25A-185 (44) Planning Board - Decision City of Northampton
Hearing No.: PLN-2006-0055 Date: May 12, 2006
C. The applicant will mitigate stormwater.
COULD NOT DEROGATE BECAUSE:
FILING DEADLINE: MAILING DATE: HEARING CONTINUED DATE: DECISION DRAFT BY: APPEAL DATE:
412012006 51412006 512512006
REFERRALS IN DATE: HEARING DEADLINE DATE: HEARING CLOSE DATE: FINAL SIGNING BY: APPEAL DEADLINE:
412712006 711612006 511112006 512512006 61112006
FIRST ADVERTISING DATE: HEARING DATE: VOTING DATE: DECISION DATE:
412712006 5!11!2006 511112006 511212006
SECOND ADVERTISING DATE: HEARING TIME: VOTING DEADLINE: DECISION DEADLINE:
51412006 7:25 PM 81912006 81912006
MEMBERS PRESENT: VOTE:
George Russell votes to Grant
Frances Volkmann votes to Grant
Jennifer Dieringer votes to Grant
Paul Voss votes to Grant
Francis Johnson votes to Grant
George Kohout votes to Grant
Kenneth Jodrie votes to Grant
MOTION MADE BY: SECONDED BY: VOTE COUNT: DECISION:
Kenneth Jodrie George Russell 7 Approved
MINUTES OF MEETING:
Available in the Office of Planning&Development.
1, Carolyn Misch,as agent to the Planning Board, certify that this is a true and accurate decision made by the Planning Board and certify
that a copy of this and all plans have been filed with the Board and the City Clerk on May 12, 2006.
/certif that a copy of this decision has been mailed to the Owner and Applicant.
( ,� �,� - �
Notice of Appeal
An appeal from the decision of the Planning Board may be made by any person aggrieved pursuant to MGL Chapt.40A, Section 17 as
amended within twenty(20)days after the date of the riling of the notice of the decision with the City Clerk. The date is listed above.
Such appeal may be made to the Hampshire Superior Court with a certified copy of the appeal sent to the City Clerk of the City of
Northampton.
GeoTMS®2006 Des Lauriers Municipal Solutions,Inc.
Planning Board - Decision City of Northampton
Hearing No.: PLN-2006-0055 Date: May 12, 2006
APPLICATION TYPE: SUBMISSION DATE:
PB Major Site Plan 5/12/2006
Applicant's Name: Owner's Name: Surveyor's Name:
NAME: NAME: COMPANY NAME:
Hixson COCA COLA COMPANY THE
ADDRESS: ADDRESS: ADDRESS:
659 Van Meter St. 45 Industrial Drive
TOWN: STATE: ZIP CODE: TOWN: STATE: ZIP CODE: TOWN: STATE: ZIP CODE:
CINCINNATI OH NORTHAMPTON MA 01060
PHONE NO.: FAX NO.: PHONE NO.: FAX NO.: PHONE NO.: FAX NO.:
(413)582-6508 0
EMAIL ADDRESS: EMAIL ADDRESS: EMAIL ADDRESS:
cjarc@hixson-inc.com jgoodseii@na.ko.com
Site Information: _
SITE ZONING:
GI [; �= �; t41 LL�
TOWN: SECTION OF BYLAW: -
NORTHAMPTON MA 01060 Section 11:Site Plan Approval
M : MAP DATE: ACTION TAKEN: ,1 Approved With Conditions
i
4571
1177
Rin c3-.Y=1A ir'Z 1914.'1
NATURE OF PROPOSED WORK:
Addition to the processing facility and addition to support offices.
HARDSHIP:
CONDITION OF APPROVAL:
FINDINGS: 1) The wall pack lighting shall not exceed 3 foot-candles.
The Planning Board granted the Site Plan Approval for the the 9,500 square foot expansion of the manufacturing plant based on the
following plans submitted with the application:
1. "Hot Fill Line Addition Coca Cola North America"Site Plan Prepared by Hixson,Sheet CO.1.
2. "Coca-Cola North America Proposed Associate Entrance"Rendering Prepared by Hixson,DatedMay 11,2006.
3. "Coca-Cola North America Proposed Process Building Addition"Rendering Prepared by Hixson,DatedMay 11,2006.
In granting the Site Plan the Planning Board found:
1. The requested use protects adjoining premises against seriously detrimental uses. The new building and use will be consistent with
other industrial uses in the GI zone. The exterior HVAC system will be moved to the non-residential side of the building and visually
screend on the roof.
2. The requested use addresses safety of vehicular and pedestrian movement within the site and on adjacent streets. All truck access is
separated from pedestrian access.
3. The requested use will promote a harmonious relationship of structures and open spaces to the
natural landscape,existing buildings and other community assets in the area. The addition will match teh existing building and be
enhanced with tectural facade materials.
4. The requested use will not overload,and will mitigate adverse impacts on, the City's resources including the effect on the City's water
supply and distribution system,sanitary and storm sewage collection and treatment systems, fire protection,streets and schools. The
addition will be constructed over existing impervious surface and stormwater controls are currently in place.
5. The requested use does not trigger compliance with special regulations set forth in the Zoning Ordinance other than for site plan
review.
6. Compliance with the following technical performance standards have been met:
A.Additional curb cuts are not required.
B.Pedestrian,bicycle and vehicular traffic movement on site are separated.
GeoTMS®2006 Des Lauriers Municipal Solutions, Inc.