Loading...
25A-181 (9) WRIGHT ARCHITECTURAL MILLWORK CORP. CHECK DATE 08/28/2008 CHECK NO. 30523 INVOICE INV DATE DESCRIPTION GROSS AMOUNT ADJUSTMENTS NET AMOUNT BLDGPERMIT 08/29/2008 Building Permit $8,646.50 $0.00 $8,646.00 VENDOR NO. VENDOR NAME TOTAL GROSS TOTAL ADJ. TOTAL NET City of Northampton $8,646.50 $0.00 $8,646.00 WESTFIELD BANK Westfield,Massachusetts 01086 030523 WRIGHT ARCHITECTURAL MILLWORK CORP. 53-7160-2118 115 INDUSTRIAL DRIVE DATE CHECK No. AMOUNT NORTHAMPTON,MA 01060 08/28/2008 30523 $8,646.50***** PAY *** Eight Thousand Six. .Hundred.Forty Six Dollars and. 50/100: *************************** TO THE City Of Northampton � TWO SIGNATURES REQUIRED OVER$5,000.00 ORDER OF 1110305 2311' 1: 2 L 187IGOLX 0 L 29 4 L3755ill WRIGHT ARCHITECTURAL MILLWORK CORP. WRICHTARCHITECTURAL MILLWORK CORP. EXHIBIT'D' PLAN LIST SKEET TITLE ISSUED REV DATE -- I COVER SITE (HUNTLEY ASSOCIATES) 2 OF q CONSTRUCTION NOTES 4 LEGEND q-11-07 10-12-07 4 OF q EXISTING CONDITIONS PLAN q-11-07 10-12-07 5 OF q DEMOLITION 4 EROSION CONTROL PLAN q-II-07 10-12-07 6 OF q LAYOUT 4 PLANTING PLAN 10-II-07 10-12-07 7 OF q GRADING 4 UTILITIES PLAN 10-11-07 10-12-07 8 OF q CONSTRUCTION DETAILS q-11-07 10-12-07 q OF q CONSTRUCTION DETAILS q-11-07 10-12-07 ARCHITECTURAL (ASSOCIATED BUILDERS, INC.) AO.O CODE REVIEW 10-15-07 07-25-08 AI.O DEMO PLAN 10-15-07 07-25-08 AI.1 FLOOR PLAN 10-15-07 07-25-08 AI.2 DOOR 4 ROOM FINISH SCHEDULE 10-15-07 07-25-08 A3.1 EXTERIOR ELEVATIONS 10-15-07 07-25-08 A4.1 BUILDING SECTIONS 10-15-07 07-25-05 A4.2 BUILDING SECTIONS 10-15-07 07-25-08 A6.1 WALL SECTIONS 10-15-07 07-25-08 A6.2 WALL SECTIONS 10-15-07 07-25-08 A6.3 WALL SECTIONS 10-15-07 07-25-08 A6.4 WALL SECTIONS 10-15-07 07-25-08 Aq.O ROOF PLAN 10-15-07 07-25-08 STRUCTURAL (ASSOCIATED BUILDERS, INC.) 51.1 FOUNDATION PLAN 10-15-07 10-22-07 52.1 FOUNDATION DETAILS 10-15-07 10-22-07 52.2 FOUNDATION DETAILS 10-15-07 10-22-07 PLUMBING (PAIGE PLUMBING) r P L O PLUMBING FLOOR PLANS 08-Ob-08 2.0 PLUMBING FLOOR PLANS 08-06-08 FIRE PROTECTION (WAREHOUSE MECHANICAL CONTRACTORS, INC.) I of 2 SPRINKLER PLAN 10-15-07 2 of 2 SPRINKLER DETAILS 10-15-07 HVAC (McCORMICK- ALLUM) H-I ROOF FRAMING PLAN 06-061-05 H-2 GAS PIPING PLAN 05-0q-08 H-3 MANUFACTURING HVAC 06-0q-08 ELECTRICAL (PELLAND ELECTRICAL CONTRACTORS) ASSOCIATED BUILDERS, INC. 4 INDUSTRIAL DRIVE,SOUTH HADLEY,MA 01075 PHONE(413)536-0021 FAX(413)536-0908 EMAIL:abuilders @abuilders.com ISSUED FOR BUILDING PERMIT& CONSTRUCTION 08.25.08 25. If checked: [X] YES Upon completion of the work covered by this Order, the applicant shall submit an as-built plan to verify compensatory storage, signed and stamped by a registered professional engineer or land surveyor, together with a written request for a Certificate of Compliance. The plan and written request shall specify any ways that the completed project differs from the plans referenced in the Order. The as-built plan shall include, at a minimum, and as applicable to the project: elevations of all pipe inverts and outlets,pipe sizes, materials, and slopes; all other drainage structures; limits of clearing, grading, and fill; all structures,pavement, and contours within 100 feet of wetland boundaries; all alterations within the wetland resource areas; all wetland replication areas; and all dates of fieldwork. The as-built must also indicate that all flood-storage created meets or exceeds the amount planned. 26. Permanent markers (either boulders greater than 3' in diameter or cement markers showing at least 1 foot above ground) a maximum of 20 feet apart shall be installed along the 50' wetland buffer. This shall be a permanent no disturbance zone. 27. Erosion control devices shall remain in place until all disturbed surfaces have been stabilized with a vegetative cover or until the Commission has authorized their removal. Areas that cannot be permanently stabilized within 30 days of disturbance, shall be stabilized by temporary measures acceptable to the Conservation Commission. .OIL J "ATTACHMENT A" IS. The owner of the property described in this Order must advise any potential buyer of the property that any construction or alteration to said property, including brush cutting or clearance, may require approval by the Northampton Conservation Commission. Any instrument conveying any or all of the owners' interest in said property or any portion thereof, shall contain language similar to the following: "This property is subject to the Northampton Wetlands Protection Ordinance and/or Wetlands Protection Act. Any construction or maintenance work performed on this property requires an Order of Conditions, and/or a Determination of Applicability from the Northampton Conservation Commission. 19. A copy of this Order and associated plans shall remain on site during all construction and/or building activities. The project manager and all equipment operators shall be familiar with the approved plans, and shall be informed of their location on the site. This location shall be accessible to all contractors whenever work is occurring on site. 20. All required permits must be obtained from the Army Corp of Engineers (Section 404, Water Quality Certification), Planning Board, Zoning Board, Department of Public Works, or Building Inspector prior to the start of projects involving fill within any wetland resource area; 21. No disposal of soils or other materials shall be allowed within: a 100-year floodplain; 40 feet of the 100-year floodplain elevation; any wetland; or any area within 100-feet of a wetland, unless such areas are specifically approved by the Commission, in accordance with 310 CMR 10.00, and City of Northampton Ordinances - Chapter 24; 22. All revised plans,referenced within this Order of Conditions, shall be approved by the Conservation Commission and incorporated into this Order by reference and shall be followed during the course of construction. 23. Ongoing conditions that shall not expire with the issuance of a Certificate of Compliance are as follows: N/A 24. Prior to the start of any site work, excavation or construction, a pre-construction conference shall be held on the site, between the contractor conducting the work, the site/project engineer, the applicant, and a member or agent of the Conservation Commission, in order to ensure that the requirements of this Order are understood by all parties. Prior to the pre-construction meeting, all erosion control devices must be installed. Massachusetts Department of Environmental Protection Bureau of Resource Protection -Wetlands DEP File Number: 11ll1PA Form 5 - Order of Conditions 246-566 Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 F. Appeals The applicant, the owner, any person aggrieved by this Order, any owner of land abutting the land subject to this Order, or any ten residents of the city or town in which such land is located, are hereby notified of their right to request the appropriate DEP Regional Office to issue a Superseding Order of Conditions. The request must be made by certified mail or hand delivery to the Department, with the appropriate filing fee and a completed Request of Departmental Action Fee Transmittal Form, as provided in 310 CMR 10.03(7)within ten business days from the date of issuance of this Order. A copy of the request shall at the same time be sent by certified mail or hand delivery to the Conservation Commission and to the applicant, if he/she is not the appellant.Any appellants seeking to appeal the Department's Superseding Order associated with this appeal will be required to demonstrate prior participation in the review of this project. Previous participation in the permit proceeding means the submission of written information to the Conservation Commission prior to the close of the public hearing, requesting a Superseding Order or Determination, or providing written information to the Department prior to issuance of a Superseding Order or Determination. The request shall state clearly and concisely the objections to the Order which is being appealed and how the Order does not contribute to the protection of the interests identified in the Massachusetts Wetlands Protection Act, (M.G.L. c. 131, §40) and is inconsistent with the wetlands regulations (310 CMR 10.00). To the extent that the Order is based on a municipal ordinance or bylaw, and not on the Massachusetts Wetlands Protection Act or regulations, the Department has no appellate jurisdiction. Section G, Recording Information is available on the following page. I wpaform5.doc• rev.3/1105 Page 8 of 9 r Massachusetts Department of Environmental Protection Bureau of Resource Protection -Wetlands DEP File Number: WPA Form 5 - Order of Conditions 246-566 Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 D. Findings Under Municipal Wetlands Bylaw or Ordinance 1. Is a municipal wetlands bylaw or ordinance applicable? ® Yes ❑ No 2. The Northampton hereby finds (check one that applies): Conservation Commission 3. ❑ that the proposed work cannot be conditioned to meet the standards set forth in a municipal ordinance or bylaw specifically: a. Municipal Ordinance or Bylaw b. Citation Therefore, work on this project may not go forward unless and until a revised Notice of Intent is submitted which provides measures which are adequate to meet these standards, and a final Order of Conditions is issued. 4. ® that the following additional conditions are necessary to comply with a municipal ordinance or bylaw: Northampton Wetlands Ordinance Chapter 24 and 25 a. Municipal Ordinance or Bylaw b.Citation The Commission orders that all work shall be performed in accordance with the following conditions and with the Notice of Intent referenced above. To the extent that the following conditions modify or differ from the plans, specifications, or other proposals submitted with the Notice of Intent, the conditions shall control. If you need more space for c. The special conditions relating to municipal ordinance or bylaw are as follows: additional conditions, See "Attachment A" select box to attach a text document ❑ 5.doc• rev.311105 Page 6 of 9 l � Massachusetts Department of Environmental Protection Bureau of Resource Protection -Wetlands DEP File Number: WPA Form 5 - Order of Conditions M(,-s� Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 E. Issuance This Order is valid for three years, unless otherwise specified as a special d9�zolao45 condition pursuant to General Conditions#4, from the date of issuance. 1. Date of issuance Please indicate the number of members who will sign this form: ,- This Order must be signed by a majority of the Conservation Commission. 2. Number of signers The Order must be mailed by certified mail (return receipt requested) or hand delivered to the applicant. A copy also must be mailed or hand delivered at the same time to the appropriate Department of Environmental Protection Regional Office, if not filing electronically, and the property owner, if different from appfte t. Signatsures: I IN l L ' a r L%✓l.i_ Notary Acknowledgement Commonwealth of Massachusetts County of '�"^PS`tt2E On this �$ of °^^ coos Day Month Year Before me, the undDrsigned Notary Public, ?RyL- WE eL- personally appeared Name of Document Signer proved to me through satisfactory evidence of identification, which was/were Description of evidence of identification ja1111111/1 „ to be the person whose name is signed on the preceding or attached document, and`ppknowl;2dged to me that he/she signed it voluntarily for its stated purpose. unrn�tawtumnl As member of cityT town Conse�� tip� issimn Signature ot Notary Public C-At2dVkf tiq r SC4 Prin ed N e of Notary Public Place notary seal and/or any stamp above Tco mission Expires(Date) This Order is issued to the applicant as follows: J ❑ by hand delivery on ® by certified mail, return receipt requested, on 09/�4� Date Da e wpaform5.doc• rev.311105 Page 7 of 9 Massachusetts Department of Environmental Protection Bureau of Resource Protection - Wetlands DEP File Number: l WPA Form 5 - Order of Conditions 246-566 Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 C. General Conditions Under Massachusetts Wetlan Is Protection Act 10. Where the Department of Environmental Protection is requested to issue a Superseding Order, the Conservation Commission shall be a party to all agency proceedings and hearings before DEP. 11. Upon completion of the work described herein, the applicant shall submit a Request for Certificate of Compliance (WPA Form 8A) to the Conservation Commission. 12. The work shall conform to the plans and special conditions referenced in this order. 13. Any change to the plans identified in Condition#12 above shall require the applicant to inquire of the Conservation Commission in writing whether the change is significant enough to require the filing of a new Notice of Intent. 14. The Agent or members of the Conservation Commission and the Department of Environmental Protection shall have the right to enter and inspect the area subject to this Order at reasonable hours to evaluate compliance with the conditions stated in this Order, and may require the submittal of any data deemed necessary by the Conservation Commission or Department for that evaluation. 15. This Order of Conditions shall apply to any successor in interest or successor in control of the property subject to this Order and to any contractor or other person performing work conditioned by this Order. 