25A-185 (114) S "
O C
0
0
m
cv
a�
CD
• NOTE:IN ORDER THAT THIS APPLICATION MAYBE ACCEPTED,THE DATA CALLED FOR BELOW MUST BE-SO SET FORTH THAT
WE CAN DETERMINE FROM THE APPLICATION AND THE ACCOMPANYING PLANS WHAT THE EXISTING CONDITIONS ARE AND
WHAT THE FUTURE CONDITIONS WILL BE.
Plans,in duplicate,must be filed with this application beforea permit will be granted,one of which,upon issuance
of the permit shall be kept at the site during the progress of the work.
New...............0
Addition......X2
No.................~D, Zone..... I........., Type..................., Map...2.5A........, Parcel.......1.8.5....... Alterations ....0
Repair............0
r 4 � �Z1LW PT0
3 �� ► ~� CITY OF NORTHAMPTON r1�..4.�., Demolition....0
/
MASSACHUSETTS
Application for other than a Dwei Ang , ,
rr�i
(To be filled out in ink OR on a typewriter) A
To the Building Inspector:
Date.....FebruarX...�p............... 199 5... td
Application for a permit is hereby made according to the following:-
1. Location, Street and No..........4.5....Indus.tx dal....Dr-iv,G........................................................................
see
2. Nearest cross street....................Bate.s...SLr.eet.....................:..........:..................;...�.. Lot No....afi d
zr�he
3. Owner's name...The Cc�a-.Cola Comp4r�y Audress 0.11P C. o.c.a...Co1.a . ....
4. Architect's name..Fae,i.litY... 11.g.jzl�s~xs....Jur.......... Axatm Atlanta, Georgia303T3*
.......................
5. Builder's name .Faai.1.i.t..y....P.rop�r. ias....�F1.C.......... Address .223.3...)ake...P.a.zk...Dr.,. Smyrna, GA
6. Use of building, Present.Bottlinq Proposed Warehouse 30080
p .........................................................................
7. Building fronts on how many Streets?......................Gzla.......................................................................................
8. Is building in fire district? Yes...............................................................................................................................
g, g,....., Length in ft. 7 5 0..........., He t r{ft......3.9..........
9. Size of building,Width in ft. ....5 0 0.,,, ..,., ,}•
�7 763 Y 51R6 , existinq
10. Distance of building from Street Line.....51,Q.`, left lot line.....3.5, right lot line....55., rear lot line proposed
11. Type of construction(check one): 1-A.......... 1-B .......... 1•-C .......... II.......... III.......... IV.......... V ..........
Stories B 1 2 3 4 5 6 7 Roof
Story heights in ft. 39
Thickn's of walls in ins. 311
Material of walls metal
Material of floor/roof c o n c r t o
metal
Design live load
Design dead load
Occupancy or Use
No.of persons/families 20
No.of stairs ---no e---- ----- ----
12. Soil under footing is...........s, 1 t and....s. ...........................
and .......................................................................
....... .. .......
13. Depth of footing below grade..............4................... ft. Will piles be used?............no
..................
14. Area of entire building(Present plus new) 4 62, 475+ ••..,,,•„ sq.ft.
.......................................................................................
steel
15. Type of roof-flat....................... pitched.....�.�3�� f l Iaterial of roof covering..................................................
16. No.of elevators...Q......... Method of heating.............. System ..I , it heatersFuel ....natural gas
..... ...............
17. Are live loads noted on drawings? .....Y.Q.S.. Are all other structural conditions noted on drawings?..........ye s
18. Building(will be)(is)equipped with sprinklers?......Xe.s................... With sprinkler alarm?........ es
19. Is building to be used as a factory,workshop or mercantile or other establishment employing 10 or more persons?
..............................X e.s..............................................................................................................................................
20. Is building to be used as an office building,dormitory,hotel,family hotel,apartment or boarding house,lodging
house or tenement house having 8 or more rooms above the second story? .............na........................................
21. How many exits(per floor)to street? .............7........................................................................................................
22. Is building a"Place of assembly"as defined by the General Laws? .....no.......
23. Will building conform to the General Laws? ......YQ.,5.......... Building and Zoning Ordinances? ..........�'es
.............
24. If a garage,distance from nearest building? ........a a............................................................................................
25. If an addition,alteration or demolition,when was building erected?......................................................................
