25A-182 (7) s F City of Northampton December 4 , 1993 Page 2 5 . Electrical conduit has been stubbed up through the slab on the northeast corner of each building . No electrical wiring has been pulled at this time . Please let me know if you have any questions or comments . Very truly yours , Gerald P. Berson, P.E. P. E. No . 32387 cc : The O' Leary Company, Inc . GERALD P. BERSON, P.E. 35 Lee's Lane DEC 7 Longmeadow, MA 01106 413-567-0793 December 4 , 1993 City of Northampton Building Department 212 Main Street Northampton, MA 01061 RE: Mini Storage Buildings for Bolo Foote - Northampton Industrial Park Construction Report No . 2 Gentlemen: Since my last report dated November 20 , 1993 , the following construction has been completed, inspected and except as noted found to be in compliance with applicable codes and construction documents for this project : 1 . As previously reported, rough site clearing for the two new mini storage warehouse buildings and driveway areas has been completed. Excess topsoil has been stockpiled around the perimeter of the site . Siltation fencing and erosion control hay bales remain in place adjacent to the wetland areas on the west and south sides of the site . The storm drainage swale and retention area has now been graded along the south side of the site . Some siltation has built up within the storm drainage retention area and should be cleaned out periodically. No siltation or erosion has taken place beyond the perimeter barriers . 2 . Excavation has been completed for all building footing and foundation walls . 3 . All reinforced concrete footings and foundation walls have now been poured and backfilled up to grade . The reinforced concrete slab on grade has also been poured and finished at this time with no cracking or deficiencies noted. 4 . The Butler pre-engineered metal building system has now been delivered to the job site , inspected and found to be free of damage. It is anticipated that building erection will begin within the next week. City of Northampton November 20 , 1993 Page 2 5 . The Butler pre-engineered metal building system has not yet been delivered to the job site . Please let me know if you have any questions or comments . Very truly yours , Gerald P. Berson, P.E. P.E. No. 32387 cc : The O'Leary Company, Inc . GERALD P. BERSON, P. E. 35 Lee's Lane Longmeadow, MA 01106 413-567-0793 NOV . November 20 , 1993 City of Northampton Building Department 212 Main Street Northampton, MA 01061 RE: Mini Storage Buildings for Bolo Foote - Northampton Industrial Park Construction Report No . 1 Gentlemen: On November 20 , 1993 I inspected the above referenced project. The following construction has been completed and except as noted found to be in compliance with applicable codes and construction documents for this project . 1 . Rough site clearing for the two new mini storage warehouse buildings has been completed. 2 . Excavation for footings and foundation walls is also complete . Soils encountered at the site are basically clay materials , however, due to the minimal building loads, there will be no bearing capacity problems . 3 . All reinforced concrete footings and approximately 90% of the reinforced concrete foundation walls have now been poured. Due to recent heavy rains, approximately 4" of standing water has accumulated at the bottom of the footing trench. It is my understanding , however, from site personnel , that the trenches were dry at the time that footings were poured. No problems or deficiencies in the concrete work were noted. 4 . A storm water retention area has been roughed in on site and appears to be working adequately. Siltation control fencing and hay bales have been placed along the west property line adjacent to the wetland areas and no siltation or erosion along this line was observed. City of Northampton January 9 , 1994 Page 2 5 . Since the site was snow covered at the time of my inspection, I was not able to observe the condition of the storm water retention area. However, at my last inspection this area was in generally good condition and no problems are anticipated at this time. Please let me know if you have any questions or comments. Very truly yours , Gerald P. Berson, P.E. P.E. No. 32387 cc : The O'Leary Company, Inc . GERALD P. BERSON, P.E. 35 Lee's Lane Longmeadow, MA 01106 im 413-567-0793 January 9 , 1994 City of Northampton Building Department 212 Main Street Northampton, MA 01061 RE: Mini Storage Buildings for Bob Foote - Northampton Industrial Park Construction Report No. 4 Gentlemen: Since my last report dated December 24 , 1993 , the following construction has been completed, inspected and except as noted found to be in compliance with applicable codes and construction documents for this project : 1 . Since my last report , no additional site work has been completed. 