16. Prior to the start of work, and if the project involves work adjacent to a Bordering Vegetated Wetland, the boundary of the wetland in the vicinity of the proposed work area shall be marked by wooden stakes or flagging. Once in place, the wetland boundary markers shall be maintained until a Certificate of Compliance has been issued by the Conservation Commission. 17. All sedimentation barriers shall be maintained in good repair until all disturbed areas have been fully stabilized with vegetation or other means. At no time shall sediments be deposited in a wetland or water body. During construction, the applicant or his/her designee shall inspect the erosion controls on a daily basis and shall remove accumulated sediments as needed.The applicant shall immediately control any erosion problems that occur at the site and shall also immediately notify the Conservation Commission, which reserves the right to require additional erosion and/or damage prevention controls it may deem necessary. Sedimentation barriers shall serve as the limit of work unless another limit of work line has been approved by this Order. 18. All work associated with this Order is required to comply with the Massachusetts Stormwater Policy Standards. Special Conditions: If you need more See"Attachment A" space for additional conditions, select box to attach a text document ❑ 1 wpaform5.doc• rev.311/05 Page 5 of 9 Massachusetts Department of Environmental Protection Bureau of Resource Protection - Wetlands DEP File Number: WPA Form 5 - Order of Conditions 246-566 Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 C. General Conditions Under Massachusetts Wetlands Protection Act (only applicable to approved projects) 1. Failure to comply with all conditions stated herein, and with all related statutes and other regulatory measures, shall be deemed cause to revoke or modify this Order. 2. The Order does not grant any property rights or any exclusive privileges; it does not authorize any injury to private property or invasion of private rights. 3. This Order does not relieve the permittee or any other person of the necessity of complying with all other applicable federal, state, or local statutes, ordinances, bylaws, or regulations. 4. The work authorized hereunder shall be completed within three years from the date of this Order unless either of the following apply: a, the work is a maintenance dredging project as provided for in the Act; or b. the time for completion has been extended to a specified date more than three years, but less than five years, from the date of issuance. If this Order is intended to be valid for more than three years, the extension date and the special circumstances warranting the extended time period are set forth as a special condition in this Order. 5. This Order may be extended by the issuing authority for one or more periods of up to three years each upon application to the issuing authority at least 30 days prior to the expiration date of the Order. 6. Any fill used in connection with this project shall be clean fill. Any fill shall contain no trash, refuse, rubbish, or debris, including but not limited to lumber, bricks, plaster, wire, lath, paper, cardboard, pipe, tires, ashes, refrigerators, motor vehicles, or parts of any of the foregoing. 7. This Order is not final until all administrative appeal periods from this Order have elapsed, or if such an appeal has been taken, until all proceedings before the Department have been completed. 8. No work shall be undertaken until the Order has become final and then has been recorded in the Registry of Deeds or the Land Court for the district in which the land is located,within the chain of title of the affected property. In the case of recorded land, the Final Order shall also be noted in the Registry's Grantor Index under the name of the owner of the land upon which the proposed work is to be done. In the case of the registered land, the Final Order shall also be noted on the Land Court Certificate of Title of the owner of the land upon which the proposed work is done. The recording information shall be submitted to this Conservation Commission on the form at the end of this Order, which form must be stamped by the Registry of Deeds, prior to the commencement of work. 9. A sign shall be displayed at the site not less then two square feet or more than three square feet in size bearing the words, "Massachusetts Department of Environmental Protection" [or, "MA DEP"] "File Number 246-566 " wpaform5.doc• rev.3/1105 - Page 4 of 9 Massachusetts Department.of Environmental Protection Bureau of Resource Protection - Wetlands DEP File Number: WPA Form 5 - Order of Conditions 246-566 Massachusetts Wetlands Protection Act M.G.L. c. 139, §40 B. Findings (cont.) Resource Area Proposed Permitted Proposed Permitted Alteration Alteration Replacement Replacement 7. ❑ Bordering Land Subject to Flooding a.square feet b.square feet c.square feet d.square feet Cubic Feet Flood Storage e.cubic feet f.cubic feet g.cubic feet h.cubic feet e. ❑ Isolated Land Subject to Flooding a.square feet b.square feet Cubic Feet Flood Storage c.cubic feet d.cubic feet e.cubic feet f.cubic feet 9. ❑ Riverfront area a.total sq.feet b.total sq.feet Sq ft within 100 ft c.square feet d.square feet e.square feet f.square feet Sq ft between 100-200 ft g.square feet h.square feet i.square feet T.square feet Coastal Resource Area Impacts: Check all that apply below. (For Approvals Only) 1a ❑ Designated Port Areas Indicate size under Land Under the Ocean, below 11. ❑ Land Under the Ocean a.square feet b.square feet c.cu.yd dredged d.cu.yd dredged 12: ❑ Barrier Beaches Indicate size under Coastal Beaches and/or Coastal Dunes below 13. ❑ Coastal Beaches a.square feet b.square feet c.dy nourishmt. d.c/y nourishmt. 14. ❑ Coastal Dunes a.square feet b.square feet c.c/y nourishmt. d.c!y nourishmt 15. ❑ Coastal Banks a.linear feet b. linear feet 16. ❑ Rocky Intertidal Shores a.square feet b.square feet 17. ❑ Salt Marshes a.square feet b.square feet c.square feet d.square feet 18. ❑ Land Under Salt Ponds a.square feet b.square feet c.cu.yd dredged d.cu.yd dredged 19. ❑ Land Containing Shellfish a.square feet b.square feet c.square feet d.square feet 20. ❑ Fish Runs Indicate size under Coastal Banks, inland Bank, Land Under the Ocean, and/or inland Land Under Waterbodies and Waterways, above a.cu.yd dredged b.cu.yd dredged 21. ❑ Land Subject to Coastal Storm Flowage a.square feet b.square feet wpaform5.doc•rev.311105 Page 3 of 9 Massachusetts Department of Environmental Protection Bureau of Resource Protection - Wetlands DEP File Number: WPA Form 5 - Order of Conditions 246-566 Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 B. Findings 1. Findings pursuant to the Massachusetts Wetlands Protection Act: Following the review of the above-referenced Notice of Intent and based on the information provided in this application and presented at the public hearing, this Commission finds that the areas in which work is proposed is significant to the following interests of the Wetlands Protection Act. Check all that apply: a. ® Public Water Supply b. ❑ Land Containing Shellfish c. ® Prevention of Pollution d. ® Private Water Supply e. ❑ Fisheries f. ® Protection of Wildlife Habitat g. ® Groundwater Supply h. ® Storm Damage Prevention i. ❑ Flood Control 2. This Commission hereby finds the project, as proposed, is: (check one of the following boxes) Approved subject to: a. ® the following conditions which are necessary in accordance with the performance standards set forth in the wetlands regulations. This Commission orders that all work shall be performed in accordance with the Notice of Intent referenced above, the following General Conditions, and any other special conditions attached to this Order. To the extent that the following conditions modify or differ from the plans, specifications, or other proposals submitted with the Notice of Intent, these conditions shall control. J Denied because: b. ❑ the proposed Work cannot be conditioned to meet the performance standards set forth in the wetland regulations. Therefore, work on this project may not go forward unless and until a new Notice of Intent is submitted which provides measures which are adequate to protect these interests, and a final Order of Conditions is issued. A description of the performance standards which the proposed work cannot meet is attached to this Order. C. ❑ the information submitted by the applicant is not sufficient to describe the site, the work, or the effect of the work on the interests identified in the Wetlands Protection Act. Therefore, work on this project may not go forward unless and until a revised Notice of Intent is submitted which provides sufficient information and includes measures which are adequate to protect the Act's interests, and a final Order of Conditions is issued. A description of the specific information which is lacking and why it is necessary is attached to this Order as per 310 CMR 10.05(6)(c). Inland Resource Area Impacts: Check all that apply below. (For Approvals Only) 3. ® Buffer Zone Impacts: Shortest distance between limit of project disturbance and 10 wetland boundary (if available) a. linear feet Resource Area Proposed Permitted Proposed Permitted Alteration Alteration Replacement Replacement 4. ❑ Bank a.linear feet b.linear feet c.linear feet d.linear feet 5. ❑ Bordering Vegetated Wetland a.square feet b.square feet c.square feet d.square feet 6. ❑ Land Under Waterbodies a.square feet b.square feet c.square feet d.square feet and Waterways e.cu.yd dredged f.cu.yd dredged wepaform5.doc• rev 311105 Page 2 of 9 a Massachusetts Department of Environmental Protection Bureau of Resource Protection - Wetlands DEP File Number. 1 WPA Form 5 - Order of Conditions 246-566 Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 A. General Information Important: Northampton When filling From: 1.Conservation Commission out forms on the computer, 2. This issuance is for(check one): a. ® Order of Conditions b. ❑ Amended Order of Conditions use only the tab key to 3. To: Applicant: move your cursor-do not Walter Price Wright Architectural Millwork use the return a. First Name b. Last Name c.Company key. 115 Industrial Drive d.Mailing Address Northampton MA 01060 e.City/Town f.State g.Zip Code 4. Property Owner(if different from applicant): a. First Name b.Last Name c,Company d.Mailing Address e,City/Town f.State g.Zip Code 5. Project Location: 115 Industrial Drive Northampton a. Street Address b.City/Town 25A 181 c,Assessors Map/Plat Number d. Parcel/Lot-lumber Latitude and Longitude, if known (note: electronic filers will click for GIS locator): e. Latitude f.Longitude 6. Property recorded at the Registry of Deeds for(attach additional information if more than one parcel): Hampshire a.County b.Certificate(if registered land) 1990 58 c.Book d. Page 7. Dates: 08/10/2005 09/08/2005 09/20/2005 a.Date Notice of Intent Filed b.Date Public Hearing Closed c.Date of Issuance 8. Final Approved Plans and Other Documents (attach additional plan or document references as needed): Notice of Intent Wright Architectural Millwork.Northampton, MA a.Plan Title New England Environmental, Inc./Huntley Associates, P.C. c.Signed and Stamped by 08/08/2005 111=30' d. Final Revision Date e.Scale f.Additional Plan or Document Title"" g. Date i c 22 wpaform5.doc• rev.3/1/05 Page 1 of 9 i 1! IE 1 I C C I O 1 0 1 C 1 0 1 0 0 0 1 0 1 a � 1 a O I lC7 I If) 1 O 1 tf] 1 U'1 IL7 It1 1 En. 1 N O O ! O Q 1 Eff I Efi I 4 1 fN 1 fi! fff f/T 1 I Y I O N O I •. L }+ J I d 1 I 1 1 O) O>• fi J O i \ 1 M � i 1 1 C d U 4 •Ll N I Y 1 C I 1 1 � N =� d l O I �O O I 1 •. .. 1 L 7. N N O O ti 1 f1] 1 It-f E 1 1 N 1 O ++ m V 1 I 07 4 1 1 tT - 1 QI O F-.x $ C 1 1 a I 1 O G1•.- - v Q Q N L Z�•-� x 1 2 1 O V ! 1 I dY ++ O ti 1 I O I 1 tp 10 C I N E L ILA ce 1 d' 1 O I W 1 1 1 O 1 -•- 1 V f �•+ 1 N I d••- 1 O_ 1 E N I J 1 d 1 E L I M 1 - ` Planning - Decision City of Northampton Hearing No.: PLN-2008-0011 Date: December 20, 200 supply and distribution system,sanitary and storm sewage collection and treatment systems,fire protection,streets and schools. The applicant has received a stormwater permit from DPW based upon revised design and calculations from that originally submitted with the application. E. The requested use meets other special regulations set forth in this chapter.For curb cut widths and fighting. The Board did approve a small waiver of lighting atone point on the site for levels to be approximately.1 foot candle at the property boundary. The 42'wide curb cut with concrete rumble strips was approved based on the need for tractor trailer turning movements along Industrial Drive East and should improve safety of vehiclular entry at that location. F. Compliance with the following technical performance standards:(1)Curb cuts onto streets shall be minimized. One of the curb cuts along Industrial Drive will be closed and a new curb cut on the less traveled Industrial Drive East will be created to separate truck traffic from other vehicular and pedestrian traffic on site. (2)Pedestrian, bicycle and vehicular traffic movement on site must be separated, to the extent possible,and sidewalks will be provided between businesses within a development. (3)No increase in peak flows from the one-or two-and ten-year Soil Conservation Service design storm from predevelopment conditions and must obtain a permit stating as such by the Department of Public Works. COULD NOT DEROGATE BECAUSE: FILING DEADLINE: MAILING DATE. HEARING CONTINUED DATE: DECISION DRAFT BY: APPEAL DATE: 9/20/2007 101412007 10/25/2007 1/2/2008 REFERRALS IN DATE: HEARING DEADLINE DATE: HEARING CLOSE DATE: FINAL SIGNING BY: APPEAL DEADLINE: 9/27/2007 1111612007 12/19/2007 1/2/2008 1/9/2008 FIRST ADVERTISING DATE: HEARING DATE: VOTING DATE: DECISION DATE: 9/27/2007 10/11/2007 1211912007 12/20/2007 SECOND ADVERTISING DATE: HEARING TIME: VOTING DEADLINE: DECISION DEADLINE: 101412007 9/20/2007 311812008 MEMBERS PRESENT: VOTE: Stephen Gilson votes to Grant Paul Voss votes to Grant Francis Johnson votes to Grant Keith Wilson votes to Grant Kenneth Jodrie votes to ineligible to Vote MOTION MADE BY: SECONDED BY: VOTE COUNT: IDECISION: Paul Voss Keith Wilson 4 Approved with Conditions MINUTES OF MEETING: Available in the Office of Planning&Development. 