June 9, 1995
Mr. George Andrikidis -Assistant City Engineer,
Northampton Department of Public Works
125 Locust Street
Northampton, Ma. 01060
Re: The Coca-Cola Company
45 industrial Drive
Existing Sanitary Sewer System
Austin W.O. #94-8631D
Dear Mr. Andrikidis;
As discussed in a meeting on June 7, 1995 between the Department of Public Works and
representatives of the Coca-Cola Company, The Austin Company, Huntley and Associates and the
Facility Group, the unmonitored sanitary flow for the existing facility at 45 Industrial Drive would be
created by the following fixtures:
16 water closets, 5 urinals, 14 lavatories and 4 service sinks
The existing floor drains at the cooling tower sump room will be routed to the waste water equalization
basin where the flow will be monitored.
Very Truly Yours,
THE AUSTIN COMPANY
aui F. Trujillo, A.I.A.
Project Coordinator
AFT/ksf
cc: Stelios Vafiadis
Steve Wheeler
B. Andrise
B. Diffenderfer
R. Trujillo
M. Kovach
File #94-8631
SIJN - x+' - 95 THIJ i 0 i P - i
Har ry Grodsk & Co.,
- Mechanical Contractors&Engineers Since 1918
June 8, 1995
FAX TRANSMISSION(404)436-5244
The Facility Group, Inc.
2233 Lake Park Drive
Smyrna, GA 30080
Attn: Mr. John Newton
RE. Coca-Cola Warehouse
Dcar John:
The total domestic effluent that will be discharged from the warehouse facility only into the city
�ualatary,s+rwr is 328 l at roxis»atety 45 11 urrittlR. .
The following is a list of fixtures installed in the building:
• 4
If you have any questions regarding this subject, please do'not hesitate to contact us.
Very truly yours,
PARRY GRODSXY& CO., UX.
f'l4 JOl .
Brian Toomey el
Project Manager
BTAJ1
33 Shaws lane PO Rox 880 SPringflcld MA 01101 (413)785.1947 FAX (413) 737-9870
i
FACILITY CONSTRUCTORS INC. 411;
a subsidiary of THE FACILITY GROUP INC.
95 JUIN 12 PH 12: n;
June 8, 1995
Mr. George Andrikidis
Department of Public Work
City of Northampton
125 Locust Street
Northampton, Massachusetts 01060
Reference: Coca Cola Warehouse
MV rthampton,Massachusetts
Dear George:
Further to our meeting of the June 6, 1995 regarding to sanitary outfall flows on the above project.
I enclose a copy of a letter from our plumbing subcontractor outlining the information you requested.
I hope you find this satisfactory, but should you have any further information please do not hesitate to
contact me.
Yours sincerely,
FACILITY CONSTRUCTORS INC.
John Newton
Project Manager
JN\kh:094cc
Enclosure
cc: Stellios Vafiadis,Coca Cola
Ray Remillard,Huntley&Associates
Paul Taylor
Dennis Bunting
John Sullivan
File
2233 LAKE PARK DRIVE ■ SMYRNA,GEORGIA 30080
1 800 525-2463 ■ TEL: 404 437-2700 ■ FAX: 404 436-6244
7 01
June 9, 1995 -
Mr.Georgs AndrikidiS
Department of Public Works
City of Northampton
125 Locust Street
Northampton Massachusetts 01469
Referenca: Coca-Cola Project
Dear George:
Further to our June 6th. meeting, in regards to the outstanding effluents discharge
issues at the-Coca-Cola piant,l would like to add the following comments to the letters
that you have by now received from the tivo main contractors.
As you have noticed at the old plant,we will separate the r.vo cooling tower sump
drains,from the sanitary out!ets.These sur:p dnains will be connected directly to the lift
station and they will be monitored accordingiy.For the sanitary outlets remains tc decide
how they will be monitored.
that,
-_jay be used occasionally if none at all.
Finally i would like to thank you for giving us the opportunity to meet with you and
understand first hand the Issues surrounding the effluents discharge.
1 would be available to answer any questions you may have in the future-Again thank
you for your cooperation,and I look forward to a continued positive professional
relationship.
S (4- = is
Prci Manager
ell
c.c.James Le Sage
Dirk L unsford
John Newton
Raul Trujillo
r
CITY OF NORTHAMPTON, MASSACHUSETTS
DEPARTMENT OF PUBLIC WORKS
125 Locust Street
l S Northampton, MA 01060
a°
Samuel B. Brindis, P.E.
413-582-1570
h ,
Director. Cay Engineer
Peter J. McNulty, Sr. i. J
Assistant Director of PubLc Works
� 5
June 12, 1995
Stelios Vafiadis, Project Manager
Coca-Cola, USA Operations
P.O. Drawer 1734
Atlanta, GA 30301
Re: Coca-Cola Project
Dear Mr. Vafiadis:
The Department of Public Works (DPW) is in receipt of two letters
(attached) from the Austin Company and Facility Constructors
respectively in regard to the unmetered effluent discharge from the
Coca-Cola facility. f in each building='
have been ,ide t t.. on. ardin
s dt NMIT916 warehouse facilityllt
e pprov�l
The DPW will review expeditiously any method Coca-Cola proposes to
utilize in order to measure the above mentioned effluent.
Please call me or George Andrikidis at (413) 582-1574 if there are
any questions.
Very truly yours,
Samuel B. Brindis, P.E.
Director of Public Works
SBB/G.A. /k
Enclosures: Letter from Vafiadis to DPW dated 6.9 .95
Letter from Austin to DPW dated 6.9.95
Letter from Facility to DPW dated 6.8 .95
cc: Board of Public Works
Mary Ford Jim Dostal
John Newton Penny Rim
Raul Trujillo
Ray Remillard
I Mill