26. Estimated costs:-
The undersigned certifies that the above statements are true to the best
General$....3. . .>..,.= .:4;. of his/her knowledge and belief.
Plumbing.............:-........................
...... ......itect.....engineer...................
Gas Piping............. ....................... Si nature of owner,architect or engineer
Sprinklers.... ............ WRITTEN DISC RIPTION OF WORK TO BE DONE
Heating............................................ (Use blank half of reverse side,if necessary)
Electric ! C�,,,A � � This application is for a full building
............................................
Other ....... ::�?-> > �
P ermit Electrical, plumbing, fire P rotect-
. ...........................
�� ion, and mechanical co t act rs will apply for
Total$........................,:.................. separate permits at a fairer 8a to.
PERMIT APPLICATION CHECK LIST
c
PAGE �514 PLOT ( ZONE - t{ j u u - ES NO DATE
1 ZONING FORM APPLICATION
2 , PERMIT A PPLICATION � v
3 O //LIC . #) IF NOT t/
4 3 SETS OF PLANS /PLOT PLAN
5 NEW CONSTRUCTION
6 CURB CUT
7 WATER AVAILABILITY FORMS
8 REMODELING INTERIOR
9 ADDITION
10 ACCESSORY STRUCTURE
11 SIGN / AWNING
12 , PERMIT FEE - CHEC \ONLY - MONEY ORDER
13 SPECIAL PERMIT REQUIRED WITH DEED IF APPLIC B
,I4 UNDER SECTION 127 - CMR 780
15 FORM A
16 . FILL j1
"Y
COMMENTS :
t;
STEELOX
.� k SYSTEMS INC.
5412 Courseview Drive, Suite 300
P.O. Box 8181
Mason,Ohio 45040-8181
513/573-5200
November 4, 1994
CERTIFICA TION
This is to certify that STEELOX SYSTEMS INC., an AISC/MB Quality Certified Manufacturer,
has designed the building and components below to meet the loads indicated in accordance with
the order documents.
Size and Type : RFMG/BJ: 500'-0"wide x 752'-0" long x 32'-6" cave height
Order Number : P-7421
Date of Order : December 23, 1994
Builder : STEELOX Construction Services
Owner : Coca-Cola USA
Location : Northhampton, Ma.
End Use : bottling plant and warehouse
Design Basis : Roof Live Load = 35 psf
Ground Snow Load = n.a. C-0 _
Roof Snow = 35 psf 0
Roof Dead Load = 3.5 psf F,,
Collateral Load = 8 psf
Wind Load = 12 psf
SEISMIC ZONE = per Ma. code
Load Combinations and Wind Application in accordance with the 1986 edition of the
Massachusetts building code.
Design Standards : AISC 8th Edition
AISI 1989 Edition
RECEIVED
Signed;
r
FEB 2 11995
FACILITY CONSTRUCTORS
CKA COLA
JeE o NORTHAMPTON, CIA
S OX SAS INC.
This certification is not a warranty. In no eveni shall Steelox Systems Inc. have any liability whether direct of derivative with respect to any
commercial loss,claim for labor,of consequential damage of any type, whether such claims be based in contract,tort,warranty,strict liability or
otherwise on account of this certification. Steelox System,Inc.liability in respect of errors,misstatement or otherwise arising out of the delivery of this
certification is limited to repair or replace those portions of the building referred to in this certificate to which such errors or misstatements apply,or to
allow credit therefore at Steelox systems,Inc.option.
FACILI17 GROUP 002
yr
z
All
2
DATE: 01/1/95
TO Josepli J . Falasak , Jr
3182 Tia Court
Kenile3aw , GA 30144
RE: APPL. NO; 46577 TEMPORARY PERMIT 1995-()Cii
Dear Mr . Palzsak
In accordance with Sectior-1 81R-(c) of Chapter 112 of the general Laws, you are
hereby granted Per'llission to practice V R 0 F-r N G 1_N E F R T NG in the Commonwealth
Of Massachusetts for a period of thirty days from
or until such time as the Board needs for' final 'Fo�—o.n your applicat"
ac ion for
registration in the Commonwealth of Massachusetts.
The Pr'Ocedure for using your GEORTGA —Seal on a plan or document
in Massacl-jusetts under this permit is to letter or write under the seal the
following.
"TEMPORARY PERMIT MASSACHUSETTS 199/;-001 PF.,-
Very truly yours
An(ireiv Listna , P . E. I,.S .