1, Carolyn Misch,as agent to the Planning Board,certify that this is a true and accurate decision made by the Planning Board and certify that a copy of this and all plans have been filed with the Board and the City Clerk on December 20, 2007. 1 certify that a copy of this decision has been mailed to the Owner and Applicant. Notice of Appeal An appeal from the decision of the Planning Board may be made by any person aggrieved pursuant to MGL Chapt. 40A, Section 17 as amended within twenty(20)days after the date of the filing of the notice of the decision with the City Clerk. The date is listed above. Such appeal may be made to the Hampshire Superior Court with a certified copy of the appeal sent to the City Clerk of the City of Northampton. DECEIVED DEC 2 1 2007 WRIGHT ARCHITECTURAL MILLWORK CORP. GeoTMS®2007 Des Lauriers Municipal Solutions,Inc. Planning - Decision City of Northampton Hearing No.: PLN-2008-0011 IIII 1 1111111 Date: December 20, 2007 II II I I I I II III VIII I IIIIIIIIIIIIII II I IIIIIIIIIIIIIIIIIIII I I 2008-00017215 APPLICAI"1014 TYPE. SUBMISSION DATE: Bk:9561 Pg:320 Page: 1 of 2 PB Major Site Plan 9/12/2007 Recorded: 08/04/2008 09:13 AM Applicant's Name: Owner's Name: Surveyor's Name: NAME: NAME: COMPANY14AME: Walter Price Walter Price ADDRESS: ADDRESS: ADDRESS: 115 Industrial Drive 115 Industrial Drive TOWN: STATE: ZIP CODE TOWN: STATE: ZIP CODE TOWN: STATE'. ZIP.CODE: NORTHAMPTON MA 01060 NORTHAMPTON MA 01060 PHONE NO.: FAX NO.: PHONE NO.: FAX NO.: PHO14E NO.: FAX NO.: EMAIL ADDRESS: EMAIL ADDRESS: EMAIL ADDRESS: Site Information: STREET NO.: SITE ZONING: 115 INDUSTRIAL DR GI TOWN: SECTION OF BYLAW: NORTHAMPTON MA 01060 Chpt.350-11:Site Plan Approval MAP: BLOCK: LOT: MAP DATE: ACTION TAKEN: 1 181 001 Approved With Conditions Book: Page: 1990 058 NATURE OF PROPOSED WORK: Demolition &removal of 2 sheds,construction of 12,800+- sf addition for office and warehouse with;parking lot lands cape.impro vemen ts and curb cut relocation. HARDSHIP: CONDITION OF APPROVAL: 1) Prior to certificate of occupancy, the applicant shall provide an as-built of the lighting plan indicating conformance with the submitted plan. 2) As offered by the applicant,and prior to issuance of a CERTIFICATE OF OCCUPANCY, the applicant shall show proof of the agreement,in the form of change order with Microcal's contractor, that traffic mitigation payment of$4,000 has been made to Microcal's contractor. This payment change order is for the purpose of continuing the construction of a sidewalk extension along Industrial Drive from the point at which Microcal's obligation terminates at Bradford Street as part of its project. FINDINGS: The Planning Board approved the request for site plan for the 12,800 sf additions with 42'wide curb cut relocation based on the following plans submitted with the application: 1. Wright Architectural Millwork Site Plan, Prepared by Huntley Associates,PC,dated September 2007 with final revised date of November 2007,sheets Sheets 1-9,Attachment 1(Elevation Rendering),Attachment 2,(Luminary Plan) 2. Wright Architectural Millwork, Tractor Trailer Simulation, Prepared by Huntley Associates,PC,dated 10/11/07,sheets 1-4. 3. Drainage Report,dated September 11, 2007 Prepared by Huntley Associates, PC. In approving the Plan, the Board found that--(lighting) A. The requested use protects adjoining premises against seriously detrimental uses, which could include surface water drainage, and other quality of life impacts;Industrial uses are allowed and this expansion is consistent with the goal of allowing growth of businesses on existing infrastructure. B. The requested use will promote the convenience and safety of vehicular and pedestrian movement within the site and on adjacent streets, minimize traffic impacts on the streets and roads in the area. The project will not decrease the level of service(LOS)of all area roads or intersections affected by the project below the existing conditions. As offered by the applicant, sidewalk improvements along industrial drive will be made up to$4,000 worth of linear feet of design/construction. C. The requested use will promote a harmonious relationship of structures and open spaces to the natural landscape, existing buildings and other community assets in the area;and D. The requested use will not overload,and will mitigate adverse impacts on, the City's resources including the effect on the City's water GeoTMS®2007 Des Lauriers Municipal Solutions,Inc. I Acknowledgement Letter Page 8 of 20 low 8144 NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM (NPDES) STORMWATER NOTICE OF INTENT PROCESSING CENTER OPERATOR: 11/01/2007 ASSOCIATED BUILDERS INC FACILITY: ATTN: MARK MCCLUSKY, P.E. WRIGHT ARCHITECTURAL MILLWORK 4 INDUSTRIAL DRIVE 115INDUSTRIAL DRIVE SOUTH,MA 01075 NORTHAMPTON, MA 01060 TRACKING NUMBER: MAR10C177 - _-This-letter acknowledges_tha you have-submitted a complete Notice of Intent form-to-be.couered-.under-E-PA's NPDES Stormwater Construction General Permit(CGP).Coverage under this permit began at the conclusion of your seven-day waiting period on 11/01/2007. As stated above,this letter acknowledges receipt of a complete Notice of Intent. However, it is not an EPA determination of the validity of the information you provided.Your eligibility for coverage under the Permit is based on the validity of the certification you provided.Your signature on the Notice of Intent certifies that you have read, understood,and are implementing all of the applicable requirements.An important aspect of this certification requires that you correctly determine whether you are eligible for coverage under this permit. As you know,the Construction General Permit requires you to have developed and begun implementing a Stormwater Pollution Prevention Plan(SWPPP)and outlines important inspection and record keeping requirements.You must also comply with any additional location-specific requirements applicable to your state or tribal area.A copy of the Construction General Permit must be kept with your SWPPP. An electronic copy of the Construction General Permit and additional guidance materials can be viewed and downloaded at www.epa.gov/npdes/stormwater/cgp. If you have general questions regarding the stormwater program or your responsibilities under the Construction General Permit, please call: Region 1 Thelma Murphy (617)918-1615 Next time,please use the EPA's electronic Notice of Intent(eNOQ system (http://www.epa.gov/npdos/enoi).It is easy to use.and faster than submitting a paper form.You can terminate(NOT)this NOI by using the eNOI system. If you have questions about your form, please call the EPA NOI Processing Center at 1-866-352-7755(toll free) or send an inquiry via the online form at http:///Www.epa.gov/npdes/noicontact. EPA NOI Processing Center Operated by Avanti Corporation 1200 Pennsylvania Ave.,NW Mail Code:4203M Washington, DC 20460 1-866-352-7755 U.S. ENVIRONMENTAL PROTECTION AGENCY(EPA) https://cfpub.epa.gov/npdesadmin/NOICenter/letters/Acknowledgement.cfin?permit_number=... 11/l/2007 6. The proposed pavement in the southeast portion of the site adjacent to the loading dock must be graded so that the majority of the pavement drains toward the paved waterway and only a small area drains to CB#1 according to the approved drainage calculations. 7. The proposed forebay and detention pond must not be used for snow storage. Signature of C" Engine te � Date �' e cc.Planning Board c/o Office of Planning and Development Building Department Conservation Commission c/o Office of Planning and Development EAStormwater Permits\Pcrmits_new applications\11.5 Industrial Dr_Wright.doc Page 4 of 4 the City Engineer,submission of"As-built"plans, and certification of completion by the Department of Public Works of the stormwater management facilities being in compliance with the approved plan and the provisions of this Ordinance. Specific Permit Conditions: 1. Prior to issuance of a Building Permit, the applicant shall record an executed Stormwater Operation,Maintenance, and Inspection Agreement that.is binding on all subsequent owners of land served by the private stormwater management facility by recording it in the land records of the Registry of Deeds.This agreement shall be approved by the Northampton DPW,signed by the owner,and signed by the Mayor of Northampton. Section 22-85 of the Northampton Stormwater Management Ordinance provides additional guidance for the requirements of this agreement.The applicant shall amend the submitted Annual Maintenance and Inspection schedule to the satisfaction of the DPW and submit 3 original signature copies of the Agreement to the DPW. 2. This project will be required to submit one or more Notice of Intent(NOI)to the U.S. EPA for coverage under the NPDES Stormwater Construction General Permit.A Stormwater Pollution Prevention Plan(SWPPP)must be finalized and implemented. Prior to issuance of a building permit,copies of both the NOI and the final SWPPP shall be submitted to the Northampton DPW for review and may need to be amended to the satisfaction of the Northampton DPW prior to the start of construction. 3. The applicant shall be required to apply for separate permits from the DPW for all proposed connections to the municipal storm drain system. 4. The elevation of the rim of the proposed Catch Basin#1 (CB#1)is approximately the same elevation as the top of the existing 36"storm drain main located in Industrial Drive East,which will connect the proposed drain system via the proposed Manhole#2. If during a storm event,the 36"storm drain line in Industrial Drive East reaches capacity, the proposed CB#1,proposed MR#1,and the outlet of the detention pond(AD#1)may not drain effectively and may surcharge stormwater into the proposed drainage structures on the site due to the elevation of these proposed structures.The city is not responsible for problems and/or damage to private or public property resulting from the inadequate functioning of the proposed drain system or surcharge of drainage flows onto the site. The DPW recommends that the applicant review other possible drainage designs that will not surcharge during certain rain events. 5. The drainage calculations specify Area 2 of the roof draining to existing DMH#1 located in Industrial Drive. Sheet 7 of the Site Plans specifies a drain line connecting to DMH 41 in Industrial Drive and heading in the direction of the existing building, but no connection to roof leaders is indicated.Prior to a certificate of occupancy, the applicant must confirm with written documentation that this portion of the roof is connected to the municipal drain system and not to the sanitary sewer system. If any portion of the existing stormwater system for the site is found to be connected to the sanitary sewer system,the applicant must reconstruct the system so that all offsite stormwater flows discharge to waterways or to the municipal drainage system in the roadways. EAStormwater PermitsTefmits_new applications\l 15 Industrial Dr_Wright.doc Page 3 of 4 a. Site Plan for Wright Architectural Millwork,Northampton,MA,November 2007 (REV.),Sheets 1-9 stamped and dated 11/28/2007 by Mark A.McClusky,P.E., Huntley Associates, P.C. b. Wright Architectural Millwork, Drainage Report, dated 11/28/2007,stamped by Mark A. McClusky,Huntley Associates,P.C. c. Stormwater Pollution Prevention Plan for Wright Architectural Millwork, dated October 12, 2007,stamped by Mark A. McClusky,P.E.,Huntley Associates, P.C. d. Stormwater Management Maintenance Plan,Annual Maintenance and Inspection, dated October 11,2007 by Huntley Associates,P.C. e. Soil Test Pit Field Sheets and Percolation Test Results,completed 10/5/2007 by Tupac Branche,Soil Evaluator,Huntley Associates,P.C. 2. The Northampton Department of Public Works(DPW)or its authorized representative shall be provided access to the property to conduct inspections before,during, and after construction activities as necessary.The applicant shall arrange with the DPW to schedule the following inspections:Initial Inspection,Erosion Control Inspection,Bury Inspection,and Final Inspection.The DPW may also conduct random inspections to ensure effective control of erosion and sedimentation during all phases of construction. 3. At the completion of the work,including construction of stormwater management facilities and landscaping,the applicant shall submit a statement to the DPW from a professional engineer of record in the Commonwealth of Massachusetts certifying that the materials and construction of the stormwater management system was constructed in accordance with the approved plans and will function as designed.All changes to the approved stormwater facilities shall be documented by a professional engineer of record in the Commonwealth of Massachusetts and approved by the DPW prior to submission of the certification statement described above. It is recommended that the applicant retain the engineer during construction of stormwater facilities to ensure that they are constructed in accordance with the approved plans and specifications. 