25A-185 (125) c o,
r.,
n>
D
ca
c
cc
a`>
s
0
0
c
o .ti
M c
o a
o z c-
cl
Q. ,
-pagaaia aq upa ainlanals
aqj os UOTIVTVISUT uoTlvpuno3 pup jTuuad uoTlvpunoT v saiznbai goigA
`S66I `I g3JUW XTaIpmzxojddp aeTIJV 01 paTnpagns sz Taals Tpinjanils aqy -ATuo
(-Iuoa) NolialuOsIQ Halli m
NOTE: IN ORDER•1'I IATTI[IS APPLICATION MAY 13I?ACCIiP"11?D,TI1E DATA CALLED FOR BELOW MUST BE SO SET FORTH THAT
WE CAN DIi'ITRMINF.FROM THIi APPLICATION AND THE ACCOMPANYING PLANS WIIATTHE EXISTING CONDITIONS ARE AND
-WHAT THE. hUI'URE CONDITIONS WILL BF,.
Plans,in duplicate,must be filed with this application before a permit will be granted,one of which,upon issuance
of the permit shall be kept at the site during the progress of the work.
New...............❑
Addition ........Id
No. ................—D, Zone....GI.........., Type..................., Map Z5A............. Parcel....1.$5.......... Alterations ....
�z N,Pr
Repair............❑
p CITY OF NORTHAMPTON Demolition....Cl
k MASSACHUSETTS
Application for other than a Dwelling Permit
(To be filled out in ink OR on a itypewriter)
To the Building Inspector: Date........January..C18.................. 19 95
Application for a permit is hereby made according to the following:--
1. Location, Street and No. ......45..Industrial Drive
2. Nearest cross s eet ........Bates, Street,,,,,,,,,,,,, .. Lot No...see„attached
. .............................
3. Owner's n Il i ,,E.. _.ggc,a-Cola Company.., Address ....fie..Coca-Cola„Plaza,.,,Atlanta, 3GA
4. Architect's name......Facility Enpineersa Inc ........... Address 2233 Lake Park Drives Smyrna30A300$(
5. Builder's name .F.C1.lity...R.mpgr.t liar.................. Address2233...Lake Park Drive, Smyrna, GA3008C
6. Use of building, Present ..Bottling,,,,,,,,,,,,,,,, Proposed ....Warehouse
. ................................................
7. Building fronts on how many Streets?..............One................................................................................................
8. Is building in fire district? ............Yes.....................................................................................................................
9. Size of building, Width in it. .......500 Length in ft........750 Heigf�t in ft............39'
b 1f 3V*.......... 230 ..5101 Existing
10. Distance of building from Street Line......51.0.:, left lot line....... 5,' right lot line..55.:.., rear lot line....h .. Proposed
11. Type of construction (check one): l—A .......... 1—B .......... I -C .......... II ...G..... III .......... IV.......... V ..........
Stories I3 1 2 3 4 5 6 7 Roof
Story heights in ft. _ 39
T'hickn's of walls in ins. 3”
:Material of walls etal
Material of floor/roof Concrete Metal
Design live load 5 1psf --
Design dead load 14 psf
Occupancy or Use S — 2
No.of persons/families 20
No.of stairs ------ ------ ------ ---NON ------ ---------------
12. Soil under footing is....s_ilt..a?nd...sand...�S.4l ..Pep.R4.> ..e.>G1�1RS.add.....................................................
13. Depth of footing below grade..............4................... ft. Will piles be used?.......No
........................
14. Area of entire building(Present plus new) ........462,475 ,t q
15. Type of roof—flat....................... pitched.l/3"/ftr Material of roof covering.......steel...............................
16. No. of elevators.......0....... Method of heating .............. System lJnit Heaters Fuel ..Natural Gas
.... ..............
17. Are live loads noted on drawings? ...Y..eS..... Are all other structural conditions noted on drawings?..Yes,,,,,,,,,,
18. Building(will be) (is)equipped with sprinklers?.......Yes.................. With sprinkler alarm?.......Yes................
19. Is building to be used as a factory,workshop or mercantile or other establishment employing 10 or more persons?
.....................Y.es...............................................................................................................................I.......................
20. Is building to he used as an office building,dormitory,hotel, family hotel,apartment or boarding house,lodging
o
house or tenement house having 8 or more rooms above the second story? ......N..
................................................
21. How many exits (per floor) to street`? ........7............................................................................................................
22. Is building a"Place of assembly" as defined by the General Laws? ...........No.......................................................
23. Will building conform to the General Laws? ......Y.eS............ Building and Zoning Ordinances? ......Y.q.$............
24. If a garage,distance from nearest building? .......N/A.............................................................................................
25. it an adciiiion,alteration or demol;Lon, when was building erected? 6.1.2.3/80
26. Estimated costs:
The under 'gnedcertifiesthattheabovestatementsaretruetothebest
General S......................................... of his/her kowlgdge and belief.
