25A-185 (115) PLUMBING & GAS Grodsky: A. All piping clearly labeled. B. Exterior High Pressure gas lines shall be painted. C. Backflow paperwork missing from 3 units. D. Flash tank connections (Boiler Room) inspected & tested; all temp- orary lines removed and capped. E. Light and fire all unit heaters low pressure. Moran: A. Bathroom final on all bathrooms. B. Water heaters inspected and temperature tested. BUILDING: A. Sprinkler system active and tested. B. Alarm system working and tested. C. 3 copies of Site Plan of Building showing floor layout with utility shutoffs for gas, electric and water clearly indicated. D. Letter from the Planning Board indicating Special Permit conditions have been fulfilled. ELECTRICAL: A. All Exit & Emergency lights installed & operable. B. All temporary wiring and lighting removed from line #1 area & any other working area. C. All panels, switches, boxes, fitting covers installed. No exposed parts. D. Panels, switches, motors etc. identified & labeled. Typed directory required. E. All seal fittings on working equipment sealed & secured. F. Permanent lighting supported and wires secured. G. Approvals on equipment, as-built plans,/drawings for installed machinery and terminals. 4TttAIN p�, O O Q',Zty of JXort4a 11pton �83sHthtiSttt4 � _ DEPARTMENT OF BUILDD`G INSPECTIONS 212 Main Street ' Municipal Building INSPECTOR ,. Northampton, Mass. 01060 April 10, 1995 Ray Remillard Almer Huntley Associates Industrial Drive Northampton, MA 01060 Dear Ray, Enclosed is the list of items that have to be completed before a Temporary Occupancy Certificate will be issued for the existing building. If you've got any questions just give me a call. Tony Patillo Assistant Building Commissioner