Loading...
32C-001 (22) 1m x x - O N A� v Zz z mo N N -i O V I � I �I v K me .1m mm & I I� ---- , � � I O N I m mm am wm ��Ens I 4 nl os L r0 N j b oA�b � v � Om � m I � r 0 � f m0 a d I f , � Q e I H { A N N _ �oQ Cn o000 mz - c� pm� mm0 f zZ a m ysr 3 0 = Cn m A = m cn O z a Ul N O_ f I @@ I 0 9 j I i Initial Construction Control Document To be submitted with the building permit application by a d Registered Design Professional for work per the 8th edition of the J Massachusetts State Building Code, 780 CMR, Section 107.6.2 Project Title: Date: Property Address: Project: Check one or both as applicable: -J New construction L- Existing Construction Project description: I MA Registration Number: Expiration date: , am a registered design professional, and hereby certify that I have prepared or directly supervised the preparation of all design plans,computations and specifications concerning: [ ] Entire Project [ ] Architectural [ ] Structural [ ] Mechanical [ ] Fire Protection [ ] Electrical [ ] Other for the above named project and that such plans,computations and specifications meet the applicable provisions of the Massachusetts State Building Code,(780 CMR), and accepted engineering practices for the proposed project. I understand and agree that I(or my designee)shall perform the necessary professional services and be present on the construction site on a regular and periodic basis to: 1. Review,for conformance to this code and the design concept,shop drawings,samples and other submittals by the contractor in accordance with the requirements of the construction documents. 2. Perform the duties for registered design professionals in 780 CMR Chapter 17,as applicable. 3. Be present at intervals appropriate to the stage of construction to become generally familiar with the progress and quality of the work and to determine if the work is being performed in a manner consistent with the approved construction documents and this code. When required by the building official, I shall submit field/progress reports(see item 3.)together with pertinent comments,in a form acceptable to the building official. Upon completion of the work,I shall submit to the building official a `Final Construction Control Document'. fA a�rr� Enter in the space to the right a"wet"or !y oo fFr electronic signature and seal: t +� M0.pM Phone number: Email: Building Official Use Only Building Official Name: Permit No.: Date: Trial Version 10 09 2012 Code Review Thomas Douglas Architects,Inc. Renovations to Thornes Marketplace 196 Pleasant Street,Suite 202 150 Main St. Northampton,MA 01060 Northampton,MA 413-585-0641 This project's construction costs are:$2o,000 The assessed value of the building (assessors web site) is:$3,854,400 This project's construction costs are less than 30%of the assessed value of the building and less than$100,000. This building has an existing elevator that does not access the levels of the work area. The previous use of the work area was public. No private areas are being converted to public areas. All elements of public spaces will be constructed to accessible standards. Hood and kitchen equipment: I met with Louis Hasbrouck on Friday November 15, 2013 about 3 different projects. One of them was the chocolate kitchen in Thornes. David Claxton was there with me. Mr. Hasbrouck told us, based on the equipment we showed him, we would not need a full-blown commercial kitchen hood with an ansul system. Louis will have to forward our equipment information to the Fire Department for their final determination.. He will require that the space have some kind of exhaust vent to get rid of odors and steam. The contractor will specify the exhaust system and the information will be submitted as an addendum to the drawings. We will send Mr. Hasbrouck the spec and drawing and ask him to forward to the fire dept. End of Document 6of6 Code Review Thomas Douglas Architects,Inc. Renovations to Thornes Marketplace 196 Pleasant Street,Suite 202 150 Main St. Northampton,MA 01060 Northampton,MA 413-585-0641 705.4.4 Panic Hardware Panic hardware will be installed on all exit doors. 