25A-185 (108) o THE AUSTIN COMPUTATION
COMPANY SHEET
DESIGNERS • ENGINEERS • CONSTRUCT
LISTED BY OWNER EST. NO. _.
CHECKED BY LOCATION SHEET OF
CONTRACT NO. '�63� DATE _.
-C�GO-C0 LJ,%
Ij0fLTPAMPYOIJ,Mi�
W
f � a
y
Kb
� o
Qo
r
FORM NO.48 Rev.7/90
l
D 48 PERIMETER CENTER EAST
THE AUSTIN
ATLANTA, GEORGIA 30346-1998
COMPANY TELEPHONE: (404) 394-2500
DESIGNERS•ENGINEERS•CONSTRUCTORS TELECOPIER: (404) 394-9269
February 15, 1995
Mr. Anthony Patillo, Inspector
Building Department
City of Northampton
Northampton, Ma. 01060
Re: The Coca-Cola Company
45 Industrial Drive
Austin W.O. #94-8631 D
Dear Mr. Patillo;
We have reviewed the loading contributed by the electrical conduit suspended from the bottom chords
of joists. The joists are capable of sustaining this added load when the loads are properly applied at
panel points. We agree the method of attachement is wanting. Therefore,the subcontractor will change
the hangers to conform to the enclosed sketch.
In addition, plates were added where heavy tanks legs rest on the floor slab. These plates serve to
distribute load and insure no "punching" of the concrete slab will occur.
We appreciate your watchful attention and understandable concern since inappropriate application of
loads could have serious consequences.
Very truly yours,
THE AUSTIN COM�PANY�I r
William Quam, AIA
Director of Design
WQ/ksf