4. Annual Reports that are stamped by a Registered Professional Engineer documenting the actions completed as required by the Operation,Maintenance and Inspection Agreement shall be submitted to the Northampton Department of Public Works by October 1"of each year. 5. If construction of the proposed stormwater system has not started within five years of the issue date of this permit,then the permit will expire and a new permit will be required. Construction is defined as clearing,grading, excavation,filling, and installation of drainage structures on the lots specified in this permit. 6. The DPW shall require from the developer a cash escrow, irrevocable letter of credit,or other means of security acceptable to the DPW prior to the issuance of any building permit for the construction of a development requiring a stormwater management facility. The amount of the security shall not be less than the total estimated construction cost of the stormwater management facility.The guarantee so required in this section shall include provisions relative to forfeiture for failure to complete work specified in the approved stormwater management plan,compliance with all of the provisions of this Ordinance and other applicable laws and regulations, and any time limitations.The guarantee shall not be fully released without a final inspection of the completed work by E:lstormwater Perm its\Permits_new applicationAl15 Industrial Dr_Wright.doc Page 2 of 4 STORMWATER MANAGEMENT PERMIT APPLICATION DECISION City of Northampton Department of Public Works Project/ Site Name:Wright Architectural Millwork Project Street or Location/Assessor ID: 115 Industrial Drive,Northampton,MA/25A, 181 Applicant Name: Huntley Associates,P.C. Applicant Address/Phone: 30 Industrial Dr.East,Northampton, MA/413-584-7444 Owner Name: Walter Price Owner Address/Phone: 115 Industrial Drive.Northampton.MA/413-586-3528 Application Submission Date: 10/1212007 THE FOLLOWING ACTION BY THE NORTHAMPTON DEPARTMENT OF PUBLIC WORKS HAS BEEN TAKEN ON THIS APPLICATION BASED ON INFORMATION PRESENTED: Disapproval of the Stormwater Management Permit Application based on a determination within seven days of the receipt of the application that the application is administratively incomplete (see attached documentation). Approval of the Stormwater Management Permit Application. X Approval of the Stormwater Management Permit Application subject to any conditions,modifications or restrictions required by the Department of Public Works (see below) Disapproval of the Stormwater Management Permit Application based upon a determination that the proposed plan,as submitted,does not meet the purposes set forth in the Northampton Stormwater Management. Standard Permit Conditions: 1. All clearing, grading, drainage, construction, and development shall be conducted in strict accordance with the following plans and information submitted with the application and as amended by any conditions attached to this permit: E:1Stormwater Permits\Permits new applications\115 Industrial Dr_Wright.doe Page 1 of 4 LO 4 r Q Q V cm 0) � O LO N ti _ co Q � N N a N 0 :n O rn =� 0 n Q a 'y 0. 00D Qfl. l4tNN � LO co M O N r O O N to N o = La ai LL + T D EE ' W = Ln N tv +-� '0 Q N N y ca d T T ca a) i. E ~ cm z N- c 3 0 o E LL o V' 0. Z s CL a ao — 000 W Ln > ao co cm�. � v� C) N J N CIL Cl N h M "It � a o � L = z_ to La N o ca p � ce1) WU- Ln M Y O J J_ C) J O o M O � O Q F- � Z N 2 of F- H � QQ CD a o =I- U")� Zo m 0 _ Vi � 0 — ZW 0 0 0 0 0 0 0 d N o co co N CL Ca KRIGHT ARCHITECTURAL MILLNGRR Drawing Date:10 123107 10123107 9:31 Tyco Fire Products Page 6 %9:Y/. ,8:�1�75f99YJ/�W��6G3IG9PI�iSY//AIdY,O,SYAsf;f;�'�J,YN,d'/H/,dYH,G91.OW//bKf,91,Y�1S'NI�F:'!/,�;;G'/rWl,4/!llrYX'�1S'f11;.Y/,9PJWb5t.33dYl.YHI HJ.'•:dSSYI/�Y�:/1//,67Y,Y/,td0AYJJI/+'S9Y'A/J,3Gd93J/3:'b9h HYD. Qa DIA. FITTING PIPE Pt Pt REF "C" TYPES FTNG'S Pe Pv ******* NOTES ******* POINT Qt Pf/ft TOTAL Pf Pn PATH 2 FROM HYDRAULIC REFERENCE 19 TO A2 CONTINUED 24.07 1. 049 10.01 18.5 18 .5 K = 5 . 60 19 C=120 0.00 0.2 0. 0 24.07 0.183 10.01 1.8 18 .5 Vel = 9. 02 25.37 1. 380 10. 01 20.5 20.5 K = 5 . 60 20 C=120 0. 00 0. 2 0. 0 49.44 0. 183 10. 01 1.8 20 .5 Vel = 10.71 26.59 1. 610 10. 01 22 . 6 22 . 6 K = 5 . 60 21 C=120 0.00 0.2 0. 0 76.03 0.191 10.01 1. 9 22 . 6 Vel = 12 .10 27.81 1. 610 10.01 24 .7 24 .7 K = 5 . 60 22 C=120 0.00 0.2 0 . 0 103. 85 0.340 10 . 01 3 . 4 24 .7 Vel = 16.53 29.78 1. 610 lE 3. 90 28.3 28 .3 K = 5. 60 23 C=120 1T 12 . 00 0. 9 0. 0 133. 63 0.542 15. 90 8 . 6 28 .3 Vel = 21.27 A2 133. 63 37 . 8 K = 21.73 PATH 3 FROM HYDRAULIC REFERENCE 24 TO A3 31.15 1. 610 10. 01 30. 9 30 . 9 K = 5 . 60 24 C=120 0.00 0.2 0. 0 31.15 0.037 10. 01 0. 4 30 . 9 Vel = 4 . 96 31.43 1. 610 10. 01 31.5 31.5 K = 5 . 60 25 C=120 0.00 0.2 0 . 0 62.58 0.133 10.01 1.3 31 .5 Vel = 9. 96 32.19 1. 610 lE 3. 90 33. 0 33. 0 K = 5 . 60 26 C=120 1T 12 .00 0. 9 0. 0 94.77 0.287 15 . 90 4 . 6 33 . 0 Vel = 15 .08 A3 94.77 38 .5 K = 15 .27 Yfr YAY fJ//N�W�;YN/1i//iID iMSY!/,3W1//HI�A1.Y1,339Y�1'/,'1�Y1�,"9JYVi'./�i#SY/b9Y/l+9SY+Y/A:Y.YH.•9:59:�?iHf/A:9//,"rD 7fr:Y�iY1,'1//.lY.',�3'1�59f+f'!/.YNN.3l/PiY�7D////JJ1JlAti/,OT9d+d%fA3J/HYf�37. UNITS - DIAMETER (INCH) LENGTH (FOOT) FLOW (GPM) PRESSURE (PSI) ~ NRIGHT ARCHITECTURAL MILLWORK Drawing Date: 10 123107 10123107 9:31 Tyco Fire Products Page 5 .cr�sx.�:�.:: ��,.�w:�.��.r•��r�v��,c� �rcc �o�so.�o� ,: .a;.�:�re=.-<�a��an .asv. ��ss��:�ae�yzs�,�szz �.c HYD. Qa DIA. FITTING PIPE Pt Pt REF "C" TYPES FTNG' S Pe Pv ******* NOTES ******* POINT Qt Pf/ft TOTAL Pf Pn .x{y 1,1G?Yj'J A1}H/l/.r�i?n'•�Yf OlrY�xi'+�J iYI»�:::+i7lJ/ii'i.7yyq/AJ1,t�i373�CnP�'d,7//.r 13/t7Y1fi'/1/!�'7f1 A91 '//i/1,3<tq.Cfl.•?�ifiG'/.{�A.diL'?Xi9.i1'v%S9�..O/Oit+'�.'S/.'i3Y.J.+t' +�'3° PATH 1 FROM HYDRAULIC REFERENCE 14 TO W (PRIMARY PATH) 24 .00 1.049 10. 01 18 . 4 18 . 4 K = 5 . 60 14 C=120 0.00 0 . 2 0. 0 24 . 00 0. 182 10. 01 1. 8 18 . 4 Vel = 9. 00 25 .29 1.380 10. 01 20. 4 20 . 4 K = 5 . 60 15 C=120 0.00 0.2 0 . 0 49.29 0. 182 10.01 1.8 20. 4 Vel = 10. 68 26.52 1. 610 10. 01 22 . 4 22 . 4 K = 5 . 60 16 C=120 0. 00 0.2 0 . 0 75 .81 0.190 10. 01 1 . 9 22 . 4 Vel = 12 . 06 27.73 1. 610 10.01 24 .5 24 .5 K = 5. 60 17 C=120 0. 00 0 .2 0. 0 103.54 0. 338 10. 01 3. 4 24 . 5 Vel = 16. 48 29.70 1. 610 1E 3. 90 28 . 1 28 . 1 K = 5 . 60 18 C=120 1T 12. 00 0 . 9 0 . 0 133.24 0.539 15. 90 8 . 6 28 . 1 Vel = 21.20 3.260 12 .00 37 . 6 37 . 6 Al C=120 0 .00 0. 0 0.0 133.24 0. 017 12 .00 0.2 37 . 6 Vel = 5.17 133.63 3.260 11.25 37 . 8 37 . 8 A2 C=120 0 . 00 0. 0 0 . 0 See PATH 2 266.87 0 . 063 11 .25 0 .7 37 . 8 Vel = 10.36 94.77 3.260 5E 245 . 62 38 .5 38 .5 A3 C=120 1T 67 .20 2.5 0.0 See PATH 3 361. 64 0.110 312 .82 34 .5 38 .5 Vel = 14 . 04 4 . 026 22 .50 75 . 4 75 . 4 A4 C=120 0. 00 0. 0 0. 0 361. 64 0.039 22 .50 0. 9 75 . 4 Vel = 9.20 4 .026 1.50 76.3 76. 3 A5 C=120 0. 00 0. 0 0 . 0 361. 64 0.039 1 .50 0. 1 76. 3 Vel = 9.20 W 361. 64 76. 4 K = 41. 38 PATH 2 FROM HYDRAULIC REFERENCE 19 TO A2 UNITS - DIAMETER (INCH) LENGTH (FOOT) FLOW (GPM) PRESSURE (PSI) W IGET ARCHITECTURAL MILLNORE Drawing Date:10 123107 10123107 9:31 Page 4 9;;H/l3YY'+Y,37+•:1,dSw'1.3il3'1,�%%l.'!A",i^.lip'!'3%+Y.�r,•.fi'�S:r Y.;;r;.'illlHrfC,I,:AYHillBH,e�/.•',',59;'.�;`1f95,"H:;f9.Y�Y/„Tv'�; v/,Ylllllll�7I/IIII HIiW:.r�{i,CrlJ ll/.+II f..7Yl,Yl/.�lll.!�R'd',G39rY/.9.K'Ilill,53/.3f9Yfi!'IIIIiJi• NODE ELEVATION SPRINKLER PRESSURE ACTUAL MINIMUM ACTUAL NUMBER K-FACTOR FLOW FLOW DENSITY (FT) (GPM/ (PSI-1,�) ) (PSI) (GPM) (GPM) (GPM/SQ.FT) .�:ypu. �xarerr•.•a�,ws�x;s�.sill,�.�r..�.�sssrsmwws;�s.,mom.•: �r•.scss*nva�:;• mrss:�.��s<:::�,:�s-1.�vrs:�ll��rrr. r.,tsrr�llxss:�s�: s:�vi 14 18 . 62 5 . 60 18 . 4 24 . 0 24 .0 0.20 15 18 .15 5 . 60 20. 4 25 . 3 24 . 0 0.21 16 17. 67 5 . 60 22. 4 26.5 24 . 0 0.22 17 17 .20 5 . 60 24 .5 27 .7 24. 0 0.23 18 16.73 5 . 60 28 . 1 29.7 24 . 0 0.25 19 18 . 62 5 . 60 18 .5 24 . 1 24 . 0 0.20 20 18 . 15 5 . 60 20.5 25 . 4 24 .0 0.21 21 17 . 67 5. 60 22. 6 26. 6 24 . 0 0.22 22 17 .20 5 . 60 24 .7 27 .8 24 . 0 0.23 23 16.73 5 . 60 28 .3 29.8 24 .0 0.25 24 17 . 67 5 . 60 30. 9 31 . 1 21. 0 0.30 25 17 .20 5 . 60 31.5 31 . 4 21. 0 0 .30 26 16.73 5 . 60 33 . 0 32 .2 21. 0 0.31 Al 14 . 67 37 . 6 A2 14. 67 37 . 8 A3 14 . 67 38 .5 A4 9. 00 75 . 4 A5 9.00 76.3 W 9. 00 76. 4 Max velocity of 21.27 occurs in the pipe from 23 TO A2 NRIGRT ARCRITECTURAL MILLNORE Drawing Date: 10 123107 10123107 9:31 Page 3 FITTING NAME TABLE ABBREV. NAME $C•`,l.+�Y}%.;{:.4,•i$:•S:$'lt/!'i?'r'}i.4}}}}r y�N.4i�i$$:},ti.4�'}i'{J iC� :�i.'�i'19.$C{]:h'$!.''�.i,:r�'}}.tN.t}}.�1.'.'r'�:YJt4$ih,5 C Coupling E 90' Standard Elbow F 45 ' Elbow S Straight Flow Thru Tee T 90' Flow Thru Tee V Valve LEGEND HYD REF Hydraulic reference. Refer to accompanying flow diagram. _ K FACTOR Flow factor for open head or path where Flow (gpm) = K x -\/P Qa Flow added or subtracted Qt Total flow DIA Actual internal diameter of pipe C Hazen Williams pipe roughness factor Pf/ft Friction loss per foot of pipe PIPE Length of pipe FTNG'S Number of fittings . See table above. TOTAL Total length (PIPE + FTNG'S) Pt Total pressure (psi) at fitting Pe Pressure due to change in elevation where Pe = 0. 433 x change in elevation Pf Friction loss (psi) to fitting where Pf = 1 x 4 .52 x (Q/C) ^1. 85 / ID^4 . 87 Pv Velocity pressure (psi) where Pv = 0.001123 x Q^2/ID^4 Pn Normal pressure (psi) , where Pn = Pt - Pv NOTES: - Pressures are balanced to 0. 01 psi. Pressures are listed to 0.1 psi. Addition may vary by 0.1 psi due to accumulation of round off. - Calculations conform to NFPA 13. - Velocity Pressures are not considered in these Calculations WRIGHT ARCHITECTURAL MILLNORR Drawing Date:10 123107 10123107 9:31 HYDRAULIC CALCULATION DETAILS HYDRAULIC FLOW LOSS QTY DESCRIPTION LENGTH C ID gpm psi TOTALS Hydr Ref W Required at Hyd Area 2 362 76.4 psi 2 4" Grvd 90 Ell 20' 120 4 . 026 362 0.8 1 Pipe 4" 40x21 10' 120 4 .026 362 0. 4 1 4" Fingd Alarm Valve "F" CHART LOSS 362 1 . 1 1 4" Grvd Back Flow Valve WILKENS 1137 CHART LOSS 362 7 . 9 1 Pipe 6" DIx18 Cl 350 250' 140 6.338 362 0. 8 Fixed Flow Flow Loss 250 gpm Hydr Ref R1 Required at Source 612 87.4 psi Water Source118.0 psi static, 76.0 psi residual @ 1450 gpm 612 gpm 109.5 psi SAFETY PRESSURE 22.1 psi Available Pressure of 109.5 psi Exceeds Required Pressure of 87.4 psi This is a safety margin of 22 .1 psi or 20 % of Supply Maximum Water Velocity is 21 .3 fps ..LIGHT ARCHITECTURAL MILLWORK Drawing Date:10 123107 10123107 9:31 HYDRAULIC DESIGN INFORMATION SHEET Job Name: WRIGHT ARCHITECTURAL MILLWORK Location: 115 INDUSTRAIL DRIVE NORTHAMPTON, MA 01060 Drawing Date: 10/23/07 Remote Area Number: 2 Contractor: WAREHOUSE MECHANICAL CONTRACTORS INC. Telephone: 413-536-9222 342 BRITTON STREET CHICOPEE, MA 01020 Designer: DAVID P. KRAUSE Calculated By:SprinkCAD www.sprinkcad.com 451 N. Cannon Ave. Lansdale, PA 19446 Construction: METAL PURLINS Occupancy:WOOD WORKING Reviewing Authorities:CITY SYSTEM DESIGN Code:NFPA 13 Hazard:OR GR II System Type:WET Area of Sprinkler Oper. 1500 sq ft1 Sprinkler or Nozzle Density (gpm/sq ft) 0 .200 1 Make: VIKING Area per Sprinkler 120.0 sq fti Model: VK100 Hose Allowance Inside 0 gpm I K-Factor: 5 . 60 Hose Allowance Outside 250 gpm I Temperature Rating: 200 CALCULATION SUMMARY 13 Flowing Outlets gpm Required: 611.6 psi Required: 87.4 @ Source WATER SUPPLY Water Flow Test 1 Pump Data I Date of Test 11/09/03 1 Rated Capacity 0 gpm I Static Pressure 118. 0 psi I Rated Pressure 0.0 psi 1 Residual Pres 76. 0 psi 1 Elevation 0 I At a Flow of 1450 gpm I Make: I Elevation 0" 1 Model: Location: INDUSTRAIL DRIVE IN FRONT OF C.0 Source of Information: WMC & NWD SYSTEM VOLUME 450 Gallons Notes: - � LO EE UBK § 02 0 C14 � Q .. $ 0 0(n X30 E E � CL0- c- ooCL CL A _ _ o ,qt Q22gr- R k .. c 00CQ � � � fL � E £�w ¢2 $ 722 _. ■ 2 �.■ ■ � ammnz E � co LO 0 L CN $ / ''% z LL 002 > 0 � / f � � E § 2 o q 22 pF- % m � 7R a \ � $ cak. � § a).� Rj LO � Y � � R a / 2W 0 ul>k � qz / ac 4m2 - m w� < « °LO $ z3: 0 .QWLOae 0 — 2J ILI k E 2 2 7 q CL U) — NRIGAT ARCHITECTURAL MILLNORE Drawing Date: 10 123107 10123107 9:31 Tyco Fire Products Page 6 risxar.{�v.�rrir�,a�tsscs�•:err.Dui.as,W9,nr!�.c+r.{{,rr.�tsr�:�rrrrrrrrrr�mrrrrr.�tr.<vrrr,.�.r.•sw,rrrrt�rrrrrrrri:,.;rrry�,�{�..-{•�!+.-r{�.,{.syr<<rr{mss.rat-rr�rrm5s�rrrasturctvr� HYD. Qa DIA. FITTING PIPE Pt Pt REF "C" TYPES FTNG'S Pe Pv ******* NOTES ******* POINT Qt Pf/ft TOTAL Pf Pn � .7iC3kG�R%Y,Sr79:4t'::St2na*rFA�`^.V:+o<}{Gai?Fi:?aAt'�YYt'+.c63."•.5+^.5;.�:?;4ffi.+.::;<:?%"��;'yi�l?i.'%{{fs:}r�i.,rr,.,nc;cud'^v.�:tui:'cdi',u,{.;�;:�Y;'r.•:C{tC,'•`.:L;S3Sf;S5.:.ti',�.,`{V.9,f6GJSi'S3Y.t?CCtCG3iCL PATH 2 FROM HYDRAULIC REFERENCE 5 TO B2 CONTINUED 27 .50 1 .380 15.01 24 . 1 24 . 1 K = 5 . 60 6 C=120 0. 00 0 .3 0. 0 53.04 0.208 15 . 01 3 . 1 24 . 1 Vel = 11. 49 29.37 1. 610 15. 01 27 .5 27 .5 K = 5. 60 7 C=120 0. 00 0.3 0. 0 82. 40 0.222 15.01 3 .3 27 .5 Vel = 13.11 31.22 1. 610 1E 20.56 31 . 1 31 . 1 K = 5 . 60 8 C=120 1T 12 . 00 1 .2 0. 0 113. 63 0. 402 32.56 13 . 1 31. 1 Vel = 18 . 08 B2 113. 63 45 . 4 K = 16. 86 PATH 3 FROM HYDRAULIC REFERENCE 9 TO B3 25. 66 1.049 15.01 21.0 21. 0 K = 5 . 60 9 C=120 0. 00 0.3 0.0 25 . 66 0.206 15.01 3.1 21. 0 Vel = 9. 62 27. 63 1.380 15. 01 24 .3 24 .3 K = 5 . 60 10 C=120 0. 00 0.3 0. 0 53.29 0.210 15. 01 3. 