705.7 Means of Egress lighting All means of egress will have compliant exit signs. 705.7 Exit Signs The renovated space will have compliant egress lighting 711 and 607 Energy Conservation: Level i alterations are permitted without requiring the entire building to comply with the International Energy Conservation Code.Alterations (new construction) shall comply with the International Energy Conservation Code. A building that undergoes Level 2 alterations is required to meet a certain level of energy compliance. Where there are reconfigurations of the space or new doors or windows, any such new element is required to meet the International Energy Conservation Code. Elements within the building that are not being affected do notYeed to be evaluated and do not neJto comply with the energy provisions. Essentially the entire building is not required to meet the energy provisions; only a degree of possible improvement in the energy performance of the building is intended to be achieved by making the new elements meet the IECC. In certain cases where the reconfiguration of the space might have resulted in the creation of new spaces the newly created space should be evaluated as a whole for compliance with the energy provisions even though some of the element within the space might actually not have been altered. Likewise, in a case where an existing mechanical system is being extended to other areas or new ductwork is being installed to reconfigure and reroute the ducts to various spaces, it is only required to have the new elements meet the energy provisions and not the entire system. There are no new exterior walls. Existing concrete floor slab:No changes to existing. 8o6 Accessibility CMR 5521 3.3.1 b. If the work costs $ioo,000 or more, then the work being performed is required to comply with 521 CMR. In addition, an accessible public entrance and an accessible toilet room shall be provided. 3.3.2 If the work performed, including the exempted work, amounts to 30%or more of the full and fair cash value of the building, the entire building is required to comply with 521 CMR. 5of6 Code Review Thomas Douglas Architects,Inc. Renovations to Thornes Marketplace 196 Pleasant Street,Suite 202 150 Main St. Northampton,MA 01060 Northampton,MA 413-585-0641 Length of dead end corridors, comply with 705.6 Minimum ceiling height of newly created habitable and occupied spaces shall be 7 feet. OCCUPANCY Occupant Load Calculation Max occupancy (1004.4.1) based on 100 gross sf per person Suite 1L2-1 3 M use Suite L2-2 3 B use Suite L2-3 5 B use Suite L24 I S use Suite L2-5 I S use Toilets: There are common toilets in the building within 300 feet. 704 Fire Protection: 704.2, 912.2a Automatic sprinkler systems Automatic sprinkler systems will be upgraded in the work area as needed. 705 Means of Egress The proposed work will include 1 means of egress. There will not be a reduction of means of egress in any part of the building. IBC Table ioi6a Exit Access Travel Distance: For M use and sprinklers: 250 ft maximum allowable travel distance. The travel distance is iog feet to an exit door. IBC Table ioi8.i Corridor Fire Resistance Rating We will provide a i-hour fire separation between the tenant spaces and the exit access corridor. The emergency power room-Suite L2-i will have a i-hour fire separation. IBC 1014.3 Common path of egress travel: For B use and sprinklers: ioo ft maximum allowable common path of travel. The common path of travel to a point where there are 2 choices of exit routes is 57'-10". 