Loading...
25A-190 (15) y Document' No. U 0 7 . � Line No. = Line Type 0 T Vendor No. A CIOCCA CONSTRUCTION CORP P. O. BOX 149 GENERAL C O N T R A C T O R S m 6 SPRINGFIELD, MASSACHUSETTS 01101 P TO: Juster Pope Associates FORM LETTER 5 Bridge Street Shelburne Falls, MA 01370 DATE: July 21, 1986 RE: PVTA New Bus Facility Northampton, MA ATTIT: Jack Frazier 483/483 G/C - Owner Change to Contract Proposal No. We are submitting the following Proposal for your consideration: As requested during the project meeting held on July 8, 1986 , we are proposing an occupancy schedule for the Bus Storage Area portion of the above captioned project. Extremely adverse weather conditions during the month of June, 1986 has caused significant delay to the progress of construction. As given by the National Weather Bureau at Bradley Field June' s average rainfall is 3. 2 inches of percipitation, while June, 1986 received 6. 79 inches and had a total of 14 days of significant rainfall. We lost 14 working days because of this t percipitation and are requesting a time exension of 14 working days. Because of the nature of the work being done at that time: site excavation, installation of below grade structures and concrete footings and foundation, adverse weather played a major role in its progress. We wish to bring to your attention the fact that we did in fact have people working in the field on all but six of those days, but because of the weather the extra effort bore little fruit. We feel that we will be able to deliver the Bus Storage Area to the PVTA for bus storage by August 11, 1986. Bituminous base will be in place and drainage structure and piping will be complete on the north side by August 11, 1986. The concrete pits for the three bus lifts will be poured and all below grade structures within the building will be in place by August 11, 1986 with the exception of the Bus Wash area. We feel the two fluid storage receptacles shown on Page A-1 and Page Eq-1 of the contract drawings are not included in the base contract price and not included in the completion. schedule. Acceptance of this proposal will increase/decrease the Contract Sum by $ 0. 00 and increaseAiRRxRaxR the Contract Time by ays. Approved as - to form- Signed Copy to: Request for , hdnge File Project Manag r No. Job No. 508