1 24 .3 Vel = 11.54 29.50 1. 610 15 . 01 27 . 8 27 . 8 K = 5 . 60 11 C=120 0. 00 0.3 0.0 82.79 0.224 15 . 01 3. 4 27 .8 Vel = 13. 17 31.36 1. 610 1E 20 .56 31. 4 31. 4 K = 5. 60 12 C=120 1T 12 . 00 1 . 2 0. 0 114 .15 0. 405 32 .56 13.2 31 . 4 Vel = 18 .17 B3 114.15 45 . 8 K = 16. 87 .�r� rsrss ,snr�:�sss: . ss�r.�srr.�mss,�rx�.��ra, xorR UNITS - DIAMETER (INCH) LENGTH (FOOT) FLOW (GPM) PRESSURE (PSI) WRIGHT ARCHITECTURAL MILLNORR Drawing Date: 10 123107 10123107 9:31 Tyco Fire Products Page 5 laniY�"i#/YtiYl,�##13.F9;9�Y,Y#N.YADl3YJ.•9Y#A:,YYIJ,Y.•i�,vYJrY,p/il,'71,W,'N„YJ!';##J}J,J Dh.Y,',Y1/.•S:H.,.;X+?.•;,SYJ i,^.::�Y.LY/,<Y,JY#//.•;3;YA1,27Y/1,"/,7;5?,'3Y,%K•Yid±�>.C.•iNAY,YJ##,YiWJkJ'+3f;32 HYD. Qa DIA. FITTING PIPE Pt Pt REF "C" TYPES FTNG'S Pe Pv ******* NOTES ******* POINT Qt Pf/ft TOTAL Pf Pn # ;GYA;'#1�f66�GdY#!J##i.4'AF�c'C✓//AJld;6G�GGY,C4;:ri.2+,�Ji.�JY.l4'd59R:{F/#AFi,'C�!'E•Y#1„'U},'�rySYf/.�f..�5:;v?9"}:{ff,;,Y f�C#;,C UI JJ.+Yf#cb9/3C,Si Y{,�qy/,�dG'AGJ/,D9/aa3YA.'�1/l�tdYA3) PATH 1 FROM HYDRAULIC REFERENCE 1 TO W (PRIMARY PATH) 25 .50 1. 049 15 .01 20.7 20.7 K = 5 . 60 1 C=120 0 . 00 0 .3 0. 0 25 .50 0.204 15 .01 3 . 1 20 . 7 Vel = 9.56 27 . 47 1.380 15 .01 24 . 1 24 . 1 K = 5 . 60 2 C=120 0. 00 0 .3 0. 0 52. 97 0.207 15 .01 3.1 24 . 1 Vel = 11.47 29.33 1 . 610 15 . 01 27 . 4 27 . 4 K = 5 . 60 3 C=120 0. 00 0 . 3 0. 0 82 .30 0.221 15 . 01 3 .3 27 . 4 Vel = 13.10 31.18 1. 610 lE 20.56 31. 0 31.0 K = 5 . 60 4 C=120 IT 12 . 00 1.2 0. 0 113.48 0. 401 32.56 13.1 31. 0 Vel = 18 .06 3.260 8.50 45 .3 45 .3 Bl C=120 0.00 0. 0 0. 0 113.48 0.013 8. 50 0. 1 45 .3 Vel = 4 . 40 113. 63 3.260 8. 42 45 . 4 45 . 4 B2 C=120 0. 00 0 .0 0. 0 See PATH 2 227 .11 0.047 8. 42 0. 4 45 . 4 Vel = 8 . 81 114 .15 3. 260 7E 141.36 45 . 8 45 . 8 B3 C=120 IT 86. 01 2 . 1 0. 0 See PATH 3 341.26 0. 099 227 . 37 22 .5 45 . 8 Vel = 13.25 4.026 1.50 70. 4 70 . 4 A5 C=120 0. 00 0. 0 0. 0 341.26 0.035 1.50 0. 1 70. 4 Vel = 8 . 68 W 341.26 70.5 K = 40. 66 PATH 2 FROM HYDRAULIC REFERENCE 5 TO B2 25 .53 1 . 049 15 . 01 20 . 8 20 . 8 K = 5 . 60 5 C=120 0. 00 0.3 0. 0 25 . 53 0.204 15 . 01 3 .1 20. 8 Vel = 9.57 UNITS - DIAMETER (INCH) LENGTH (FOOT) FLOW (GPM) PRESSURE (PSI) WR1GET ARCHITECTURAL MILLWORK Drawing Date:10 123107 10123107 9:31 Page 4 �x�r�a;cz �,rx�.�s-rri-r.✓:f ,c.-r�.�;c�rcxs�,�:r,��rx'�s:.�iris<y,�rrrr�rrr.�r,�rrrssrrrr�rt�,dr. ,as�rrr,�,!�.c-rr.�y,�!ar�r,,.ryrrr��rrrrrrr,:�tzzt%as�::r� ffraa..:3tcassvyws�a� NODE ELEVATION SPRINKLER PRESSURE ACTUAL MINIMUM ACTUAL NUMBER K-FACTOR FLOW FLOW DENSITY (FT) (GPM/ (PSI^3z) ) (PSI) (GPM) (GPM) (GPM/SQ.FT) . n2XXoC i'�7Sf,',•X�:ZW^,X�",.••�'i+.tXtX,�',n`?C�'•.',YiYY,Y.Ytii:2YX+. C.cAY;�2Xd.:x`X:.,X72:C:::.�itFih'tXH:t`,•w.�.;.Xt,'?,'.^•.XY.,:;2w,:Rv:.`•3:7%;.'t?X{�:',,'•k:�i:�:kk:223#tCt:Jt�Di7Y�:.rY:Xt2o.;'kL�c`�ikX1,c5 1 18 . 48 5 . 60 20 .7 25 . 5 25 .5 0.20 2 17 .88 5 . 60 24 . 1 27 .5 25 .5 0.22 3 17.29 5 . 60 27 . 4 29. 3 25 .5 0.23 4 16. 69 5 . 60 31. 0 31.2 25 .5 0.24 5 18.48 5. 60 20. 8 25.5 25 .5 0.20 6 17 . 88 5 . 60 24. 1 27 . 5 25 .5 0. 22 7 17 .29 5 . 60 27 .5 29. 4 25 .5 0.23 8 16. 69 5 . 60 31.1 31 .2 25 .5 0.24 9 18 . 48 5 . 60 21. 0 25 .7 25 .5 0.20 10 17 . 88 5 . 60 24 .3 27 . 6 25 .5 0.22 11 17.29 5 . 60 27. 8 29. 5 25 .5 0.23 12 16. 69 5. 60 31. 4 31. 4 25. 5 0.25 A5 9. 00 70. 4 B1 13.83 45 .3 B2 13.83 45 . 4 B3 13.83 45 .8 W 9.00 70.5 Max velocity of 18.17 occurs in the pipe from B3 TO 12 NR GHT ARCHITECTURAL MILLWORK Drawing Date: 10 123107 10123107 9:31 Page 3 FITTING NAME TABLE ABBREV. NAME over.�za�sr,�.a.}.rair.��rzti✓,�sn3-: rrrr�t�ru��r�,ww.cc�,c�.����.�rmF�t,�sv�,��r.�r..-,a C Coupling E 90' Standard Elbow F 45' Elbow S Straight Flow Thru Tee T 90' Flow Thru Tee V Valve LEGEND HYD REF Hydraulic reference. Refer to accompanying flow diagram. _ K FACTOR Flow factor for open head or path where Flow (gpm) = K x -\/P Qa Flow added or subtracted Qt Total flow DIA Actual internal diameter of pipe C Hazen Williams pipe roughness factor Pf/ft Friction loss per foot of pipe PIPE Length of pipe FTNG'S Number of fittings. See table above. TOTAL Total length (PIPE + FTNG'S) Pt Total pressure (psi) at fitting Pe Pressure due to change in elevation where Pe = 0. 433 x change in elevation Pf Friction loss (psi) to fitting where Pf = 1 x 4 .52 x (Q/C) ^1 . 85 / ID^4 . 87 Pv Velocity pressure (psi) where Pv = 0. 001123 x Q^2/ID^4 Pn Normal pressure (psi) , where Pn = Pt - Pv NOTES: - Pressures are balanced to 0 .01 psi. Pressures are listed to 0.1 psi. Addition may vary by 0. 1 psi due to accumulation of round off. - Calculations conform to NFPA 13. - Velocity Pressures are not considered in these Calculations WRIGHT ARCHITECTURAL MILLNORK Drawing Date: 10 123107 10123107 9:31 HYDRAULIC CALCULATION DETAILS HYDRAULIC FLOW LOSS QTY DESCRIPTION LENGTH C ID gpm psi TOTALS Hydr Ref W Required at Hyd Area 1 341 70.5 psi 2 4" Grvd 90 Ell 20' 120 4 . 026 341 0.7 1 Pipe 4" 40x21 10' 120 4 .026 341 0. 4 1 4" Fingd Alarm Valve "F" CHART LOSS 341 1. 0 1 4" Grvd Back Flow Valve WILKENS 1'37 CHART LOSS 341 7 .8 1 Pipe 6" DIx18 Cl 350 250' 140 6. 338 341 0.7 Fixed Flow Flow Loss 250 gpm Hydr Ref R1 Required at Source 591 81.0 psi Water Source118 .0 psi static, 76. 0 psi residual @ 1450 gpm 591 gpm 110.0 psi SAFETY PRESSURE 29.0 psi Available Pressure of 110.0 psi Exceeds Required Pressure of 81.0 psi This is a safety margin of 29.0 psi or 26 % of Supply Maximum Water Velocity is 18.2 fps bRIGRT ARCHITECTURAL MILLWORK Drawing Date:10 123107 10123107 9:31 HYDRAULIC DESIGN INFORMATION SHEET Job Name: WRIGHT ARCHITECTURAL MILLWORK Location: 115 INDUSTRAIL DRIVE NORTHAMPTON, MA 01060 Drawing Date: 10/23/07 Remote Area Number: 1 Contractor: WAREHOUSE MECHANICAL CONTRACTORS INC. Telephone: 413-536-9222 342 BRITTON STREET CHICOPEE, MA 01020 Designer: DAVID P. KRAUSE Calculated By:SprinkCAD www.sprinkcad.com 451 N. Cannon Ave. Lansdale, PA 19446 Construction: METAL PURLINS Occupancy:WOOD WORKING Reviewing Authorities:CITY SYSTEM DESIGN Code:NFPA 13 Hazard:OR GR II System Type:WET Area of Sprinkler Oper. 1500 sq ftl Sprinkler or Nozzle Density (gpm/sq ft) 0.200 1 Make: VIKING Area per Sprinkler 127 .5 sq ftl Model: VK100 Hose Allowance Inside 0 gpm I K-Factor: 5 . 60 Hose Allowance Outside 250 gpm I Temperature Rating: 200 CALCULATION SUMMARY 12 Flowing Outlets gpm Required: 591.3 psi Required: 81.0 @ Source WATER SUPPLY Water Flow Test I Pump Data Date of Test 11/09/03 l Rated Capacity 0 gpm l Static Pressure 118.0 psi i Rated Pressure 0. 0 psi i Residual Pres 76.0 psi l Elevation 0 l At a Flow of 1450 gpm ( Make: l Elevation 0" I Model: I Location: INDUSTRAIL DRIVE IN FRONT OF C.0 Source of Information: WMC & NWD SYSTEM VOLUME 450 Gallons Notes: i Section 2-Equipment and Tools a. Manufacturer's instructions b. Approved Narrative Report, sequence of operation section. c. Flow measuring devices-pitot tube for backflow preventer flushing. d. Gauges-main riser for 2" drain and hydrostatic testing. e. Fire hose is required to direct backflow preventer flushing discharge. Section 3-approval Requirements a. Certification from the legally recognized professional responsible for the design Stating that the fire protection sprinkler system has been installed in accordance with the approved fire protection construction documents and that he has reviewed the shop drawings for conformance to 780 CMR 903.3 and has identified deviations if any, from the approved fire protection construction documents. b. Confirmation by the building owner/developer or authorized representative that they-have received the as-built sprinkler system shop drawings from the installing contractor and that the legally recognized professional has certified their Accuracy. c. Material, Test,performance and Completion Certificates,properly executed by the installing contractor and that the legally recognized professional has certified their Accuracy. d. Satisfactory functional test of all fire protection systems witnessed by the Building official and the head of the fire department or their deignees. a. Water supply existing six-inch fire main supplied from circulating main in industrial drive. b. Automatic sprinkler systems and components. c. Fire alarm systems and components-audio and visual appliances installed throughout in accordance with NFPA 72. d. Manual suppression systems-small hose stations aren't required(storage under 12-0) in accordance with NFPA 13 standpipe isn't required. e. Seismic provided in accordance with NFPA 13, 9.3. f. Fire Department Siamese (existing) connection is being replaced with a new storz connection. All of the above items are required by regulations. (780 CMR) all systems are new. 903.1.1 (13) Sequence of operation Section 1 Wet sprinkler system System operates automatically upon the fusing of a single fire sprinkler. Operational Sequence: 1. Wet system on fusing of a single sprinkler head water flow will close contacts of a flow switch. Closed contact on the flow switch will activate local audible visual panel and provide alarm contact for the fire control panel. 903.1.1 (1.C)Testing Criteria Section 1-Testing Criteria. Underground piping: Existing. System piping: 1. Hydrostatically test at a pressure of 200 psi. for two hours without a loss of pressure. 2. 2"main drain test shall be conducted,Record Static and residual pressures on test certificate. 3. Conduct system operational test from inspectors test connection. Local alarm must sound within 1 minute. 4. Central station must receive alarm and trouble signals. Warehouse Mechanical is in charge of setting up and coordinating testing. Warehouse Mechanical will provide test certificates. FIRE PROTECTION SYSTEMS NARRATIVE REPORTS 903.1.1 (La) BASIS (METHODOLOGY) OF DESIGN Section 1-Building Description a. Building"USE"Group: Mixed, B-Business (existing), F-1 Factory. b. Type (s) of occupancies (hazards within building): Offices (existing), factory and storage. c. Storage of commodities within the building: bulk lumber in piles under 12'-0" off finish floor. d. One story above grade high point of building roof 20-0 at high eave. e. Zero stories below grade. f. New additions a,b, and c=16,969 square feet, existing 19,130 square feet, total 36,099 square feet. g. Storage limited to class III commodities 12-0 off finished floor or class IV commodities 10-0 off finished floor. 18 inches clearance must be provided between sprinkler head deflector and top of storage. Project consists of extending wet sprinklers to three new manufacturing additions. Systems are designed to provide .20 over the most remote 1500 square feet with 250 gpm allowance for hose streams. We are providing new tamper and flow switches along with a new storz connection Section 2-Applicable laws, regulations and standards a. 780 CMR code sections"Fire Protection System Requirements" 904.0 fire suppression systems, 906.5 requires audio visual alarm devices, 923.1 requires UL Central station for sprinkler system monitoring. b.NFPA Standards and Edition used for design of each specific fire protection system NFPA 13, 2002 NFPA 72, 2002 NFPA 24, 2002. Section 3—Design Responsibility for Fire Protection Systems Warehouse Mechanical the installing contractor completely designs and specifies (develops a full system layout, design criteria and calculations), installs the system and certifies system installation for code compliance at completion. Exempt from requirement for seal of Massachusetts Registered Professional Engineer in accordance with MGLC 112 section 81r. Section 4-fire Protection systems to be installed. Fire Sprinkler portion of Narrative Report For 2007 Additions Wright Architectural Millwork 115 Industrial Drive Northampton, Ma. BY Warehouse Mechanical Contractors, Inc. Ma Sprinkler Contractor License SC 2254 413-536-9222 October 24, 2007 • MASSACHUSETTS STATE BUILDING CODE 6TH EDITION CONSTRUCTION CONTROL AFFIDAVIT DATE: July 25, 2008 PROJECT NUMBER: 7932 PROJECT TITLE: Wright Architectural Millwork Building Additions PROJECT LOCATION: 115 Industrial Drive, Northampton,Massachusetts SCOPE OF PROJECT: Construction of(3)three separate additions totaling 16,969 SF,slab-on-grade,steel-framed building with exterior finishes consisting of metal wall panels and metal roof. The additions will be used for manufacturing. Site development will include a modified parking area,additional curb cut with paved access drive to an enclosed loading dock area,a storm water management system,and landscaping. PURSUANT TO SECTION 116.0 OF THE MASSACHUSETTS STATE BUILDING CODE, I, NAME FIRM 540 Meadow Street Ext. Agwam, MA 01001 ' 413-789-,10-960 ADDRESS PHONE NUMBER MASS.REGISTRATION NOBEING A REGISTERED PROFESSIONAL ENGINEER/ARCHITECT, HEREBY CERTIFY THAT HAVE PREPARED AND DIRECTLY SUPERVISED THE PREPARATION OF ALL DESIGN PLANS,COMPUTATIONS AND SPECIFICATIONS CONCERNING: _ARCHITECTURAL _STRUCTURAL x MECHANICAL FIRE PROTECTION _ELECTRICAL _OTHER(specify) FOR THE ABOVE NAMED PROJECT AND THAT,TO THE BEST OF MY KNOWLEDGE,SUCH PLANS,COMPUTATIONS AND SPECIFICATIONS MEET THE APPLICABLE PROVISIONS OF THE MASSACHUSETTS STATE BUILDING CODE. ALL ACCEPTABLE ENGINEERING PRACTICES AND ALL APPLICABLE LAWS FOR THE PROPOSED PROJECT. FURTHER CERTIFY THAT I SHALL PERFORM THE NECESSARY PROFESSIONAL SERVICES AND BE PRESENT ON THE CONSTRUCTION SITE ON A REGULAR AND PERIODIC BASIS TO DETERMINE THAT THE WORK IS PROCEEDING IN ACCORDANCE WITH THE DOCUMENTS APPROVED FOR THE BUILDING PERMIT AND SHALL BE RESPONSIBLE FOR THE FOLLOWING AS SPECIFIED IN SECTION 116.2: 1. Review of shop drawings,samples and other submittals of the contractor as required by the construction contract documents as submitted for building permit,and approval for conformance to the design concept. 