4of6 Code Review Thomas Douglas Architects,Inc. Renovations to Thomes Marketplace 196 Pleasant Street, Suite 202 150 Main St. Northampton,MA 01060 Northampton,MA 413-585-0641 secondary members Roof construction and o secondary members Work Area Method Calculations The total building area is 76,786 square feet. The existing renovated space is i story, 1,778 square feet The work area is 2.3%of the aggregate area of the building. The work area comprises less than 50% of aggregate area of the building; therefore this is not a level 3-alteration project. IEBC section 405) The work area includes reconfiguration of the space, the addition of new doors, and the reconfiguration of systems (HVAQ. Most of this project will be classified as a level z project. Part of the project will be classified as a level i project. The alterations will follow level 2 guidelines. Level i work requirements: The removal and replacement or the covering of existing materials, elements, equipment or fixtures using new materials, elements, equipment or fixtures that serves the same purpose This Project will have new interior walls, doors,finishes and lighting. 602.1 Interior finishes:All newly installed wall and ceiling finishes shall comply with the IBC. 603 Fire Protection: Alterations shall be done in a manner that maintains the level of fire protection provided. This Project will not affect the level of fire protection that is currently provided. 604 Means of Egress Repairs shall be made in a manner that maintains the level of protection provided for the means of egress. 6o6 Structural: None proposed 607 Energy Conservation: See Iii below 701.3 Compliance New electrical equipment must comply with section 7o8 3of6 Code Review Thomas Douglas Architects,Inc. Renovations to Thomes Marketplace 196 Pleasant Street,Suite 202 150 Main St. Northampton,MA 01060 Northampton,MA 413-585-0641 3. 1" floor: 16,440 sf 4. 2nd floor: 16,522 Sf 5. ;rd floor: 16,522 Sf Total: 76,876 sf Proposed work areas by use: B areas proposed: 871, sf Si areas proposed: 292 Sf mechanical areas proposed: 300 sf Corridor area proposed: 315 sf Total proposed work area: 1,778, sf 704 Fire Protection:The building is fully sprinkled. There are sprinklers in the existing space. We are reconfiguring the sprinkler layout in the work area to conform to the new layout. There will be no modifications to the areas outside of the work area. 704.4 Fire alarm and detection: • The building has a fire alarm system in all areas. It will be maintained and altered as necessary in the work area. According to the IEBC this renovation is being reviewed as: Work Area Method, Chapter 4. Applicable Sections are: Chapter 6-Alterations Level 1- New finishes and fixtures Chapter 7-Alterations Level 2 -New construction. Fire Resistive Required Types of Building Element Type 3B Construction,Table 6oi IBC Primary Structural o Frame Bearing walls, Exterior 2 Bearing walls, Interior o Nonbearing walls and o partitions, exterior Nonbearing walls and o partitions, interior Floor construction and o 2of6 Code Review Thomas Douglas Architects,Inc. Renovations to Thornes Marketplace 196 Pleasant Street,Suite 202 150 Main St. Northampton,MA 01060 Northampton,MA 413-585-0641 CODE REVIEW April 18, 2014 Thornes Marketplace Ground floor level L2 renovations 150 Main Street Northampton, MA Applicable Building Code: MA 78o CMR Eighth Addition IBC, IEBC International EXISTING Building Code, 2009 ZONING DISTRICT: CB Proposed Renovations: Project Description: • Renovate storage, mechanical, and businesses areas for tenant use. Use Groups • The space is a former B or A use (L'Oasis, Night club). • The proposed uses are B business and Si storage use. No change of use is proposed for the work areas. Existing separation of uses within the overall building: Table 5o8.4 (IBC) does not require a fire separation between M, Si, and B uses. • The current level of safety or sanitation will NOT be reduced and the portions altered shall conform to the requirements of the IBC, including interior finishes, interior floor finishes, and interior trim. Construction Type • 3B Valuation of Project: • This project's construction costs are: $20,000 • The assessed value of the building is: $3,854400 • The cost of the project is 0.5%of the assessed valuation. Areas The total building area is 76,876 square feet. The proposed renovated work area is:i story, 1,778 square feet Existing Areas by floor: i. Ground floor: 10,720 sf 2. Lower Level: 16,582 sf 1 of 6 ifro 6 fiRass itch nsctta' ca -3 DEPARTMENT OF BUILDD.