25A-185 (111) 7 . Submission of a maintenance schedule for all catchbasins and
detention areas/chambers to be located on site.
Proof that the basins and detention areas have been and
shall be cleaned on the following schedule: :
a. immediately following the final installation of
z the permanent impervious surfacing within the
'ELLS °o parking and loading areas.
z
b. In the fall and spring during the first year after
Zo the commencement of the operation of the plant.
N o�
r?�
C. In the Spring of every year, after the completion
o0 of the first year after the plant commences
az
operation.
A report shall be submitted to the Planning Board, detailing
the amount of material found within the structures and the
amount removed.
Complied with.
8 . Submission of any plans and or information for entrance and
directional signs to be located on the property designating
entrances, exits, employee parking, loading and receiving
areas, as was discussed within the narrative of the
applicant's application.
Complied with.
Please note, much of the requested information was complied with,
but there is still much to be reviewed and approved.
Any changes to the site layout, parking, the entrance of the
railroad spur, etc. must receive an amended permit from the
Planning Board, and must be done under the Public Hearing
process.
MAY 2 31995
DEPT OF 9UILOING INSPECTIONS
NOR MPT Q>t'1. that,. the ,exstin
RUT
s '
aDy d3eterious xmpac s awn seam a S
OVIOL
' Pose grado;� and�or_corrections
:c
conditions '
aft$
Nttit 'flOeA;' with.
5. Submission of a map/plan that shows the relocation of the
existing drainage easement, located on the eastern portion
of the applicant's property, to include the actual location
of the existing stormwater drainage pipe. This relocation
shall be shown on a plan and submitted with an accurate
description to be approved by the City, and then recorded at
the Registry of Deeds.
Map was submitted, however, no accurate description was
drafted or submitted for approval by OPD and/or DPW.
6. Submission of drainage calculations and design for storm
detention chambers sized to accommodate/detain, parking lot
and impervious area runoff from the "first flush", prior to
it's release into the city's drainage system.
The design must be adequate to hold all of the drainage
coming off of all of the parking lots located on the site
for an average of four hours, with facilities for the
capture and retention of suspended solids, debris, oils and
greases. Final design is subject to Office of Planning &
Development Approval, and shall be constructed within 180
days of approval.
The system has already been constructed, however, it did not
receive approval from DPW or OPD, prior to it being
implemented. If the drainage system and/or industrial park
drainage system cannot handle the capacity, they may have to
make major revisions to the structures already on-site.
t 1995 � .1
�hA`l 2 3
DENORTHAIviFT10N�MSP 1G6�trs lan showing that the proposed noise barrier/fence
will be extended easterly on the property to the point
where it intersects with the proposed rail spur.
Complied with.
D. A revised plan detailing snow storage areas and or snow
disposal areas.
Complied with, however, snow storage is proposed to be
located in the rear loading dock area and the detention
pond. This could render that type drainage structure useless
in the spring if it is full of snow. This needs to be
clarified prior to a permanent occupancy permit being
issued.
show'n � +
t
MUM� v 41ealt .with when final
�n: *
F. A revised landscaping plan demonstrating that
additional landscaping shall be provided along the
Northern property boundary, fencing and adjacent to the
building. This shall consist of flowering shrubbery and
evergreen plantings covering minimum of 50% of the all
grassed areas in these areas.
Not complied with. This may be because of a utility easement
in that vicinity, however some compromise must be made,
prior to the issuance of a permanent occupancy permit.
-+-bat Firial and. Police` DO artme erg
G0 s o:. X13
A& 46AA h p re An
No information has been submitted showing that this was
complied with, as of this date. This must be taken care of
prior to the issuance of a permanent occupancy permit.
Drainage/Sewerage Analysis/System:
3 . Proof that the applicant has received approval for sewer
entry from the Board of Public Works.
Not complied with.
�O4.�t1AMp7O'�
City of Northampton, Massachusetts ,
Office of Planning and Development MAY 2 3
City Hall - 210 Main Street 4 t
Northampton, MA 01060 • (413) 586-6950
FAX (413) 586-3726 DEPT OF BUILDING iNSPE'TIONS x �,
NOR I rIANTT�tiy�01060
• Community and Economic Development -- — �s
•Conservation -Historic Preservation
• Planning Board •Zoning Board of Appeals
• Northampton Parking Commission
TO: Frank Sienkiewicz, Building Commissioner, and
Penelope G. Kim, Director OPD
FR: Paulette L. Kuzdeba, Senior Planner
RE: Review of Additional Information Submitted to Determine Coca
Cola USA's compliance with Special Permit Conditions
Below you shall find a list of plans and information that was
required to be submitted (in most cases within 60 days of the
issuance of the permit) in order to have compliance with the
conditions imposed with the issuing of the Special Permit.
The following is a review of the information submitted and how
CocaCola has complied (or not complied) in bold.
1. Copy of plans as revised by conditions of Special Permit,
including:
A. A revised site plan, denoting the type of materials to
be used in designated parking, loading and overflow
parking areas (asphalt, concrete, concrete pavers) , and
where proposed signage shall be located to designate
these areas.
Complied with. However, signage proposed to be erected onto
the back of the building, still requires a Zoning Permit
application to be filed for and approved.