Loading...
34-007 (17) 158 TURKEY HILL RD BP-2014-1118 GIS#: COMMONWEALTH OF MASSACHUSETTS Map:Block: 34 -007 CITY OF NORTHAMPTON Lot: -001 Permit: Building Category: SOLAR PANELS BUILDING PERMIT Permit# BP-2014-1118 Project# JS-2014-001121 Est. Cost: $27000.00 Fee: $162.00 PERMISSION IS HEREBY GRANTED TO: Const. Class: Contractor: License: Use Group: FIRST SUN SOLAR CO 95026 Lot Size(sq. ft.): 109335.60 Owner: WEINBERGER DOREEN A&CLAIRE HUTTLINGER Zoning: Applicant: FIRST SUN SOLAR CO AT. 158 TURKEY HILL RD Applicant Address: Phone: Insurance: P O BOX 687 (413) 209-9456 0 WC LUDLOWMA01056 ISSUED ON.4 13012014 0:00:00 TO PERFORM THE FOLLOWING WORK:INSTALL ROOF MOUNTED 8.91 KW SOLAR ARRAY ON ACCESSORY STRUCTURE POST THIS CARD SO IT IS VISIBLE FROM THE STREET Inspector of Plumbing Inspector of Wiring D.P.W. Building Inspector Underground: Service- Meter:Meter: I ' /R.e,vgo I, �� �/ Footings: ,SzeN"Tv�es O� ?-1YK _S Rough: Rough:0��_ 3-/y House# Foundation: Driveway Final: Final: Final: Ot<g/-/y Rough Frame: Gas: Fire Department Fireplace/Chimney: Rough: Oil: Insulation: Final: Smoke: Final: O 7-31"'1YkS THIS PERMIT MAY BE REVOKED BY THE CITY OF NORTHAMPTON UPON VIOLATION OF ANY OF ITS RULES AND ON Certificate of OCCU a C Si nature: "o At'v!2 ov--e4feeT e: Date Paid: Amount: Building 4/30/2014 0:00:00 $162.00 212 Main Street,Phone(413)587-1240, Fax: (413)587-1272 Louis Hasbrouck-Building Commissioner