[G INSPECTIONS 212 Main Street ' Municipal Building ' Northampton, Mass. 01060 WORKER'S COMPENSATTON INSURANCE AFMI AVIT I, Pioneer Contract orG (licensulpermltt.ee) with a principal place of business/residence at. ir P.O. Box 1145 Nr) hamntnn MA n1 061 _(Phol"4) _5g6- 5491 do hereby certify, under the pains and penalties of perjury, chit. ( I am an employer providing the follo`vi.ng worker's eolnpensluon coverage for my employees wor>dng on this job: Wcc 5005957012001? AGcnni atari Fmnn1nugmy-S Tnsii3:a icP Cn ---- - (Insurana; Company) (PoLicy NumL�er) (Ex-piration Dan:) ( ) I aln a sole proprietor, general contractor or homeowner (circle one) and have hired the contractors listed below who have the following worker's compensation policies, (Name of Contractor) (Insurance Compa y/Policy Number) (E pirntion Date) (Name of Contractor) (Insurance Company/Policy Number) (Expiration Date) (Name of COn=ctof) (I.nsuraace Compary/Poiicy Number) (Expiration Date) (Name of Contractor) (Insurance Compauy/Policy Number) (EViration Dace) (-fta h additiecui shed ifnoc ssa to inclUdc inforu,4om pcxtainim.g 1.all ooahvdon) ( ) I am a sole proprietor and have no one working for me. ( ) I am a home owner performing all the work myself. NOTE:pl=ac be awaic ttua while homcowaa3 who employ p«sous to do -�—�, ooa3n act on or rcpau work on a dµeiling of mot more then three tarts is winch tix bomoowocr residcs or oa the grounds appurtcaazd lba do arc not&WCrany ooaridcmd a be rmploycra under tbo veorkerIx ounpcxtsatioa Act a.ppticadon by a homooa'na for a lio=so a pamaa may nid=oc the Icgaf cumin of an ermployer under tbo Wockda Ooaopomation Act 1 undemiad d st a copy of this ctalemad tnay be forwarded to tbo Deparmunt of lodusa-iai Aoad=&Offioe of 1=wu 0co for tho coverage vrrifit%tion and that f_-'d re to row n covcmp under scW oa 25A of MGL 152 can lmd to the imposition of aimkw P' u- a oomisting of a f7me of up to S 1,500.00 and/or imprisoomcrA of up to one year and civil pcuLWc3 io the form of a Slop Work Otdcr and a find CC S 100.00 a day agaimsl me For dimtnalt11 tuc oaty Pcrmit Number Map#----Lot Si Wre of LiccnscelPermi e Versionl.7 Commercial Building Permit May 15,2000 SECTION 10-STRUCTURAL PEER REVIEW(780 CMR 110.11) Independent Structural Engineering Structural Peer Review Required Yes © No e SECTION 11 -OWNER AUTHORIZATION-TO BE COMPLETED WHEN OWNERS AGENT OR CONTRACTOR APPLIES FOR BUILDING PERMIT 1 Thornes Marketplace LLC as Owner of the subject property hereby authorize Pioneer Contractors to act on my b alf, in all matters relative to work authorized by this building permit application. &,J G E` PrL* a I- 05/08/2014 A*rYWg'T1-L.D1CIe� Signature of Owner Date 1 David Claxton/Pioneer Contractors as Gwner/Authorized Agent hereby declare that the statements and information on the foregoing application are true and accurate,to the best of my knowledge and belief. Signed under the pains and penalties of perjury. Print Name 05/08/2014 Signature o weer/Agent Date SECTION 12-CONSTRUCTION SERVICES 10.1 Licensed Construction Supervisor: Not Applicable ❑ Name of License Holder: David Claxton CS-017890 License Number 01/19/2016 Address Expiration Date (413)626-7267 Signat Telephone SECTION 13-WORKERS'COMPENSATION INSURANCE AFFIDAVIT(M.G.L.c. 152,§25C(6)) Workers Compensation Insurance affidavit must be completed and submitted with this application. Failure to provide this affidavit will result in the denial of the issuance of the building permit. Signed Affidavit Attached Yes O No Versionl.7 Commercial Building Permit May 15,2000 SECTION 9-PROFESSIONAL DESIGN AND CONSTRUCTION SERVICES-FOR BUILDINGS AND STRUCTURES SUBJECT TO CONSTRUCTION CONTROL PURSUANT TO 780 CMR 116(CONTAINING MORE THAN 35,000 C.F.OF ENCLOSED SPACE) 9.1 Registered Architect: Thomas Douglas Architects, Inc. Not Applicable ❑ Name(Registrant): Thomas Douglas Architects, Inc. Registration Number Address (413) 585-0641 Expiration Date Signature Telephone 9.2 Registered Professional Engineer(s): Name Area of Responsibility Address Registration Number Signature Telephone Expiration Date Name Area of Responsibility Address