25A-185 (36) i ® Document G704" - 2000 Instructions Certificate of Substantial Completion GENERAL INFORMATION Purpose This document was developed to establish the date of Substantial Completion for the purpose of commencement of applicable warranties and to allow the Owner to occupy or utilize the Work or designated portion thereof. Related Documents This document was prepared for use under the terms of AIA Document A201,General Conditions of the Contract for Construction;and under the general conditions contained in AIA Document A107 and A105. Use of Current Documents Prior to using any AIA Contract Document, users should consult www.aia.org or a local AIA component to verify the most recent edition. Reproductions This document is a copyrighted work and may not be reproduced or excerpted from without the express written permission of the AIA.There is no implied permission to reproduce this document,nor does membership in The American Institute of Architects confer any further rights to reproduce this document. The AIA hereby grants the purchaser a limited license to reproduce a maximum of ten copies of a completed G704, but only for use in connection with a particular project.The AIA will not permit reproduction outside of the limited license for reproduction granted above,except upon written request and receipt of written permission from the AIA. Rights to reproduce the document may vary for users of AIA software. Licensed AIA software users should consult the End User License Agreement(EULA). To report copyright violations of AIA Contract Documents,e-mail The American Institute of Architects'legal counsel,copyright @aia.org. COMPLETING THE G704 FORM After the words "Project or Designated Portion shall include:,"insert a detailed description of the Project or portion(s)of the Project that have been accepted as being substantially complete. Determine Work to be completed. Provide a list of items that are to be completed or corrected. Determine dates for completion of the Work. Establish an amount to be withheld to complete the Work. EXECUTION OF THE DOCUMENT The G704 document should be executed in not less than triplicate by the Owner, Architect and Contractor,each of whom retains an original. AIA Document G704TM—2000.Copyright©1963,1978,1992 and 2000 by The American Institute of Architects.All rights reserved.WARNING:This AIA®Document is protected by U.S.Copyright Law and International Treaties.Unauthorized reproduction or distribution of this AIA®Document, or any portion of it,may result in severe civil and criminal penalties,and will be prosecuted to the maximum extent possible under the law. Purchasers are permitted to reproduce ten(10)copies of this document when completed.To report copyright violations of AIA Contract Documents,e-mail The American Institute of Architects'legal counsel,copyright @aia.org. *A1A Document G704 TM - 2000 Certificate of Substantial Completion PROJECT:(Name and address) PROJECT NUMBER: 6788.40 OWNER ❑ Coca-Cola North America CONTRACTFOR: 45 Industrial Drive Hot Fill Line Addition ARCHITECT ❑ Northampton, MA 01060 CONTRACT DATE: July_31,, 2006 CONTRACTOR ❑ TO OWNER:(Name and address) TO CONTRACTOR:(Name and address) FIELD ❑ Coca-Cola North America Forish Construction Company 45 Industrial Drive 21 Mainline Drive OTHER ❑ Northampton, MA 01060 Westfield, MA 01086 PROJECT OR PORTION OF THE PROJECT DESIGNATED FOR PARTIAL OCCUPANCY OR USE SHALL INCLUDE: The Work performed under this Contract has been reviewed and found,to the Architect's best knowledge,information and belief,to be substantially complete. Substantial Completion is the stage in the progress of the Work when the Work or designated portion is sufficiently complete in accordance with the Contract Documents so that the Owner can occupy or utilize the Work for its intended use.The date of Substantial Completion of the Project or portion designated above is the date of issuance established by this Certificate, which is also the date of commencement of applicable warranties required by the Contract Documents,except as stated below: Hixson Inc. Z*4W d' /'07 ARCHITECT BY DATE OF ISSUANCE chael J. Meyer A list of items to be completed or corrected is attached hereto.The failure to include any items on such list does not alter the responsibility of the Contractor to complete all Work in accordance with the Contract Documents.Unless otherwise agreed to in writing,the date of commencement of warranties for items on the attached list will be the date of issuance of the final Certificate of Payment or the date of final payment. Cost estimate of Work that is incomplete or defective: $ The Contractor will complete or correct the Work on the list of items attached hereto within ( 60 )days from the above date of Substantial Completion. Forish Construction Co. /Vk P co, 01710-7 CONTRACTOR BY Je sey DATE Ir The Owner accepts the Work or designated po ion s substa ally complete and will assume full possession at (time)o Ch 1 , 007 (date). Coca—Cola North America OWNER BY DATE ' Jer sell The responsibilities of the Owner and Contract for security,maintenance,heat,utilities,damage to the Work and insurance shall be as follows: (Note: Owner's nd Contractor's legal and insurance counsel should determine and review insurance requirements and coverage. AIA Document G704TM—2000.Copyright @ 1963,1978,1992 and 2000 by The American Institute of Architects.All rights reserved.WARNING:This AIA®Document is protected by U.S.Copyright Law and International Treaties.Unauthorized reproduction or distribution of this AIA®Document, or any portion of it,may result in severe civil and criminal penalties,and will be prosecuted to the maximum extent possible under the law. Purchasers are permitted to reproduce ten(10)copies of this document when completed.To report copyright violations of AIA Contract Documents,e-mail The American Institute of Architects'legal counsel,copyright @aia.org. r Fo'rish Construction Company TRANSMITTAL PO Box 358 _It?S' No. 00160 21 Mainline Dr. Phone: 413-568-8624 Westfield,MA 01086 Fax: 413-562-7136 PROJECT: COCA COLA NORTHAMPTON DATE: 12/3/2007 TO: NORTHAMPTON BUILDING DEPARTMENT REF: Signed Cert. of Substantial City of Northampton Completion Building Department 212 Main Street Northampton, MA 01060 ATTN: Louis WE ARE SENDING* SUBMITTED FORe ACTION TAKEN* ❑ Shop Drawings ❑ Approval ❑ Approved as Submitted ❑ Letter ❑ Your Use ❑ Approved as Noted ❑ Prints ❑ As Requested ❑ Returned After Loan ❑ Change Order ❑ Review and Comment ❑ Resubmit ❑ Plans ❑ Submit ❑ Samples SENT VIA: ❑ Returned ❑ Specifications ❑ Attached ❑ Returned for Corrections ❑ Other: ❑ Separate Cover Via: ❑ Due Date: COPIES DATE DRAWING NUMBER REV.NO. DESCRIPTION 1 11/29/2007 Signed Certificate of Substantial Completion Remarks: Louis, Here is the signed copy of the Certficate of Substantial Completion that you requested. I apologize for the delay in getting it to you. Please feel free to call with any questions or if you need any additional information. Thank you. CC: Signed: �- J sey Expedition