2. Review and approval of the quality control procedures for all code-required controlled materials. 3. Special architectural or engineering professional inspection of critical construction components requiring controlled materials or construction specified in the accepted engineering practice standards. PURSUANT TO SECTION 116.2.3, 1 SHALL SUBMIT PERIODICALLY,A PROG S REPORT TOGETH WITH PERTINENT COMMENTS TO THE BUILDING INSPECTOR. UPON COMPLETION OF TH , I SHALL B IT FIN R PO AS TO THE SATISFACTORY COMPLETION AND READINESS OF THE PROJECTA CUP C natur SUB CRIBED AND , /ORN TO BEFORE ME THIS DAY OF 2008 OF ` NOTARY PUBLIC R MY COMMISSION EXPIRES S)d3/ I� $ G OBEOBERT TH3 MECHMICAL NO.33161 �'O,g,9FG/StTREO ��Q �+ tkl-E '�ta MASSACHUSETTS STATE BUILDING CODE 6TH EDITION CONSTRUCTION CONTROL AFFIDAVIT DATE: July 25,2008 PROJECT NUMBER: 7932 PROJECT TITLE: Wright Architectural Millwork Building Additions PROJECT LOCATION: 115 Industrial Drive, Northampton, Massachusetts SCOPE OF PROJECT: Construction of(3)three separate additions totaling 16,969 SF,slab-on-grade,steel-framed building with exterior finishes consisting of metal wall panels and metal roof. The additions will be used for manufacturing. Site development will include a modified parking area,additional curb cut with paved access drive to an enclosed loading dock area, a storm water management system,and landscaping. PURSUANT TO SECTION 116.0 OF THE MASSACHUSETTS STATE BUILDING CODE, I, Robert F. Griffiths P_ E_ Robert W_ HallCons .F.nQ_ Tnc_ NAME I'llW 540 Meadow Street Ext . Agwam, MA 01001 ' 413-789-' 0960 ADDRESS PHONE NUMBER MASS. REGISTRATION NO. 4.?- �BEING A REGISTERED PROFESSIONAL ENGINEER/ARCHITECT, HEREBY CERTIFY THAT I HAVE PREPARED AND DIRECTLY SUPERVISED THE PREPARATION OF ALL DESIGN PLANS,COMPUTATIONS AND SPECIFICATIONS CONCERNING: ARCHITECTURAL STRUCTURAL X MECHANICAL FIRE PROTECTION _ELECTRICAL _OTHER(specify) FOR THE ABOVE NAMED PROJECT AND THAT,TO THE BEST OF MY KNOWLEDGE,SUCH PLANS,COMPUTATIONS AND SPECIFICATIONS MEET THE APPLICABLE PROVISIONS OF THE MASSACHUSETTS STATE BUILDING CODE. ALL ACCEPTABLE ENGINEERING PRACTICES AND ALL APPLICABLE LAWS FOR THE PROPOSED PROJECT. I FURTHER CERTIFY THAT I SHALL PERFORM THE NECESSARY PROFESSIONAL SERVICES AND BE PRESENT ON THE CONSTRUCTION SITE ON A REGULAR AND PERIODIC BASIS TO DETERMINE THAT THE WORK IS PROCEEDING IN ACCORDANCE WITH THE DOCUMENTS APPROVED FOR THE BUILDING PERMIT AND SHALL BE RESPONSIBLE FOR THE FOLLOWING AS SPECIFIED IN SECTION 116.2: 1. Review of shop drawings,samples and other submittals of the contractor as required by the construction contract documents as submitted for building permit,and approval for conformance to the design concept. 2. Review and approval of the quality control procedures for all code-required controlled materials. 3. Special architectural or engineering professional inspection of critical construction components requiring controlled materials or construction specified in the accepted engineering practice standards. PURSUANT TO SECTION 116.2.3, 1 SHALL SUBMIT PERIODICALLY,A PR ESS REPORT TO HER WITH PERTINENT COMMENTS TO THE BUILDING INSPECTOR. UPON COMPLETION OF W RK, I S LL MIT j(9fttMEPORT AS TO THE SATISFACTORY COMPLETION AND READINESS OF THE PROJE O OC P Si a re SUE1,5CRIBED AND WORN TO BEFORE ME THIS j o'L DAY OF �-.c.� 2008 O ART FyGJ' NOT PUBLIC GRIFRTHS MY COMMISSION EXPIRES sI f'� MECHANICAL NO.33161 �'pg9FGJSTERti� MASSACHUSETTS STATE BUILDING CODE 6TH EDITION CONSTRUCTION CONTROL AFFIDAVIT DATE: July 25, 2008 PROJECT NUMBER: 7932 PROJECT TITLE: Wright Architectural Millwork Building Additions PROJECT LOCATION: 115 Industrial Drive, Northampton, Massachusetts SCOPE OF PROJECT: Construction of(3)three separate additions totaling 16,969 SF,slab-on-grade,steel-framed building with exterior finishes consisting of metal wall panels and metal roof. The additions will be used for manufacturing. Site development will include a modified parking area,additional curb cut with paved access drive to an enclosed loading dock area,a storm water management system,and landscaping. PURSUANT TO SECTION 116.0 OF THE MASSACHUSETTS STATE BUILDING CODE, I, Robert F. Griffiths P. F. Robert W. HallCons .En . Tn�. NAME A&M 540 Meadow Street Ext . Agwam, MA 01001 ' ` 413-789_! 0968 ADDRESS t33A,1 PHONE NUMBER MASS. REGISTRATION NO..%Z�EING A REGISTERED PROFESSIONAL ENGINEER/ARCHITECT, HEREBY CERTIFY THAT I HAVE PREPARED AND DIRECTLY SUPERVISED THE PREPARATION OF ALL DESIGN PLANS, COMPUTATIONS AND SPECIFICATIONS CONCERNING: ARCHITECTURAL STRUCTURAL x MECHANICAL _FIRE PROTECTION _ELECTRICAL _OTHER(specify) FOR THE ABOVE NAMED PROJECT AND THAT,TO THE BEST OF MY KNOWLEDGE,SUCH PLANS,COMPUTATIONS AND SPECIFICATIONS MEET THE APPLICABLE PROVISIONS OF THE MASSACHUSETTS STATE BUILDING CODE. ALL ACCEPTABLE ENGINEERING PRACTICES AND ALL APPLICABLE LAWS FOR THE PROPOSED PROJECT. I FURTHER CERTIFY THAT I SHALL PERFORM THE NECESSARY PROFESSIONAL SERVICES AND BE PRESENT ON THE CONSTRUCTION SITE ON A REGULAR AND PERIODIC BASIS TO DETERMINE THAT THE WORK IS PROCEEDING IN ACCORDANCE WITH THE DOCUMENTS APPROVED FOR THE BUILDING PERMIT AND SHALL BE RESPONSIBLE FOR THE FOLLOWING AS SPECIFIED IN SECTION 116.2: 1. Review of shop drawings,samples and other submittals of the contractor as required by the construction contract documents as submitted for building permit,and approval for conformance to the design concept. 2. Review and approval of the quality control procedures for all code-required controlled materials. 3. Special architectural or engineering professional inspection of critical construction components requiring controlled materials or construction specified in the accepted engineering practice standards. PURSUANT TO SECTION 116.2.3, 1 SHALL SUBMIT PERIODICALLY,A PRO SS REPORT TOGS ER WITH PERTINENT COMMENTS TO THE BUILDING INSPECTOR. UPON COMPLETION OFT IRK, I SHA L S B T WLR T AS TO THE SATISFACTORY COMPLETION AND READINESS OF THE PROJEC F CCU A igna r SUB�yC, RIBED AND ORN TO B�fORE ME THIS 1o`Tk DAY OF 2008 OF G � R6WFffF �NO RY �IC ,�, MY COMMISSION EXPIRES MECHANICAL N No.3:161 gF61S�0�`�� MASSACHUSETTS STATE BUILDING CODE 6TH EDITION CONSTRUCTION CONTROL AFFIDAVIT DATE: October 10,2007 PROJECT NUMBER: 7932 PROJECT TITLE: Wright Architectural Millwork Building Additions PROJECT LOCATION: 115 Industrial Drive, Northampton, Massachusetts SCOPE OF PROJECT: Construction of(3)three separate additions totaling 16,969 SF,slab-on-grade,steel4ramed building with exterior finishes consisting of metal wall panels and metal roof. The additions will be used for manufacturing. Site development will include a modified parking area,additional curb cut with paved access drive to an enclosed loading dock area,a storm water management system, and landscaping. PURSUANT TO SECTION 116.0 OF THE MASSACHUSETTS STATE BUILDING CODE, I, DAVID P.KRAUSE WAREHOUSE MECHANICAL CONTRACTORS INC. NAME FIRM 342 BRITTON STREET CHICOPEE, MA 01020 413-536-9222 ADDRESS PHONE NUMBER MASS. REGISTRATION NO. 5233 BEING A LICENSED PROFESSIONAL HEREBY CERTIFY THAT I HAVE PREPARED AND DIRECTLY SUPERVISED THE PREPARATION OF ALL DESIGN PLANS, COMPUTATIONS AND SPECIFICATIONS CONCERNING: _ARCHITECTURAL _STRUCTURAL MECHANICAL X FIRE PROTECTION _ELECTRICAL _OTHER(specify) FOR THE ABOVE NAMED PROJECT AND THAT, TO THE BEST OF MY KNOWLEDGE, SUCH PLANS, COMPUTATIONS AND SPECIFICATIONS MEET THE APPLICABLE PROVISIONS OF THE MASSACHUSETTS STATE BUILDING CODE. ALL ACCEPTABLE ENGINEERING PRACTICES AND ALL APPLICABLE LAWS FOR THE PROPOSED PROJECT. I FURTHER CERTIFY THAT I SHALL PERFORM THE NECESSARY PROFESSIONAL SERVICES AND BE PRESENT ON THE CONSTRUCTION SITE ON A REGULAR AND PERIODIC BASIS TO DETERMINE THAT THE WORK IS PROCEEDING IN ACCORDANCE WITH THE DOCUMENTS APPROVED FOR THE BUILDING PERMIT AND SHALL BE RESPONSIBLE FOR THE FOLLOWING AS SPECIFIED IN SECTION 116.2: 1. Review of shop drawings, samples and other submittals of the contractor as required by the construction contract documents as submitted for building permit, and approval for conformance to the design concept. 2. Review and approval of the quality control procedures for all code-required controlled materials. 3. Special architectural or engineering professional inspection of critical construction components requiring controlled materials or construction specified in the accepted engineering practice standards. PURSUANT TO SECTION 116.2.3, 1 SHALL SUBMIT PERIODICALLY,A PROGRESS REPORT TOGETHER WITH PERTINENT COMMENTS TO THE BUILDING INSPECTOR. UPON COMPLETION OF THE WORK, I SHALL SUBMIT A FINAL REPORT AS TO THE SATISFACTORY COMPLETION AND READINESS OF THE PROJECT FOR 99CUPANCY. Signature SUBSCRIBED AND SWORN TO BEFORE ME THIS DAY OF 2007 ��— NOTARY PUBLIC `````�pttUttttttttttltt�f'!i MY COMMISSION EXPIRES `�.�`�Q,4A AN.. \��` QI.\Sop Expire, 9� Q : �Ry PURE. O `.. , t3jfSq'CtH U S;"e�titi MASSACHUSETTS STATE BUILDING CODE 6TH EDITION CONSTRUCTION CONTROL AFFIDAVTr DATE: July 25,2008 PROJECT NUMBER: 7932 PROJECT TITLE: Wright Architectural Millwork Building Additions PROJECT LOCATION: 115 Industrial Drive,Northampton,Massachusetts SCOPE OF PROJECT: Construction of(3)three separate additions totaling 16,969 SF,slab-0n-grade,steel-framed building with exterior finishes consisting of metal wall panels and metal roof. The additions will be used for manufacturing. Site development will include a modified parking area,additional curb cut with paved access drive to an enclosed loading dock area,a storm water management system,and landscaping. PURSUANT TO SECTION 116.0 OF THE MASSACHUSETTS STATE BUILDING CODE, I, NAME FIRM ADDRESS ­ / PHONE UMBER MASS.REGISTRATION NO: /BEING A REGISTERED PROFESSIONAL ENGINEER/ARCHITECT,HEREBY CERTIFY THAT I HAVE PREPARED AND DIRECTLY SUPERVISED THE PREPARATION OF ALL DESIGN PLANS,COMPUTATIONS AND SPECIFICATIONS CONCERNING: —ARCHITECTURAL —STRUCTURAL MECHANICAL —FIRE PROTECTION _ELECTRICAL _OTHER(specify) FOR THE ABOVE NAMED PROJECT AND THAT,TO THE BEST OF MY KNOWLEDGE,SUCH PLANS,COMPUTATIONS AND SPECIFICATIONS MEET THE APPLICABLE PROVISIONS OF THE MASSACHUSETTS STATE BUILDING CODE. ALL ACCEPTABLE ENGINEERING PRACTICES AND ALL APPLICABLE LAWS FOR THE PROPOSED PROJECT. I FURTHER CERTIFY THAT I SHALL PERFORM THE NECESSARY PROFESSIONAL SERVICES AND BE PRESENT ON THE CONSTRUCTION SITE ON A REGULAR AND PERIODIC BASIS TO DETERMINE THAT THE WORK IS PROCEEDING IN ACCORDANCE WITH THE DOCUMENTS APPROVED FOR THE BUILDING PERMIT AND SHALL BE RESPONSIBLE FOR THE FOLLOWING AS SPECIFIED IN SECTION 116.2: 1. Review of shop drawings,samples and other submittals of the contractor as required by the construction contract documents as submitted for building permit,and approval for conformance to the design concept. 2. Review and approval of the quality control procedures for all code-required controlled materials. 3. Special architectural or engineering professional inspection of critical construction components requiring controlled materials or construction specified in the accepted engineering practice standards. PURSUANT TO SECTION 116.2.3,1 SHALL SUBMIT PERIODICALLY,A PRO ESS REPORT TO ETHER WITH PERTINENT COMMENTS TO THE BUILDING INSPECTOR. UPON COMPLETION OF RK, 1 S L S MI A FI REPORT AS TO THE SATISFACTORY COMPLETION AND READINESS OF THE PROJE( 0 CC P C ature SU¢SCRIBED AND SWORN TO BEFORE ME THIS _DAY OF_ C), 2008 OTARY PUBLIC MY COMMISSION EXPIRES 0 MASSACHUSETTS STATE BUILDING CODE 6'$EDITION CONSTRUCTION CONTROL AFFIDAVIT DATE: July 25,2008 PROJECT NUMBER: 7932 PROJECT TITLE: Wright Architectural Millwork Building Additions PROJECT LOCATION: 115Industrial Drive,Northampton,Massachusetts SCOPE OF PROJECT: Construction of(3)three separate additions totaling 16,969 SF,slab-on-grade,steel-framed building with exterior finishes consisting of metal wall panels and metal roof. The additions will be used for manufacturing. Site development will include a modified parking area,additional curb cut with paved access drive to an enclosed loading dock area,a storm water management system,and landscaping. PURSUANT TO SECTION 116.0 OF THE MASSACHUSETTS STATE BUILDING CODE, I, NAME FIRM ADDRESS PHONE NUMBER MASS.REGISTRATION Nc 5f BEING A REGISTERED PROFESSIONAL ENGINEER/ARCHITECT,HEREBY CERTIFY THAT I HAVE PREPARED AND DIRECTLY SUPERVISED THE PREPARATION OF ALL DESIGN PLANS,COMPUTATIONS AND SPECIFICATIONS CONCERNING: _ARCHITECTURAL —STRUCTURAL '-I ECHANICAL —FIRE PROTECTION _ELECTRICAL _OTHER(specify) FOR THE ABOVE NAMED PROJECT AND THAT,TO THE BEST OF MY KNOWLEDGE,SUCH PLANS,COMPUTATIONS AND SPECIFICATIONS MEET THE APPLICABLE PROVISIONS OF THE MASSACHUSETTS STATE BUILDING CODE. ALL ACCEPTABLE ENGINEERING PRACTICES AND ALL APPLICABLE LAWS FOR THE PROPOSED PROJECT. I FURTHER CERTIFY THAT I SHALL PERFORM THE NECESSARY PROFESSIONAL SERVICES AND BE PRESENT ON THE CONSTRUCTION SITE ON A REGULAR AND PERIODIC BASIS TO DETERMINE THAT THE WORK IS PROCEEDING IN ACCORDANCE WITH THE DOCUMENTS APPROVED FOR THE BUILDING PERMIT AND SHALL BE RESPONSIBLE FOR THE FOLLOWING AS SPECIFIED IN SECTION 116.2: 1. Review of shop drawings,samples and other submittals of the contractor as required by the construction contract documents as submitted for building permit,and approval for conformance to the design concept. 2. Review and approval of the quality control procedures for all code-required controlled materials. 