Registration Number Signature Telephone Expiration Date Name Area of Responsibility Address Registration Number Signature Telephone Expiration Date Name Area of Responsibility Address Registration Number Signature Telephone Expiration Date 9.3 General Contractor Pioneer Contractors Not Applicable ❑ Company Name: David Claxton Responsible In Charge of Construction P.O. Box 1 5 Northampto , MA 01061 Address (413) 586-5491 Signature Telephone Versionl.7 Commercial Building Permit May 15,2000 8. NORTHAMPTON ZONING Existing Proposed Required by Zoning This column to be tilled in by Building Department Lot Size Frontage Setbacks Front Side L: R: L: R: Rear Building Height Bldg. Square Footage % Open Space Footage % (Lot area minus bldg&paved parking) #of Parking Spaces Fill: volume&Location) A. Has a Special Permit/Variance/Finding ever been issued for/on the site? NO Q DONT KNOW e YES IF YES, date issued: IF YES: Was the permit recorded at the Registry of Deeds? NO ® DON'T KNOW Q YES IF YES: enter Book Page and/or Document# B. Does the site contain a brook, body of water or wetlands? NO e DON'T KNOW 0 YES IF YES, has a permit been or need to be obtained from the Conservation Commission? Needs to be obtained ® Obtained © , Date Issued: C. Do any signs exist on the property? YES O NO IF YES, describe size, type and location: D. Are there any proposed changes to or additions of signs intended for the property? YES ® NO IF YES, describe size, type and location: E. Will the construction activity disturb(clearing,grading, excavation,or filling)over 1 acre or is it part of a common plan that will disturb over 1 acre? YES ® NO Q IF YES,then a Northampton Storm Water Management Permit from the DPW is required. Versionl.7 Commercial Building Permit May 15,2000 SECTION 4-CONSTRUCTION SERVICES FOR PROJECTS LESS THAN 35,000 CUBIC FEET OF ENCLOSED SPACE Interior Alterations Q Existing Wall Signs ❑ Demolition❑ Repairs❑ Additions ❑ Accessory Building❑ Exterior Alteration ❑ Existing Ground Sign❑ New Signs❑ Roofing❑ Change of Use❑ Other❑ Brief Description Enter a brief description here. Per Attached plan--partitions,plumbing, electrical& fire sprinkler Of Proposed Work: modification. SECTION 5-USE GROUP AND CONSTRUCTION TYPE USE GROUP(Check as applicable) CONSTRUCTION TYPE A Assembly ❑ A-1 ❑ A-2 ❑ A-3 ❑ 1A ❑ A-4 ❑ A-5 ❑ 113 ❑ B Business (] 2A ❑ E Educational ❑ 2B I ❑ F Factory ❑ F-1 ❑ F-2 ❑ 2C ❑ H High Hazard ❑ 3A ❑ Institutional ❑ 1-1 ❑ 1-2 ❑ 1-3 ❑ 3B 0 M Mercantile ❑ 4 ❑ R Residential ❑ R-1 ❑ R-2 ❑ R-3 ❑ 5A ❑ S Storage ❑ S-1 ❑ S-2 ❑ 5B ❑ U Utility ❑ Specify: M Mixed Use ❑ Specify: S Special Use ❑ Specify: COMPLETE THIS SECTION IF EXISTING BUILDING UNDERGOING RENOVATIONS,ADDITIONS AND/OR CHANGE IN USE Existing Use Group: B or A Proposed Use Group: B Existing Hazard Index 780 CMR 34): Proposed Hazard Index 780 CMR 34): SECTION 6 BUILDING HEIGHT AND AREA BUILDING AREA EXISTING PROPOSED NEW CONSTRUCTION OFFICE USE ONLY Floor Area per Floor(sf) 1St 1 St 2nd 2nd 3 rd 3rd 4th 4th Total Area(sf) Total Proposed New Construction(sf) Total Height(ft) Total Height ft 7.Water Supply(M.G.L.c.40,§54) 7.1 Flood Zone Information: 7.3 Sewage Disposal System: Public 0 Private ❑ I Zone Outside Flood Zoned Municipal [Z] On site disposal system E] Version 1.7 Commercial Building Permit May 15,2000 Department use only r City of Northampton Status of Permit: I Building Department Curb Cut/Driveway Permit 212 Main Street Sewer/Septic Availability L'lectri AY — 9 ZOI4� , w Room 100 Water/WellAvailability "' M ing&Gas Ins eorthampton, MA 01060 Two Sets of Structural Plans na m 3-587-1240 Fax 413-587-1272 Plot(Site Plans Mr as nspec ions Other S Ci Lieu h,c,,T t:n MA1)1060 APPLICATION TO CONSTRUCT,REPAIR, RENOVATE,CHANGE THE USE OR OCCUPANCY OF,OR DEMOLISH ANY BUILDING OTHER THAN A ONE OR TWO FAMILY DWELLING SECTION 1 -SITE INFORMATION 1.1 Property Address: This section to be completed by office 150Main Street (Thornes Marketplace) Map Lot Unit 014�� Zone Overlay District Elm St.District CB District SECTION 2-PROPERTY OWNERSHIP/AUTHORIZED AGENT 2.1 Owner of Record: