Loading...
25A-181 (13) , 10. Do any signs exist on the property? YES x NO IF YES, describe size, type and location: One "WRIGHT ARCHITECTURAL MILLWORK CORD" 4'x12'wooden sign. Are there any proposed changes to or additions of signs intended for the property? YES NO X IF YES, describe size, type and location: 11. ALL INFORMATION MUST BE COMPLETED, or PERMIT CAN BE DENIED DUE TO LACK OF INFORMATION This column reserved for use by the Building Department EXISTING PROPOSED REQUIRED BY ZONING Lot Size 108,902 SF 108,902 SF Frontage 242' 242' Setbacks Front 62' 62' Side L: 45 ' R: 50' L: 25' R: 35' L: R: Rear 48' 38' Building Height 18' 18' Building Square Footage 21,431 SF 33,280 SF Open Space: (lot area 55% 46% minus building 8 paved parking # of Parking Spaces 35 49 #of Loading Docks N/A 2 Fill: (volume Et location) N/A N/A 12. Certification: I hereby certify that the information contained herein is true and accurate to the best of my knowledge. Date: 02 Ala Applicant's Signature ,'Y4,' 1TL 4 NOTE:Issuance of a zoning permit does not relieve an applicant's burden to compl/with all zoning requirements and obtain all required permits from the Board of Health,Conservation Commission, Historic and Architectural Boards,Department of Public Works and other applicable permit granting authorities. OOO.pdf UP — r 2005 s i File No p� Please type or print all information and return this form to the Building Inspector's Office with the $15.filing fee (check or money order)payable to the City of Northampton 1. Name of Applicant: Mr. Walter Price, President Address: 115 Industrial Drive Telephone: (413) 586-3528 2. Owner of Property: Wright Architectural Millwork LLC Address: 115 Industrial Drive Telephone: 3. Status of Applicant: Owner x Contract Purchaser Lessee Other (explain) 4. Job Location: 115 Industrial Drive,Northampton Parcel Id:' Zoning Map# = Parcei Uistnct(s):n .. In°,Elm Sta.,eet District ; In. + ntra[,Business District (l�`BE.FJLLED%IN BYTHE BUILDING DEPARTMENT] 5. Existing Use of Structure/Property: One-story concrete block building consisting of manufacturing and office area. Two one-story storage metal buildings. 6. Description of Proposed Use/Work/Project/Occupation: (Use additional sheets if necessary): The project includes the removal of two storage metal buildings. Building addition to existing concrete block building including manufacturing,office and truck loading area. Project also includes parking lot reconfiguration and appurtenance work including grading, landscape and utilities. 7. Attached Plans: Sketch Plan Site Plan X Engineered/Surveyed Plans 8. Has a Special Permit/Variance/Finding ever been issued for/on the site? NO DONT KNOW X YES IF YES, date issued: IF YES: Was the permit recorded at the Registry of Deeds? NO DON'T KNOW YES IF YES: enter Book Page and/or Document# 9. Does the site contain a brook, body of water or wetlands? NO DONT KNOW YES x IF YES, has a permit been or need to be obtained from the Conservation Commission? Needs to be obtained Obtained x , date issued: (Form Continues On Other Side) File#MP-2005-0091 APPLICANT/CONTACT PERSON HUNTLEY ASSOCIATES PC ADDRESS/PHONE 30 INDUSTRIAL DR EAST (413)584-7444 PROPERTY LOCATION 115 INDUSTRIAL DR MAP 25A PARCEL 181 001 ZONE GI THIS SECTION FOR OFFICIAL USE ONLY: PERMIT APPLICATION CHECKLIST ENCLOSED REQUIRED DATE NING FO ILLED OUT ee ai , Building Permit Filled out Fee Paid Typeof Construction: ZPA-REMOVE STORAGE BLDGS&CONSTRUCT ADDITION&PARKING LOT RECONFIGURATION New Construction Non Structural interior renovations Addition to Existing Accessory Structure Building Plans Included: Owner/Statement or License 3 sets of Plans/Plot Plan THE FOLLOWINYAC ON HAS BEEN TAKEN ON THIS APPLICATION BASED ON INFORMATION P TED: Approved ditional permits required(see below) PLANNING BOARD PERMIT REQUIRED UNDER: § ��• Intermediate Project: Site Plan AND/OR Special Permit with Site Plan Major Project: (/ Site Plan AND/OR Special Permit with Site Plan ZONING BOARD PERMIT REQUIRED UNDER: § Finding Special Permit Variance* �, �yj 2 v -?R Received&Recorded at Registry of Deeds Proof Enclosed �v,Ew�o�-s�R"cT�• Other Permits Required: 2. Curb Cut from DPW Water Availability Sewer Availability ' Septic Approval Board of Health Well Water Potability Board of Health 1/ Permit from Conservation Commission Permit from CB Architecture Committee Permit from Elm Street C ssion Signature of Building Official Date Note:Issuance of a Zoning permit does not relieve a applicant's burden to comply with all zoning requirements and obtain all required permits from Board of Health,Conservation Commission,Department of public works and other applicable permit granting authorities. *Variances are granted only to those applicants who meet the strict standards of MGL 40A. Contact the Office of Planning&Development for more information.