4,W STURDY HOME IMPROVEMENT_INC. _ Name of Contractor/Designated Registrant %($ 2— Q. )upon start of work; P.O. Box 51033 Street Address q(s Z­�,cD upon completion of Indian Orchard MA 01151 413-543-1681 � v City/State Phone %($ ✓ L )shall made forthwith upon completion of work under this contract. Name of Salesman Authorized Signature ACCeptance of Proposal I have read both sides of this document and accept the prices,specifications and conditions stated.I understand that upon signing,this proposal becomes a binding contract.You are authorized to do the work as specified. Payment will be made as outlined above. You may cancel this agreement if it has been signed by a party thereto at a place other than an address of the Seller,which may be his main office or branch thereof,provided you notify the Seller in writing at his main office or branch by ordinary mail posted,by telegram sent or by delivery,not later than midnight of the third business day following the signing of this agreement.Please refer to the Notice of Cancellation that accompanies this contract;con- tents of which are referred to above and incorporated herein by reference. DO NOT SIGN THIS CONTRACT IF THERE ARE ANY BLANK SPACES. • .- � f I{ p Signature �V\J�V ��._./_'Date Signature Date