25A-185 (46) 10. Do any signs exist on the property? YES NO X
IF YES, describe size, type and location:
Are there any proposed changes to or additions of signs intended for the property? YES N0-_
IF YES, describe size, type and location:
11. ALL INFORMATION MUST BE COMPLETED, or PERMIT CAN BE DENIED DUE TO LACK OF INFORMATION
No Building or addition proposed. This column reserved
Question/ table below does not apply. for use by the Building
Department
EXISTING PROPOSED REQUIRED BY
Z014ING
Lot Size
948,329 sq. ft. 948,329 sq. ft.
Frontage
607' 607'
Setbacks Front 79' 79'
Side L: 60' R: 33' L: 60 R: 33' L: R
Rear 68 68'
Building Height N/A N/A
Building Square Footage
447,610 447,610
% Open Space: (lot area 29% 25%
minus building l3 paved parking
#of Parking Spaces
125 182
# of Loading Docks
26 26
Fill:
(volume Et location) match grade
12, Certification: I hereby certify that the information contained herein is true and accurate to the best of
my knowledge.
'02io.e, ccc* -cap �
Date: 12/8/03 Applicant's Signature c�✓� �.
NOTE:Issuance of a zoning permit does not relieve an applicant's burden to comply with all zoning
requirements and obtain all required permits from the Board of Health,Conservation Commission,
Historic and Architectural Boards,Department of Public Works and other applicable permit
granting authorities.
OOO.pdf
i ll i_w'Js1 `
File No W3
P �all information and return this form to the Building
Inspector's Office with the $io.,filing fee (check or money order)payable to the
City of Northampton
1. Name of Applicant: The Coca-Cola Comany c/o Gary Carlow, Project Manager
Address: 45 Industrial Drive Telephone: (413) 582-6553
2. Owner of Property: Coca-Cola North America
Address: P.O. Box 105037 Atlanta, CA 30348-5037 Telephone:
3. Status of Applicant: Owner X Contract Purchaser Lessee Other (explain)
4. Job Location: Industrial Drive
f Fla
E
� g g
5. Existing Use of Structure/Property: Manufacture and Warehouse for Coca-Cola Products
6. Description of Proposed Use/Work/Project/Occupation: (Use additional sheets if necessary):
The Coca-Cola site alteration for the Tndustrial Drive complex in Northampton. Site alteration
includes additional parking spaces and associated drainage, landscape, lighting, etc. The
widening of driveway behind warehouse for truck route
7. Attached Plans: Sketch Plan Site Plan X Engineered/Surveyed Plans
8. Has a Special Permit/Variance/Finding ever been issued for/on the site?
NO DON'T KNOW X YES IF YES, date issued:
IF YES: Was the permit recorded at the Registry of Deeds?
NO DON'T KNOW YES
IF YES: enter Book Page and/or Document#
9. Does the site contain a brook, body of water or wetlands? NO X DONT KNOW YES
IF YES, has a permit been or need to be obtained from the Conservation Commission?
Needs to be obtained Obtained , date issued:
(Form Continues On Other Side)
r
.te#MP-2004-0063
APPLICANT/CONTACT PERSON HUNTLEY ASSOCIATES PC
ADDRESS/PHONE 30 INDUSTRIAL DR EAST (413)584-7444
PROPERTY LOCATION 45 INDUSTRIAL DR
MAP 25A PARCEL 185 001 ZONE GI
THIS SECTION FOR OFFICIAL USE ONLY:
PERMIT APPLICATION CHECKLIST
ENCLOSED REQUIRED DATE
ZONING F RM FILLED OUT
Building Permit Filled out
Fee Paid
TZpeof Construction: ZPA-SITE ALTERATION
New Construction
Non Structural interior renovations
Addition to Existing
Accessory Structure
Building Plans Included:
Owner/Statement or License
3 sets of Plans/Plot Plan
THE FOLLOWING ACTION HAS BEEN TAKEN ON THIS APPLICATION BASED ON
INFORMATION PRESENTED:
Approved additional permits required(see below)
PLANNING BOARD PERMIT REQUIRED UNDER: § f
Intermediate Project: Site Plan AND/OR Special Permit with Site Plan
Major Project:___,V,Site Plan AND/OR Special Permit with Site Plan
ZONING BOARD PERMIT REQUIRED UNDER: §
Finding Special Permit Variance*
Received&Recorded at Registry of Deeds Proof Enclosed
Other Permits Required:
Curb Cut from DPW Water Availability Sewer Availability
Septic Approval Board of Health Well Water Potability Board of Health
Permit from Conservation Commission Permit from CB Architecture Committee
Permit from Elm Street Commission
Signature of Building Official Date
Note:Issuance of a Zoning permit does not relieve a applicant's burden to comply with all zoning
requirements and obtain all required permits from Board of Health,Conservation Commission,Department
of public works and other applicable permit granting authorities.
*Variances are granted only to those applicants who meet the strict standards of MGL 40A. Contact the Office of
Planning&Development for more information.