Chairman
c m
o n o
-+ a
a ry o cn z �
c x o a
m o
crrc � x v
rte-• � r `mil
c �
Z �U
� m a
z rn
0 0 <
w
� L
uM _
N
O A
ou O (O l0
� O
O
S
� d 1
3y
41' y r M
� M
a : r
t �
9 � r
>r
s
v ,
_ r
i � l
Date Filed February 20 , 1995 File No.
ZONING PERMIT APPLICATION (510. 2)
I . Name of Applicant: Facility Engineers Inc.
Address : 2233 Lake Park Drive, Smyr na, Telephone: 404/435-0027
2 . Owner of Property: The Coca-Cola Co.
Address : One Coca-Cola Plaza, Atlanta, GA Telephone: 404/676-4718.
(P.O. Drawer 1734, Atlanta Status 3 . Status of Applicant: Owner o act) Purchaser
Lessee Other (explain: )
4 . Parcel Identification: Zoning Map Sheetf 25A t Parcelf 185 r
Zoning District(s) (include ovelrlays)__ _ ____
Street Address 45 Industrial Drive
Required
5 . Existing Proposed. by Zoning
Use o Str Ctr ManufP an is r..4
(if project is only interior work, skip to #6)
Building height 39 '
oBldg. coverage (Footprint)
Setbacks - front 9 n I 0 '
- side L: 15 ' R: 15 ' L: 15 R: 15 15
- rear 20 20-r�-
Lot size 2182A
Frontage. 363 ' 363 '
Floor Area Ratio 12% 49%
oOpen Space (Lot area minus
,building and parking) 70% 24%
Parking Spaces 100 128 275
Loading ?4 54
Signs Relocation of existin - sign to n w expan-
Fill (volume & location) sion ( rear of building)
6 . Narrative Description of Proposed Work/Project: (Use additional sheets
if necessary) P,,,Dnga-d Distribution Center & Bottling Facility for
Fx=ansion of Existing Facility.
X
7 . Attached Plans : Sketch Plan Site Plan
8 . Certification: I hereby certify that the information contained herein
is true and accurate to the best of my knowledge.'
Date: 2120/95 Applicant' s Signature: Q PoLoA•e�Q
Vk
THIS SECTION FOR OFFICIAL USE ONLY: — — r — r _
Approved as presented/based on information presented
Denied as presented--Reason :
S ecial' Permit and/or Site Plan Required:
ndi g Requ ��; Variance Required
g atu/ Bull ing In "pec Oate
NOTE: issuance of a zoning g pe not reflove an applicant's burden to comply wNt all zoning requirements and obtain all required permits
(tom the Board of Hoa! satvation Commission, OopaArnont of Public Works and outer applicable permit granting aulhoritlos.
CD
Q
aCD
t
y o
o on o 7d
o, a � S "'
�JS a�.. n
3. 2A u, o
bb � oo' � COP rt oN
�. p, n y 6
o
r. '*+ co 00 cn
aog � � OQ a H
Vi p
rr
co IQ
R•
n Q o o
I o
o
o � �� W 0 rt n
o
d 5' i = o o c ° a A CD
g0
B. C' ° ° Co
on
(IQ 0 CJQ Lo
n o
o
sss
�r W c�n
co
qQ
C CrJ
T CA i 1 � �
b
cn R• C C R• .
tz
OQ
0
CD
ow
(rit� of NaLt4alliptall
A X Is*chits Wit
office of the �nspertor of �guilbiujjz
212 Main.Street •Municipal Building = t
Northampton, Mass. 01060 =�
#1227
TEMPORARY 60 Day
CERTIFICATE OF OCCUPANCY
May 22, 1995
Page No. 25A — Plot 185
jilding (Name) Coca - Cola Address 45 Industrial Drive
Same
Nner Address
)plicant Address
>e: 1st Industrial Occupancy
2nd Occupancy
3rd Occupancy — —
4th Occupancy _
one District GI
squired Inspections:
New Building Existing Bu.lding X
evator Electrical
C ,
umbing Fire
L
11 d1ng Other
Inspec ngs
CONDITION: This 60 day temporary certificate of occupancy allows for the
moving in of equipment. However, there shall be NO dumping of any pro-
duction waste until approval from the Department of Public Works has been
obtained.