3. Special architectural or engineering professional inspection of critical construction components requiring controlled materials or construction specified in the accepted engineering practice standards. PURSUANT TO SECTION 116.2.3,1 SHALL SUBMIT PERIODICALLY,A PR0,JqkESS REPORT TOG HER ITH PERTINENT COMMENTS TO THE BUILDING INSPECTOR. UPON COMPLETION OF THFWORK, I SHA L S IT LR PORT AS TO THE SATISFACTORY COMPLETION AND READINESS OF THE PROJE 0 C Y. S' re SUBSCRIBED AND SWORN TO BEFORE ME THIS 4 r DAY OF flue:' 2008 NOTARY PUBLIC MY COMMISSION EXPIRES I ��� MASSACHUSETTS STATE BUILDING CODE 6TH EDITION CONSTRUCTION CONTROL AFFIDAVIT DATE: October 10,2007 PROJECT NUMBER: 7932 PROJECT TITLE: Wright Architectural Millwork Building Additions PROJECT LOCATION: 115 Industrial Drive, Northampton,Massachusetts SCOPE OF PROJECT: Construction of(3)three separate additions totaling 16,969 SF,slab-on-grade,steel-framed building with exterior finishes consisting of metal wall panels and metal roof. The additions will be used for manufacturing. Site development will include a modified parking area,additional curb cut with paved access drive to an enclosed loading dock area,a storm water management system,and landscaping. PURSUANT TO SECTION 116.0 OF THE MASSACHUSETTS STATE BUILDING CODE, I, Robert M. Dawson III Russell & Dawson LLC NAME FIRM 330 Roberts Street, East Hartford, CT 06108 (860) 289-1100 ADDRESS PHONE NUMBER MASS. REGISTRATION NO. 22320 BEING A REGISTERED PROFESSIONAL ENGINEER/ARCHITECT, HEREBY CERTIFY THAT I HAVE PREPARED AND DIRECTLY SUPERVISED THE PREPARATION OF ALL DESIGN PLANS,COMPUTATIONS AND SPECIFICATIONS CONCERNING: _ARCHITECTURAL XX STRUCTURAL MECHANICAL _FIRE PROTECTION _ELECTRICAL _OTHER(specify) FOR THE ABOVE NAMED PROJECT AND THAT,TO THE BEST OF MY KNOWLEDGE,SUCH PLANS,COMPUTATIONS AND SPECIFICATIONS MEET THE APPLICABLE PROVISIONS OF THE MASSACHUSETTS STATE BUILDING CODE. ALL ACCEPTABLE ENGINEERING PRACTICES AND ALL APPLICABLE LAWS FOR THE PROPOSED PROJECT. I FURTHER CERTIFY THAT I SHALL PERFORM THE NECESSARY PROFESSIONAL SERVICES AND BE PRESENT ON THE CONSTRUCTION SITE ON A REGULAR AND PERIODIC BASIS TO DETERMINE THAT THE WORK IS PROCEEDING IN ACCORDANCE WITH THE DOCUMENTS APPROVED FOR THE BUILDING PERMIT AND SHALL BE RESPONSIBLE FOR THE FOLLOWING AS SPECIFIED IN SECTION 116.2: 1. Review of shop drawings, samples and other submittals of the contractor as required by the construction contract documents as submitted for building permit,and approval for conformance to the design concept. 2. Review and approval of the quality control procedures for all code-required controlled materials. 3. Special architectural or engineering professional inspection of critical construction components requiring controlled materials or construction specified in the accepted engineering practice standards. PURSUANT TO SECTION 116.2.3, 1 SHALL SUBMIT PERIODICALLY,A PROGRES ORT TOGET WITH PERTINENT COMMENTS TO THE BUILDING INSPECTOR. UPON COMPLETION OF THE W K, S ALL S BM T A FINAL R THE SATISFACTORY COMPLETION AND READINESS OF THE PROJECT FO;'O NCY Signature U DAWSON,ITI y SUB,�CRIBED AN TO BEFORE ME THIS Ac�sTE��°� � �fOF i��� _� 2007 � � ro►sA► ���,r NOTARY PUBLIC MY COMMISSION EXPIRES. 4 MASSACHUSETTS STATE BUILDING CODE 6TH EDITION CONSTRUCTION CONTROL AFFIDAVIT DATE: October 10,2007 PROJECT NUMBER: 7932 PROJECT TITLE: Wright Architectural Millwork Building Additions PROJECT LOCATION: 115 Industrial Drive, Northampton, Massachusetts SCOPE OF PROJECT: Construction of(3)three separate additions totaling 16,969 SF,slab-on-grade,steel-framed building with exterior finishes consisting of metal wall panels and metal roof. The additions will be used for manufacturing. Site development will include a modified parking area,additional curb cut with paved access drive to an enclosed loading dock area,a storm water management system,and landscaping. PURSUANT TO SECTION 116.0 OF THE MASSACHUSETTS STATE BUILDING CODE, I, Robert M. Dawson III Russell & Dawson LLC NAME FIRM 330 Roberts Street, East Hartford, CT 06108 (860) 289-1100 ADDRESS PHONE NUMBER MASS. REGISTRATION NO. 22-M BEING A REGISTERED PROFESSIONAL ENGINEER/ARCHITECT,HEREBY CERTIFY THAT I HAVE PREPARED AND DIRECTLY SUPERVISED THE PREPARATION OF ALL DESIGN PLANS,COMPUTATIONS AND SPECIFICATIONS CONCERNING: _ARCHITECTURAL XX STRUCTURAL MECHANICAL —FIRE PROTECTION _ELECTRICAL _OTHER(specify) FOR THE ABOVE NAMED PROJECT AND THAT,TO THE BEST OF MY KNOWLEDGE,SUCH PLANS,COMPUTATIONS AND SPECIFICATIONS MLET THE APPLICABLE PROVISIONS OF THE MASSACHUSETTS STATE BUILDING CODE. ALL ACCEPTABLE ENGINEERING PRACTICES AND ALL APPLICABLE LAWS FOR THE PROPOSED PROJECT. I FURTHER CERTIFY T'-iAT I SHALL PERFORM THE NECESSARY PROFESSIONAL SERVICES AND BE PRESENT ON THE CONSTRUCTION SITE ON A REGULAR AND PERIODIC BASIS TO DETERMINE THAT THE WORK IS PROCEEDING IN ACCORDANCE WITH THE DOCUMENTS APPROVED FOR THE BUILDING PERMIT AND SHALL BE RESPONSIBLE FOR THE FOLLOWING AS SPECIFIED IN SECTION 116.2: 1. Review of shop drawings,samples and other submittals of the contractor as required by the construction contract documents as submitted for building permit,and approval for conformance to the design concept. 2. Review and approval of the quality control procedures for all code-required controlled materials. 3. Special architectural or engineering professional inspection of critical construction components requiring controlled materials or construction specified in the accepted engineering practice standards. PURSUANT TO SECTION 116.2.3, 1 SHALL SUBMIT PERIODICALLY,A PROG REPORT TOG HER WITH PERTINENT COMMENTS TO THE BUILDING INSPECTOR. UPON COMPLETION OF TH O K, SHALL SU M A FINAL REPORT AS TO THE SATISFACTORY COMPLETION AND READINESS OF THE PROJECT OIL C PA Y. i' ignature h1. o DAWSON, III ` SU RIBED AND- TO BEFORE ME THIS / J No.22320 d �d I DAY OF 2007sT���\{ , r }`�cOMkI �. NOTARY PUBLIC MY COMMISSION EXPIRES 7��i�o MASSACHUSETTS STATE BUILDING CODE 6TH EDITION CONSTRUCTION CONTROL AFFIDAVIT DATE: July 25,2008 PROJECT NUMBER: 7932 PROJECT TITLE: Wright Architectural Millwork Building Additions PROJECT LOCATION: 115 Industrial Drive, Northampton,Massachusetts SCOPE OF PROJECT: Construction of(3)three separate additions totaling 16,969 SF,slab-on-grade,steel-framed building with exterior finishes consisting of metal wall panels and metal roof. The additions will be used for manufacturing. Site development will include a modified parking area,additional curb cut with paved access drive to an enclosed loading dock area,a storm water management system,and landscaping. PURSUANT TO SECTION 116.0 OF THE MASSACHUSETTS STATE BUILDING CODE, I, Douglas P.Mattoon Associated Builders,Inc. NAME FIRM 4 Industrial Drive,South Hadley,MA 01075 1.413.536.0021 ADDRESS PHONE NUMBER MASS. REGISTRATION NO.30880 334847_BEING A REGISTERED PROFESSIONAL ENGINEER/ARCHITECT,HEREBY CERTIFY THAT 1 HAVE PREPARED AND DIRECTLY SUPERVISED THE PREPARATION OF ALL DESIGN PLANS,COMPUTATIONS AND SPECIFICATIONS CONCERNING: X ARCHITECTURAL _STRUCTURAL _MECHANICAL _FIRE PROTECTION _ELECTRICAL _OTHER(specify) FOR THE ABOVE NAMED PROJECT AND THAT,TO THE BEST OF MY KNOWLEDGE,SUCH PLANS,COMPUTATIONS AND SPECIFICATIONS MEET THE APPLICABLE PROVISIONS OF THE MASSACHUSETTS STATE BUILDING CODE. ALL ACCEPTABLE ENGINEERING PRACTICES AND ALL APPLICABLE LAWS FOR THE PROPOSED PROJECT. I FURTHER CERTIFY THAT I SHALL PERFORM THE NECESSARY PROFESSIONAL SERVICES AND BE PRESENT ON THE CONSTRUCTION SITE ON A REGULAR AND PERIODIC BASIS TO DETERMINE THAT THE WORK IS PROCEEDING IN ACCORDANCE WITH THE DOCUMENTS APPROVED FOR THE BUILDING PERMIT AND SHALL BE RESPONSIBLE FOR THE FOLLOWING AS SPECIFIED IN SECTION 116.2: 1. Review of shop drawings,samples and other submittals of the contractor as required by the construction contract documents as submitted for building permit,and approval for conformance to the design concept. 2. Review and approval of the quality control procedures for all code-required controlled materials. 3. Special architectural or engineering professional inspection of critical construction components requiring controlled materials or construction specified in the accepted engineering practice standards. PURSUANT TO SECTION 116.2.3, 1 SHALL SUBMIT PERIODICALLY,A PROGRESS REPORT TOGETHER WITH PERTINENT COMMENTS TO THE BUILDING INSPECTOR. UPON COMPLETION OF THE WORK, I SHALL SUBMIT A FINAL REPORT AS TO THE SATISFACTORY COMPLETION AND READINESS OF THE PROJECT FOR OCCUPANCY. � Z74e Signature SUBSCRIBED AND SWORN TO BEFORE ME THIS ```�aa+tu�uk++Wi,,�� wi_t' DAY OF Aucsa.S 2007 �� .,P,•AN/lp --� , QP•S\o ,es ,•� ,,s � Q' NOTARY PUBLIC: a roll MY COMMISSION EXPIRES } � ® V Zi�T'f Y P ?'�• .C�c . R U . V t Climate-Specific Requirements Gross Area or Cavity Cont. Proposed Budget Component Name/Description Perimeter R-Value R-Value U-Factor U-Factor Roof BLDG A: Metal Roof without Thermal Blocks 2680 19.0 19.0 0.035 0.056 Roof BLLG B: Metal Roof with Thermal Blocks 10168 19.0 19.0 0.030 0.056 Roof BLDG C: Metal Roof with Thermal Blocks 4240 19.0 19.0 0.030 0.056 Exterior Wall BLDG A: Metal Wall without Thermal Blocks 1834 11.0 11.0 0.054 0.079 Exterior Wall BLDG B: Metal Wall without Thermal Blocks 5408 11.0 11.0 0.054 0.079 4 Windows: Metal Frame with Thermal Break:Double Pane Clear, SHGC 0.74(b) 72 — — 0.490 0.547 Door BLDG B: Overhead 280 — -- 0.075 0.127 PASS DoorS BLDG B: Solid 42 — — 0.067 0.127 Exterior Wall BLDG C: Metal Wall without Thermal Blocks 4349 11.0 11.0 0.054 0.079 Door BLDG C: Overhead 336 — — 0.075 0.127 PASS Door BLDG C: Solid 42 — — 0.067 0.127 Floor BLDG C: Slab-On-Grade:Unheated, Depth 4 C(c) 234 — 5.0 — — Floor BLDG B: Slab-On-Grade:Unheated, Depth 4 1.(c) 300 — 5.0 — -- Floor BLDG A: Slab-On-Grade:Unheated, Depth 4 8.(c) 122 — 5.0 — — (a)Budget U-factors are used for software baseline calculations ONLY,and are not code requirements. (b)Claimed performance does not exceed defaults in Tables 1301.9.3.1.No manufacturer certification required. (c)Certain building use types require continuous under-slab insulation(see Massachusetts Code Section 1304.2.7 and 1304.2.8). FnveIope PASSES: Design 27%better than code Section 4: Compliance Statement The proposed envelope design represented in this document is consistent with the building plans, specifications and other calculations submitted with this permit application. The proposed envelope system has been designed to meet the Massachusetts Commercial Code requirements in COMcheck-EZ Version 3.0 Release 2b and to comply with the mandatory requirements in the Requirements Checklist. 606 ;%l-s U Z;,71 ,- 6- 8 -d �3 Principal Envelope Designer Name Signature Date Permit Number Envelope Compliance Certificate Checked By/Date Massachusetts Commercial Code COMcheck-EZ So$ware Version 3.0 Release 2b Data filename: PA7932 WRIGHT ARCHITECTURAL\permits\Building\7932 ENERGY CODE.cck Section 1: Project Information Project Name: WRIGHT ARCHITECTURAL MILLWORK Designer/Contractor. ASSOCIATED BUILDERS Document Author: BOB FRASCO Section 2: General Information Building Location(for weather data): Northampton, Massachusetts Climate Zone: 14a Heating Degree Days (base 65 degrees F): 6894 Cooling Degree Days (base 65 degrees F): 507 Project Type: New Construction Window/Wall Ratio: 0.01 Building Type Floor Area Manufacturing 16969 Section 3: Requirements Checklist Bldg. Dept. Use Air Leakage, Component Certification, and Vapor Retarder Requirements [ ] 1. All joints and penetrations are caulked, gasketed, weather-stripped, or otherwise sealed. [ ] 2. Windows, doors, and skylights certified as meeting leakage requirements. [ ] 3. Component R-values &U-factors labeled as certified. THE INSURANCE COMPANY OF THE STATE OF PENNSYLVANIA 69194-0000 WC 940-74-53 13889 --------------------------------------------- 013-82-1107-00 N• IA ► Obis] ASSOCIATED BUILDERS, INC. P 4 -INDUSTRIAL DR. 01M Member Companies of SOUTH HADLEY, MA 01075-0000 American International Group EXECUTIVE OFFICES: 70 PINE STREET, NEW YORK, N.Y. 10270 SEE NAME AND ADDRESS SCHEDULE - WC990610 I.D# MA UI#: .. , . .. TPA INSURANCE AGENCY, INC. WORKERS COMPENSATION AND EMPLOYERS 10 NEW ENGLAND BUS CTR DR LIABILITY POLICY INFORMATION PAGE ANDOVER, MA 01810-1096 INSURED IS PREVIOUS POLICY NUMBER CORPORATION I NEW OTHER WORKPLACES NOT SHOWN ABOVE:SEE NAME AND ADDRESS SCHEDULE - WC99061 0 ITEM 2 POLICY PERIOD 12:01 A.M.standard time at the insured's mailing address FROM 11/01/07 TO 11/01/08 ITEM 3 A. Workers Compensation Insurance: Part One of the policy applies to the Workers Compensation Law of the states listed here: MA B. Employers Liability Insurance: Part Two of the policy applies to the work in each state listed in item 3:A. - The limits of our liability under Part Two are: Bodily injury by Accident $ 500,000 each accident Bodily Injury by Disease $ 500,000 policy limit Bodily Injury by Disease $ 500.000 each employee C. Other States Insurance: Part Three of the policy applies to the states, if any, listed here: AK AL AR AZ CO CT DC DE FL GA HI IA ID IL IN KS KY LA MD ME MI MN MO MS. MT NC NE NH NJ NM NV NY OK OR PA RI SC SD TN TX UT VA VT WI ITEM The premium for this policy will be determined by our Manuals of Rules, Classifications, Rates and Rating Plans. All information required below is subject to verification and change by audit. Estimated Total Rate Per Estimated Classifications Code Number Remuneration ;100 OF Re- Premium Annual❑3 Year muneration ER Annual ❑3 Year SEE EXTENSION OF INFORMATION PAGE - WC7754 TAXES/ASSESSMENTS/SURCHARGES $2,307 EXPENSE CONSTANT(EXCEPT WHERE APPLICABLE BY STATE) $318 MA MINIMUM PREMIUM $500 MA TOTAL ESTIMATED PREMIUM $51 ,266 If indicated below,interim adjustments of premium shall be made: Semi-Annually 1:1 Quarterly Monthly DEPOSIT PREMIUM ENDORSEMENTS(FORM NUMBER) SEE ATTACHED FORM SCHEDULE - WC990612 11 /26/07 PARSIPPANY 82 Issue Date Issuing Office Authorized Representiaive WC 00 00 01 39967 The Commonwealth of Massachusetts Department of Industrial Accidents Office of Investigations E 600 Washington Street Boston, MA 02111 www.mass.gov/dia Workers' Compensation Insurance Affidavit: Builders/Contractors/Electricians/Plumbers Applicant Information Please Print Lelzibly Name (Business/Organization/Individual): Associated Builders, Inc. Address: 4 Industrial Drive City/State/Zip: south Hadley, MA 01075 Phone #: 413.536.0021 Are you an employer? Check the appropriate box: Type of project(required): 1.0 I am a employer with 3 0 4. F] I am a general contractor and I 6. []New construction employees(full and/or part-time).