Plumbing—......................................
_...........i..... .. . .....C:...:../.......... . ... .....................................
Gas Piping....................................... k_1 Sixnature of owner, architect o engineer
Sprinklers........ ............................... j WRITTEN DISCRIPTION OF ORK TO BE DONE
Heating............................................ (Use blank half of reverse side, if necessary)
Electric..................... . . I ....This...will...be warehouse...ac�d7l.C744aR...CR...Ch.....e3.sating
Other .,•,.Foundations 450,000,( building. The existing building will. have bottling
. . ..........................
Total S ............................................
lines installs>_d. This aPpli.cation...is...for. foundations
PNINT�SNOP
,ty"°
> ?
I z �
n'
T, A
v �
a
.. Z m
rri
Zoning
Miscellaneous Additions,Repairs,Alterations,etc. Tel.No._ Alterations
i
NORTHAMPTON, MASS. Y, 19 Additions
APPLICATION FOR PERM4 TO ALTER Repair
Garage
1. Location Lot No.
2. Owner's name Address
3. Builder's name Address
Mass.Construction Supervisor's License No._n Expiration Date
4. Addition
5. Alteration
6. New Porch
7. Is existing building to be demolished?
8. Repair after the fire
9. Garage No.of cars Size
10. Method of heating
11. Distance to lot lines
12. Type of roof
13. Siding house
14. Estimated cost:-
The undersigned certifies that the above statements are true to the best of his, her
knowle a .belief.
46-a
Signature of responsible app icant
Remarks
i
Date Filed January 9, 1995 File No.
ZONING PERMIT APPLICATION (§10 . 2)
I . Name of Applicant: Facility Properties, Inc.
Address : 2233 Lake Park Drive, Smyrna, Ga 30080Telephone : 404/435-0027
2 . Owner of Property: The Coca-Cola Comapny
Address : One Coca-Cola Plaza, Atlanta, GA 30313 Telephone: 404/676-4718
(P.O. Drawer 1734, Atlanta, Ga 30301)
3 . Status of Applicant: Owner g Contract Purchaser
Lessee Other (explain : .____ )
4 . Parcel Identification: Zoning Map Sheet# Parcel# ,
Zoning Districts) (include overlays)
Street Address
Required
5 . Existinq Proposed by Zoning
Use of Structure/Property Manuf.Plant/Dist.I.Ar/Manuf. Plant/Dist Gtr.
(if project is only interior work, skip t:o #6 )
Building height 39 ft.
.Bldg. Coverage (Footprint) 491
Setbacks - front 2p' 20' 20'
- side L: 15' R: 15, _L: 15' R: 15' 15'
- rear 20, '
Lot size L�?
Frontage . ft. 363 ft.
Floor Area Ratio 121 491
oOpen Space (Lot area minus
building and parking) _ 701 241
Parking Spaces 100 128 275 .
Loading 24 54
Signs Relocation of existing n to new ex i on (rear of bldg.)
Fill (volume & location)
6 . Narrative Description of Proposed Work/Project: (Use additional sheets
if necessary) Proposed Distribution Center & Bottling Facility for
Beverage Expansion of Existing Faciity.
7 . Attached Plans: Sketch Plan X __Site Plan
8 . Certification: I hereby certify that the :information contained herein
is true and accurate to the best of my knowley ge.
Date: 01/09/95 Applicant Is Signature: 2
THIS SECTION FOR OFFICIAL USE ONLY:
Approved as presented/based on information presented
Denied as presented--Reason-
special.* Permit and/or Site Plan Required:_
Finding Required: Variance Required:
Signature of Building Inspector Date
NOTE: tssuance of a zoning permit does not tolieve an appliconCs burden to comply With all zoning requirements and obtain all required permits
from the Board of Hoalth, conservation Commission, Dcpattmont of Public Works and otlior applicable permit granting outhoriUos.
i�T)_
001001
itt� ' 8 ca a. �C�N 1 •1�\��11'\a1�3\'t _ b ll•14� i iYaQBC�: r
PERMIT 01 /11 19.1r 1800 . 00 1800 . 00
BANK
+.
_1.001_ 01 /11 /95
EIGHTEEN HUNDRED DOLLARS & NO/1 00 $_1 SOD- 00***-----------
CITY OF NORTHHAMPTON
11'00 100 111' I:05 10000 781: 10 ?[IS 0611'
001001
to
PERMIT 01 /11 /9.( 1800 . 00 1800 . 00
BANK s,,_,TH 1�
00100"
1-DDS 01 /11 /95
EIGHTEEN HUNDRED DOLLARS & NO/100***************
TVtiL'Sit 14AT'1'S P t Q,
CITY OF NORTHHAMPTON
11'00 100 111' I:0 6 10000 ?81: 10 ? LOS 0611'