Thornes Marketplace LLC 150 Main St. Northampton, MA 01060 Name(Print) Current Mailing Address: 1 M� o� ., (413) 587-9970 Signature C)tW "4' 't1�'1J`t'�S '-v�v�-t�Y� Telephone 2.2 Authorized Agent: Pioneer Contractors P.O. Box 1145 Northampton, MA 01061 Name(Print) Current Mailing Address: (413) 586-5491 Signature Telephone SECTION 3-ESTIMATED CONSTRUCTION COSTS Item Estimated Cost(Dollars)to be Official Use Only completed by ermit applicant 1. Building $8,900.00 (a)Building Permit Fee 2. Electrical $4,652.00 (b)Estimated Total Cost of Construction from 6 3. Plumbing $4,150.00 Building Permit Fee 4. Mechanical (HVAC) 5. Fire Protection $4,600.00 6. Total =(1 +2+3+4+5) 77,2/97-,0t) Check Number This Section For Official Use Only Building Permit Number Date Issued Signature: Building Commissioner/Inspector of Buildings Date File#BP-2014-1187 APPLICANT/CONTACT PERSON PIONEER CONTRACTORS ADDRESS/PHONE PO Box 1145 NORTHAMPTON (413)586-5491 PROPERTY LOCATION 150 MAIN ST-HEAVENLY CHOCOLATE-2ND FLR MAP 32C PARCEL 001 001 ZONE CB(100)/ THIS SECTION FOR OFFICIAL USE ONLY: PERMIT APPLICATION CHECKLIST ENCLOSED REQUIRED DATE ZONING FORM FILLED OUT Fee Paid Building Permit Filled out Fee Paid Typeof Construction: INSTALL PARTITIONS& SPRINKLERS New Construction Non Structural interior renovations Addition to Existing Accessory Structure Building Plans Included: Owner/Statement or License 017890 3 sets of Plans/Plot Plan THE FOLLOWING ACTION HAS BEEN TAKEN ON THIS APPLICATION BASED ON INFORMATION PRESENTED: _LZApproved Additional permits required(see below) PLANNING BOARD PERMIT REQUIRED UNDER:§ Intermediate Project: Site Plan AND/OR Special Permit With Site Plan Major Project: Site Plan AND/OR Special Permit With Site Plan ZONING BOARD PERMIT REQUIRED UNDER: § Finding Special Permit Variance* Received&Recorded at Registry of Deeds Proof Enclosed Other Permits Required: Curb Cut from DPW Water Availability Sewer Availability Septic Approval Board of Health Well Water Potability Board of Health Permit from Conservation Commission Permit from CB Architecture Committee Permit from Elm Street Commission Permit DPW Storm Water Management Demolition Delay (, 4 /t_J­e_J S Al Signature o uilding Official Date Note: Issuance of a Zoning permit does not relieve a applicant's burden to comply with all zoning requirements and obtain all required permits from Board of Health,Conservation Commission,Department of public works and other applicable permit granting authorities. * Variances are granted only to those applicants who meet the strict standards of MGL 40A.Contact Office of Planning&Development for more information. 150 MAIN ST-HEAVENLY CHOCOLATE-2ND FLR BP-2014-1187 GIs#: COMMONWEALTH OF MASSACHUSETTS Map:Block: 32C-001 CITY OF NORTHAMPTON Lot: -001 PERSONS CONTRACTING WITH UNREGISTERED CONTRACTORS Permit: Building DO NOT HAVE ACCESS TO THE GUARANTY FUND (MGL c.142A) Category: renovation BUILDING PERMIT Permit# BP-2014-1187 Project# JS-2014-002007 Est. Cost: $22302.00 Fee: $138.00 PERMISSION IS HEREBY GRANTED TO: Const. Class: Contractor: License: Use Group: PIONEER CONTRACTORS 017890 Lot Size(sq. ft.): 16683.48 Owner: THORNES MARKETPLACE LLC C/O HPMG Zoning: CB(100)/ Applicant: PIONEER CONTRACTORS AT: 150 MAIN ST - HEAVENLY CHOCOLATE - 2ND FLR Applicant Address: Phone: Insurance: PO Box 1145 (413)586-5491 Workers Compensation NORTHAMPTON MAO 1061 ISSUED ON.511512014 0:00:00 TO PERFORM THE FOLLOWING WORK.-INSTALL PARTITIONS & SPRINKLERS POST THIS CARD SO IT IS VISIBLE FROM THE STREET Inspector of Plumbing Inspector of Wiring D.P.W. Building Inspector Underground: Service: Meter: Footings: Rough: Rough: House# Foundation: Driveway Final: Final: Final: Rough Frame: Gas: Fire Department Fireplace/Chimney: Rough: Oil: Insulation: Final: Smoke: Final: THIS PERMIT MAY BE REVOKED BY THE CITY OF NORTHAMPTON UPON VIOLATION OF ANY OF ITS RULES AND REGULATIONS. Certificate of Occupancy Signature: FeeType: Date Paid: Amount: Building 5/15/2014 0:00:00 $138.00 212 Main Street,Phone(413)587-1240,Fax: (413)587-1272 Louis Hasbrouck—Building Commissioner