* have hired the sub-contractors 2.❑ I am a sole proprietor or partner- listed on the attached sheet. 7. E] Remodeling ship and have no employees These sub-contractors have g_ Demolition working or me in an capacity. employees and have workers' g Y P h'• 9. []x Building addition [No workers' comp.insurance comp. insurance.+ required.] 5. [:] We are a corporation and its 10.❑Electrical repairs or additions 3.❑ I am a homeowner doing all work officers have exercised their 11.❑Plumbing repairs or additions myself. [No workers' comp. right of exemption per MGL 12.❑ Roof repairs insurance required.] t c. 152, §1(4),and we have no employees. [No workers' 13.❑ Other comp. insurance required.] *Any applicant that checks box 41 must also fill out the section below showing their workers'compensation policy information. Homeowners who submit this affidavit indicating they are doing all work and then hire outside contractors must submit a new affidavit indicating such. *Contractors that check this box must attached an additional sheet showing the name of the sub-contractors and state whether or not those entities have employees. If the sub-contractors have employees,they must provide their workers'comp.policy number. I am an employer that is providing workers'compensation insurance for my emplovees. Below is the policy and job site information. Insurance Company Name: The Insurance Company of the State of Pennsylvania 13889 Policy#or Self-ins. Lie.#: WC 940-74-53 Expiration Date: 11/01/08 Job Site Address: 115 Industrial Drive City/State/Zip:Northampton/MA/01060 Attach a copy of the workers'compensation policy declaration page(showing the policy number and expiration date). Failure to secure coverage as required under Section 25A of MGL c. 152 can lead to the imposition of criminal penalties of a fine up to$1,500.00 and/or one-year imprisonment, as well as civil penalties in the form of a STOP WORK ORDER and a fine of up to$250.00 a day against the violator. Be advised that a copy of this statement may be forwarded to the Office of Investigations of the DIA for insurance coverage verification. I do hereby certify under the pain of pe5f'Kiiy'that the info ation provided above is trite and correct. Signature ` w` Date: 8-8-08 Phone 9: 413.536.0021 Official use only. Do not write in this area,to be completed by city,or town official City or Town: Permit/License# Issuing Authority(circle one): 1.Board of Health 2.Building Department 3. City/Town Clerk 4.Electrical Inspector 5.Plumbing Inspector 6.Other Contact Person: Phone#: v4 Tt,R a QLiI IT i< to } Versionl.7 Commercial Building Pennit May 15,2000 SECTION 10-STRUCTURAL PEER REVIEW(780 CMR 110.11) Independent Structural Engineering Structural Peer Review Required Yes 0 No SECTION 11-OWNER AUTHORIZATION-TO BE COMPLETED WHEN OWNERS AGENT OR CONTRACTOR APPLIES FOR BUILDING PERMIT Walter K Price as Owner of the subject property =Associated Builders,Inc. hereby authorize _. on my behalf, in all matt rs rel a to work authorized by this building permit application. ✓'L_ c_ Signature of Owner Date 'Michael J.Ciolek,Jr., President,Associated Builders, Inc. as Owner/Authorized _, Agent hereby declare that the statements and information on the foregoing application are true and accurate,to the best of my knowledge and belief. Signed under the_pains and penalties of ertur�r _____. Michael J. Ciolek,Jr.,P sident Print Name f Signatu er ent Date SECTION 12-CONSTRUCTION SERVICES 10.1 Licensed Construction Suaervisor: Not Applicable ❑ Name of License Holder:?Mark Oparowskt _ =CS 0_85210 License Number !Associated Builders,Inc.,4 Industrial Drive, South Hadley,MA 01075 X08/07/2009 Address Expiration Date wA `(413) 536-0021^ m Signature Telephone SECTION 13-WORKERS'COMPENSATION INSURANCE AFFIDAVIT(M.G.L.c.152,§25C(6)) Workers Compensation Insurance affidavit must be completed and submitted with this application.Failure to provide this affidavit will result in the denial of the issuance of the building permit. Signed Affidavit Attached Yes No 0 a Versionl.7 Commercial Building Permit May 15,2000 SECTION 9-PROFESSIONAL DESIGN AND CONSTRUCTION SERVICES-FOR BUILDINGS AND STRUCTURES SUBJECT TO CONSTRUCTION CONTROL PURSUANT TO 780 CMR 116(CONTAINING MORE THAN 35,000 C.F.OF ENCLOSED SPACE) 9.1 Registered Architect: Not Applicable ❑ Douglas P. Mattoon, AIA _. Name Registrant ,30880 334847 11-111,_ �._ ... .... ..__w_ ;Associated Builders,Inc.,4 Industrial Drive, South Hadley,MA 01075 ` Registration Number _.._ ..__ ... _...._. _ m.__.. ._.. ...._ __....__._.__. _ w_._._...... __. _. ._.... .... . .._.:__ ._._ ... ..— ...__. _.. 108/31/2009 Address _.. M....., ... ._.__ . _._.. See attached affidavit 1413) 536-0021 Expiration Date Signature Telephone 9.2 Registered Professional Engineer(s): ;Robert M. Dawson III,P E Structural Name _ Area of Responsibility ,Russell&Dawson, LL_C, 330 Roberts St.,East Hartford,CT 06108 I X22320 _ Address- Registration Number See attached affidavit L(860)289-1100 [06/30/2010 Signature Telephone Expiration Date Robert Griffiths,P E Mechanical Name Area of Responsibility Robert W Hal),Inc, 540 Meadow Street Ext ,Agawam,MA 01001 _ 33161 Address _ Registration Number See attached affidavits) (413) 789-0960 1 [06/30/2009 9 Signature Telephone Expiration Date °David P Krause 'Fire Protection Name Area of Responsibility 342 Britton Street,Chicopee,MA 01020 _.._ v ._..._ . ..m. ...... ._._._.. 6233 Address Registration Number See attached affidavit '(413) 536_9222 , 11/23/2009 Signature Telephone Expiration Date Name Area of Responsibility Address Registration Number .. . .,..] Signature Telephone Expiration Date 9.3 General Contractor Associated Builders,Inc. _ Not Applicable ❑ Company Name: Michael J Ciolek, Jr Responsible In Charge of Construction 14 Industrial TDrive, Sou adley,MA 01075 Address ` (413) 536-0021 Signatu Telephone r Versionl.7 Commercial Building Permit May 15,2000 8. NORTHAMPTON ZONING Existing Proposed Required by Zoning This column to be filled in by Building Department Lot Size Frontage 242' . _...._._ ........... ... .. =242' ...._ . ..___w_. .. _.___x _._ _....._. Setbacks Front Side L:45.,._.._( R:'6 . L L2 R.`40' _ Rear 48 38'.. I Building Height l.s' 2 '( O S ..J Bldg. Square Footage 9i3" % 33 1 _, 17.6 3609E �__�� ______ Open Space Footage % (Lot area minus bldg&paved parking) 35V, r46.._ #of Parking Spaces -------�-� Fill: _ volume&Location --/ I A. Has a Special Permit/Variance/Finding ever been issued for/on the site? NO 0 DONT KNOW e YES Q IF YES, date issued: IF YES: Was the permit recorded at the Registry of Deeds? NO 0 DONT KNOW (F) YES 0 IF YES: enter Book Page' and/or Document#_ B. Does the site contain a brook, body of water or wetlands? NO Q DONT KNOW 0 YES IF YES, has a permit been or need to be obtained from the Conservation Commission? Needs to be obtained Obtained , bate Issued: 09/20/2005 C. Do any signs exist on the property? YES NO IF YES, describe size, type and location 14'x8'+/-wood sign in landscaped area at site entrance D. Are there any proposed changes to or additions of signs intended for the property? YES 0 NO IF YES, describe size, type and location; E. Will the construction activity disturb(clearing,grading,excavation,or filling)over 1 acre or is it part of a common plan that will disturb over 1 acre? YES G) NO Q IF YES,then a Northampton Storm Water Management Permit from the DPW is required. Versionl.7 Commercial Building Permit May 15,2000 SECTION 4-CONSTRUCTION SERVICES FOR PROJECTS LESS THAN 35,000 CUBIC FEET OF ENCLOSED SPACE Interior Alterations ❑ Existing Wall Signs ❑ Demolition❑ Repairs❑ Additions ❑ Accessory Building❑ Exterior Alteration ❑ Existing Ground Sign❑ New Signs❑ Roofing❑ Change of Use❑ Other 0 Brief Description Of Proposed Work: SECTION 5-USE GROUP AND CONSTRUCTION TYPE USE GROUP(Check as applicable) CONSTRUCTION TYPE A Assembly ❑ A-1 ❑ A-2 ❑ A-3 ❑ 1A [] A-4 ❑ A-5 ❑ 113 ❑ B Business ❑✓ 2A 0 E Educational ❑ 26 I ❑ F Factory F-1 F-2 ❑ 2C ID H High Hazard ❑ 3A ❑ I Institutional ❑ 1-1 ❑ 1-2 ❑ 1-3 ❑ 313 ❑ M Mercantile ❑ 4 ❑ R Residential ❑ R-1 ❑ R-2 ❑ R-3 ❑ 5A ❑ S Storage ❑✓ S-1 S-2 ❑ 513 ❑ U Utility E3 Specify:; M Mixed Use ❑ Specify S Special Use El Specify: a COMPLETE THIS SECTION IF EXISTING BUILDING UNDERGOING RENOVATIONS,ADDITIONS AND/OR CHANGE IN USE Existing Use Group. Business and Factory - a_ Proposed Use Group. `Business, Facto,& Storage Existing Hazard Index 780 CMR 34):i2 and 3,__..__ Proposed Hazard Index 780 CMR 34) 2 and 3 n SECTION 6 BUILDING HEIGHT AND AREA BUILDING AREA EXISTING PROPOSED NEW CONSTRUCTION OFFICE USE ONLY Floor Area per Floor(sf) 1 st , 1 si _....._. __. ... _. ... 19 130; _._ 169 nd 2 I 0 ......_.._._ .....__._..,_„_ ,_,__..._..,......... rd 3rd ` 01 th 4m 0 0 Total Area(sf) 19 130 Total Proposed New Construction(sfJ _ 16,969,1 Total Height(ft) 18 Total Height ft 7.Water Supply(M.G.L.c.40,§54) 7.1 Flood Zone Information: 7.3 Sewage Disposal System: Public Private ❑ Zone Outside Flood ZoneE] Municipal [Z] On site disposal system❑ Versionl.7 Commercial Building Permit May 15,2000 parfinent use only City of Northamptontat4ts Building Department 212 Main Street S� alt�btla a �� y� Room 100 Northampton, MA 01060 oral zrr sS � phone 413-587-1240 Fax 413-587-1272 APPLICATION TO CONSTRUCT,REPAIR,RENOVATE,CHANGE THE USE OR OCCUPANCY OF,OR DEMOLISH ANY BUILDING OTHER THAN A ONE OR TWO FAMILY DWELLING SECTION 1-SITE INFORMATION 1.1 Property Address: This section to be completed by office `115 Industrial Drive Map Lot= unite (Northampton, MA 01060 ` Overlay District Elm st�bistrict CB District' SECTION 2 PROPERTY OWNERSHIP/AUTHORIZED AGENT 2.1 Owner of Record: 1WAM,L.L.C. 115 Industrial Drive,Northampton,MA 01060 Name(Print) Current Mailing Address: 413 586-3528 Signature�--t— Telephone 2.2 Authorized Agent: Walter K Price 1-1-5 Industrial Drive Northam 1?ton, .MA -0-10-- 1060 Name(Print) Current Mailing Address (413) 586-3528 signature 1_ Telephone SECTION 3-ESTIMATED CONSTRUCTION COSTS Item Estimated Cost(Dollars)to be Official Use Only com leted by ermit applicant 1. Building } (a)Building Permit Fee $517,453-0'0< 2. Electrical $51,425.001 (b)Estimated Total Cost of I Construction from 6r_ _.__...._._____..�._i 3. Plumbing Building Permit Fee $25,500.001 4. Mechanical(HVAC) 5. Fire Protection $78,060.00' 6. Total=(1 +2+3+4+5) $672,438 Check Number This Section For Official Use Only Building Permit Number Date Issued Signature: Building Commissioner/Inspector of Buildings Date • r 1 4 ASSOCIATED BUILDERS, INC. 4 INDUSTRIAL DRIVE•SOUTH HADLEY,MA 01075•(413)536-0021 FAX(413)536.0908 August 29, 2008 Anthony Patillo,Building Commissioner City of Northampton Building Department 212 Main Street Northampton,Massachusetts 01060 RE: Wright Architectural Millwork — Building Permit Application 115 Industrial Drive,Northampton,MA 01060 Dear Mr.Patillo, On behalf of Wright Architectural Millwork.,Associated Builders,Inc.is pleased to submit a permit application for building additions and interior renovation work proposed at their existing facility located at 115 Industrial Drive in Northampton,Massachusetts. This submission includes(1)original and(2) copies of the following documents: • City of Northampton Application to construct,repair,renovate,change the use of or demolish any building other than a one or two family dwelling. • Renovation Permit Fee of$8,646.50 (16,969 S.F. additions x$.50 plus$162 for$27,000 of interior structural alterations @$6.00/1000) • Workers' Compensation Insurance Affidavit&Policy • Envelop Compliance Certificate • Construction Control Affidavits • Fire Sprinkler Narrative Report prepared by Warehouse Mechanical Contractors,Inc., dated October 24,2007. • Hydraulic Design Information Sheets for Remote Area 1 and Area 2 prepared by Warehouse Mechanical Contractors,Inc. dated 10/23/07. • Copy of Planning Board Decision that was recorded at registry of deeds with receipt of filing. • Copy of Storm Water Management Permit Application Decision dated 12-13-07 • Copy of the Order of Conditions(Conservation Commission Decision) • Plans Issued for Building Permit and Construction on 08-25-08 as specified on the attached Plan List. We are available at your convenience to review the plans and supporting documents. We look forward to working with the Building Department to ensure that work is performed in compliance with the Massachusetts Building Code and the requirements of the City of Northampton. Sincerely, Douglas P. attoon,AIA,NCARB Senior Architect cc: Walt Price.WAM Project File