25A-181 (13) ,
10. Do any signs exist on the property? YES x NO
IF YES, describe size, type and location: One "WRIGHT ARCHITECTURAL MILLWORK CORD"
4'x12'wooden sign.
Are there any proposed changes to or additions of signs intended for the property? YES NO X
IF YES, describe size, type and location:
11. ALL INFORMATION MUST BE COMPLETED, or PERMIT CAN BE DENIED DUE TO LACK OF INFORMATION
This column reserved
for use by the Building
Department
EXISTING PROPOSED REQUIRED BY
ZONING
Lot Size 108,902 SF 108,902 SF
Frontage 242'
242'
Setbacks Front 62' 62'
Side L: 45 ' R: 50' L: 25' R: 35' L: R:
Rear 48' 38'
Building Height
18' 18'
Building Square Footage 21,431 SF
33,280 SF
Open Space: (lot area 55% 46%
minus building 8 paved parking
# of Parking Spaces
35 49
#of Loading Docks N/A
2
Fill:
(volume Et location) N/A N/A
12. Certification: I hereby certify that the information contained herein is true and accurate to the best of
my knowledge.
Date: 02 Ala Applicant's Signature
,'Y4,' 1TL 4
NOTE:Issuance of a zoning permit does not relieve an applicant's burden to compl/with all zoning
requirements and obtain all required permits from the Board of Health,Conservation Commission,
Historic and Architectural Boards,Department of Public Works and other applicable permit
granting authorities.
OOO.pdf
UP — r 2005 s i
File No
p�
Please type or print all information and return this form to the Building
Inspector's Office with the $15.filing fee (check or money order)payable to the
City of Northampton
1. Name of Applicant: Mr. Walter Price, President
Address: 115 Industrial Drive Telephone: (413) 586-3528
2. Owner of Property: Wright Architectural Millwork LLC
Address: 115 Industrial Drive Telephone:
3. Status of Applicant: Owner x Contract Purchaser Lessee Other (explain)
4. Job Location: 115 Industrial Drive,Northampton
Parcel Id:' Zoning Map# = Parcei Uistnct(s):n
.. In°,Elm Sta.,eet District ; In. + ntra[,Business District
(l�`BE.FJLLED%IN BYTHE BUILDING DEPARTMENT]
5. Existing Use of Structure/Property: One-story concrete block building consisting of manufacturing
and office area. Two one-story storage metal buildings.
6. Description of Proposed Use/Work/Project/Occupation: (Use additional sheets if necessary):
The project includes the removal of two storage metal buildings. Building addition to existing concrete
block building including manufacturing,office and truck loading area. Project also includes parking
lot reconfiguration and appurtenance work including grading, landscape and utilities.
7. Attached Plans: Sketch Plan Site Plan X Engineered/Surveyed Plans
8. Has a Special Permit/Variance/Finding ever been issued for/on the site?
NO DONT KNOW X YES IF YES, date issued:
IF YES: Was the permit recorded at the Registry of Deeds?
NO DON'T KNOW YES
IF YES: enter Book Page and/or Document#
9. Does the site contain a brook, body of water or wetlands? NO DONT KNOW YES x
IF YES, has a permit been or need to be obtained from the Conservation Commission?
Needs to be obtained Obtained x , date issued:
(Form Continues On Other Side)
File#MP-2005-0091
APPLICANT/CONTACT PERSON HUNTLEY ASSOCIATES PC
ADDRESS/PHONE 30 INDUSTRIAL DR EAST (413)584-7444
PROPERTY LOCATION 115 INDUSTRIAL DR
MAP 25A PARCEL 181 001 ZONE GI
THIS SECTION FOR OFFICIAL USE ONLY:
PERMIT APPLICATION CHECKLIST
ENCLOSED REQUIRED DATE
NING FO ILLED OUT
ee ai ,
Building Permit Filled out
Fee Paid
Typeof Construction: ZPA-REMOVE STORAGE BLDGS&CONSTRUCT ADDITION&PARKING LOT
RECONFIGURATION
New Construction
Non Structural interior renovations
Addition to Existing
Accessory Structure
Building Plans Included:
Owner/Statement or License
3 sets of Plans/Plot Plan
THE FOLLOWINYAC ON HAS BEEN TAKEN ON THIS APPLICATION BASED ON
INFORMATION P TED:
Approved ditional permits required(see below)
PLANNING BOARD PERMIT REQUIRED UNDER: § ��•
Intermediate Project: Site Plan AND/OR Special Permit with Site Plan
Major Project: (/ Site Plan AND/OR Special Permit with Site Plan
ZONING BOARD PERMIT REQUIRED UNDER: §
Finding Special Permit Variance* �, �yj 2 v -?R
Received&Recorded at Registry of Deeds Proof Enclosed
�v,Ew�o�-s�R"cT�•
Other Permits Required:
2.
Curb Cut from DPW Water Availability Sewer Availability
' Septic Approval Board of Health Well Water Potability Board of Health
1/ Permit from Conservation Commission Permit from CB Architecture Committee
Permit from Elm Street C ssion
Signature of Building Official Date
Note:Issuance of a Zoning permit does not relieve a applicant's burden to comply with all zoning
requirements and obtain all required permits from Board of Health,Conservation Commission,Department
of public works and other applicable permit granting authorities.
*Variances are granted only to those applicants who meet the strict standards of MGL 40A. Contact the Office of
Planning&Development for more information.