2 . As previously reported, all reinforced concrete footings and foundation walls have been poured and backfilled up to finished grade. The reinforced concrete slab on grade has also been installed. 3 . Erection of the Butler pre-engineered mini storage warehouse building system is continuing on building number one . All wall framing members and roof framing members have now been erected. All steel tie down anchors and clip angles at the concrete slab have now been erected for this building as well as exterior and interior metal wall panels . Butler standing seam metal roof system and fiberglass insulation is approximately 90% complete for this building. Installation of roll up overhead doors has now begun and is approximately 5% complete . At building two , Butler pre-engineered metal building system has been delivered to the job site , however, erection has not yet begun. 4 . It is my understanding that installation of all electric utilities for these buildings is being coordinated directly by the owner and not under the supervision of the O'Leary Company. City of Northampton December 24 , 1993 Page 2 4 . No additional electrical wiring has been completed since my last report. Electrical conduit has been stubbed up through the slab on the northeast corner of each building. Please let me know if you have any questions or comments . Very truly yours, Gerald P. Berson, P.E. P.E. No. 32387 cc : The O' Leary Company, Inc . GERALD P. BERSON, P.E. 35 Lee's Lane Longmeadow, MA 01106 413-567-0793 December 24 , 1993 City of Northampton Building Department 212 Main Street Northampton, MA 01061 RE: Mini Storage Buildings for Bob Foote - Northampton Industrial Park Construction Report No. 3 Gentlemen: Since my last report dated December 4, 1993 , the following construction has been completed, inspected and except as noted found to be in compliance with applicable codes and construction documents for this project : 1 . As previously reported, all rough site work for the two new mini storage warehouse buildings and driveway areas has been completed. All reinforced concrete footings and foundation walls have now been installed and backfilled up to grade. Gravel base material has now been installed and compacted around the perimeter of the two new buildings and in the driveway areas . Additional hay bales have now been installed in the storm drainage swale and retention area along the south side of the construction site . Stone rip rap has been placed at the main storm water run-off area for additional erosion protection. No siltation or erosion has taken place beyond the protective barriers . 2 . Also as previously reported, reinforced concrete slab on grade has been poured and finished with control joints cut for the two new buildings. 3 . Erection of the Butler pre-engineered metal building system for the mini storage warehouse units has begun and is approximately 10% complete. Steel tie down anchors and clip angles are being properly installed with no problems noted. No roof installation has begun at this time. It is anticipated that routine building erection will continue over the next two week period. . :.,..,-..,,,,,,.,,,,.�......o... �. s i }. ` '�� # , • THE r,OMMONWEALTR OF ltASSA S FEB 1504 ' of BUILD NSPEOT�ONS ON THIS 12th DIY OF Februar DENpRTi AmPTOV N°'•�1 BEFORE ME, Anthony E. Conklin , Jr , A NOTARY PUBLIC DULY COMMISSIONED AND QUALIFIED FOR THE COMMONWEALTH OF MASSACHUSETTS, PERSONALLY APPEARED Gerald,P. Berson, P.E. WHO BEING DULY SWORN, DEPOSES AND SAYS THAT HE HAS SUPERVISED THE CONSTRUCTION OF Mini Storage Bldgs. Bob Foote Northampton Ind Park (STREET ADDRESS) City of Northampton UNDER PERMIT / 1045 AND THAT THIS (CITY OR TOWN) STRUCTURE CONFORMS TO THE SUBMITTED PLANS AND TO THE CODES Or TY.€ !Northampton (CITY OR TOWN) AND THE COMMONWEALTH. FURTHER, THAT ALL REQUIRED APPROVALS AND MATERIAL AFFIDAVITS HAVE BEEN SUBMITTED, AND THAT THERE ARE NO VIOLATIONS OF LAW OF ORDERS OF THE DEPARTMENT OF PUBLIC SAFETY PENDING. I, AS THE AFFIDAVITED ENGINEER AND40R ARCHITECT HEREBY CERTIFY THAT I HAVE ON THIS DATE February 12 , 1994 INSPECTED THE PROPERTY LOCATED AT Northampton Industrial Park AND FIND THAT THE LOCUS AND ITS STRUCTURES (STREET ADDRESS) COMPLY WITH MY PLANS AND SPECIFICATIONS AND ALL RULES AND REGULATIONS OF THE CODES OF THE COtfflONWEALTH. THEREFORE, I REQUEST A CERTIFICATE OF OCCUPANCY FOR THE ABOVE ADDRESS. 12/94 ORIGINAL SIGNAT E & `FAL DATE SUBSCRIBED AND SWORN TO BEFORE ME THIS 12th DAY OF _February I 9 NOTA Y PUBLIC MY COMMISS10N EXPIRES January 19, 2001